Anda di halaman 1dari 69

BILL OF QUANTITY

PEKERJAAN : PENYIAPAN BADAN JALAN YONKAV 2/BC


LOKASI : YONKAV KODAM XII/TPR DI KAB. PONTIANAK
TA. : 2016

HARGA BIAYA
NO PEKERJAAN VOLUME SAT
(RP) (RP)
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank 1.104,86 M1 43.200,00 47.729.828,57
2 Galian Tanah ( Dengan Alat ) 9.801,41 M3 101.300,00 992.882.354,86
3 Kayu Simpiran (3 cm) 375,60 M3 269.200,00 101.111.520,00
4 Urugan pasir 1.252,00 M3 146.900,00 183.918.800,00
Sub Total 1.325.642.503,44
II PEKERJAAN PERSIAPAN
1 Kayu Cerucuk dia. 10 - 4 M jarak 30 cm 59.813,00 Ttk 18.100,00 1.082.615.300,00
2 Timbunan dan Pemadatan tanah/15cm tebal 30 cm ( Dengan Alat ) 3.756,00 M3 135.400,00 508.562.400,00
3 Lapis Pondasi Atas Agregat kelas A tebal 30 cm 3.756,00 M3 567.600,00 2.131.905.600,00
Sub Total 3.723.083.300,00
III PEKERJAAN DRAINASE
1 Parit pas. Batu kali 0,6x/0,6x0,4 m tebal 20 cm diplester 4.595,87 M1 520.300,00 2.391.231.161,00
Sub Total 2.391.231.161,00
TOTAL 7.439.956.964,44
PPN 10% 743.995.696
TOTAL 8.183.952.660,88
DIPERBULAT 8.183.952.000,00

Terbilang : Delapan Milyar Seratus Delapan Puluh Tiga Juta Sembilan Ratus Lima Puluh Dua Ribu Rupiah
BILL OF QUANTITY

PEKERJAAN : INSTALASI AIR


LOKASI : YONKAV KODAM XII/TPR DI KAB. PONTIANAK
TA. : 2016

HARGA BIAYA
NO PEKERJAAN VOLUME SAT
(RP) (RP)
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 30,00 M2 10.800,00 324.000,00
2 Papan bowplank 22,00 M2 43.200,00 950.400,00

II PEKERJAAN TANAH
1 Galian tanah 7,84 M3 78.600,00 616.224,00
2 Urugan tanah kembali 2,35 M3 26.200,00 61.622,40
3 Urugan pasir bwh pondasi/lantai 1,16 M3 146.900,00 170.404,00
4 Cerucuk ky bulat dia. 8-10 panj. 4 m 72,00 Btg 29.800,00 2.145.600,00

III PEKERJAAN PASANGAN


1 Pasang batu aanstamping 0,78 M3 646.300,00 506.699,20
2 Pondasi batu gunung 3,36 M3 1.121.800,00 3.769.248,00
3 Pasang Bataco 1 : 2 4,20 M2 119.300,00 501.060,00
4 Pas. Bataco 1 : 4 40,60 M2 119.300,00 4.843.580,00
5 Kolom, sloof, ring balk beton 0,91 M2 4.859.100,00 4.431.499,20
6 Plesteran dinding 1 : 2 8,40 M2 86.310,00 725.004,00
7 Plesteran dinding 1 : 4 81,20 M2 68.680,00 5.576.816,00

IV PENUTUP ATAP BJ. RINGAN


1 Kuda-kuda atap baja Ringan 25,20 M2 115.600,00 2.913.120,00
2 Pasang atap genteng metal 25,20 M2 129.000,00 3.250.800,00
3 Pasang Nok genteng metal 8,00 M1 89.600,00 716.800,00

