NIM : 180511625530
OFFERING : A2
TUGAS : Materials Requirement Planning (MRP) Keterangan :
1. Rangka Konstruksi
2. Tanki
3. Pengaduk
4. Poros
5. Bos As
6. Motor Listrik AC
7. Motor Listrik DC
8. Gearbox
9. Gear
10. Rantai
11. Pulli
12. Bearing Pillow Block
13. V-Belt
14. Mur dan Baut
15. Kompor
16. Plat Stainlees Steel
17. Panel Kontrol
Materials Requirement Planning (MRP)
Austenthic P= 545mm
Stainlees
2 Tanki 1 Stainlees L= 410mm 2 Lembar 500.000 1.000.000 KB
Steel 304
Steel Tebal = 4 mm
Motor
200 Watt
7 Listrik DC 1 1000 RPM Worm Gear - 1 Buah 850.000 850.000 KS
1 : 50
Gearbox
8 1 - Rasio 1:40 - 1 Buah 575.000 575.000 KS
Baja Karbon
Kontrusksi
9 Gear 2 S45C Jumlah Gigi 25 2 Buah 110.000 220.000 KS
Mesin (JIS G
4501)
Baja Karbon
Rantai Kontrusksi
10 1 Rantai Roll Pitch (p) 12,7mm 1 Buah 200.000 200.000 KS
Mesin (JIS G
4501)
Pulli Besi Cor
Ø 4 inc 50.000
11 2 Kelabu (JIS FC20 2 Buah 130.000 KS
Ø 6inc 80.000
G 5501)
Bearing
Pillow Diameter As
12 3 - UCF208 3 Buah 150.000 450.000 KS
Block 40mm
Total 9.450.000