1 Aspal ( AC ) Kg Rp 10,000.00
2 Kayu Bakar m3 Rp 490,000.00
3 Paaving Blok m2 Rp 57,000.00
4 Olie SAE 30 Ltr Rp 23,000.00
5 Olie SAE 40 Ltr Rp 23,000.00
6 Olie SAE 90 Ltr Rp 35,000.00
7 Olie SAE 100 Ltr Rp 35,000.00
8 Aspal Emulsi Kg Rp 7,500.00
9 Flux Oil Ltr Rp 2,700.00
10 Alat Bantu Bina Marga Set Rp 100,000.00
11 Alat Bantu Pengairan Set Rp 80,000.00
12 Sambungan Rumah 1/2" Set Rp 166,000.00
13 Sambungan Rumah 3/4" Set Rp 475,000.00
14 Sambungan Rumah 1" Set Rp 1,500,000.00
15 Mesin Las Unit Rp 15,000,000.00
16 Bor Listrik Unit Rp 1,000,000.00
17 Mesin Potong Besi Bh Rp 1,000,000.00
18 KWH Listrik KWH Rp 1,000.00
19 Gas Exetilyn Btl Rp 100,000.00
20 Gas Oksigen Btl Rp 100,000.00
21 Solar Ltr Rp 4,000.00
22 Mata Bor Bh Rp 50,000.00
23 Alat Bantu Penyetelan Set Rp 100,000.00
REKAP ANALISA
KEGIATAN :
KABUPATEN : DOMPU
TAHUN ANGGARAN : 2009
KODE
NO. JENIS PEKERJAAN HARGA
ANALISA
1 2 3 4
PEKERJAAN PERSIAPAN
1 A. 1 1 m2 Pembersihan Lapangan dan Perataan Rp. 3,500.00
2 A. 2 1 Bh Pembuatan Papan nama Proyek 0,8 x 1,2 cm Rp. 203,500.00
3 A. 3 1 m3 Bongkar Beton Bertulang Rp. 233,345.00
4 A. 4 1 m2 Bongkar Dinding tembok bata merah Rp. 11,200.00
5 A. 5 1 m2 Bongkar Penutup Atap, Usuk + Reng dan KAP Rp. 5,250.00
6 A. 6 1 m2 Bongkar Plafond Rp. 5,250.00
7 A. 7 1 m3 Bongkar Pondasi Batu Kali Rp. 105,000.00
8 A. 8 1 m2 Bongkar Penutup Atap, Usuk + Reng dan KAP, Kayu Dipakai Kembali Rp. 9,995.00
9 A. 9 1 m1 Pengukuran dan Pemasangan Bouwplank Rp. 25,770.00
PEKERJAAN BETON
326 G. 1 1 m3 Membuat beton tumbuk 1 Pc : 3 Ps : 5 Kr Rp. 462,555.00
327 G. 2 1 m2 Membuat Lantai kerja beton tumbuk 1 Pc : 3 Ps : 5 Kr (tebal 5 cm) Rp. 60,044.00
328 G. 3 10 Kg Pembesian dengan Besi Polos Rp. 176,669.00
329 G. 4 10 Kg Pembesian dengan Besi Ulir Rp. 166,169.00
330 G. 5 10 Kg pasang kabel press tressed polos Rp. 174,085.00
331 G. 6 10 Kg pasang kabel press tressed strands Rp. 163,585.00
332 G. 7 10 Kg pasang jaring kawat baja/wire mesh Rp -
333 G. 8 1 m2 Pasang Bekisting Untuk Pondasi Rp. 124,074.00
334 G. 9 1 m2 Pasang Bekisting Untuk Sloof Rp. 130,794.00
335 G. 10 1 m2 Pasang Bekisting Untuk Kolom Rp. 305,957.00
336 G. 11 1 m2 Pasang Bekisting Untuk Balok Rp. 313,307.00
337 G. 12 1 m2 Pasang Bekisting Untuk Lantai Rp. 505,957.00
338 G. 13 1 m2 Pasang Bekisting Untuk Dinding Rp. 447,707.00
339 G. 14 1 m2 Pasang Bekisting Untuk Tangga Rp. 285,322.00
340 G. 15 1 m3 Membuat beton mutu F'c = 19,3 Mpa (K 225), slump (12+2) cm, w/c = 0,58 Rp -
341 G. 16 1 m3 Membuat beton mutu F'c = 21,7 Mpa (K 250), slump (12+2) cm, w/c = 0,56 Rp -
342 G. 17 1 m3 Membuat beton mutu F'c = 24,0 Mpa (K 275), slump (12+2) cm, w/c = 0,53 Rp -
343 G. 18 1 m3 Membuat beton mutu F'c = 26,4 Mpa (K 300), slump (12+2) cm, w/c = 0,52 Rp -
344 G. 19 1 m3 Membuat beton mutu F'c = 28,8 Mpa (K 325), slump (12+2) cm, w/c = 0,49 Rp -
345 G. 20 1 m3 Membuat beton mutu F'c = 31,2 Mpa (K 350), slump (12+2) cm, w/c = 0,48 Rp -
346 G. 21 1 m3 Membuat beton mutu F'c = 7,4 Mpa (K 100), slump (12 + 2) cm, w/c = 0,87 Rp -
347 G. 22 1 m3 Membuat beton mutu F'c = 9,8 Mpa (K 125), slump (12 + 2) cm, w/c = 0,78 Rp -
348 G. 23 1 m3 Membuat beton mutu F'c = 12,2 Mpa (K 150), slump (12 + 2) cm, w/c = 0,72 Rp -
349 G. 24 1 m3 Membuat beton mutu F'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87 Rp -
350 G. 25 1 m3 Membuat beton mutu F'c = 14,5 Mpa (K 175), slump (12+2) cm, w/c = 0,66 Rp -
351 G. 26 1 m3 Membuat beton mutu F'c = 16,9 Mpa (K 200), slump (12+2) cm, w/c = 0,61 Rp -
352 G. 27 1 m3 Membuat beton kedap air dengan strorox - 100 Rp -
353 G. 28 1 m2 Pasang Jembatan pengecoran untuk beton Rp. 96,365.00
354 G. 29 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 3 Kr Rp. 469,145.00
355 G. 30 1 m3 Membuat pondasi beton bertulang (150 kg besi + bekisting) Rp. 3,859,597.00
356 G. 31 1 m3 Membuat Sloof beton bertulang (200 kg besi + bekisting) Rp. 4,889,256.00
357 G. 32 1 m3 Membuat Kolom beton bertulang (150 kg besi + bekisting) Rp. 6,453,490.00
358 G. 33 1 m3 Membuat Kolom beton bertulang (300 kg besi + bekisting) Rp. 8,910,962.00
359 G. 34 1 m' Membuat Kolom praktis beton bertulang (11 x 11) cm Rp. 80,194.00
360 G. 35 1 m' Membuat Ring balok beton bertulang ( 10 x 15 ) cm Rp. 95,049.00
361 G. 36 1 m3 Membuat Balok beton bertulang (200 kg besi + bekisting) Rp. 6,631,252.00
362 G. 37 1 m3 Membuat Balok beton bertulang (150 kg besi + bekisting) Rp. 5,810,337.00
363 G. 38 1 m3 Membuat Dinding beton bertulang (150 kg besi + bekisting) Rp. 5,487,313.00
364 G. 39 1 m3 Membuat Dinding beton bertulang (200 kg besi + bekisting) Rp. 6,144,456.00
365 G. 40 1 m3 Membuat plat beton bertulang (150 kg besi + bekisting ) Rp. 6,054,710.00
PEKERJAAN PENGUNCI
366 H. 1 1 Bh Pasang Kunci Tanam Antik Rp. 314,500.00
367 H. 2 1 Bh Pasang Kunci Tanam Biasa Rp. 107,350.00
368 H. 3 1 Bh Pasang Kunci Tanam KM/WC Rp. 78,925.00
369 H. 4 1 Bh Pasang Kunci Selinder Rp. 97,175.00
370 H. 5 1 Bh Pasang Engsel Pintu Rp. 18,625.00
371 H. 6 1 Bh Pasang Engsel Jendela Kupu - Kupu Rp. 10,250.00
372 H. 7 1 Bh Pasang Grendel Pintu/Jendela Rp. 12,750.00
373 H. 8 1 Bh Pasang Grendel Pintu/Jendela Besi Rp. 11,250.00
374 H. 9 1 Bh Pasang Engsel angin-angin Rp. 10,250.00
375 H. 10 1 Bh Pasang Door Closer Rp. 68,750.00
376 H. 11 1 Bh Pasang kunci Selot Rp. 40,200.00
377 H. 12 1 Bh Pasang Pegangan Pintu / Door Holder Rp. 191,700.00
378 H. 13 1 m1 Pasang Rel pintu Dorong Rp. 70,880.00
379 H. 14 1 Bh Pasang Kait Angin Kecil Rp. 16,510.00
380 H. 15 1 Bh Pasang Kait Angin Besar Rp. 22,010.00
381 H. 16 1 Bh Baut Diameter 12 mm Rp. 4,025.00
382 H. 17 1 Bh Baut Diameter 16 mm Rp. 4,275.00
383 H. 18 1 Bh Baut Diameter 19 mm Rp. 4,525.00
384 H. 19 1 Bh angker Dia. 12 mm Rp. 4,025.00
385 H. 20 1 Bh Beugel U Rp. 40,525.00
386 H. 21 1 Bh Beugel Plat Rp. 40,525.00
387 H. 22 1 m2 Pasang Kaca, tebal 3 mm Rp. 66,925.00
388 H. 23 1 m2 Pasang Kaca, tebal 5 mm Rp. 79,025.00
389 H. 24 1 m2 Pasang Kaca Ryben, tebal 3 mm Rp. 76,825.00
390 H. 25 1 m2 Pasang Kaca Ryben, tebal 5 mm Rp. 94,025.00
391 H. 26 1 m2 Pasang Glass Blok Rp. 459,487.50
392 H. 27 1 m2 Pasang Kaca Buram ( Kaca ES ), tebal 5 mm Rp. 135,375.00
PEKERJAAN FHINISING
393 I. 1 1 m2 Mendempul dan Menggosok kayu Rp. 6,940.00
394 I. 2 1 m2 pengecatan Bidang kayu lama ( 1 lapis plamir), 1 lapis cat dasar,
2 lapis cat penutup Rp. 27,286.00
395 I. 3 1 m2 pengecatan bidang kayu baru ( 1 lapis plamir), 1 lapis cat dasar,
2 lapis cat penutup Rp. 32,602.00
396 I. 4 1 m2 pelaburan bidang kayu dengan Politur Rp. 42,333.60
397 I. 5 1 m2 pelaburan bidang kayu dengan Cat residu dan teer Rp. 13,740.00
398 I. 6 1 m2 pelaburan bidang kayu dengan Vernis Rp. 20,950.00
399 I. 7 1 m2 Pengecetan Tembok baru Rp. 12,282.00
400 I. 8 1 m2 Pengecetan Tembok lama Rp. 9,104.00
401 I. 9 1 m2 Pengecetan Besi 1 x Meni Rp. 59,150.00
402 I. 10 1 m2 Mengecat Genteng 2 x Cat Rp. 22,501.00
403 I. 11 1 m2 Pengecetan Plafond baru Rp. 19,820.00
404 I. 12 1 m2 Pengecetan Plafond lama Rp. 15,120.00
405 I. 13 1 m2 Pengecetan Rangka Baja Zygromet (IWF dan Canal) Rp. 18,670.00
PEKERJAAN SANITAIR
406 J. 1 Memasang 1 Bh Closed Jongkok Porselin Rp. 307,160.00
407 J. 2 Memasang 1 Bh Closed Jongkok Teraso Rp. 216,210.00
408 J. 3 Memasang 1 Bh Closed Duduk Porselin Rp. 1,707,160.00
409 J. 4 Memasang 1 Bh Closed Duduk Porselin (K.W I Super) Rp. 2,707,160.00
410 J. 5 Memasang 1 Bh Bak Mandi Porselin Rp. 782,880.00
411 J. 6 Memasang 1 Bh Bak Mandi Teraso Rp. 215,410.00
412 J. 7 Memasang 1 Bh Bak Mandi Plastik Rp. 437,100.00
413 J. 8 Memasang 1 Bh Bath Tub Rp. 3,649,380.00
414 J. 9 Memasang 1 Bh Urinoir Rp. 1,163,360.00
415 J. 10 Memasang 1 m' Pipa Stenlis dia 2" Rp. 135,282.00
416 J. 11 Memasang 1 m' PVC Water Stop lebar 230 mm - 320 mm Rp -
417 J. 12 Memasang 1 m' PVC Water Stop lebar 200 mm Rp -
418 J. 13 Memasang 1 m' PVC Water Stop lebar 150 mm Rp -
419 J. 14 Memasang 1 m' Pipa PVC AW dia 1/2" Rp. 11,757.00
420 J. 15 Memasang 1 m' Pipa PVC AW dia 1.5" Rp. 18,732.00
421 J. 16 Memasang 1 m' Pipa PVC AW dia 3" Rp. 31,907.00
422 J. 17 Memasang 1 m' Pipa PVC AW dia 4" Rp. 46,409.50
423 J. 18 Memasang 1 bh kran dia 3/4" atau 1/2" Rp. 21,270.00
424 J. 19 Memasang 1 bh kran (Double Out Water) dia 3/4" atau 1/2" Rp. 141,270.00
425 J. 20 Memasang 1 bh kran Air Antik dia 3/4" atau 1/2" Rp. 141,270.00
426 J. 21 Memasang 1 bh Floor Drain Rp. 18,220.00
427 J. 22 Memasang 1 bh Saringan Air Besi Rp. 41,220.00
428 J. 23 Memasang 1 bh Saringan Air Plastik Rp. 16,220.00
429 J. 24 Memasang 1 bh Tempat Sabun Rp. 136,220.00
430 J. 25 Memasang 1 bh Cermin Antik Rp. 806,220.00
431 J. 26 Memasang 1 bh Gantungan Handuk Antik Rp. 441,220.00
432 J. 27 Memasang 1 bh Souwer Antik Rp. 381,220.00
433 J. 28 Memasang 1 bh Hand Drier Antik Rp. 906,220.00
434 J. 29 Memasang 1 bh Gantungan Baju Antik Rp. 156,220.00
435 J. 30 Memasang 1 bh Kran Air Semprot Rp. 151,220.00
436 J. 31 Memasang 1 bh Bak Cuci piring logam Rp. 473,660.00
437 J. 32 Memasang 1 bh Bak Cuci piring Teraso Rp. 381,300.00
438 J. 33 Memasang 1 bh wastafel Rp. 636,200.00
439 J. 34 Memasang 1 bh wastafel (K.W I Super) Rp. 1,644,200.00
440 J. 35 Memasang 1 M1 Buis Beton Dia.20 cm Rp. 41,259.50
DAFTAR ANALISA HARGA SATUAN
DINAS :
KABUPATEN : DOMPU
TAHUN ANGGARAN : 2009
PEKERJAAN PERSIAPAN
A. 1 1 m2 Pembersihan Lapangan dan Perataan 3,500.00
0.10000 OH Pekerja Rp. 35,000.00 3,500.00
Jumlah 3,500.00
Total 3,500.00
A. 2 1 Bh Pembuatan Papan nama Proyek 0,8 x 1,2 cm 203,500.00
1.00000 Bh Papan nama Proyek Rp. 200,000.00 200,000.00
0.10000 OH Pekerja Rp. 35,000.00 3,500.00
Jumlah 203,500.00
Total 203,500.00
A. 3 1 m3 Bongkar Beton Bertulang 233,345.00
6.66700 OH Pekerja Rp. 35,000.00 233,345.00
Jumlah 233,345.00
Total 233,345.00
A. 4 1 m2 Bongkar Dinding tembok bata merah 11,200.00
0.32000 OH Pekerja Rp. 35,000.00 11,200.00
Jumlah 11,200.00
Total 11,200.00
A. 5 1 m2 Bongkar Penutup Atap, Usuk + Reng dan KAP 5,250.00
0.15000 OH Pekerja Rp. 35,000.00 5,250.00
Jumlah 5,250.00
Total 5,250.00
A. 6 1 m2 Bongkar Plafond 5,250.00
0.15000 OH Pekerja Rp. 35,000.00 5,250.00
Jumlah 5,250.00
Total 5,250.00
A. 7 1 m3 Bongkar Pondasi Batu Kali 105,000.00
3.00000 OH Pekerja Rp. 35,000.00 105,000.00
Jumlah 105,000.00
Total 105,000.00
A. 8 1 m2 Bongkar Penutup Atap, Usuk + Reng dan KAP, Kayu Dipakai Kembali 9,995.00
0.20000 OH Pekerja Rp. 35,000.00 7,000.00
0.05000 OH Tukang Kayu Rp. 54,000.00 2,700.00
0.00500 OH Kepala Tukang Kayu Rp. 59,000.00 295.00
Jumlah 9,995.00
Total 9,995.00
A. 9 1 m1 Pengukuran dan Pemasangan Bouwplank 25,770.00
0.01200 OH Kayu Perancah 5/7 Rp. 50,000.00 600.00
0.02000 OH Paku Panjang 4 cm - 6 cm Rp. 16,000.00 320.00
0.00700 OH Kayu Papan 3/20 Rp. 2,050,000.00 14,350.00
0.3000 OH Pekerja Rp. 35,000.00 10,500.00
Jumlah 25,770.00
Total 25,770.00
1.20000 m 3
Tanah urug Rp 42,000.00 50,400.00
0.25000 OH Pekerja Rp. 35,000.00 8,750.00
Jumlah 59,150.00
Total 59,150.00
B. 11 1 m3 Pemadatan Tanah Per 20 cm 17,500.00
0.50000 OH Pekerja Rp. 35,000.00 17,500.00
Jumlah 17,500.00
Total 17,500.00
0.24800 m 3
Kapur pasang Rp 55,000.00 13,640.00
1.24000 m3 Tanah liat Rp - -
0.80000 OH Pekerja Rp. 35,000.00 28,000.00
0.40000 OH Tukang Gali Rp 53,000.00 21,200.00
0.04000 OH Kepala Tukang Rp 57,000.00 2,280.00
Jumlah 65,120.00
Total 65,120.00
C. 3 1 m3 Pasang Lapisan Pudel Ijuk 10 cm 50,250.00
6.00000 Kg Ijuk Rp 7,500.00 45,000.00
0.15000 OH Pekerja Rp. 35,000.00 5,250.00
Jumlah 50,250.00
Total 50,250.00
C. 4 1 m3 Pasangan Pondasi batu belah 1 Pc : 1 PP 642,360.00
1.20000 m3 Batu belah 15/20 cm Rp 95,000.00 114,000.00
392.00000 Kg Semen Portland Rp 1,060.00 415,520.00
0.31400 m3 Pasir Pasang Rp 80,000.00 25,120.00
1.50000 OH Pekerja Rp. 35,000.00 52,500.00
0.60000 OH Tukang Batu Rp 53,000.00 31,800.00
0.06000 OH Kepala Tukang Rp 57,000.00 3,420.00
Jumlah 642,360.00
Total 642,360.00
C. 5 1 m3 Pasangan Pondasi batu belah 1 Pc : 2 PP 518,900.00
1.20000 m 3
Batu belah 15/20 cm Rp 95,000.00 114,000.00
267.00000 Kg Semen Portland Rp 1,060.00 283,020.00
0.42700 m3 Pasir Pasang Rp 80,000.00 34,160.00
