Anda di halaman 1dari 40

RENCANA ANGGARAN BIAYA

)RAB(
: PEKERJAAN

PEMBANGUNAN RUMAH TINGGAL


JALAN SKIP DALAM III

-TAHUN 2019-
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL


LOKASI : JALAN SKIP DALAM III
TAHUN : 2019

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

I PEKERJAAN PENDAHULUAN 569,720.00


II PEKERJAAN TANAH 4,267,964.35
III PEKERJAAN PONDASI 15,698,592.00
IV PEKERJAAN STRUKTUR KONSTRUKSI BETON 25,012,994.32
V PEKERJAAN KUDA-KUDA, ATAP dan LISTPLANG 43,586,667.25
VI PEKERJAAN DINDING PAS. BATA, PLESTERAN & ORNAMEN 45,637,905.94
VII PEKERJAAN LANTAI, PLAFOND 44,040,971.00
VIII PEKERJAAN KUSEN, DAUN PINTU JENDELA DAN KACA 12,040,441.52
IX PEKERJAAN PENGECATAN, BATU ALAM & ORNAMEN PAGAR BESI 14,826,947.20
X PEKERJAAN SANITASI & SEPTICTANK 2,205,835.09
XI PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 5,815,500.00
JUMLAH 213,703,538.68
JUMLAH PEMBULATAN 213,703,000.00
Terbilang : (Dua Ratus Tiga Belas Juta Tujuh Ratus Tiga Ribu)
Tanjungpandan, 26 Juli 2019
: Dibuat Oleh

MEIDY PRATAMA
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL


LOKASI : JALAN SKIP DALAM III
TAHUN : 2019

KODE
URAIAN KEGIATAN SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
ANALISA

1 2 3 4 5 6
I. PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi Bangunan M2 A1 320.00 - -
2 Pemasangan Bowplank M1 A2 80.00 7,121.50 569,720.00
JUMLAH I 569,720.00
II. PEKERJAAN TANAH
1 Galian Tanah Pondasi Poor Plate dan Pondasi Menerus M3 B1 15.12 43,275.00 654,318.00
2 Urugan Tanah Kembali M3 B3 3.78 11,078.40 41,876.35
3 Urugan Tanah Peninggian Lantai Bangunan M3 B4 67.00 53,310.00 3,571,770.00
JUMLAH II 4,267,964.35
III. PEKERJAAN PONDASI
1 Pas Batu Gunung 1 : 4 M3 B10 40.32 389,350.00 15,698,592.00
JUMLAH III 15,698,592.00
IV. PEKERJAAN STRUKTUR KONSTRUKSI BETON
PEKERJAAN COR BETON BERTULANG K.250
1 Beton Sloof 15 x 20 M3 C18 9.07 1,721,546.65 15,617,871.18
2 Beton Balok Elevasi +4.50 (15 x 40) M3 C19 0.81 3,162,719.07 2,561,802.45
3 Beton Balok Elevasi +4.50 (40 x 40) M4 C20 1.44 2,563,122.72 3,690,896.71
4 Beton Balok Elevasi +4.50 (20 x 40) M3 C24 0.56 3,047,596.57 1,706,654.08
5 Beton Untuk Pet M3 0.83 1,721,546.65 1,435,769.90
JUMLAH IV 25,012,994.32
V. PEKERJAAN KUDA-KUDA, ATAP dan LISTPLANG
1 Kuda-Kuda Baja Ringan & rangka Atap M2 I1 319.00 48,994.40 15,629,213.60
2 Pasang Atap Genteng Metal M2 I3 319.00 61,854.35 19,731,537.65
3 Pasang Nok Metal M1 I4 138.00 36,594.50 5,050,041.00
4 Listplang Papan GRC Finishing Cat M1 I2 90.00 35,287.50 3,175,875.00

JUMLAH V 43,586,667.25
VI. PEKERJAAN DINDING PAS. BATA, PLESTERAN & ORNAMEN
LANTAI 1
1 Pasangan Dinding 1/2 bata 1:4 M2 E2 450.34 64,510.00 29,051,433.40
2 Plesteran Dinding 1 : 2 M2 E3 450.34 36,831.00 16,586,472.54
JUMLAH VI 45,637,905.94

RAB RUMAH 3
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL


LOKASI : JALAN SKIP DALAM III
TAHUN : 2019

KODE
URAIAN KEGIATAN SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
ANALISA

1 2 3 4 5 6
VII. PEKERJAAN LANTAI, PLAFOND
PEKERJAAN LANTAI KERAMIK
1 Lantai Keramik 60/60 M2 D2 201.00 136,637.00 27,464,037.00
2 Keramik tangga 60/60 M2 2.80 136,637.00 382,583.60
3 Lantai Keramik 60/60 U KM/WC M2 D2 12.00 136,637.00 1,639,644.00
4 Dinding Keramik 20/40 u km/wc M2 D3 28.50 94,735.00 2,699,947.50

