100.00
A. BANGUNAN MASJID
94.52
I. PEKERJAAN PERSIAPAN DAN ADMINISTRASI 1.45 1.45
89.04
II. PEKERJAAN TANAH 1.31 0.65 0.65
83.55
III. PEKERJAAN PONDASI 6.39 3.20 3.20
IV. PEKERJAAN STRUKTUR BETON DAN BAJA 26.39 6.60 6.60 6.60 6.60
74.33
VI. PEKERJAAN PENUTUP LANTAI DAN DINDING 9.92 3.31 3.31 3.31 65.65
56.00
VIII. PEKERJAAN KUSEN, PINTU, JENDELA 2.95 1.47 1.47
52.69
39.05
XI. PEKERJAAN ATAP 10.62 5.31 5.31
35.54
22.34
B. LANSCAPE MASJID
5.95
III. PEKERJAAN TAMAN 1.77 0.59 0.59 0.59
2.10 2.75
1.45
IV. PEKERJAAN PAGAR 3.56 1.19 1.19 1.19
PROGRES MINGGUAN 1.45 0.65 0.65 3.20 3.20 6.60 6.60 6.60 6.60 3.51 3.51 6.82 3.31 3.31 9.65 8.68 9.23 5.48 5.48 5.48
100.00
KOMULATIF PROGRES MINGGUAN 1.45 2.10 2.75 5.95 9.15 15.74 22.34 28.94 35.54 39.05 42.57 49.39 52.69 56.00 65.65 74.33 83.55 89.04 94.52 100.00
ttd
A. BANGUNAN MASJID
I. PEKERJAAN PERSIAPAN DAN ADMINISTRASI
1 Papan Nama Proyek dengan Spanduk 4x1 m 1.00 set 949,607.57 949,607.57 1.00 set 949,607.57 949,607.57 - - - - Tetap
2 Pekerjaan Uji Tanah/ Sondir 4.00 Titik 2,484,672.17 9,938,688.68 4.00 Titik 2,484,672.17 9,938,688.68 - - - - Tetap
3 Sewa Direksi Keet 5.00 bln 1,500,000.00 7,500,000.00 5.00 bln 1,500,000.00 7,500,000.00 - - - - Tetap
4 Penyiapan Air Kerja dan Listrik untuk Pekerjaan 5.00 bln 1,250,000.00 6,250,000.00 5.00 bln 1,250,000.00 6,250,000.00 - - - - Tetap
5 Sewa Alat Berat 3.00 hari 1,150,000.00 3,450,000.00 3.00 hari 1,150,000.00 3,450,000.00 - - - - Tetap
6 Mobilisasi dan Demobilisasi 1.00 ls 3,000,000.00 3,000,000.00 1.00 ls 3,000,000.00 3,000,000.00 - - - - Tetap
7 Pelaporan, Dokumentasi As-Built drawing 1.00 ls 4,000,000.00 4,000,000.00 1.00 ls 4,000,000.00 4,000,000.00 - - - - Tetap
8 Pengadaan K3 1.00 ls 5,368,813.70 5,368,813.70 1.00 ls 5,368,813.70 5,368,813.70 - - - - Tetap
9 Biaya Protokol Kesehatan 1.00 ls 1,650,000.00 1,650,000.00 1.00 ls 1,650,000.00 1,650,000.00 - - - - Tetap
JUMLAH HARGA I 42,107,109.95 42,107,109.95
II. PEKERJAAN TANAH
1 Pek. Galian tanah untuk pondasi 91.90 m3 85,800.00 7,885,020.00 334.51 m3 85,800.00 28,701,129.60 242.61 20,816,109.60 - - Lebih
2 Pek. Pengurugan kembali galian tanah 30.63 m3 61,600.00 1,886,808.00 83.63 m3 61,600.00 5,151,484.80 53.00 3,264,676.80 - - Lebih
3 Pek. Pengurugan tanah untuk Leveling 252.44 m3 96,721.70 24,416,426.30 - m3 96,721.70 - - - (252.44) (24,416,426.30) Kurang
4 Pek. Urugan pasir bawah pondasi dan lantai 45.15 m3 85,029.00 3,839,059.40 8.94 m3 85,029.00 760,159.27 - - (36.21) (3,078,900.13) Kurang
JUMLAH HARGA II 38,027,313.70 34,612,773.67
V. PEKERJAAN DINDING
1 Pasangan bata Ringan 10 cm 873.60 m2 116,857.67 102,086,862.67 873.60 m2 116,857.67 102,086,862.67 - - - - Tetap
2 Pasangan Penebalan bata Ringan 5 cm 16.68 m2 58,428.84 974,592.99 16.68 m2 58,428.84 974,592.99 - - - - Tetap
3 Pasangan plesteran 1,957.69 m2 52,113.32 102,021,719.77 1,957.69 m2 52,113.32 102,021,719.77 - - - - Tetap
4 Pasangan acian 1,957.69 m2 34,320.00 67,187,920.80 1,957.69 m2 34,320.00 67,187,920.80 - - - - Tetap
5 Pasangan Profilan & skonengan 192.10 m1 61,684.61 11,849,613.02 192.10 m1 61,684.61 11,849,613.02 - - - - Tetap
6 Pasangan roster GRC motif 68.00 bh 145,464.37 9,891,576.94 68.00 bh 145,464.37 9,891,576.94 - - - - Tetap
7 Pasangan Trap tangga bata merah 55.80 m2 225,636.08 12,590,493.29 55.80 m2 225,636.08 12,590,493.29 - - - - Tetap
JUMLAH HARGA V 306,602,779.47 306,602,779.47
VI. PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pasangan lantai granit 60/60 homogeneous 441.79 m2 387,092.77 171,013,714.10 441.79 m2 387,092.77 171,013,714.10 - - - - Tetap
2 Pasangan plint granit 10/60 homogeneous 163.35 m1 95,335.68 15,573,082.98 163.35 m1 95,335.68 15,573,082.98 - - - - Tetap
3 Pasangan lantai keramik 40/40 70.56 m2 142,074.52 10,024,777.90 70.56 m2 142,074.52 10,024,777.90 - - - - Tetap
4 Pasangan Kuku Macan 4 X 20 cm 56.00 m1 26,298.62 1,472,722.79 56.00 m1 26,298.62 1,472,722.79 - - - - Tetap
5 Pasangan dinding keramik 40/40 110.68 m2 142,074.52 15,724,807.52 110.68 m2 142,074.52 15,724,807.52 - - - - Tetap
6 Pasangan dinding Granite Hitam 60/60 64.18 m2 387,092.77 24,843,613.87 64.18 m2 387,092.77 24,843,613.87 - - - - Tetap
