Anda di halaman 1dari 20

LAPORAN HARIAN

HARI : Senin
TANGGAL : 06-06-2016 IT Consultant, Modelling & Simulation
PROYEK : Upgrade Wargaming System
TA 2016 PT. PASIM SENTRA UTAMA

No Jenis Pekerjaan PIC Progress Ket


1 Pekerjaan Renovasi Ruangan
Tim Interior
a. Membersihkan Lantai Panggung di setiap ruangan 100%
2 Upgrade Software
a. Membuat Fungsi List Combo Demo 100%
b. Logon Demo 30%
c. Add Range Demo 25%
Tim Software
d. Instalasi Hardware 30%

e. Membuat 3D Model Shenyang J-811, KC-135 R, KRI Anaconda, AMX 10p,


Selamet Riyadi, APC Acmot, Boeing Garuda Air, KRI Frans Kaisiepo 368, 25%
Diponegoro 365, IFU Marder IA3, Fokker 28

Daftar Hadir Personel Terlampir

DIBUAT,
PT. PASIM SENTRA UTAMA

Erna Hikmawati
Coordinator Project
7424-6144
#REF! #REF!
#REF!
86.71875
#DIV/0!

86.71875
LAPORAN HARIAN
HARI : Selasa
TANGGAL : 07-06-2016 IT Consultant, Modelling & Simulation
PROYEK : Upgrade Wargaming System
TA 2016 PT. PASIM SENTRA UTAMA

No Jenis Pekerjaan PIC Progress Ket


1 Pekerjaan Renovasi Ruangan
a. Pemasangan label nama setiap ruangan 100%
Tim Interior
b. Mengecat Bagian Luar Ruang Server 100%
c. Memperbaiki meja meeting di Ruangan AAR 100%
2 Upgrade Software
a. Operation other control windows 100%
b. Anim Demo 60%
c. List Control Demo Tim Software 60%
d. Membuat 3D Model Shenyang J-811, KC-135 R, KRI Anaconda,
AMX 10p, Selamet Riyadi, APC Acmot, Boeing Garuda Air, KRI Frans 50%
Kaisiepo 368, Diponegoro 365, IFU Marder IA3, Fokker 28

Daftar Hadir Personel Terlampir


props

DIBUAT,
PT. PASIM SENTRA UTAMA

Erna Hikmawati
Coordinator Project
LAPORAN HARIAN
HARI : Rabu
TANGGAL : 08-06-2016 IT Consultant, Modelling & Simulation
PROYEK : Upgrade Wargaming System
TA 2016 PT. PASIM SENTRA UTAMA

No Jenis Pekerjaan PIC Progress Ket


1 Pekerjaan Renovasi Ruangan
a. Memotong Meja Meeting di AAR 100%
b. Mengecat pintu blue force Tim 100%
c. Membersihkan ruangan-ruangan Interior 100%
d. Mengerjakan komplain-komplain yang ada 100%
e. Memperbaiki lantai di depan pintu ruang server 100%
2 Upgrade Software
a. Shading .tif 100%
b. Learning tutorial import initial shapes 100%
c. Instalasi hardware di red force 100%
d. Fixing Operation Tab Control 100%
e. Dialog Box on Button Click Tim 100%
Software 100%
f. List Control Demo Part 2
g. HTML Dialog Demo 100%

d. Membuat 3D Model Shenyang J-811, KC-135 R, KRI Anaconda, AMX 75%


10p, Selamet Riyadi, APC Acmot, Boeing Garuda Air, KRI Frans Kaisiepo
368, Diponegoro 365, IFU Marder IA3, Fokker 28

Daftar Hadir Personel Terlampir

DIBUAT,
PT. PASIM SENTRA UTAMA

Erna Hikmawati
Coordinator Project
LAPORAN HARIAN
HARI : Kamis
TANGGAL : 09-06-2016 IT Consultant, Modelling & Simulation
PROYEK : Upgrade Wargaming System
TA 2016 PT. PASIM SENTRA UTAMA

No Jenis Pekerjaan PIC Progress Ket


1 Upgrade Software
a. Installasi Hardware 80%
Tim Software
b. Membuat 3D Model Shenyang J-811, KC-135 R, KRI Anaconda, AMX
10p, Selamet Riyadi, APC Acmot, Boeing Garuda Air, KRI Frans Kaisiepo
368, Diponegoro 365, IFU Marder IA3, Fokker 28 100%

