JUMLAH
No. Tgl. KODE REKENING URAIAN PENERIMAAN PENGELUARAN NO BUKTI PENGELUARAN SALDO
( Rp. ) ( Rp. ) KOMULATIF
1 2 3 4 5 6 7 8 9
1 2 Total Pendapatan Transfer Rp. 438,099,197.30
1 2 1 Dana Gampong Rp. 253,971,184.60
1 2 2 Pajak dan Restribusi Rp. 1,405,068.23
1 2 3 Alokasi Dana Gampong Rp. 152,722,944.47
1 13/07/2015 Terima Penyaluran Tahap Pertama (I) Dari DPKKD RP 147,826,877.65 Rp. 147,826,877.65
2 2 1 Penyelenggara Pemerintahan Gampong
3 2 1 1 1 Belanja Pegawai
4 14/07/2015 Penghasilan tetap Keuchik 1 Org x 06 bln @ 750.000 Rp. 4,500,000.00 4,500,000.00 143,326,877.65
5 14/07/2015 Penghasilan Kaur 3 Org x 06 bln @ 257.000 Rp. 4,626,000.00 9,126,000.00 138,700,877.65
6 14/07/2015 Penghasilan Tetap Kadus 3 org06 bln @ 257.000 Rp. 4,626,000.00 13,752,000.00 134,074,877.65
7 14/07/2015 Tunjangan Keuchik 1 Org x 06 bln @ 350.000 Rp. 2,100,000.00 15,852,000.00 131,974,877.65
8 14/07/2015 Tunjangan Kaur 3 Org x 06 bln @ 75.000 Rp. 1,350,000.00 17,202,000.00 130,624,877.65
9 14/07/2015 Tunjangan Tetap Kadus 3 Org x 06 bln @ 75.000 Rp. 1,350,000.00 18,552,000.00 129,274,877.65
10 14/07/2015 Tunjangan Ketua TPG 1 Org x 06 bln@ 100.000 Rp. 600,000.00 19,152,000.00 128,674,877.65
11 14/07/2015 Tunjangan Wakil TPG 1 Org x 06 bln @70.000 Rp. 420,000.00 19,572,000.00 128,254,877.65
12 14/07/2015 Tunjangan Sekretaris TPG 1 Org x 06 bln @70.000 Rp. 420,000.00 19,992,000.00 127,834,877.65
13 14/07/2015 Tunjangan Anggota TPG 4 Org x 06 bln @50.000 Rp. 1,200,000.00 21,192,000.00 126,634,877.65
14 14/07/2015 Insentif Keuchik 1 Org x 06 bln @ 350.000 Rp. 2,100,000.00 23,292,000.00 124,534,877.65
15 14/07/2015 Insentif Kaur 3 Org x 06 bln @ 100.000 Rp. 1,800,000.00 25,092,000.00 122,734,877.65
16 14/07/2015 Insentif Kadus 3 Org x 06 bln @100.000 Rp. 1,800,000.00 26,892,000.00 120,934,877.65
17 14/07/2015 Insentif Imuem Gampong 1 Org x 06 bln @ 325.000 Rp. 1,950,000.00 28,842,000.00 118,984,877.65
18 14/07/2015 Insentif Ketua TPG 1 Org x06 bln @ 150.000 Rp. 900,000.00 29,742,000.00 118,084,877.65
JUMLAH
No. Tgl. KODE REKENING URAIAN PENERIMAAN PENGELUARAN NO BUKTI PENGELUARAN SALDO
( Rp. ) ( Rp. ) KOMULATIF
1 2 3 4 5 6 7 8 9
19 14/07/2015 Insentif Wakil TPG 1 Org x 06 bln @125.000 Rp. 750,000.00 30,492,000.00 117,334,877.65
20 14/07/2015 Insentif Sekretaris TPG 1 Org x 06 bln @125.000 Rp. 750,000.00 31,242,000.00 116,584,877.65
21 14/07/2015 Insentif Anggota TPG 4 Org x 06 bln @100.000 Rp. 2,400,000.00 33,642,000.00 114,184,877.65
22
23 2 1 2 2 Operasional Kantor
24 16/07/2015 Alat Tulis Kantor Rp. 450,000.00 34,092,000.00 113,734,877.65
25 18/07/2015 Benda Pos Dan Materai Rp. 300,000.00 34,392,000.00 113,434,877.65
26 18/07/2015 Alat Dan Bahan Kebersihan Rp. 50,000.00 34,442,000.00 113,384,877.65
27 20/07/2015 Perjalanan Dinas keucik Rp. 960,000.00 35,402,000.00 112,424,877.65
28 21/07/2015 Honor Bendahara 6x257.000 Rp. 1,542,000.00 36,944,000.00 110,882,877.65
29 21/07/2015 Insentif Bendahara 6x157,000 Rp. 1,050,000.00 37,994,000.00 109,832,877.65
30 22/07/2015 Rekening Listrik Rp. 600,000.00 38,594,000.00 109,232,877.65
31 22/07/2015 Biaya Musrembang Rp. 1,500,000.00 40,094,000.00 107,732,877.65
32 22/07/2015 Biaya Rapat Gampong Rp. 1,000,000.00 41,094,000.00 106,732,877.65
33 22/07/2015 Cetak Dan Jilit Rp. 300,000.00 41,394,000.00 106,432,877.65
34 22/07/2015 sewa Kantor Keucik Rp. 3,000,000.00 44,394,000.00 103,432,877.65
35 2 1 2 3 Belanja Modal Rp.
