Gal Pondasi 7
pjg 44.02
tgg 1.30
lbr 0.80
vol 45.78 m3 8
Pondasi
pjg 44.02
tgg 1.20 9
lbr atas 0.30
lbr bwh 0.70
vol 26.41 m3
10
Sloof 0.15 0.20
panjang 44.02
beton 1.32 m3
bekisting 35.64 m2
199.89 m2
vol 365.94 m2
vol 65.11 m2
List Gypsum C7
Dalam 40.50 m'
KM 5.40 m'
Luar (tritisan datar) 17.19 m'
75.17 m2
PEKERJAAN VOLUME SATUAN HARGA SATUAN
Jumlah
dibulatkan
57.76
JUMLAH KETERANGAN
815,377.88
2,059,902.00
238,033.12
9,405,000.00
1,035,628.94
2,530,582.00
1,005,994.00
1,111,745.25
3,452,003.00
1,265,591.25
2,099,410.32
4,604,093.00
2,222,332.20
140,402.16
356,922.00
325,287.00
263,801.27
535,383.00
254,221.34
18,531,423.75
1,076,932.50
11,417,328.00 Camp 1PC : 10 Psr
5,159,754.00 Camp 1PC :5 Mill
4,120,320.00 Maxilite / setara
2,936,010.00 Cat Genteng
6,185,450.00 Gypsum board Knauf rangka hollow galvais
946,350.00 List Gypsum C7
8,268,700.00
4,886,050.00 Motif Pasir tebal 0.25 mm,
700,000.00
1,000,000.00 Lampu Downlight LED Panel 12W Putih 12 W Watt 12Watt Tipis Bulat Inbow
6,000,000.00 RM lampu / RM 2x20 / RM LED T8 led
900,000.00 Stopkontak Broco Inbow / tanam Cream
130,000.00 saklar tunggal broco
260,000.00 saklar dobel broco
250,000.00 5 A,kotak Presto
486,000.00 Rucika Wavin
1,080,000.00 Rucika Wavin
1,080,000.00 Rucika Wavin
900,000.00 Buis 80 cm
900,000.00 Buis 80 cm
4,650,000.00 Suntik 3"
7,250,000.00 300 ltr Pinguin,Rangka Baja Siku
1,150,000.00 Shimizu
2,500,000.00
2,500,000.00
1,250,000.00
250,000.00 PVC Polos
4,250,000.00
500,000.00
472,800.00 40x40
6,501,000.00 40x40
472,800.00 40x40
289,000.00 20x20
1,776,000.00 20x25
2,680,560.00 t= 10 cm
205,800.00
169,007,007.16
169,000,000.00
2,925,900.28
(24,607,007.16)
144,400,000.00
RENCANA ANGGARAN BIAYA
Proyek : Pembangunan Rumah
Lokasi : Bugisan