Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 1 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 2 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 3 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 4 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
3.5.1.3 Type P1
Kaca tempered 12 mm m2 5.94 950,000.00 5,643,000.00 0.028 5.940 950,000.000
Patch fitting(atas) bh 3.00 1,140,000.00 3,420,000.00 0.017 3.000 1,140,000.000
Patch fitting(bawah) bh 3.00 1,140,000.00 3,420,000.00 0.017 6.000 1,140,000.000
Handle pintu type Pull handle psg 3.00 2,385,000.00 7,155,000.00 0.036 3.000 2,385,000.000
Kunci tanam bh 3.00 352,000.00 1,056,000.00 0.005 3.000 352,000.000
Lock case tanam bh 3.00 740,000.00 2,220,000.00 0.011 3.000 740,000.000
Engsel tanam/Floor hinge bh 3.00 1,050,000.00 3,150,000.00 0.016 6.000 1,050,000.000
3.5.1.4 Type P1a
Kusen aluminium m1 161.20 754,000.00 121,544,800.00 0.605 147.900 754,000.000
bingkai pintu aluminum m1 186.00 275,000.00 51,150,000.00 0.255 162.400 275,000.000
Kaca bening 5 mm m2 49.60 280,000.00 13,888,000.00 0.069 46.400 280,000.000
engsel pintu dia 4 bh 62.00 85,066.00 5,274,092.00 0.026 58.000 85,066.000
Pegangan pintu psg 31.00 460,000.00 14,260,000.00 0.071 29.000 460,000.000
Kunci lockies bh 31.00 270,000.00 8,370,000.00 0.042 29.000 270,000.000
Fisher bh 279.00 22,000.00 6,138,000.00 0.031 261.000 22,000.000
3.5.1.5 Type P1b Toilet
Kusen aluminium m1 52.00 754,000.00 39,208,000.00 0.195 66.300 754,000.000
Daun pintu aluminum m2 17.20 490,000.00 8,428,000.00 0.042 21.840 490,000.000
Pegangan pintu psg 10.00 460,000.00 4,600,000.00 0.023 13.000 460,000.000
Kunci lockies bh 10.00 270,000.00 2,700,000.00 0.013 13.000 270,000.000
engsel pintu dia 4 bh 20.00 85,066.00 1,701,320.00 0.008 26.000 85,066.000
Fisher bh 90.00 22,000.00 1,980,000.00 0.010 234.000 22,000.000
3.5.1.6 Type P2
Kaca tempered 12 mm m2 3.96 950,000.00 3,762,000.00 0.019 3.960 950,000.000
Patch fitting(atas) bh 2.00 1,140,000.00 2,280,000.00 0.011 2.000 1,140,000.000
Patch fitting(bawah) bh 2.00 1,140,000.00 2,280,000.00 0.011 4.000 1,140,000.000
Handle pintu type Pull handle psg 2.00 2,385,000.00 4,770,000.00 0.024 2.000 2,385,000.000
Kunci tanam bh 1.00 352,000.00 352,000.00 0.002 1.000 352,000.000
Lock case tanam bh 1.00 740,000.00 740,000.00 0.004 1.000 740,000.000
Engsel tanam/Floor hinge bh 1.00 1,050,000.00 1,050,000.00 0.005 4.000 1,050,000.000
Alat bantu dan perlengkapan ls 1.00 1,038,000.00 1,038,000.00 0.005 1.000 1,038,000.000
3.5.1.7 Type P2a (daun pintu sama besar )
Kusen aluminium m1 30.00 754,000.00 22,620,000.00 0.113 19.500 754,000.000
bingkai pintu aluminum m1 58.40 490,000.00 28,616,000.00 0.142 35.400 490,000.000
Kaca bening 5 mm m2 15.37 280,000.00 4,303,600.00 0.021 12.416 280,000.000
Pegangan pintu psg 10.00 460,000.00 4,600,000.00 0.023 10.000 460,000.000
Kunci lockies bh 5.00 270,000.00 1,350,000.00 0.007 5.000 270,000.000
engsel pintu dia 4 bh 20.00 85,066.00 1,701,320.00 0.008 30.000 85,066.000
Grendel tanam bh 5.00 290,000.00 1,450,000.00 0.007 5.000 290,000.000
