NAMA POYEK : PEKERJAAN JASA QUALITY ASSURANCE/QUALITY CONTROL DAN SUPERVISI KONSTRUKSI SUTT 150 KV KETAPANG - KENDAWANGAN
TANGGAL KONTRAK : 29-08-2018
NO KONTRAK : 18.PJ/KON.02.02/UIP.KALBAGBAR/2018
BULAN : 1 OKTOBER - 31 OKTOBER 2019

NO NAMA JABATAN MM kontrak


BULAN OKTOBER 2019 TOTAL
MM Actual KETERANGAN
HARI
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TIME SHEET PERSONIL

I HEAD OFFICE
1 Suparman Project Director 1.80 0.00
2 Sutiyo Project Manager 4.50 0 0.00 21 Hari Kerja
3 Jamal Hamra Cost Control Engineer 0.00
II SITE OFFICE
4 Hapsara Pram Site Manager 9.00 0 0.00
5 Hery Kurniawan Civil Engineer 9.00 0 0.00
6 Andrie Louise HSE Engineer 9.00 0 0.00
7 Mahindra Hardinata HSE Engineer 9.00 0 0.00
8 Suranto Inspector Electrical/ME 6.00 0 0.00
9 Udji Riyadi Inspector Electrical/ME 6.00 0 0.00
10 Anggita Fajar Inspector Electrical/ME 6.00 0 0.00
11 Kuswidayat Civil Inspector 9.00 0 0.00
12 Hery Iswandi Civil Inspector 9.00 0 0.00
13 Herduansyah Civil Inspector 9.00 0 0.00
14 Bayu Muharri Civil Inspector 9.00 0 0.00
III TENAGA PENDUKUNG
15 Jannen Sitanggang Project Administrator 9.00 0 0.00 25 Hari Kerja
16 Ninda Fitria Pratiwi Administration/Typist 9.00 0 0.00 25 Hari Kerja
17 Rio Winanda W Office Boy 9.00 0 0.00 25 Hari Kerja
18 Roedhi Setiady Driver I 9.00 0 0.00 25 Hari Kerja
19 Ridwan Driver II 9.00 0 0.00 25 Hari Kerja
0.00
M : Meeting I : Izin
S : Sakit DT : Duty Trip/Mobilisasi
CT : Cuti CB : Cuti Bersama
A : Absen LN : Libur Nasional (Tahun Baru Islam 1441 H)
TL : Temporary Leave V : Hadir
PD : SPPD ( Perjalanan Dinas)

Ketapang, 01 November 2019

Disetujui,
Diajukan Oleh, PT.PLN ( Persero )
PT.PLN ENJINIRING UPP KITRING KALBAGBAR 4
PROJECT TEAM LEADER MANAGER BAGIAN TEKNIK
(HAPSARA PRAM) (TOMY PRASOJO)
PROYEK JASA KONSULTANSI SUPERVISI KONSTRUKSI
SUTT 150 KV KETAPANG - KENDAWANGAN
NO. KONTRAK : 18.PJ/KON.02.02/UIP.KALBAGBAR/2018

Nama Personil : HAPSARA PRAM


Jabatan : PROJECT TEAM LEADER
Bulan : 1 OKTOBER - 31 OKTOBER 2019

Hari Kerja
Tanggal Hari Uraian Pekerjaan Keterangan
Site Other
1 Selasa 1

2 Rabu 1
3 Kamis 1
4 Jumat 1
5 Sabtu 1
6 Minggu 1
7 Senin 1

8 Selasa 1

9 Rabu 1
10 Kamis 1
11 Jumat 1
12 Sabtu 1
13 Minggu 1
14 Senin 1

15 Selasa 1

16 Rabu 1
17 Kamis 1
18 Jumat 1
19 Sabtu 1
20 Minggu 1

21 Senin 1

22 Selasa 1

23 Rabu 1

24 Kamis 1

25 Jumat 1

26 Sabtu 1

27 Minggu 1

28 Senin 1

29 Selasa 1

30 Rabu 1

31 Kamis 1
TOTAL Man Days 31 0

Total Working Days 31


Total Actual Man-Month 1.00

Menyetujui,
Dibuat Oleh, PT. PLN (PERSERO)
PT. PLN ENJINIRING UPP KITRING KBB 4

HAPSARA PRAM (..........................................)