V PEKERJAAN KAYU
1 Kusen pintu / jendela kayu klas. I 0,05 M3 7.996.600,00 383.836,80
2 Lysplank papan ky.kls.I 2x2,5/20 22,00 M2 108.800,00 2.393.600,00
3 Pintu panil papan 1,00 Bh 1.240.920,00 1.240.920,00
4 Ventilasi besi Ø 8 2,00 M2 350.000,00 700.000,00
5 Pas. Rangka plafond kayu klas.II 21,80 M2 128.100,00 2.792.580,00
6 Penutup Plafond GRC 21,80 M2 71.800,00 1.565.240,00
7 List plafond kayu profil 14,00 M1 20.600,00 288.400,00

VI PEKERJAAN LANTAI
1 Lantai cor beton tbl. 15 cm 1,20 M3 1.183.600,00 1.420.320,00
2 Pas. lantai Keramik 40/40 12,00 M2 221.510,00 2.658.120,00
3 Pas. lantai Keramik rabatz 40/40 11,20 M2 221.510,00 2.480.912,00
4 Cor lantai rabatz beton 0,78 M3 1.183.600,00 927.942,40
5 Parit cucuran atap 22,00 M1 84.100,00 1.850.200,00

VII PEK. ALAT GANTUNG


1 Kunci pintu 2 slaag 1,00 Bh 307.600,00 307.600,00
3 Engsel pintu 2,00 Psg 61.000,00 122.000,00
2 Slot pintu 2,00 Bh 47.100,00 94.200,00

VIII PEKERJAAN LISTRIK + AIR


1 Titik mata lampu 4,00 Ttk 175.600,00 702.400,00
2 Stop kontak 1,00 Ttk 37.200,00 37.200,00
3 Lampu XL 18 watt 4,00 Bh 120.100,00 480.400,00
4 Kast zekering 4 group 1,00 Bh 110.000,00 110.000,00
5 Arde BC draad 6 mm 3,00 M1 190.000,00 570.000,00
IX PEKERJAAN PENGECATAN
1 Cat dinding tembok+plafond 0,78 M2 20.700,00 16.228,80
2 Cat kayu / kilap 10,17 M2 61.900,00 629.523,00
3 Cat brouwn silver 16,00 M2 61.900,00 990.400,00

X PEKERJAAN LAIN-LAIN
1 Membeli mesin pompa air 1,00 Bh 5.390.000,00 5.390.000,00
2 Membeli mesin diesel yanmar 1,00 Bh 7.840.000,00 7.840.000,00
3 Pasang pipa pex dia. 2.5" 1.100,00 M1 98.000,00 107.800.000,00
4 Membuat sumur bor (water drilling) 2,00 Ttk 80.510.000,00 161.020.000,00
TOTAL 336.314.899,80
PPN 10% 33.631.489,98
TOTAL 369.946.389,78
DIPERBULAT 369.946.000,00

Terbilang : Tiga Ratus Enam Puluh Sembilan Juta Sembilan Ratus Empat Puluh Enam Ribu Rupiah
BILL OF QUANTITY

PEKERJAAN : PEMATANGAN LAHAN


LOKASI : YONKAV KODAM XII/TPR DI KAB. PONTIANAK
TA. : 2016

HARGA BIAYA
NO PEKERJAAN VOLUME SAT
(RP) (RP)
1 2 3 4 5 6

1 Timbunan dan Pemadatan tanah/15cm tebal 30 cm ( Dengan Alat ) 631,96 M3 135.400,00 85.566.707,00
TOTAL 85.566.707,00
PPN 10% 8.556.670,70
TOTAL 94.123.377,70
DIPERBULAT 94.123.000,00

Terbilang : Sembilan Puluh Empat Juta Seratus Dua Puluh Tiga Ribu Rupiah
BILL OF QUANTITY