PEKERJAAN PLAFOND
1 Pasang Rangka plafond M2 E.001 201.00 29,520.00 5,933,520.00
2 Pasang bahan plafond GRC M2 G2 201.00 29,458.90 5,921,238.90
JUMLAH VII 44,040,971.00
VIII.PEKERJAAN KUSEN, DAUN PINTU JENDELA DAN KACA
PEKERJAAN KUSEN, DAUN PINTU, JENDELA & KACA UNTUK LANTAI 1
1 Pasang Kusen, pintu, jendela Kayu M' F.001 96.00 7,021.19 674,034.66
2 Pasang Pintu Panel Rangka Kayu bengkirai/kapur M2 F.002 30.36 217,580.00 6,605,728.80
3 Pasang Daun Jendela kaca Rangka Kayu M2 F.003 6.48 150,164.00 973,062.72
4 Pasang kaca Bening 5 mm M2 K10 9.72 50,384.50 489,737.34
5 Pasang Kunci Pintu 2x putar setara SES Bh K4 14.00 120,961.50 1,693,461.00
6 Pasang Engsel Pintu BH K5 42.00 15,384.50 646,149.00
7 Pasang Engsel Jendela BH K6 40.00 11,923.00 476,920.00
8 Pasang Grendel Jendela BH 20.00 15,000.00 300,000.00
9 Pasang Hak angin BH K9 20.00 9,067.40 181,348.00
JUMLAH VIII 12,040,441.52
IX. PEKERJAAN PENGECATAN, BATU ALAM & ORNAMEN PAGAR BESI
1 Cat Dinding Tembok dan Plafond M2 F1 1,101.68 11,701.98 12,891,837.33
2 Cat Minyak Kusen, Pintu, Jendela, Lisplank M2 F3 36.84 11,810.80 435,109.87
3 Batu Alam atau Finishing Dinding dengan cat motif M2 6.00 250,000.00 1,500,000.00
JUMLAH IX 14,826,947.20
X. PEKERJAAN SANITASI & SEPTICTANK
1 Kloset Dudukk + Acsesoris Lengkap (Ex. Toto) Bh M1 1.00 1,355,405.00 1,355,405.00
2 Septicktang Beton dan Pasangan Bata 1.00 350,000.00 350,000.00
1. Galian Tanah biasa M3 B1 1.00 43,275.00 43,275.00
2. Urugan Tanah Kembali M3 B3 0.30 11,078.40 3,323.52
3. Urugan Pasir M3 B4 0.10 11,078.40 1,107.84
4. Cor Beton Bertulang Konstruksi M3 C18 0.08 1,721,546.65 137,723.73
5. Pemasangan Pipa PVC Ø4" M1 14.00 22,500.00 315,000.00

RAB RUMAH 4
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL


LOKASI : JALAN SKIP DALAM III
TAHUN : 2019

KODE
URAIAN KEGIATAN SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
ANALISA

1 2 3 4 5 6
JUMLAH X 2,205,835.09

RAB RUMAH 5
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL


LOKASI : JALAN SKIP DALAM III
TAHUN : 2019

KODE
URAIAN KEGIATAN SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
ANALISA

1 2 3 4 5 6
XI. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
A PEKERJAN ELEKTRIKAL
1 Pek Sekring Listrik
1). Sekring unit 1.00 200,000.00 200,000.00
Sub Total, A,a, I 200,000.00
2 Pek Lampu Penerangan
1). Lampu LED 14 watt bh 8.00 52,000.00 416,000.00
2). Lampu LED 10 watt bh 14.00 32,000.00 448,000.00
3). Lampu LED 5 watt bh 4.00 27,000.00 108,000.00
4). Lampu LED 3 watt bh 58.00 18,000.00 1,044,000.00
5). Saklar tunggal bh 30.00 15,000.00 450,000.00
6). Saklar seri bh 20.00 32,000.00 640,000.00
Sub Total,A, a, IV 3,106,000.00
TOTAL, A 3,306,000.00
B PEKERJAAN MEKANIKAL
a Pek,Instalasi Air Bersih
B.a,1 Pek Air Bersih Lantai I
1). Pipa PVC Ø 1/2" m 87.00 3,500.00 304,500.00
2). Kran Æ 1/2 " Bh 7.00 15,000.00 105,000.00
3). Fitting - Fitting ( Elbow, Tee, Reduser,etc ) Ls 1.00 500,000.00 500,000.00
Sub Total, B,a, I 909,500.00
b Pek,Instalasi Air Kotor & Bekas
B.b,1 Pek Air Kotor & Bekas Lantai I
1). Pipa PVC 4" AW m 40.00 22,500.00 900,000.00
2). Pipa PVC 2" AW m 8.00 11,250.00 90,000.00
3). Floor Drain Bh 2.00 55,000.00 110,000.00
4). Fitting - Fitting ( Elbow, Tee, Reduser,etc ) Ls 1.00 500,000.00 500,000.00
Sub Total, B.b, I 1,600,000.00

TOTAL, B 2,509,500.00
JUMLAH TOTAL, A , B. 5,815,500.00
JUMLAH PEMBANGUNAN 213,703,538.68
213,703,000.00

RAB RUMAH 6
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL


LOKASI : JALAN SKIP DALAM III
TAHUN : 2019

KODE
URAIAN KEGIATAN SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
ANALISA

1 2 3 4 5 6

Kalang Ulin 5/10 dan Kalang Ulin 5/10 Setempat

RAB RUMAH 7
900000000
300
1,350,000,000.00

Pengurangan 0.59803

0.07

besi dia 12 0.888

besi dia 16 1.578

1.34 besi dia 8 (begel/sengkang) 0.395


63.4

#REF!

0.089285714285714

RAB RUMAH 8
900000000
300
1,350,000,000.00

23,577,224.42 27.72

4,521.02

227.23
213.12

#REF! 152.50 #REF!


#REF!
305.00

48.00

25,125,000.00 2,339,037.00

213,703,000.00

28.00

RAB RUMAH 9
900000000
300
1,350,000,000.00

213,703,538.68

RAB RUMAH 10
24

RAB RUMAH 11
4,608.00

r ganti pi/pa+dapur+k

3.5

RAB RUMAH 12
16.00

RAB RUMAH 13
titik

RAB RUMAH 14
m1

r ganti pi/pa+dapur+k 1,234.75

RAB RUMAH 15
ANALISA PEKERJAAN

NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)

A. ANALISA PEKERJAAN PERSIAPAN / PENDAHULUAN


A1 1 M2 Pembersihan Lahan
SNI
6.8 Pekerja 0.1000 org - 0.00 0.00
03-2835-2002 Mandor 0.0500 org - 0.00 0.00
Jumlah 0.00 - -

A2 1 M' Pengukuran dan Pemasangan Bouwplank


6.4 Paku Biasa 0.0200 kg 14,850.00 297.00 297.00
03-2835-2002 Kayu Papan Meranti Bouwplank 3/20 0.0070 M³ 1,800,000.00 12,600.00 12,600.00
Kepala tukang 0.010 org 134,600.00 1,346.00 1,346.00
Jumlah 12,897.00 1,346.00 14,243.00