PROJECT TEAM LEADER PENGAWAS LAPANGAN
PROYEK JASA KONSULTANSI SUPERVISI KONSTRUKSI
SUTT 150 KV KETAPANG - KENDAWANGAN
NO. KONTRAK : 18.PJ/KON.02.02/UIP.KALBAGBAR/2018

Nama Personil : HERY KURNIAWAN


Jabatan : CIVIL ENGINEER
Bulan : 1 OKTOBER - 31 OKTOBER 2019

Hari Kerja
Tanggal Hari Uraian Pekerjaan Keterangan
Site Other

1 Selasa 1

2 Rabu 1

3 Kamis 1

4 Jumat 1

5 Sabtu 1

6 Minggu 1

7 Senin 1

8 Selasa 1

9 Rabu 1

10 Kamis 1

11 Jumat 1

12 Sabtu 1

13 Minggu 1

14 Senin 1

15 Selasa 1

16 Rabu 1

17 Kamis 1

18 Jumat 1

19 Sabtu 1

20 Minggu 1

21 Senin 1

22 Selasa 1

23 Rabu 1

24 Kamis 1

25 Jumat 1

26 Sabtu 1

27 Minggu 1

28 Senin 1

29 Selasa 1

30 Rabu 1

31 Kamis 1
TOTAL Man Days 31 0

Total Working Days 31


Total Actual Man-Month 1.00

Menyetujui,
Dibuat Oleh, Mengetahui, PT. PLN (PERSERO)
PT. PLN ENJINIRING PT. PLN ENJINIRING UPP KITRING KBB 4

HERY KURNIAWAN HAPSARA PRAM (..........................................)


CIVIL ENGINEER PROJECT TEAM LEADER PENGAWAS LAPANGAN
CIVIL ENGINEER PROJECT TEAM LEADER
PROYEK JASA KONSULTANSI SUPERVISI KONSTRUKSI
SUTT 150 KV KETAPANG - KENDAWANGAN
NO. KONTRAK : 18.PJ/KON.02.02/UIP.KALBAGBAR/2018

Nama Personil : ANDRE LOUISE


Jabatan : HSE ENGINEER
Bulan : 1 OKTOBER - 31 OKTOBER 2019

Hari Kerja
Tanggal Hari Uraian Pekerjaan Keterangan
Site Other
1 Selasa 1

2 Rabu 1

3 Kamis 1

4 Jumat 1

5 Sabtu 1

6 Minggu 1

7 Senin 1

8 Selasa 1

9 Rabu 1

10 Kamis 1

11 Jumat 1

12 Sabtu 1

13 Minggu 1

14 Senin 1

15 Selasa 1

16 Rabu 1

17 Kamis 1

18 Jumat 1

19 Sabtu 1

20 Minggu 1

21 Senin 1

22 Selasa 1

23 Rabu 1

24 Kamis 1

25 Jumat 1

26 Sabtu 1

27 Minggu 1

28 Senin 1

29 Selasa 1

30 Rabu 1

31 Kamis 1
TOTAL Man Days 31 0

Total Working Days 29


Total Actual Man-Month 1.07

Menyetujui,
Dibuat Oleh, Mengetahui, PT. PLN (PERSERO)
PT. PLN ENJINIRING PT. PLN ENJINIRING UPP KITRING KBB 4

ANDRE LOUISE HAPSARA PRAM (..........................................)


HSE ENGINEER PROJECT TEAM LEADER PENGAWAS LAPANGAN
ANDRE LOUISE HAPSARA PRAM (..........................................)
HSE ENGINEER PROJECT TEAM LEADER PENGAWAS LAPANGAN
PROYEK JASA KONSULTANSI SUPERVISI KONSTRUKSI
SUTT 150 KV KETAPANG - KENDAWANGAN
NO. KONTRAK : 18.PJ/KON.02.02/UIP.KALBAGBAR/2018

Nama Personil : MAHINDRA HARDINATA


Jabatan : HSE ENGINEER
Bulan : 1 OKTOBER - 31 OKTOBER 2019

Hari Kerja
Tanggal Hari Uraian Pekerjaan Keterangan
Site Other
1 Selasa 1 Pengawasan dan Inspeksi Pekerjaan Stringing T78 - T99 section 2 dan T35 - T56
2 Rabu 1 Pengawasan dan Inspeksi Pekerjaan civil section 3 T187

