A. 4.1.1.1. Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang Batu L.02 OH 0.275 75,000.00 20,625.00
Kepala Tukang L.03 OH 0.028 80,000.00 2,240.00
Mandor L.04 OH 0.083 85,000.00 7,055.00
JUMLAH TENAGA KERJA 145,420.00
B. BAHAN
Semen portland kg 247.000 1,200.00 296,400.00
Pasir beton kg 869.000 214.29 186,214.29
Kerikil (maks 30 mm) kg 999.000 133.33 133,200.00
Air ltr 215.000 0.10 21.50
JUMLAH HARGA BAHAN 615,835.79
C. PERALATAN
A. 4.1.1.2. Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (12 ± 2) cm, w/c = 0,78
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang Batu L.02 OH 0.275 75,000.00 20,625.00
Kepala Tukang L.03 OH 0.028 80,000.00 2,240.00
Mandor L.04 OH 0.083 85,000.00 7,055.00
JUMLAH TENAGA KERJA 145,420.00
B. BAHAN
Semen portland kg 276.000 1,200.00 331,200.00
Pasir beton kg 828.000 214.29 177,428.57
Kerikil (maks 30 mm) kg 1012.000 133.33 134,933.33
Air ltr 215.000 0.10 21.50
JUMLAH HARGA BAHAN 643,583.40
C. PERALATAN
A. 4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,97
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 70,000.00 84,000.00
Tukang Batu L.02 OH 0.200 75,000.00 15,000.00
Kepala Tukang L.03 OH 0.020 80,000.00 1,600.00
Mandor L.04 OH 0.060 85,000.00 5,100.00
JUMLAH TENAGA KERJA 105,700.00
B. BAHAN
Semen portland kg 230.000 1,200.00 276,000.00
Pasir beton kg 893.000 214.29 191,357.14
Kerikil (maks 30 mm) kg 1027.000 133.33 136,933.33
Air ltr 200.000 0.10 20.00
JUMLAH HARGA BAHAN 604,310.48
C. PERALATAN
A. 4.1.1.6. Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), slump (12 ± 2) cm, w/c = 0,61
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang Batu L.02 OH 0.275 75,000.00 20,625.00
Kepala Tukang L.03 OH 0.028 80,000.00 2,240.00
Mandor L.04 OH 0.083 85,000.00 7,055.00
JUMLAH TENAGA KERJA 145,420.00
B. BAHAN
Semen portland kg 352.000 1,200.00 422,400.00
Pasir beton kg 731.000 214.29 156,642.86
Kerikil (maks 30 mm) kg 1031.000 133.33 137,466.67
Air ltr 215.000 0.10 21.50
JUMLAH HARGA BAHAN 716,531.02
C. PERALATAN
A. 4.1.1.8. Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang Batu L.02 OH 0.275 75,000.00 20,625.00
Kepala Tukang L.03 OH 0.028 80,000.00 2,240.00
Mandor L.04 OH 0.083 85,000.00 7,055.00
JUMLAH TENAGA KERJA 145,420.00
B. BAHAN
Semen portland kg 384.000 1,200.00 460,800.00
Pasir beton kg 692.000 214.29 148,285.71
Kerikil (maks 30 mm) kg 1039.000 133.33 138,533.33
Air ltr 215.000 0.10 21.50
JUMLAH HARGA BAHAN 747,640.55
C. PERALATAN
A. 4.1.1.10. Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K300), slump (12 ± 2) cm, w/c = 0,52
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang Batu L.02 OH 0.275 75,000.00 20,625.00
Kepala Tukang L.03 OH 0.028 80,000.00 2,240.00
