UNIVERSITAS
TANJUNGPURA
2,6 m FAKULTAS TEKNIK
Berat Batu 39,93 kg
TUGAS
Sumber cahaya
Berat Batu 7,99 Ton TERSTRUKTUR
Tangga
Laut PERENCANAAN PELABUHAN
Tangki bahan bakar
+6,0 Tinggi Breakwater
Berat Batu 798,62 kg DIKERJAKAN OLEH
2
WILSON RAMADANDI
1
NIM. D1011191132
+2,0 HWL
4,5 m 3m DOSEN PEMBIMBING
0,0 MSL
DR. ING. IR. SLAMET WIDODO, M.T.
-2,0 LWL NIP. 196712231992031002
DOSEN PENANGGUNGJAWAB
POTONGAN C-C
KETERANGAN
-10,709
POTONGAN C - C
Skala 1 : 200
SKALA TANGGAL
KETERANGAN : 1:200
HWL = High Water Level (Elevasi Muka Air Tinggi)
MSL = Mean Sea Level (Elevasi Muka Air Rata-Rata) NOMOR HALAMAN JUMLAH
LWL = Low Water Level (Elevasi Muka Air Rendah)