7 Pasangan Trap tangga Granit 60x60 Unpolished 83.70 m2 387,092.77 32,399,664.71 83.70 m2 387,092.77 32,399,664.71 - - - - Tetap
8 Pasangan pot bunga bata merah 40.80 m2 113,402.29 4,626,813.27 40.80 m2 113,402.29 4,626,813.27 - - - - Tetap
9 Pasangan Rolag Bata 114.50 m1 113,402.29 12,984,561.75 114.50 m1 113,402.29 12,984,561.75 - - - - Tetap
JUMLAH HARGA VI 288,663,758.88 288,663,758.88
VII. PEKERJAAN PLAFOND
1 Pek. Rangka plafon modul 60 x 60 469.94 m2 104,739.75 49,221,398.33 469.94 m2 104,739.75 49,221,398.33 - - - - Tetap
2 Pek. Penutup plafon gypsum 440.66 m2 40,507.48 17,850,026.09 440.66 m2 40,507.48 17,850,026.09 - - - - Tetap
3 Pek. Penutup dan rangka plafon gypsum (Drop Ceilling) 220.33 m2 20,253.74 4,462,506.52 220.33 m2 20,253.74 4,462,506.52 - - - - Tetap
4 Pek. Penutup plafon GRC 29.28 m2 42,553.25 1,245,959.16 29.28 m2 42,553.25 1,245,959.16 - - - - Tetap
5 Pek. List plafon Dalam 76.00 m1 29,452.30 2,238,374.66 76.00 m1 29,452.30 2,238,374.66 - - - - Tetap
6 Pek. List plafon Luar 278.00 m1 29,452.30 8,187,738.90 278.00 m1 29,452.30 8,187,738.90 - - - - Tetap
JUMLAH HARGA VII 83,206,003.66 83,206,003.66
VIII. PEKERJAAN KUSEN, PINTU, JENDELA
1 Pasang pintu tipe P1 3.00 bh 4,982,414.66 14,947,243.98 3.00 bh 4,982,414.66 14,947,243.98 - - - - Tetap
2 Pasang pintu tipe P2 4.00 bh 3,101,800.11 12,407,200.44 4.00 bh 3,101,800.11 12,407,200.44 - - - - Tetap
3 Pasang pintu KM/WC 5.00 bh 1,317,500.00 6,587,500.00 5.00 bh 1,317,500.00 6,587,500.00 - - - - Tetap
4 Pasang jendela tipe J1 12.00 bh 2,816,511.19 33,798,134.28 12.00 bh 2,816,511.19 33,798,134.28 - - - - Tetap
5 Pasang jendela tipe J2 6.00 bh 1,170,656.53 7,023,939.18 6.00 bh 1,170,656.53 7,023,939.18 - - - - Tetap
6 Pasang bouvenligth BV1 2.00 bh 447,629.22 895,258.44 2.00 bh 447,629.22 895,258.44 - - - - Tetap
7 Pasang bouvenligth BV2 16.00 bh 320,118.46 5,121,895.36 16.00 bh 320,118.46 5,121,895.36 - - - - Tetap
8 Pasang Glass Blok 24.00 bh 51,000.00 1,224,000.00 24.00 bh 51,000.00 1,224,000.00 - - - - Tetap
9 Pasang Loster Krawangan 108.00 bh 29,750.00 3,213,000.00 108.00 bh 29,750.00 3,213,000.00 - - - - Tetap
10 Pasang pintu mainhole GRC 2.00 bh 297,500.00 595,000.00 2.00 bh 297,500.00 595,000.00 - - - - Tetap
JUMLAH HARGA VIII 85,813,171.68 85,813,171.68
KONTRAK MC O PEKERJAAN TAMBAH PEKERJAAN KURANG
NO URAIAN PEKERJAAN HARGA KET
VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME SAT. JUMLAH HARGA VOLUME JUMLAH VOLUME JUMLAH
SATUAN
# HASIL MC O
PEKERJAAN TAMBAH Rp 113,021,894.54
PEKERJAAN KURANG Rp (32,170,359.28)
JUMLAH Rp 80,851,535.26
NILAI KONTRAK Rp 2,909,090,000.00
JUMLAH Rp 2,989,941,535.26
PPN Rp 298,994,153.53
TOTAL Rp 3,288,935,688.78
RENCANA ANGGARAN BIAYA
(RAB)
KEGIATAN : PENYEDIAAN DAN PEMBANGUNAN PERUMAHAN
PEKERJAAN : PEMBANGUNAN MASJID DAN LANSCAPE KABUPATEN TANGERANG
LOKASI : DESA KAYU AGUNG, KEC. SEPATAN, KAB. TANGERANG, PROV. BANTEN
TAHUN : 2021
JUMLAH HARGA
NO URAIAN KEGIATAN
(Rp)
A. BANGUNAN MASJID
B. LANSCAPE MASJID
PPN 10 % 290,909,000.00
Terbilang : TIGA MILYAR TIGA RATUS TIGA BELAS JUTA TIGA RATUS TIGA BELAS RIBU RUPIAH
P X L X T X QTY
GALIAN TANAH UNTUK PILE CAP TYPE F1 2.20 X 1.20 X 0.80 X 12.00 25.34 M3
TYPE F2 1.20 X 1.20 X 0.80 X 4.00 4.61 M3
- Beton 42.20 m3
DIA p x ṽ x ṟ x ṟ x qty
40 12 x 3.14 x 0.20 x 0.20 x 28.00 42.20 m3
3 Lantai kerja beton mutu k-100 5.36 m3
p x L x t x qty
pile Cap f1 1.9 x 1.00 x 0.20 x 12.00 4.56 m3
f2 1.0 x 1.00 x 0.20 x 4.00 0.80 m3
Pek. Galian tanah untuk pondasi
Dimensi Pengurangan
Seg.
P L T K1 K2
Lantai kerja
Dimensi Pengurangan
Seg.
P L T
Pondasi batu
Dimensi Pengurangan
Seg.
P La Lb T K1 K2
Pas batu 100.00 0.25 0.75 1.00 1.92
Footplate 1
Dimensi
Seg.
P L T P Jmlh /kg
Sloof 20/40
Dimensi Pengurangan
Seg.
P L T P Jmlh /kg
Sloof 20/30
Dimensi Pengurangan
Seg.
P L T P Jmlh /kg
Sloof 15/30
Dimensi Pengurangan
Seg.
P L T P Jmlh /kg
Sloof 15/25
Dimensi Pengurangan
Seg.
P L T P Jmlh /kg
Kolom 40/40
Dimensi Pengurangan
Seg.
P L T P Jmlh /kg
Kolom 30/30
Dimensi Pengurangan
Seg.
P L T P Jmlh /kg
Kolom dia.30
Dimensi Pengurangan
Seg.