PEMBANGUNAN : RUANG MAKAN / 1 BUAH YONKAV


LOKASI : PENITI
LUAS : 288 M2
TA. : 2016

HARGA JUMLAH
NO PEKERJAAN VOLUME SAT
(Rp) (Rp)
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 374,00 M2 10.800,00 4.039.200,00
2 Pengukuran bouwplank 252,00 M1 43.200,00 10.886.400,00
Sub Total 14.925.600,00
II PEKERJAAN TANAH
1 Galian tanah pondasi 201,60 M3 78.600,00 15.845.760,00
2 Urugan tanah kembali 67,20 M3 26.200,00 1.760.640,00
3 Urugan pasir bwh pondasi/lantai 28,80 M3 146.900,00 4.230.720,00
4 Urugan tanah bawah lantai 445,93 M3 129.400,00 57.703.525,75
5 Cerucuk kayu bulat 1.496,00 Btg 29.800,00 44.580.800,00
Sub Total 124.121.445,75
III PEKERJAAN PASANGAN
1 Pondasi bt kosong/aanstamping 40,32 M3 646.300,00 26.058.816,00
2 Pondasi batu gunung 141,12 M3 1.121.800,00 158.308.416,00
3 Pasang bataco trasram 1:2 185,25 M2 119.300,00 22.100.325,00
4 Pasang bataco 1:4 555,75 M2 119.300,00 66.300.975,00
5 Kolom teras depan 20/20 7,04 M3 4.859.100,00 34.208.064,00
6 Bok Depan Pintu 1,44 M3 1.121.800,00 1.615.392,00
7 Sloof beton 20/30 15,12 M3 5.045.800,00 76.292.496,00
8 Ring balk beton 15/20 7,56 M3 5.045.800,00 38.146.248,00
9 Plester dinding 1:2 185,25 M2 86.310,00 15.988.927,50
10 Plester dinding 1:4 1.111,50 M2 68.680,00 76.337.820,00
11 Pas. Dinding kamprot 185,25 M2 54.100,00 10.022.025,00
Sub Total 525.379.504,50
IV PENUTUP ATAP BJ. RINGAN
1 Kuda-kuda atap baja Ringan 374,00 M2 115.600,00 43.234.400,00
2 Pasang atap genteng metal 374,00 M2 129.000,00 48.246.000,00
3 Pasang Nok genteng metal 48,70 M1 89.600,00 4.363.520,00
Sub Total 95.843.920,00
V PEKERJAAN KAYU
1 Kusen pintu/jendela ky. Klas I 0,45 M3 7.996.600,00 3.574.480,20
2 Lysplank GRC 79,00 M1 108.800,00 8.595.200,00
3 Pintu panil double papan 6,00 Bh 2.343.960,00 14.063.760,00
4 Pintu panil papan 2,00 Bh 1.240.920,00 2.481.840,00
5 Jendela double kaca panil 14,00 Bh 544.590,00 7.624.260,00
6 Rangka plafond kayu klas II 374,00 M2 128.100,00 47.909.400,00
7 Penutup Plafond GRC 374,00 M2 71.800,00 26.853.200,00
8 List plafond kayu profil 334,00 M1 20.600,00 6.880.400,00
9 Jalusi Jendela dan Pintu 13,80 M2 617.300,00 8.518.740,00
Sub Total 126.501.280,20
VI PEKERJAAN LANTAI
1 Pas. Keramik lantai 40/40 288,00 M2 221.510,00 63.794.880,00
2 Meja Saji Lengkap Keramik uk 20/20 3,00 Bh 1.000.000,00 3.000.000,00
3 Cor Lantai Tebal 10 cm 57,60 M3 1.183.600,00 68.175.360,00
4 Cor lantai keliling rabatz beton 12,90 M3 1.183.600,00 15.268.440,00
5 Parit cucuran atap 79,00 M1 84.100,00 6.643.900,00
6 Parit pas. Batu kali 0,6x/0,6x0,4m tebal 20 cm diplester 46,20 M3 520.300,00 24.035.778,80
7 Plat Deuker 1,5 x 1,5 m tebal 10cm 2,00 Bh 4.963.300,00 9.926.600,00
Sub Total 190.844.958,80
VII PEK. ALAT GANTUNG
1 Kunci pintu 14,00 Bh 307.600,00 4.306.400,00
2 Engsel pintu 42,00 Psg 61.000,00 2.562.000,00
3 Engsel jendela 56,00 Psg 45.500,00 2.548.000,00
4 Hak angin 28,00 Bh 42.500,00 1.190.000,00
5 Grendel 84,00 Bh 47.100,00 3.956.400,00
6 Handle jendela 28,00 Bh 48.700,00 1.363.600,00
Sub Total 15.926.400,00
VIII PEKERJAAN LISTRIK + AIR
1 Titik mata lampu 10,00 Ttk 175.600,00 1.756.000,00
2 Stop kontak setara Broco 4,00 Ttk 37.200,00 148.800,00
3 Saklar ganda 6,00 Bh 53.000,00 318.000,00
4 Lampu XL 18 watt 6,00 Bh 120.100,00 720.600,00
5 Pas. Lampu TL 20 watt 4,00 Bh 74.600,00 298.400,00
6 Kast zekering 4 group 1,00 Bh 110.000,00 110.000,00
7 Arde BC draad 6 mm 60,00 M1 190.000,00 11.400.000,00
Sub Total 14.751.800,00
IX PEKERJAAN PENGECATAN
1 Cat dinding tembok+plafond 1.485,95 M2 20.700,00 30.759.165,00
2 Cat kayu / kilap 32,56 M2 61.900,00 2.015.464,00
Sub Total 32.774.629,00
JUMLAH 1.141.069.538,25
PPN 10 % 114.106.953,82
TOTAL 1.255.176.492,07
RUMDIS K-45 / 1KK 1.255.176.000,00

