DRAWING LIST PEKERJAAN PEMBANGUNAN GEDUNG PARKIR DAN MASJID PLN KETINTANG

No Document Title Drawing No. Keterangan

GEDUNG PARKIR
1 Layout PLN Induk SP01-PARKIR-GJM-2019
2 Denah Parkir Sepeda Motor Existing SP02-PARKIR-GJM-2019
3 Denah Perubahan Parkir LT.1 SP03-PARKIR-GJM-2019
4 Denah Perubahan Parkir LT.2 SP04-PARKIR-GJM-2019
5 Denah Pondasi SP05-PARKIR-GJM-2019
6 Denah Atap SP06-PARKIR-GJM-2019
Tampak Dari Utara
7
Tampak Dari Selatan SP07-PARKIR-GJM-2019
Potongan A
8
Potongan B SP08-PARKIR-GJM-2019
9 Tampak Dari Barat SP09-PARKIR-GJM-2019
10 Denah Titik Lampu LT.1 SP10-PARKIR-GJM-2019
11 Denah Titik Lampu LT.2 SP11-PARKIR-GJM-2019
Detail Pondasi, Kolom, Dan Pot Bunga
12
Detail Saluran SP12-PARKIR-GJM-2019
Diagram PP.1 LT.1
13
Diagram PP.2 LT.2 SP13-PARKIR-GJM-2019
14 Potongan Pondasi, Detail Poer, Tabel Penulangan SP14-PARKIR-GJM-2019
15 Denah Plat Lantai 2 SP15-PARKIR-GJM-2019
16 Detail Tangga SP16-PARKIR-GJM-2019
17 Detail Kuda-Kuda WF SP17-PARKIR-GJM-2019
18 Konstruksi Baja -

MASJID PLN KETINTANG


1 Denah Eksisting SP18-MASJID-GJM-2019
2 Denah Pengembangan SP19-MASJID-GJM-2019
3 Tampak Depan SP20-MASJID-GJM-2019
4 Potongan A-A (Melintang) SP21-MASJID-GJM-2019
5 Potongan B-B (Memanjang) SP22-MASJID-GJM-2019
6 Denah Pondasi, Sloof dan Kolom SP23-MASJID-GJM-2019
7 Denah Balok Elevasi + 4.00 dan + 4.50 SP24-MASJID-GJM-2019
8 Denah Balok Elevasi + 5.00 SP25-MASJID-GJM-2019
9 Denah Balok dan Dek Elevasi + 7.00, + 8.00, + 8.50 SP26-MASJID-GJM-2019
10 Detail Pondasi, Balok dan Kolom SP27-MASJID-GJM-2019
11 Denah penutup Lantai (Keramik) SP28-MASJID-GJM-2019
12 Denah Plafon SP29-MASJID-GJM-2019
13 Rencana Atap SP30-MASJID-GJM-2019
14 Denah Saluran Air Kotor SP31-MASJID-GJM-2019
15 Denah Saluran Air Bersih SP32-MASJID-GJM-2019
16 Denah Penempatan Lampu SP33-MASJID-GJM-2019
17 Rencana Penempatan Kusen SP34-MASJID-GJM-2019
18 Rencana Jendela Elevasi +2.50 dan +4.00 SP35-MASJID-GJM-2019
19 Rencana Jendela Elevasi +8.00 SP36-MASJID-GJM-2019
20 Detail Kusen (J1, PJ1, PJ2, P1, P2) SP37-MASJID-GJM-2019
21 Detail Kusen (J2, J3, J4, J5, J6, J7, J8, J9, J10, J11, JV) SP38-MASJID-GJM-2019
22 Denah Balok Elevasi + 5.85 SP39-MASJID-GJM-2019
23 Detail Saluran Air D600 SP40-MASJID-GJM-2019
24 Detail Dak Beton SP41-MASJID-GJM-2019
25 Denah Balok Elevasi + 5.80 SP42-MASJID-GJM-2019
26 Detail Talang Plat Besi (t=9mm) SP43-MASJID-GJM-2019