Fisher bh 50.00 22,000.00 1,100,000.00 0.005 90.000 22,000.000
3.5.1.8 Type P2b (daun pintu besar & kecil )
Kusen aluminium m1 23.20 754,000.00 17,492,800.00 0.087 18.500 754,000.000
bingkai pintu aluminum m1 45.12 490,000.00 22,108,800.00 0.110 52.800 490,000.000
Kaca bening 5 mm m2 10.66 280,000.00 2,984,800.00 0.015 6.286 280,000.000
Pegangan pintu psg 4.00 460,000.00 1,840,000.00 0.009 3.000 460,000.000
Kunci lockies bh 4.00 270,000.00 1,080,000.00 0.005 3.000 270,000.000
engsel pintu dia 4 bh 16.00 85,066.00 1,361,056.00 0.007 18.000 85,066.000
Grendel tanam bh 4.00 290,000.00 1,160,000.00 0.006 3.000 290,000.000
Fisher bh 40.00 22,000.00 880,000.00 0.004 30.000 22,000.000
3.5.1.9 Type P2f ( servis ) -
Kusen aluminium m1 5.30 754,000.00 3,996,200.00 0.020
Doubel teak wood m2 1.58 740,000.00 1,169,200.00 0.006
Pegangan pintu psg 1.00 460,000.00 460,000.00 0.002
engsel pintu dia 4 bh 3.00 270,000.00 810,000.00 0.004
Grendel tanam bh 1.00 85,066.00 85,066.00 0.000
Fisher bh 10.00 290,000.00 2,900,000.00 0.014
3.5.1.10 Type J3
Kusen aluminium m1 208.56 754,000.00 157,254,240.00 0.783 208.560 754,000.000
Daun jendela aluminum m1 273.24 245,000.00 66,943,800.00 0.333 273.240 245,000.000
Kaca bening 5 mm m2 43.35 280,000.00 12,138,000.00 0.060 43.350 280,000.000
Casement 16 psg 72.00 108,000.00 7,776,000.00 0.039 72.000 108,000.000
Casement 12 psg 72.00 86,500.00 6,228,000.00 0.031 72.000 86,500.000
Grendel jendela bh 72.00 75,000.00 5,400,000.00 0.027 72.000 75,000.000
Fisher bh 144.00 22,000.00 3,168,000.00 0.016 144.000 22,000.000
3.5.1.11 Type V3
Laporan Mingguan - 5 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 6 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 7 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
3.5.2.7 Type J1
Cladding kaca m1 18.04 310,000.00 5,592,400.00 0.028 18.040 310,000.000
Kaca bening 6 mm m2 4.53 390,000.00 1,766,700.00 0.009 4.530 390,000.000
Fisher bh 8.00 22,000.00 176,000.00 0.001 8.000 22,000.000
3.5.2.8 Type J2
Kusen aluminium m1 167.20 754,000.00 126,068,800.00 0.627 167.200 754,000.000
Daun jendela aluminum m1 190.08 245,000.00 46,569,600.00 0.232 190.080 245,000.000
Kaca bening 5 mm m2 42.61 280,000.00 11,930,800.00 0.059 42.610 280,000.000
Casement 16 psg 64.00 108,000.00 6,912,000.00 0.034 64.000 108,000.000
Grendel jendela bh 64.00 75,000.00 4,800,000.00 0.024 64.000 75,000.000
Fisher bh 64.00 22,000.00 1,408,000.00 0.007 64.000 22,000.000
3.5.2.9 Type J3
Kusen aluminium m1 347.60 754,000.00 262,090,400.00 1.304 347.600 754,000.000
Daun jendela aluminum m1 455.40 245,000.00 111,573,000.00 0.555 455.400 245,000.000
Kaca bening 5 mm m2 72.26 280,000.00 20,232,800.00 0.101 72.260 280,000.000
Casement 16 psg 120.00 108,000.00 12,960,000.00 0.065 120.000 108,000.000
Casement 12 psg 120.00 86,500.00 10,380,000.00 0.052 120.000 86,500.000
Grendel jendela bh 120.00 75,000.00 9,000,000.00 0.045 120.000 75,000.000
Fisher bh 240.00 22,000.00 5,280,000.00 0.026 240.000 22,000.000
3.5.2.10 Type J7
