LAMPIRAN - CCO

KEGIATAN : DINAS PEKERJAAN UMUM PROVINSI MALUKU UTARA


PEKERJAAN : PEMBANGUNAN DRAINASE KAWASAN STRATEGIS PROVINSI - MATUTING
NOMOR KONTRAK : 600.690/SPK/DPUPR-MU/CK/APBD/FISIK-29/2020
TANGGAL KONTRAK : 09 APRIL 2020
LOKASI : DESA MATUTING KAB. HALMAHERA SELATAN
TAHUN ANGARAN : APBD TAHUN ANGGARAN 2020

Kontrak Kontrak Perubahan Kontrak Baru

Pekerjaan Kurang Pekerjaan Tambah


No. Uraian Pekerjaan Sat. Ket.
Harga Satuan
Volume Jumlah Harga (Rp) Jumlah Harga Jumlah Harga Volume Jumlah Harga (Rp)
(Rp)
Volume Volume
( Rp ) ( Rp )
I. PEKERJAAN PERSIAPAN
1 Barak Kerja/Sewa Gudang Ls 1.00 5,000,000.00 5,000,000.00 - - - - 1.000 5,000,000.00 Tetap
2 Pembersihan Awal dan Akhir Ls 1.00 2,200,000.00 2,200,000.00 - - - - 1.000 2,200,000.00 Tetap
3 Pengukuran Ls 1.00 2,200,000.00 2,200,000.00 - - - - 1.000 2,200,000.00 Tetap
4 Mobilisai/Demobilisasi Ls 1.00 2,600,000.00 2,600,000.00 - - - - 1.000 2,600,000.00 Tetap
5 Papan Nama Proyek Ls 1.00 567,000.00 567,000.00 - - - - 1.000 567,000.00 Tetap
6 Dokumentasi / Asbuild Drawing Ls 1.00 15,000,000.00 15,000,000.00 - - - - 1.000 15,000,000.00 Tetap
27,567,000.00
II. PEMBUATAN DRAINASE
1 Galian Tanah Biasa M3 127.84 92,075.00 11,770,868.00 - - 0.94 86,571.29 128.78 11,857,439.29 Tambah
2 Pasangan Pondasi batu Kali 1 : 4 M3 55.93 1,401,947.00 78,410,895.71 - - 8.46 11,860,629.89 64.39 90,271,525.60 Tambah
3 Pasangan Batu Kosong M3 7.52 773,760.60 5,818,679.71 0.65 504,276.257 - - 6.87 5,314,403.45 Kurang
4 Rabat Beton 1 : 3 : 5 M3 3.76 1,358,882.00 5,109,396.32 0.33 442,806.166 - - 3.43 4,666,590.15 Kurang
5 Plesteran 1 : 3 M2 319.60 94,351.38 30,154,701.05 62.04 5,853,517.008 - - 257.56 24,301,184.04 Kurang
131,264,540.79
III. PEMBUATAN PLAT DECKER
1 Galian Tanah Biasa M3 4.95 92,075.00 455,771.25 4.95 455,771.25 - - 0.00 - Kurang
2 Pasangan Pondasi batu Kali 1 : 4 M3 2.45 1,401,947.00 3,434,770.15 2.45 3,434,770.15 - - 0.00 - Kurang
3 Pasangan Batu Kosong M3 0.20 773,760.60 154,752.12 0.20 154,752.12 - - 0.00 - Kurang
4 Rabat Beton 1 : 3 : 5 M3 0.10 1,358,882.00 135,888.20 0.10 135,888.20 - - 0.00 - Kurang
5 Plesteran 1 : 3 M2 6.00 94,351.38 566,108.28 6.00 566,108.28 - - 0.00 - Kurang
6 Plat Beton M3 0.54 6,655,195.83 3,593,805.75 0.06 399,311.75 - - 0.48 3,194,494.00 Kurang
8,341,095.75

JUMLAH 167,172,636.54 11,947,201.18 11,947,201.18 167,172,636.54


PPn 10% 16,717,263.65 16,717,263.65
TOTAL 183,889,900.19 183,889,900.19
DIBULATKAN 183,889,000.00 183,889,000.00

UNSUR PROYEK : UNSUR KONTRAKTOR :

1. Moh. Rizal Usman, ST 1. Muhdi A. Saleh


Nip. 19820921 201001 1 005 Direktur
................................................. ..............................................