3 Kamis 1 Pengawasan dan Inspeksi Pekerjaan Stringing T78 - T99 section 2 dan T35 - T56

4 Jumat 1 Pengawasan dan Inspeksi Pekerjaan Stringing T78 - T99 section 2 dan T35 - T57

5 Sabtu 1 Koordinasi HSE terkait Work Permite pekerjaan

6 Minggu 1 Membuat laporan Mingguan HSE

7 Senin 1 Pengawasan dan Inspeksi Pekerjaan Stringing T78 - T99 section 2 dan T35 - T54

8 Selasa 1 Pengawasan dan Inspeksi Pekerjaan Stringing T78 - T99 section 2 dan T35 - T55

9 Rabu 1 Pengawasan dan Inspeksi Pekerjaan Stringing T78 - T99 section 2 dan T35 - T55

10 Kamis 1 Pengawasan dan Inspeksi Pekerjaan Erection Tower T175 Section 3

11 Jumat 1 Koordinasi dengan HSE PT Indisi terkait Safety Sign di lapangan

12 Sabtu 1 Pengawasan dan Inspeksi Pekerjaan Erection Tower T176 Section 3

13 Minggu 1 Membuat laporan Mingguan HSE

14 Senin 1 Pengawasan dan Inspeksi Pekerjaan Stringing T78 - T99 section 2 dan Section 1 T56 - T77

15 Selasa 1 Pengawasan dan Inspeksi Pekerjaan Stringing T78 - T99 section 2 dan Section 1 T56 - T77

16 Rabu 1 Pengawasan dan Inspeksi Pekerjaan Stringing T 56 - T 77

17 Kamis 1 Pengawasan dan Inspeksi Pekerjaan Stringing T78 - T99

18 Jumat 1 Pengawasan dan Inspeksi Pekerjaan Stringing T78 - T99 section 2 dan Section 1 T56 - T77

19 Sabtu 1 Pengawasan dan Inspeksi Pekerjaan Erection Tower T1 Section 3

20 Minggu 1 Membuat laporan Mingguan HSE

21 Senin 1 Pengawasan dan Inspeksi Pekerjaan Stringing T138 - 151 section 2 dan Section 1 T56 - T77

22 Selasa 1 Pengawasan dan Inspeksi Pekerjaan civil T187 dan 189

23 Rabu 1 Pengawasan dan Inspeksi Pekerjaan Stringing T138 - 151 section 2 dan Section 1 T56 - T79

24 Kamis 1 Pengawasan dan Inspeksi Pekerjaan pemasangan specer T 99 - 102

25 Jumat 1 Pengawasan dan Inspeksi Pekerjaan Stringing T138 - 151 section 2 dan Section 1 T21 - T34

26 Sabtu 1 Pengawasan dan Inspeksi Pekerjaan Stringing T138 - 151 section 2 dan Section 1 T21 - T34

27 Minggu 1 Membuat laporan Bulanan HSE Bulan Oktober 2019

28 Senin 1 Pengawasan dan Inspeksi Pekerjaan Stringing T138 - 151 section 2 dan Section 1 T21 - T34

29 Selasa 1 Pengawasan dan Inspeksi Pekerjaan Erection Tower T 185 dan 182

Review Laporan Bulanan HSE Kontraktor dan Pengawasan dan Inspeksi Pekerjaan Stringing T138 -
30 Rabu 1
151 section 2 dan Section 1 T21 - T34
31 Kamis 1 Pengawasan dan Inspeksi Pekerjaan Stringing T138 - 151 section 2 dan Section 1 T21 - T34
TOTAL Man Days 31 0

Total Working Days 31


Total Actual Man-Month 1.00

Menyetujui,
Dibuat Oleh, Mengetahui, PT. PLN (PERSERO)
PT. PLN ENJINIRING PT. PLN ENJINIRING UPP KITRING KBB 4

MAHINDRA HARDINATA HAPSARA PRAM (..........................................)


HSE ENGINEER PROJECT TEAM LEADER PENGAWAS LAPANGAN
PROYEK JASA KONSULTANSI SUPERVISI KONSTRUKSI
SUTT 150 KV KETAPANG - KENDAWANGAN
NO. KONTRAK : 18.PJ/KON.02.02/UIP.KALBAGBAR/2018

Nama Personil : SURANTO


Jabatan : INSPECTOR ELECTRICAL / MECHANICAL ELECTRICAL
Bulan :

Hari Kerja
Tanggal Hari Uraian Pekerjaan Keterangan
Site Other

TOTAL Man Days 0 0

Total Working Days 29


Total Actual Man-Month 0.00

Menyetujui,
Dibuat Oleh, Mengetahui, PT. PLN (PERSERO)
PT. PLN ENJINIRING PT. PLN ENJINIRING UPP KITRING KBB 4

SURANTO HAPSARA PRAM (..........................................)