1.50000 OH Pekerja Rp. 35,000.00 52,500.00
0.60000 OH Tukang Batu Rp 53,000.00 31,800.00
0.06000 OH Kepala Tukang Rp 57,000.00 3,420.00
Jumlah 518,900.00
Total 518,900.00
C. 6 1 m3 Pasangan pondasi batu belah 1 PC : 3 PP 454,640.00
1.20000 m 3
Batu belah 15/20 cm Rp 95,000.00 114,000.00
202.00000 Kg Semen porland Rp 1,060.00 214,120.00
0.48500 m3 Pasir pasang Rp 80,000.00 38,800.00
1.50000 OH Pekerja Rp. 35,000.00 52,500.00
0.60000 OH Tukang Batu Rp. 53,000.00 31,800.00
0.06000 OH Kepala Tukang Rp 57,000.00 3,420.00
Jumlah 454,640.00
Total 454,640.00
C. 7 1 m3 Pasangan pondasi batu belah 1 PC : 4 PP 416,100.00
1.20000 m 3
Batu belah 15/20 cm Rp 95,000.00 114,000.00
91.00000 Kg Semen porland Rp 1,060.00 96,460.00
0.58400 m3 Pasir pasang Rp 80,000.00 46,720.00
1.50000 OH Pekerja Rp. 35,000.00 52,500.00
0.60000 OH Tukang Batu Rp. 53,000.00 31,800.00
0.06000 OH Kepala Tukang Rp 57,000.00 3,420.00
Jumlah 344,900.00
Total 344,900.00
C. 11 1 m3 Pasangan pondasi batu belah 1 KP : 8 SM : 2 PP 231,096.00
1.20000 m 3
Batu belah 15/20 cm Rp 95,000.00 114,000.00
0.17000 m3 Kapur pasang Rp 2,800.00 476.00
0.17000 m3 Semen merah Rp 10,000.00 1,700.00
0.34000 m3 Pasir pasang Rp 80,000.00 27,200.00
1.50000 OH Pekerja Rp. 35,000.00 52,500.00
0.60000 OH Tukang Batu Rp. 53,000.00 31,800.00
0.06000 OH Kepala Tukang Rp 57,000.00 3,420.00
Jumlah 231,096.00
Total 231,096.00
C. 12 1 m3 Pasangan pondasi batu belah 1 PC : 3 KP : 10 PP 306,151.60
1.20000 m 3
Batu belah 15/20 cm Rp 95,000.00 114,000.00
41.00000 Kg Semen porland Rp 1,060.00 43,460.00
0.13100 m3 Kapur pasang Rp 2,800.00 366.80
0.52300 m3 Pasir pasang Rp 80,000.00 41,840.00
1.50000 OH Pekerja Rp. 35,000.00 52,500.00
0.60000 OH Tukang Batu Rp. 53,000.00 31,800.00
0.06000 OH Kepala Tukang Rp 57,000.00 3,420.00
Jumlah 287,386.80
Total 287,386.80
C. 25 1 m2 Pasangan Bata Merah ukuran (5x11x22) cm tebal 1 bata, campuran spesi 1 PC : 3 Kp : 10 PP 101,337.30
140.00000 bh Bata merah 5 X 11 X 22 CM Rp 350.00 49,000.00
10.08000 Kg Semen Portland Rp 1,060.00 10,684.80
0.09250 m3 Pasir Pasang Rp 80,000.00 7,400.00
0.02750 m3 Kapur pasang Rp 55,000.00 1,512.50
0.60000 OH Pekerja Rp. 35,000.00 21,000.00
0.20000 OH Tukang Batu Rp 53,000.00 10,600.00
0.02000 OH Kepala Tukang Rp 57,000.00 1,140.00
Jumlah 101,337.30
Total 101,337.30
C. 26 1 m2 Pasangan Bata Merah ukuran (5x11x22) cm tebal 1/2 bata, campuran spesi 1 PC : 1 PP 73,278.00
70.00000 bh Bata merah 5 X 11 X 22 CM Rp 350.00 24,500.00
27.80000 Kg Semen Portland Rp 1,060.00 29,468.00
0.02800 m3 Pasir Pasang Rp 80,000.00 2,240.00
0.32000 OH Pekerja Rp. 35,000.00 11,200.00
0.10000 OH Tukang Batu Rp 53,000.00 5,300.00
0.01000 OH Kepala Tukang Rp 57,000.00 570.00
Jumlah 73,278.00
Total 73,278.00
C. 27 1 m2 Pasangan Bata Merah ukuran (5x11x22) cm tebal 1/2 bata, campuran spesi 1 PC : 2 PP 63,997.00
70.00000 bh Bata merah 5 X 11 X 22 CM Rp 350.00 24,500.00
18.95000 Kg Semen Portland Rp 1,060.00 20,087.00
0.03800 m3 Pasir Pasang Rp 80,000.00 3,040.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.10000 OH Tukang Batu Rp 53,000.00 5,300.00
0.01000 OH Kepala Tukang Rp 57,000.00 570.00
Jumlah 63,997.00
Total 63,997.00
C. 28 1 m2 Pasangan Bata Merah ukuran (5x11x22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 Ps 59,302.20
70.00000 bh Bata merah 5 X 11 X 22 CM Rp 350.00 24,500.00
14.37000 Kg Semen Portland Rp 1,060.00 15,232.20
0.04000 m3 Pasir Pasang Rp 80,000.00 3,200.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.10000 OH Tukang Batu Rp 53,000.00 5,300.00
0.01000 OH Kepala Tukang Rp 57,000.00 570.00
Jumlah 59,302.20
Total 59,302.20
C. 29 1 m2 Pasangan Bata Merah ukuran (5x11x22) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PP 56,500.00
70.00000 bh Bata merah 5 X 11 X 22 CM Rp 350.00 24,500.00
11.50000 Kg Semen Portland Rp 1,060.00 12,190.00
0.04300 m3 Pasir Pasang Rp 80,000.00 3,440.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.10000 OH Tukang Batu Rp 53,000.00 5,300.00
0.01000 OH Kepala Tukang Rp 57,000.00 570.00
Jumlah 56,500.00
Total 56,500.00
C. 30 1 m2 Pasangan Bata Merah ukuran (5x11x22) cm tebal 1/2 bata, campuran spesi 1 PC : 5 PP 54,730.80
70.00000 bh Bata merah 5 X 11 X 22 CM Rp 350.00 24,500.00
9.68000 Kg Semen Portland Rp 1,060.00 10,260.80
0.04500 m3 Pasir Pasang Rp 80,000.00 3,600.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.10000 OH Tukang Batu Rp 53,000.00 5,300.00
0.01000 OH Kepala Tukang Rp 57,000.00 570.00
Jumlah 54,730.80
Total 54,730.80
C. 31 1 m2 Pasangan Bata Merah ukuran (5x11x22) cm tebal 1/2 bata, campuran spesi 1 PC : 6 PP 53,609.20
70.00000 bh Bata merah 5 X 11 X 22 CM Rp 350.00 24,500.00
8.32000 Kg Semen Portland Rp 1,060.00 8,819.20
0.04900 m3 Pasir Pasang Rp 80,000.00 3,920.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.10000 OH Tukang Batu Rp 53,000.00 5,300.00
0.01000 OH Kepala Tukang Rp 57,000.00 570.00
Jumlah 53,609.20
Total 53,609.20
C. 32 1 m2 Pasangan Bata Merah ukuran (5x11x22) cm tebal 1/2 bata, campuran spesi 1 PC : 8 PP 51,760.00
70.00000 bh Bata merah 5 X 11 X 22 CM Rp 350.00 24,500.00
6.50000 Kg Semen Portland Rp 1,060.00 6,890.00
0.05000 m3 Pasir Pasang Rp 80,000.00 4,000.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.10000 OH Tukang Batu Rp 53,000.00 5,300.00
0.01000 OH Kepala Tukang Rp 57,000.00 570.00
Jumlah 51,760.00
Total 51,760.00
C. 33 1 m2 Pasangan Bata Merah ukuran (5x11x22) cm tebal 1/2 bata, campuran spesi 1 PC : 3KP : 10 PP 50,465.00
70.00000 bh Bata merah 5 X 11 X 22 CM Rp 350.00 24,500.00
4.50000 Kg Semen Portland Rp 1,060.00 4,770.00
0.05000 m3 Pasir Pasang Rp 80,000.00 4,000.00
0.01500 m3 Kapur pasang Rp 55,000.00 825.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.10000 OH Tukang Batu Rp 53,000.00 5,300.00
0.01000 OH Kepala Tukang Rp 57,000.00 570.00
Jumlah 50,465.00
Total 50,465.00
C. 34 1 m2 Pasangan Bata Merah ukuran (5x11x22) cm tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 1 PP 43,480.00
70.00000 bh Bata merah 5 X 11 X 22 CM Rp 350.00 24,500.00
0.01800 m3 Semen merah Rp 10,000.00 180.00
0.01800 m3 Pasir Pasang Rp 80,000.00 1,440.00
0.01800 m3 Kapur pasang Rp 55,000.00 990.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.10000 OH Tukang Batu Rp 53,000.00 5,300.00
0.01000 OH Kepala Tukang Rp 57,000.00 570.00
Jumlah 43,480.00
Total 43,480.00
C. 35 1 m2 Pasangan Bata Merah ukuran (5x11x22) cm tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 2 PP 42,900.00
70.00000 bh Bata merah 5 X 11 X 22 CM Rp 350.00 24,500.00
0.01400 Kg Semen merah Rp 10,000.00 140.00
0.01400 m3 Pasir Pasang Rp 80,000.00 1,120.00
0.01400 m3 Kapur pasang Rp 55,000.00 770.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.10000 OH Tukang Batu Rp 53,000.00 5,300.00
0.01000 OH Kepala Tukang Rp 57,000.00 570.00
Jumlah 42,900.00
Total 42,900.00
C. 36 1 m2 Pasangan dinding hollow block 20, campuran spesi 1 PC : 3 PP 338,884.20
12.50000 bh Hollow block 20 Rp 18,000.00 225,000.00
30.32000 Kg Semen Portland Rp 1,060.00 32,139.20
0.72800 m3 Pasir Pasang Rp 80,000.00 58,240.00
0.28000 Kg Besi angkur f = 8 mm Rp 15,000.00 4,200.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.15000 OH Tukang Batu Rp 53,000.00 7,950.00
0.01500 OH Kepala Tukang Rp 57,000.00 855.00
Jumlah 338,884.20
Total 338,884.20
C. 37 1 m2 Pasangan dinding hollow block 20, campuran spesi 1 PC : 4 PP 335,980.60
12.50000 bh Hollow block 20 Rp 18,000.00 225,000.00
24.26000 Kg Semen Portland Rp 1,060.00 25,715.60
0.77200 m3 Pasir Pasang Rp 80,000.00 61,760.00
0.28000 Kg Besi angkur f = 8 mm Rp 15,000.00 4,200.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.15000 OH Tukang Batu Rp 53,000.00 7,950.00
0.01500 OH Kepala Tukang Rp 57,000.00 855.00
Jumlah 335,980.60
Total 335,980.60
C. 38 1 m2 Pasangan dinding hollow block 15, campuran spesi 1 PC : 3 PP 316,948.40
12.50000 bh Hollow block 15 Rp 18,000.00 225,000.00
22.74000 Kg Semen Portland Rp 1,060.00 24,104.40
0.55000 m3 Pasir Pasang Rp 80,000.00 44,000.00
0.28000 Kg Besi angkur f = 8 mm Rp 15,000.00 4,200.00
0.36000 OH Pekerja Rp. 35,000.00 12,600.00
0.12000 OH Tukang Batu Rp 53,000.00 6,360.00
0.01200 OH Kepala Tukang Rp 57,000.00 684.00
Jumlah 316,948.40
Total 316,948.40
C. 39 1 m2 Pasangan dinding hollow block 15, campuran spesi 1 PC : 4 PP 314,696.00
12.50000 bh Hollow block 15 Rp 18,000.00 225,000.00
18.20000 Kg Semen Portland Rp 1,060.00 19,292.00
0.58200 m3 Pasir Pasang Rp 80,000.00 46,560.00
0.28000 Kg Besi angkur f = 8 mm Rp 15,000.00 4,200.00
0.36000 OH Pekerja Rp. 35,000.00 12,600.00
0.12000 OH Tukang Batu Rp 53,000.00 6,360.00
0.01200 OH Kepala Tukang Rp 57,000.00 684.00
Jumlah 314,696.00
Total 314,696.00
C. 40 1 m2 Pasangan dinding hollow block 10, campuran spesi 1 PC : 3 PP 290,759.60
12.50000 bh Hollow block 10 Rp 18,000.00 225,000.00
15.16000 Kg Semen Portland Rp 1,060.00 16,069.60
0.36400 m3 Pasir Pasang Rp 80,000.00 29,120.00
0.28000 Kg Besi angkur f = 8 mm Rp 15,000.00 4,200.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.10000 OH Tukang Batu Rp 53,000.00 5,300.00
0.01000 OH Kepala Tukang Rp 57,000.00 570.00
Jumlah 290,759.60
Total 290,759.60
C. 41 1 m2 Pasangan dinding hollow block 10, campuran spesi 1 PC : 4 PP 289,467.80
12.50000 bh Hollow block 10 Rp 18,000.00 225,000.00
12.13000 Kg Semen Portland Rp 1,060.00 12,857.80
0.38800 m3 Pasir Pasang Rp 80,000.00 31,040.00
0.28000 Kg Besi angkur f = 8 mm Rp 15,000.00 4,200.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.10000 OH Tukang Batu Rp 53,000.00 5,300.00
0.01000 OH Kepala Tukang Rp 57,000.00 570.00
Jumlah 289,467.80
Total 289,467.80
C. 42 1 m2 Pasangan Bata Merah , 1 PC : 3 Ps untuk Lantai & Selimut Kolom 45,252.60
40.00000 bh Bata merah 5 X 11 X 22 CM Rp 350.00 14,000.00
0.46000 Kg Semen Portland Rp 1,060.00 487.60
0.04800 m3 Pasir Pasang Rp 80,000.00 3,840.00
0.35000 OH Pekerja Rp. 35,000.00 12,250.00
0.25000 OH Tukang Batu Rp 53,000.00 13,250.00
0.02500 OH Kepala Tukang Rp 57,000.00 1,425.00
Jumlah 45,252.60
Total 45,252.60
C. 43 1 m2 Pasang dinding roster/terawang (12x11x24) cm, campuran spesi 1 PC : 3 PP 483,770.00
30.00000 bh Roster/terawang Rp 15,000.00 450,000.00
14.00000 Kg Semen Portland Rp 1,060.00 14,840.00
0.03200 m3 Pasir Pasang Rp 80,000.00 2,560.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.10000 OH Tukang Batu Rp 53,000.00 5,300.00
0.01000 OH Kepala Tukang Rp 57,000.00 570.00
Jumlah 483,770.00
Total 483,770.00
C. 44 1 m2 Pasang dinding roster/terawang (12x11x24) cm, campuran spesi 1 PC : 4 PP 480,830.00
30.00000 bh Roster/terawang Rp 15,000.00 450,000.00
11.00000 Kg Semen Portland Rp 1,060.00 11,660.00
0.03500 m3 Pasir Pasang Rp 80,000.00 2,800.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.10000 OH Tukang Batu Rp 53,000.00 5,300.00
0.01000 OH Kepala Tukang Rp 57,000.00 570.00
Jumlah 480,830.00
Total 480,830.00
C. 45 1 m2 Pasang dinding bata berongga ekspose ukuran (5x11x24) cm, campuran spesi 1 PC : 3 36,705.00
70.00000 bh Bata berongga ekspose Rp - -
14.00000 Kg Semen Portland Rp 1,060.00 14,840.00
0.03200 m3 Pasir Pasang Rp 80,000.00 2,560.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.15000 OH Tukang Batu Rp 53,000.00 7,950.00
0.01500 OH Kepala Tukang Rp 57,000.00 855.00
Jumlah 36,705.00
Total 36,705.00
C. 46 1 m2 Pasang dinding anyaman bambu, rangka kayu 99,475.00
1.50000 m 2
Bilik bambu Rp 19,000.00 28,500.00
0.01400 m3 Balok kayu klas II (5/7) Rp 2,450,000.00 34,300.00
0.01200 Kg Paku Rp 15,000.00 180.00
6.00000 m' List kayu 2/4 Rp 5,000.00 30,000.00
0.10000 OH Pekerja Rp 35,000.00 3,500.00
0.05000 OH Tukang Kayu Rp 54,000.00 2,700.00
0.00500 OH Kepala Tukang Rp 59,000.00 295.00
Jumlah 99,475.00
Total 99,475.00
C. 47 1 m2 Plesteran 1 Pc : 1 Pp tebal 15 mm 33,519.24
15.50400 Kg Semen Portland Rp 1,060.00 16,434.24
0.01600 m3 Pasir Pasang Rp 80,000.00 1,280.00
0.20000 OH Pekerja Rp. 35,000.00 7,000.00
0.15000 OH Tukang Batu Rp 53,000.00 7,950.00
0.01500 OH Kepala Tukang Rp 57,000.00 855.00
Jumlah 33,519.24
Total 33,519.24
C. 48 1 m2 Plesteran 1 Pc : 2 Pp tebal 15 mm 28,242.44