1 2 3 4 5 6 7 8 9
2 3 3 Peringatan Hari Besar Nasional (PHBN)
47 16/8/2015 Rp. 82,711,000.00 65,115,877.65
Iuran PHBN Untuk Kecamatan 700,000.00
48 18/08/2015
Papan Mall 14 Lbr @50.000 Rp. 700,000.00 83,411,000.00 64,415,877.65
49 18/08/2015
Kayu Kelas III 2 Ton @ 4.500.000 Rp. 9,000,000.00 92,411,000.00 55,415,877.65
50 18/08/2015
Balok Kayu Kelas II 3 Ton @5.000.000 Rp. 15,000,000.00 107,411,000.00 40,415,877.65
51 18/08/2015
Dolken Kayu Galam 621 Btg @30.000 Rp. 18,630,000.00 126,041,000.00 21,785,877.65
52 18/08/2015 Rp. 128,541,000.00 19,285,877.65
Operasional Tim Pelaksana Kegiatan 2,500,000.00
53 18/08/2015 Rp. 136,541,000.00 11,285,877.65
HOK Tukang 8,000,000.00
54 19/08/2015
Pajak PPN Material Lantai balai Musyawarah Rp. 8,047,000.00 144,588,000.00 3,238,877.65
55 19/08/2015
Pajak PPH Material Lantai balai Musyawarah Rp. 1,206,000.00 145,794,000.00 2,032,877.65
56 2 3 Pembinaan Kemasyarakatan
57 2 3 2 Peringatan Hari Besar Islam
58 14/10/2015 Aqua sedang 12 bh @ 3000 36,000.00 145,830,000.00 1,996,877.65
59 14/10/2015 snak 67 bks @2.000 134,000.00 145,964,000.00 1,862,877.65
60 14/10/2015 kopi Susu 3 ceret @ 45.000 135,000.00 146,099,000.00 1,727,877.65
61 14/10/2015 Nasi Siang 63 Bks @ 15.000 945,000.00 147,044,000.00 782,877.65
62 14/10/2015
Sumbangan pimpinan Zikir 1 muharram 1437 H 350,000.00 147,394,000.00 432,877.65
63 26/10/2015
Honor Panitia PHBI 400,000.00 147,794,000.00 32,877.65
JAFARUDDIN M,JAFAR
BUKU KAS UMUM
GAMPONG SEUNEUBOK DALAM KECAMATAN NURUSSALAM
TAHUN ANGGARAN 2015
JUMLAH
No. Tgl. KODE REKENING URAIAN PENERIMAAN PENGELUARAN NO BUKTI PENGELUARAN SALDO
( Rp. ) ( Rp. ) KOMULATIF
1 2 3 4 5 6 7 8 9
1 2 Total Pendapatan Transfer Rp. 169,520,229.15
1 2 1 Dana Gampong Rp. 100,737,985.11
1 2 2 Pajak dan Restribusi Rp. 632,280.70
1 2 3 Alokasi Dana Gampong Rp. 68,149,963.34
1 Terima Penyaluran Tahap Kedua (II) Dari DPKKD RP 169,520,229.15 1/KM/15 Rp. 169,520,229.15
2 1 Penyelenggara Pemerintahan Gampong
1 2 3 4 5 6 7 8 9
1 2 2 Operasional Kantor 5,616,000.00
22 10/7/2015 Alat Tulis Kantor Rp. 500,000.00 19/KK/15 23,456,000.00 146,064,229.15
23 10/7/2015 Benda Pos Dan Materai Rp. 300,000.00 20/KK/15 23,756,000.00 145,764,229.15
24 10/7/2015 Perjalanan Dinas keucik Rp. 960,000.00 22/KK/15 24,716,000.00 144,804,229.15
25 10/7/2015 Honor Bendahara 6x257.000 Rp. 1,028,000.00 23/KK/15 25,744,000.00 143,776,229.15
26 10/7/2015 Insentif Bendahara 6x157,000 Rp. 628,000.00 24/KK/15 26,372,000.00 143,148,229.15
27 10/7/2015 Rekening Listrik Rp. 500,000.00 25/KK/15 26,872,000.00 142,648,229.15
28 10/7/2015 pembuatan Monografi dan struktur Gampong 1,000,000.00 27,872,000.00 141,648,229.15
29 10/10/2015 Biaya Rapat Gampong Rp. 500,000.00 26/KK/15 28,372,000.00 141,148,229.15
30 10/12/2015 Cetak Dan Jilit Rp. 200,000.00 28/KK/15 28,572,000.00 140,948,229.15
1 2 3 Belanja Modal 12,100,000.00
31 10/12/2015 Komputer Rp 29/KK/15 34,272,000.00 135,248,229.15
5,700,000.00
32 10/12/2015 Meja dan Kursi Rp 30/KK/15 36,072,000.00 133,448,229.15
1,800,000.00
33 10/12/2015 Lemari Arsip Rp 31/KK/15 37,072,000.00 132,448,229.15
1,000,000.00
34 10/12/2015 Kipas Angin Rp 32/KK/15 37,572,000.00 131,948,229.15
500,000.00
35 10/12/2015 Printer Multi Fungsi Rp 33/KK/15 39,372,000.00 130,148,229.15
1,800,000.00
36 10/12/2015 Stabilizer Rp 34/KK/15 39,872,000.00 129,648,229.15
500,000.00
37 10/12/2015 UPS (Unit Power Storage) Rp. 800,000.00 35/KK/15 40,672,000.00 128,848,229.15
Pajak
1 3 Operasional Tuha Peut gampong 1,100,000.00
38 10/13/2015 ATK TPG 300,000.00 40,972,000.00 128,548,229.15
39 10/13/2015 penggandaan 200,000.00 41,172,000.00 128,348,229.15
40 10/13/2015 konsumsi Rapat TPG 600,000.00 41,772,000.00 127,748,229.15
3 2 Peringatan Hari Besar Islam 3,881,000.00
41 10/14/2015 Sewa Teratak 2 Paket @ 150,000 300,000.00 42,072,000.00 127,448,229.15
42 10/14/2015 Sewa Sons Sistem 1 Set @ 400,000 400,000.00 42,472,000.00 127,048,229.15
43 10/14/2015 Aqua Sedang 30 Buah @ 3,000 90,000.00 42,562,000.00 126,958,229.15
44 10/14/2015 Aqua Gelas 4 Kotak @ 18,000 72,000.00 42,634,000.00 126,886,229.15
45 10/14/2015 Kue dan Kopi 400,000.00 43,034,000.00 126,486,229.15
46 10/14/2015 Makan Siang Bersama Panitia Dan Tokoh Agama 1,150,000.00 44,184,000.00 125,336,229.15
47 10/14/2015 Beli Kertas Perda,Hekter,Lem Fox,dan Kertas Manila 59,400.00 44,243,400.00 125,276,829.15
48 10/14/2015 Sumbangan Pimpinan Zikir dan Tausiah Rohani 1,000,000.00 45,243,400.00 124,276,829.15