INSPECTOR ELECTRICAL/ME PROJECT TEAM LEADER PENGAWAS LAPANGAN
SURANTO HAPSARA PRAM (..........................................)
INSPECTOR ELECTRICAL/ME PROJECT TEAM LEADER PENGAWAS LAPANGAN
PROYEK JASA KONSULTANSI SUPERVISI KONSTRUKSI
SUTT 150 KV KETAPANG - KENDAWANGAN
NO. KONTRAK : 18.PJ/KON.02.02/UIP.KALBAGBAR/2018

Nama Personil : UDJI RIYADI


Jabatan : INSPECTOR ELECTRICAL / MECHANICAL ELECTRICAL
Bulan : 1 OKTOBER - 31 OKTOBER 2019

Hari Kerja
Tanggal Hari Uraian Pekerjaan Keterangan
Site Other
1 Selasa 1 Libur Nasional Tahun Baru Islam 1441 H
Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV
2 Rabu 1
Ketapang - Kendawangan
Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV
3 Kamis 1
Ketapang - Kendawangan
Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV
4 Jumat 1
Ketapang - Kendawangan
Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV
5 Sabtu 1
Ketapang - Kendawangan
Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV
6 Minggu 1
Ketapang - Kendawangan
Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV
7 Senin 1
Ketapang - Kendawangan

8 Selasa 1 Membuat laporan dan Koordinasi dengan Kontraktor Section.I, II dan Section III

Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV


9 Rabu 1
Ketapang - Kendawangan
Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV
10 Kamis 1
Ketapang - Kendawangan
Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV
11 Jumat 1
Ketapang - Kendawangan
Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV
12 Sabtu 1
Ketapang - Kendawangan
Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV
13 Minggu 1
Ketapang - Kendawangan
Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV
14 Senin 1
Ketapang - Kendawangan

15 Selasa 1 Membuat laporan dan Koordinasi dengan Kontraktor Section.I, II dan Section III

Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV


16 Rabu 1
Ketapang - Kendawangan
Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV
17 Kamis 1
Ketapang - Kendawangan
Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV
18 Jumat 1
Ketapang - Kendawangan
Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV
19 Sabtu 1
Ketapang - Kendawangan
Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV
20 Minggu 1
Ketapang - Kendawangan
Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV
21 Senin 1
Ketapang - Kendawangan

22 Selasa 1 Membuat laporan dan Koordinasi dengan Kontraktor Section.I, II dan Section III

Pengawasan Pekerjaan Stringing dan Pekerjaan Erection Tower SUTT 150kV


23 Rabu 1
Ketapang - Kendawangan

24 Kamis 1 Pengawasan Stringing dan persiapan stringing Section 1 dan Section 2

25 Jumat 1 Pengawasan Stringing dan persiapan stringing Section 1 dan Section 2

26 Sabtu 1 Pengawasan Stringing dan persiapan stringing Section 1 dan Section 2

27 Minggu 1 Pengawasan Stringing dan persiapan stringing Section 1 dan Section 2

28 Senin 1 Pengawasan Stringing dan persiapan stringing Section 1 dan Section 2

29 Selasa 1 Membuat laporan dan Koordinasi dengan Kontraktor Section.I, II dan Section III

30 Rabu 1 Pengawasan Stringing dan persiapan stringing Section 1 dan Section 2


31 Kamis 1 Pengawasan Stringing dan persiapan stringing Section 1 dan Section 2
TOTAL Man Days 31 0

Total Working Days 31


Total Actual Man-Month 1.00

Menyetujui,
Dibuat Oleh, Mengetahui, PT. PLN (PERSERO)
PT. PLN ENJINIRING PT. PLN ENJINIRING UPP KITRING KBB 4

UDJI RIYADI HAPSARA PRAM (..........................................)


INSPECTOR ELECTRICAL/ME PROJECT TEAM LEADER PENGAWAS LAPANGAN
INSPECTOR ELECTRICAL/ME PROJECT TEAM LEADER PENGAWAS LAPANGAN
PROYEK JASA KONSULTANSI SUPERVISI KONSTRUKSI
SUTT 150 KV KETAPANG - KENDAWANGAN
NO. KONTRAK : 18.PJ/KON.02.02/UIP.KALBAGBAR/2018

Nama Personil : ANGGITA FAJAR BAHARI


Jabatan : INSPECTOR ELECTRICAL / MECHANICAL ELECTRICAL
Bulan : 1 OKTOBER - 31 OKTOBER 2019

Hari Kerja
Tanggal Hari Uraian Pekerjaan Keterangan
Site Other
1 Selasa 1
2 Rabu 1
3 Kamis 1

4 Jumat 1

5 Sabtu 1
6 Minggu 1
7 Senin 1
8 Selasa 1
9 Rabu 1
10 Kamis 1

11 Jumat 1

12 Sabtu 1
13 Minggu 1
14 Senin 1
15 Selasa 1
16 Rabu 1

17 Kamis 1

18 Jumat 1

19 Sabtu 1
20 Minggu 1
21 Senin 1
22 Selasa 1
23 Rabu 1
24 Kamis 1

25 Jumat 1

26 Sabtu 1
27 Minggu 1
28 Senin 1
29 Selasa 1
30 Rabu 1
31 Kamis 1
TOTAL Man Days 31 0

Total Working Days 31


Total Actual Man-Month 1.00

Menyetujui,
Dibuat Oleh, Mengetahui, PT. PLN (PERSERO)
PT. PLN ENJINIRING PT. PLN ENJINIRING UPP KITRING KBB 4

ANGGITA FAJAR BAHARI HAPSARA PRAM (..........................................)