Mandor L.04 OH 0.083 85,000.00 7,055.00
JUMLAH TENAGA KERJA 145,420.00
B. BAHAN
Semen portland kg 413.000 1,200.00 495,600.00
Pasir beton kg 681.000 214.29 145,928.57
Kerikil (maks 30 mm) kg 1021.000 133.33 136,133.33
Air ltr 215.000 0.10 21.50
JUMLAH HARGA BAHAN 777,683.40
C. PERALATAN
A. 4.1.1.12. Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K350), slump (12 ± 2) cm, w/c = 0,48
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.100 70,000.00 147,000.00
Tukang Batu L.02 OH 0.350 75,000.00 26,250.00
Kepala Tukang L.03 OH 0.035 80,000.00 2,800.00
Mandor L.04 OH 0.105 85,000.00 8,925.00
JUMLAH TENAGA KERJA 184,975.00
B. BAHAN
Semen portland kg 448.000 1,200.00 537,600.00
Pasir beton kg 667.000 214.29 142,928.57
Kerikil (maks 30 mm) kg 1000.000 133.33 133,333.33
Air ltr 215.000 0.10 21.50
JUMLAH HARGA BAHAN 813,883.40
C. PERALATAN
A. 4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 120 cm, dinding partisi
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Tukang Besi L.02 OH 0.250 75,000.00 18,750.00
Kepala tukang L.03 OH 0.025 80,000.00 2,000.00
Mandor L,04 OH 0.013 85,000.00 1,105.00
JUMLAH TENAGA KERJA 39,355.00
B. BAHAN
Rangka hollow 40.40.2 mm m 3.500 9,000.00 31,500.00
assesoris (perkuatan, las, dll) Ls 100%xrangka 9,000.00 9,000.00
A. 4.2.1.21.a Pemasangan 1 m2 Rangka atap baja ringan Main Truss C75 Reng 0,45, penutup atap genteng metal
A. 4.4.1.9. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 OH 0.100 75,000.00 7,500.00
Kepala tukang L.03 OH 0.010 80,000.00 800.00
Mandor L,04 OH 0.015 85,000.00 1,275.00
-
JUMLAH TENAGA KERJA 30,575.00
B. BAHAN
Bata merah buah 70.000 800.00 56,000.00
Semen portland kg 11.500 1,200.00 13,800.00
Pasir pasang m3 0.043 280,000.00 12,040.00
JUMLAH HARGA BAHAN 81,840.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 112,415.00
E. Profit 5% *D 5,620.75
F. Harga Satuan Pekerjaan (D+E) 118,035.75
A. 4.4.1.10. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 OH 0.100 75,000.00 7,500.00
Kepala tukang L.03 OH 0.010 80,000.00 800.00
Mandor L,04 OH 0.015 85,000.00 1,275.00
JUMLAH TENAGA KERJA 30,575.00
B. BAHAN
Bata merah buah 70.000 800.00 56,000.00
Semen portland kg 9.680 1,200.00 11,616.00
Pasir pasang m3 0.045 280,000.00 12,600.00
JUMLAH HARGA BAHAN 80,216.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 110,791.00
E. Profit 5% *D 5,539.55
F. Harga Satuan Pekerjaan (D+E) 116,330.55
A. 4.5.1.9. Pemasangan 1 m2 Partisi Dobel GRCbard 6mm, berikut rangka metal furing
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.480 70,000.00 33,600.00
Tukang Besi L.02 OH 0.740 75,000.00 55,500.00
Kepala Tukang L.03 OH 0.074 80,000.00 5,920.00
Mandor L.04 OH 0.024 85,000.00 2,040.00
JUMLAH TENAGA KERJA 97,060.00
B. BAHAN
