RAB
KEGIATAN PEMBANGUNAN SALURAN TESIER 402 M
2 3 4
A. BAHAN
91,873,300
1,897,000
32,199,000
125,969,300
3,779,079
2,519,386
2,519,386
8,817,851.00
134,787,151