INSPECTOR ELECTRICAL/ME PROJECT TEAM LEADER PENGAWAS LAPANGAN
PROYEK JASA KONSULTANSI SUPERVISI KONSTRUKSI
SUTT 150 KV KETAPANG - KENDAWANGAN
NO. KONTRAK : 18.PJ/KON.02.02/UIP.KALBAGBAR/2018

Nama Personil : KUSWIDAYAT


Jabatan : CIVIL INSPECTOR
Bulan : 1 OKTOBER - 31 OKTOBER 2019

Hari Kerja
Tanggal Hari Uraian Pekerjaan Keterangan
Site Other

1 Selasa 1

2 Rabu 1

3 Kamis 1

4 Jumat 1

5 Sabtu 1

6 Minggu 1

7 Senin 1

8 Selasa 1

9 Rabu 1

10 Kamis 1

11 Jumat 1

12 Sabtu 1

13 Minggu 1

14 Senin 1

15 Selasa 1

16 Rabu 1

17 Kamis 1
18 Jumat 1

19 Sabtu 1

20 Minggu 1
21 Senin 1

22 Selasa 1

23 Rabu 1
24 Kamis 1
25 Jumat 1
26 Sabtu 1

27 Minggu 1

28 Senin 1

29 Selasa 1

30 Rabu 1

31 Kamis 1
TOTAL Man Days 31 0

Total Working Days 31


Total Actual Man-Month 1.00

Menyetujui,
Dibuat Oleh, Mengetahui, PT. PLN (PERSERO)
PT. PLN ENJINIRING PT. PLN ENJINIRING UPP KITRING KBB 4

KUSWIDAYAT HAPSARA PRAM (..........................................)


CIVIL INSPECTOR PROJECT TEAM LEADER PENGAWAS LAPANGAN
PROYEK JASA KONSULTANSI SUPERVISI KONSTRUKSI
SUTT 150 KV KETAPANG - KENDAWANGAN
NO. KONTRAK : 18.PJ/KON.02.02/UIP.KALBAGBAR/2018

Nama Personil : HERY ISWANDI


Jabatan : CIVIL INSPECTOR
Bulan : 1 OKTOBER - 31 OKTOBER 2019

Hari Kerja
Tanggal Hari Uraian Pekerjaan Keterangan
Site Other
1 Selasa 1

2 Rabu 1

3 Kamis 1

4 Jumat 1

5 Sabtu 1

6 Minggu 1

7 Senin 1

8 Selasa 1

9 Rabu 1

10 Kamis 1

11 Jumat 1

12 Sabtu 1

13 Minggu 1

14 Senin 1

15 Selasa 1

16 Rabu 1

17 Kamis 1

18 Jumat 1

19 Sabtu 1

20 Minggu 1

21 Senin 1
22 Selasa 1

23 Rabu 1

24 Kamis 1

25 Jumat 1

26 Sabtu 1

27 Minggu 1

28 Senin 1

29 Selasa 1

30 Rabu 1
31 Kamis 1
TOTAL Man Days 31 0

Total Working Days 31


Total Actual Man-Month 1.00

Menyetujui,
Dibuat Oleh, Mengetahui, PT. PLN (PERSERO)
PT. PLN ENJINIRING PT. PLN ENJINIRING UPP KITRING KBB 4

HERY ISWANDI HAPSARA PRAM (..........................................)


CIVIL INSPECTOR PROJECT TEAM LEADER PENGAWAS LAPANGAN
HERY ISWANDI HAPSARA PRAM (..........................................)
CIVIL INSPECTOR PROJECT TEAM LEADER PENGAWAS LAPANGAN
PROYEK JASA KONSULTANSI SUPERVISI KONSTRUKSI
SUTT 150 KV KETAPANG - KENDAWANGAN
NO. KONTRAK : 18.PJ/KON.02.02/UIP.KALBAGBAR/2018