10.22400 Kg Semen Portland Rp 1,060.00 10,837.44
0.02000 m3 Pasir Pasang Rp 80,000.00 1,600.00
0.20000 OH Pekerja Rp. 35,000.00 7,000.00
0.15000 OH Tukang Batu Rp 53,000.00 7,950.00
0.01500 OH Kepala Tukang Rp 57,000.00 855.00
Jumlah 28,242.44
Total 28,242.44
C. 49 1 m2 Plesteran 1 Pc : 3 Pp tebal 15 mm 25,032.56
7.77600 Kg Semen Portland Rp 1,060.00 8,242.56
0.02300 m3 Pasir Pasang Rp 80,000.00 1,840.00
0.20000 OH Pekerja Rp. 35,000.00 7,000.00
0.15000 OH Tukang Batu Rp 53,000.00 7,950.00
Jumlah 25,032.56
Total 25,032.56
Jumlah 22,525.04
Total 22,525.04
C. 52 1 m2 Plesteran 1 Pc : 6 Ps tebal 15 mm 22,645.96
4.41600 Kg Semen Portland Rp 1,060.00 4,680.96
0.02700 m3 Pasir Pasang Rp 80,000.00 2,160.00
0.20000 OH Pekerja Rp. 35,000.00 7,000.00
0.15000 OH Tukang Batu Rp 53,000.00 7,950.00
0.01500 OH Kepala Tukang Rp 57,000.00 855.00
Jumlah 22,645.96
Total 22,645.96
C. 53 1 m2 Plesteran 1 Pc : 7 Ps tebal 15 mm 22,217.16
3.93600 Kg Semen Portland Rp 1,060.00 4,172.16
0.02800 m3 Pasir Pasang Rp 80,000.00 2,240.00
0.20000 OH Pekerja Rp. 35,000.00 7,000.00
0.15000 OH Tukang Batu Rp 53,000.00 7,950.00
0.01500 OH Kepala Tukang Rp 57,000.00 855.00
Jumlah 22,217.16
Total 22,217.16
C. 54 1 m2 Plesteran 1 Pc : 8 Ps tebal 15 mm 21,788.36
3.45600 Kg Semen Portland Rp 1,060.00 3,663.36
0.02900 m3 Pasir Pasang Rp 80,000.00 2,320.00
0.20000 OH Pekerja Rp. 35,000.00 7,000.00
0.15000 OH Tukang Batu Rp 53,000.00 7,950.00
0.01500 OH Kepala Tukang Rp 57,000.00 855.00
Jumlah 21,788.36
Total 21,788.36
C. 55 1 m2 Plesteran 1 Pc : 1/2 Kp : 3 Pp tebal 15 mm 22,054.60
5.76000 Kg Semen Portland Rp 1,060.00 6,105.60
0.00300 m3 Kapur pasang Rp 55,000.00 165.00
0.01300 m3 Pasir Pasang Rp 80,000.00 1,040.00
0.22000 OH Pekerja Rp. 35,000.00 7,700.00
0.12000 OH Tukang Batu Rp 53,000.00 6,360.00
0.01200 OH Kepala Tukang Rp 57,000.00 684.00
Jumlah 22,054.60
Total 22,054.60
C. 56 1 m2 Plesteran 1 Pc : 2 Kp : 8 Pp tebal 15 mm 16,937.00
0.30000 Kg Semen Portland Rp 1,060.00 318.00
0.00500 m3 Kapur pasang Rp 55,000.00 275.00
0.02000 m3 Pasir Pasang Rp 80,000.00 1,600.00
0.22000 OH Pekerja Rp. 35,000.00 7,700.00
0.12000 OH Tukang Batu Rp 53,000.00 6,360.00
0.01200 OH Kepala Tukang Rp 57,000.00 684.00
Jumlah 16,937.00
Total 16,937.00
C. 57 1 m2 Plesteran 1 Sm : 1 Kp : 2 Pp tebal 15 mm 16,399.00
0.00700 Kg Semen merah Rp 10,000.00 70.00
0.00700 m3 Kapur pasang Rp 55,000.00 385.00
0.01500 m3 Pasir Pasang Rp 80,000.00 1,200.00
0.22000 OH Pekerja Rp. 35,000.00 7,700.00
0.12000 OH Tukang Batu Rp 53,000.00 6,360.00
0.01200 OH Kepala Tukang Rp 57,000.00 684.00
Jumlah 16,399.00
Total 16,399.00
C. 58 1 m2 Plesteran 1 Sm : 1 Kp : 1 Pp tebal 15 mm 16,049.00
0.00900 m3
Semen merah Rp 10,000.00 90.00
0.00900 m3 Kapur pasang Rp 55,000.00 495.00
0.00900 m3 Pasir Pasang Rp 80,000.00 720.00
0.22000 OH Pekerja Rp. 35,000.00 7,700.00
0.12000 OH Tukang Batu Rp 53,000.00 6,360.00
0.01200 OH Kepala Tukang Rp 57,000.00 684.00
Jumlah 16,049.00
Total 16,049.00
C. 59 1 m2 Plesteran 1 Pc : 2 Pp tebal 20 mm 37,449.92
13.63200 Kg Semen Portland Rp 1,060.00 14,449.92
0.02700 m3 Pasir Pasang Rp 80,000.00 2,160.00
0.26000 OH Pekerja Rp. 35,000.00 9,100.00
0.20000 OH Tukang Batu Rp 53,000.00 10,600.00
0.02000 OH Kepala Tukang Rp 57,000.00 1,140.00
Jumlah 37,449.92
Total 37,449.92
C. 60 1 m2 Plesteran 1 Pc : 3 Ps tebal 20 mm 33,170.08
10.36800 Kg Semen Portland Rp 1,060.00 10,990.08
0.03100 m3 Pasir Pasang Rp 80,000.00 2,480.00
0.26000 OH Pekerja Rp. 35,000.00 9,100.00
0.20000 OH Tukang Batu Rp 53,000.00 10,600.00
Jumlah 33,170.08
Total 33,170.08
C. 61 1 m2 Plesteran 1 Pc : 4 Ps tebal 20 mm 32,219.20
8.32000 Kg Semen Portland Rp 1,060.00 8,819.20
0.03200 m3 Pasir Pasang Rp 80,000.00 2,560.00
0.26000 OH Pekerja Rp. 35,000.00 9,100.00
0.20000 OH Tukang Batu Rp 53,000.00 10,600.00
0.02000 OH Kepala Tukang Rp 57,000.00 1,140.00
Jumlah 32,219.20
Total 32,219.20
C. 62 1 m2 Plesteran 1 Pc : 5 Ps tebal 20 mm 30,966.72
6.91200 Kg Semen Portland Rp 1,060.00 7,326.72
0.03500 m3 Pasir Pasang Rp 80,000.00 2,800.00
0.26000 OH Pekerja Rp. 35,000.00 9,100.00
0.20000 OH Tukang Batu Rp 53,000.00 10,600.00
0.02000 OH Kepala Tukang Rp 57,000.00 1,140.00
Jumlah 30,966.72
Total 30,966.72
C. 63 1 m2 Plesteran 1 Pc : 6 Ps tebal 20 mm 29,961.28
5.88800 Kg Semen Portland Rp 1,060.00 6,241.28
0.03600 m3 Pasir Pasang Rp 80,000.00 2,880.00
0.26000 OH Pekerja Rp. 35,000.00 9,100.00
0.20000 OH Tukang Batu Rp 53,000.00 10,600.00
0.02000 OH Kepala Tukang Rp 57,000.00 1,140.00
Jumlah 29,961.28
Total 29,961.28
C. 64 1 m2 Plesteran 1 SM : 1 KP : 2 Ps tebal 20 mm 24,949.00
0.00900 m 3
Semen merah Rp 10,000.00 90.00
0.00900 m3 Kapur pasang Rp 55,000.00 495.00
0.01800 m3 Pasir Pasang Rp 80,000.00 1,440.00
0.28600 OH Pekerja Rp. 35,000.00 10,010.00
0.22000 OH Tukang Batu Rp 53,000.00 11,660.00
0.02200 OH Kepala Tukang Rp 57,000.00 1,254.00
Jumlah 24,949.00
Total 24,949.00
C. 65 1 m2 Plesteran 1 Pc : 2 Ps tebal 25 mm 39,710.00
15.50000 Kg Semen Portland Rp 1,060.00 16,430.00
0.01300 m3 Pasir Pasang Rp 80,000.00 1,040.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.20000 OH Tukang Batu Rp 53,000.00 10,600.00
0.02000 OH Kepala Tukang Rp 57,000.00 1,140.00
Jumlah 39,710.00
Total 39,710.00
C. 66 1 m2 Plesteran 1 Pc : 3 Ps tebal 25 mm 37,495.00
11.75000 Kg Semen Portland Rp 1,060.00 12,455.00
0.03500 m3 Pasir Pasang Rp 80,000.00 2,800.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.20000 OH Tukang Batu Rp 53,000.00 10,600.00
0.02000 OH Kepala Tukang Rp 57,000.00 1,140.00
Jumlah 37,495.00
Total 37,495.00
C. 67 1 m2 Plesteran 1 Pc : 4 Ps tebal 25 mm 35,328.80
9.48000 Kg Semen Portland Rp 1,060.00 10,048.80
0.03800 m3 Pasir Pasang Rp 80,000.00 3,040.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.20000 OH Tukang Batu Rp 53,000.00 10,600.00
0.02000 OH Kepala Tukang Rp 57,000.00 1,140.00
Jumlah 35,328.80
Total 35,328.80
C. 68 1 m2 Plesteran 1 Pc : 5 Ps tebal 25 mm 33,776.40
7.94000 Kg Semen Portland Rp 1,060.00 8,416.40
0.03900 m3 Pasir Pasang Rp 80,000.00 3,120.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.20000 OH Tukang Batu Rp 53,000.00 10,600.00
0.02000 OH Kepala Tukang Rp 57,000.00 1,140.00
Jumlah 33,776.40
Total 33,776.40
C. 69 1 m2 Plesteran 1 Pc : 2 Ps tebal 30 mm 48,444.00
18.65000 Kg Semen Portland Rp 1,060.00 19,769.00
0.03500 m3 Pasir Pasang Rp 80,000.00 2,800.00
0.32000 OH Pekerja Rp. 35,000.00 11,200.00
0.25000 OH Tukang Batu Rp 53,000.00 13,250.00
0.02500 OH Kepala Tukang Rp 57,000.00 1,425.00
Jumlah 48,444.00
Total 48,444.00
C. 70 1 m2 Plesteran 1 Pc : 3 Ps tebal 30 mm 43,994.00
14.15000 Kg Semen Portland Rp 1,060.00 14,999.00
0.03900 m3 Pasir Pasang Rp 80,000.00 3,120.00
0.32000 OH Pekerja Rp. 35,000.00 11,200.00
0.25000 OH Tukang Batu Rp 53,000.00 13,250.00
0.02500 OH Kepala Tukang Rp 57,000.00 1,425.00
Jumlah 43,994.00
Total 43,994.00
C. 71 1 m2 Plesteran 1 Pc : 4 Ps tebal 30 mm 41,297.80
11.38000 Kg Semen Portland Rp 1,060.00 12,062.80
0.04200 m3 Pasir Pasang Rp 80,000.00 3,360.00
0.32000 OH Pekerja Rp. 35,000.00 11,200.00
0.25000 OH Tukang Batu Rp 53,000.00 13,250.00
0.02500 OH Kepala Tukang Rp 57,000.00 1,425.00
Jumlah 41,297.80
Total 41,297.80
C. 72 1 m2 Plesteran 1 Pc : 5 Ps tebal 30 mm 38,156.40
8.19000 Kg Semen Portland Rp 1,060.00 8,681.40
0.04500 m3 Pasir Pasang Rp 80,000.00 3,600.00
0.32000 OH Pekerja Rp. 35,000.00 11,200.00
0.25000 OH Tukang Batu Rp 53,000.00 13,250.00
0.02500 OH Kepala Tukang Rp 57,000.00 1,425.00
Jumlah 38,156.40
Total 38,156.40
C. 73 1 m2 Berapen 1 Pc : 3 Ps tebal 30 mm 18,533.20
7.07000 Kg Semen Portland Rp 1,060.00 7,494.20
0.02100 m3 Pasir Pasang Rp 80,000.00 1,680.00
0.15000 OH Pekerja Rp. 35,000.00 5,250.00
0.07000 OH Tukang Batu Rp 53,000.00 3,710.00
0.00700 OH Kepala Tukang Rp 57,000.00 399.00
Jumlah 18,533.20
Total 18,533.20
C. 74 1 m2 Berapen 1 Pc : 5 Ps tebal 15 mm 16,934.04
5.18400 Kg Semen Portland Rp 1,060.00 5,495.04
0.02600 m3 Pasir Pasang Rp 80,000.00 2,080.00
0.15000 OH Pekerja Rp. 35,000.00 5,250.00
0.07000 OH Tukang Batu Rp 53,000.00 3,710.00
0.00700 OH Kepala Tukang Rp 57,000.00 399.00
Jumlah 16,934.04
Total 16,934.04
C. 75 1 m1 Plesteran Skoning 1 Pc : 2 Ps, Lebar 10 mm 26,897.00
0.50000 Kg Semen Portland Rp 1,060.00 530.00
0.01300 m3 Pasir Pasang Rp 80,000.00 1,040.00
0.05700 OH Pekerja Rp. 53,000.00 3,021.00
0.38000 OH Tukang Batu Rp 53,000.00 20,140.00
0.03800 OH Kepala Tukang Rp 57,000.00 2,166.00
Jumlah 26,897.00
Total 26,897.00
C. 76 1 m1 Plesteran Granit 1 Pc : 2 Granit, tebal 10 mm 38,090.00
10.00000 Kg Semen Portland Rp 1,060.00 10,600.00
15.00000 Kg Batu Granit Rp - -
0.45000 OH Pekerja Rp. 35,000.00 15,750.00
0.20000 OH Tukang Batu Rp 53,000.00 10,600.00
0.02000 OH Kepala Tukang Rp 57,000.00 1,140.00
Jumlah 38,090.00
Total 38,090.00
C. 77 1 m1 Plesteran Teraso 1 Pc : 2 Batu teraso, tebal 10 mm 38,090.00
10.00000 Kg Semen Portland Rp 1,060.00 10,600.00
15.00000 Kg Batu Teraso Rp - -
0.45000 OH Pekerja Rp. 35,000.00 15,750.00
0.20000 OH Tukang Batu Rp 53,000.00 10,600.00
0.02000 OH Kepala Tukang Rp 57,000.00 1,140.00
Jumlah 38,090.00
Total 38,090.00
C. 78 1 m2 Plesteran Ciprat 1 Pc : 2 Ps 19,679.20
4.32000 Kg Semen Portland Rp 1,060.00 4,579.20
0.00600 m3 Pasir Pasang Rp 80,000.00 480.00
0.25000 OH Pekerja Rp. 35,000.00 8,750.00
0.10000 OH Tukang Batu Rp 53,000.00 5,300.00
0.01000 OH Kepala Tukang Rp 57,000.00 570.00
Jumlah 19,679.20
Total 19,679.20
C. 79 1 m2 Finishing siar pasangan dinding bata merah (= 20 m') 12,653.48
3.10800 Kg Semen Portland Rp 1,060.00 3,294.48
0.15000 OH Pekerja Rp. 35,000.00 5,250.00
0.07000 OH Tukang Batu Rp 53,000.00 3,710.00
0.00700 OH Kepala Tukang Rp 57,000.00 399.00
Jumlah 12,653.48
Total 12,653.48
C. 80 1 m2 Finishing siar pasangan dinding conblock ekspose (= 8 m') 6,404.00
1.60000 Kg Semen Portland Rp 1,060.00 1,696.00
0.07500 OH Pekerja Rp. 35,000.00 2,625.00
0.03500 OH Tukang Batu Rp 53,000.00 1,855.00
0.00400 OH Kepala Tukang Rp 57,000.00 228.00
Jumlah 6,404.00
Total 6,404.00
C. 81 1 m2 Finishing siar pasangan batu kali adukan 1 PC : 2 PP 26,398.40
6.34000 Kg Semen Portland Rp 1,060.00 6,720.40
0.01200 m3 Pasir Pasang Rp 80,000.00 960.00
0.30000 OH Pekerja Rp. 35,000.00 10,500.00
0.14000 OH Tukang Batu Rp 53,000.00 7,420.00
0.01400 OH Kepala Tukang Rp 57,000.00 798.00
Jumlah 26,398.40
Total 26,398.40
C. 82 1 m2 Plesteran Beton 1 Pc : 2 Ps, Tebal 15 mm 32,138.00
9.30000 Kg Semen Portland Rp 1,060.00 9,858.00
0.01800 m3 Pasir Pasang Rp 80,000.00 1,440.00
0.26000 OH Pekerja Rp. 35,000.00 9,100.00
0.20000 OH Tukang Batu Rp 53,000.00 10,600.00
0.02000 OH Kepala Tukang Rp 57,000.00 1,140.00
Jumlah 32,138.00
Total 32,138.00
C. 83 1 m2 Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm 30,014.20
7.07000 Kg Semen Portland Rp 1,060.00 7,494.20
0.02100 m3 Pasir Pasang Rp 80,000.00 1,680.00
0.26000 OH Pekerja Rp. 35,000.00 9,100.00
0.20000 OH Tukang Batu Rp 53,000.00 10,600.00
0.02000 OH Kepala Tukang Rp 57,000.00 1,140.00
Jumlah 30,014.20
Total 30,014.20
C. 84 1 m2 Pas. Lantai Ubin PC abu-abu 40x40 cm 76,282.00
6.63000 Bh Ubin PC abu-abu 40 x 40 cm Rp 7,013.57 46,500.00
9.80000 Kg Semen Portland Rp 1,060.00 10,388.00
0.04500 m3 Pasir Pasang Rp 80,000.00 3,600.00
0.25000 OH Pekerja Rp. 35,000.00 8,750.00
0.12000 OH Tukang batu Rp. 53,000.00 6,360.00
0.01200 OH Kepala tukang Rp. 57,000.00 684.00
Jumlah 76,282.00
Total 76,282.00
C. 85 1 m2 Pas. Lantai Ubin PC abu-abu 30x30 cm 77,166.00
11.87000 Bh Ubin PC abu-abu 30 x 30 cm Rp 3,917.44 46,500.00
10.00000 Kg Semen Portland Rp 1,060.00 10,600.00
0.04500 m3 Pasir Pasang Rp 80,000.00 3,600.00
0.26000 OH Pekerja Rp. 35,000.00 9,100.00
0.12500 OH Tukang batu Rp. 53,000.00 6,625.00
0.01300 OH Kepala tukang Rp. 57,000.00 741.00
Jumlah 77,166.00
Total 77,166.00
C. 86 1 m2 Pas. Lantai Ubin PC abu-abu 20x20 cm 78,205.00
26.20000 Bh Ubin PC abu-abu 20 x 20 cm Rp 1,774.81 46,500.00
10.40000 Kg Semen Portland Rp 1,060.00 11,024.00
0.04500 m3 Pasir Pasang Rp 80,000.00 3,600.00
0.27000 OH Pekerja Rp. 35,000.00 9,450.00