Terbilang : Satu Milyar Dua Ratus Lima Puluh Lima Juta Seratus Tujuh Puluh Enam Ribu Rupiah
DAFTAR UPAH PEKERJA

D A E R A H : KAB. PONTIANAK

HARGA
NO. JENIS BAHAN SAT KET.
(Rp)

1 Pekerja Hr 98.500,00
2 Mandor Hr 189.100,00
3 Tukang listrik Hr 124.600,00
4 Kep. tk. LIstrik Hr 162.000,00
5 Tukang kayu Hr 124.600,00
6 Kep. tk. kayu Hr 162.000,00
7 Tukang batu Hr 124.600,00
8 Kep. tk. batu Hr 162.000,00
9 Tukang besi Hr 124.600,00
10 T u k a n g b e s i konstruksi Hr 124.600,00
11 K e p . t k . b e s i Hr 162.000,00
12 T u k a n g c a t Hr 124.600,00
13 K e p . t k . c a t Hr 162.000,00
14 T u k a n g p l i t u r Hr 124.600,00
15 T u k a n g j a l a n Hr 124.600,00
16 T u k a n g g a l i Hr 124.600,00
17 Tukang masak aspal Hr 124.600,00
18 T k . l e i d e n g Hr 124.600,00
19 Operator Hr 311.500,00
20 P e m b . Operator Hr 137.100,00
21 P e n j a g a a p i Hr 186.900,00
22 P e n j a g a m a l a m Hr 186.900,00
23 Sopir Hr 249.200,00
24 Pembantu Sopir Hr 112.100,00
25 Mekanik Hr 373.800,00
26 Operator alat berat Hr 311.500,00
DAFTAR HARGA SATUAN UPAH DAN BAHAN
( BASIC PRICE )