B. ANALISA PEKERJAAN PONDASI / TANAH


SNI 2835:2008
B1 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 1 M'
SNI 2835:2008 Pekerja 0.7500 org 57,700.00 43,275.00 43,275.00
Jumlah 0.00 43,275.00 43,275.00

B2 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 2 M'


Pekerja 0.9000 org 57,700.00 51,930.00 51,930.00
Jumlah 51,930.00 51,930.00

B3 1 M3 PEK. URUGAN TANAH KEMBALI


Pekerja 0.1920 org 57,700.00 11,078.40 11,078.40
Alat bantu 0.0000 lot 25,000.00 0.00 0.00
Jumlah 0.00 11,078.40 11,078.40

B4 1 M3 URUGAN TANAH
Tanah urug 1.2000 m3 30,000.00 36,000.00 36,000.00
Pekerja / buruh tak terlatih 0.300 org 57,700.00 17,310.00 17,310.00
Jumlah 36,000.00 17,310.00 53,310.00

B10 1 M3 PASANGAN BATU GUNUNG 1 : 4


SNI Batu gunung 1.1000 m3 150,000.00 165,000.00 165,000.00
6.9 PC ( 40 kg ) 86.0000 kg 1,300.00 111,800.00 111,800.00
03-2836-2002 Pasir pasang 0.5200 m3 50,000.00 26,000.00 26,000.00
Pekerja 1.5000 org 57,700.00 86,550.00 86,550.00
Jumlah 302,800.00 86,550.00 389,350.00

16
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
C. ANALISA PEKERJAAN BETON
C6 1 Kg. Besi beton polos/Ulir
SNI besi beton (polos/ulir) 1.0500 kg 9,916.00 10,411.80 10,411.80
7394:2008 kawat beton 0.0150 kg 15,000.00 225.00 225.00
Pekerja 0.0070 org 57,700.00 403.90 403.90
Jumlah 10,636.80 403.90 11,040.70

C9 1 M2 BEKESTING DENGAN PAPAN UNTUK SLOOF


SNI Kayu Kelas III papan meranti begesting 0.0450 M³ 1,800,000.00 81,000.00 81,000.00
6.21 paku 5 cm-10 cm 0.3000 kg 14,850.00 4,455.00 4,455.00
7394:2008 Pekerja 0.5200 org 57,700.00 30,004.00 30,004.00
Jumlah 85,455.00 30,004.00 115,459.00
BAHAN 4X PAKAI 51,367.75
C10 1 M2 BEKESTING UNTUK KOLOM
SNI Kayu Kelas III papan meranti begesting 0.0400 M³ 1,800,000.00 72,000.00 72,000.00
6.22 paku 5 cm-10 cm 0.4000 kg 14,850.00 5,940.00 5,940.00
7394:2008 Pekerja 0.6600 org 57,700.00 38,082.00 38,082.00
Jumlah 77,940.00 38,082.00 116,022.00
BAHAN 4X PAKAI 57,567.00
C11 1 M2 BEKESTING DENGAN PAPAN UNTUK RING BALK
papan begesting 0.0450 M³ 1,800,000.00 81,000.00 81,000.00
paku 0.3000 kg 14,850.00 4,455.00 4,455.00
Pekerja 0.3000 org 57,700.00 17,310.00 17,310.00
Jumlah 85,455.00 17,310.00 102,765.00
BAHAN 4X PAKAI 38,673.75
C13 1 M2 BEKESTING UNTUK BALOK
papan begesting 0.0400 M³ 1,800,000.00 72,000.00 72,000.00
paku 0.4000 kg 14,850.00 5,940.00 5,940.00
Balok Kayu Meranti 0.0180 M³ 1,800,000.00 32,400.00 32,400.00
Pekerja 0.3200 org 57,700.00 18,464.00 18,464.00
Jumlah 110,340.00 18,464.00 128,804.00
BAHAN 4X PAKAI 46,049.00
C15 1 M3 BETON K-250
SNI 7394:2008 PC ( 50 kg ) 324.000 kg 1,300.00 421,200.00 421,200.00
Pasir beton 0.499 m3 50,000.00 24,928.57 24,928.57
Split pecah mesin 2/3 0.582 m3 200,000.00 116,333.33 116,333.33
Pekerja 1.650 org 57,700.00 95,205.00 95,205.00
Jumlah 562,461.90 95,205.00 657,666.90
SNI 7394:2008
C18 1 M3 BETON BERTULANG SLOOP 15/20
Begesting untuk Sloof 134.4000 m2 51,367.75 6,903,825.60 6,903,825.60
Besi beton polos/Ulir 346.0000 Kg 11,040.70 3,820,082.20 3,820,082.20
Cor Beton K-250 10.0800 m3 657,666.90 6,629,282.40 6,629,282.40
jumlah 17,353,190.20 17,353,190.20
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton 1,721,546.65

17
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
C19 1 M3 BETON BERTULANG BALOK EL. 4.5 15/40
Begesting untuk Balok 16.8750 m2 46,049.00 777,076.88 777,076.88
Besi beton polos/Ulir 113.4000 Kg 11,040.70 1,252,015.38 1,252,015.38
Cor Beton K-250 0.8100 m3 657,666.90 532,710.19 532,710.19
jumlah 2,561,802.45 2,561,802.45
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton 3,162,719.07
C19.A 1 M3 BETON BERTULANG BALOK EL. 4.5 40/40
Begesting untuk Balok 11.2500 m2 46,049.00 518,051.25 518,051.25
Besi beton polos/Ulir 201.6000 Kg 11,040.70 2,225,805.12 2,225,805.12
Cor Beton K-250 1.4400 m3 657,666.90 947,040.34 947,040.34
jumlah 3,690,896.71 3,690,896.71
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton 2,563,122.72
C20 1 M3 BETON BERTULANG BALOK EL. 4.5 20/40
Begesting untuk Balok 17.3250 m2 46,049.00 797,798.93 797,798.93
Besi beton polos/Ulir 132.3000 Kg 11,040.70 1,460,684.61 1,460,684.61
Cor Beton K-250 0.9450 m3 657,666.90 621,495.23 621,495.23
jumlah 2,879,978.76 2,879,978.76
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton 3,047,596.57