Cladding kaca m1 67.10 310,000.00 20,801,000.00 0.104 67.100 310,000.000
Kaca bening 6 mm m2 32.71 390,000.00 12,756,900.00 0.063 32.710 390,000.000
Fisher bh 14.00 22,000.00 308,000.00 0.002 14.000 22,000.000
3.5.2.11 Type J8
Cladding kaca m1 74.48 310,000.00 23,088,800.00 0.115 74.480 310,000.000
Kaca bening 6 mm m2 33.48 390,000.00 13,057,200.00 0.065 33.480 390,000.000
Fisher bh 32.00 22,000.00 704,000.00 0.004 32.000 22,000.000
3.5.2.12 Type J2a
Kusen aluminium m1 38.00 754,000.00 28,652,000.00 0.143 38.000 754,000.000
Daun jendela aluminum m1 41.60 245,000.00 10,192,000.00 0.051 41.600 245,000.000
Kaca bening 5 mm m2 10.53 280,000.00 2,948,400.00 0.015 10.530 280,000.000
Casement 16 psg 16.00 108,000.00 1,728,000.00 0.009 16.000 108,000.000
Grendel jendela bh 8.00 75,000.00 600,000.00 0.003 8.000 75,000.000
Fisher bh 40.00 22,000.00 880,000.00 0.004 40.000 22,000.000
3.5.2.13 Type V3
Kusen aluminium m1 26.40 754,000.00 19,905,600.00 0.099 26.400 754,000.000
Daun jendela aluminum m1 27.72 245,000.00 6,791,400.00 0.034 27.720 245,000.000
Kaca bening 5 mm m2 3.23 280,000.00 904,400.00 0.005 3.230 280,000.000
Casement 12 psg 18.00 86,500.00 1,557,000.00 0.008 18.000 86,500.000
Grendel jendela bh 9.00 75,000.00 675,000.00 0.003 9.000 75,000.000
Fisher bh 24.00 22,000.00 528,000.00 0.003 24.000 22,000.000
Laporan Mingguan - 8 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 9 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 10 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 11 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 12 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Gate Valve dia.50 mm unit 1.00 850,000.00 850,000.00 0.004 1.000 850,000.000
Gate Valve dia.40 mm unit 2.00 580,000.00 1,160,000.00 0.006 2.000 580,000.000
Gate Valve dia.25 mm unit 1.00 455,000.00 455,000.00 0.002 1.000 455,000.000
Gate Valve dia.15 mm unit 4.00 240,000.00 960,000.00 0.005 4.000 240,000.000
Strainer dia.100 mm unit 1.00 3,700,000.00 3,700,000.00 0.018 1.000 3,700,000.000
Strainer dia.40 mm unit 1.00 620,000.00 620,000.00 0.003 1.000 620,000.000
Safety Valve dia.25 mm unit 1.00 330,000.00 330,000.00 0.002 1.000 330,000.000
Floating Valve dia. 25 mm unit 1.00 360,000.00 360,000.00 0.002 1.000 360,000.000
Pressure Gauge dia.15 mm unit 4.00 160,000.00 640,000.00 0.003 4.000 160,000.000
Fleksible connection dia.100 mm unit 4.00 2,400,000.00 9,600,000.00 0.048 4.000 2,400,000.000
Fleksible connection dia.40 mm unit 4.00 460,000.00 1,840,000.00 0.009 4.000 460,000.000
Header BSP schedule 40 dia 200mm (L=200 cm) unit 1.00 6,000,000.00 6,000,000.00 0.030
Header BSP schedule 40 dia 200mm (L=200 cm) + Pressure Tank 300 Liter include unit 25,000,000.00 1.000 25,000,000.000
Piping
- BSP schedule 40 dia.100 mm m 126.00 310,000.00 39,060,000.00 0.194 126.000 310,000.000
- BSP schedule 40 dia.40 mm m 35.00 126,000.00 4,410,000.00 0.022 35.000 126,000.000
- BSP schedule 40 dia.25 mm m 15.00 77,000.00 1,155,000.00 0.006 15.000 77,000.000
Supporting Material