GRCboard 6mm Lbr 0.720 85,000.00 61,200.00
Profil C Stud 75 x 35 t:1mm Zincalume m 8.325 15,000.00 124,875.00
Kasa gypsum kg 0.100 12,000.00 1,200.00
Tepung gypsum kg 0.900 5,000.00 4,500.00
Alkasit kg 0.006 50,000.00 300.00
Paku skrup kg 0.300 19,300.00 5,790.00
JUMLAH HARGA BAHAN 197,865.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 294,925.00
E. Profit 5% *D 14,746.25
F. Harga Satuan Pekerjaan (D+E) 309,671.25
A. 4.5.2.32. Pemasangan 1 m2 atap genteng metal berpasir uk. 0,77 x 0,8 m, tebal 0,25 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang Kayu L.03 OH 0.100 75,000.00 7,500.00
Kepala Tukang L.11 OH 0.010 80,000.00 800.00
Mandor L.15 OH 0.001 85,000.00 85.00
JUMLAH TENAGA KERJA 22,385.00
B. BAHAN
Genteng metal Bh 1.020 90,000.00 91,800.00
Paku biasa 1/2"-1" Kg 0.200 18,100.00 3,620.00
JUMLAH HARGA BAHAN 95,420.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 117,805.00
E. Profit 5% *D 5,890.25
F. Harga Satuan Pekerjaan (D+E) 123,695.25
A. 4.5.2.32. Pemasangan 1 m2 atap genteng metal berpasir uk. 0,77 x 1 m, tebal 0,30 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang Kayu L.03 OH 0.100 75,000.00 7,500.00
Kepala Tukang L.11 OH 0.010 80,000.00 800.00
Mandor L.15 OH 0.001 85,000.00 85.00
JUMLAH TENAGA KERJA 22,385.00
B. BAHAN
Genteng metal Bh 1.020 105,000.00 107,100.00
Paku biasa 1/2"-1" Kg 0.200 18,100.00 3,620.00
JUMLAH HARGA BAHAN 110,720.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 133,105.00
E. Profit 5% *D 6,655.25
F. Harga Satuan Pekerjaan (D+E) 139,760.25
A. 4.7.1.10. 1 M2 Pengecatan tembok baru Interior(1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
A. 4.7.1.10. 1 M2 Pengecatan tembok baru Exterior (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
1 2 3 4 5
UPAH
1 Mandor Oh Rp 85,000.00 106,000
2 Pekerja Oh Rp 70,000.00 91,000
3 Tenaga gali tanah/pondasi Oh Rp 70,000.00
4 Tukang batu Oh Rp 75,000.00 101,000
5 Tukang kayu Oh Rp 75,000.00
6 Tukang cat Oh Rp 75,000.00
7 Tukang besi Oh Rp 75,000.00
8 Tukang politur Oh Rp 75,000.00
9 Tukang Listrik Oh Rp 75,000.00
10 Tukang Las Konstruksi Oh Rp 75,000.00
11 Tukang Las biasa Oh Rp 75,000.00
12 Tukang Pipa ledeng Oh Rp 75,000.00
13 Tukang Vibrator Oh Rp 75,000.00
14 Tukang Erection Oh Rp 75,000.00
15 Operator crane Oh Rp 75,000.00
16 Pembantu operator crane Oh Rp 75,000.00
17 Kepala tukang batu Oh Rp 80,000.00 106,000
18 Kepala tukang kayu Oh Rp 80,000.00
19 Kepala tukang cat Oh Rp 80,000.00
20 Kepala tukang besi Oh Rp 80,000.00
21 Kepala tukang politur Oh Rp 80,000.00
BAHAN
Air m3 Rp 100.00
Semen (PC)
Semen zak Rp 60,000.00 65,000
Semen putih zak Rp 82,500.00
Semen warna kg Rp 1,900.00 1,900
Batu bata bj Rp 800.00 1,100
Batu belah hitam