18
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
D. ANALISA PEKERJAAN KERAMIK DAN PENUTUP DINDING
D2 1 M2 LANTAI KERAMIK 60/60
Keramik 1.0000 m2 90,278.00 90,278.00 90,278.00
PC ( 40 kg ) 11.3800 kg 1,300.00 14,794.00 14,794.00
Pasir pasang 0.0420 m3 50,000.00 2,100.00 2,100.00
Semen warna 0.4000 kg 1,300.00 520.00 520.00
Pekerja 0.4200 org 57,700.00 24,234.00 24,234.00
Kepala tukang batu 0.0350 org 134,600.00 4,711.00 4,711.00
Jumlah 107,692.00 28,945.00 136,637.00

D3 1 M2 DINDING KERAMIK 20/40


Keramik 1.0000 m2 52,000.00 52,000.00 52,000.00
PC ( 50 kg ) 8.3800 kg 1,300.00 10,894.00 10,894.00
Pasir pasang 0.0180 m3 50,000.00 900.00 900.00
Semen warna 0.5000 kg 1,300.00 650.00 650.00
Pekerja 0.4200 org 57,700.00 24,234.00 24,234.00
Kepala tukang batu 0.0450 org 134,600.00 6,057.00 6,057.00
Jumlah 64,444.00 30,291.00 94,735.00

D5 1 M2 DINDING BATU ALAM


Keramik 1.0500 m2 130,000.00 136,500.00 136,500.00
PC ( 50 kg ) 11.7500 kg 1,300.00 15,275.00 15,275.00
Pasir pasang 0.0350 m3 50,000.00 1,750.00 1,750.00
Pekerja 0.4200 org 57,700.00 24,234.00 24,234.00
Kepala tukang batu 0.0350 org 134,600.00 4,711.00 4,711.00
Jumlah 153,525.00 28,945.00 182,470.00

E. ANALISA PEKERJAAN DINDING


E2 1 M2 PASANGAN BATAKO 1 BATAKO 1 : 4
BATAKO 12.0000 bh 2,300.00 27,600.00 27,600.00
PC ( 40 kg ) 11.5000 kg 1,300.00 14,950.00 14,950.00
Pasir pasang 0.0430 m3 50,000.00 2,150.00 2,150.00
Pekerja 0.3200 org 57,700.00 18,464.00 18,464.00
Kepala tukang batu 0.0100 org 134,600.00 1,346.00 1,346.00
Jumlah 44,700.00 19,810.00 64,510.00

E3 1 M2 PLESTERAN DINDING / SIAR 1 : 2 + ACIAN tebal 20 mm


PC ( 40 kg ) 14.2800 kg 1,300.00 18,564.00 18,564.00
Pasir pasang 0.0230 m3 50,000.00 1,150.00 1,150.00
Pekerja 0.2500 org 57,700.00 14,425.00 14,425.00
Kepala tukang batu 0.0200 org 134,600.00 2,692.00 2,692.00
Jumlah 19,714.00 17,117.00 36,831.00

19
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
F. ANALISA PEKERJAAN CAT
F1 1 M2 PENGECATAN TEMBOK BARU BAGIAN DALAM ( 1 LAPIS PLAMIR, 2 LAPIS CAT PENUTUP )
Plamir Tembok 0.1000 kg 32,000.00 3,200.00 3,200.00
Cat Penutup dalam morilex 2x 0.2600 kg 25,000.00 6,500.00 6,500.00
Pekerja 0.0200 org 57,700.00 1,154.00 1,154.00
Kepala tukang cat 0.0063 org 134,600.00 847.98 847.98
Jumlah 9,700.00 2,001.98 11,701.98

F2 1 M2 PENGECATAN TEMBOK BARU BAGIAN LUAR ( 2 LAPIS CAT PENUTUP )


Cat Penutup Luar morilex 2x 0.2600 kg 28,500.00 7,410.00 7,410.00
Pekerja 0.0200 org 57,700.00 1,154.00 1,154.00
Kepala tukang cat 0.0063 org 134,600.00 847.98 847.98
Jumlah 7,410.00 2,001.98 9,411.98

F3 1 M2 PENGECATAN KAYU, 1 LAPIS PLAMIR, 1 LAPIS MENI, 2 LAPIS CAT


Plamir kayu 0.1500 kg 32,000.00 4,800.00 4,800.00
Cat kayu dasar morilex 0.1700 kg 32,500.00 5,525.00 5,525.00
Cat kayu penutup morilex 0.2600 kg 32,500.00 8,450.00 8,450.00
Pekerja 0.0700 org 57,700.00 4,039.00 4,039.00
Kepala tukang cat 0.0060 org 134,600.00 807.60 807.60
Jumlah 18,775.00 4,846.60 23,621.60

F4 1 M2 MENDEMPUL DAN MENGGOSOK KAYU


Dempul 0.0800 kg 7,000.00 560.00 560.00
Minyak cat 0.0200 Ltr 3,500.00 70.00 70.00
Pekerja 0.0400 org 57,700.00 2,308.00 2,308.00
Kepala tukang cat 0.0040 org 134,600.00 538.40 538.40
Jumlah 630.00 2,846.40 3,476.40

G. ANALISA PEKERJAAN PLAFON


E.001 1 M2 PAS. RANGKA PLAFOND ( HANYA RANGKA UKURAN 1 X 1 M' )
Rehel 4.0000 M1 3,750.00 15,000.00 15,000.00
Paku + Asesoris 1.0000 Ls 2,500.00 2,500.00 2,500.00
Pekerja 0.1500 org 57,700.00 8,655.00 8,655.00
Kepala tukang 0.0250 org 134,600.00 3,365.00 3,365.00
Jumlah 17,500.00 12,020.00 29,520.00
G2 1 M2 PAS. BAHAN PLAFOND GRC TEBAL 4 MM PENUTUP PADA RANGKA
Fiber Plat GRC 0.3040 Lbr 66,000.00 20,064.00 20,064.00
Paku 0.1100 kg 25,000.00 2,750.00 2,750.00
Pekerja 0.1000 org 57,700.00 5,770.00 5,770.00
Kepala tukang kayu 0.0065 org 134,600.00 874.90 874.90
Jumlah 22,814.00 6,644.90 29,458.90