Daftar Hadir Personel Terlampir


DIBUAT,
PT. PASIM SENTRA UTAMA

Erna Hikmawati
Coordinator Project
LAPORAN HARIAN
HARI : Jum'at
TANGGAL : 10-06-2016 IT Consultant, Modelling & Simulation
PROYEK : Upgrade Wargaming System
TA 2016 PT. PASIM SENTRA UTAMA

No Jenis Pekerjaan PIC Progress Ket


1 Upgrade Software

a. Installasi Hardware Tim Software 100%

b. Persiapan Uji Fungsi ARES Wargaming System Tahap I 100%

Daftar Hadir Personel Terlampir


DIBUAT,
PT. PASIM SENTRA UTAMA

Erna Hikmawati
Coordinator Project
LAPORAN MINGGUAN

PROYEK : PENGADAAN ALAT SIMULATOR (WARGAMING) SESKO TNI TA 2016


LOKASI : JL. RAA. MARTANEGARA NO. 11, BANDUNG
PERIODE : 6 Juni 2016 - 10 Juni 2016
MINGGU : XV

Persentase PENCAPAIAN PENCAPAIAN (%)


NO. URAIAN KEGIATAN
Total % TOTAL % % MINGGU INI % MINGGU LALU % PROGRESS
Target Realisasi Target Realisasi Target Realisasi
1 2 3 4 5 6 7 8 9 10

UPGRADE SOFTWARE WARGAMING SYSTEM


A 77.9540 23.5181
(INCLUDED TRANSFER OF TECHNOLOGY)

Penambahan menu udara pada fungsi Laut dan Penambahan


1 0.0145 0.0083 57.50 57.50 50.00 50.00 7.50 7.50
menu Laut pada fungsi Udara

2 Penambahan fungsi pesawat tanpa awak 2.0307 0.9138 -

2.1 simulate UAV mission controller 0.6382 0.2872 45.00 45.00 40.00 40.00 5.00 5.00

2.2 receive the information from UAV 0.2901 0.1305 45.00 45.00 40.00 40.00 5.00 5.00
2.3 real-time dynamic database updates such as way-point and 0.4061 0.1828 45.00 45.00 40.00 40.00 5.00 5.00
target.
2.4 simulate weather, weapon effects, localized damage and 0.4061 0.1828 45.00 45.00 40.00 40.00 5.00 5.00
feature placement
2.5 interfaces with ARES Model 0.2901 0.1305 45.00 45.00 40.00 40.00 5.00 5.00

3 Tambahan tampilan 3D pada object IGI 24.4260 5.7823


3.1 3D Visualizations SW 4.8736 1.8266 37.48 37.48 35.40 35.40 2.08 2.08
1 2 3 4 5 6 5 6 9 10
3.2 Building 3D Objects 12.3001 3.9557 32.16 32.16 30.37 30.37 1.79 1.79
Membuat Model 3D Shenyang J-811
Membuat Model 3D KC 135 R
Membuat Model 3D KRI Anaconda
Membuat Model 3D AMX 10p
Membuat Model 3D Selamet Riyadi
Membuat Model 3D APC Acmot
Membuat Model 3D Boeing Garuda Air
Membuat Model 3D KRI Frans Kaisiepo 368
Membuat Model 3D Diponegoro 365
Membuat Model 3D IFU Marder IA3
Membuat Model 3D Fokker 28
3.3 Realtime Interaction with ARES Model 3.5392 - - - - - - -
1. Research & Development CIGI
3.4 Provide AAR function for 3D environments 3.7132 - - - - - - -

Penambahan Fungsi pada Red Force yang sama dengan Blue


4 2.6689 1.2010 45.00 45.00 35.00 35.00 10.00 10.00
Force

Penambahan Fitur Peta 3D untuk wilayah Indonesia dengan


5 22.8015 7.8089
tingkat kedetailan standar dan 3 lokasi dengan yang lebih detail

5.1 High Resolution 3D Map 7.8906 - - - - - - -


Download Image TMS until level 12
5.2 Provide 3D terrain map(google map level) about whole
Indonesia , east-south asia area, New Zealand and Australia 9.6892 3.6315 37.48 37.48 35.40 35.40 2.08 2.08
area
Additional Elevation Data to map server
5.3 Provide terrain models. Static terrains, such as OpenFlight, 5.2217 4.1774 80.00 80.00 80.00 80.00 - -
built using terrain construction applications.
Building Terrain Feature Data