49 10/14/2015 Operasional Tim 300,000.00 45,543,400.00 123,976,829.15
50 Pemungutan PPN Sons Sitem dan Teratak 91,300.00 45,634,700.00 123,885,529.15
51 Pemungutan PPH 2% Sons Sitem dan Teratak 18,300.00 45,653,000.00 123,867,229.15
JUMLAH
No. Tgl. KODE REKENING URAIAN PENERIMAAN PENGELUARAN NO BUKTI PENGELUARAN SALDO
( Rp. ) ( Rp. ) KOMULATIF
1 2 3 4 5 6 7 8 9
2 2 Bidang pembangunan
2 2 1 Pembangunan MCK 6,989,000.00
52 18/10/15 Rp. 45,853,000.00 123,667,229.15
papan Nama Kegiatan 200,000.00
53 18/10/15 Rp. 46,153,000.00 123,367,229.15
Beton Prasasti 300,000.00
54 18/10/15 Rp. 47,128,000.00 122,392,229.15
Cat Nippon 65 Kg @15.000 975,000.00
55 18/10/15 Rp. 47,428,000.00 122,092,229.15
Pipa 3/4 12 btg @25.000 300,000.00
56 18/10/15 Rp. 47,828,000.00 121,692,229.15
sannyo 1bh @ 400.000 400,000.00
57 18/10/15 Rp. 49,828,000.00 119,692,229.15
Tabung Air 1 bh @2.000.000 2,000,000.00
58 19/10/15 Rp. 51,017,000.00 118,503,229.15
HOK Tukang 1,189,000.00
59 Pajak PPN Pembangunan MCK Rp. 1,215,000.00 52,232,000.00 117,288,229.15
60 Pajak PPH Pembangunan MCK Rp. 410,000.00 52,642,000.00 116,878,229.15
2 3 3 pembangunan Talut Rp. 24,475,500.00
61 10/20/2015 Rp. 52,647,000.00 116,873,229.15
Benang Mall 1 Gulung @ 5000 5,000.00
62 10/20/2015 Rp. 52,675,000.00 116,845,229.15
Tinba Cor 4 Buah @7.000 28,000.00
63 10/20/2015 Rp. 52,843,000.00 116,677,229.15
Pipa 1,5 Inc 6 Batang @ 28,000 168,000.00
64 10/20/2015 Rp. 59,058,000.00 110,462,229.15
Semen PC 113 Zak @ 55,000 6,215,000.00
65 10/20/2015 Rp. 59,642,000.00 109,878,229.15
Kayu Perancah 73 Batang @ 8,000 584,000.00
66 10/20/2015 Rp. 60,902,000.00 108,618,229.15
Pasir Pasangan 18 M3 @70,000 1,260,000.00
67 10/20/2015 Rp. 68,382,000.00 101,138,229.15
Batu Kali 34 M3 @220,000 7,480,000.00
68 10/20/2015 Rp. 69,382,000.00 100,138,229.15
Tanah Timbun 20 M3 @50.000 1,000,000.00
69 10/20/2015 Rp. 74,302,000.00 95,218,229.15
HOK Tukang dan Pekerja 4,920,000.00
70 10/20/2015 Rp. 74,651,650.00 94,868,579.15
Desain & RAB 349,650.00
71 10/21/2015 Rp. 75,467,500.00 94,052,729.15
Operasional TIM 815,850.00
72 Pajak MBLB
73 PPN 1,421,700.00 76,889,200.00 92,631,029.15
74 PPH 228,300.00 77,117,500.00 92,402,729.15
4 9 Operasional Pendamping Desa Rp. 3,000,000.00
75 22/10/2015 Rp. 80,117,500.00 89,402,729.15
Pembayaran Operasional Pendamping Desa 6 Bln @500.000 3,000,000.00
4 Pemberdayaan masyarakat Rp.
4 3 Operasional TPA Rp. 11,600,000.00
76 10/28/2015 Rp. 81,797,500.00 87,722,729.15
Bayar Harga Seng 40 lbr @ 42,000 1,680,000.00
77 10/28/2015 Rp. 81,831,500.00 87,688,729.15
Paku Seng 2 Ktk @ 17,000 34,000.00
78 10/28/2015 Rp. 81,921,500.00 87,598,729.15
Paku Biasa 4",2,5'',dan 3 inc 5 kg @ 18,000 90,000.00
79 10/28/2015 Rp. 83,121,500.00 86,398,729.15
Kayu 2/3 Sentang 20 Lbr @ 60,000 1,200,000.00
80 10/28/2015 Rp. 84,921,500.00 84,598,729.15
Papan Sentang 30 lbr @ 60,000 1,800,000.00
JUMLAH
No. Tgl. KODE REKENING URAIAN PENERIMAAN PENGELUARAN NO BUKTI PENGELUARAN SALDO
( Rp. ) ( Rp. ) KOMULATIF
1 2 3 4 5 6 7 8 9
81 10/30/2015 Rp. 87,681,500.00 81,838,729.15
Ongkos Tukang 2,760,000.00
82 Pajak Rp. 436,000.00 88,117,500.00 81,402,729.15
83 11/10/2015 Rp. 91,717,500.00 77,802,729.15
Insentie Guru Pengajian 4 Org Selama 6 bln @ 150,000 3,600,000.00