P Dia. T P Jmlh /kg
Balok 12/20
Dimensi Pengurangan
Seg.
P L T P Jmlh /kg
Balok 12/12
Dimensi Pengurangan
Seg.
P L T P Jmlh /kg
Plat t10
Dimensi Pengurangan
Seg.
Luas T P Jmlh /kg
Lisplank
Dimensi Pengurangan
Seg.
Luas T P Jmlh /kg
Dinding
Dimensi Pengurangan
Seg.
P T kusen K1 K2 K3 KP
utama 85.00 5.80 27.24 27.84 3.48 6.26
km pria 29.50 4.65 9.06 9.77 1.67
km wanita 29.50 4.65 9.06 9.77 1.67
sekre 27.50 4.65 10.40 11.16 0.56
gudang 27.50 4.65 10.40 11.16
Plesteran
Dimensi Pengurangan
Seg.
P T kusen
Skoning
Dimensi
Seg.
P L
P1 2.00 2.24
P2 1.00 2.80
PVC 0.70 1.90
J1 0.79 1.74
roster jdl 0.57 1.74
roster atas 1.50 2.00
BV1 0.60 0.80
BV2 0.60 2.00
prof 3.86
mihrab 2.88 2.88
P1 5.80 -
P2 - -
PVC - -
J1 6.80 -
J2 4.80 -
Teras 64.30 -
Lantai 40/40
Dimensi Dimensi Pengurangan
Seg. qty
P L P L
Dinding 40/40
Dimensi Pengurangan
Seg.
P T kusen pvc kusen P2
plint 10/60
Dimensi Pengurangan
Seg.
P
Plafond gypsum
Dimensi
Seg.
P La Lb T pcs
Plafond GRC
Dimensi Dimensi Pengurangan
Seg.
P L P L
km pria 2.35 7.35 2.35 2.43
km wanita 2.35 7.35 2.35 2.43
dding void 20.00 2.90
Atap
Dimensi Pengurangan
Seg.
P La Lb T
utama 117.26
waterproofing
Dimensi Pengurangan
Seg.
rooster GRC
Dimensi Pengurangan
Seg.
P L T
CNP (Gording)
Dimensi Pengurangan
Seg.
P L T
0.55
2.38
4.46
6.65
8.64
10
12.81
14.9
15
15
15
Talang beton bertulang
Dimensi Pengurangan
Seg.
P L T A
Beton 58 1.20 0.10
Bekisting 58 1.20
Slab t = 120 mm
Dimensi Pengurangan
Seg.
P L T A P Jmlh /kg
21.5 21.50 0.10
Beton
6.00 1.20 0.10
Jumlah
21.5 21.50 0.03
Lantai Kerja
6.00 1.20 0.03
Jumlah
Bekisting 48 0.10
Sloof 15/25
Dimensi Pengurangan
Seg.
P L T A P Jmlh /kg
Beton 15 0.15 0.25
Jumlah
Pile Cap
Dimensi Pengurangan
Seg.
P L T A P Jmlh /kg
Beton PC1 1.35 0.60 0.45
Beton pc2 0.60 0.60 0.45
Jumlah
Waterproofing
Dimensi Pengurangan
Seg.
P L T A P Jmlh /kg
Beton 5.2 5.00
Talang 60 1.00
Jumlah
Lisplang ACP
Dimensi Pengurangan
Seg.
P L T A P Jmlh /kg
Trap 1 22 1.20
Trap 2 12.8 1.00
Jumlah
12.00 10.37 m3
4.00 1.54 m4
80.00 m3
91.90 m3
rangan
Pcs Luas Volume
12.00 10.37 m3
4.00 1.54 m4
80.00 m3
91.90 m3
rangan
Pcs Luas Volume
- m3
243.04 m3
9.40 m3
252.44 m3
rangan
Pcs Luas Volume
12.00 10.37 m3
4.00 1.54 m3
8.00 m3
24.30 m3
0.94 m3
45.15 m3
rangan
Pcs Luas Volume
12.00 10.37 m3
4.00 1.54 m3
11.90 m3
rangan
Pcs Luas Volume
1.92 50.00 48.08 m3
48.08 m3
rangan
Pcs Luas Volume
rangan
Pcs Luas Volume
rangan
Pcs Luas Volume
96.00 m2
1,137.60
1,431.48 kg
293.88
9.60 m3
rangan
Pcs Luas Volume
92.76 m2
803.92
1,100.92 kg
1,100.92 kg
297.00
9.28 m3
rangan
Pcs Luas Volume
27.00 m2
159.84
234.50 kg
74.66
2.03 m3
rangan
Pcs Luas Volume
14.29 m2
101.48
141.26 kg
39.78
1.07 m3
rangan
Pcs Luas Volume
rangan
Pcs Luas Volume
rangan
Pcs Luas Volume
rangan
Pcs Jumlh Volume
rangan Volume
Pcs Jumlh
rangan Volume
Pcs Jumlh
rangan Volume
Pcs Jumlh
rangan Volume
Pcs Jumlh
rangan
Pcs Luas Volume
Pek.
10.40 m2 Pek.
