Anda di halaman 1dari 2

LAPORAN SHIFT SUPERVISOR & SHIFT HANDOVER WHB #170

Hari/Tanggal Sunday, November 03, 2019 Team A3


Jam 08.00-16.00 Shift Supervisor BENNY SAPUTRA

Input
Parameter Satuan Nakula Sadewa
Material Balance
BFW WHB I-II ton/jam 27.66 32.81
HP/MP Steam Product ton/jam 29.25 29.95 8.94
HP/MP Steam Temperature degC 371 375 209
Kondisi Operasi
Press Steam Drum kg/cm2 41.38 41.23
Bukaan C.B.B point 4 4
Kondisi Energi (EMS)
Konsumsi Fuel Oil m3/jam 2.78 2.7
Combustion Air Flow Nm3/jam 35547 42755
Total Fuel ton/TSRF 12.08 12.72
O2 Excess Heater % 10.18 10.2
Temp Stack degC 246 252

Keterangan
WHB
08.30 : Check kondisi CT-52,53 dan 54
: Check nyala api WHB I dan II
: Rojok-rojok coke di burner WHB I dan II
: IBB WHB I DAN II
: M.UP Lo 5Ltr To tk.Infus

GROUP I
09.00 - 09.55 : Transfer coke ke yard X via V.PORTABLE
10.00 - MASIH : Transfer coke ke SHIP G. crane
Shift Handover Checklist
Kegiatan SPV Jaga Pengganti
Menyampaikan Parameter Operasi > Parameter Limit
Menyampaikan Proses Upset/Kondisi Kritikal
Menyampaikan Pekerjaan yang Berlanjut
Menyampaikan Kondisi Unsafe/Pencemaran Lingkungan
Menyampaikan Kondisi Alarm yang Sering Muncul & Perlu Tindak Lanjut Segera
Menyampaikan Peralatan/ESD yang Dibypass
EMS Activity
PIC Kegiatan Status

Maintenance Activity
PIC Kegiatan Status

Catatan / Informasi

Anda mungkin juga menyukai