Fitting for Pipe - FF lot 1.00 2,500,000.00 2,500,000.00 0.012 1.000 2,500,000.000
Hanger Support - FF lot 1.00 2,500,000.00 2,500,000.00 0.012 1.000 2,500,000.000
IV.E.1.2 1st FLOOR EQUIPMENT
Indoor Hydrant Box 1200x800x200mm c/w unit 3.00 5,200,000.00 15,600,000.00 0.078 3.000 5,200,000.000
Fire Extinguisher Dry chemical type ABC unit 9.00 980,000.00 8,820,000.00 0.044 9.000 980,000.000
Head Sprinkler nos 116.00 300,000.00 34,800,000.00 0.173 116.000 300,000.000
HYDRANT PIPE - Black Steel Pipe Sch 40
Black steel pipe sch 40 dia. 100mm m 90.00 290,000.00 26,100,000.00 0.130 90.000 290,000.000
Black steel pipe sch 40 dia. 75mm m 60.00 260,000.00 15,600,000.00 0.078 60.000 260,000.000
Black steel pipe sch 40 dia. 65mm m 20.00 200,000.00 4,000,000.00 0.020 20.000 200,000.000
Black steel pipe sch 40 dia. 40mm m 30.00 125,000.00 3,750,000.00 0.019 30.000 125,000.000
SPRINKLER PIPE - Black Steel Pipe Sch 40
Black steel pipe sch 40 dia. 150mm m 45.00 490,000.00 22,050,000.00 0.110 45.000 490,000.000
Black steel pipe sch 40 dia. 100mm m 80.00 290,000.00 23,200,000.00 0.115 80.000 290,000.000
Black steel pipe sch 40 dia. 75mm m 75.00 260,000.00 19,500,000.00 0.097 75.000 260,000.000
Black steel pipe sch 40 dia. 65mm m 55.00 200,000.00 11,000,000.00 0.055 55.000 200,000.000
Black steel pipe sch 40 dia. 50mm m 90.00 170,000.00 15,300,000.00 0.076 90.000 170,000.000
Black steel pipe sch 40 dia. 40mm m 85.00 120,000.00 10,200,000.00 0.051 85.000 120,000.000
Black steel pipe sch 40 dia. 25mm m 420.00 73,000.00 30,660,000.00 0.153 420.000 73,000.000
Black steel pipe sch 40 dia. 40mm (for drain) m 123.00 120,000.00 14,760,000.00 0.073 123.000 120,000.000
VALVE
Gate Valve diameter 6 16k nos 1.00 6,000,000.00 6,000,000.00 0.030 1.000 6,000,000.000
Gate Valve diameter 4 16k nos 3.00 3,000,000.00 9,000,000.00 0.045 3.000 3,000,000.000
Gate Valve diameter 2 16k nos 1.00 1,000,000.00 1,000,000.00 0.005 1.000 1,000,000.000
Supporting Material
Fitting for Pipe - FF lot 1.00 20,000,000.00 20,000,000.00 0.100 1.000 20,000,000.000
Hanger Support - FF lot 1.00 10,000,000.00 10,000,000.00 0.050 1.000 10,000,000.000
IV.E.1.3 2nd FLOOR EQUIPMENT
Indoor Hydrant Box 1200x800x200mm c/w unit 2.00 5,200,000.00 10,400,000.00 0.052 2.000 5,200,000.000
Fire Extinguisher Dry chemical type ABC unit 7.00 980,000.00 6,860,000.00 0.034 7.000 980,000.000
Head Sprinkler nos 88.00 300,000.00 26,400,000.00 0.131 88.000 300,000.000
Laporan Mingguan - 13 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 14 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 15 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 16 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 17 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 18 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 19 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 20 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Laporan Mingguan - 21 / 57
KONTRAK ORIGINAL Contract hange Order
Jenis barang/jasa
Sat Volume Harga satuan (Rp.) Jumlah Harga (Rp.) Bobot (%) Volume Harga satuan (Rp.)