0.13000 OH Tukang batu Rp. 53,000.00 6,890.00
0.01300 OH Kepala tukang Rp. 57,000.00 741.00
Jumlah 78,205.00
Total 78,205.00
C. 87 1 m2 Pas. Lantai Ubin bergaris PC abu-abu 20x20 cm 77,185.00
26.50000 Bh Tegel abu-abu bergaris 20 x 20 cm Rp 1,811.32 48,000.00
10.40000 Kg Semen Portland Rp 1,060.00 11,024.00
0.01350 m3 Pasir Pasang Rp 80,000.00 1,080.00
0.27000 OH Pekerja Rp 35,000.00 9,450.00
0.13000 OH Tukang batu Rp 53,000.00 6,890.00
0.01300 OH Kepala tukang Rp 57,000.00 741.00
Jumlah 77,185.00
Total 77,185.00
C. 88 1 m2 Pas. Lantai Ubin warna 40x40 cm 90,782.00
6.63000 Bh Ubin warna 40 x 40 cm Rp 7,239.82 48,000.00
9.80000 Kg Semen Portland Rp 1,060.00 10,388.00
0.04500 m3 Pasir Pasang Rp 80,000.00 3,600.00
1.30000 Kg Semen warna Rp 10,000.00 13,000.00
0.25000 OH Pekerja Rp. 35,000.00 8,750.00
0.12000 OH Tukang batu Rp. 53,000.00 6,360.00
0.01200 OH Kepala tukang Rp. 57,000.00 684.00
Jumlah 90,782.00
Total 90,782.00
C. 89 1 m2 Pas. Lantai Ubin warna 30x30 cm 93,666.00
11.87000 Bh Ubin warna 30 x 30 cm Rp 4,043.81 48,000.00
10.00000 Kg Semen Portland Rp 1,060.00 10,600.00
0.04500 m3 Pasir Pasang Rp 80,000.00 3,600.00
1.50000 Kg Semen warna Rp 10,000.00 15,000.00
0.26000 OH Pekerja Rp. 35,000.00 9,100.00
0.12500 OH Tukang batu Rp. 53,000.00 6,625.00
0.01300 OH Kepala tukang Rp. 57,000.00 741.00
Jumlah 93,666.00
Total 93,666.00
C. 90 1 m2 Pas. Lantai Ubin warna 20x20 cm 95,905.00
26.50000 Bh Ubin warna 20 x 20 cm Rp 1,811.32 48,000.00
10.40000 Kg Semen Portland Rp 1,060.00 11,024.00
0.04500 m3 Pasir Pasang Rp 80,000.00 3,600.00
1.62000 Kg Semen warna Rp 10,000.00 16,200.00
0.27000 OH Pekerja Rp. 35,000.00 9,450.00
0.13000 OH Tukang batu Rp. 53,000.00 6,890.00
0.01300 OH Kepala tukang Rp. 57,000.00 741.00
Jumlah 95,905.00
Total 95,905.00
C. 91 1 m2 Pas. Lantai tegel warna bergaris 20x20 cm 85,206.60
26.50000 Bh Tegel warna bergaris 20 x 20 cm Rp 1,811.32 48,000.00
8.76000 Kg Semen Portland Rp. 1,060.00 9,285.60
0.02300 m3 Pasir Pasang Rp. 80,000.00 1,840.00
0.90000 Kg Semen warna Rp. 10,000.00 9,000.00
0.27000 OH Pekerja Rp. 35,000.00 9,450.00
0.13000 OH Tukang batu Rp. 53,000.00 6,890.00
0.01300 OH Kepala tukang Rp. 57,000.00 741.00
Jumlah 85,206.60
Total 85,206.60
C. 92 1 m2 Pas. Lantai Ubin teraso 40x40 cm, KW I 96,782.00
6.63000 Bh Ubin teraso 40 x 40 cm Rp 8,144.80 54,000.00
9.80000 Kg Semen Portland Rp 1,060.00 10,388.00
0.04500 m3 Pasir Pasang Rp 80,000.00 3,600.00
1.30000 Kg Semen warna Rp 10,000.00 13,000.00
0.25000 OH Pekerja Rp. 35,000.00 8,750.00
0.12000 OH Tukang batu Rp. 53,000.00 6,360.00
0.01200 OH Kepala tukang Rp. 57,000.00 684.00
Jumlah 96,782.00
Total 96,782.00
C. 93 1 m2 Pas. Lantai Ubin teraso 30x30 cm, KW I 99,666.00
11.87000 Bh Ubin teraso 30 x 30 cm Rp 4,549.28 54,000.00
10.00000 Kg Semen Portland Rp 1,060.00 10,600.00
0.04500 m3 Pasir Pasang Rp 80,000.00 3,600.00
1.50000 Kg Semen warna Rp 10,000.00 15,000.00
0.26000 OH Pekerja Rp. 35,000.00 9,100.00
0.12500 OH Tukang batu Rp. 53,000.00 6,625.00
0.01300 OH Kepala tukang Rp. 57,000.00 741.00
Jumlah 99,666.00
Total 99,666.00
C. 94 1 m2 Pas. Lantai Ubin granit 40x40 cm 42,782.00
6.63000 Bh Ubin teraso 40 x 40 cm Rp - -
9.80000 Kg Semen Portland Rp 1,060.00 10,388.00
0.04500 m3 Pasir Pasang Rp 80,000.00 3,600.00
1.30000 Kg Semen warna Rp 10,000.00 13,000.00
0.25000 OH Pekerja Rp. 35,000.00 8,750.00
0.12000 OH Tukang batu Rp. 53,000.00 6,360.00
0.01200 OH Kepala tukang Rp. 57,000.00 684.00
Jumlah 42,782.00
Total 42,782.00
C. 95 1 m2 Pas. Lantai Ubin granit 30x30 cm 45,666.00
11.87000 Bh Ubin teraso 30 x 30 cm Rp - -
10.00000 Kg Semen Portland Rp 1,060.00 10,600.00
0.04500 m3 Pasir Pasang Rp 80,000.00 3,600.00
1.50000 Kg Semen warna Rp 10,000.00 15,000.00
0.26000 OH Pekerja Rp. 35,000.00 9,100.00
0.12500 OH Tukang batu Rp. 53,000.00 6,625.00
0.01300 OH Kepala tukang Rp. 57,000.00 741.00
Jumlah 45,666.00
Total 45,666.00
C. 96 1 m2 Pas. Lantai Ubin teralux 40x40 cm 42,839.00
6.63000 Bh Ubin teralux kerang 40 x 40 cm Rp - -
9.80000 Kg Semen Portland Rp 1,060.00 10,388.00
0.04500 m3 Pasir Pasang Rp 80,000.00 3,600.00
1.30000 Kg Semen warna Rp 10,000.00 13,000.00
0.25000 OH Pekerja Rp. 35,000.00 8,750.00
0.12000 OH Tukang batu Rp. 53,000.00 6,360.00
0.01300 OH Kepala tukang Rp. 57,000.00 741.00
Jumlah 42,839.00
Total 42,839.00
C. 97 1 m2 Pas. Lantai Ubin teralux 30x30 cm 45,666.00
11.87000 Bh Ubin teralux kerang 30 x 30 cm Rp - -
10.00000 Kg Semen Portland Rp 1,060.00 10,600.00
0.04500 m3 Pasir Pasang Rp 80,000.00 3,600.00
1.50000 Kg Semen warna Rp 10,000.00 15,000.00
0.26000 OH Pekerja Rp. 35,000.00 9,100.00
0.12500 OH Tukang batu Rp. 53,000.00 6,625.00
0.01300 OH Kepala tukang Rp. 57,000.00 741.00
Jumlah 45,666.00
Total 45,666.00
C. 98 1 m2 Pas. Lantai Ubin teralux marmer 60x60 cm 259,970.00
3.10000 Bh Ubin teralux kerang marmer 60 x 60 cm Rp 74,193.55 230,000.00
9.60000 Kg Semen Portland Rp 1,060.00 10,176.00
0.04500 m3 Pasir Pasang Rp 80,000.00 3,600.00
0.11000 Kg Semen warna Rp 10,000.00 1,100.00
0.23000 OH Pekerja Rp. 35,000.00 8,050.00
0.12000 OH Tukang batu Rp. 53,000.00 6,360.00
0.01200 OH Kepala tukang Rp. 57,000.00 684.00
Jumlah 259,970.00
Total 259,970.00
C. 99 1 m2 Pas. Lantai Ubin teralux marmer 40x40 cm 261,082.00
7.00000 Bh Ubin teralux kerang marmer 40 x 40 cm Rp 32,857.14 230,000.00
9.80000 Kg Semen Portland Rp 1,060.00 10,388.00
0.04500 m3 Pasir Pasang Rp 80,000.00 3,600.00
0.13000 Kg Semen warna Rp 10,000.00 1,300.00
0.25000 OH Pekerja Rp. 35,000.00 8,750.00
0.12000 OH Tukang batu Rp. 53,000.00 6,360.00
0.01200 OH Kepala tukang Rp. 57,000.00 684.00
Jumlah 261,082.00
Total 261,082.00
C. 100 1 m2 Pas. Lantai Ubin teralux marmer 30x30 cm 262,194.00
12.00000 Bh Ubin teralux kerang marmer 30 x 30 cm Rp 19,166.67 230,000.00
10.00000 Kg Semen Portland Rp 1,060.00 10,600.00
0.04500 m3 Pasir Pasang Rp 80,000.00 3,600.00
0.15000 Kg Semen warna Rp 10,000.00 1,500.00
0.27000 OH Pekerja Rp. 35,000.00 9,450.00
0.12000 OH Tukang batu Rp. 53,000.00 6,360.00
0.01200 OH Kepala tukang Rp. 57,000.00 684.00
Jumlah 262,194.00
Total 262,194.00
C. 101 1 m2 Pas. Lantai teraso Cor ditempat tebal 3 cm 10,947.60
0.03600 Bh Teraso cor tebal 3 cm Rp - -
0.36000 OH Pekerja Rp. 1,060.00 381.60
0.18000 OH Tukang batu Rp 53,000.00 9,540.00
0.01800 OH Kepala tukang Rp 57,000.00 1,026.00
Jumlah 10,947.60
Total 10,947.60
C. 102 1 m2 Pas. Lantai Keramik 20x20 cm (Kualitas I Motif) 132,667.80
25.00000 Bh Keramik 20 x 20 cm Rp 2,400.00 60,000.00
11.38000 Kg Semen Portland Rp 1,060.00 12,062.80
0.04200 m3 Pasir Pasang Rp 80,000.00 3,360.00
1.50000 Kg Semen Warna Rp 10,000.00 15,000.00
0.62000 OH Pekerja Rp. 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 132,667.80
Total 132,667.80
C. 103 1 m2 Pas. Lantai Keramik 25 x 25 cm (Kualitas I Motif) 131,467.80
16.00000 Bh Keramik 25 x 25 cm Rp 3,750.00 60,000.00
11.38000 Kg Sement Portland Rp 1,060.00 12,062.80
0.04200 m3 Pasir pasang Rp 80,000.00 3,360.00
1.38000 Kg Semen warna Rp 10,000.00 13,800.00
0.62000 OH Pekerja Rp. 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 131,467.80
Total 131,467.80
C. 104 1 m2 Pas. Lantai Keramik 30 x 30 cm (Kualitas I Motif) 130,267.80
12.00000 Bh Keramik 30 x 30 cm Rp 5,000.00 60,000.00
11.38000 Kg Sement Portland Rp 1,060.00 12,062.80
0.04200 m3 Pasir pasang Rp 80,000.00 3,360.00
1.26000 Kg Semen warna Rp 10,000.00 12,600.00
0.62000 OH Pekerja Rp. 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 130,267.80
Total 130,267.80
C. 105 1 m2 Pas. Lantai Keramik 40 x 40 cm (Kualitas I Motif) 129,067.80
7.00000 Bh Keramik 40x40 cm Rp 8,571.43 60,000.00
11.38000 Kg Sement Portland Rp 1,060.00 12,062.80
0.04200 m3 Pasir pasang Rp 80,000.00 3,360.00
1.14000 Kg Semen warna Rp 10,000.00 11,400.00
0.62000 OH Pekerja Rp. 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 129,067.80
Total 129,067.80
C. 106 1 m2 Pas. Lantai Keramik 20 x 20 cm (Kualitas I Motif) Anti slip 132,667.80
25.00000 Bh Keramik 20 x 20 cm anti slip Rp 2,400.00 60,000.00
11.38000 Kg Sement Portland Rp 1,060.00 12,062.80
0.04200 m3 Pasir pasang Rp 80,000.00 3,360.00
1.50000 Kg Semen warna Rp 10,000.00 15,000.00
0.62000 OH Pekerja Rp. 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 132,667.80
Total 132,667.80
C. 107 1 m2 Pas. Lantai Keramik 20 x 20 cm (Kualitas II Motif) 118,672.80
25.00000 Bh Keramik 20x20 cm Rp 1,920.00 48,000.00
11.38000 Kg Sement Portland Rp 1,060.00 12,062.80
0.04200 m3 Pasir pasang Rp 80,000.00 3,360.00
1.50000 Kg Semen warna Rp 10,000.00 15,000.00
0.62000 OH Pekerja Rp. 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
Jumlah 118,672.80
Total 118,672.80
C. 108 1 m2 Pas. Lantai Keramik 30 x 30 cm (Kualitas II Motif) 117,472.80
12.00000 Bh Keramik 30x30 cm Rp 4,000.00 48,000.00
11.38000 Kg Sement Portland Rp 1,060.00 12,062.80
0.04200 m3 Pasir pasang Rp 80,000.00 3,360.00
1.38000 Kg Semen warna Rp 10,000.00 13,800.00
0.62000 OH Pekerja Rp. 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
Jumlah 117,472.80
Total 117,472.80
C. 109 1 m2 Pas. Lantai Keramik 40 x 40 cm (Kualitas II Motif) 116,272.80
7.00000 Bh Keramik 40x40 cm Rp 6,857.14 48,000.00
11.38000 Kg Sement Portland Rp 1,060.00 12,062.80
0.04200 m3 Pasir pasang Rp 80,000.00 3,360.00
1.26000 Kg Semen warna Rp 10,000.00 12,600.00
0.62000 OH Pekerja Rp. 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
Jumlah 116,272.80
Total 116,272.80
C. 110 1 m2 Pas. Lantai Keramik 20 x 20 cm (Kualitas II Motif) Anti slip 120,667.80
25.00000 Bh Keramik 20 x 20 cm anti slip Rp 1,920.00 48,000.00
11.38000 Kg Sement Portland Rp 1,060.00 12,062.80
0.04200 m3 Pasir pasang Rp 80,000.00 3,360.00
1.50000 Kg Semen warna Rp 10,000.00 15,000.00
0.62000 OH Pekerja Rp. 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 120,667.80
Total 120,667.80
C. 111 1 m2 Pas. Lantai Keramik 33 x 33 cm 119,067.80
10.00000 Bh Keramik 33 x 33 cm Rp 4,800.00 48,000.00
11.38000 Kg Sement Portland Rp 1,060.00 12,062.80
0.04200 m3 Pasir pasang Rp 80,000.00 3,360.00
1.34000 Kg Semen warna Rp 10,000.00 13,400.00
0.62000 OH Pekerja Rp. 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 119,067.80
Total 119,067.80
C. 112 1 m2 Pas. Lantai Keramik Artistik 10 x 20 cm 479,526.40
53.00000 Bh Keramik artistik 10 x 20 cm Rp 7,500.00 397,500.00
8.19000 Kg Sement Portland Rp 1,060.00 8,681.40
0.04500 m3 Pasir pasang Rp 80,000.00 3,600.00
2.75000 Kg Semen warna Rp 10,000.00 27,500.00
0.62000 OH Pekerja Rp. 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 479,526.40
Total 479,526.40
C. 113 1 m2 Pas. Lantai Keramik Artistik 10 x 10 cm atau 5 x 20 cm 881,526.40
106.00000 Bh Keramik artistik 10 x 10 cm Rp 7,500.00 795,000.00
8.19000 Kg Sement Portland Rp 1,060.00 8,681.40
0.04500 m3 Pasir pasang Rp 80,000.00 3,600.00
3.20000 Kg Semen warna Rp 10,000.00 32,000.00
0.62000 OH Pekerja Rp. 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 881,526.40
Total 881,526.40
C. 114 1 m2 Pas. Lantai Marmer 30 x 30 cm (Kualitas I) 350,364.00
12.00000 Bh Marmer 30x30 cm Rp 22,500.00 270,000.00
14.15000 Kg Sement Portland Rp 1,060.00 14,999.00
0.03900 m3 Pasir pasang Rp 80,000.00 3,120.00
2.00000 Kg Semen warna Rp 10,000.00 20,000.00
0.62000 OH Pekerja Rp. 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 350,364.00
Total 350,364.00
C. 115 1 m2 Pas. Lantai Marmer 30 x 30 cm (Kualitas II) 310,364.00
12.00000 Bh Marmer 30x30 cm Rp 19,166.67 230,000.00
14.15000 Kg Sement Portland Rp 1,060.00 14,999.00
0.03900 m3 Pasir pasang Rp 80,000.00 3,120.00
2.00000 Kg Semen warna Rp 10,000.00 20,000.00
0.62000 OH Pekerja Rp. 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 310,364.00
Total 310,364.00
C. 116 1 m2 Pas. Lantai Marmer 100 x 100 cm, (Kualitas I) 337,344.00
1.06000 Bh Marmer 100x100 cm Rp 254,716.98 270,000.00
14.15000 Kg Sement Portland Rp 1,060.00 14,999.00
0.04500 m3 Pasir pasang Rp 80,000.00 3,600.00
0.65000 Kg Semen warna Rp 10,000.00 6,500.00
0.62000 OH Pekerja Rp. 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 337,344.00
Total 337,344.00