71.04 Pek.
90.48 kg
19.44
0.48 m3
rangan
Pcs Luas Volume
15.60 m2
230.88
266.80 kg
35.92
0.94 m3
rangan
Pcs Luas Volume
75.14 m2
160.13 1,203.25 kg
7.51 m3
rangan
Pcs Luas Volume
42.45 m2
160.13 679.70 kg
4.24 m3
Kusen
kurang Luas Volume
P1 2.00 2.24
64.82 493.00 428.18 m2 P2 1.00 2.80
20.50 137.18 116.68 m2 PVC 0.70 1.90
20.50 137.18 116.68 m2 J1 0.79 1.74
22.12 127.88 105.76 m2 roster jdl 0.57 1.74
21.56 127.88 106.32 m2 roster atas 1.50 2.00
BV1 0.60 0.80
873.60 m2 BV2 0.60 2.00
1,957.69 m2
228.70 m1
3.00 17.40 m1
7.00 - - m1
4.00 - - m1
12.00 81.60 m1
6.00 28.80 m1
1.00 64.30 m1
192.10
1.00 5.76 2.88 m1
387.08 m1
rangan
kurang Luas Volume
441.79 m2
rangan
kurang Luas Volume
35.28 m2
35.28 m2
70.56 m2
110.68 m2
Volume
163.35 m1
163.35 m1
55.60 222.40 m2
25.00 m2
12.50 m2
260.82 552.25 291.43 m2
551.33 m2
rangan
kurang Luas Volume
22.97 m2
22.97 m2
58.00 m2
103.94 m2
rangan
pcs Luas Volume
525.00 m2
rangan
pcs Luas Volume
75.14 75.14 m2
75.14 m2
rangan
pcs Luas Volume
27.87 m2
rangan
pcs Berat Volume
Jumlah 2,584.16 kg
rangan
pcs Berat Volume
rangan
pcs Berat Volume
46.23 m3
4.00 2.88 m3
49.11 m3
13.87 m3
4.00 0.86 m3
14.73 m3
4.80 m2
rangan
pcs Berat Volume
3.00 1.69 m3
1.69 m3
rangan
pcs Berat Volume
12.00 4.37 m3
4.00 0.65 m3
5.02 m3
rangan
pcs Berat Volume
4.00 104.00 m2
60.00 m2
164.00 m2
rangan
pcs Berat Volume
3.00 37.20 m2
3.00 23.25 m2
3.00 23.25 m2
83.70 m2
rangan
pcs Berat Volume
3.00 18.60 m2
3.00 18.60 m2
3.00 18.60 m2
55.80 m2
rangan
pcs Berat Volume
4.00 105.60 m2
4.00 51.20 m2
156.80 m2
rangan
pcs Berat Volume
4.00 40.80 m2
40.80 m2
rangan
pcs Berat Volume
x 0,75 mm
Kusen
luas Jumlah
4.48 3.00
2.80 7.00
1.33 4.00
1.37 12.00
1.98 12.00 23.80 m2
3.00 15.00 45.00 m2
0.48 5.00
1.20 5.00
DAFTAR HARGA SATUAN PEKERJAAN
(DHSP)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja OH 1.200 100,000.00 120,000.00
2 Tukang Kayu OH 0.400 100,000.00 40,000.00
3 Tukang cat OH 0.040 100,000.00 4,000.00
4 Mandor OH 0.120 120,000.00 14,400.00
JUMLAH HARGA TENAGA KERJA 178,400.00
B. BAHAN
1 Kaso 5/7 m3 0.350 5,378,227.39 1,882,379.59
2 Dinding triplek 4mm Lembar 1.000 34,574.32 34,574.32
3 Pondasi Pasangan Batu m3 0.170 808,877.09 137,509.10
Plafon asbes 3 mm
4 Lembar 1.240 10,756.45 13,338.00
(1x1 m)
5 Paku kg 0.750 13,829.73 10,372.30
6 Asbes gelombang Lembar 0.695 15,558.44 10,813.12
7 Paku asbes kg 0.100 19,207.95 1,920.80
Floor lantai (Beton
8 m3 0.150 714,836.83 107,225.52
lantai kerja teakwood rangka
Pintu Double
9 m2 0.100 422,575.01 42,257.50
kayu
10 Jendela kaca nako daun 1.000 18,823.80 18,823.80
11 Cat dinding/plafon
JUMLAH HARGA BAHAN 2,259,214.04
C. PERALATAN
Sewa Dump Truck 3,5 T (106 HP) hari 1.000 960,398 960,398
JUMLAH HARGA PERALATAN
Jumlah Harga Tenaga, Bahan dan Peralatan (A + B + C) 960,397.75
Overhead & Profit 96,039.77
Harga Satuan Pekerjaan (D + E) 1,056,437.52
A.2.2.1.4 Mobilisasi dan Demobilisasi
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6 7
A.2.2.1.5 Pekerjaan K3
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6 7
Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Set 1.000 450,000.00 450,000.00
Spanduk (banner) Lb 1.000 30,732.73 30,732.73
Topi Pelindung (Safety Helmet) Bh 30.000 35,000.00 1,050,000.00
Sepatu Keselamatan (Rubber Safety Shoes_and toe cap) Psg 30.000 95,000.00 2,850,000.00
Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll) Ls 1.000 500,000.00 500,000.00
JUMLAH HARGA PERALATAN 4,880,739.73
Jumlah Harga Tenaga, Bahan dan Peralatan (A + B + C) 4,880,739.73
Overhead & Profit 488,073.97
Harga Satuan Pekerjaan (D + E) 5,368,813.70
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6 7
Tempat Cuci Tangan termasuk pengadaan perlengkapan Ls 2.000 500,000.00 1,000,000.00
Pelindung Pernafasan Dan Mulut (Masker Kain); Bh 30.000 5,000.00 150,000.00
Pengukur Suhu Badan Nir Sentuh Bh 1.000 350,000.00 350,000.00
JUMLAH HARGA PERALATAN 1,500,000.00
Jumlah Harga Tenaga, Bahan dan Peralatan (A + B + C) 1,500,000.00
Overhead & Profit 150,000.00
Harga Satuan Pekerjaan (D + E) 1,650,000.00
PEKERJAAN TANAH
A.2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja OH 0.750 100,000.00 75,000.00
2 Mandor OH 0.025 120,000.00 3,000.00
JUMLAH HARGA TENAGA KERJA 78,000.00
B. BAHAN
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja OH 0.500 100,000.00 50,000.00
2 Mandor OH 0.050 120,000.00 6,000.00
JUMLAH HARGA TENAGA KERJA 56,000.00
B. BAHAN
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja OH 0.300 100,000.00 30,000.00
2 Mandor OH 0.010 120,000.00 1,200.00
JUMLAH HARGA TENAGA KERJA 31,200.00
B. BAHAN
1 Pasir urug m3 1.200 38,416 46,099.09
JUMLAH HARGA BAHAN 46,099.09
C. PERALATAN
HARGA SATUAN
NO. URAIAN KODE SATUAN KEDALAMAN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6 7
Kedalaman galian m' 12.000 85,800.00 1,029,600.00
1,029,600.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A + B + C) 1,029,600.00
E. Overhead & Profit 102,960.00
F. Harga Satuan Pekerjaan (D + E) 1,132,560.00
A.2.3.1.6 Uji Sondir (Dutch Cone Penetrometer) 1 Titik
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Mobilisasi dan Demobilisasi ls 1.000 400,000.00 400,000.00
2 Sondir + Laporan Hasil titik 1.000 1,850,000.00 1,850,000.00
2,250,000.00
B. Jumlah Harga Tenaga, Bahan dan Peralatan (A + B + C) 2,258,792.88
C. Overhead & Profit 225,879.29
D. Harga Satuan Pekerjaan (D + E) 2,484,672.17
PEKERJAAN PONDASI
A.4.1.1.1.2 Membuat 1 m3 beton mutu f'c = 19,3 MPa (K225), slump (12+2) cm, w/c = 0,58
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja OH 1.650 100,000.00 165,000.00
2 Tukang batu OH 0.275 100,000.00 27,500.00
3 Kepala tukang batu OH 0.028 110,000.00 3,080.00
4 Mandor OH 0.083 120,000.00 9,960.00
JUMLAH HARGA TENAGA KERJA 205,540.00
B. BAHAN
1 Semen Portland kg 371.000 1,200 445,200.00
2 Pasir beton kg 698.000 137 95,765.38
3 Batu pecah mesin 2/3 kg 1,047.000 92 96,084.59
4 Air liter 215.000 38 8,259.42
JUMLAH HARGA BAHAN 645,309.39