20
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
F. ANALISA KUSEN & DAUN PINTU
F.001 Membuat dan Memasang 1 m3 kusen pintu dan kusen jendela
Paku 10 cm 1.2500 Kg 14,850.00 18,562.50 18,562.50
Lem Kayu 1.0000 Kg 15,000.00 15,000.00 15,000.00
Pekerja 7.0000 OH 57,700.00 403,900.00 403,900.00
Kepala tukang 2.1000 OH 134,600.00 282,660.00 282,660.00
Jumlah 33,562.50 686,560.00 720,122.50
untuk 1 m1 kusen kayu 102.56 0.01 7,021.19
F.002 Membuat dan Memasang 1 m pintu daun pintu panel
2

Papan Kayu 0.0400 M3 2,800,000.00 112,000.00 112,000.00


Lem Kayu 0.5000 kg 15,000.00 7,500.00 7,500.00
Pekerja 1.0000 OH 57,700.00 57,700.00 57,700.00
Kepala tukang 0.3000 OH 134,600.00 40,380.00 40,380.00
Jumlah 119,500.00 98,080.00 217,580.00
F.003 Membuat dan Memasang 1 m pintu dan jendela kaca
2

Papan Kayu 0.0240 M3 2,800,000.00 67,200.00 67,200.00


Lem Kayu 0.3000 kg 15,000.00 4,500.00 4,500.00
Pekerja 0.8000 OH 57,700.00 46,160.00 46,160.00
Kepala tukang 0.2400 OH 134,600.00 32,304.00 32,304.00
Jumlah 71,700.00 78,464.00 150,164.00

21
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
I. ANALISA PEKERJAAN ATAP
I1 1 M2 KUDA-KUDA & RANGKA ATAP BAJA RINGAN
Besi baja Ringan C 75 5 0,5 1.2000 m1 12,500.00 15,000.00 15,000.00
Reng tipe R-35 0.8000 m1 9,500.00 7,600.00 7,600.00
Sekrup + Asesoris 10% 1.0000 ls 2,200.00 2,200.00 2,200.00
Pekerja 0.340 org 57,700.00 19,618.00 19,618.00
Kepala tukang 0.034 org 134,600.00 4,576.40 4,576.40
Jumlah 44,418.00 4,576.40 48,994.40

I2 1 M' PEKERJAAN LISTPLANK PAPAN GRC BOARD


Papan GRC 0.3850 M2 66,000.00 25,410.00 25,410.00
Paku 0.0500 kg 14,850.00 742.50 742.50
Pekerja 0.1000 org 57,700.00 5,770.00 5,770.00
Kepala tukang kayu 0.0250 org 134,600.00 3,365.00 3,365.00
Jumlah 26,152.50 9,135.00 35,287.50

I3 1 M2 PENUTUP ATAP SPANDEK


SPANDEK 1.1545 M2 45,000.00 51,952.50 51,952.50
Paku Genteng Metal 0.0500 Kg 24,750.00 1,237.50 1,237.50
Pekerja 0.1315 org 57,700.00 7,587.55 7,587.55
Kepala tukang kayu 0.0080 org 134,600.00 1,076.80 1,076.80
Jumlah 53,190.00 8,664.35 61,854.35

I4 1 M' PASANG NOK Genteng Metal


Nok Metal Jadi 1.0000 Bh 25,000.00 25,000.00 25,000.00
Paku Genteng 0.0100 kg 24,750.00 247.50 247.50
Pekerja 0.1500 org 57,700.00 8,655.00 8,655.00
Kepala tukang kayu 0.0200 org 134,600.00 2,692.00 2,692.00
Jumlah 25,247.50 11,347.00 36,594.50

22
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
K. ANALISA PEKERJAAN KUNCI DAN KACA
K1 1 BH PASANG GERENDEL
Gerendel 1.0000 bh 15,000.00 15,000.00 15,000.00
Pekerja 0.0150 org 57,700.00 865.50 865.50
Kepala tukang 0.0150 org 134,600.00 2,019.00 2,019.00
Jumlah 15,000.00 2,884.50 17,884.50

K2 1 BH PASANG KUNCI SILINDER


Kunci silinder 1.0000 bh 15,000.00 15,000.00 15,000.00
Pekerja 0.0050 org 57,700.00 288.50 288.50
Kepala tukang 0.0050 org 134,600.00 673.00 673.00
Jumlah 15,000.00 961.50 15,961.50

K4 1 BH PASANG KUNCI TANAM 2 PUTARAN


Kunci Tanam 2 Putaran 1.0000 bh 120,000.00 120,000.00 120,000.00
Pekerja 0.0050 org 57,700.00 288.50 288.50
Kepala tukang 0.0050 org 134,600.00 673.00 673.00
Jumlah 120,000.00 961.50 120,961.50

K5 1 BH PASANG ENGSEL PINTU KUPU - KUPU BESAR


Engsel pintu 1.0000 bh 12,500.00 12,500.00 12,500.00
Pekerja 0.0150 org 57,700.00 865.50 865.50
Kepala tukang 0.0150 org 134,600.00 2,019.00 2,019.00
Jumlah 12,500.00 2,884.50 15,384.50

K6 1 BH PASANG ENGSEL JENDELA KUPU - KUPU KECIL


Engsel jendela 1.0000 bh 10,000.00 10,000.00 10,000.00
Pekerja 0.0100 org 57,700.00 577.00 577.00
Kepala tukang 0.0100 org 134,600.00 1,346.00 1,346.00
Jumlah 10,000.00 1,923.00 11,923.00

K7 1 BH PASANG KAIT / HAK ANGIN


kait angin 1.0000 bh 8,000.00 8,000.00 8,000.00
Pekerja 0.0150 org 57,700.00 865.50 865.50
Kepala tukang 0.0015 org 134,600.00 201.90 201.90
Jumlah 8,000.00 1,067.40 9,067.40

