2

1300
400
Tiang Sandaran
Lening
2140 240 Railing
Trotoar

1300
Agregat Kelas A t= 20 cm

+0.000
240

Level 1
200 100 240

240 200 200


K2 4 Ø10 +2.480
K2 4 Ø10
Level 2
160 300

K1 Ø10 -200

240
400
Beton Kelas K.175 t=10 cm
Agregat Kelas B t=20 cm
Material Pilihan Var. 0-100 cm

1 Detail 1 Box Culvert 2 Detail 2 Box Culvert


1 : 30 1 : 30
B

BBS Kaki Box Culvert


Dimensi Bending Pembesian Total
Diameter Jenis Kode Berat per
Lokasi Gambar Jarak Jumlah Panjang Berat Besi
240

Besi Besi Bending A B C D Kait 1 Kait 2 Meter


Besi
+0.000
240

Level 1
Kaki Box 10 mm Plain K1 300 1140 300 1140 59 59 200 1 x 147 433650 mm 0.62 kg/m 268.86 kg
200 100 240

Culvert mm mm mm mm mm mm mm

K4 4 Ø10 K4 4 Ø10 Kaki Box 10 mm Plain K2 29930 2x4 119720 mm 0.62 kg/m 148.45 kg
Culvert mm
Kaki Box 10 mm Plain K3 300 1140 300 1140 59 59 200 1 x 26 76700 mm 0.62 kg/m 47.55 kg
160 300

K3 Ø10 -200

Culvert mm mm mm mm mm mm mm

400 Kaki Box 10 mm Plain K4 4900 2x4 19600 mm 0.62 kg/m 24.30 kg
Culvert mm
Beton Kelas K.175 t=10 cm
Agregat Kelas B t=20 cm Grand total: 6 489.17 kg
Material Pilihan Var. 0-100 cm

Keterangan :
3 Detail 3 Box Culvert - Tabel di atas merupakan data untuk satu kaki box culvert
1 : 30 - Jumlah kaki box culvert ada 2 (dua)

PEKERJAAN : NO. PAKET : MENGETAHUI DISETUJUI DIRENCANAKAN GAMBAR RENCANA


603/47/SPP-PPJ/DPUPR-HS/DAU/2021 KEPALA DINAS PUPR PEJABAT PEMBUAT KOMITMEN CV. PESONA CIPTA CV. PESONA CIPTA TANGGAL SKALA
HALMAHERA SELATAN (PPK) ENGINEERING ENGINEERING
LOKASI :
PEMERINTAH KABUPATEN HALMAHERA SELATAN PERENCANAAN TEKNIS
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PEMBANGUNAN
STR-10
KOTA LABUHA
KAB. HALMAHERA SELATAN 1 : 30
PROVINSI MALUKU UTARA JEMBATAN KAWASAN
Jl. Karet Putih Telp. (0927) - 21298 DALAM PERKOTAAN
LABUHA
ALI HASAN, ST WALID SYUKUR ABD. RISDAM TARAJU, SH MAJID LAMASINU, ST
NIP. 19730312 200808 1 001 NIP. 19751015 199703 1 003 DIREKTUR TEAM LEADER

Anda mungkin juga menyukai