C. PERALATAN
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja OH 1.000 100,000.00 100,000.00
2 Tukang batu OH 0.250 100,000.00 25,000.00
3 Kepala tukang batu OH 0.025 110,000.00 2,750.00
4 Mandor OH 0.100 120,000.00 12,000.00
JUMLAH HARGA TENAGA KERJA 139,750.00
B. BAHAN
1 Beton Readymix K300 m3 1.020 672,278 685,723.99
JUMLAH HARGA BAHAN 685,723.99
C. PERALATAN
1 Sewa pompa readymix hari 0.120 1,382,973 165,956.73
JUMLAH HARGA PERALATAN 165,956.73
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A + B + C) 991,430.72
E. Overhead & Profit 99,143.07
F. Harga Satuan Pekerjaan (D + E) 1,090,573.79
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja OH 0.520 100,000.00 52,000.00
2 Tukang Kayu OH 0.260 100,000.00 26,000.00
3 Kepala Tukang OH 0.026 110,000.00 2,860.00
4 Mandor OH 0.026 120,000.00 3,120.00
JUMLAH HARGA TENAGA KERJA 83,980.00
B. BAHAN
1 Kayu balok Kelas III m3 0.045 845,150 38,031.75
2 Paku 5 cm - 12 cm kg 0.300 13,830 4,148.92
3 Minyak bekesting liter 0.100 4,418 441.78
JUMLAH HARGA BAHAN 42,622.45
C. PERALATAN
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja OH 0.660 100,000.00 66,000.00
2 Tukang Kayu OH 0.330 100,000.00 33,000.00
3 Kepala Tukang OH 0.033 110,000.00 3,630.00
4 Mandor OH 0.033 120,000.00 3,960.00
JUMLAH HARGA TENAGA KERJA 106,590.00
B. BAHAN
1 Kayu balok Kelas III m3 0.040 845,150 33,806.00
2 Paku 5 cm - 12 cm kg 0.400 13,830 5,531.89
3 Minyak bekisting liter 0.200 4,418 883.57
4 Balok kayu kelas II m3 0.015 921,982 13,829.73
5 Plywood tebal 9 mm lbr 0.350 92,198 32,269.36
6 Dolken kayu gelam (dia.8-10cm), panjang 4 m btg 2.000 8,452 16,903.00
JUMLAH HARGA BAHAN 103,223.55
C. PERALATAN
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja OH 0.660 100,000.00 66,000.00
2 Tukang Kayu OH 0.330 100,000.00 33,000.00
3 Kepala Tukang OH 0.033 110,000.00 3,630.00
4 Mandor OH 0.033 120,000.00 3,960.00
JUMLAH HARGA TENAGA KERJA 106,590.00
B. BAHAN
1 Kayu kelas III m3 0.040 845,150 33,806.00
2 Paku 5 cm - 12 cm kg 0.400 13,830 5,531.89
3 Minyak bekisting liter 0.200 4,418 883.57
4 Balok kayu kelas II m3 0.018 921,982 16,595.67
5 Plywood tebal 9 mm lbr 0.350 92,198 32,269.36
6 Dolken kayu gelam (dia.8-10cm), panjang 4 m btg 2.000 8,452 16,903.00
JUMLAH HARGA BAHAN 105,989.50
C. PERALATAN
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6 7
1 Beton readymix K225 m3 0.399 653,070 260,575.12
2 Dinding bata merah m2 0.180 113402.286001239 20,412.41
3 Plesteran m2 5.718 52113.3171071092 297,983.95
4 Acian m2 5.718 34320 196,241.76
5 Profilan m2 4.398 29452.2981956561 129,531.21
6 Bekisting m2 5.718 230,794.90 1,319,685.27
JUMLAH HARGA PERALATAN 2,224,429.71
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A + B + C) 2,224,429.71
E. Overhead & Profit 222,442.97
F. Harga Satuan Pekerjaan (D + E) 2,446,872.68
PEKERJAAN BESI
A.4.1.1.10 Pembesian 10 kg dengan besi polos atau besi ulir
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja OH 0.070 100,000.00 7,000.00
2 Tukang Besi OH 0.070 100,000.00 7,000.00
3 Kepala Tukang OH 0.007 110,000.00 770.00
4 Mandor OH 0.004 120,000.00 480.00
JUMLAH HARGA TENAGA KERJA 15,250.00
B. BAHAN
1 Besi beton kg 10.500 7,837 82,286.88
2 Kawat beton kg 0.150 11,525 1,728.72
JUMLAH HARGA BAHAN 84,015.59
C. PERALATAN
JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp)
(Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja OH 0.100 100,000.00 10,000.00
2 Tukang besi OH 0.075 100,000.00 7,500.00
3 Kepala Tukang OH - 110,000.00 -
4 Mandor OH 0.010 120,000.00 1,200.00
JUMLAH HARGA TENAGA KERJA 18,700.00
B. BAHAN
1 wiremesh m8 m2 1.000 79,137 79,136.77
JUMLAH HARGA BAHAN 79,136.77
C. PERALATAN
JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp)
(Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja OH 0.050 100,000.00 5,000.00
2 Tukang Las Konstruksi OH 0.050 100,000.00 5,000.00
3 Kepala Tukang OH 0.005 110,000.00 550.00
4 Mandor OH 0.003 120,000.00 360.00
JUMLAH HARGA TENAGA KERJA 10,910.00
B. BAHAN
1 Besi profil kg 1.050 8,836 9,277.44
2 Electrode Las kg 0.001 13,830 13.83
JUMLAH HARGA BAHAN 9,291.27
C. PERALATAN
1 Mesin Las Jam 0.005 23,050 115.25
2 Crowler Crane 35 ton Jam 0.001 1,025,705 1,025.70
JUMLAH HARGA PERALATAN 1,140.95
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A + B + C) 21,342.22
E. Overhead & Profit 2,134.22
F. Harga Satuan Pekerjaan (D + E) 23,476.45
1 Kusen Alumunium Warna Set 4" Ex Alexsindo / 0,8 mm m' 80,000.00 3.60 288,000.00 2.60 208,000.00
2 Kisi-kisi Aluminium Silver set 3" Ex Alexsindo / 0,8 mm m' - -
3 Jalusi Alumunium Warna Set 3" Ex Alexsindo / 0,8 mm m' - -
4 Daun Pintu Aluminium Warna Set 4" Ex Alexsindo / 0,8 mm m' - -
5 Daun Jendela Aluminium Warna Set 4" Ex Alexsindo / 0,8 mm m' - -
6 Daun Pintu double Teakwood m2 - -
7 Multiplek 9 mm 120 x 240 cm (m2) m2 - -
8 HPL 120 x 240cm (m2) m2 - -
9 Lem Kuning kg - -
10 Kaca polos 5 mm m2 96,039.77 0.72 69,148.64 0.49 47,059.49
11 Kunci Khusus Alumunium bh - -
12 Handle jendela alumunium bh - -
13 Engsel pintu ring 4" Set. Unilon bh - -
14 Engsel jendela casement bh - -
15 Karet Kaca m' 3,841.59 7.20 27,659.46 5.20 19,976.27
16 Silicone Sealent (m1) m' 3,073.27 7.20 22,127.56 5.20 15,981.02
17 Door stop bh - -
18 Upah tenaga kerja (15%) ls 61,040.35 -
Jumlah Harga 406,935.66 291,016.78
Keuntungan 10% 40,693.57 29,101.68
Jumlah Total 447,629.22 320,118.46
Dibulatkan 447,629.22 320,118.46
PASANGAN DINDING
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja OH 0.300 100,000.00 30,000.00
2 Tukang Batu OH 0.100 100,000.00 10,000.00
3 Kepala Tukang OH 0.010 110,000.00 1,100.00
4 Mandor OH 0.015 120,000.00 1,800.00
JUMLAH HARGA TENAGA KERJA 42,900.00
B. BAHAN
1 Bata merah bh 70.000 499.41 34,958.48
2 Semen Portland Kg 14.370 1,200.00 17,244.00
3 Pasir pasang m3 0.040 199,762.73 7,990.51
JUMLAH HARGA BAHAN 60,192.99
C. PERALATAN
A.4.4.1.9 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai B.