batu belah 15/20 m3 Rp 200,000.00 304,000
batu belah 10/15 m3 Rp 200,000.00 244,700
batu belah 5/7 m3 Rp 200,000.00 269,200
batu belah 4/6 m3 Rp 200,000.00 318,100
batu kricak 3/4 (MS) m3 Rp 200,000.00 296,000
batu kricak 2/3 (MS) m3 Rp 200,000.00 296,000
Split beton m3 Rp 200,000.00 296,000
Split beton kg Rp 133.33
Pasir pasang
pasir pasang m3 Rp 280,000.00 326,200
pasir pasang kg Rp 200.00
pasir beton m3 Rp 300,000.00 335,600
pasir beton kg Rp 214.29
Pasir urug m3 Rp 100,000.00 244,700
Sirtu m3 Rp 150,000.00 189,700
Tanah urugan m3 Rp 70,000.00 104,900
Krokos/ kroco 2-4 cm m3 Rp 150,000.00 346,100
Baja dan Besi
Baja IWF kg Rp 13,000.00 17,400
Besi profil Siku kg Rp 11,000.00 17,400
Besi beton kg Rp 13,000.00 11,700
NO. URAIAN SATUAN HARGA INDEX BUPATI
1 2 3 4 5
Kawat beton / bendrat kg Rp 20,000.00 19,900
Profil aluminium m' Rp 90,000.00 156,300
Aluminium strip m' Rp 50,000.00 143,800
Skrup fixer bh Rp 500.00 2,000
sealant tube Rp 3,000.00 37,900
Profil kaca m Rp 7,500.00 137,500
Besi hollow 40.40.0,4 m Rp 9,000.00 15,500
kayu begesteng m3 Rp 1,500,000.00 3,000,000
Kayu dolken m3 Rp 1,500,000.00
Kayu dolken, 4 mtran btg Rp 5,000.00 30,900
Spacer buah Rp 5,000.00 6,300
Balok kayu klas II
papan m3 Rp 1,200,000.00 5,758,000
balok m3 Rp 800,000.00 6,155,900
reng m' Rp 3,000.00 4,000
Kayu lapis tripleks 9 mm lbr Rp 100,000.00 230,000
Kayu lapis tripleks 12 mm lbr Rp 140,000.00 230,000
Kayu lapis teakwood 4 mm lbr Rp 90,000.00 230,000
Minyak cat/ Thinner ltr Rp 20,000.00 32,100
Minyak bekisting ltr Rp 20,000.00 30,900
Paku besar, sedang kg 18,100 18,100
Paku kecil kg 18,100 18,100
Paku payung kg 18,100 18,100
Paku skrup kg 19,300 19,300
Genteng
genteng metal berpasir uk. 0,77 x 0,8 m, tebal m2 Rp 90,000.00 64,100
0,25 mm Ex. Prima
genteng metal berpasir uk. 0,77 x 1 m, tebal m2 Rp 105,000.00 64,100
0,3 mm Ex. Prima
Alumnium foil roll Rp 75,000.00 85,000
1 2 3 4 5
Washtafel bh Rp 350,000.00
Kran bh Rp 50,000.00
Kran Wastafel bh Rp 150,000.00
Bak Zink bh Rp 450,000.00
Clean Out dia. 2" bh Rp 225,000.00
Clean Out dia. 4" bh Rp 300,000.00
Closet Jongkok unit Rp 200,000.00
Closet Duduk unit Rp 1,850,000.00
Floor Drain bh Rp 50,000.00
Ijuk kg Rp 15,000.00
4.4.3
1 A. 4.4.3.34. Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm
Pekerjaan Penutup lantai &
2 A. 4.4.3.34. Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm anti slip
Penutup dinding
3 A. 4.4.3.53. Pemasangan 1 m1 plint keramik ukuran 10cm x 40cm
4 A. 4.4.3.43. Pemasangan 1 m1 plint keramik ukuran 5cm x 20cm
5 A. 4.4.3.38. Pemasangan 1 m2 lantai keramik ukuran 20cm x 20cm
6 A. 4.4.3.58. Pemasangan 1 m2 dinding keramik 20cmx 25cm
7 A. 4.4.3.59. Pemasangan 1 m2 dinding keramik 20cmx 40cm
4.5.1
Pekerjaan Plafond