4 4 Bantuan Operasional Majlis Ta'lim Rp. 1,800,000.00
84 11/10/2015 Rp. 93,517,500.00 76,002,729.15
Insentif Guru Pengajian Umum 2 Orang 6 bln @ 900,000 1,800,000.00
4 6 Bantuan Kegiatan Sosial Produktif Rp. 54,500,000.00
85 11/13/2015 Rp. 124,517,500.00 45,002,729.15
Pengadaan Teratak 6x5 2 Set 31,000,000.00
86 11/22/2015 Rp. 131,717,500.00 37,802,729.15
Kursi 40 bh @ 90,000 7,200,000.00
87 11/22/2015 Rp. 133,237,500.00 36,282,729.15
Meja Makan 19 bh @80,000 1,520,000.00
88 11/22/2015 Rp. 134,137,500.00 35,382,729.15
Termor Ait 3 bh @ 300,000 900,000.00
89 11/22/2015 Rp. 135,137,500.00 34,382,729.15
Piber Nasi 1bh @1,000,000 1,000,000.00
90 11/22/2015 Rp. 138,737,500.00 30,782,729.15
Piring 8 inc 30 Lusi @ 120,000 3,600,000.00
91 11/22/2015 Rp. 140,937,500.00 28,582,729.15
Piring 7 Inc 20 usin @ 110,000 2,200,000.00
92 11/22/2015 Rp. 141,737,500.00 27,782,729.15
Gelas 20 Lusin @40,000 800,000.00
93 11/22/2015 Rp. 142,737,500.00 26,782,729.15
Talam Panel 2 Lusin @ 500,000 1,000,000.00
94 11/22/2015 Rp. 143,637,500.00 25,882,729.15
Sendok Makan 30 Lusin @30,000 900,000.00
95 11/22/2015 Rp. 144,237,500.00 25,282,729.15
Dadang 1 Bh @600,000 600,000.00
96 11/23/2015 Rp. 145,737,500.00 23,782,729.15
Honor Tim 1,500,000.00
97 Pajak Rp. 2,280,000.00 148,017,500.00 21,502,729.15
4 8 Bantuan Operasional Siswa Usia SDs/d SMA Wajib Sekolah 9 Thn Rp. 21,380,000.00
98 Pengadaan Seragam SD 35 Pasang Rp. 10,257,000.00 158,274,500.00 11,245,729.15
99 Pengadaan Seragam SMP 15 Pasang Rp. 5,320,000.00 163,594,500.00 5,925,729.15
100 Pengadaan Seragam SMA 8 Pasang Rp. 2,880,000.00 166,474,500.00 3,045,729.15
101 Oerasional Tim Rp. 500,000.00 166,974,500.00 2,545,729.15
102 Pajak Rp. 2,423,000.00 169,397,500.00 122,729.15
MUHAMMAD M,HUSEN
.
BUKU KAS UMUM
GAMPONG SEUNEUBOK DALAM KECAMATAN NURUSSALAM
TAHUN ANGGARAN 2015
JUMLAH
No. Tgl. KODE REKENING URAIAN PENERIMAAN PENGELUARAN NO BUKTI PENGELUARAN SALDO
( Rp. ) ( Rp. ) KOMULATIF
1 2 3 4 5 6 7 8 9
7/10/2015 1 2 Total Pendapatan Transfer Rp. 404,694,393.98
1 2 1 Dana Gampong Rp. 251,844,962.78
1 2 2 Pajak dan Restribusi Rp. 1,405,068.23
1 2 3 Alokasi Dana Gampong Rp. 151,444,362.97
1 7/10/2015 Terima Penyaluran Tahap Pertama (I) Dari DPKKD RP 146,592,814.47 1/KM/15 Rp. 146,592,814.47
2 2 1 Penyelenggara Pemerintahan Gampong
3 2 1 1 1 Belanja Pegawai
4 Penghasilan tetap Keuchik 1 Org x 06 bln @ 750.000 Rp. 4,500,000.00 1/KK/15 4,500,000.00 142,092,814.47
5 Penghasilan Kaur 3 Org x 06 bln @ 257.000 Rp. 4,626,000.00 2/KK/15 9,126,000.00 137,466,814.47
6 Penghasilan Tetap Kadus 4 Org x 06 bln @ 257.000 Rp. 6,168,000.00 3/KK/15 15,294,000.00 131,298,814.47
7 Tunjangan Keuchik 1 Org x 06 bln @ 350.000 Rp. 2,100,000.00 4/KK/15 17,394,000.00 129,198,814.47
8 Tunjangan Kaur 3 Org x 06 bln @ 75.000 Rp. 1,350,000.00 5/KK/15 18,744,000.00 127,848,814.47
9 Tunjangan Tetap Kadus 4 Org x 06 bln @ 75.000 Rp. 1,800,000.00 6/KK/15 20,544,000.00 126,048,814.47
10 Tunjangan Ketua TPG 1 Org x 06 bln@ 100.000 Rp. 600,000.00 7/KK/15 21,144,000.00 125,448,814.47
11 Tunjangan Wakil TPG 1 Org x 06 bln @70.000 Rp. 420,000.00 8/KK/15 21,564,000.00 125,028,814.47
12 Tunjangan Sekretaris TPG 1 Org x 06 bln @70.000 Rp. 420,000.00 9/KK/15 21,984,000.00 124,608,814.47