A.4.4.1.9 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
CAT
Cat dasar undercoat / alkali resisiting primer kg 34,574
Cat dinding weathershield Dulux kg 69,149
Cat dasar kayu, besi dan genteng kg 23,818
Cat meni kayu, besi dan genteng kg 12,524
Cat Besi kg 34,574
Plamur Fuji kg 7,683
Minyak cat ltr 9,604
Thinner ltr 10,756
Spiritus ltr 5,762
Batu kambang kg 6,147
Cat meni besi sinkromat kg 21,705
Thermo plastik / cat marka (putih) kg 47,636
Thermo plastik / cat marka (kuning) kg 47,636
Thermo plastik / cat marka (merah) kg 47,636
Kuas roll bh 9,604
Kuas ukuran 3,5" bh 6,147
Kuas ukuran 2,5" bh 4,226
Kuas 5" bh 6,147
Kuas 2" bh 3,073
Kuas ukuran kecil 1" bh 1,729
Soda api kg 11,525
Sabun deterjen kg 9,220
Amplas lbr 2,305
Prodo Mas m2 2,304,955
Kertas 100 x 100 cm lbr 1,537
Karbon lbr 2,920
Koset Jongkok "Toto" bh 249,703
Wastafel "Toto" bh 1,369,527
Urinoir TOTO set 1,321,507
Kran air diameter 3/4" atau 1/2" bh 42,258
Seal tape bh 2,497
Floordrain bh 53,782
Asbes plat ( 100 x 100 x 0,3 ) lbr 8,452
Genteng Onduvilla m2 38,416
Nok Genteng Onduvilla m' 65,307
Keramik 40 x 40 bh 8,964
ubin granit Indogress (Polished) 60x60 cm bh 91,238
Kuku macan 2,5x10 bh 2,305
Plint granit warna 10x60 cm bh 26,891
Pipa PVC tipe AW diameter 1/2" m 5,762
Pipa PVC tipe AW diameter 3" m 38,416
Pipa PVC tipe AW diameter 4" m 57,624
Paving Block 6x10x20 K175 m2 65,307
Paving Block 8x10x20 K250 m2 103,723
Kayu balok Kelas III m3 845,150
Kayu Kelas II m3 921,982
Kayu kamper balok m3 5,378,227
Kayu kamper papan m3 6,146,546
Kayu glugu balok m3 1,213,943
Kayu glugu ukuran 5/7 m1 5,378
Kayu meranti m3 2,731,371
Kayu Meranti Papan m3 2,727,530
Kayu Meranti Balok m3 2,304,955
Papan cetakan / begesteng m3 806,734
Kayu dolken m3 845,150
Kayu dolken Ø 8 - 10/400 cm btg 8,452
Kayu bakar m3 72,990
Kayu lapis mutu I AA 3 lapis uk. 122x244x0,3 cm lbr 30,733
Kayu lapis mutu I AA 3 lapis uk. 122x244x0,4 cm lbr 34,574
Kayu lapis mutu I AA 3 lapis uk. 122x244x0,6 cm lbr 44,562
Kayu lapis mutu I AA 3 lapis uk. 122x244x0,9 cm lbr 72,990
Kayu lapis mutu I AA 3 lapis uk. 122x244x1,2 cm lbr 92,198
Teak wood ( 90 x 240 ) lbr 56,856
Plywood tebal 9 mm lbr 92,198
HPL 120 x 240cm (m2) m2 69,149
Ijuk m3 57,624
Ijuk kg 7,683
Alang-alang ikat 384
Besi beton polos kg 7,837
Besi beton ulir kg 8,067
Besi baja profil kg 8,836
wiremesh m8 m2 79,137
Angkur Baut dia. 16 ; P=40cm bh 30,733
Bondek Tebal 0.75mm m2 88,741
Besi CNP kg 9,220
Sekrup 12 - 14 x 20 mm bh 768
Dyna bolt M 10 x 80 mm bh 1,537
Truss C.75.75 0,8 (rangka bajaringan) m1 12,805
Reng TS 40 (rangka bajaringan) m1 5,762
Kawat beton / bindrat kg 11,525
Kawat las kg 13,830
Pipa hollow 4 x 4 cm tebal 1.2 mm btg 96,040
Rangka metal hollow 40.40. m1 3,842
Jendela nako bh 18,824
Pipa hollow 2 x 4 cm tebal 1.2 mm m1 15,328
Aluminium Composit Panel m2 460,991
Bracket Siku m1 8,452
Alumunium foil m2 16,903
Pas. Angkur 19mm p= 50cm Bh 88,357
Pas. Angkur 16mm p= 40cm Bh 65,307
Pas. MurBaut 16mm Bh 9,604
Baut Baja kg 9,988
Paku 5-12 cm kg 13,830
Paku asbes kg 19,208
Paku sumbat bh 307
Paku sekrup 3.5" bh 576
Paku skrup kg 26,891
Paku gypsum kg 15,366
Kunci alumuinium bh 334,218
Handle jendela alumunium bh 19,208
Engsel pintu ring 4" bh 26,891
Grendel tanam pintu bh 15,366
Pintu Double teakwood rangka kayu m2 422,575
Karet Kaca m1 3,842
Batu pecah 2/3 ( split ) m3 165,188
Batu Split 1/2 m3 144,060
Batu Jagung 0,5/1,00 m3 126,773
Batu pecah mesin 2/3 165,188
Batu pecah 10/15 m3 105,644
Batu pecah 3/4 m3 119,089
Batu pecah 4/6 m3 119,089
Batu pecah 5/7 m3 124,852
Batu pecah 1/2 m3 172,872
Batu belah 15/20 m3 69,149
Batu belah m3 161,347
Pasir urug m3 38,416
Pasir pasang m3 199,763
Pasir Beton m3 192,080
Krikil beton biasa m3 97,576
Kerikil beton pecah m3 153,664
Kerikil tidak tersaring m3 70,570
Split D 30 - 40 mm m3 153,664
Split D 10 - 20 mm m3 153,664
Split D 1 - 2 cm m3 172,872
Batu merah ( 5x11x23 ) bh 499
Batu merah ( 4x9x19 ) bh 269
Bata ringan tebal 7,5 cm m3 653,070
Bata ringan tebal 10 cm m3 653,070