C. 117 1 m2 Pas. Lantai Mosaik 30 x 30 cm (campuran spesi 1 PC : 3 PP) 80,364.00
11.87000 Bh Mosaik 30x30 cm Rp - -
14.15000 Kg Sement Portland Rp 1,060.00 14,999.00
0.03900 m3 Pasir pasang Rp 80,000.00 3,120.00
2.00000 Kg Semen warna Rp 10,000.00 20,000.00
0.62000 OH Pekerja Rp. 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 80,364.00
Total 80,364.00
C. 118 1 m2 Pas. Lantai Karpet 26,633.00
1.05000 m 2
Karpet Rp - -
0.35000 Kg Lem Rp 30,000.00 10,500.00
0.17000 OH Pekerja Rp. 35,000.00 5,950.00
0.17000 OH Tukang Rp 54,000.00 9,180.00
0.01700 OH Kepala tukang Rp 59,000.00 1,003.00
Jumlah 26,633.00
Total 26,633.00
C. 119 1 m2 Pas. Lantai Kayu (Gymfloor) 45,515.00
1.05000 m 2
Gymfloor Rp - -
0.06000 Kg Lem Rp 30,000.00 1,800.00
0.65000 OH Pekerja Rp. 35,000.00 22,750.00
0.35000 OH Tukang Rp 54,000.00 18,900.00
0.03500 OH Kepala tukang Rp 59,000.00 2,065.00
Jumlah 45,515.00
Total 45,515.00
C. 120 1 m2 Pas. Underlayer 21,888.00
1.05000 m 2
Parquet Rp - -
0.60000 Kg Lem Rp 30,000.00 18,000.00
0.65000 OH Pekerja Rp. 35,000.00 22,750.00
0.35000 OH Tukang Rp 54,000.00 18,900.00
0.03500 OH Kepala tukang Rp 59,000.00 2,065.00
Jumlah 61,715.00
Total 61,715.00
C. 122 1 m2 Pas. Lantai Vinyl 30 x 30 cm KL 1 14,235.00
11.78000 Bh Vinyl 30x30 cm Rp - -
0.35000 Kg Lem Vinyl Rp - -
0.15000 OH Pekerja Rp. 35,000.00 5,250.00
0.15000 OH Tukang Rp 54,000.00 8,100.00
0.01500 OH Kepala tukang Rp 59,000.00 885.00
Jumlah 14,235.00
Total 14,235.00
C. 123 1 m2 Pas. Lantai Vinyl 20 x 20 cm KL 1 14,235.00
11.78000 Bh Vinyl 30x30 cm Rp - -
0.35000 Kg Lem Vinyl Rp - -
0.15000 OH Pekerja Rp. 35,000.00 5,250.00
0.15000 OH Tukang Rp 54,000.00 8,100.00
0.01500 OH Kepala tukang Rp 59,000.00 885.00
Jumlah 14,235.00
Total 14,235.00
C. 124 1 m2 Pas. Wall paper lebar 50 cm 43,933.00
2.20000 m Wall paper Rp - -
0.25000 Kg Lem Rp 30,000.00 7,500.00
0.75000 OH Pekerja Rp. 35,000.00 26,250.00
0.17000 OH Tukang Rp 54,000.00 9,180.00
0.01700 OH Kepala tukang Rp 59,000.00 1,003.00
Jumlah 43,933.00
Total 43,933.00
C. 125 1 m2 Pas. Floor hardener 11,388.00
5.00000 m Floor hardener Rp - -
0.12000 OH Pekerja Rp. 35,000.00 4,200.00
0.12000 OH Tukang Rp 54,000.00 6,480.00
0.01200 OH Kepala tukang Rp 59,000.00 708.00
Jumlah 11,388.00
Total 11,388.00
C. 126 1 m2 Pas. Paving Blok 94,175.00
50.00000 Bh Paving Blok Rp 1,240.00 62,000.00
0.25000 OH Tukang Batu Rp. 53,000.00 13,250.00
0.02500 OH Kepala Tukang Rp 57,000.00 1,425.00
0.50000 OH Pekerja Rp 35,000.00 17,500.00
Jumlah 94,175.00
Total 94,175.00
C. 127 1 m2 Pas. Dinding Keramik 20 x 25 cm (Kualitas I Motif) 127,713.00
20.00000 Bh Keramik 20x25 cm Rp 2,700.00 54,000.00
9.30000 Kg Sement Portland Rp 1,060.00 9,858.00
1.50000 Kg Semen warna Rp 10,000.00 15,000.00
0.01800 m3 Pasir pasang Rp 80,000.00 1,440.00
0.60000 OH Pekerja Rp 35,000.00 21,000.00
0.45000 OH Tukang batu Rp 53,000.00 23,850.00
0.04500 OH Kepala tukang Rp 57,000.00 2,565.00
Jumlah 127,713.00
Total 127,713.00
C. 128 1 m2 Pas. Dinding Keramik 20 x 25 cm (Kualitas II Motif) 119,713.00
20.00000 Bh Keramik 20x25 cm Rp 2,300.00 46,000.00
9.30000 Kg Sement Portland Rp 1,060.00 9,858.00
1.50000 Kg Semen warna Rp 10,000.00 15,000.00
0.01800 m3 Pasir pasang Rp 80,000.00 1,440.00
0.60000 OH Pekerja Rp 35,000.00 21,000.00
0.45000 OH Tukang batu Rp 53,000.00 23,850.00
0.04500 OH Kepala tukang Rp 57,000.00 2,565.00
Jumlah 119,713.00
Total 119,713.00
C. 129 1 m2 Pas. Dinding Keramik 20 x 20 cm (Kualitas I Motif) 132,113.00
26.50000 Bh Keramik 20x20 cm Rp 2,037.74 54,000.00
9.30000 Kg Sement Portland Rp 1,060.00 9,858.00
1.94000 Kg Semen warna Rp 10,000.00 19,400.00
0.01800 m3 Pasir pasang Rp 80,000.00 1,440.00
0.60000 OH Pekerja Rp 35,000.00 21,000.00
0.45000 OH Tukang batu Rp 53,000.00 23,850.00
0.04500 OH Kepala tukang Rp 57,000.00 2,565.00
Jumlah 132,113.00
Total 132,113.00
C. 130 1 m2 Pas. Dinding Keramik 20 x 40 cm (Kualitas I Motif Super) 213,113.00
13.00000 Bh Keramik 20x40 cm Rp 10,384.62 135,000.00
9.30000 Kg Sement Portland Rp 1,060.00 9,858.00
1.94000 Kg Semen warna Rp 10,000.00 19,400.00
0.01800 m3 Pasir pasang Rp 80,000.00 1,440.00
0.60000 OH Pekerja Rp 35,000.00 21,000.00
0.45000 OH Tukang batu Rp 53,000.00 23,850.00
0.04500 OH Kepala tukang Rp 57,000.00 2,565.00
Jumlah 213,113.00
Total 213,113.00
C. 131 1 m' Keramik Sudut Artistik 10 cm (Kualitas I Motif) 36,638.00
10.00000 Bh Keramik Sudut Rp 2,500.00 25,000.00
1.65000 Kg Semen Portland Rp 1,060.00 1,749.00
0.00320 m3 Pasir pasang Rp 80,000.00 256.00
0.12000 Kg Semen warna Rp 10,000.00 1,200.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 36,638.00
Total 36,638.00
C. 132 1 m2 Pas. Dinding Keramik 10 x 20 cm (Kualitas I Motif) 140,213.00
53.00000 Bh Keramik 10x20 cm Rp 1,018.87 54,000.00
9.30000 Kg Sement Portland Rp 1,060.00 9,858.00
2.75000 Kg Semen warna Rp 10,000.00 27,500.00
0.01800 m3 Pasir pasang Rp 80,000.00 1,440.00
0.60000 OH Pekerja Rp 35,000.00 21,000.00
0.45000 OH Tukang batu Rp 53,000.00 23,850.00
0.04500 OH Kepala tukang Rp 57,000.00 2,565.00
Jumlah 140,213.00
Total 140,213.00
C. 133 1 m2 Pas. Dinding Keramik Artistik 10 x 20 cm (Kualitas I Motif) 140,213.00
53.00000 Bh Keramik 10x20 cm artistik Rp 1,018.87 54,000.00
9.30000 Kg Sement Portland Rp 1,060.00 9,858.00
2.75000 Kg Semen warna Rp 10,000.00 27,500.00
0.01800 m3 Pasir pasang Rp 80,000.00 1,440.00
0.60000 OH Pekerja Rp 35,000.00 21,000.00
0.45000 OH Tukang batu Rp 53,000.00 23,850.00
0.04500 OH Kepala tukang Rp 57,000.00 2,565.00
Jumlah 140,213.00
Total 140,213.00
C. 134 1 m2 Pas. Dinding Keramik Artistik 5 x 20 cm (Kualitas I Motif) 141,713.00
106.00000 Bh Keramik Artistik 5 x 20 cm Rp 509.43 54,000.00
9.30000 Kg Sement Portland Rp 1,060.00 9,858.00
2.90000 Kg Semen warna Rp 10,000.00 29,000.00
0.01800 m3 Pasir pasang Rp 80,000.00 1,440.00
0.60000 OH Pekerja Rp 35,000.00 21,000.00
0.45000 OH Tukang batu Rp 53,000.00 23,850.00
0.04500 OH Kepala tukang Rp 57,000.00 2,565.00
Jumlah 141,713.00
Total 141,713.00
C. 135 1 m2 Pas. Dinding Marmer 100 x 100 cm 385,041.40
1.02000 m2 Marmer 100 x 100 cm Rp 264,705.88 270,000.00
2.00000 Bh Paku 12 cm Rp 15,000.00 30,000.00
12.44000 Kg Sement Portland Rp 1,060.00 13,186.40
0.65000 Kg Semen warna Rp 10,000.00 6,500.00
0.02500 m3 Pasir pasang Rp 80,000.00 2,000.00
0.72000 OH Pekerja Rp 35,000.00 25,200.00
0.65000 OH Tukang batu Rp 53,000.00 34,450.00
0.06500 OH Kepala tukang Rp 57,000.00 3,705.00
Jumlah 385,041.40
Total 385,041.40
C. 136 1 m2 Pas. Dinding Bata pelapis 3 x 7 x 24 cm 94,786.40
63.00000 Bh Bata pelapis dinding Rp - -
12.44000 Kg Sement Portland Rp 1,060.00 13,186.40
2.75000 Kg Semen warna Rp 10,000.00 27,500.00
0.02500 m3 Pasir pasang Rp 80,000.00 2,000.00
0.65000 OH Pekerja Rp 35,000.00 22,750.00
0.50000 OH Tukang batu Rp 53,000.00 26,500.00
0.05000 OH Kepala tukang Rp 57,000.00 2,850.00
Jumlah 94,786.40
Total 94,786.40
C. 137 1 m2 Pas. Dinding Batu Paras 57,500.00
1.10000 m 2
Bata paras Rp - -
11.75000 Kg Sement Portland Rp 1,060.00 12,455.00
0.03500 m3 Pasir pasang Rp 80,000.00 2,800.00
0.62000 OH Pekerja Rp 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 57,500.00
Total 57,500.00
C. 138 1 m2 Pas. Dinding Batu Tempel hitam 57,500.00
1.10000 m 2
Batu tempel hitam Rp - -
11.75000 Kg Sement Portland Rp 1,060.00 12,455.00
0.03500 m3 Pasir pasang Rp 80,000.00 2,800.00
0.62000 OH Pekerja Rp 35,000.00 21,700.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 57,500.00
Total 57,500.00
C. 139 1 m' Plint ubin PC abu-abu 15 x 20 cm 10,502.00
5.30000 Bh Plint Ubin PC abu-abu 15 x 20 cm Rp - -
1.65000 Kg Semen Portland Rp 1,060.00 1,749.00
0.00400 m3 Pasir pasang Rp 80,000.00 320.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 10,502.00
Total 10,502.00
C. 140 1 m' Plint ubin PC abu-abu 10 x 30 cm 9,987.40
3.53000 Bh Plint Ubin PC abu-abu 10 x 30 cm Rp - -
1.24000 Kg Semen Portland Rp 1,060.00 1,314.40
0.00300 m3 Pasir pasang Rp 80,000.00 240.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 9,987.40
Total 9,987.40
C. 141 1 m' Plint ubin PC abu-abu 10 x 40 cm 9,987.40
2.65000 Bh Plint Ubin PC abu-abu 10 x 40 cm Rp - -
1.24000 Kg Semen Portland Rp 1,060.00 1,314.40
0.00300 m3 Pasir pasang Rp 80,000.00 240.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 9,987.40
Total 9,987.40
C. 142 1 m' Plint ubin PC warna 10 x 20 cm 9,881.40
5.30000 Bh Plint Ubin PC warna 10 x 20 cm Rp - -
1.14000 Kg Semen Portland Rp 1,060.00 1,208.40
0.00300 m3 Pasir pasang Rp 80,000.00 240.00
0.10000 Kg Semen warna Rp 10,000.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 9,881.40
Total 9,881.40
C. 143 1 m' Plint ubin PC warna 10 x 30 cm 10,881.40
3.53000 Bh Plint Ubin PC warna 10 x 30 cm Rp - -
1.14000 Kg Semen Portland Rp 1,060.00 1,208.40
0.00300 m3 Pasir pasang Rp 80,000.00 240.00
0.10000 Kg Semen warna Rp 10,000.00 1,000.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 10,881.40
Total 10,881.40
C. 144 1 m' Plint ubin PC warna 10 x 40 cm 10,881.40
2.65000 Bh Plint Ubin PC warna 10 x 40 cm Rp - -
1.14000 Kg Semen Portland Rp 1,060.00 1,208.40
0.00300 m3 Pasir pasang Rp 80,000.00 240.00
0.10000 Kg Semen warna Rp 10,000.00 1,000.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 10,881.40
Total 10,881.40
C. 145 1 m' Plint ubin teraso 10 x 30 cm 10,881.40
3.53000 Bh Plint Ubin teraso 10 x 30 cm Rp - -
1.14000 Kg Semen Portland Rp 1,060.00 1,208.40
0.00300 m3 Pasir pasang Rp 80,000.00 240.00
0.10000 Kg Semen warna Rp 10,000.00 1,000.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 10,881.40
Total 10,881.40
C. 146 1 m' Plint ubin teraso 10 x 40 cm 10,881.40
2.65000 Bh Plint Ubin teraso 10 x 40 cm Rp - -
1.14000 Kg Semen Portland Rp 1,060.00 1,208.40
0.00300 m3 Pasir pasang Rp 80,000.00 240.00
0.10000 Kg Semen warna Rp 10,000.00 1,000.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 10,881.40
Total 10,881.40
C. 147 1 m' Plint ubin granit 10 x 40 cm 10,881.40
2.65000 Bh Plint Ubin granit 10 x 40 cm Rp - -
1.14000 Kg Semen Portland Rp 1,060.00 1,208.40
0.00300 m3 Pasir pasang Rp 80,000.00 240.00
0.10000 Kg Semen warna Rp 10,000.00 1,000.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 10,881.40
Total 10,881.40
C. 148 1 m' Plint ubin granit 10 x 30 cm 10,881.40
3.53000 Bh Plint Ubin granit 10 x 30 cm Rp - -
1.14000 Kg Semen Portland Rp 1,060.00 1,208.40
0.00300 m3 Pasir pasang Rp 80,000.00 240.00
0.10000 Kg Semen warna Rp 10,000.00 1,000.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 10,881.40
Total 10,881.40
C. 149 1 m' Plint ubin teralux kerang 10 x 40 cm 10,881.40
2.65000 Bh Plint Ubin teralux kerang 10 x 40 cm Rp - -
1.14000 Kg Semen Portland Rp 1,060.00 1,208.40
0.00300 m3 Pasir pasang Rp 80,000.00 240.00
0.10000 Kg Semen warna Rp 10,000.00 1,000.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 10,881.40
Total 10,881.40
C. 150 1 m' Plint ubin teralux kerang 10 x 30 cm 10,881.40
3.53000 Bh Plint Ubin teralux kerang 10 x 30 cm Rp - -
1.14000 Kg Semen Portland Rp 1,060.00 1,208.40
0.00300 m3 Pasir pasang Rp 80,000.00 240.00
0.10000 Kg Semen warna Rp 10,000.00 1,000.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 10,881.40
Total 10,881.40
C. 151 1 m' Plint ubin teralux marmer 10 x 60 cm 10,881.40
1.70000 Bh Plint Ubin teralux marmer 10 x 60 cm Rp - -
1.14000 Kg Semen Portland Rp 1,060.00 1,208.40
0.00300 m3 Pasir pasang Rp 80,000.00 240.00
0.10000 Kg Semen warna Rp 10,000.00 1,000.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 10,881.40
Total 10,881.40
C. 152 1 m' Plint ubin teralux marmer 10 x 40 cm 10,881.40
2.65000 Bh Plint Ubin teralux marmer 10 x 40 cm Rp - -
1.14000 Kg Semen Portland Rp 1,060.00 1,208.40
0.00300 m3 Pasir pasang Rp 80,000.00 240.00
0.10000 Kg Semen warna Rp 10,000.00 1,000.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 10,881.40
Total 10,881.40
C. 153 1 m' Plint ubin teralux marmer 10 x 30 cm 10,881.40
3.53000 Bh Plint Ubin teralux marmer 10 x 30 cm Rp - -
1.14000 Kg Semen Portland Rp 1,060.00 1,208.40
0.00300 m3 Pasir pasang Rp 80,000.00 240.00
