SUMMARY
A B C
No Description Total (USD)
I PEKERJAAN PERSIAPAN $ 2,800.00
II PEKERJAAN TANAH $ 1,321.48
III PEKERJAAN PASANGAN DAN PLESTERAN $ 2,143.64
IV PEKERJAAN BETON $ 12,506.80
V PEKERJAAN KERAMIK $ 260.50
VI PEKERJAAN PINTU DAN JENDELA $ 1,240.00
VII PEKERJAAN INSTALASI LISTRIK $ 602.00
VIII PEKEJAAN ATAP DAN PLAFON $ 1,474.75
IX PEKEERJAAN PENGECATAN $ 365.00
X PEKERJAAN SANITASI $ 2,430.72
XI PEKERJAAN TAMAN $ 5,744.15
TOTAL KOSTRUKSI $ 30,889.04
FEE KONTRAKTOR 10% $ 3,088.90
TAX 2% $ 679.56
GRANT TOTAL $ 34,657.50
In Words