Kabupaten PONTIANAK
Provinsi KALIMANTAN BARAT
Tahun 2016
Lokasi

NO URAIAN KETERANGAN SAT HARGA SAT


SAJINGAN

I BATA, BATU DAN PASIR

1 Batu kali Batu belah pondasi m3 382.200,00


2 Batu kong m3 382.200,00
3 Batu Split Pecah Mesin 1/2 m3 519.100,00
4 Batu Split Pecah Mesin 2/3 m3 534.500,00
5 Batu Split Pecah Mesin 3/5 m3 495.800,00
6 Batu Split Pecah Mesin 5/7 m3 557.900,00
7 Batu Kerikil tdk tersaring m3 557.900,00
8 Sirtu ( pasir koral ) m3 189.000,00
9 Pasir Beton m3 189.000,00
10 Pasir Pasang m3 112.400,00
11 Pasir Urug m3 96.200,00
12 Tanah Urug/ tanah datang m3 85.700,00
0,00
II BAHAN CETAKAN 0,00
1 Bata Merah uk. 5 x 11 x 22 cm bh 900,00
2 Bataco bh 2.400,00
3 Buis beton setengah lingkaran dia. 30 cm uk. Pj. 100 cm bh 131.400,00
0,00
IV BAHAN PEREKAT 0,00
1 Semen zak 88.400,00
2 Semen kg 2.000,00
3 Semen putih @40 kg zak 125.000,00
4 Semen Warna kg 19.000,00
5 Aspal drum kg 17.500,00
0,00
NO URAIAN KETERANGAN SAT HARGA SAT
V BAHAN BESI / BAJA / ALUMUNIUM 0,00
1 Rangka baja ringan btg 99.500,00
2 Besi Beton polos dia. 6 mm Kg 27.400,00
3 Besi Beton polos dia. 8 mm Kg 167.800,00
4 Besi Beton polos dia. 10 mm Kg 66.400,00
5 Besi Beton polos dia. 12 mm Kg 110.800,00
6 Besi Beton polos dia. 16 mm Kg 54.100,00
7 Besi Beton ulir dia. 12 mm kg 14.100,00
8 Besi beton U-24 kg 10.400,00
9 Besi beton U-39 kg 12.400,00
10 Besi wire mest Ø 6 mm Roll 4.132.700,00
11 Beugel plat L 3 cm btg 46.900,00
12 Mur/baud biasa 4 s/d 6 cm kg 5.900,00
13 Besi Hollow 40.40.4 mm kg 11.800,00
14 Besi Hollow 80.80.4 mm kg 11.800,00
15 Kusen Alumunium m1 225.400,00
16 Rangka plafond metal furing m2 57.000,00
17 Begel kuda-kuda kg 46.900,00
0,00
VI KAWAT / MESH 0,00
1 Kawat Benrat Kawat Beton kg 19.300,00
2 Kawat simpai rool putih kg 18.800,00
3 Kawat Harmonika Rool 247.300,00
4 Kawat ikat duri @ 10 kg Rool 113.400,00
5 Kawat nyamuk besi m2 43.900,00
6 Kawat nyamuk plastik Kawat nyamuk plastik m2 24.100,00
0,00
VII BAHAN PAKU DAN MUR BAUT : 0,00
1 Paku 1 s/d 3 cm kg 23.300,00
2 Paku 4 s/d 7 cm kg 23.300,00
3 Paku 8 s/d 12 cm kg 23.300,00
4 Paku campur kg 23.300,00
5 Paku beton kg 34.400,00
6 Paku seng RRT kg 33.900,00
7 Paku Asbes/seng kg 34.500,00
8 Sekrup zincalume bh 2.400,00
0,00
NO URAIAN KETERANGAN SAT HARGA SAT
VIII BAHAN KAYU 0,00
1 Kayu Belian 0,00
Balok kayu Belian tdk ketam Uk. 10/10 cm - 4 M tidak diketam m3 8.453.400,00
Balok kayu Belian ketam Uk. 10/10 cm - 4 M m3 8.453.400,00
Papan Kayu Belian ketam Uk. 2/14 - 2,5/16 cm - 4 M m3 13.876.000,00
2 Kayu Klas I (Bengkirai/tekam) 0,00
Balok Kayu klas I 18/18 - 20/20 cm - 4 M tidak diketam m3 3.987.500,00
Papan Kayu klas I /8 cm m3 3.976.200,00
Papan Kayu klas 2/18 - 5/18 cm - 4 M m3 3.976.200,00
Reng atap Uk. 2/3 - 3/5 cm - 4 M m3 19.400,00
3 Kayu Klas II 0,00
Balok Kayu klas II Uk. 8/12 cm - 4 M tidak diketam m3 3.588.700,00
Papan Kayu klas II Uk. 2/20 cm - 4 M m3 3.381.300,00
4 Kayu klas III 0,00
Balok Kayu klas III tidak diketam m3 2.682.100,00
Papan Kayu klas III tidak diketam m3 2.692.600,00
5 Kayu Dolken/ Cerucuk 0,00
Dolken (Cerucuk) dia 10 s/d 12 cm - 4 M btg 18.100,00
6 Kayu bakar M3 269.200,00
0,00
IX BAHAN PELAPIS ( PLAFOND ) 0,00
1 Teakwood t. 4 mm Uk 120x240 cm lbr 126.100,00
2 Formika t.0,03 mm lbr 300.500,00
3 GRC/Kasiboard uk. 6 mm x 122 x 244 cm lbr 137.800,00
0,00
X BAHAN LANTAI & DINDING KERAMIK 0,00
1 Keramik polos 20/20 cm m2 78.100,00