13 Tunjangan Anggota TPG 2 Org x 06 bln @50.000 Rp. 600,000.00 10/KK/15 22,584,000.00 124,008,814.47
14 Insentif Keuchik 1 Org x 06 bln @ 350.000 Rp. 2,100,000.00 11/KK/15 24,684,000.00 121,908,814.47
15 Insentif Kaur 3 Org x 06 bln @ 100.000 Rp. 1,800,000.00 12/KK/15 26,484,000.00 120,108,814.47
16 Insentif Kadus 4 Org x 06 bln @100.000 Rp. 2,400,000.00 13/KK/15 28,884,000.00 117,708,814.47
17 Insentif Imuem Gampong 1 Org x 06 bln @ 325.000 Rp. 1,950,000.00 14/KK/15 30,834,000.00 115,758,814.47
18 Insentif Ketua TPG 1 Org x06 bln @ 150.000 Rp. 900,000.00 15/KK/15 31,734,000.00 114,858,814.47
19 Insentif Wakil TPG 1 Org x 06 bln @125.000 Rp. 750,000.00 16/KK/15 32,484,000.00 114,108,814.47
20 Insentif Sekretaris TPG 1 Org x 06 bln @125.000 Rp. 750,000.00 17/KK/15 33,234,000.00 113,358,814.47
21 Insentif Anggota TPG 2 Org x 06 bln @100.000 Rp. 1,200,000.00 18/KK/15 34,434,000.00 112,158,814.47
22
23 2 1 2 2 Operasional Kantor
JUMLAH
No. Tgl. KODE REKENING URAIAN PENERIMAAN PENGELUARAN NO BUKTI PENGELUARAN SALDO
( Rp. ) ( Rp. ) KOMULATIF
1 2 3 4 5 6 7 8 9
24 Alat Tulis Kantor Rp. 177,000.00 19/KK/15 34,611,000.00 111,981,814.47
25 Benda Pos Dan Materai Rp. 180,000.00 20/KK/15 34,791,000.00 111,801,814.47
26 Alat Dan Bahan Kebersihan Rp. 120,000.00 21/KK/15 34,911,000.00 111,681,814.47
27 Perjalanan Dinas keucik Rp. 480,000.00 22/KK/15 35,391,000.00 111,201,814.47
28 Honor Bendahara 6x257.000 Rp. 1,542,000.00 23/KK/15 36,933,000.00 109,659,814.47
29 Insentif Bendahara 6x157,000 Rp. 1,050,000.00 24/KK/15 37,983,000.00 108,609,814.47
30 Rekening Listrik Rp. 450,000.00 25/KK/15 38,433,000.00 108,159,814.47
31 Biaya Musrembang Rp. 1,500,000.00 26/KK/15 39,933,000.00 106,659,814.47
32 Biaya Rapat Gampong Rp. 1,000,000.00 27/KK/15 40,933,000.00 105,659,814.47
33 Cetak Dan Jilit Rp. 300,000.00 28/KK/15 41,233,000.00 105,359,814.47
34 Rehab Kantor Keucik Rp. 3,000,000.00 29/KK/15 44,233,000.00 102,359,814.47
35 2 1 2 3 Belanja Modal Rp.
1 2 3 4 5 6 7 8 9
59 25 Juli 2015 Rp. 52/KK/15 80,668,000.00 65,924,814.47
Papan Lisplang 4 btg @120,000 480,000.00
60 10 Agt 2015 Rp. 53/KK/15 90,093,000.00 56,499,814.47
Bayar HOK 20 Hari Kerja 9,425,000.00
61 15 Agt 2015 Rp. 54/KK/15 90,168,000.00 56,424,814.47
Semen Putih 1 Zak @ 75,000 75,000.00
62 15 Agt 2015 Rp. 55/KK/15 91,143,000.00 55,449,814.47
Cat Tembok "NIPPON" 65 Kg @ 15,000 975,000.00
63 15 Agt 2015 Rp. 56/KK/15 91,233,000.00 55,359,814.47
Cat Minyak Kuda Terbang 2 Kg @ 45,000 90,000.00
64 15 Agt 2015 Rp. 57/KK/15 91,608,000.00 54,984,814.47
25 Bh Karan Air @ 15,000 375,000.00
65 15 Agt 2015 Rp. 58/KK/15 91,833,000.00 54,759,814.47
5 Btg Pipa PVC 1,5 inc@45,000 225,000.00
66 15 Agt 2015 Rp. 59/KK/15 92,073,000.00 54,519,814.47
8 btg Pipa PVC 3/4 inc @30,000 240,000.00
67 15 Agt 2015 Rp. 60/KK/15 92,205,000.00 54,387,814.47
22 btg L/T BOW 3/4 @6,000 132,000.00
68 15 Agt 2015 Rp. 61/KK/15 92,305,000.00 54,287,814.47
5 bh L BOW Shok 3" @20,000 100,000.00
69 15 Agt 2015 Rp. 62/KK/15 92,785,000.00 53,807,814.47
6 btg Pipa PVC 3 inc @80,000 480,000.00
70 15 Agt 2015 Rp. 63/KK/15 92,834,000.00 53,758,814.47
1 bh Lem Pipa@49,000 49,000.00
71 15 Agt 2015 Rp. 64/KK/15 92,879,000.00 53,713,814.47
3 bh Pembuang Air Lantai @15,000 45,000.00
72 15 Agt 2015 Rp. 65/KK/15 93,029,000.00 53,563,814.47