6 Sebagian Pengoperasian Object bisa dengan fitur otomatisasi 26.0124 7.8037


6.1 Scripts Design and Development for describing automation 7.1364 2.1409 30.00 30.00 30.00 30.00 - -
rule
6.2 Scripts Parser & Assigning Behavior & Generate Order for 6.5111 1.9533 30.00 30.00 30.00 30.00 - -
ARES
6.3 Response to ARES Event using Artifficial Intelligence 6.2501 1.8750 30.00 30.00 30.00 30.00 - -
Technologies (Agent Based Simulation)
6.4 Interaction with ARES 3.0574 0.9172 30.00 30.00 30.00 30.00 - -
6.5 User Interface for Automation Controller 3.0574 0.9172 30.00 30.00 30.00 30.00 - -
1 2 3 4 5 6 5 6 9 10

B KEGIATAN UPDATE DATABASE 1.4990 0.4497

Kegiatan Update Database ARES Wargaming System baik


database darat, database laut dan database Udara serta 1.4990 0.4497 30.00 30.00 25.00 25.00 5.00 5.00
database Peta.
Kunjungan Ke Mabes Masing-masing Matra 30.00 30.00 25.00 25.00 5.00 5.00

C RINCIAN UPGRADE HARDWARE AWS 15.8336 13.2310


1 Server
Dell poweredge R730 (Intel Xeon , 16GB (1 x 16GB) DDR4 1.0419 0.8336
2133Mhz RDIMM, 300GB SAS 2.5" 15K Hotplug, 4 x GbE NIC, 0.4946 0.3957 80.00 80.00 80.00 80.00 - -
HP
Dell ENVY 750-101DR730/Intel Core i7-6700
, 23,4G
x 32 8M
GB 65 W CP Intel
Rackpoweredge
Case) (Intel® Xeon® RDIM,HARD 0.5474 0.4379 80.00 80.00 80.00 80.00 - -
Skylake
DRIVE 2Z170 / 1PCI-E x 16, PCI-E x 1,4 x HDD 3,5' . 4 GB
X 2TB)
2 Dekstop
DDR4b1TB HDD Super Multi DVDRW NVDIA GEFORCE GTX 4.4914 4.2699
745 4GB DDR3, HP 7-in1 Multimedia Card Reader, HP Wireless 2.5460 2.5460 100.00 100.00 100.00 100.00 - -
Kit, Windows 10
Penambahan RAM 64 4GB
bit. 500W Power
Desktop HP Supply
ENVY 1 Year Limited 0.1344 0.1344 100.00 100.00 100.00 100.00 - -
Warrantty
PerpananganHP 2 Tahun PC Garansi Desktop HP ENVY 0.1391 0.1113 80.00 80.00 80.00 80.00 - -
Pavilion 23 cw IPS Monitor
Monitor 23 inch 0.7033 0.7033 100.00 100.00 100.00 100.00 - -
Vga 4 GB Upgrade Dell Xps 8300 0.8038 0.6430 80.00 80.00 80.00 80.00 - -
Memory 4GB Upgrade Dell XPS 8300 0.1646 0.1317 80.00 80.00 80.00 80.00 - -

3 Switch 48 port 0.6836 0.6836


Switch 48 port 0.6285 0.6285 100.00 100.00 100.00 100.00 - -
2-port Stacking Module 0.0471 0.0471 100.00 100.00 100.00 100.00 - -
1.0m Stacking Cable 0.0081 0.0081 100.00 100.00 100.00 100.00 - -

4 CCTV 2.0068 2.0068


2 Megapixel Full HD Indoor Motorized Dome IP-Camera 18x 1.5881 1.5881 100.00 100.00 100.00 100.00 - -
Zoom ICR WDR
Bracket 0.0907 0.0907 100.00 100.00 100.00 100.00 - -
Adaptor 0.0882 0.0882 100.00 100.00 100.00 100.00 - -
Cable UTP CAT-6 0.0950 0.0950 100.00 100.00 100.00 100.00 - -
Switch 8 Port POE 0.0481 0.0481 100.00 100.00 100.00 100.00 - -
NVR Server 20TB 0.0588 0.0588 100.00 100.00 100.00 100.00 - -
Jasa Instalasi 0.0378 0.0378 100.00 100.00 100.00 100.00 - -
-

1 2 3 4 5 6 5 6 9 10
5 Upgrade UPS 0.3361 0.1440
Board Controller 0.0720 0.0360 50.00 50.00 20.00 20.00 30.00 30.00
Battery 0.2161 0.1080 50.00 50.00 20.00 20.00 30.00 30.00
UPS Service fee 0.0480 0.0048 10.00 10.00 - - 10.00 10.00

