1. Upah
2. Bahan
3. Uraian pekerjaan
4. Harga satuan Pekerjaan
5. Rab Pekerjaan
-
A B C D E F G=EXF G
RAB Page 1 of 2
NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA
A B C D E F G=EXF G
- Bekisting Kualitas Beton Expose M2 601,12 Rp 271.953,00 Rp 163.476.387,36
3
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M 69,11 Rp 1.018.834,62 Rp 70.411.660,39
II.1.6.1c PEKERJAAN WATERPROOFING Waterproofing Membrane Coating tebal 4mm + Aci Kasar M2 21,55 Rp 208.739,59 Rp 4.498.338,08
II.1.6.1d PEKERJAAN SCREEDING M2 21,55 Rp 49.940,33 Rp 1.076.214,11
II.1.6.1e PASANG ROOF DRAIN Outlet 2" (50mm) Setara RFS01 Brass Bh 2,00 Rp 221.408,55 Rp 442.817,10
II.1.6.1f PASANG INSTALASI AIR HUJAN Pipa Pvc Type AW Diameter 2" beserta fitting M1 5,00 Rp 39.026,02 Rp 195.130,10