K8 1 BH PASANG PEGANGAN PINTU / DOOR HOLDER


Door holder 1.0000 bh 50,000.00 50,000.00 50,000.00
Pekerja 0.0500 org 57,700.00 2,885.00 2,885.00
Kepala tukang 0.0500 org 134,600.00 6,730.00 6,730.00
Jumlah 50,000.00 9,615.00 59,615.00

23
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
K9 1 BH PASANG HANDLE JENDELA
Handle Jendela 1.0000 bh 10,000.00 10,000.00 10,000.00
Pekerja 0.0150 org 57,700.00 865.50 865.50
Kepala tukang 0.0150 org 134,600.00 2,019.00 2,019.00
Jumlah 10,000.00 2,884.50 12,884.50

K10 1 M2 PASANG KACA BENING , TEBAL 5 MM


Kaca bening 5 mm 1.0000 m2 47,500.00 47,500.00 47,500.00
Pekerja 0.0150 org 57,700.00 865.50 865.50
Kepala tukang kayu 0.0150 org 134,600.00 2,019.00 2,019.00
Jumlah 47,500.00 2,884.50 50,384.50

24
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
M. ANALISA PEKERJAAN SANITASI
M1 Memasang 1 bh Kloset Duduk Porselin
closet duduk porselin ex toto 1.0000 bh 1,200,000.00 1,200,000.00 1,200,000.00
semen PC 6.0000 kg 1,300.00 7,800.00 7,800.00
pasir pasang 0.0100 m3 50,000.00 500.00 500.00
Pekerja 0.4500 org 57,700.00 25,965.00 25,965.00
Kepala tukang 0.9000 org 134,600.00 121,140.00 121,140.00
Jumlah 1,208,300.00 147,105.00 1,355,405.00

M4 Memasang 1 bh kran 1/2"


Kran 1/2" 1.0000 bh 15,000.00 15,000.00 15,000.00
Seal Tape 0.0250 Bh 1,980.00 49.50 49.50
Pekerja 0.0100 org 57,700.00 577.00 577.00
Kepala tukang 0.0100 org 134,600.00 1,346.00 1,346.00
Jumlah 15,049.50 1,923.00 16,972.50

M7 1 M' Memasang Pipa PVC 1/2"


Pipa PVC 1/2" AW 1.2000 m' 3,500.00 4,200.00 4,200.00
Perlengkapan 35 % x Pipa 1.0000 Bh 1,225.00 1,225.00 1,225.00
Pekerja 0.0360 org 57,700.00 2,077.20 2,077.20
Kepala tukang 0.0060 org 134,600.00 807.60 807.60
Jumlah 5,425.00 2,884.80 8,309.80

M8 Memasang Stop Kran 1/2"


Stop Kran 1.0000 Bh 15,000.00 15,000.00 15,000.00
Seal Tape 0.0250 Bh 1,980.00 49.50 49.50
Pekerja 0.0100 org 57,700.00 577.00 577.00
Kepala tukang 0.0100 org 134,600.00 1,346.00 1,346.00
Jumlah 15,049.50 1,923.00 16,972.50

M10 Memasang Floor Drain


Foor Drain 1.0000 Bh 55,000.00 55,000.00 55,000.00
Pekerja 0.0100 org 57,700.00 577.00 577.00
Kepala tukang 0.0100 org 134,600.00 1,346.00 1,346.00
Jumlah 55,000.00 1,923.00 56,923.00

M11 Memasang 1 bh kran 1/2"


Kran 1/2" 1.0000 bh 15,000.00 15,000.00 15,000.00
Seal Tape 0.0250 Bh 1,980.00 49.50 49.50
Pekerja 0.0100 org 57,700.00 577.00 577.00
Kepala tukang 0.0100 org 134,600.00 1,346.00 1,346.00
Jumlah 15,049.50 1,923.00 16,972.50

25
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
M12 Mmasang Pipa PVC 3"
Pipa PVC 1.2000 m' 15,500.00 18,600.00 18,600.00
Perlengkapan 35 % x Pipa 1.0000 Bh 5,425.00 5,425.00 5,425.00
Pekerja 0.0810 org 57,700.00 4,673.70 4,673.70
Kepala tukang 0.0135 org 134,600.00 1,817.10 1,817.10
Jumlah 24,025.00 6,490.80 30,515.80

M13 Mmasang Pipa PVC 4"


Pipa PVC 1.2000 m' 22,500.00 27,000.00 27,000.00
Perlengkapan 35 % x Pipa 1.0000 Bh 7,875.00 7,875.00 7,875.00
Pekerja 0.0810 org 57,700.00 4,673.70 4,673.70
Kepala tukang 0.0135 org 134,600.00 1,817.10 1,817.10
Jumlah 34,875.00 6,490.80 41,365.80

26
-

0.0200 kg Paku reng


0.0070 m3 Kayu meranti papan 3/20
0.1000 org Pekerja

27
392.3628
0.4060
0.8229
6.0000

3 Begesting Sloof 15 x 20 M2 0 134.40


3 Besi Beton Sloof 15 x 20 (D. 12, be Kg 0 1,411.20
3 Beton Sloof 15 x 20 M3 0 10.08

10.08 27.46

28
4 Begesting Balok Elevasi +4.00 (20 M2 0 16.88
4 Besi Beton Balok Elevasi +4.00 (15 Kg 0 113.40
4 Beton Balok Elevasi +3.20 (15 x 20 M3 0 0.81