Nama Personil : HERDUANSYAH


Jabatan : CIVIL INSPECTOR
Bulan : 1 OKTOBER - 31 OKTOBER 2019

Hari Kerja
Tanggal Hari Uraian Pekerjaan Keterangan
Site Other

1 Selasa 1

2 Rabu 1

3 Kamis 1

4 Jumat 1

5 Sabtu 1

6 Minggu 1

7 Senin 1

8 Selasa 1

9 Rabu 1

10 Kamis 1

11 Jumat 1

12 Sabtu 1

13 Minggu 1

14 Senin 1

15 Selasa 1

16 Rabu 1

17 Kamis 1

18 Jumat 1

19 Sabtu 1

20 Minggu 1

21 Senin 1

22 Selasa 1

23 Rabu 1

24 Kamis 1

25 Jumat 1

26 Sabtu 1

27 Minggu 1

28 Senin 1

29 Selasa 1

30 Rabu 1

31 Kamis 1
TOTAL Man Days 31 0

Total Working Days 31


Total Actual Man-Month 1.00

Menyetujui,
Dibuat Oleh, Mengetahui, PT. PLN (PERSERO)
PT. PLN ENJINIRING PT. PLN ENJINIRING UPP KITRING KBB 4

HERDUANSYAH HAPSARA PRAM (..........................................)


CIVIL INSPECTOR PROJECT TEAM LEADER PENGAWAS LAPANGAN
CIVIL INSPECTOR PROJECT TEAM LEADER PENGAWAS LAPANGAN
PROYEK JASA KONSULTANSI SUPERVISI KONSTRUKSI
SUTT 150 KV KETAPANG - KENDAWANGAN
NO. KONTRAK : 18.PJ/KON.02.02/UIP.KALBAGBAR/2018

Nama Personil : BAYU MUHARRI


Jabatan : CIVIL INSPECTOR
Bulan : 1 OKTOBER - 31 OKTOBER 2019

Hari Kerja
Tanggal Hari Uraian Pekerjaan Keterangan
Site Other
1 Selasa 1

2 Rabu 1

3 Kamis 1

4 Jumat 1

5 Sabtu 1

6 Minggu 1

7 Senin 1

8 Selasa 1

9 Rabu 1

10 Kamis 1

11 Jumat 1

12 Sabtu 1

13 Minggu 1

14 Senin 1

15 Selasa 1

16 Rabu 1

17 Kamis 1

18 Jumat 1

19 Sabtu 1

20 Minggu 1

21 Senin 1

22 Selasa 1

23 Rabu 1

24 Kamis 1

25 Jumat 1

26 Sabtu 1

27 Minggu 1

28 Senin 1

29 Selasa 1
30 Rabu 1
31 Kamis 1
TOTAL Man Days 31 0

Total Working Days 29


Total Actual Man-Month 1.07

Menyetujui,
Dibuat Oleh, Mengetahui, PT. PLN (PERSERO)
PT. PLN ENJINIRING PT. PLN ENJINIRING UPP KITRING KBB 4

BAYU MUHARRI HAPSARA PRAM (..........................................)


CIVIL INSPECTOR PROJECT TEAM LEADER PENGAWAS LAPANGAN
PROYEK JASA KONSULTANSI SUPERVISI KONSTRUKSI
SUTT 150 KV KETAPANG - KENDAWANGAN
NO. KONTRAK : 18.PJ/KON.02.02/UIP.KALBAGBAR/2018

Nama Personil : JANNEN SITANGGANG


Jabatan : PROJECT ADMINISTRATOR
Bulan : 1 OKTOBER - 31 OKTOBER 2019

Hari Kerja
Tanggal Hari Uraian Pekerjaan Keterangan
Site Other
Membuat dan mengarsipkan surat dan dokumen lain proyek konstruksi SUTT
1 Selasa 1
150 kV Ketapang - Kendawangan
Membuat dan mengarsipkan surat dan dokumen lain proyek konstruksi SUTT
2 Rabu 1
150 kV Ketapang - Kendawangan
Melengkapi, mengarsipkan surat dan dokumen lain proyek konstruksi SUTT
3 Kamis 1
150 kV Ketapang - Kendawangan
Melengkapi, mengarsipkan surat dan dokumen lain proyek konstruksi SUTT
4 Jumat 1
150 kV Ketapang - Kendawangan
Melengkapi, mengarsipkan surat dan dokumen lain proyek konstruksi SUTT
5 Sabtu 1
150 kV Ketapang - Kendawangan
6 Minggu 1
7 Senin 1 Menyusun dan Melaporkan Laporan Mingguan
Membuat dan mengarsipkan surat dan dokumen lain proyek konstruksi SUTT
8 Selasa 1
150 kV Ketapang - Kendawangan
Melengkapi, mengarsipkan surat dan dokumen lain proyek konstruksi SUTT
9 Rabu 1
150 kV Ketapang - Kendawangan
Melengkapi, mengarsipkan surat dan dokumen lain proyek konstruksi SUTT
10 Kamis 1
150 kV Ketapang - Kendawangan
Melengkapi, mengarsipkan surat dan dokumen lain proyek konstruksi SUTT
11 Jumat 1
150 kV Ketapang - Kendawangan
12 Sabtu 1 Menyusun LPJ
13 Minggu 1