1 A. 4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran ( 120x240x0,9 )cm, tebal 9mm
2 A. 4.5.1.8. Pemasangan 1 m2 langit-langit GRCboard ukuran ( 120x240x0,4)cm, tebal 4mm
3 A. 4.5.1.9. Pemasangan 1 m2 Partisi Dobel GRCbard 6mm, berikut rangka metal furing
4 A. 4.5.1.10. Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40
5 A. 4.5.1.12. Pemasangan 1 m2 Partisi GRCboard ukuran ( 100x100 )cm, tebal 9mm
6 A. 4.5.1.10. Pemasangan 1 m1 list gypsum
4.5.2
Pekerjaan Penutup atap
1 A. 4.2.1.21.a Pemasangan 1 m2 Rangka atap baja ringan Main Truss C75 Reng 0,45, penutup atap genteng metal
2 A. 4.5.2.32. Pemasangan 1 m2 atap genteng metal uk. 0,77 x 0,8 m, tebal 0,3 mm
3 A. 4.5.2.32. Pemasangan 1 m2 atap genteng metal berpasir uk. 0,77 x 0,8 m, tebal 0,25 mm
4 A. 4.5.2.32. Pemasangan 1 m2 atap genteng metal berpasir uk. 0,77 x 1 m, tebal 0,30 mm
KELOMPOK PEKERJAAN JENIS PEKERJAAN
(LEVEL 2) (SUB LEVEL 2)
5 A. 4.5.2.36. Pemasangan 1 m1 nok genteng metal
6 A. 4.5.2.42. Pemasangan 1 m2 alumunium foil/sisalation
7 A. 4.6.1.22. Pemasangan 1m' lisplank ukuran (0,9 x 20), cm GRC Kalsiplank
8 Genting metal pasit + insulator
4.6.1
Pekerjaan Pintu dan jendela
1 A. 4.6.1.31 Mengerjakan 1 Unit Pintu P-1 Firemless
2 A. 4.6.1.32 Mengerjakan 1 Unit Pintu P-2
3 A. 4.6.1.33 Mengerjakan 1 Unit Pintu P-3
4 A. 4.6.1.34 Mengerjakan 1 Unit Pintu P-4
5 A. 4.6.1.39 Mengerjakan 1 Unit Jendela J-1
6 A. 4.6.1.40 Mengerjakan 1 Unit Jendela J-2
7 A. 4.6.1.46 Mengerjakan 1 Unit Jendela B-1
Pekerjaan Pengecatan
1 A. 4.7.1.10. 1 M2 Pengecatan tembok baru Interior(1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
2 A. 4.7.1.10. 1 M2 Pengecatan tembok baru Exterior (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
3 A. 4.7.1.11. 1 M2 Pengecatan plafon
5.1.1 KOMPON
Pekerjaan Sanitasi Gedung
1 A. 5.1.1.1. Pemasangan 1 buah clooset duduk / monoblok
2 A. 5.1.1.2. Pemasangan 1 buah clooset jongkok porslin
3 A. 5.1.1.5. Pemasangan 1 buah wastafel
4 A. 5.1.1.6. Pemasangan 1 buah Kran Wastafel
A.5.1.1.11 Pemasangan 1 unit shower
A. 5.1.1.12. Pemasangan 1 buah bak cuci piring stainlessteel
A. 5.1.1.13. Pemasangan 1 buah Kran Air
5 A. 5.1.1.14. Pemasangan 1 buah floor drain
6 A. 5.1.1.25. Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"
7 A. 5.1.1.26. Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"
8 A. 5.1.1.27. Pemasangan 1 m' pipa PVC tipe AW diameter 1"
9 A. 5.1.1.28. Pemasangan 1 m' pipa PVC tipe AW diameter 1 1/2"
10 A. 5.1.1.29. Pemasangan 1 m' pipa PVC tipe AW diameter 2"
11 A. 5.1.1.30. Pemasangan 1 m' pipa PVC tipe AW diameter 2 1/2"
12 A. 5.1.1.31. Pemasangan 1 m' pipa PVC tipe AW diameter 3"
13 A. 5.1.1.32. Pemasangan 1 m' pipa PVC tipe AW diameter 4"
6.1.1
Pekerjaan ME 1 A. 6.1.1.1. Pemasangan 1 titik Stop kontak