6 Vmware 0.6475
VMware vSphere Enterprise 0.3865 0.3092 80.00 80.00 80.00 80.00 - -
vMware vcentre sever 0.2610 0.2088 80.00 80.00 80.00 80.00 - -
-
7 LAN (local area Network) 0.1744 0.1744
Cable UTP CAT-6 0.1187 0.1187 100.00 100.00 100.00 100.00 - -
Persiapan pengadaan - 100.00 100.00 100.00 100.00 - -
Jasa Instalasi 0.0557 0.0557 100.00 100.00 100.00 100.00 - -
Instalasi - 100.00 100.00 100.00 100.00 - -

8 TV 0.8762 0.8762
TV 42 inch 0.2228 0.2228 100.00 100.00 100.00 100.00 - -
TV 55 inch 0.0816 0.0816 100.00 100.00 100.00 100.00 - -
TV 60 inch 0.5717 0.5717 100.00 100.00 100.00 100.00 - -
-
9 Sound Systems 0.1005 0.0923
power amplifier 0.0408 0.0327 80.00 80.00 80.00 80.00 - -
speaker pasif 0.0118 0.0118 100.00 100.00 100.00 100.00 20.00 20.00
cable speaker 0.0479 0.0479 100.00 100.00 100.00 100.00 - -
-
Tambahan peralatan simulasi radio yang lebih mudah dalam
10 5.1329 4.1063 80.00 80.00 80.00 80.00 - -
pengoperasian dan perawatannya
Penarikan kabel Jaringan ke Ruang Server -
Instalasi Jaringan -
11 HDMI Switch 0.0438
ATEN VS0801H 0.0438 0.0438 100.00 100.00 100.00 100.00 - -

12 HDMI Matrix Switch


VM 0404H 0.2984 0.2984 100.00 100.00 100.00 100.00 - -

1 2 3 4 5 6 5 6 9 10

D PEKERJAAN RENOVASI RUANGAN 3.5707 3.5496

Pembuatan Ruangan Blue Force menjadi masing-masing Kogas


dan Renovasi ruangan Senior Control, ruangan Red Force, -
ruangan AAR, dan ruang Server

1 Blue Force 1.5325 1.5325


Meja Simulator 0.5802 0.5802 100.00 100.00 100.00 100.00 - -
Pembuatan Meja Simulator - 100.00 100.00 100.00 100.00 - -
Meja Pengawas 0.0538 0.0538 100.00 100.00 100.00 100.00 - -
Pembuatan Meja Pengawas - 100.00 100.00 100.00 100.00 - -
Kursi 0.2612 0.2612 100.00 100.00 100.00 100.00 - -

Partisi Gypsum Peredam Suara Gypsum 0.0913 0.0913 100.00 100.00 100.00 100.00 - -
Instalasi listrik - 100.00 100.00 100.00 100.00 - -
Partisi Gypsum Peredam Suara Galpanis 0.0578 0.0578 100.00 100.00 100.00 100.00 - -
Pemasangan gypsum - 100.00 100.00 100.00 100.00 - -
Pintu Panel + Kusen 0.0845 0.0845 100.00 100.00 100.00 100.00 - -
Pengukuran Pintu 100.00 100.00 100.00 100.00
Plafond dan Drop Ceiling 0.1808 0.1808 100.00 100.00 100.00 100.00 - -
Pemasangan Drop Ceiling 100.00 100.00 100.00 100.00
Air Conditioner 0.1056 0.1056 100.00 100.00 100.00 100.00 - -
Wallpaper 0.1173 0.1173 100.00 100.00 100.00 100.00 - -
-
2 Red Force 0.5538 0.5538
Meja Simulator 0.2418 0.2418 100.00 100.00 100.00 100.00 - -
Pembuatan Meja Simulator - 100.00 100.00 100.00 100.00 - -
Meja Pengawas 0.0134 0.0134 100.00 100.00 100.00 100.00 - -
Pembuatan Meja Pengawas - 100.00 100.00 100.00 100.00 - -
Kursi 0.0898 0.0898 100.00 100.00 100.00 100.00 - -
Pintu Utama + Kusen 0.0211 0.0211 100.00 100.00 100.00 100.00 - -
Plafon and Drop Ceiling 0.0445 0.0445 100.00 100.00 100.00 100.00 - -
Air Conditioner 0.0528 0.0528 100.00 100.00 100.00 100.00 - -
Wallpaper 0.0903 0.0903 100.00 100.00 100.00 100.00 - -