0.81

4 Begesting Balok Elevasi +4.00 (20 M2 0 11.25


4 Besi Beton Balok Elevasi +4.00 (15 Kg 0 201.60
4 Beton Balok Elevasi +3.20 (15 x 20 M3 0 1.44

1.44

5 Begesting Balok Elevasi +6.00 (15 M2 0 17.33


5 Besi Beton Balok Elevasi +6.00 (15 Kg 0 132.30
5 Beton Balok Elevasi +6.00 (15 x 20 M3 0 0.95

0.95

29
###

30
###

31
DAFTAR HARGA SATUAN UPAH TENAGA, SATUAN BAHAN & PERALATAN

LOKASI : JALAN SKIP DALAM III


TAHUN : 2019
MACAM HARGA
NO. SATUAN
BAHAN/ALAT SATUAN Rp.
01 02 03 04
A. MACAM TENAGA
1 Kepala Tukang Kayu Orang Per Hari 134,600.00
2 Kepala Tukang Batu Orang Per Hari 134,600.00
3 Kepala Tukang Besi Orang Per Hari 134,600.00
4 Mandor Orang Per Hari -
5 Operator Orang Per Hari -
6 Pekerja Batu Orang Per Hari 57,700.00
7 Pekerja Besi Orang Per Hari 57,700.00
8 Pekerja Kayu Orang Per Hari 57,700.00
9 Tukang Batu Orang Per Hari -
10 Tukang Besi Orang Per Hari -
11 Tukang Kayu Orang Per Hari -

B. MACAM ALAT
1 Bar Bender Jam -
2 Bar Cutter Jam -
3 Concrete Mixer Jam -
4 Concrete Pump Jam -
5 Concrete Vibrator Jam -
6 Curing Beton Jam -
7 Alat Pancang Beton Jam -

32
MACAM HARGA
NO. SATUAN
BAHAN/ALAT SATUAN Rp.
01 02 03 04
C. MACAM BAHAN
1 Alkali Per Kg -
2 Amplas / ampril / kertas gosok Per Lbr -
3 Baja Profil Per Kg -
4 Bak Mandi teraso Per bh -
5 Bak Cuci Stainliss Per bh -
6 Batchup Per bh -
7 Batu Bata Per bh 2,300.00
8 Batu gunung ( gebal/besar ) Per m3 150,000.00
9 Batu Alam Per M2 130,000.00
10 Batu Apung Per Kg -
11 Bendrad Per kg 15,000.00
12 Besi beton polos/Ulir 8mm, 4.74 kg/btg Per kg 9,916.00
13 Besi cincin 4mm, 1.87 kg/btg Per kg 9,091.00
14 Besi profil Per kg
15 Besi / Kawat Berduri Per kg -
16 Box Meteran Listrik Per Bh 29,700.00
17 Cincin Pipa Besi Ø 4" Tebal 5mm-20cm Per Bh -
18 Cat tembok dalam setara mowilex Per kg 25,000.00
19 Cat tembok luar setara mowilex Per kg 28,500.00
20 Cat tembok dasar setara mowilex Per kg -
21 Cat kayu besi setara aftelak Per kg -
22 Cat kayu besi setara mowilex Per kg 32,500.00
23 Cat M e n y kayu / besi setara nippon Per kg -
24 Cat M e n y kayu setara nippon Per kg -
25 Cat Clear Doof Per lt 65,000.00
26 Closet jongkok ex toto Per bh 247,500.00
27 Closet duduk ex toto Per bh 1,200,000.00
28 Urinoir Ex toto Per bh -
29 Wastafel komplit kaca & asesories Ex Toto Per bh -
30 Dempul Per kg 7,000.00
31 Engsel jendela 3" Per bh 10,000.00
32 Engsel pintu 4" Per bh 12,500.00

33
MACAM HARGA
NO. SATUAN
BAHAN/ALAT SATUAN Rp.
01 02 03 04
33 Fiber Bergelombang Per Lbr -
34 Floor drain Per bh 55,000.00
35 Atap Spandek Per m2 45,000.00
36 Atap Nok Metal Jadi Per m2 25,000.00
37 Genteng Metal 2 susun setara sakura elang Per Lbr -
38 Gerendel jendela / bouvenlist Per bh 15,000.00
39 Gypsum Board 9 mm Per Lbr -
40 Gypsum List Per M' -
41 GRC BOARD Per Lbr 66,000.00
42 Kabel NYY 2,5 mm Per Rol 200,000.00
43 Kaca bening t = 5 mm Per m2 47,500.00
44 Kaca bening Frameless t = 12 mm Per m2 -
45 Kaca riben t = 5 mm Per m2 47,500.00
46 Kait Angin / Hak Angin Per bh 8,000.00
47 Kasa Per M' 3,465.00
48 Kayu bangkirai Papan 2/10 Per m3 -
49 Kayu Belanger Balok 5/7, 6/12, 8/12 Per m3 2,800,000.00
50 Kayu Bangkirai Listpalnk Per m' 5,000.00
51 Kayu Kapur Papan 2/10 Per m3 -
52 Kayu Kapur Balok 5/7, 6/12, 8/12 Per m3 -
53 Kayu Kapur / Bangkirai Lumber Siring Per Lbr -
54 Kayu meranti Balok 5/7 Per m3 2,200,000.00
55 Kayu Meranti Papan 3/20, 2/20 Per m3 -
56 Kayu Meranti Bouwplank / Begesting Per m3 1,800,000.00
57 ( Kayu perancah / perancah d 8 cm panjang 4 m ) Per Btg -
58 Kayu Ulin Balok 10/10 Per m3 -
59 Kayu Ulin Papan 3/30 Per m3 -
60 Keramik Dinding 20 x 40 cm ex. Roman Per m2 52,000.00
61 Keramik lantai 20 x 20 cm ex. Roman Per m2 -
62 Keramik lantai 30 x 30 cm ex. Roman Per m2 -
63 Keramik lantai 40 x 40 cm ex. Roman Per m2 47,000.00
64 Keramik list dinding 10 x 20 cm ex. Roman Per bh -
65 Keramik list dinding 10 x 40 cm ex. Roman Per bh -
66 Keramik lantai 60 x 60 cm ex. Ceranosa Per m2 90,278.00
67 Keramik lantai 30 x 30 cm ex. Ezenza Per m2
68 Koral Beton Per m3 200,000.00
69 Kran air / stop k 1/2" Per bh 15,000.00
70 Kuas 2,5" Per bh 5,000.00
71 Kunci Tanam 1 putaran untuk wc/km Per bh 80,000.00