2 A. 6.1.1.2. Pemasangan 1 titik Penerangan
3 A. 6.1.1.6. Pemasangan 1 buah Lampu SL 9 watt
4 A. 6.1.1.29. Pemasangan 1 buah Lampu RM 2 x18W
5 A. 6.1.1.5. Pemasangan 1 m Kabel NYA 1x2,5 mm2
6 A. 6.1.1.10. Pemasangan 1 m Kabel NYY 3 x 2,5 mm2
7 A. 6.1.1.11. Pemasangan 1 m Kabel NYY 3x6 mm2
8 A. 6.1.1.13. Pemasangan 1 m Kabel BC 1x6
9 A. 6.1.1.21. Pemasangan 1 unit Panel MDP
10 A. 6.1.1.21. Pemasangan 1 unit Panel SDP
11 A. 6.1.1.24. Pemasangan 1 buah Lampu Downlight LED 9 watt
12 A. 6.1.1.32. Pemasangan 1 bh Saklar Tunggal
13 A. 6.1.1.33. Pemasangan 1 bh Saklar Seri/Ganda
14 A. 6.1.1.35. Pemasangan 1 bh Stop Kontak
HARGA SATUAN
(Rp)
57,356.25
70,166.25
19,118.75
41,212.50
156,975.00
111,952.50
209,606.25
101,456.25
792,566.25
765,602.25
392,159.25
799,318.58
745,511.00
878,533.58
937,713.58
969,258.58
158,077.50
110,901.00
106,438.50
177,066.75
178,326.75
197,541.75
168,141.75
198,066.75
23,189.25
117,631.25
488,433.00
105,084.00
118,035.75
116,330.55
51,379.65
50,637.09
Err:509
28,402.50
174,857.55
180,107.55
28,773.89
26,673.89
182,892.15
193,264.05
193,264.05
39,225.90
40,372.50
309,671.25
105,084.00
58,335.90
19,850.25
236,413.34
104,557.71
123,695.25
139,760.25
HARGA SATUAN
(Rp)
85,533.00
126,346.50
36,000.13
266,106.75
21,336,120.00
4,000,000.00
2,200,000.00
2,000,000.00
1,500,000.00
2,500,000.00
300,000.00
26,128.20
36,470.70
21,106.05
35,000.00
2,347,695.00
491,505.00
588,052.50
193,606.88
442,422.75
554,688.75
88,606.88
188,396.25
17,493.00
18,835.69
21,480.38
32,424.00
43,002.75
60,797.63
75,038.25
109,622.63
206,062.50
180,862.50
98,805.00
419,212.50
7,560.00
15,067.50
75,589.50
23,441.25
160,441.96
46,698.75
62,448.75
46,698.75
HARGA PERKIRAAN SENDIRI (HPS)
(Bill of Quantity)
Harga ( Rp)
BOBOT 1 2 3 4 5 6 7 8 9 10
No Uraian Item Pekerjaan
(%)
1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70
Satuan
I PEKERAAN PERSIAPAN 1.99% 0.66% 0.66% 0.66%
II PEKERJAAN TANAH 2.22% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37%
III PEKERJAAN PASANGAN 31.04% 2.82% 2.82% 2.82% 2.82% 2.82% 2.82% 2.82%
IV PEKERJAAN STRUKTUR BETON 23.13% 2.10% 2.10% 2.10% 2.10% 2.10% 2.10% 2.10% 2.10%
V PEKERJAAN PENUTUP PLAFOND 5.10%
VI PEKERJAAN PENUTUP LANTAI 5.79%
VII PEKERJAAN PINTU DAN JENDELA 5.45%
VIII PEKERJAAN FINISING 3.79%
IX PEKERJAAN LAIN LAIN 6.69%
X PEKERJAAN MEKANIKAL ELEKTRIKAL PLUMBING 6.12% 0.38% 0.38% 0.38% 0.38% 0.38%
XI PEKERJAAN PENUTUP ATAP 8.68%
###
RENCANA PERMINGGU (%) 0.66% 1.03% 3.14% 5.29% 5.29% 5.68% 5.68% 5.31% 5.31% 5.31%
KOMULATIF BOBOT PEKERJAAN PERMINGGU (%) 0.66% 1.70% 4.83% 10.13% 15.42% 21.10% 26.78% 32.08% 37.39% 42.70%
REALISASI BOBOT PEKERJAAN PERMINGGU (%)
DEVIASI BOBOT PEKERJAAN PERMINGGU (%)
