Anda di halaman 1dari 1

KETERANGAN :

Mutu Beton
- Fondasi : fc' = 20 MPa
STF PLATE t = 8 mm BAUT 2.2D19
Mutu Baja Tulangan
60

10
- "" (POLOS) : fy = 300 MPa

50 50
WF 200.100.5,5.8 WF 200.100.5,5.8 100 [ <13 ]

200
100
- "D" (ULIR) : fy = 400 MPa
60

10
100 [ D>13 ]
POT WF 200.100.5,5.8

DETIL B PLATE 220.100.10 mm Baja : BJ 37

SKALA 1 : 20 PLATE 410.120.10 mm Baut : BJ 37


SAMBUNGAN BALOK WF 200.100.5,5.8 BAUT 4.2D19
KE BALOK WF 200.100.5,5.8 60 STF PLATE t = 8 mm
30 30
10 60
200 100 WF 200.100.5,5.8
50
10 410
40
100
60 No. Revisi Tanggal Paraf
POT. WF 200.100.5,5.8

WF 298.149.6.8
120

DETIL A 500
10
PEMBERI TUGAS : Disetujui

SKALA 1 : 20 HJ GLOVE Tanggal

PROYEK :
GUDANG POLYGON
SAMBUNGAN BALOK WF 200,100,5,5.8 GAMPING, SLEMAN

KE KOLOM WF 298.149.6.8 PERHATIAN


YOGYAKARTA

GAMBAR JANGAN DI SKALA, IKUTI UKURAN


DIMENSI YANG TERTERA, SEMUA UKURAN
HARUS DI CEK DI LAPANGAN, SETIAP
PERBEDAAN YANG DITEMUKAN HARUS
DIBERITAHUKAN KEPADA PERENCANA
DENGAN SEGERA, GAMBAR INI HARUS
DIBACA DALAM HUBUNGANNYA DENGAN
SPESIFIKASI PERENCANA DAN SYARAT-
SYARAT KONTRAK.
PLATE 608.149.12 mm

8. 1 4 9.6.8 JUDUL GAMBAR :


STF PLATE t = 8 mm
WF 29 SAMBUNGAN A
SAMBUNGAN B
SAMBUNGAN C
150
10 10 44
100
298 STF. PLATE t = 8 mm
100 STRUKTUR :
100
WF 298.149.6.8

Ir. Giri Subowo .


290
100 POT WF 298.149.6.8 SKA. 1.2.201.2.142.31.1898742
0
100
KODE PROYEK :
100
44 TANGGAL :
10 10
SKALA DIGAMBAR SATUAN
149 BAUT MUR 2.6.19 mm
1 : 20 milimeter

STF PLATE t = 10 mm NO. GAMBAR JMH. GAMBAR

SAMBUNGAN BALOK KUDA-KUDA STR 13 14


DETIL C 12
WF 298.149.6.8 KE KOLOM WF 298.149.6.8
SKALA 1 : 20

Anda mungkin juga menyukai