14 Senin 1 Menyusun dan Melaporkan Laporan Mingguan

15 Selasa 1 Menyusun dan Melaporkan Timesheet Personil Periode Oktober 2019


16 Rabu 1 Menyusun LPJ

17 Kamis 1 Menyusun LPJ

18 Jumat 1 Menyusun Laporan Bulanan


19 Sabtu 1 Menyusun Laporan Bulanan
20 Minggu 1

21 Senin 1 Menyusun dan Melaporkan Laporan Mingguan


Membuat dan mengarsipkan surat dan dokumen lain proyek konstruksi SUTT
22 Selasa 1
150 kV Ketapang - Kendawangan
Melengkapi, mengarsipkan surat dan dokumen lain proyek konstruksi SUTT
23 Rabu 1
150 kV Ketapang - Kendawangan
Melengkapi, mengarsipkan surat dan dokumen lain proyek konstruksi SUTT
24 Kamis 1
150 kV Ketapang - Kendawangan
Melengkapi, mengarsipkan surat dan dokumen lain proyek konstruksi SUTT
25 Jumat 1
150 kV Ketapang - Kendawangan
26 Sabtu 1 Menyusun LPJ
27 Minggu 1
28 Senin 1 Menyusun dan Melaporkan Laporan Mingguan
Membuat dan mengarsipkan surat dan dokumen lain proyek konstruksi SUTT
29 Selasa 1
150 kV Ketapang - Kendawangan
Melengkapi, mengarsipkan surat dan dokumen lain proyek konstruksi SUTT
30 Rabu 1
150 kV Ketapang - Kendawangan
Melengkapi, mengarsipkan surat dan dokumen lain proyek konstruksi SUTT
31 Kamis 1
150 kV Ketapang - Kendawangan
TOTAL Man Days 31 0

Total Working Days 25


Total Actual Man-Month 1.24

Dibuat Oleh, Mengetahui, Menyetujui,


PT. PLN ENJINIRING PT. PLN ENJINIRING PT. PLN (PERSERO)
UPP KITRING KBB 4

JANNEN SITANGGANG HAPSARA PRAM


PROJECT ADMINISTRATOR PROJECT TEAM LEADER (..........................................)
PENGAWAS LAPANGAN
PROJECT ADMINISTRATOR PROJECT TEAM LEADER
PENGAWAS LAPANGAN
PROYEK JASA KONSULTANSI SUPERVISI KONSTRUKSI
SUTT 150 KV KETAPANG - KENDAWANGAN
NO. KONTRAK : 18.PJ/KON.02.02/UIP.KALBAGBAR/2018

Nama Personil : NINDA FITRIA PRATIWI


Jabatan : ADMINISTRATION/TYPIST
Bulan : 1 OKTOBER - 31 OKTOBER 2019

Hari Kerja
Tanggal Hari Uraian Pekerjaan Keterangan
Site Other
1 Selasa 1
2 Rabu 1
3 Kamis 1
4 Jumat 1
5 Sabtu 1
6 Minggu
7 Senin 1
8 Selasa 1
9 Rabu 1
10 Kamis 1
11 Jumat 1
12 Sabtu 1
13 Minggu
14 Senin 1
15 Selasa 1
16 Rabu 1
17 Kamis 1
18 Jumat 1
19 Sabtu 1
20 Minggu
21 Senin 1
22 Selasa 1
23 Rabu 1
24 Kamis 1
25 Jumat 1
26 Sabtu 1
27 Minggu
28 Senin 1
29 Selasa 1
30 Rabu 1
31 Kamis 1
TOTAL Man Days 27 0

Total Working Days 27


Total Actual Man-Month 1.00

Menyetujui,
Dibuat Oleh, Mengetahui, PT. PLN (PERSERO)
PT. PLN ENJINIRING PT. PLN ENJINIRING UPP KITRING KBB 4

NINDA FITRIA PRATIWI HAPSARA PRAM (..........................................)