2. Yakub, SE
Nip. 19800424 200501 1 013
.................................................

3. Rivaldy A. Talib
Nip. 19771226 200312 1 005
..................................................
0.10

0.20
0.50

0.25 0.25
Pasangan Batu Kali

Pekerjaan Drainase
Pekerjaan Luas Panjang Volume Harga Satuan Total Harga
Galian Tanah 0.576 690 397 37,792.18 15,020,124.02
Pasangan Batu Kali 0.324 690 223.56 956,791.65 213,900,341.27
Plesteran 2.0438 690 1,410 53,531.50 75,491,298.99
Rabat Beton 0.036 690 25 1,121,709.93 27,863,274.66
Pasir urug
Total 332,275,039
Jalan Setapak
Pekerjaan P L T VOL Harga Satuan Total Harga
Rabat Beton 72 2.2 0.1 15.84 1,121,709.93 17,767,885.29
P. Pondasi Batu Kosong 72 1.7 0.45 55.08 773,760.60 42,618,733.85
Pasir Urug

Galian Tanah 72 0.25 0.2 7.2 92,075.00 662,940.00


Pasangan Batu Kali 72 0.25 0.7 25.2 1,401,947.00 35,329,064.40
96,378,623.54

Jalan Setapak
Rabat Beton 77.5 2.2 0.1 17.05 1,121,709.93 19,125,154.31
P. Batu Kosong 77.5 1.95 0.2 30.225 773,760.60 23,386,914.14

Galian Tanah 77.5 0.25 0.2 7.75 92,075.00 713,581.25


Pasangan Batu Kali 77.5 0.25 0.5 19.375 1,401,947.00 27,162,723.13
70,388,372.82
Rabat Beton 29 2.25 0.1 6.525 1,121,709.93 7,319,157.29
P. Pondasi Batu Kosong 29 1.75 0.2 10.15 773,760.60 7,853,670.09

Galian Tanah 29 0.25 0.2 2.9 92,075.00 267,017.50


Pasangan Batu Kali 29 0.25 0.5 7.25 1,401,947.00 10,164,115.75
25,603,960.63
Rabat Beton 73 2.2 0.1 16.06 1,121,709.93 18,014,661.48
P. Pondasi Batu Kosong 73 1.7 0.2 24.82 773,760.60 19,204,738.09

Galian Tanah 73 0.25 0.2 7.3 92,075.00 672,147.50


Pasangan Batu Kali 73 0.25 0.5 18.25 1,401,947.00 25,585,532.75
63,477,079.82
Total
Rabat Beton 27 1.5 0.1 4.05 1,121,709.93 4,542,925.22
P. Pondasi Batu Kosong 27 1 0.2 5.4 773,760.60 4,178,307.24

Galian Tanah 27 0.25 0.2 2.7 92,075.00 248,602.50


Pasangan Batu Kali 27 0.25 0.5 6.75 1,401,947.00 9,463,142.25
18,432,977.21
Total
Rabat Beton 17 4.35 0.1 7.395 1,121,709.93 8,295,044.93
P. Pondasi Batu Kosong 17 3.85 0.2 13.09 773,760.60 10,128,526.25

Galian Tanah 17 0.25 0.2 1.7 92,075.00 156,527.50


Pasangan Batu Kali 17 0.25 0.5 4.25 1,401,947.00 5,958,274.75
24,538,373.44
Rabat Beton 162.3 2.75 0.1 44.6325 1,121,709.93 50,064,718.45
P. Pondasi Batu Kosong 162.3 2.25 0.2 73.035 773,760.60 56,511,605.42