Krokos 0,2/0,4 m3 70,570
Tanah urug m3 49,941
Sirtu m3 57,624
Roster 25/25 bh 2,305
Roster 20/20 bh 2,305
Roster 10/20 bh 1,537
Roster terawang 50x50 bh 69,149
Bata berongga expose 5 x 11 x 24 bh 653
Tanah liat m3 36,303
Pasir Silika kg 3,842
Panel beton pracetak lbr 177,482
Kolom beton pracetak btg 253,545
Sika Grout 215 25kg 88,357
Portland Cement (PC) Tiga roda 50 kg 60,000
Lem Kuning kg 42,258
Sealent tube 30,733
Tepung Gypsum kg 2,958
Gypsum board lbr 48,673
Kasa gypsum roll 8,452
List profil gypsum lebar sampai 5 cm m1 6,915
List profil gypsum lebar sampai 6 - 10 cm m1 9,220
List profil gypsum lebar lebih 10 cm m1 12,677
GRC (120 x 240 ) lbr 53,782
Listplank GRC 300x2400x8 mm lbr 49,941
Minyak bekisting ltr 4,418
Kaca Polos 5 mm m2 96,040
Mortar Utama Siap Pakai 1 kg 9,220
Sewa alat sondir hr 80,673
Sewa Scaffolding unit 19,208
Benda uji silinder beton bh 2,420
Biaya tes beton per benda uji bh 4,034
Biaya analisis tes beton perbenda uji bh 12,101
Bambu batangan (apus) batang 4,082
Air ltr 38
Gas oksigen 5 kg tb 12,101
Nipel bh 8,067
Pipa dia. 3/8" - 15 cm bh 1,210
Nitobond EC kg 80,673
Conbextra EP kg 161,347
Cebex 100 kg 121,010
Sewa Compressor untuk pekerjaan grouting hr 201,684
Sewa Mesin Grouting hr 121,010
Sewa mesin gerinda untuk pekerjaan grouting hr 80,673
Sewa mixer untuk pekerjaan grouting hr 4,840
Alat bantu pekerjaan grouting ls 4,034
Alat bantu pekerjaan pekerjaan expantion joint ls 104,875
Pelapisan kedap air lantai dengan coating ( terpasang ) m2 32,269
Pelapisan kedap air lantai dengan membran ( terpasang ) m2 48,404
Sewa Alat Ukur hr 57,624
Sewa Alat Las Jam 23,050
Sewa Mobil Tanki hr 576,239
Sewa Pompa Air hr 46,099
Sewa pompa readymix hr 1,382,973
Sewa Dump Truck 3,5 T (106 HP) Jam 960,398
Crowler Crane 35 ton hr 1,025,705
Tower Reservoir Atas buah 4,033,671
Toren air 5000 L buah 7,299,023
Outdoor LED Wall Lamp 2 arah Led Philips 4.5 W 220 V m2 267,720
Sewa Jack Hammer Hari 38,416
Beton Cor K300 Ready Mix m3 672,278
Beton Cor K250 Ready Mix m3 -
Beton Cor K225 Ready Mix m3 653,070
Beton Cor K200 Ready Mix m3 557,031
Kubah GRC - D.2 m, T.2,2 m + rangka bh 10,756,455
Mahkota Kubah GRC - T.3 m + rangka bh 6,914,864
Terminal Kabel bh 1,921
Wadge Type bh 5,705
Box MCB set 5,378
Rel MCB m1 40,337
Terminal Nol Besar buah 34,574
Beugel bh -
Knee pipa PVC 1.5" bh 384
Klem pipa bh 115
Pipa spiral 1.5" m1 -
Angkur bh 9,604
Spener set -
Kawat 6 mm m1 -
Klem PVC 1/2" bh 384
Ornamen Lampu Gantung Pvc 60x60 bh 432,188
Pipa listrik 5/8 PVC m1 6,147
-
BOX PANEL -
Box Panel 20 x 11 x 9 bh 74,573
Box Panel 20 x 15 x 9 bh 47,221
Box Panel 20 x 40 x 50 bh 298,507
Box Panel 25 x 25 x 12 bh 86,981
Box Panel 25 x 25 x 20 bh 115,570
Box Panel 30 x 40 x 15 bh 141,678
Box Panel 30 x 40 x 20 bh 238,563
Box Panel KWH Meter 20 x 40 x 50 bh 497,006
Box Panel KWH Meter 20 x 40 x 60 bh 537,823
Box Panel KWH Meter 25 x 35 x 20 bh 426,624
Tutup Panel 30 x 30 bh 28,581
-
FITTING -
Fitting duduk bh 5,094
Fitting Gantung Plastik Gantung bh 1,037
Fitting Goliath E.27 gantung bh 19,992
Fitting Goliath E.40 gantung bh 25,408
Fitting kecil lampu 2,5W bh 446
Fitting Plastik hitam bh 3,565
Fitting Sport Par 38 (1) Oog bh 126,972
Fitting Spot duduk bh 157,444
Fitting Spot taman bh 157,444
Fitting WD E.27 duduk bh 9,028
Fitting WD E.40 duduk bh 18,055
-
FLASHER -
Flasher Lampu Hias Buterfly bh 2,871,589
Flasher Lampu Hias Kembang Api besar bh 2,871,589
Flasher Lampu Hias Kembang Api kecil bh 2,871,589
Flasher Lampu Hias Kipas bh 2,871,589
-
FUSE / SEKERING / MCB -
GZ 30 Ampere bh 37,863
Kop Sekering bh 3,803
MCB 2 Ampere / MCB 2A bh 64,612
MCB 4 Ampere / MCB 4A bh 53,413
MCB 6 Ampere / MCB 6A bh 42,807
MCB 10 Ampere / MCB 10A bh 38,032
MCB 16 Ampere / MCB 16A bh 36,849
MCB 20 Ampere / MCB 20A bh 40,440
MCB 25 Ampere / MCB 25A bh 45,173
MCB 32 Ampere / MCB 32A bh 73,697
MCB 35 Ampere / MCB 35A bh 72,990
MCB 40 Ampere / MCB 40A bh 79,655
MCB 63 Ampere / MCB 63A bh 146,211
NT Fuse kaki besar bh 128,378
NT Fuse kaki kecil bh 47,540
Patron Sekering bh 1,902
