Anda di halaman 1dari 5

GELCOAT

M300
WR600
M450
LAMINASI
GELCOAT
M300
KULIT(SHELL)
WR300
WR600
WR600 WR600
WR450 M450 NAMABAGIAN LAMINASI LAYER
WR450
Coremat4mm KEELPLATE G+2M300+6WR600+2M450 10
PROGRAM :
BOTTOMPLATE G+2M300+2WR600+2M450 6

G+M300+WR600+M450 3
SIDEPLATE
PENGELOLAAN PERIKANAN
MAIN&SIDEDECK G+M300+WR600+M450 3

3
TANGKAP
BULKHEAD G+M300+WR600+M450
TRANSOM G+2M300+2WR600+2M450 6
KEGIATAN :

DETAILIII DETAILIV DETAILV KONSTRUKSI


PENGELOLAAN PENANGKAPAN IKAN DI
WILAYAH SUNGAI, DANAU, WADUK, RAWA,
DAN GENANGAN AIR LAINNYA YANG
NAMABAGIAN PROFILE LAMINASI LAYER DAPAT DI USAHAKAN DALAM 1 DAERAH
KABUPATEN KOTA
TRANSVERSEFRAME 50X60 M300+2WR600+M450 3

SIDELONGITUDINAL 50X60 M300+2WR600+M450 3


M300+2WR600+M450
BOTTOMLOGITUDINASL 50X60 3 LOKASI :
GIRDER 50X60 M300+2WR600+M450 3

FLOOR 50X70 M300+WR600+M450 3 KUB. CAHAYA NUSANTARA,


TRANSVERSEBEAM 50X50 M300+WR600+M450 3
DESA WARU-WARU, KEC.
M450 M450 LOGITUDINALBEAM 50X50 M300+WR600+M450 3
M450 M450 BUNGKU SELATAN
WR800 STIFENER 50X50 M300+3WR600+M450 3
WR600 WR600 DECKSHEL
WR600 G+M300+3WR600+M450 5
WR600
WR600 DISETUJUI :
WR600 M300
WR600 M300
GELCOAT
M300
M300
SPESIFIKASIMATERIAL
GELCOAT
TANDA NAMABARANG BERAT
G GELCOAT 775gm2

M300 CHOPPEDSTRANDMATT300 300gm2

DETAILII
M450 CHOPPEDSTRANDMATT450 450gm 2

DETAILI WR800 WOVENROVING 600gm 2

DIPERIKSA :
UKURANUTAMAKAPAL:
Panjang 7.00m
Lebar 0.80m
Tinggi 0.60m
MotorInduk 9HP
KONSULTANPERENCANA:

DETAILIV DETAILV

DETAILIII

NAMAGAMBAR:

DETAILII

KODE NOMOR JUMLAH


DETAILI GAMBAR LEMBAR LEMBAR

04 04
GAMBAR KERJA

PROGRAM :
PENGELOLAAN PERIKANAN TANGKAP

KEGIATAN :
PENGELOLAAN PENANGKAPAN IKAN DI WILAYAH SUNGAI, DANAU, WADUK, RAWA, DAN
GENANGAN AIR LAINNYA YANG DAPAT DI USAHAKAN DALAM 1 DAERAH KABUPATEN KOTA

SUB KEGIATAN :
PENJAMINAN KETERSEDIAAN PERIKANAN TANGKAP

PEKERJAAN :
PERAHU/KAPAL PENANGKAP IKAN <5 GT BESERTA MESIN, ALAT PENANGKAPAN
IKAN DAN ALAT BANTU PENANGKAPAN IKAN

LOKASI :
KUB. CAHAYA NUSANTARA, DESA WARU-WARU, KEC. BUNGKU SELATAN

SUMBER DANA
DANA ALOKASI KHUSUS (DAK)

TAHUN ANGGARAN
280
T.A 2021 DAK KM NELAYAN
KAB. MOROWAL I 2021

KONSULTANPERENCANA
STARBOARDSIDEVIEW

Kuning Terang

Biru Dongker

T.A 2021 DAK KM NELAYAN 280


KAB. MOROWALI Merah Terang

BL
PROGRAM :
BL

PENGELOLAAN PERIKANAN
TANGKAP
KEGIATAN :
0 5 10 15 PENGELOLAAN PENANGKAPAN IKAN DI
WILAYAH SUNGAI, DANAU, WADUK, RAWA,
ATCENTERLINEVIEW
DAN GENANGAN AIR LAINNYA YANG
DAPAT DI USAHAKAN DALAM 1 DAERAH
KABUPATEN KOTA

LOKASI :

KUB. CAHAYA NUSANTARA,


Storage DESA WARU-WARU, KEC.
BUNGKU SELATAN
BL BL

DISETUJUI :

0 5 10 15

DIPERIKSA :

DECKVIEW

CL

KONSULTANPERENCANA:

0 5 10 15

UKURANUTAMAKAPAL: NAMAGAMBAR:
Panjang 7.00m
Lebar 0.80m
Tinggi 0.60m
MotorInduk 9 HP
KODE NOMOR JUMLAH
GAMBAR LEMBAR LEMBAR

01 04
BODYPLAN

BULKWARK
BULKWARK MAINDECK
MAINDECK

WL6
WL5
WL4 PROGRAM :
WL3
WL2
WL1
WL0BASELINE
PENGELOLAAN PERIKANAN
TANGKAP
BT4 BT3 BT2 BT1 CL BT1 BT2 BT3 BT4
KEGIATAN :

PENGELOLAAN PENANGKAPAN IKAN DI


WILAYAH SUNGAI, DANAU, WADUK, RAWA,
DAN GENANGAN AIR LAINNYA YANG
DAPAT DI USAHAKAN DALAM 1 DAERAH
KABUPATEN KOTA

LOKASI :

KUB. CAHAYA NUSANTARA,


DESA WARU-WARU, KEC.
BUNGKU SELATAN

0 5 10 15 DISETUJUI :

HALFBREADTHWATERPLAN
WL0.6
WL0.5
WL0.4
WL0.3
WL0.2 CHINE
WL0.1 MAINDECK
BULKWARK
DIPERIKSA :
BL4

BL3

BL2

BL1

KONSULTANPERENCANA:
0 5 10 15

UKURANUTAMAKAPAL: NAMAGAMBAR:
Panjang 7.00m
Lebar 0.80m
Tinggi 0.60m
MotorInduk 9 HP
KODE NOMOR JUMLAH
GAMBAR LEMBAR LEMBAR

02 04
KONSTRUKSI SEKAT

FENDER

MAINDECK PROGRAM :
250

PENGELOLAAN PERIKANAN
STIFFENER
TANGKAP
BULKHEAD
KEGIATAN :
SIDE
SHELL
PENGELOLAAN PENANGKAPAN IKAN DI
WILAYAH SUNGAI, DANAU, WADUK, RAWA,
SIDE
STRINGER DAN GENANGAN AIR LAINNYA YANG
DAPAT DI USAHAKAN DALAM 1 DAERAH
KABUPATEN KOTA
BASELINE

LOKASI :

CL CL KUB. CAHAYA NUSANTARA,


DESA WARU-WARU, KEC.
BUNGKU SELATAN

DISETUJUI :

KONSTRUKSIMELINTANG
DIPERIKSA :

KONSULTANPERENCANA:

CL CL
NAMAGAMBAR:

KODE NOMOR JUMLAH


GAMBAR LEMBAR LEMBAR

03 04

Anda mungkin juga menyukai