0.10000 Kg Semen warna Rp 10,000.00 1,000.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 10,881.40
Total 10,881.40
C. 154 1 m' Plint Keramik Artistik 5 x 20 cm (Kualitas I Motif) 10,310.00
5.00000 Bh Plint Keramik 5 x 20 cm Rp - -
0.85000 Kg Semen Portland Rp 1,060.00 901.00
0.00220 m3 Pasir pasang Rp 80,000.00 176.00
0.08000 Kg Semen warna Rp 10,000.00 800.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 10,310.00
Total 10,310.00
C. 155 1 m' Plint Keramik Artistik 10 x 20 cm (Kualitas I Motif) 71,438.00
5.00000 Bh Plint Keramik 10 x 20 cm Rp 12,000.00 60,000.00
1.65000 Kg Semen Portland Rp 1,060.00 1,749.00
0.00320 m3 Pasir pasang Rp 80,000.00 256.00
0.10000 Kg Semen warna Rp 10,000.00 1,000.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 71,438.00
Total 71,438.00
C. 156 1 m' Plint Keramik Artistik 10 x 20 cm (Kualitas I Motif Super) 636,438.00
5.00000 Bh Plint Keramik 10 x 20 cm Super Rp 125,000.00 625,000.00
1.65000 Kg Semen Portland Rp 1,060.00 1,749.00
0.00320 m3 Pasir pasang Rp 80,000.00 256.00
0.10000 Kg Semen warna Rp 10,000.00 1,000.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 636,438.00
Total 636,438.00
C. 157 1 m' Plint Keramik 10 x 20 cm 10,131.40
5.30000 Bh Plint Keramik Artistik 10 x 20 cm Rp - -
1.14000 Kg Semen Portland Rp 1,060.00 1,208.40
0.00300 m3 Pasir pasang Rp 80,000.00 240.00
0.02500 Kg Semen warna Rp 10,000.00 250.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 10,131.40
Total 10,131.40
C. 158 1 m' Plint Keramik 10 x 10 cm 10,381.40
10.60000 Bh Plint Keramik Artistik 10 x 10 cm Rp - -
1.14000 Kg Semen Portland Rp 1,060.00 1,208.40
0.00300 m3 Pasir pasang Rp 80,000.00 240.00
0.05000 Kg Semen warna Rp 10,000.00 500.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 10,381.40
Total 10,381.40
C. 159 1 m' Plint Keramik 5 x 20 cm 9,287.20
5.30000 Bh Plint Keramik Artistik 5 x 20 cm Rp - -
0.57000 Kg Semen Portland Rp 1,060.00 604.20
0.00150 m3 Pasir pasang Rp 80,000.00 120.00
0.01300 Kg Semen warna Rp 10,000.00 130.00
0.09000 OH Pekerja Rp 35,000.00 3,150.00
0.09000 OH Tukang batu Rp 53,000.00 4,770.00
0.00900 OH Kepala tukang Rp 57,000.00 513.00
Jumlah 9,287.20
Total 9,287.20
C. 160 1 m' Plint Internal cove artistik 5 x 5 x 20 cm 55,113.40
5.30000 Bh Plint Internal cove Artistik5 x 5 x 20 cm Rp - -
1.14000 Kg Semen Portland Rp 1,060.00 1,208.40
0.00300 m3 Pasir pasang Rp 80,000.00 240.00
0.10000 Kg Semen warna Rp 10,000.00 1,000.00
0.75000 OH Pekerja Rp 35,000.00 26,250.00
0.45000 OH Tukang batu Rp 53,000.00 23,850.00
0.04500 OH Kepala tukang Rp 57,000.00 2,565.00
Jumlah 55,113.40
Total 55,113.40
C. 161 1 m' Plint Vinyil karet 30 x 30 dengan perekat 9,352.00
1.76000 Bh Plint vinyil karet Rp - -
0.08000 Kg Lem vinyil Rp 22,000.00 1,760.00
0.08000 OH Pekerja Rp 35,000.00 2,800.00
0.08000 OH Tukang Rp 54,000.00 4,320.00
0.00800 OH Kepala tukang Rp 59,000.00 472.00
Jumlah 9,352.00
Total 9,352.00
C. 162 1 m' Plint kayu kelas II 2 x 10cm 21,538.00
0.00300 m3 Papan kayu kelas II Rp 2,650,000.00 7,950.00
0.05000 Kg Paku skrup 5 cm Rp 44,000.00 2,200.00
0.12000 OH Pekerja Rp 35,000.00 4,200.00
0.12000 OH Tukang kayu Rp 54,000.00 6,480.00
0.01200 OH Kepala tukang Rp 59,000.00 708.00
Jumlah 21,538.00
Total 21,538.00
C. 163 1 m2 Pas. Dinding Porselin 15 x 15 cm (Kualitas I Polos) 73,713.00
45.00000 Bh Porselin15 x 15 cm Rp - -
9.30000 Kg Sement Portland Rp 1,060.00 9,858.00
1.50000 Kg Semen warna Rp 10,000.00 15,000.00
0.01800 m3 Pasir pasang Rp 80,000.00 1,440.00
0.60000 OH Pekerja Rp 35,000.00 21,000.00
0.45000 OH Tukang batu Rp 53,000.00 23,850.00
0.04500 OH Kepala tukang Rp 57,000.00 2,565.00
Jumlah 73,713.00
Total 73,713.00
C. 164 1 m2 Pas. Dinding Porselin 20 x 20 cm (Kualitas I Polos) 86,213.00
26.50000 Bh Porselin 20x20 cm Rp - -
9.30000 Kg Sement Portland Rp 1,060.00 9,858.00
2.75000 Kg Semen warna Rp 10,000.00 27,500.00
0.01800 m3 Pasir pasang Rp 80,000.00 1,440.00
0.60000 OH Pekerja Rp 35,000.00 21,000.00
0.45000 OH Tukang batu Rp 53,000.00 23,850.00
0.04500 OH Kepala tukang Rp 57,000.00 2,565.00
Jumlah 86,213.00
Total 86,213.00
C. 165 1 m2 Pas. Dinding Porselin 15 x 15 cm (Kualitas I Warna) 74,913.00
45.00000 Bh Porselin15 x 15 cm Rp - -
9.30000 Kg Sement Portland Rp 1,060.00 9,858.00
1.62000 Kg Semen warna Rp 10,000.00 16,200.00
0.01800 m3 Pasir pasang Rp 80,000.00 1,440.00
0.60000 OH Pekerja Rp 35,000.00 21,000.00
0.45000 OH Tukang batu Rp 53,000.00 23,850.00
0.04500 OH Kepala tukang Rp 57,000.00 2,565.00
Jumlah 74,913.00
Total 74,913.00
C. 166 1 m2 Pas. Dinding Porselin 20 x 20 cm (Kualitas I Warna) 73,713.00
25.00000 Bh Porselin 20x20 cm Rp - -
9.30000 Kg Sement Portland Rp 1,060.00 9,858.00
1.50000 Kg Semen warna Rp 10,000.00 15,000.00
0.01800 m3 Pasir pasang Rp 80,000.00 1,440.00
0.60000 OH Pekerja Rp 35,000.00 21,000.00
0.45000 OH Tukang batu Rp 53,000.00 23,850.00
0.04500 OH Kepala tukang Rp 57,000.00 2,565.00
Jumlah 73,713.00
Total 73,713.00
C. 167 1 m2 Pas. Dinding Porselin 10 x 20 cm (Kualitas I Warna) 86,213.00
53.00000 Bh Porselin 10x20 cm Rp - -
9.30000 Kg Sement Portland Rp 1,060.00 9,858.00
2.75000 Kg Semen warna Rp 10,000.00 27,500.00
0.01800 m3 Pasir pasang Rp 80,000.00 1,440.00
0.60000 OH Pekerja Rp 35,000.00 21,000.00
0.45000 OH Tukang batu Rp 53,000.00 23,850.00
0.04500 OH Kepala tukang Rp 57,000.00 2,565.00
Jumlah 86,213.00
Total 86,213.00
C. 168 1 m2 Pas. Dinding Porselin 11 x 11 cm (Kualitas I Warna) 77,348.00
86.00000 Bh Porselin 11x11 cm Rp - -
9.30000 Kg Sement Portland Rp 1,060.00 9,858.00
1.50000 Kg Semen warna Rp 10,000.00 15,000.00
0.01800 m3 Pasir pasang Rp 80,000.00 1,440.00
0.62000 OH Pekerja Rp 35,000.00 21,700.00
0.50000 OH Tukang batu Rp 53,000.00 26,500.00
0.05000 OH Kepala tukang Rp 57,000.00 2,850.00
Jumlah 77,348.00
Total 77,348.00
PEKERJAAN KAYU DAN BESI
D. 1 1 m' Pasang Lisplang ukuran 2 x (2x20) cm, Kayu klas I 49,625.00
0.00860 m3 Papan Kayu Klas I Rp 3,750,000.00 32,250.00
0.10000 Kg Paku biasa 2" - 5 " Rp 16,000.00 1,600.00
0.10000 OH Pekerja Rp 35,000.00 3,500.00
0.20000 OH Tukang kayu Rp 54,000.00 10,800.00
0.02500 OH Kepala Tukang Rp 59,000.00 1,475.00
Jumlah 49,625.00
Total 49,625.00
D. 2 1 m' Pasang Lisplang ukuran 2 x (2x20) cm, Kayu klas II 39,365.00
0.00860 m3 Papan Kayu Klas II Rp 2,650,000.00 22,790.00
0.05000 Kg Paku biasa 2" - 5 " Rp 16,000.00 800.00
0.10000 OH Pekerja Rp 35,000.00 3,500.00
0.20000 OH Tukang kayu Rp 54,000.00 10,800.00
0.02500 OH Kepala Tukang Rp 59,000.00 1,475.00
Jumlah 39,365.00
Total 39,365.00
D. 3 1 m' Pasang Lisplang ukuran (3x20) cm kayu kelas I 57,875.00
0.01080 m 3
Papan Kayu Klas I Rp 3,750,000.00 40,500.00
0.10000 Kg Paku 5 cm - 7 cm Rp 16,000.00 1,600.00
0.10000 OH Pekerja Rp 35,000.00 3,500.00
0.20000 OH Tukang kayu Rp 54,000.00 10,800.00
0.02500 OH Kepala Tukang Rp 59,000.00 1,475.00
Jumlah 57,875.00
Total 57,875.00
D. 4 1 m' Pasang Lisplang ukuran (3x20) cm kayu kelas II 45,995.00
0.01080 m 3
Papan Kayu Klas II Rp 2,650,000.00 28,620.00
0.10000 Kg Paku 5 cm - 7 cm Rp 16,000.00 1,600.00
0.10000 OH Pekerja Rp 35,000.00 3,500.00
0.20000 OH Tukang kayu Rp 54,000.00 10,800.00
0.02500 OH Kepala Tukang Rp 59,000.00 1,475.00
Jumlah 45,995.00
Total 45,995.00
D. 5 1 m' Pasang Lisplang ukuran (3x30) cm kayu kelas I 57,530.00
0.01100 m 3
Papan Kayu Klas I Rp 3,750,000.00 41,250.00
0.05000 Kg Paku 5 cm - 7 cm Rp 16,000.00 800.00
0.10000 OH Pekerja Rp 35,000.00 3,500.00
0.20000 OH Tukang kayu Rp 54,000.00 10,800.00
0.02000 OH Kepala Tukang Rp 59,000.00 1,180.00
Jumlah 57,530.00
Total 57,530.00
D. 6 1 m' Pasang Lisplang ukuran (3x30) cm kayu kelas II 45,430.00
0.01100 m 3
Papan Kayu Klas II Rp 2,650,000.00 29,150.00
0.05000 Kg Paku 5 cm - 7 cm Rp 16,000.00 800.00
0.10000 OH Pekerja Rp 35,000.00 3,500.00
0.20000 OH Tukang kayu Rp 54,000.00 10,800.00
0.02000 OH Kepala Tukang Rp 59,000.00 1,180.00
Jumlah 45,430.00
Total 45,430.00
D. 7 1 m' Pasang Lisplang Dengan Menggunakan Bahan Lama 16,280.00
- m3 Papan Kayu Rp - -
0.05000 Kg Paku biasa 2" - 5 " Rp 16,000.00 800.00
0.10000 OH Pekerja Rp 35,000.00 3,500.00
0.20000 OH Tukang kayu Rp 54,000.00 10,800.00
0.02000 OH Kepala Tukang Rp 59,000.00 1,180.00
Jumlah 16,280.00
Total 16,280.00
D. 8 1 m' Pasang Papan reuter ukuran (2x20) cm 36,575.00
0.00400 m3 Papan Kayu Klas II Rp 2,650,000.00 10,600.00
0.25000 Kg Paku biasa 2" - 5 " Rp 16,000.00 4,000.00
0.20000 OH Pekerja Rp 35,000.00 7,000.00
0.25000 OH Tukang kayu Rp 54,000.00 13,500.00
0.02500 OH Kepala Tukang kayu Rp 59,000.00 1,475.00
Jumlah 36,575.00
Total 36,575.00
D. 9 1 m' Pasang Talang datar / jurai seng BJLS - 20 lembar 90 cm 130,045.00
1.05000 m1 Seng Plat BJLS 20 Rp 47,000.00 49,350.00
0.01500 Kg Paku 1 cm - 2,5 cm Rp 18,000.00 270.00
0.01900 m3 Papan kayu kelas II Rp 2,650,000.00 50,350.00
0.20000 OH Pekerja Rp 35,000.00 7,000.00
0.40000 OH Tukang kayu Rp 54,000.00 21,600.00
0.02500 OH Kepala Tukang Rp 59,000.00 1,475.00
Jumlah 130,045.00
Total 130,045.00
D. 10 1 m' Pasang Talang 1/2 lingkaran D-15, seng plat BJLS - 20 lembar 45 cm 83,250.00
1.05000 m1 Seng Plat BJLS 20 Rp 47,000.00 49,350.00
0.01000 Kg Paku 1 cm - 2,5 cm Rp 18,000.00 180.00
0.50000 Kg Besi strip Rp 21,000.00 10,500.00
0.15000 OH Pekerja Rp 35,000.00 5,250.00
0.30000 OH Tukang kayu Rp 54,000.00 16,200.00
0.03000 OH Kepala Tukang Rp 59,000.00 1,770.00
Jumlah 83,250.00
Total 83,250.00
D. 11 1 m' Pasang Talang Papan ukuran 2 x (2x20) cm 40 cm 47,100.00
0.00100 m3 Papan Kayu Klas II Rp 2,650,000.00 2,650.00
0.25000 Kg Paku biasa 2" - 5 " Rp 16,000.00 4,000.00
0.15000 Kg Paku Seng Rp 18,000.00 2,700.00
0.40000 Lbr Seng Plat BJLS 20 Rp 47,000.00 18,800.00
0.25000 OH Pekerja Rp 35,000.00 8,750.00
0.02500 OH Tukang kayu Rp 54,000.00 1,350.00
0.15000 OH Kepala Tukang Rp 59,000.00 8,850.00
Jumlah 47,100.00
Total 47,100.00
0.04000 m 3
Papan Kayu Klas II Rp 2,650,000.00 106,000.00
0.05000 Kg Paku 5 cm - 7 cm Rp 16,000.00 800.00
0.35000 OH Pekerja Rp 35,000.00 12,250.00
1.05000 OH Tukang kayu Rp 54,000.00 56,700.00
0.10500 OH Kepala Tukang Rp 59,000.00 6,195.00
Jumlah 181,945.00
Total 181,945.00
D. 13 1 m2 Pasang Pintu Klamp sederhana, Kayu Kelas III 157,945.00
0.04000 m 3
Papan Kayu Klas III Rp 2,050,000.00 82,000.00
0.05000 Kg Paku 5 cm - 7 cm Rp 16,000.00 800.00
0.35000 OH Pekerja Rp 35,000.00 12,250.00
1.05000 OH Tukang kayu Rp 54,000.00 56,700.00
0.10500 OH Kepala Tukang Rp 59,000.00 6,195.00
Jumlah 157,945.00
Total 157,945.00
D. 14 1 m2 Pasang Pintu Panel Kayu Kelas I 349,750.00
0.04000 m 3
Papan Kayu Klas II Rp 2,650,000.00 106,000.00
0.50000 Kg Lem Kayu Rp 30,000.00 15,000.00
1.00000 OH Pekerja Rp 35,000.00 35,000.00
2.50000 OH Tukang kayu Rp 54,000.00 135,000.00
0.25000 OH Kepala Tukang Rp 59,000.00 14,750.00
Jumlah 305,750.00
Total 305,750.00
D. 16 1 m2 Pasang pintu Panel Kayu Kelas II Lapis Formika 368,750.00
0.04000 m 3
Papan Kayu Klas II Rp 2,650,000.00 106,000.00
0.50000 Lmbr Formika Rp 108,000.00 54,000.00
0.80000 Kg Lem Kayu Rp 30,000.00 24,000.00
1.00000 OH Pekerja Rp 35,000.00 35,000.00
2.50000 OH Tukang kayu Rp 54,000.00 135,000.00
0.25000 OH Kepala Tukang Rp 59,000.00 14,750.00
Jumlah 368,750.00
Total 368,750.00
D. 17 1 m2 Pasang Jalusi ( Krepyak ) Mati kusen, Kayu klas I 364,700.00
0.06000 m3 Papan Kayu Klas I Rp 3,750,000.00 225,000.00
0.15000 Kg Paku 1 cm - 2,5 cm Rp 16,000.00 2,400.00
0.50000 OH Pekerja Rp 35,000.00 17,500.00
2.00000 OH Tukang kayu Rp 54,000.00 108,000.00
0.20000 OH Kepala Tukang Rp 59,000.00 11,800.00
Jumlah 364,700.00
Total 364,700.00
D. 18 1 m2 Pasang Jalusi ( Krepyak ) Mati kusen, Kayu klas II 298,700.00
0.06000 m 3
Papan Kayu Klas II Rp 2,650,000.00 159,000.00
0.15000 Kg Paku 1 cm - 2,5 cm Rp 16,000.00 2,400.00
0.50000 OH Pekerja Rp 35,000.00 17,500.00
2.00000 OH Tukang kayu Rp 54,000.00 108,000.00
0.20000 OH Kepala Tukang Rp 59,000.00 11,800.00
Jumlah 298,700.00
Total 298,700.00
D. 19 1 m2 Pasang Jalusi ( Krepyak ) Mati kusen, Kayu klas III 262,700.00
0.06000 m 3
Papan Kayu Klas III Rp 2,050,000.00 123,000.00
0.15000 Kg Paku 1 cm - 2,5 cm Rp 16,000.00 2,400.00
0.50000 OH Pekerja Rp 35,000.00 17,500.00