2 Keramik 20/25 cm KW1 ex Masterina m2 78.100,00
3 Keramik 30/30 cm KW1 ex Masterina m2 74.300,00
4 Keramik 40/40 cm KW1 ex Masterina m2 76.200,00
5 Keramik 60/60 cm KW1 ex Masterina Lbr 197.900,00
6 list keramik uk. 2 x 10 cm bh 20.400,00
0,00
XI BAHAN PENUTUP ATAP 0,00
1 Genteng Metal 25 mm lbr 53.200,00
2 Atap zincalume lbr 48.000,00
3 Nok Genteng Metal lbr 36.600,00
4 Seng gelombang BJLS - 20 lbr 61.500,00
5 Seng Plat/datar BJLS 20 lbr 58.000,00
6 Alumunium plat 0,3 Lbr 84.100,00
7 Rangka atap baja ringan m2 115.600,00
0,00
XII BAHAN KACA : 0,00
1 Kaca Polos 5 mm m2 147.100,00
2 Kaca rayben 5 mm m2 327.100,00
NO URAIAN KETERANGAN SAT HARGA SAT
3 Kaca rayben 3 mm m2 273.900,00
NO URAIAN KETERANGAN SAT HARGA SAT
0,00
XIII BAHAN FINISHING / CAT 0,00
A. Cat Besi dan Kayu : 0,00
Cat kilat Kg 0,00
1 Dempul Besi/Kayu Kg 51.400,00
2 Cat kayu/Besi ex Glotek Kg 81.200,00
3 Plamir Kayu Kg 51.600,00
4 Meni kayu ex Nippon kg 32.300,00
5 Thinner Ltr 315.800,00
6 Amplas besi Lbr 2.000,00
7 Amplas Kayu Lbr 4.200,00
8 Kwas cat bh 16.800,00
0,00
B. Cat Tembok 0,00
Cat Tembok / Cat Dinding 0,00
1 Cat tembok ltr 17.500,00
2 Cat Dasar Emulsion ex Dulux 26.900,00
3 Plamir Tembok Kg 16.300,00
4 Dempul 4 kg klg 17.300,00
0,00
XIV BAHAN ALAT GANTUNG 0,00
1 Engsel 3" bh 30.400,00
2 Engsel 4" bh 38.300,00
3 Slot jendela 3" bh 16.800,00
4 Slot pintu 4" bh 16.800,00
5 Kunci tanam 2 slaag besar bh 241.800,00
6 Kunci tanam kecil bh 72.300,00
7 Grendel/Gembok bh 20.500,00
8 Kait Angin bh 18.400,00
9 Handle jendela bh 18.400,00
0,00
XV BAHAN SANITARI 0,00
0,00
1 Kloset Jongkok warna unt 148.500,00
2 Kloset Jongkok polos unt 148.500,00
3 Bak cuci piring stenlis unt 297.000,00
4 Bak cuci piring stenlis 2 lubang unt 558.800,00
5 Urinoir Merk Toto unt 986.200,00
6 Bak air fibreglass uk. 55x55x60 cm bh 266.300,00
7 Floor drain bh 17.800,00
8 Kran zink type T 30 AR13NV7N ex Toto bh 17.000,00
9 Kitchenzink stainless steel 1 lubang Hwaco 1L unt 115.800,00
10 Kran air lokal 1/2" bh 32.600,00
11 Kran air lokal 3/4" bh 45.700,00
12 Seal tape bh 5.900,00
NO URAIAN KETERANGAN SAT HARGA SAT
0,00
NO URAIAN KETERANGAN SAT HARGA SAT
XVI BAHAN SALURAN AIR 0,00
0,00
1 Pipa PVC dia 1/2" SCJ M 25.400,00
2 Pipa PVC dia 1 1/2" SCJ M 65.700,00
3 Pipa PVC dia 3" SCJ M 152.400,00
4 Pipa PVC dia 1/2" AW ex Wavin P. 4 m m 25.400,00
5 Pipa PVC dia 2" AW ex Wavin P. 4 m m 19.600,00
6 Pipa PVC dia 4" AW ex Wavin P. 4 m m 58.800,00
NO URAIAN KETERANGAN SAT HARGA SAT
7 Pipa Pex Uk. 3" m 55.300,00
0,00
XVII HARGA SEWA ALAT 0,00
1 Excavator on Track/ on Whell 0,30 M3 Jam 253.400,00
2 Dump Truck 5 Ton Jam 215.800,00
3 Tandem / Three Roller 6 - 8 Ton Jam 217.800,00
4 Tanker Truck 6000 Liter Jam 224.700,00
0,00
XVIII PERALATAN ELEKTRIKAL/LISTRIK 0,00
1 Sekering 63 A bh 122.000,00
2 MCB 6 A Legran bh 49.500,00
3 Kabel NYA 2 x 2,5 mm ( 50 m ) Rool 758.700,00
4 Kabel NYM 2 x 2,5 mm m 16.600,00
5 Kabel NYM 3 x 2,5 mm m 15.100,00
6 Kabel Coax 3 c 75 ohm m 19.600,00
7 Kabel telephone 4 x 0.5 mm m 78.400,00
8 Isolasi bh 3.400,00
9 Klem bh 14.800,00
10 Mangkok Listrik bh 1.200,00
11 Saklar tunggal Broco bh 15.800,00
12 Saklar ganda Broco bh 19.300,00
13 Lampu TL 20 watt Panasonic bh 38.600,00
14 Lampu LX 18 watt bh 84.100,00
15 Tiang Besi 7 mtr 100 daN bh 2.716.100,00
16 Twice Cable 3x25+1x35 mm2 AL m 26.300,00
0,00
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah

