Pasangan Batu Kali
Pekerjaan Drainase
Pekerjaan Luas Panjang Volume Harga Satuan Total Harga
Galian Tanah 0.576 690 397 37,792.18 15,020,124.02
Pasangan Batu Kali 0.324 690 223.56 956,791.65 213,900,341.27
Plesteran 2.0438 690 1,410 53,531.50 75,491,298.99
Rabat Beton 0.036 690 25 1,121,709.93 27,863,274.66
Pasir urug
Total 332,275,039
Jalan Setapak
Pekerjaan P L T VOL Harga Satuan Total Harga
Rabat Beton 72 2.2 0.1 15.84 1,121,709.93 17,767,885.29
P. Pondasi Batu Kosong 72 1.7 0.45 55.08 773,760.60 42,618,733.85
Pasir Urug
Jalan Setapak
Rabat Beton 77.5 2.2 0.1 17.05 1,121,709.93 19,125,154.31
P. Batu Kosong 77.5 1.95 0.2 30.225 773,760.60 23,386,914.14
ANGGARAN 167,172,636.54
Jumlah 896,561,654.28
Sisa (729,389,017.74)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : DINAS PEKERJAAN UMUM PROVINSI MALUKU UTARA
PEKERJAAN : PEMBANGUNAN KANTOR DINAS PEKERJAAN UMUM TAHAP IV
LOKASI : MATANTENGIN - KABUPATEN HALMAHERA SELATAN
TAHUN ANGARAN : APBD TAHUN ANGGARAN 2014
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #NAME?
NO Uraian Pekerjaan Volume Satuan Analisa Total