34
MACAM HARGA
NO. SATUAN
BAHAN/ALAT SATUAN Rp.
01 02 03 04
72 Kunci Tanam 2 putaran Per bh 120,000.00
73 Kunci Silinder sekualitas ELT Per bh 15,000.00
74 Kusen pintu/jendela aluminium Per m' 54,340.00
75 Lampu LED Philips 14 Watt Per bh 52,000.00
76 Lampu Gantung TL Philips 2 x 20 Watt Per bh
77 Lampu LED Philips 3 Watt Per bh 18,000.00
78 Lampu LED Philips 10 Watt Per bh 32,000.00
79 Lampu LED Philips 5 Watt Per bh 27,000.00
80 Lem Kayu (Fox) Per Kg 15,000.00
81 Minyak Begesting Per lt -
82 Minyak Cat / Tiner A Per lt 3,500.00
83 Nok/kerpus atap multi roof Per bh -
84 Nok/kerpus atap Fiberglass Per bh -
85 Paku Biasa Per kg 14,850.00
86 Paku Baut Per Bh -
87 Paku GRC Per kg 25,000.00
88 Paku Genteng Metal Per kg 24,750.00
89 Paku Plywood 1,5 mm Per kg 17,325.00
90 Pasir beton / palu Per m3 50,000.00
91 Pasir pasang Per m3 50,000.00
92 Pasir urug Per m3 37,500.00
93 Paving Blok Per Bh -
94 Pegangan / Handle Jendela Per bh 10,000.00
95 Pegangan / Door Holder Per bh 50,000.00
96 Penyekat Urinoir Per bh -
97 Pipa pralon PVC dia. 4" Per m' 22,500.00
98 Pipa pralon PVC dia. 3" Per m' 15,500.00
99 Pipa pralon PVC dia. 2" Per m' 11,250.00
100 Pipa pralon PVC dia. 3/4" Per m' 8,000.00
101 Pipa pralon PVC dia. 1/2" Per m' 3,500.00
102 Pipa pralon untuk listrik Per m' 1,250.00
103 Plamir kayu Per kg 32,000.00
104 Plastik cor Per m2 -
105 Plywood/ tripleks tb. 4 mm Per lb -
106 Plywood/ tripleks tb. 9 mm Per lb -
107 Plywood/ tripleks tb. 12 mm Per lb -
108 Plywood/ tripleks sungkai Per lb -
109 Rangka Atap Baja Ringan Per M2 150,000.00
110 Residu Per ltr -

35
MACAM HARGA
NO. SATUAN
BAHAN/ALAT SATUAN Rp.
01 02 03 04
111 Saklar Tunggal Per bh 15,000.00
112 Saklar Double Per bh -
113 Saklar Triple Per bh 32,000.00
114 Sambungan Tiang Pancang Kayu / Shock 4" Per bh -
115 Sambungan Tiang Pancang Beton / Las Per Titik -
116 Sanding Sailer Per Kg -
117 Seal Tape Per bh 1,980.00
118 Sekring Lokal Per bh 35,000.00
119 Semen Gersik 40kg Per kg 1,300.00
120 Semen Portland Per Zak 52,000.00
121 Semen warna Per kg 1,300.00
122 Seng gelombang 0,8 x 2,10 BJLS 30 ( Zincalume ) Per lb -
123 Seng gelombang 0,8 x 2,10 BJLS 20 Per lb -
124 Seng gelombang 0,8 x 2,10 BJLS 18 Per lb -
125 Stop Kontak Per bh 15,000.00
126 Talang seng t=0.2 mm, L=60 cm Per m' 24,750.00
127 T Dos Per bh 7,425.00
128 T a n a h Urug Per m3 30,000.00
129 Tiang Pancang □ 20 x 20 K-450 Per m' -
130 Water Proofing Per m2 -
131 Wood Filler Per kg -
132 Wood Stain (pewarna) Per kg -

36
BALOK UTAMA 25/45 LT 2 BALOK ANAK 20/30 LT 2
h h
15.625 1 15.625 15.625
30.625 3 91.875 30.625
9.875 0 0 9.875
17.4 0 0 17.4
17.125 0 0 17.125

v v
10 3 30 10
2.5 0 0 2.5
6.5 0 0 6.5
18.75 1 18.75 18.75
18.5 1 18.5 18.5
15 1 15 15
10 0 0 10
18.125 3 54.375 18.125
244.13

DINDING LT 1
h
14.7 2 29.4 V
4 1 4 10
1.5 1 1.5 3.35
19 1 19 3.075
4 1 4 2.23
2.7 1 2.7 6.35
3 1 3 1.425
29 1 29 4.3
5 1 5 2.1
2 1 2 3.3
29 1 29 3.2
6
4
5
12
128.6

DINDING LT 2
h
15.7 1 15.7 V
12 1 12 10
6.5 1 6.5 3.8
2.5 3 7.5 6.35
4 1 4 3.925
29 1 29 7
16 1 16 12
8 1 8 7.8
29 1 29 17
1 0 2.3
1 0 2.2

127.7

DINDING LT 3
h
14 1 14 V
12 1 12 18
6.5 1 6.5 3.8
2.5 3 7.5 6.35
4 1 4 11
14 1 14 8.5
8 1 8 14
2.5 1 2.5
16 1 16
1 0
1 0

84.5
BALOK ANAK 20/30 LT 2

2 31.25
0 0
2 19.75
2 34.8
1 17.125

0 0
1 2.5
1 6.5
0 0
0 0
0 0
1 10
0 0
121.93

PINTU
1 10 8 15.12
1 3.35 7 11.76
2 6.15 26.88
1 2.23
1 6.35 PINTU FG
1 1.425 2 22.5
2 8.6
1 2.1 49.38
1 3.3
1 3.2
1 6
4 16
1 5
1 12
85.705 214.305 M1

PINTU
1 10 16 30.24
6 22.8 5 8.4
1 6.35 38.64
4 15.7
1 7
1 12
1 7.8
1 17
1 2.3
1 2.2

103.15 230.85 M1

PINTU
1 18 11 20.79
5 19 5 8.4
1 6.35 29.19
1 11
2 17
1 14

85.35 169.85 M1

Anda mungkin juga menyukai