2 Bh Keramik Tempat Sabun @75,000 150,000.00
73 15 Agt 2015 Rp. 66/KK/15 94,079,000.00 52,513,814.47
30 Bh Pintu angin Motif 15x30 @35,000 1,050,000.00
74 15 Agt 2015 Rp. 67/KK/15 94,479,000.00 52,113,814.47
1 Bh Pompa Air "PANASONIK" @400,000 400,000.00
75 15 Agt 2015 Rp. 68/KK/15 94,979,000.00 51,613,814.47
2 Bh Pintu Kamar mandi @250,000 500,000.00
76 15 Agt 2015 Rp. 69/KK/15 96,864,000.00 49,728,814.47
29 Kotak Keramik 20x20 "IKAD" @65,000 1,885,000.00
77 15 Agt 2015 Rp. 70/KK/15 102,674,000.00 43,918,814.47
83 Kotak Keramik 20x25 "IKAD" @70,000 5,810,000.00
78 15 Agt 2015 Rp. 71/KK/15 103,374,000.00 43,218,814.47
70 bh Lis Keramik @10,000 700,000.00
79 15 Agt 2015 Rp. 72/KK/15 103,854,000.00 42,738,814.47
60 Meter Bon Bon Keramik @8,000 480,000.00
80 15 Agt 2015 Rp. 73/KK/15 105,024,000.00 41,568,814.47
18 Bh Genteng Metal "SAKURA" 0,30 cm @ 65,000 1,170,000.00
81 15 Agt 2015 Rp. 74/KK/15 105,264,000.00 41,328,814.47
18 bh Rabung Metal "SAKURA" 0,30 cm @30,000 240,000.00
82 15 Agt 2015 Rp. 75/KK/15 105,314,000.00 41,278,814.47
2 Bh Pipa T hawa Septi Tank @25,000 50,000.00
83 15 Agt 2015 Rp. 76/KK/15 105,434,000.00 41,158,814.47
10 Btg Pipa Instalasi @12,000 120,000.00
84 15 Agt 2015 Rp. 77/KK/15 105,449,000.00 41,143,814.47
3 Bh Mangkok Tanam Saklar @5,000 15,000.00
85 15 Agt 2015 Rp. 78/KK/15 105,539,000.00 41,053,814.47
6 Bh Saklar "PANASONIK" @15,000 90,000.00
86 15 Agt 2015 Rp. 79/KK/15 105,599,000.00 40,993,814.47
6 Bh Piting Lampu @10,000 60,000.00
87 15 Agt 2015 Rp. 80/KK/15 105,999,000.00 40,593,814.47
2 bh Kloset @200,000 400,000.00
88 15 Agt 2015 Rp. 81/KK/15 106,003,000.00 40,589,814.47
2 Bh Isolatif @ 2,000 4,000.00
89 15 Agt 2015 Rp. 82/KK/15 106,213,000.00 40,379,814.47
6 bh Bola Lampu Philip 25 Watt @35,000 210,000.00
90 15 Agt 2015 Rp. 83/KK/15 106,613,000.00 39,979,814.47
5 M3 Pasir Pasangan @ 80,000 400,000.00
91 15 Agt 2015 Rp. 84/KK/15 107,093,000.00 39,499,814.47
4 Lbr Papan Lisplang @ 120,000 480,000.00
92 15 Agt 2015 Rp. 85/KK/15 107,493,000.00 39,099,814.47
10 Btg Kayu 2x2 @40,000 400,000.00
93 15 Agt 2015 Rp. 86/KK/15 107,693,000.00 38,899,814.47
10 Btg Kayu 2x2 @20,000 200,000.00
JUMLAH
No. Tgl. KODE REKENING URAIAN PENERIMAAN PENGELUARAN NO BUKTI PENGELUARAN SALDO
( Rp. ) ( Rp. ) KOMULATIF
1 2 3 4 5 6 7 8 9
94 15 Agt 2015 Rp. 87/KK/15 107,943,000.00 38,649,814.47
25 Btg Kayu Perancah @10,000 250,000.00
95 15 Agt 2015 Rp. 88/KK/15 109,543,000.00 37,049,814.47
2 Unit Tangga Besi @ 800,000 1,600,000.00
96 15 Agt 2015 Rp. 89/KK/15 120,943,000.00 25,649,814.47
19 Meter Pagar Besi Stailis @600,000 11,400,000.00
97 15 Agt 2015 Rp. 90/K15K/ 122,443,000.00 24,149,814.47
1 Unit Pintu Besi @1,500,000 1,500,000.00
98 15 Agt 2015 Rp. 91/KK/15 124,655,000.00 21,937,814.47
Pengadaan 1 Unit KWH Meter @2,212,000 2,212,000.00
99 5-Sep-15 Rp. 92/KK/15 134,170,000.00 12,422,814.47
Bayar HOK Kerja 26 Hari Kerja 9,515,000.00
100
1 2 3 4 5 6 7 8 9
128 18-Nov-15 Pajak camera DigitalPPN PPH Rp. 117/KK/15 137,170,000.00 9,422,814.47
129 18-Nov-15 Pajak PHBN PPN & PPH Rp. 117/KK/15 137,170,000.00 9,422,814.47
130 18-Nov-15 Pajak MCK PPN & PPH Rp. 118/KK/15 137,170,000.00 9,422,814.47
131 18-Nov-15 PaJak Rehab Kantor Keuchik PPN & PPH Rp. 119/KK/15 137,170,000.00 9,422,814.47
MUHAMMAD M,HUSEN
.
