Anda di halaman 1dari 31

GAMBAR KERJA

House of Maumere

KEGIATAN

PEMBANGUNAN HOUSE OF MAUMERE

LOKASI
DAERAH ISTIMEWA YOGYAKARTA

TAHUN 2020
DAFTAR ISI GAMBAR KERJA
HAL NAMA GAMBAR SKALA HAL NAMA GAMBAR SKALA
BANGUNAN 1 BANGUNAN 2
ARSITEKTURAL ARSITEKTURAL
1. DENAH 1 : 150 23. RENCANA KOSEN PINTU JENDELA 1 : 50
2. TAMPAK DEPAN DAN KANAN 1 : 150 24. DETIL KUSEN 1 1 : 25
3. POTONGAN A-A 1 : 150 25. RENCANA POLA LANTAI 1 : 50
4. POTONGAN B-B 1 : 150 26. RENCANA SANITASI 1 : 50
5. RENCANA KOSEN PINTU JENDELA 1 : 150 27. RENCANA ELEKTRIKAL 1 : 50
6. DETIL KUSEN 1 1 : 25
7. DETIL KUSEN 2 1 : 25
8. DETIL KUSEN 3 1 : 25
9. DETIL KUSEN 4 1 : 25
10. RENCANA POLA LANTAI 1 : 150
11. RENCANA SANITASI 1 : 150
12. DETIL SEPTIC TANK 1 : 25
13. DETIL SUMUR RESAPAN 1 : 25
14. DETIL RESAPAN AIR HUJAN 1 : 25
15. DETIL BAK KONTROL 1 : 25
16. RENCANA ELEKTRIKAL 1 : 150
STRUKTURAL
17. RENCANA PONDASI DAN KOLOM 1 : 150
18. DETIL FOOTPLAT 1 : 15
19. DETIL KOLOM 1 : 15
20. RENCANA SLOOF 1 : 150
21. DETIL SLOOF 1 : 15
22. DETIL BAJA 1 : 30
BLOK BANGUNAN 1
DENAH
SKALA 1:150
House of Maumere

TAMPAK DEPAN
SKALA 1:150

TAMPAK SAMPING KANAN


SKALA 1:150
ORNAMEN GALVALUM DENGAN LAMBANG
DAN TULISAN,
RANGKA BESI HOLLOW 4cm REGEL WF 150.75.5.7 PENUTUP ATAP GALVALUM DILAPIS
JARING-JARING (PEREDAM SUARA HUJAN)
+5.00
TREKSTANG D12

+3.40

MT
-0.40

-2.15

POTONGAN A-A
SKALA 1:150
ORNAMEN GALVALUM DENGAN LAMBANG
DAN TULISAN,
+5.00 GORDING CNP 150.65.20.3,2 RANGKA BESI HOLLOW 4cm
RAFTER WF 200.100.5,5.8 SLING TARIK
KONSOL WF 150.75.5.7

+3.40

LISPLANK KAYU
REGEL WF 150.75.5.7
REGEL WF 150.75.5.7
KOLOM WF 200.100.5.7

DINDING PARTISI RANGKA BAJA RINGAN


FINISHING GRC BOARD 9mm CAT
PAS.DINDING 1/2 BATA

MT
-0.40

-2.15

POTONGAN B-B
SKALA 1:100
RENCANA KUSEN
SKALA 1:150
POTONGAN B-B

POTONGAN A-A POTONGAN A-A

DETAIL KUSEN
SKALA 1:30
POTONGAN A-A POTONGAN A-A

DETAIL KUSEN
SKALA 1:30
POTONGAN A-A POTONGAN A-A

DETAIL KUSEN
SKALA 1:30
POTONGAN A-A POTONGAN A-A

DETAIL KUSEN
SKALA 1:30
RENCANA POLA LANTAI
SKALA 1:150
P

RENCANA SANITASI
SKALA 1:150
DETAIL SEPTIC TANK
SKALA 1:25
DETAIL SUMUR RESAPAN
SKALA 1:25
DETAIL RESAPAN AIR HUJAN
SKALA 1:25
POTONGAN B-B POTONGAN A-A
Skala 1 : 20 Skala 1 : 20

A
B B

A
DETAIL PENUTUP
TAMPAK ATAS Skala 1 : 20
Skala 1 : 20

DETAIL BAK KONTROL


SKALA 1:25
RENCANA ELEKTRIKAL
SKALA 1:150
RENCANA PONDASI DAN KOLOM
SKALA 1:150
SENGKANG 8 - 15
A A

SENGKANG 8-10

TAMPAK ATAS
WORK FLOOR (LANTAI KERJA)

POT. A-A

DETIL FOOTPLAT
SKALA 1:15
TYPE KOLOM K1 (30 X 30)
POSISI TUMPUAN LAPANGAN TUMPUAN

30

30

30
POTONGAN

30 30 30

TULANGAN 8 D16 8 D16 8 D16


SENGKANG
BETON DECKING 40 MM 40 MM 40 MM

TYPE KOLOM KP (15 X 15)


POSISI TUMPUAN LAPANGAN TUMPUAN

15

15

15
POTONGAN

15 15 15
WORK

TULANGAN 4 D12 4 D12 4 D12


SENGKANG
BETON DECKING 40 MM 40 MM 40 MM

DETIL KOLOM
SKALA 1:15
RENCANA SLOOF
SKALA 1:150
TYPE SLOOF S1 (15 X 20)
POSISI TUMPUAN LAPANGAN TUMPUAN

POTONGAN

TULANGAN ATAS 2D12 2D12 2D12


TULANGAN PINGGANG - - -
TULANGAN BAWAH 2D12 2D12 2D12
SENGKANG
BETON DECKING 40 MM 40 MM 40 MM

DETIL SLOOF
SKALA 1:15
ORNAMEN GALVALUM DENGAN LAMBANG
DAN TULISAN,
GORDING CNP 150.65.20.3,2 RANGKA BESI HOLLOW 4cm

RAFTER WF 200.100.5,5.8

SLING TARIK

LISPLANK KAYU
DINDING PARTISI RANGKA BAJA RINGAN
REGEL WF 150.75.5.7 FINISHING GRC BOARD 9mm CAT
KOLOM WF 200.100.5.7

PAS.DINDING 1/2 BATA

SENGKANG 8 - 15 KONSOL WF 150.75.5.7

SENGKANG 8-10

WORK FLOOR (LANTAI KERJA)

DETIL BAJA
SKALA 1:30
BLOK BANGUNAN 2
RENCANA KUSEN
SKALA 1:50
POTONGAN B-B POTONGAN B-B

POTONGAN A-A POTONGAN A-A

DETAIL KUSEN
SKALA 1:25
RENCANA POLA LANTAI
SKALA 1:50
RENCANA SANITASI
SKALA 1:50
RENCANA ELEKTRIKAL
SKALA 1:50

Anda mungkin juga menyukai