I Pekerjaan Pondasi
1 Pair Urug 67 0.04 2.68
2 Batu Kali 67 0.36 24.12
3 Batu Kosong 67 0.12 8.04
4 Galian Tanah 0.7792688 67 52.21100625
5 Tanah Urug 40.86600625
II Beton
1 Sloof 67 0.036 2.412
2 Kolom 2.0475
3 Ring Balok 67 0.0225 1.5075
4 Dak Beton 6.3521
5 Lantai Kerja 4.0867
0.241592715
4.6858
78
0.15 78
1.6663
312
0.6