2.00000 OH Tukang kayu Rp 54,000.00 108,000.00
0.20000 OH Kepala Tukang Rp 59,000.00 11,800.00
Jumlah 262,700.00
Total 262,700.00
D. 20 1 m2 Pasang Daun Pintu Kayu Lapis plywood rangkap,rangka tertutup kayu kelas II lebar 90 cm 312,530.00
1.20000 m 3
Balok Kayu Klas II Rp 2,450,000.00 2,940,000.00
0.80000 Kg Paku 2"- 5" Rp 16,000.00 12,800.00
16.00000 OH Pekerja Rp 35,000.00 560,000.00
1.60000 OH Tukang Kayu Rp 54,000.00 86,400.00
6.00000 OH Kepala Tukang Kayu Rp 59,000.00 354,000.00
Jumlah 3,953,200.00
Total 3,953,200.00
0.03000 m3
Kayu Kelas III Rp 2,050,000.00 61,500.00
0.40000 Kg Paku 5 cm - 12 cm Rp 15,000.00 6,000.00
0.20000 Ltr Minyak Bekisting Rp 2,700.00 540.00
0.02000 m3 Balok Kayu Kelas II Rp 2,450,000.00 49,000.00
0.35000 Lbr Plywood tebal 9 mm Rp 108,000.00 37,800.00
3.00000 Btg Dolken kayu galam f (8-10) cm, 4 m Rp 50,000.00 150,000.00
4.00000 Bh Formite/Penjaga Jarak Bekisting/Spacer Rp 25,000.00 100,000.00
0.66000 OH Pekerja Rp 35,000.00 23,100.00
0.33000 OH Tukang Kayu Rp 54,000.00 17,820.00
0.03300 OH Kepala tukang Rp 59,000.00 1,947.00
Jumlah 447,707.00
Total 447,707.00
G. 14 1 m2 Pasang Bekisting Untuk Tangga 285,322.00
0.03000 m3 Kayu Kelas III Rp 2,050,000.00 61,500.00
0.40000 Kg Paku 5 cm - 12 cm Rp 15,000.00 6,000.00
0.15000 Ltr Minyak Bekisting Rp 2,700.00 405.00
0.01500 m3 Balok Kayu Kelas II Rp 2,450,000.00 36,750.00
0.35000 Lbr Plywood tebal 9 mm Rp 108,000.00 37,800.00
2.00000 Btg Dolken kayu galam f (8-10) cm, 4 m Rp 50,000.00 100,000.00
0.66000 OH Pekerja Rp 35,000.00 23,100.00
0.33000 OH Tukang Kayu Rp 54,000.00 17,820.00
0.03300 OH Kepala tukang Rp 59,000.00 1,947.00
Jumlah 285,322.00
Total 285,322.00
G. 15 1 m3 Membuat beton mutu F'c = 19,3 Mpa (K 225), slump (12+2) cm, w/c = 0,58 467,181.00
371.00000 Kg Semen Portland Rp 1,060.00 393,260.00
698.00000 Kg Pasir beton Rp - -
1,047.00000 Kg KR (maksimum 30 mm) Rp - -
215.00000 Ltr Air Rp - -
1.65000 OH Pekerja Rp 35,000.00 57,750.00
0.27500 OH Tukang batu Rp 53,000.00 14,575.00
0.02800 OH Kepala tukang Rp 57,000.00 1,596.00
Jumlah 467,181.00
Total 467,181.00
G. 16 1 m3 Membuat beton mutu F'c = 21,7 Mpa (K 250), slump (12+2) cm, w/c = 0,56 480,961.00
384.00000 Kg Semen Portland Rp 1,060.00 407,040.00
692.00000 Kg Pasir beton Rp - -
1,039.00000 Kg KR (maksimum 30 mm) Rp - -
215.00000 Ltr Air Rp - -
1.65000 OH Pekerja Rp 35,000.00 57,750.00
0.27500 OH Tukang batu Rp 53,000.00 14,575.00
0.02800 OH Kepala tukang Rp 57,000.00 1,596.00
Jumlah 480,961.00
Total 480,961.00
G. 17 1 m3 Membuat beton mutu F'c = 24,0 Mpa (K 275), slump (12+2) cm, w/c = 0,53 504,281.00
406.00000 Kg Semen Portland Rp 1,060.00 430,360.00
684.00000 Kg Pasir beton Rp - -
1,026.00000 Kg KR (maksimum 30 mm) Rp - -
215.00000 Ltr Air Rp - -
1.65000 OH Pekerja Rp 35,000.00 57,750.00
0.27500 OH Tukang batu Rp 53,000.00 14,575.00
0.02800 OH Kepala tukang Rp 57,000.00 1,596.00
Jumlah 504,281.00
Total 504,281.00
G. 18 1 m3 Membuat beton mutu F'c = 26,4 Mpa (K 300), slump (12+2) cm, w/c = 0,52 511,113.00
413.00000 Kg Semen Portland Rp 1,060.00 437,780.00
681.00000 Kg Pasir beton Rp - -
1,021.00000 Kg KR (maksimum 30 mm) Rp - -
215.00000 Ltr Air Rp - -
1.65000 OH Pekerja Rp 35,000.00 57,750.00
0.27500 OH Tukang batu Rp 53,000.00 14,575.00
0.02800 OH Kepala tukang Rp 36,000.00 1,008.00
Jumlah 511,113.00
Total 511,113.00
G. 19 1 m3 Membuat beton mutu F'c = 28,8 Mpa (K 325), slump (12+2) cm, w/c = 0,49 559,385.00
439.00000 Kg Semen Portland Rp 1,060.00 465,340.00
670.00000 Kg Pasir beton Rp - -
1,006.00000 Kg KR (maksimum 30 mm) Rp - -
215.00000 Ltr Air Rp - -
2.10000 OH Pekerja Rp 35,000.00 73,500.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 559,385.00
Total 559,385.00
G. 20 1 m3 Membuat beton mutu F'c = 31,2 Mpa (K 350), slump (12+2) cm, w/c = 0,48 568,925.00
448.00000 Kg Semen Portland Rp 1,060.00 474,880.00
667.00000 Kg Pasir beton Rp - -
1,000.00000 Kg KR (maksimum 30 mm) Rp - -
215.00000 Ltr Air Rp - -
2.10000 OH Pekerja Rp 35,000.00 73,500.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 568,925.00
Total 568,925.00
G. 21 1 m3 Membuat beton mutu F'c = 7,4 Mpa (K 100), slump (12 + 2) cm, w/c = 0,87 335,741.00
247.00000 Kg Semen Portland Rp 1,060.00 261,820.00
869.00000 Kg Pasir beton Rp - -
999.00000 Kg KR (maksimum 30 mm) Rp - -
215.00000 Ltr Air Rp - -
1.65000 OH Pekerja Rp 35,000.00 57,750.00
0.27500 OH Tukang batu Rp 53,000.00 14,575.00
0.02800 OH Kepala tukang Rp 57,000.00 1,596.00
Jumlah 335,741.00
Total 335,741.00
G. 22 1 m3 Membuat beton mutu F'c = 9,8 Mpa (K 125), slump (12 + 2) cm, w/c = 0,78 366,481.00
276.00000 Kg Semen Portland Rp 1,060.00 292,560.00
828.00000 Kg Pasir beton Rp - -
1,012.00000 Kg KR (maksimum 30 mm) Rp - -
215.00000 Ltr Air Rp - -
1.65000 OH Pekerja Rp 35,000.00 57,750.00
0.27500 OH Tukang batu Rp 53,000.00 14,575.00
0.02800 OH Kepala tukang Rp 57,000.00 1,596.00
Jumlah 366,481.00
Total 366,481.00
G. 23 1 m3 Membuat beton mutu F'c = 12,2 Mpa (K 150), slump (12 + 2) cm, w/c = 0,72 390,861.00
299.00000 Kg Semen Portland Rp 1,060.00 316,940.00
799.00000 Kg Pasir beton Rp - -
1,017.00000 Kg KR (maksimum 30 mm) Rp - -
215.00000 Ltr Air Rp - -
1.65000 OH Pekerja Rp 35,000.00 57,750.00
0.27500 OH Tukang batu Rp 53,000.00 14,575.00
0.02800 OH Kepala tukang Rp 57,000.00 1,596.00
Jumlah 390,861.00
Total 390,861.00
G. 24 1 m3 Membuat beton mutu F'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87 297,540.00
230.00000 Kg Semen Portland Rp 1,060.00 243,800.00
893.00000 Kg Pasir beton Rp - -
1,027.00000 Kg KR (maksimum 30 mm) Rp - -
200.00000 Ltr Air Rp - -
1.20000 OH Pekerja Rp 35,000.00 42,000.00
0.20000 OH Tukang batu Rp 53,000.00 10,600.00
0.02000 OH Kepala tukang Rp 57,000.00 1,140.00
Jumlah 297,540.00
Total 297,540.00
G. 25 1 m3 Membuat beton mutu F'c = 14,5 Mpa (K 175), slump (12+2) cm, w/c = 0,66 419,481.00
326.00000 Kg Semen Portland Rp 1,060.00 345,560.00
760.00000 Kg Pasir beton Rp - -
1,029.00000 Kg KR (maksimum 30 mm) Rp - -
215.00000 Ltr Air Rp - -
1.65000 OH Pekerja Rp 35,000.00 57,750.00
0.27500 OH Tukang batu Rp 53,000.00 14,575.00
0.02800 OH Kepala tukang Rp 57,000.00 1,596.00
Jumlah 419,481.00
Total 419,481.00
G. 26 1 m3 Membuat beton mutu F'c = 16,9 Mpa (K 200), slump (12+2) cm, w/c = 0,61 447,041.00
352.00000 Kg Semen Portland Rp 1,060.00 373,120.00
731.00000 Kg Pasir beton -
1,031.00000 Kg KR (maksimum 30 mm) -
215.00000 Ltr Air -
1.65000 OH Pekerja Rp 35,000.00 57,750.00
0.27500 OH Tukang batu Rp 53,000.00 14,575.00
0.02800 OH Kepala tukang Rp 57,000.00 1,596.00
Jumlah 447,041.00
Total 447,041.00
G. 27 1 m3 Membuat beton kedap air dengan strorox - 100 668,445.00
400.00000 Kg Semen Portland Rp 1,060.00 424,000.00
0.48000 m3 Pasir beton Rp 80,000.00 38,400.00
0.80000 m3 KR (maksimum 30 mm) Rp 140,000.00 112,000.00
1.20000 Kg Strorox - 100 Rp - -
2.10000 OH Pekerja Rp 35,000.00 73,500.00
0.35000 OH Tukang batu Rp 53,000.00 18,550.00
0.03500 OH Kepala tukang Rp 57,000.00 1,995.00
Jumlah 668,445.00
Total 668,445.00
PEKERJAAN PENGUNCI
H. 1 1 Bh Pasang Kunci Tanam Antik 314,500.00
1.00000 Bh Kunci Tanam antik Rp 280,000.00 280,000.00
0.06000 OH Pekerja Rp 35,000.00 2,100.00
0.60000 OH Tukang Kayu Rp 54,000.00 32,400.00
Jumlah 314,500.00
Total 314,500.00
H. 2 1 Bh Pasang Kunci Tanam Biasa 107,350.00
1.00000 Bh Kunci Tanam 2 Slag Rp 80,000.00 80,000.00
0.01000 OH Pekerja Rp 35,000.00 350.00
0.50000 OH Tukang Kayu Rp 54,000.00 27,000.00
Jumlah 107,350.00
Total 107,350.00
H. 3 1 Bh Pasang Kunci Tanam KM/WC 78,925.00
1.00000 Bh Kunci Tanam 1 Slag Rp 51,750.00 51,750.00
0.00500 OH Pekerja Rp 35,000.00 175.00
0.50000 OH Tukang Kayu Rp 54,000.00 27,000.00
Jumlah 78,925.00
Total 78,925.00
H. 4 1 Bh Pasang Kunci Selinder 97,175.00
1.00000 Bh Kunci Selinder Rp 70,000.00 70,000.00
0.00500 OH Pekerja Rp 35,000.00 175.00
0.50000 OH Tukang Kayu Rp 54,000.00 27,000.00
Jumlah 97,175.00
Total 97,175.00
H. 5 1 Bh Pasang Engsel Pintu 18,625.00
1.00000 Psg Engsel Pintu Rp 10,000.00 10,000.00
0.01500 OH Pekerja Rp 35,000.00 525.00
0.15000 OH Tukang Kayu Rp 54,000.00 8,100.00
Jumlah 18,625.00
Total 18,625.00
H. 6 1 Bh Pasang Engsel Jendela Kupu - Kupu 10,250.00
1.00000 Psg Engsel Jendela H Rp 4,500.00 4,500.00
0.01000 OH Pekerja Rp 35,000.00 350.00
0.10000 OH Tukang Kayu Rp 54,000.00 5,400.00
Jumlah 10,250.00
Total 10,250.00
H. 7 1 Bh Pasang Grendel Pintu/Jendela 12,750.00
1.00000 Bh Grendel Kecil Rp 7,000.00 7,000.00
0.01000 OH Pekerja Rp 35,000.00 350.00
0.10000 OH Tukang Kayu Rp 54,000.00 5,400.00
Jumlah 12,750.00
Total 12,750.00
H. 8 1 Bh Pasang Grendel Pintu/Jendela Besi 11,250.00
1.00000 Steel Grendel Besar Rp 5,500.00 5,500.00
0.01000 OH Pekerja Rp 35,000.00 350.00
0.10000 OH Tukang Kayu Rp 54,000.00 5,400.00
Jumlah 11,250.00
Total 11,250.00
H. 9 1 Bh Pasang Engsel angin-angin 10,250.00
1.00000 Bh Engsel Rp 4,500.00 4,500.00
0.01000 OH Pekerja Rp 35,000.00 350.00
0.10000 OH Tukang Kayu Rp 54,000.00 5,400.00
Jumlah 10,250.00
Total 10,250.00
H. 10 1 Bh Pasang Door Closer 68,750.00
1.00000 Bh Door Closer Rp 40,000.00 40,000.00
0.05000 OH Pekerja Rp 35,000.00 1,750.00
0.50000 OH Tukang Kayu Rp 54,000.00 27,000.00
Jumlah 68,750.00
Total 68,750.00
H. 11 1 Bh Pasang kunci Selot 40,200.00
1.00000 Bh Kunci Selot Rp 8,500.00 8,500.00
0.05000 OH Pekerja Rp 35,000.00 1,750.00
0.50000 OH Tukang Kayu Rp 54,000.00 27,000.00
0.05000 OH Kepala Tukang Rp 59,000.00 2,950.00
Jumlah 40,200.00
Total 40,200.00
H. 12 1 Bh Pasang Pegangan Pintu / Door Holder 191,700.00
1.00000 Bh Pegangan Pintu KW.1 Rp 160,000.00 160,000.00
0.05000 OH Pekerja Rp 35,000.00 1,750.00
0.50000 OH Tukang Kayu Rp 54,000.00 27,000.00
0.05000 OH Kepala Tukang Rp 59,000.00 2,950.00
Jumlah 191,700.00
Total 191,700.00
H. 13 1 m1 Pasang Rel pintu Dorong 70,880.00
1.00000 m1 Rel pintu dorong Rp 62,000.00 62,000.00
0.06000 OH Pekerja Rp 35,000.00 2,100.00
0.06000 OH Tukang Kayu Rp 54,000.00 3,240.00
0.06000 OH Kepala Tukang Rp 59,000.00 3,540.00
Jumlah 70,880.00
Total 70,880.00
H. 14 1 Bh Pasang Kait Angin Kecil 16,510.00
1.00000 Bh Kait Angin Kecil Rp 7,000.00 7,000.00
0.01500 OH Pekerja Rp 35,000.00 525.00
0.15000 OH Tukang Kayu Rp 54,000.00 8,100.00
0.01500 OH Kepala Tukang Rp 59,000.00 885.00
Jumlah 16,510.00
Total 16,510.00
H. 15 1 Bh Pasang Kait Angin Besar 22,010.00
1.00000 Bh Kait Angin Besar Rp 12,500.00 12,500.00
0.01500 OH Pekerja Rp 35,000.00 525.00
0.15000 OH Tukang Kayu Rp 54,000.00 8,100.00
0.01500 OH Kepala Tukang Rp 59,000.00 885.00
Jumlah 22,010.00
Total 22,010.00
H. 16 1 Bh Baut Diameter 12 mm 4,025.00
1.00000 Bh Baut Dia.12 mm Rp 3,500.00 3,500.00
0.01500 OH Pekerja Rp 35,000.00 525.00
Jumlah 4,025.00
Total 4,025.00
H. 17 1 Bh Baut Diameter 16 mm 4,275.00
1.00000 Bh Baut Dia.16 mm Rp 3,750.00 3,750.00
0.01500 OH Pekerja Rp 35,000.00 525.00
Jumlah 4,275.00
Total 4,275.00
H. 18 1 Bh Baut Diameter 19 mm 4,525.00
1.00000 Bh Baut Dia.19mm Rp 4,000.00 4,000.00
0.01500 OH Pekerja Rp 35,000.00 525.00
Jumlah 4,525.00
Total 4,525.00
H. 19 1 Bh angker Dia. 12 mm 4,025.00
1.00000 Bh Angker Kusen Rp 3,500.00 3,500.00
0.01500 OH Pekerja Rp 35,000.00 525.00
Jumlah 4,025.00
Total 4,025.00
H. 20 1 Bh Beugel U 40,525.00
1.00000 Bh Beugel U Rp 40,000.00 40,000.00
0.01500 OH Pekerja Rp 35,000.00 525.00
Jumlah 40,525.00
Total 40,525.00
H. 21 1 Bh Beugel Plat 40,525.00
1.00000 Bh Beugel Plat Rp 40,000.00 40,000.00
0.01500 OH Pekerja Rp 35,000.00 525.00
Jumlah 40,525.00
Total 40,525.00
H. 22 1 m2 Pasang Kaca, tebal 3 mm 66,925.00
1.10000 m 2
Kaca bening 3 mm Rp 53,000.00 58,300.00
0.01500 OH Pekerja Rp 35,000.00 525.00
0.15000 OH Tukang Kayu Rp 54,000.00 8,100.00
Jumlah 66,925.00
Total 66,925.00
1.10000 m 2
Kaca bening 5 mm Rp 64,000.00 70,400.00
0.01500 OH Pekerja Rp 35,000.00 525.00
0.15000 OH Tukang Kayu Rp 54,000.00 8,100.00
Jumlah 79,025.00
Total 79,025.00
H. 24 1 m2 Pasang Kaca Ryben, tebal 3 mm 76,825.00
1.10000 m 2
Kaca Ryben 5 mm Rp 62,000.00 68,200.00
0.01500 OH Pekerja Rp 35,000.00 525.00
0.15000 OH Tukang Kayu Rp 54,000.00 8,100.00
Jumlah 76,825.00