Pipa Tembaga Type L dia 3/4 m 195.00 350,000.00 68,250,000.00 0.340 195.000 350,000.000
Pipa Tembaga Type L dia 7/8 m 281.00 433,000.00 121,673,000.00 0.606 281.000 433,000.000
Ball Valve dia 3/4 nos 3.00 920,000.00 2,760,000.00 0.014 3.000 920,000.000
Flowmeter w/Hummidfier set 2.00 4,000,000.00 8,000,000.00 0.040 2.000 4,000,000.000
Wall Suction set 2.00 8,800,000.00 17,600,000.00 0.088 2.000 8,800,000.000
Fitting + Aksesoris ls 1.00 12,500,000.00 12,500,000.00 0.062 1.000 12,500,000.000
Bedhead panjang 120cm unit 18.00 4,400,000.00 79,200,000.00 0.394 18.000 4,400,000.000
Lighting Wardrobe+instalasi lampu dan saklar ttk 18.00 385,000.00 6,930,000.00 0.034 18.000 385,000.000
Wall Mounted Socket Nasional dan Instalasi ttk 18.00 275,000.00 4,950,000.00 0.025 18.000 275,000.000
Wall Mounted Socket Internasional dan Instalasi ttk 18.00 290,000.00 5,220,000.00 0.026 18.000 290,000.000
Test Commisioning lot 1.00 5,000,000.00 5,000,000.00 0.025 1.000 5,000,000.000
VI. PEKERJAAN LAIN-LAIN - -
Penebalan Lantai 2
Urug Pasir m3 279.315 436,000.000
Disetujui, Diperiksa,
Pejabat Pembuat Komitmen
(PPK)
Laporan Mingguan - 22 / 57
Minggu Ke_ 14
Laporan Mingguan - 23 / 57
Contract hange Order Kontrak Aktual
165,000,000.000 0.821 - - - - - - - -
10,955,693,059.915 54.528 48.597 0.811 49.407 9,926,903,626.07
Laporan Mingguan - 24 / 57
Contract hange Order Kontrak Aktual
Laporan Mingguan - 25 / 57
Contract hange Order Kontrak Aktual
16,902,400.000 0.084 - - - - - - - -
4,560,000.000 0.023 - - - - - - - -
4,560,000.000 0.023 - - - - - - - -
9,540,000.000 0.047 - - - - - - - -
704,000.000 0.004 - - - - - - - -
1,480,000.000 0.007 - - - - - - - -
4,200,000.000 0.021 - - - - - - - -
11,469,900.000 0.057 - - - - - - - -
6,600,000.000 0.033 - - - - - - - -
17,556,000.000 0.087 - - - - - - - -
2,280,000.000 0.011 - - - - - - - -
2,280,000.000 0.011 - - - - - - - -
4,770,000.000 0.024 - - - - - - - -
352,000.000 0.002 - - - - - - - -
740,000.000 0.004 - - - - - - - -
2,100,000.000 0.010 - - - - - - - -
5,734,950.000 0.029 - - - - - - - -
3,300,000.000 0.016 - - - - - - - -
Laporan Mingguan - 26 / 57
Contract hange Order Kontrak Aktual
5,643,000.000 0.028 - - - - - - - -
3,420,000.000 0.017 - - - - - - - -
6,840,000.000 0.034 - - - - - - - -
7,155,000.000 0.036 - - - - - - - -
1,056,000.000 0.005 - - - - - - - -
2,220,000.000 0.011 - - - - - - - -
6,300,000.000 0.031 - - - - - - - -
3,762,000.000 0.019 - - - - - - - -
2,280,000.000 0.011 - - - - - - - -
4,560,000.000 0.023 - - - - - - - -
4,770,000.000 0.024 - - - - - - - -
352,000.000 0.002 - - - - - - - -
740,000.000 0.004 - - - - - - - -
4,200,000.000 0.021 - - - - - - - -
1,038,000.000 0.005 - - - - - - - -
Laporan Mingguan - 27 / 57
Contract hange Order Kontrak Aktual
Laporan Mingguan - 28 / 57
Contract hange Order Kontrak Aktual