Menyetujui,
Kepala Desa
ISTIYANTO
ATAN PELAKSANAAN
MINGGU KE -
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-180
5.31% 5.82% 6.40% 4.29% 3.21% 3.21% 3.21% 4.12% 4.12% 2.38% 2.38% 2.25% 3.34% 2.43% 2.43% 2.43%
48.00% 53.82% 60.21% 64.51% 67.71% 70.92% 74.13% 78.24% 82.36% 84.74% 87.12% 89.36% 92.70% 95.14% 97.57% 100.00%
9 Beton Tangga
1 Beton mutu K175 1.64 m3 Rp 937,714 Rp 1,540,195
2 Pembesian 471.62 kg Rp 15,808 Rp 7,455,190
3 Bekisting (termasuk bongkar) 37.55 m2 Rp 168,142 Rp 6,313,723
Jumlah Pekerjaan Beton Rp 287,547,760
C Pekerjaan Mekanikal , Elektrikal dan Plumbing (MEP)
I Pekerjaan Plumbing
1 Pekerjaan Intalasi Air Bersih
1 Pipa Instalasi air bersih 2" tipe AW 25.00 m' Rp 43,003 Rp 1,075,069
No Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah
a b c d e f=cxe
2 Pipa Instalasi air bersih 3/4 " tipe AW 64.00 m' Rp 18,836 Rp 1,205,484
No Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah
a b c d e f=cxe
Jumlah Pekerjaan Instalasi Air Bersih Rp 2,280,553
II Pekerjaan Instalasi Air Kotor
1 Pipa Instalasi air kotor 4" tipe AW 45.00 m' Rp 109,623 Rp 4,933,018
Jumlah Pekerjaan Instalasi Air Kotor Rp 4,933,018
D Pekerjaan Struktur Beton - Lean Concrete
1 Beton Kolom K1 30/30 mutu K250
1 Beton mutu K250 4.73 m3 Rp 937,714 Rp 4,430,697
2 Pembesian 590.01 kg Rp 15,808 Rp 9,326,723
3 Bekisting (termasuk bongkar) 63.00 m3 Rp 177,067 Rp 11,155,205
9 Beton Tangga
1 Beton mutu K175 1.64 m3
2 Pembesian 471.62 kg
3 Bekisting (termasuk bongkar) 37.55 m2
Jumlah Pekerjaan Beton
C Pekerjaan Mekanikal , Elektrikal dan Plumbing (MEP)
I Pekerjaan Plumbing
1 Pekerjaan Intalasi Air Bersih
1 Pipa Instalasi air bersih 2" tipe AW 25.00 m'
No Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah
a b c d e f=cxe
2 Pipa Instalasi air bersih 3/4 " tipe AW 64.00 m'
No Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah
a b c d e f=cxe
Jumlah Pekerjaan Instalasi Air Bersih
II Pekerjaan Instalasi Air Kotor
1 Pipa Instalasi air kotor 4" tipe AW 45.00 m'
Jumlah Pekerjaan Instalasi Air Kotor
D Pekerjaan Struktur Beton - Lean Concrete
1 Beton Kolom K1 30/30 mutu K250
1 Beton mutu K250 4.73 m3
2 Pembesian 590.01 kg
3 Bekisting (termasuk bongkar) 63.00 m3
MINGGU KE -
BOBOT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
No Uraian Item Pekerjaan
(%)
1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120
RENCANA PERMINGGU (%) 2.03% 3.16% 7.58% 7.79% 8.16% 8.16% 8.16% 7.02% 7.02% 4.79% 4.79% 4.79% 4.42% 4.42% 4.42% 4.42% 4.42% 4.42%
KOMULATIF BOBOT PEKERJAAN PERMINGGU (%) 2.03% 5.19% 12.77% 20.56% 28.72% 36.88% 45.03% 52.06% 59.08% 63.87% 68.67% 73.46% 77.88% 82.31% 86.73% 91.15% 95.58% 100.00%
REALISASI BOBOT PEKERJAAN PERMINGGU (%)
DEVIASI BOBOT PEKERJAAN PERMINGGU (%)