Total 76,825.00
H. 25 1 m2 Pasang Kaca Ryben, tebal 5 mm 94,025.00
1.10000 m2 Kaca Ryben 5 mm Rp 77,500.00 85,250.00
0.01500 OH Pekerja Rp 45,000.00 675.00
0.15000 OH Tukang Kayu Rp 54,000.00 8,100.00
Jumlah 94,025.00
Total 94,025.00
H. 26 1 m2 Pasang Glass Blok 459,487.50
25.00000 m2
Glas Blok 20 x 20 cm Rp 18,000.00 450,000.00
0.01650 OH Pekerja Rp 35,000.00 577.50
0.16500 OH Tukang Kayu Rp 54,000.00 8,910.00
Jumlah 459,487.50
Total 459,487.50
1.10000 m2
Kaca buram 5 mm + komplit Rp 110,000.00 121,000.00
0.02500 OH Pekerja Rp 35,000.00 875.00
0.25000 OH Tukang Kayu Rp 54,000.00 13,500.00
Jumlah 135,375.00
Total 135,375.00
PEKERJAAN FHINISING
I. 1 1 m2 Mendempul dan Menggosok kayu 6,940.00
0.08000 Kg Dempul jadi Rp 17,000.00 1,360.00
0.02000 Kg Minyak Cat Rp 11,000.00 220.00
0.01000 Kg batu Apung Rp 180,000.00 1,800.00
0.04000 OH Pekerja Rp 35,000.00 1,400.00
0.04000 OH Tukang cat Rp 54,000.00 2,160.00
Jumlah 6,940.00
Total 6,940.00
I. 2 1 m2 pengecatan Bidang kayu lama ( 1 lapis plamir), 1 lapis cat dasar, 27,286.00
2 lapis cat penutup
0.15000 Kg Plamir Rp 47,000.00 7,050.00
0.17000 Kg Cat dasar Rp 18,800.00 3,196.00
0.17000 Kg Cat penutup 2 kali Rp 62,000.00 10,540.00
0.07000 OH Pekerja Rp 35,000.00 2,450.00
0.07500 OH Tukang cat Rp 54,000.00 4,050.00
Jumlah 27,286.00
Total 27,286.00
I. 3 1 m2 pengecatan bidang kayu baru ( 1 lapis plamir), 1 lapis cat dasar, 32,602.00
2 lapis cat penutup
0.20000 Kg Cat Meni Rp 16,500.00 3,300.00
0.15000 Kg Plamir Rp 47,000.00 7,050.00
0.17000 Kg Cat dasar Rp 18,800.00 3,196.00
0.26000 Kg Cat penutup 2 kali Rp 62,000.00 16,120.00
0.07000 OH Pekerja Rp 35,000.00 2,450.00
0.00900 OH Tukang cat Rp 54,000.00 486.00
Jumlah 32,602.00
Total 32,602.00
Jumlah 42,333.60
Total 42,333.60
I. 5 1 m2 pelaburan bidang kayu dengan Cat residu dan teer 13,740.00
0.35000 Kg Teer Rp 20,000.00 7,000.00
0.10000 OH Pekerja Rp 35,000.00 3,500.00
0.06000 OH Tukang cat Rp 54,000.00 3,240.00
Jumlah 13,740.00
Total 13,740.00
I. 6 1 m2 pelaburan bidang kayu dengan Vernis 20,950.00
0.15000 Ltr Vernis Rp 32,000.00 4,800.00
0.05000 Kg Dempul jadi Rp 17,000.00 850.00
0.10000 Lbr Amplas Rp 9,500.00 950.00
0.01000 Bh Kuas Rp 11,000.00 110.00
0.16000 OH Pekerja Rp 35,000.00 5,600.00
0.16000 OH Tukang cat Rp 54,000.00 8,640.00
Jumlah 20,950.00
Total 20,950.00
I. 7 1 m2 Pengecetan Tembok baru 12,282.00
0.10000 Kg Plamir Rp 11,000.00 1,100.00
0.10000 Kg Cat dasar Rp 18,800.00 1,880.00
0.26000 Kg Cat Penutup 2 x kali Rp 20,000.00 5,200.00
0.02000 OH Pekerja Rp 35,000.00 700.00
0.06300 OH Tukang cat Rp 54,000.00 3,402.00
Jumlah 12,282.00
Total 12,282.00
I. 8 1 m2 Pengecetan Tembok lama 9,104.00
0.12000 Kg Cat dasar Rp 18,800.00 2,256.00
0.18000 Kg Cat Penutup 2 x kali Rp 20,000.00 3,600.00
0.02800 OH Pekerja Rp 35,000.00 980.00
0.04200 OH Tukang cat Rp 54,000.00 2,268.00
Jumlah 9,104.00
Total 9,104.00
I. 9 1 m2 Pengecetan Besi 1 x Meni 59,150.00
0.10000 Kg Meni besi Rp 16,500.00 1,650.00
0.36000 Kg Cat Besi Rp 38,000.00 13,680.00
0.47000 Ltr Minyak Cat Rp 26,000.00 12,220.00
2.00000 Lbr Amplas Rp 9,500.00 19,000.00
0.10000 Bh Kuas Rp 11,000.00 1,100.00
0.02000 OH Pekerja Rp 35,000.00 700.00
0.20000 OH Tukang cat Rp 54,000.00 10,800.00
Jumlah 59,150.00
Total 59,150.00
I. 10 1 m2 Mengecat Genteng 2 x Cat 22,501.00
0.12000 Kg Cat dasar Rp 18,800.00 2,256.00
0.18000 Kg Cat Penutup 2 x kali Rp 20,000.00 3,600.00
0.16700 OH Pekerja Rp 35,000.00 5,845.00
0.20000 OH Tukang cat Rp 54,000.00 10,800.00
Jumlah 22,501.00
Total 22,501.00
I. 11 1 m2 Pengecetan Plafond baru 19,820.00
0.10000 Kg Plamir Rp 47,000.00 4,700.00
0.10000 Kg Cat dasar Rp 18,800.00 1,880.00
0.26000 Kg Cat Penutup 2 x kali Rp 20,000.00 5,200.00
0.06000 OH Pekerja Rp 35,000.00 2,100.00
0.11000 OH Tukang cat Rp 54,000.00 5,940.00
Jumlah 19,820.00
Total 19,820.00
I. 12 1 m2 Pengecetan Plafond lama 15,120.00
0.10000 Kg Cat dasar Rp 18,800.00 1,880.00
0.26000 Kg Cat Penutup 2 x kali Rp 20,000.00 5,200.00
0.06000 OH Pekerja Rp 35,000.00 2,100.00
0.11000 OH Tukang cat Rp 54,000.00 5,940.00
Jumlah 15,120.00
Total 15,120.00
I. 13 1 m2 Pengecetan Rangka Baja Zygromet (IWF dan Canal) 18,670.00
0.1700 Kg Cat Besi zygromet Rp 70,000.00 11,900.00
0.07000 OH Pekerja Rp 35,000.00 2,450.00
0.08000 OH Tukang Cat Rp 54,000.00 4,320.00
Jumlah 18,670.00
Total 18,670.00
PEKERJAAN SANITAIR
J. 1 Memasang 1 Bh Closed Jongkok Porselin 307,160.00
1.00000 Bh Closed Jongkok Porselin Rp 100,000.00 100,000.00
6.00000 Kg Semen Portland Rp 1,060.00 6,360.00
0.01000 m3 Pasir Pasang Rp 80,000.00 800.00
1.00000 OH Pekerja Rp 35,000.00 35,000.00
1.50000 OH Tukang batu Rp 53,000.00 79,500.00
1.50000 OH Kepala Tukang Rp 57,000.00 85,500.00
Jumlah 307,160.00
Total 307,160.00
J. 2 Memasang 1 Bh Closed Jongkok Teraso 216,210.00
1.00000 Bh Closed Jongkok Teraso Rp 75,000.00 75,000.00
7.00000 Bh Bata Merah 5x11x22 cm Rp 350.00 2,450.00
6.00000 Kg Semen Portland Rp 1,060.00 6,360.00
0.01000 m3 Pasir Pasang Rp 80,000.00 800.00
1.00000 OH Pekerja Rp 35,000.00 35,000.00
1.50000 OH Tukang batu Rp 53,000.00 79,500.00
0.30000 OH Kepala Tukang Rp 57,000.00 17,100.00
Jumlah 216,210.00
Total 216,210.00
J. 3 Memasang 1 Bh Closed Duduk Porselin 1,707,160.00
1.00000 Bh Closed Duduk + Acesories Rp 1,500,000.00 1,500,000.00
6.00000 Kg Semen Portland Rp 1,060.00 6,360.00
0.01000 m3 Pasir Pasang Rp 80,000.00 800.00
1.00000 OH Pekerja Rp 35,000.00 35,000.00
1.50000 OH Tukang batu Rp 53,000.00 79,500.00
1.50000 OH Kepala Tukang Rp 57,000.00 85,500.00
Jumlah 1,707,160.00
Total 1,707,160.00
J. 4 Memasang 1 Bh Closed Duduk Porselin (K.W I Super) 2,707,160.00
1.00000 Bh Closed Duduk Merk Toto + Acesories Rp 2,500,000.00 2,500,000.00
6.00000 Kg Semen Portland Rp 1,060.00 6,360.00
0.01000 m3 Pasir Pasang Rp 80,000.00 800.00
1.00000 OH Pekerja Rp 35,000.00 35,000.00
1.50000 OH Tukang batu Rp 53,000.00 79,500.00
1.50000 OH Kepala Tukang Rp 57,000.00 85,500.00
Jumlah 2,707,160.00
Total 2,707,160.00
J. 5 Memasang 1 Bh Bak Mandi Porselin 782,880.00
1.00000 Bh Bak Mandi Porselin KW.1 Rp 520,000.00 520,000.00
Perlengkapan (0,5 % x harga Bak) Rp 26,000.00 26,000.00
1.80000 OH Pekerja Rp 35,000.00 63,000.00
2.70000 OH Tukang batu Rp 53,000.00 143,100.00
0.54000 OH Kepala Tukang Rp 57,000.00 30,780.00
Jumlah 782,880.00
Total 782,880.00
J. 6 Memasang 1 Bh Bak Mandi Teraso 215,410.00
1.00000 Bh Bak Mandi Teraso 50x50 cm Rp 95,000.00 95,000.00
6.00000 Kg Semen Portland Rp 1,060.00 6,360.00
0.01000 m3 Pasir Pasang Rp 80,000.00 800.00
2.10000 OH Pekerja Rp 35,000.00 73,500.00
0.75000 OH Tukang batu Rp 53,000.00 39,750.00
Jumlah 215,410.00
Total 215,410.00
J. 7 Memasang 1 Bh Bak Mandi Plastik 437,100.00
1.00000 Bh Bak Mandi Plastik Kapasitas 0.5 m3 Rp 220,000.00 220,000.00
Perlengkapan (0,5 % x harga Bak) Rp 11,000.00 11,000.00
1.80000 OH Pekerja Rp 35,000.00 63,000.00
2.70000 OH Tukang batu Rp 53,000.00 143,100.00
Jumlah 437,100.00
Total 437,100.00
J. 8 Memasang 1 Bh Bath Tub 3,649,380.00
1.00000 Bh Bath Tub Porselin Ukuran 170x74x40 cm Rp 3,250,000.00 3,250,000.00
Perlengkapan (0,5 % x harga Bak) Rp 162,500.00 162,500.00
1.80000 OH Pekerja Rp 35,000.00 63,000.00
2.70000 OH Tukang batu Rp 53,000.00 143,100.00
0.54000 OH Kepala Tukang Rp 57,000.00 30,780.00
Jumlah 3,649,380.00
Total 3,649,380.00
J. 9 Memasang 1 Bh Urinoir 1,163,360.00
1.00000 Bh Urinoir Porselin Rp 850,000.00 850,000.00
Perlengkapan (25 % x harga Urinoir) Rp 212,500.00 212,500.00
6.00000 Kg Semen Portland Rp 1,060.00 6,360.00
0.01000 m3 Pasir Pasang Rp 80,000.00 800.00
1.00000 OH Pekerja Rp 35,000.00 35,000.00
1.00000 OH Tukang batu Rp 53,000.00 53,000.00
0.10000 OH Kepala Tukang Rp 57,000.00 5,700.00
Jumlah 1,163,360.00
Total 1,163,360.00
J. 10 Memasang 1 m' Pipa Stenlis dia 2" 135,282.00
1.20000 m 1
Pipa Stenlis Dia 2 " Rp 90,000.00 108,000.00
Pengelasaan (25 % x harga pipa) Rp 22,500.00 22,500.00
0.03600 OH Pekerja Rp 35,000.00 1,260.00
0.06000 OH Tukang batu Rp 53,000.00 3,180.00
0.00600 OH Kepala Tukang Rp 57,000.00 342.00
Jumlah 135,282.00
Total 135,282.00
J. 11 Memasang 1 m' PVC Water Stop lebar 230 mm - 320 mm 5,148.00
1.05000 m 1
Water Stop lebar 230 mm - 320 mm Rp - -
0.08000 OH Pekerja Rp 35,000.00 2,800.00
0.04000 OH Tukang batu Rp 53,000.00 2,120.00
0.00400 OH Kepala Tukang Rp 57,000.00 228.00
Jumlah 5,148.00
Total 5,148.00
J. 12 Memasang 1 m' PVC Water Stop lebar 200 mm 4,533.00
1.05000 m1 Water Stop lebar 200 mm Rp - -
0.07000 OH Pekerja Rp 35,000.00 2,450.00
0.03500 OH Tukang batu Rp 53,000.00 1,855.00
0.00400 OH Kepala Tukang Rp 57,000.00 228.00
Jumlah 4,533.00
Total 4,533.00
J. 13 Memasang 1 m' PVC Water Stop lebar 150 mm 3,861.00
1.05000 m1 Water Stop lebar 150 mm Rp - -
0.06000 OH Pekerja Rp 35,000.00 2,100.00
0.03000 OH Tukang batu Rp 53,000.00 1,590.00
0.00300 OH Kepala Tukang Rp 57,000.00 171.00
Jumlah 3,861.00
Total 3,861.00
REKAPITULASI
KEGIATAN : PEMBANGUNAN DAN REHABILITASI SD / SDLB MELALUI DAK BIDANG PENDIDIKAN
DIKPORA KAB. DOMPU
PEKERJAAN : PEMBANGUNAN 3 RKB SDN No. 01 MANGGELEWA
NAMA SEKOLAH : SDN No. 01 MANGGELEWA
LOKASI : KABUPATEN DOMPU
TAHUN ANGGARAN : 2009
JUMLAH HARGA
No URAIAN PEKERJAAN
(Rp)
Mengetahui ,
Pejabat Pelaksana Tehnis Kegiatan Pengguna Anggaran
Dinas Pendidikan Pemuda dan Olahraga Dinas Pendidikan Pemuda dan Olahraga
Kabupaten Dompu Kabupaten Dompu
...................................... ......................................
NIP. ............................... NIP. ...............................
PEMERINTAH KABUPATEN DOMPU
DINAS PENDIDIKAN PEMUDA DAN OLAHRAGA
Jalan Seokarno - Hatta No. 17A - DOMPU Telp. (0373) 21182-21040
I PEKERJAAN PERSIAPAN
1 Pek. Kusen Pintu dan Jendela 0.74 M3 D. 36 Rp. 4,528,750.00 Rp. 3,346,308.59
2 Pek. Daun Pintu Panil Kayu Klas II 1.86 M2 D. 23 Rp. 338,850.00 Rp. 629,718.84
3 Pek. Daun Jendela Kaca 3 mm 6.34 M2 D. 32 Rp. 273,400.00 Rp. 1,734,066.84
4 Memasang Kaca Mati 5 mm 5.17 M2 D. 106 Rp. 77,650.00 Rp. 401,139.90
5 Pas. Krepiak Jelusi Mati Kusen 6.99 M2 D. 18 Rp. 298,700.00 Rp. 2,087,554.56
Rp. 8,198,788.73
VII PEKERJAAN KAP, PENUTUP ATAP DAN PLAFOND
1 Pas. Penutup Atap Genteng Metal 123.94 M2 E. 15 Rp. 67,220.00 Rp. 8,330,977.92
2 Pas. Bubungan Genteng Metal 9.60 M1 E. 16 Rp. 101,035.00 Rp. 969,936.00
3 Pas. Lisplank 2x3/20 45.02 M1 D. 4 Rp. 45,995.00 Rp. 2,070,694.90
4 Pas. Plafond Tripleks 85.44 M2 F. 9 Rp. 30,670.00 Rp. 2,620,444.80
5 Pas. Rangka Langit-langit 85.44 M2 D. 85 Rp. 70,548.00 Rp. 6,027,621.12
6 Pas. Lis Plafond 73.82 M1 F. 18 Rp. 11,730.00 Rp. 865,908.60
7 Pek. Kayu Kuda-kuda 0.59 M3 D. 73 Rp. 3,952,800.00 Rp. 2,324,625.87
8 Pek. Kayu Gording, Balok Tembok, Jurai dan Nok 0.65 M3 D. 78 Rp. 3,570,280.00 Rp. 2,311,827.71
9 Kayu Konsol Depan 0.38 M3 D. 105 Rp. 3,953,200.00 Rp. 1,507,402.60
Rp. 27,029,439.51
NO. HARGA SAT. JUMLAH HARGA
No URAIAN PEKERJAAN VOL SAT. (Rp) (Rp)
ANAL.
(0,3*$I$25)-(0,3*3)+(0,15*16)
5 Pek. Pas. Dinding Terasram 1 Pc : 3 Ps 0.00 x 30.00 = 0.00 m2 - 0.00 = - m2
3 Pas. Lantai Keramik 20x20 cm, Anti Slip (Km/Wc) 0.90 x 0.00 x 2.00 = - M2
2 Pek. Daun Pintu Panil Kayu Klas II 0.92 x 2.02 x 1.00 = 1.86 M2
3 Pek. Daun Pintu Teakwood Lapis Formika Rangka Ekspose = 0.82 x 2.02 x 0.00 = - M2
6 Pas. Krepiak Jelusi Mati Kusen 2,24*0,35*14 2.24 x 0.35 x 6.00 = 4.70 M2
1.16 x 6.00 6.9888
X PEKERJAAN PENGECATAN
3 Pengecatan Dinding Tembok Baru 195.65 = 195.65 m2
3 Pengecatan Bidang Kayu JVA
Pinggir 0.25 x 7.38 x 5.00 = 9.23
Tengah 0.38 x 5.14 x 5.00 = 9.77
Krepiak 0.30 x 6.18 x 5.00 = 9.27
PJVA
Pinggir 0.25 x 5.94 x 1.00 = 1.49
Tengah 0.38 x 2.97 x 1.00 = 1.13
Krepiak 0.30 x 4.32 x 1.00 = 1.30
PINTU
Pinggir 0.25 x 5.96 x 1.00 = 1.49
Tengah 0.38 x 1.02 x 1.00 = 0.39
Krepiak 0.30 x 2.76 x 1.00 = 0.83
GEVEL
Pinggir 0.25 x 3.30 x 2.00 = 1.65
Krepiak 0.30 x 2.16 x 2.00 = 1.30
= 37.82 m2
XI PEKERJAAN SANITAIR
1 Pas. Closed Jongkok = 2.00 bh
2 Pas. Bak Air Mandi Plastik = 2.00 bh
2 Pas. Kran Air Biasa = 2.00 bh
3 Pas. Saringan Air Besi = 2.00 bh
4 Pas. Pipa 1/2 inci = 12.00 M1
5 Pas. Pipa 3 inci = 6.00 M1
6 Septiktank Kapasitas 1 m3 = 1.00 bh