Sekering bh 2,028
Sekering kecil 1,537
UZ 25 bh 6,212
UZ 63 bh 18,086
-
IGNITOR / KONTAKTOR / STARTER / TIMER -
Ignitor 150W - 250W / 220V bh 67,105
Ignitor Metal Halide 70W 220V bh 67,105
Ignitor Metal Halide 100W 220V bh 67,105
Ignitor Metal Halide 150W 220V bh 70,862
Ignitor Metal Halide 250W 220V bh 110,446
Magnetik Kontaktor SK-12 KW 1 (SN-12) bh 198,802
Magnetik Kontaktor SK-12 KW 2 (SN-12) bh 95,686
Magnetik Kontaktor SK-20 KW 1 (SN-20) bh 246,023
Magnetik Kontaktor SK-20 KW 2 (SN-20) bh 228,621
Starter TL 20/40 W bh 4,502
Timer Delay Omron H3BA8 bh 104,391
Timer Delay Omron H3CR bh 168,976
Timer Digital Theben bh 979,122
Timer Hager (pakai bateray) bh 487,060
Timer Switch TB 388 bh 511,938
Timer Switch TB 38809 K bh 770,377
Timer Switch Theben (pakai batery) bh 626,225
-
KABEL -
Kabel NYA 4 mm m1 4,894
Kabel NYM 2 x 1,5 Sqmm sekualitas Supreme m1 7,384
Kabel NYM 2 x 2,5 Sqmm sekualitas Supreme m1 11,294
Kabel NYM 2 x 4 Sqmm sekualitas Supreme m1 15,904
Kabel NYM 3 x 1,5 Sqmm sekualitas Supreme m1 9,596
Kabel NYM 3 x 2,5 Sqmm sekualitas Supreme m1 10,756
Kabel NYM 3 x 4 Sqmm sekualitas Supreme m1 19,623
Kabel NYY 3 x 1,5 Sqmm sekualitas Supreme m1 14,306
Kabel NYY 3 x 2,5 Sqmm sekualitas Supreme m1 17,218
-
DAFTAR HARGA SATUAN BAHAN/MATERIAL ALAT-ALAT KEBERSIHAN -
-
Arit buah 20,168
Bendo buah 26,891
Cangkul dan Doran buah 28,236
Cengkrong buah 26,891
Cethok buah 20,168
Deklit Plastik buah 96,040
Garan sapu buah 6,051
Garpu Tanah buah 24,202
Gathol buah 6,012
Gunting Kactup buah 38,416
Gunting Pangkas buah 38,416
Hareg 1 M' buah 36,303
Hareg 3 M' buah 54,455
Kampak buah 26,891
Kaos Tangan buah 7,683
Karung palstik buah 1,537
Keranjang buah 3,842
Kerok buah 6,012
Kikir/Wungkal buah 11,525
Linggis buah 24,202
Loading buah 19,208
Pacul dan Doran buah 28,236
Para/ Jala buah 38,416
Sapu Lidi buah 3,842
Sekop buah 26,891
Serok buah 7,683
Serok Tanah buah 7,683
Sprater Gendong buah 57,624
Tomblok buah 7,683
Seragam bh 153,664
Masker bh 7,683
Gerobak (alat baru) bh 1,210,101
Gerobak (sewa) bh 3,842
Mesin potong rumput bh 2,420,202
Gerobak celeng bh 322,694
Sepatu ps 60,505
Ember bh 7,683
Bagor bh 1,537
Irus bh 8,067
Martil bh 15,366
Betel bh 15,366
Betel Mokuba bh 19,208
Helm bh 15,366
Tali / tambang bh 19,208
Gergaji bh 30,733
Tangga bh 15,366
Gobang bh 26,891
Carabinet/sabuk pengaman bh 76,832
Sprayer bh 384,159
Terpal bh 115,248
Tangkai Sapu bh 6,051
Sewa kendaraan untuk membuang lumpur hr 95,195
Spanduk m2 30,733
DAFTAR HARGA SATUAN BAHAN/MATERIAL PEKERJAAN CLEANING SER -
-
Peralatan -
Bottle Sprayer Buah 7,683
Tangga lipat Buah 1,536,636
Kain pell Buah 7,683
Selang plastik Meter 11,525
Grenda Buah 192,080
Gunting Besar Buah 15,366
Gunting Dahan Buah 23,050
Sabit Buah 26,891
Sapu lidi Buah 3,842
Tali tampar Buah 11,525
Safety belt Buah 76,832
Ember kecil Buah 7,683
Sapu ijuk Buah 11,525
Appron/celemek Buah 19,208
Ember plastik 3 galon Buah 76,832
Gembor plastik Buah 19,208
Linggis Buah 24,202
Pacul Buah 28,236
Perkiraan Biaya Penerapan Sistem Manajemen Keselamatan Konstruksi
Satuan
No Uraian Pekerjaan Kuantitas Harga Satuan Total Harga
Ukuran
1 Penyiapan RKK
1.1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Set 1 450,000.00 450,000.00
Page 73 of 79
B. BAHAN
1 Kait angin bh 1.000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A + B + C) Err:504
E. Overhead & Profit - %xD Err:504
F. Harga Satuan Pekerjaan (D + E) Err:504
Page 74 of 79
ANALISA HARGA SATUAN PEKERJAAN
Page 75 of 79
JUMLAH HARGA TENAGA KERJA -
B. BAHAN
1 Agregat base klas A m3 1.259 -
JUMLAH HARGA BAHAN -
C. PERALATAN
1 Sewa wheel loader hari 0.001 -
2 Sewa tandem roller hari 0.004 -
3 Sewa motor grader hari 0.000 -
4 Sewa water tanker hari 0.002 -
JUMLAH HARGA PERALATAN -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A + B + C) -
E. Overhead & Profit 10 % x D -
F. Harga Satuan Pekerjaan (D + E) -
Page 76 of 79
ANALISA PEKERJAAN STRUKTUR BETON BERTULANG
#REF!
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)
1 2 3 4 5 6 7