SURAT PERMINTAAN PEMBAYARAN (SPP)
GAMPONG SEUNEUBOK DALAM. KECAMATAN NURUSSALAM
TAHUN ANGGARAN 2015
1. Bidang 2.2 Pembangunan Gampong
2. Kegiatan 2.2.3.3 / Pembangunan (TPT) Tembok Penahan Tanah
3. Waktu Pelaksanaan 12 bulan
Rincian Pendanaan 24,475,500.00
23,310,000.00
1 Belanja barang dan jasa - 23,310,000.00 23,310,000.00 -
- -
JUMLAH 24,475,500.00 - 24,475,500.00 24,475,500.00 -
Seuneubok Dalam, tanggal 08 oktober 2015
Telah dilakukan verifikasi Pelaksana Kegiatan
Sekretaris Gampong
33,490,000.00
6,675,000.00
3,912,000.00
31,551,000.00
tahap 1
9,425,000.00 spp
3,684.00
SURAT PERMINTAAN PEMBAYARAN (SPP)
GAMPONG SEUNEUBOK DALAM. KECAMATAN NURUSSALAM
TAHUN ANGGARAN 2015
1. Bidang 2.4. / Pemberdayaan Masyarakat
2. Kegiatan 2.4.8.2/ Belanja Barang & jasa
3. Waktu Pelaksanaan 12 Bln
Rincian Pendanaan 21,380,000.00
Bantuan
I Operasional siswa Usia Sekolah SD-SMA -
Belanja Barang Dan Jasa 21,380,000.00 - 21,380,000.00 21,380,000.00 -
1 pengadaan seragam sekolah 20,880,000.00 - 20,880,000.00 20,880,000.00 -
2 Operasional Tim Pelaksana Kegiatan 500,000.00 - 500,000.00 500,000.00 -
JUMLAH 21,380,000.00 - 21,380,000.00 21,380,000.00 -
Seuneubok Dalam, tanggal 29 Oktober 2015
Telah dilakukan verifikasi Pelaksana Kegiatan
Sekretaris Gampong
I Pembangunan Gampong
1 Belanja Material/Bahan Dan Upah 146,481,000.00 97,000,000.00 97,000,000.00 49,481,000.00
3 Honor Tim Pelaksana Desain & RAB 7,324,000.00 2,500,000.00 2,500,000.00 4,824,000.00
M.YUNUS M.THAHER
Pembinaan Kemasyarakatan
Peringatan Hari Besar Nasional (PHBN) 3,000,000.00 3,000,000.00
1 bh Gunting @ 8,000 8,000.00 8,000.00 2,992,000.00
2 bh Lakban @5,000 10,000.00 18,000.00 2,982,000.00
1 bh Hakter @ 8,000 8,000.00 26,000.00 2,974,000.00
1 bh Anak Hakter @ 2,000 2,000.00 28,000.00 2,972,000.00
7 ktk Balpoin @ 14,000 98,000.00 126,000.00 2,874,000.00
10 lbr Karton @2,000 20,000.00 146,000.00 2,854,000.00
1 Ktk lem Fox @ 8,000 8,000.00 154,000.00 2,846,000.00
1 Bh Benang Tape @ 3,000 3,000.00 157,000.00 2,843,000.00
40 pak Buku Tulis BMB @ 27,000 1,080,000.00 1,237,000.00 1,763,000.00
2 bh Tali Plastik @5,000 10,000.00 1,247,000.00 1,753,000.00
20 lbr Kertas Kado @1,000 20,000.00 1,267,000.00 1,733,000.00
1 bh Pluit @5,000 5,000.00 1,272,000.00 1,728,000.00
10 ktk Aqua Merk Cleen @18,000 180,000.00 1,452,000.00 1,548,000.00
80 bks Kue @ 3,000 240,000.00 1,692,000.00 1,308,000.00
24 Botol Fanta @5,000 120,000.00 1,812,000.00 1,188,000.00
10 bh goni @ 5,000 50,000.00 1,862,000.00 1,138,000.00
1 lusin sendok @ 24,000 24,000.00 1,886,000.00 1,114,000.00
1 Ball Benang Tape @14,000 14,000.00 1,900,000.00 1,100,000.00
46 bks Nasi Siang @15,000 690,000.00 2,590,000.00 410,000.00
20 Butir Kelereng @500 10,000.00 2,600,000.00 400,000.00
Honor Tim 400,000 400,000.00 3,000,000.00 -
-
M,YUNUS JAFARUDDIN
Setujui Untuk di bayarkan Telah dibayar lunas
Keuchik Gampong Buket Meurak Bendahara Gampong
JAFARUDDIN M.JAFAR
#NAME?
###
SURAT PERMINTAAN PEMBAYARAN (SPP)
GAMPONG BUKET MEURAK. KECAMATAN NURUSSALAM
TAHUN ANGGARAN 2015
1. Bidang 2.3. / Pembinaan Masyarakat
2. Kegiatan 2.3.2/PHBI Peringatan Hari Besar Islam
3. Waktu Pelaksanaan 12 Bln
Rincian Pendanaan
PENCAIRAN S.D
PAGU ANGGARAN PERMINTAAN JUMLAH SAMPAI
NO. URAIAN YANG LALU SEKARANG SAAT INI SISA DANA
( Rp.)
( Rp.) ( Rp.) ( Rp.) ( Rp.)
M,YUNUS ABDURRANI
Setujui Untuk di bayarkan Telah dibayar lunas
Keuchik Gampong Buket Meurak Bendahara Gampong
JAFARUDDIN M.JAFAR
SURAT PERMINTAAN PEMBAYARAN (SPP)
GAMPONG SEUNEUBOK DALAM. KECAMATAN NURUSSALAM
TAHUN ANGGARAN 2015
1. Bidang 2.4 Pemberdayaan Masyarakat
2. Kegiatan 2.4.6 BantuanKegiatan sosial produktif
3. Waktu Pelaksanaan 12 bulan
Rincian Pendanaan
SARWATI MUKHTAR
Setujui Untuk di bayarkan Telah dibayar lunas
Keuchik Gampong Seuneubok Dalam Bendahara Gampong
MUHAMMAD M,HUSEN
SURAT PERMINTAAN PEMBAYARAN (SPP)
GAMPONG SEUNEUBOK DALAM. KECAMATAN NURUSSALAM
TAHUN ANGGARAN 2015
1. Bidang 2.4 Pemberdayaan Masyarakat
2. Kegiatan 2.4.9 Bantuan Operasional Pendamping Desa
3. Waktu Pelaksanaan 12 bulan