PROADMINISTRATION/TYPIST PROJECT TEAM LEADER PENGAWAS LAPANGAN
PROYEK JASA KONSULTANSI SUPERVISI KONSTRUKSI
SUTT 150 KV KETAPANG - KENDAWANGAN
NO. KONTRAK : 18.PJ/KON.02.02/UIP.KALBAGBAR/2018

Nama Personil : ROEDHI SETIADY


Jabatan : DRIVER
Bulan : 1 OKTOBER - 31 OKTOBER 2019

Hari Kerja
Tanggal Hari Uraian Pekerjaan Keterangan
Site Other
1 Selasa 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
2 Rabu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
3 Kamis 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
4 Jumat 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
5 Sabtu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
6 Minggu
7 Senin 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
8 Selasa 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
9 Rabu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
10 Kamis 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
11 Jumat 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
12 Sabtu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
13 Minggu

14 Senin 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA


15 Selasa 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
16 Rabu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
17 Kamis 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
18 Jumat 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
19 Sabtu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
20 Minggu
21 Senin 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
22 Selasa 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
23 Rabu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
24 Kamis 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
25 Jumat 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
26 Sabtu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
27 Minggu
28 Senin 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
29 Selasa 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
30 Rabu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
31 Kamis 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
TOTAL Man Days 27 0

Total Working Days 27


Total Actual Man-Month 1.00
Menyetujui,
Dibuat Oleh, Mengetahui, PT. PLN (PERSERO)
PT. PLN ENJINIRING PT. PLN ENJINIRING UPP KITRING KBB 4

ROEDHI SETIADY HAPSARA PRAM (..........................................)


DRIVER PROJECT TEAM LEADER PENGAWAS LAPANGAN
PROYEK JASA KONSULTANSI SUPERVISI KONSTRUKSI
SUTT 150 KV KETAPANG - KENDAWANGAN
NO. KONTRAK : 18.PJ/KON.02.02/UIP.KALBAGBAR/2018

Nama Personil : RIDWAN


Jabatan : DRIVER
Bulan : 1 OKTOBER - 31 OKTOBER 2019

Hari Kerja
Tanggal Hari Uraian Pekerjaan Keterangan
Site Other
1 Selasa 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA

2 Rabu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA


3 Kamis 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
4 Jumat 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
5 Sabtu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
6 Minggu

7 Senin 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA


8 Selasa 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
9 Rabu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
10 Kamis 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
11 Jumat 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
12 Sabtu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
13 Minggu

14 Senin 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA


15 Selasa 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
16 Rabu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
17 Kamis 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
18 Jumat 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
19 Sabtu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
20 Minggu

21 Senin 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA


22 Selasa 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
23 Rabu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
24 Kamis 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
25 Jumat 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
26 Sabtu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
27 Minggu

28 Senin 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA


29 Selasa 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
30 Rabu 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
31 Kamis 1 Rutinitas Transportasi Harian Personil, Engineer, PTL dan PA
TOTAL Man Days 27 0

Total Working Days 27


Total Actual Man-Month 1.00
Menyetujui,
Dibuat Oleh, Mengetahui, PT. PLN (PERSERO)
PT. PLN ENJINIRING PT. PLN ENJINIRING UPP KITRING KBB 4

RIDWAN HAPSARA PRAM (..........................................)


DRIVER PROJECT TEAM LEADER PENGAWAS LAPANGAN
PROYEK JASA KONSULTANSI SUPERVISI KONSTRUKSI
SUTT 150 KV KETAPANG - KENDAWANGAN
NO. KONTRAK : 18.PJ/KON.02.02/UIP.KALBAGBAR/2018

Nama Personil : RIO WINANDA WAHYUDI


Jabatan : OFFICE BOY
Bulan : 1 SEPTEMBER - 30 SEPTEMBER 2019

Hari Kerja
Tanggal Hari Uraian Pekerjaan Keterangan
Site Other
1 Selasa 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
2 Rabu 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
3 Kamis 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
4 Jumat 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
5 Sabtu 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
6 Minggu

7 Senin 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV


8 Selasa 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
9 Rabu 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
10 Kamis 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
11 Jumat 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
12 Sabtu 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
13 Minggu

14 Senin 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV


15 Selasa 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
16 Rabu 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
17 Kamis 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
18 Jumat 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
19 Sabtu 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
20 Minggu

21 Senin 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV


22 Selasa 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
23 Rabu 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
24 Kamis 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
25 Jumat 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
26 Sabtu 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
27 Minggu

28 Senin 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV


29 Selasa 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
30 Rabu 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
31 Kamis 1 Rutinitas Pembersihan Kantor dan Mess SUTT 150 kV
TOTAL Man Days 27 0

Total Working Days 27


Total Actual Man-Month 1.00
Menyetujui,
Dibuat Oleh, Mengetahui, PT. PLN (PERSERO)
PT. PLN ENJINIRING PT. PLN ENJINIRING UPP KITRING KBB 4

RIO WINANDA WAHYUDI HAPSARA PRAM (..........................................)


OFFICE BOY PROJECT TEAM LEADER PENGAWAS LAPANGAN

Anda mungkin juga menyukai