Laporan Mingguan - 29 / 57
Contract hange Order Kontrak Aktual
5,592,400.000 0.028 - - - - - - - -
1,766,700.000 0.009 - - - - - - - -
176,000.000 0.001 - - - - - - - -
20,801,000.000 0.104 - - - - - - - -
12,756,900.000 0.063 - - - - - - - -
308,000.000 0.002 - - - - - - - -
23,088,800.000 0.115 - - - - - - - -
13,057,200.000 0.065 - - - - - - - -
704,000.000 0.004 - - - - - - - -
Laporan Mingguan - 30 / 57
Contract hange Order Kontrak Aktual
10,519,626.600 0.052 - - - - - - - -
4,290,210.000 0.021 - - - - - - - -
4,913,720.000 0.024 - - - - - - - -
8,445,000.000 0.042 - - - - - - - -
6,407,194.500 0.032 - - - - - - - -
27,992,581.920 0.139 - - - - - - - -
46,490,722.000 0.231 - - - - - - - -
12,146,913.600 0.060 - - - - - - - -
72,247,500.000 0.360 - - - - - - - -
32,619,340.000 0.162 - - - - - - - -
65,640,007.125 0.327 - - - - - - - -
54,862,500.000 0.273 - - - - - - - -
38,334,643.200 0.191 - - - - - - - -
440,000.000 0.002 - - - - - - - -
7,500,000.000 0.037 - - - - - - - -
14,000,000.000 0.070 - - - - - - - -
Laporan Mingguan - 31 / 57
Contract hange Order Kontrak Aktual
Laporan Mingguan - 32 / 57
Contract hange Order Kontrak Aktual
3,550,000.000 0.018 - - - - - - - -
405,000,000.000 2.016 - - - - - - - -
185,000,000.000 0.921
1,900,000.000 0.009 - - - - - - - -
Laporan Mingguan - 33 / 57
Contract hange Order Kontrak Aktual
1,900,000.000 0.009 - - - - - - - -
1,900,000.000 0.009 - - - - - - - -
Laporan Mingguan - 34 / 57
Contract hange Order Kontrak Aktual
25,000,000.000 0.124 - - - - - - - -
Laporan Mingguan - 35 / 57
Contract hange Order Kontrak Aktual
2,000,000.000 0.010 - - - - - - - -
Laporan Mingguan - 36 / 57
Contract hange Order Kontrak Aktual
1,000,000.000 0.005 - - - - - - - -
Laporan Mingguan - 37 / 57
Contract hange Order Kontrak Aktual
2,640,000.000 0.013 - - - - - - - -
1,080,000.000 0.005 - - - - - - - -
33,600,000.000 0.167 120.000 0.167 - - 120.000 0.167 33,600,000.00 100
Laporan Mingguan - 38 / 57
Contract hange Order Kontrak Aktual
67,500,000.000 0.336 - - - - - - - -
36,852,000.000 0.183 41.500 0.046 - - 41.500 0.046 9,213,000.00 25
1,600,000.000 0.008 2.000 0.002 - - 2.000 0.002 400,000.00 25
750,000.000 0.004 - - - - - - - -
4,000,000.000 0.020 - - - - - - - -
93,800,000.000 0.467 335.000 0.467 - - 335.000 0.467 93,800,000.00 100
1,995,000.000 0.010 - - - - - - - -
2,500,000.000 0.012 - - - - - - - -
7,000,000.000 0.035 25.000 0.035 - - 25.000 0.035 7,000,000.00 100
6,000,000.000 0.030 12.500 0.015 - - 12.500 0.015 3,000,000.00 50
2,800,000.000 0.014 - - - - - - - -
7,840,000.000 0.039 28.000 0.039 - - 28.000 0.039 7,840,000.00 100
6,720,000.000 0.033 14.000 0.017 - - 14.000 0.017 3,360,000.00 50
600,000.000 0.003 - - - - - - - -
Laporan Mingguan - 39 / 57
Contract hange Order Kontrak Aktual