Galian Tanah 162.3 0.25 0.2 16.23 92,075.00 1,494,377.25


Pasangan Batu Kali 162.3 0.25 0.5 40.575 1,401,947.00 56,883,999.53
164,954,700.65
Rabat Beton 11 4.25 0.1 4.675 1,121,709.93 5,243,993.92
P. Pondasi Batu Kosong 11 3.75 0.45 18.5625 773,760.60 14,362,931.14

Galian Tanah 11 0.25 0.2 1.1 92,075.00 101,282.50


Pasangan Batu Kali 11 0.25 0.75 4.125 1,401,947.00 5,783,031.38
25,491,238.94
Rabat Beton 23.5 3.03 0.1 7.1205 1,121,709.93 7,987,135.56
P. Pondasi Batu Kosong 23.5 2.53 0.2 11.891 773,760.60 9,200,787.29

Galian Tanah 23.5 0.25 0.2 2.35 92,075.00 216,376.25


Pasangan Batu Kali 23.5 0.25 0.5 5.875 1,401,947.00 8,236,438.63
25,640,737.73
Rabat Beton 52 2.5 0.1 13 1,121,709.93 14,582,229.09
P. Pondasi Batu Kosong 52 2 0.2 20.8 773,760.60 16,094,220.48

Galian Tanah 52 0.25 0.2 5.2 92,075.00 478,790.00


Pasangan Batu Kali 52 0.25 0.5 13 1,401,947.00 18,225,311.00
49,380,550.57
TOTAL 564,286,615.33

ANGGARAN 167,172,636.54
Jumlah 896,561,654.28

Sisa (729,389,017.74)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : DINAS PEKERJAAN UMUM PROVINSI MALUKU UTARA
PEKERJAAN : PEMBANGUNAN KANTOR DINAS PEKERJAAN UMUM TAHAP IV
LOKASI : MATANTENGIN - KABUPATEN HALMAHERA SELATAN
TAHUN ANGARAN : APBD TAHUN ANGGARAN 2014

HARGA SATUAN JUMLAH HARGA


No. URAIAN SATUAN VOLUME
( Rp ) ( Rp )
I. PEKERJAAN PERSIAPAN
1 Barak Kerja/Sewa Gudang Ls 1.00 6,000,000.00 6,000,000.00
2 Pembersihan Awal dan Akhir Ls 1.00 2,000,000.00 2,000,000.00
3 Pengukuran Ls 1.00 2,000,000.00 2,000,000.00
4 Mobilisai/Demobilisasi Ls 1.00 4,500,000.00 4,500,000.00
5 Papan Nama Proyek Ls 1.00 500,000.00 500,000.00
6 Dokumentasi / Asbuild Drawing Ls 5.00 500,000.00 2,500,000.00

II. PEMBUATAN DRAINASE T S1


1 Galian Tanah Biasa M3 #REF! 37,792.18 #REF!
2 Pasangan Pondasi batu Kali 1 : 4 M3 #REF! 956,791.65 #REF!
3 Pasir Urug M3 #REF! 466,030.71 #REF!
4 Rabat Beton 1 : 3 : 5 M3 #REF! 1,121,709.93 #REF!
5 Plesteran 1 : 3 M2 #REF! 53,531.50 #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #NAME?
NO Uraian Pekerjaan Volume Satuan Analisa Total

1 Volume Abutmen 10.08 m3 956,791.65 9,644,459.83


2 Galian Tanah 4.68 m3 37,792.18 176,867.40
3 Lantai Cor 5.52 m3 2,788,257.11 15,391,179.25
4 Balok Gelagar 25/50 1.5 m3 2,788,257.11 4,182,385.67
5 Tiang 0.1035 m3 2,788,257.11 288,584.61
6 Besi Ø 16 17 Staff
7 Besi Ø 12 10 Staff
8 Besi Ø 8 21 Staff
9 Pipa 2 " 20 m 200,000.00 4,000,000.00
JUMLAH 33,683,476.76