Rincian Pendanaan
2 0 - -
3 0 - -
SARWATI M.HUSEN
Setujui Untuk di bayarkan Telah dibayar lunas
Keuchik Gampong Seuneubok Dalam Bendahara Gampong
MUHAMMAD M,HUSEN
SURAT PERMINTAAN PEMBAYARAN (SPP)
GAMPONG SEUNEUBOK DALAM. KECAMATAN NURUSSALAM
TAHUN ANGGARAN 2015
1. Bidang 2.4 Pemberdayaan Masyarakat
2. Kegiatan 2.4.5 Bantuan Operasional Kepemudaan
3. Waktu Pelaksanaan 12 bulan
Rincian Pendanaan
3 0 - -
SARWATI IKBAL
Setujui Untuk di bayarkan Telah dibayar lunas
Keuchik Gampong Seuneubok Dalam Bendahara Gampong
MUHAMMAD M,HUSEN
SURAT PERMINTAAN PEMBAYARAN (SPP)
GAMPONG SEUNEUBOK DALAM. KECAMATAN NURUSSALAM
TAHUN ANGGARAN 2015
1. Bidang 2.4 Pemberdayaan Masyarakat
2. Kegiatan 2.4.4 Bantuan Operasional Majlis Ta'lim
3. Waktu Pelaksanaan 12 bulan
Rincian Pendanaan
SARWATI BUSRI.S.HI
Setujui Untuk di bayarkan Telah dibayar lunas
Keuchik Gampong Seuneubok Dalam Bendahara Gampong
MUHAMMAD M,HUSEN
SURAT PERMINTAAN PEMBAYARAN (SPP)
GAMPONG SEUNEUBOK DALAM. KECAMATAN NURUSSALAM
TAHUN ANGGARAN 2015
1. Bidang 2.4 Pemberdayaan Masyarakat
2. Kegiatan 2.4.3 Bantuan Operasional TPA
3. Waktu Pelaksanaan 12 bulan
Rincian Pendanaan
SARWATI BUSRI.S.HI
Setujui Untuk di bayarkan Telah dibayar lunas
Keuchik Gampong Seuneubok Dalam Bendahara Gampong
MUHAMMAD M,HUSEN
SURAT PERMINTAAN PEMBAYARAN (SPP)
GAMPONG SEUNEUBOK DALAM. KECAMATAN NURUSSALAM
TAHUN ANGGARAN 2015
1. Bidang 2.1.3 /Pembinaan Masyarakat
2. Kegiatan 2.1.3.2 /Belanja Modal Operasional Tuha Peut gampong
3. Waktu Pelaksanaan 12 bulan
Rincian Pendanaan
SARWATI NAZAR
Setujui Untuk di bayarkan Telah dibayar lunas
Keuchik Gampong Seuneubok Dalam Bendahara Gampong
MUHAMMAD M,HUSEN
SURAT PERMINTAAN PEMBAYARAN (SPP)
GAMPONG BUKET MEURAK. KECAMATAN NURUSSALAM
TAHUN ANGGARAN 2015
1. Bidang 2.1.2 / Operasional Perkantoran
2. Kegiatan 2.1.2.2/ Belanj Barang Dan Jasa
3. Waktu Pelaksanaan 12 BULAN
Rincian Pendanaan
PENCAIRAN S.D
PAGU ANGGARAN PERMINTAAN JUMLAH SAMPAI
NO. URAIAN YANG LALU SEKARANG SAAT INI SISA DANA
( Rp.)
( Rp.) ( Rp.) ( Rp.) ( Rp.)
I Operasional Perkantoran
1 Alat tulis Kantor 900,000.00 450,000.00 450,000.00 450,000.00
2 Benda Pos dan Materai 600,000.00 300,000.00 300,000.00 300,000.00
3 Alat Dan Bahan Kebersihan 120,000.00 50,000.00 50,000.00 70,000.00
4 Perjalanan Dinas keucik dan Tuha peut 1,800,000.00 960,000.00 960,000.00 840,000.00
5 Honor Bendahara Gampong 1 x 12 bln @ 257,000 3,084,000.00 1,542,000.00 1,542,000.00 1,542,000.00
6 Insentif Bendahara Gampong 1 x 12 bln @157,000 2,100,000.00 1,050,000.00 1,050,000.00 1,050,000.00
7 Air Listrik Dan Telpon Sekretariat Kantor 1,200,000.00 600,000.00 600,000.00 600,000.00
8 Beaya Musrembang Gampong 2,500,000.00 1,500,000.00 1,500,000.00 1,000,000.00
9 BeayaRapat Gampong 2,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00
10 Pengadaan Cetak dan Jilit 600,000.00 300,000.00 300,000.00 300,000.00
11 Sewa Kantor Keucik 5,000,000.00 3,000,000.00 3,000,000.00 2,000,000.00
12 Pemeliharaan Inventaris Gampong 600,000.00 - - 600,000.00
13 Pemutakhiran Profil gampong 2,000,000.00 - - 2,000,000.00
PENCAIRAN S.D
PAGU ANGGARAN PERMINTAAN JUMLAH SAMPAI
NO. URAIAN YANG LALU SEKARANG SAAT INI SISA DANA
( Rp.)
( Rp.) ( Rp.) ( Rp.) ( Rp.)
II Belanja Modal - -
1 komputer 5,700,000.00 - 5,700,000.00
2 Meja dan Kursi 1,800,000.00 - 1,800,000.00
4 Kipas angin 500,000.00 - 500,000.00
5 Printer Multi fungsi 1,800,000.00 - 1,800,000.00
6 Stabilizer 500,000.00 - 500,000.00
7 UPS (Unit Power Storage) 800,000.00 - 800,000.00
8 kamera Digital 1,200,000.00 1,200,000.00 1,200,000.00 -
JUMLAH 34,804,000.00 11,952,000.00 11,952,000.00 22,852,000.00
Buket Meurak, tanggal 16 Juli 2015
Telah dilakukan verifikasi Pelaksana Kegiatan
Sekretaris Gampong
M.YUNUS M,THAHER
JAFARUDDIN M,JAFAR
SURAT PERMINTAAN PEMBAYARAN (SPP)
GAMPONG BUKET MEURAK. KECAMATAN NURUSSALAM
TAHUN ANGGARAN 2015
1. Bidang 2.1. / Penyelenggara Pemerintahan Gampong
2. Kegiatan 2.1.1/ Penghasilan Tetep,Tunjangan dan Insentif Pegawai
3. Waktu Pelaksanaan 6 bulan
Rincian Pendanaan
M YUNUS JAILANI
JAFARUDDIN M JAFAR