1,500,000.000 0.007 - - - - - - - -
Laporan Mingguan - 40 / 57
Contract hange Order Kontrak Aktual
16,080,000.000 0.080 - - - - - - - -
7,350,000.000 0.037 - - - - - - - -
600,000.000 0.003 - - - - - - - -
2,500,000.000 0.012 - - - - - - - -
Laporan Mingguan - 41 / 57
Contract hange Order Kontrak Aktual
2,500,000.000 0.012 - - - - - - - -
2,500,000.000 0.012 - - - - - - - -
4,500,000.000 0.022 - - - - - - - -
1,000,000.000 0.005 1.000 0.005 - - 1.000 0.005 1,000,000.00 100
24,000,000.000 0.119 1.000 0.119 - - 1.000 0.119 24,000,000.00 100
4,200,000.000 0.021 1.000 0.021 - - 1.000 0.021 4,200,000.00 100
5,400,000.000 0.027 1.000 0.027 - - 1.000 0.027 5,400,000.00 100
3,000,000.000 0.015 1.000 0.015 - - 1.000 0.015 3,000,000.00 100
42,390,000.000 0.211 - - - - - - - -
2,700,000.000 0.013 9.000 0.013 - - 9.000 0.013 2,700,000.00 100
315,000.000 0.002 9.000 0.002 - - 9.000 0.002 315,000.00 100
2,250,000.000 0.011 9.000 0.011 - - 9.000 0.011 2,250,000.00 100
Laporan Mingguan - 42 / 57
Contract hange Order Kontrak Aktual
750,000.000 0.004 - - - - - - - -
173,193,914.035 0.862 - - - - - - - -
77,000,000.000 0.383 - - - - - - - -
40,000,000.000 0.199 20.000 0.199 - - 20.000 0.199 40,000,000.00 100
12,000,000.000 0.060 6.000 0.060 - - 6.000 0.060 12,000,000.00 100
40,000,000.000 0.199 20.000 0.199 - - 20.000 0.199 40,000,000.00 100
4,000,000.000 0.020 2.000 0.020 - - 2.000 0.020 4,000,000.00 100
52,000,000.000 0.259 1.000 0.259 - - 1.000 0.259 52,000,000.00 100
25,000,000.000 0.124 1.000 0.124 - - 1.000 0.124 25,000,000.00 100
47,250,000.000 0.235 210.000 0.235 - - 210.000 0.235 47,250,000.00 100
74,562,000.000 0.371 289.000 0.371 - - 289.000 0.371 74,562,000.00 100
61,800,000.000 0.308 206.000 0.308 - - 206.000 0.308 61,800,000.00 100
Laporan Mingguan - 43 / 57
Contract hange Order Kontrak Aktual
14 Juli 2019
Dibuat,
Konsultan Pengawas,
CV. CITRA ENTERPRISE,
Laporan Mingguan - 44 / 57
1 08 April 2019 14 April 2019 7
2 15 April 2019 21 April 2019 7
3 22 April 2019 28 April 2019 7
4 29 April 2019 05 Mei 2019 7
5 06 Mei 2019 12 Mei 2019 7
Termyn I 18 Mei 6 13 Mei 2019 19 Mei 2019 7
7 20 Mei 2019 26 Mei 2019 7
8 27 Mei 2019 02 Juni 2019 7
9 03 Juni 2019 09 Juni 2019 7
10 10 Juni 2019 16 Juni 2019 7
11 17 Juni 2019 23 Juni 2019 7
12 24 Juni 2019 30 Juni 2019 7
13 01 Juli 2019 07 Juli 2019 7
14 08 Juli 2019 14 Juli 2019 7
15 15 Juli 2019 21 Juli 2019 7
16 22 Juli 2019 28 Juli 2019 7
17 29 Juli 2019 04 Agustus 2019 7
18 05 Agustus 2019 11 Agustus 2019 7
19 12 Agustus 2019 18 Agustus 2019 7
20 19 Agustus 2019 25 Agustus 2019 7
21 26 Agustus 2019 01 September 2019 7
22 02 September 2019 08 September 2019 7
23 09 September 2019 15 September 2019 7
24 16 September 2019 22 September 2019 7
25 23 September 2019 29 September 2019 7
26 30 September 2019 06 Oktober 2019 7