1 2 3 4 5 6 5 6 9 10
-
3 Server 0.2916 0.2916
Meja 3 Monitor 0.0276 0.0276 100.00 100.00 100.00 100.00 - -
Meja 1 Monitor 0.0216 0.0216 100.00 100.00 100.00 100.00 - -
Credenza / Lemari File 0.0544 0.0544 100.00 100.00 100.00 100.00 - -
Monitor Frame 0.0048 0.0048 100.00 100.00 100.00 100.00 - -
Kursi 0.0204 0.0204 100.00 100.00 100.00 100.00 - -
Bungkus Kusen 0.0128 0.0128 100.00 100.00 100.00 100.00 - -
Pintu Utama + Kusen 0.0132 0.0132 100.00 100.00 100.00 100.00 - -
Air Conditioner 0.0264 0.0264 100.00 100.00 100.00 100.00 - -
Lantai Panggung 0.0648 0.0648 100.00 100.00 100.00 100.00 - -
Wallpaper 0.0408 0.0408 100.00 100.00 100.00 100.00 - -
Drop Ceiling 0.0048 0.0048 100.00 100.00 100.00 100.00 - -

4 AAR 0.3415 0.3415


Meja Meeting 0.0360 0.0360 100.00 100.00 100.00 100.00 - -
Meja Simulator 0.0967 0.0967 100.00 100.00 100.00 100.00 - -
Meja Pengawas 0.0067 0.0067 100.00 100.00 100.00 100.00 - -
Kursi 0.0857 0.0857 100.00 100.00 100.00 100.00 - -
Pintu Panel + Kusen 0.0096 0.0096 100.00 100.00 100.00 100.00 - -
Plafond and Drop Ceiling 0.0481 0.0481 100.00 100.00 100.00 100.00 - -
Air Conditioner 0.0528 0.0528 100.00 100.00 100.00 100.00 - -
Signed Board 0.0059 0.0059 100.00 100.00 100.00 100.00 - -
-
5 Senior Control 0.3897 0.3897
Meja Meeting 0.0300 0.0300 100.00 100.00 100.00 100.00 - -
Meja Simulator 0.1209 0.1209 100.00 100.00 100.00 100.00 - -
Lemari CCTV 0.0048 0.0048 100.00 100.00 100.00 100.00 - -
Kursi 0.0816 0.0816 100.00 100.00 100.00 100.00 - -
Pintu Panel + Kusen 0.0096 0.0096 100.00 100.00 100.00 100.00 - -
Pintu Utama + Kusen 0.0384 0.0384 100.00 100.00 100.00 100.00 - -
Air Conditioner 0.0528 0.0528 100.00 100.00 100.00 100.00 - -
Plafond and Drop Ceiling 0.0445 0.0445 100.00 100.00 100.00 100.00 - -
Signed Board 0.0070 0.0070 100.00 100.00 100.00 100.00 - -
-

1 2 3 4 5 6 5 6 9 10
6 Toilet 0.1241 0.1241
Urinoir 0.0370 0.0370 100.00 100.00 100.00 100.00 - -
Wastafel 0.0158 0.0158 100.00 100.00 100.00 100.00 - -
Closet Duduk 0.0185 0.0185 100.00 100.00 100.00 100.00 - -
Lantai Keramik 0.0163 0.0163 100.00 100.00 100.00 100.00 - -
Plafon Gypsum 0.0081 0.0081 100.00 100.00 100.00 100.00 - -
Kubikal 0.0152 0.0152 100.00 100.00 100.00 100.00 - -
Bongkar Toliet Lama 0.0132 0.0132 100.00 100.00 100.00 100.00 - -

-
7 Ruang KOGAS 0.3374 0.3163
Air Conditioner 0.2113 0.1901 90.00 90.00 80.00 80.00 10.00 10.00
Vertical Blind 0.1261 0.1261 100.00 100.00 100.00 100.00 - -
-

E TRAINING 1.1427 0.3428


Training 1.1427 0.3428 30.00 30.00 30.00 30.00 - -
Pelatihan Database 30.00 30.00 30.00 30.00 - -
Pelatihan Terrain Peta 30.00 30.00 30.00 30.00 - -

TOTAL 100 41.0911


30.1691548466728 41.0911

d. Membuat 3D Model Mig 31 Foxhound, KRI Krait 827, IM 8 Rusian, Sukhoi T-50 pak fa,
Astros II MK 6, Helikopter UH-60 blackhawk, Ki Hajar Dewantara 364

37.48 2.08

37.48
3.6639
#REF!
32.16

#REF! #REF! #REF! #REF! #REF! #REF!


#REF!

0.2599 0 0 #REF! #REF!

0.083333

20 5
0.1005
99.40832

Anda mungkin juga menyukai