TANDA TERIMA
Perincian Anggaran
1 Biaya u/ Kapit Tambang = Rp 400,000.00
2 Biaya u/ Wakil Kadin Tambang = Rp 375,000.00
3 Biaya u/ Koordinator = Rp 200,000.00
4 Biaya u/ Team Penilai 9 orang (@= Rp.175.000,00) = Rp 1,575,000.00
5 Biaya u/ Bendahara Penerima = Rp 150,000.00
6 Biaya u/ Press Kartu KIM = Rp 25,000.00
7 Biaya u/ Staff Pelaksana Acara 2 orang (@=150000,00) = Rp 300,000.00
3,025,000.00
(Nendi Widiyanto)