27 07 Oktober 2019 13 Oktober 2019 7
28 14 Oktober 2019 20 Oktober 2019 7
29 21 Oktober 2019 27 Oktober 2019 7
30 28 Oktober 2019 03 November 2019 7
210
1
1 7 1 2
2 14 1 08 April 2019 15 April 2019
3 21 2 14 April 2019 21 April 2019
4 28 1 2
5 35 1 7 14
6 42
7 49 1 2
8 56 1 0.11 0.245453804906532
9 63
10 70
11 77
12 84
13 91
14 98
15 105
16 112
17 119
18 126
19 133
20 140
21 147
22 154
23 161
24 168
25 175
26 182
27 189
28 196
29 203
30 210
1 2
3 4 5 6
22 April 2019 29 April 2019 06 Mei 2019 13 Mei 2019
28 April 2019 05 Mei 2019 12 Mei 2019 19 Mei 2019
3 4 5 6
21 28 35 42
3 4 5 6
0.606331707409106 1.49877776720202 2.53125019390313 4.49428306220055
2 3
7 8 9 10
20 Mei 2019 27 Mei 2019 03 Juni 2019 10 Juni 2019
26 Mei 2019 02 Juni 2019 09 Juni 2019 16 Juni 2019
7 8 9 10
49 56 63 70
7 8 9 10
7.25079251235562 10.3014500559128 14.7118651761609 20.3451767106386
3 4
11 12 13 14
17 Juni 2019 24 Juni 2019 01 Juli 2019 08 Juli 2019
23 Juni 2019 30 Juni 2019 07 Juli 2019 14 Juli 2019
11 12 13 14
77 84 91 98
11 12 13 14
26.9607993910108 35.7952659540018 44.7363888286656 51.371454812605
4 5
15 16 17 18
15 Juli 2019 22 Juli 2019 29 Juli 2019 05 Agustus 2019
21 Juli 2019 28 Juli 2019 04 Agustus 2019 11 Agustus 2019
15 16 17 18
105 112 119 126
15 16 17 18
57.3136064572794 62.6027058745308 67.3108150185791 71.7415775961669
5 6
19 20 21 22
12 Agustus 2019 19 Agustus 2019 26 Agustus 2019 02 September 2019
18 Agustus 2019 25 Agustus 2019 01 September 2019 08 September 2019
19 20 21 22
133 140 147 154
19 20 21 22
75.4902780116105 79.1505673559005 82.7972203776956 86.1633616285834
6 7
23 24 25 26
09 September 2019 16 September 2019 23 September 2019 30 September 2019
15 September 2019 22 September 2019 29 September 2019 06 Oktober 2019
23 24 25 26
161 168 175 182
23 24 25 26
88.9684793376566 91.2262098274099 93.4703039946684 95.5741422764733
7 8
27 28 29 30
07 Oktober 2019 14 Oktober 2019 21 Oktober 2019 28 Oktober 2019
13 Oktober 2019 20 Oktober 2019 27 Oktober 2019 03 November 2019
27 28 29 30
189 196 203 210
27 28 29 30
97.5377246728246 98.9675561723508 99.918182065031 100
Kontraktor Pelaksana, : PT. RAJABATU KIERAHA PERKASA,
Site Manager : LUKMAN YOISANGADJI, ST
Pejabat Pembuat Komitmen : ABD. MAJID DANO M. NUR, S.KM, MPH
NIP. 19761029 200112 1 004
Konsultan Pengawas, : CV. CITRA ENTERPRISE,
Site engineer : DWI WAHYU NANANG U, ST
2,786,211,000.00 1,843,560,142.20
5,636,017,000.00 4,831,103,500.00
8,422,228,000.00 6,674,663,642.20
0.79
REKAPITULASI
Bobot Peker
Uraian Pekerjaan
Minggu Lalu
I. PEKERJAAN PENDAHULUAN -
V. PEKERJAAN ELECTRICAL -
JUMLAH TOTAL -
Disetujui, Diperiksa,
Pejabat Pembuat Komitmen Konsultan Pengawas,
(PPK) CV. CITRA ENTERPRISE,
0.296 0.296
1.585 1.585
49.407 49.407
9.176 9.176
24.045 24.045
84.51 84.509
14 Juli 2019
Dibuat,
Err:509
Err:509
Err:509
Site Manager