I. PEKERJAAN PERSIAPAN :

M2 PEMBERSIHAN LAPANGAN & PERATAAN TANAH - 10.796 10.796 10.800


0,100 org/hr Pekerja 98.500 9.850
0,005 org/hr Mandor 189.100 946

M1 PE NGUKURAN DAN PASANG BOUWPLANK 27.803 15.430 43.232 43.200


0,006 m3 Kayu klas III 5/7 2.682.100 15.489
0,004 m3 Papan klas III 2.692.600 11.847
0,020 kg Paku 4 s/d 7 cm 23.300 466
0,080 org/hr Pekerja 98.500 7.880
0,040 org/hr Tukang Kayu Kasar 124.600 4.984
0,010 org/hr Kepala Tukang Kayu 162.000 1.620
0,005 org/hr Mandor 189.100 946

M2 Pembuatan Direksi Keet / Gudang Bahan Bangunan dan Alat / Bedeng Pekerja 598.111 389.555 987.666 987.700
1,250 Btg Kayu Pancang (Dolken) d = 10cm, p = 4m - -
0,186 M3 Kayu Kelas III 2.682.100 498.871
0,300 Kg Paku 23.300 6.990
1,500 Lbr Seng Gelombang BJLS 0.20 61.500 92.250
1,3500 Lbr Triplek 4mm - -
2,000 org/hr Tukang Kayu 124.600 249.200
1,000 org/hr Pekerja 98.500 98.500
0,200 org/hr Kepala Tukang 162.000 32.400
0,050 org/hr Mandor 189.100 9.455

PEKERJAAN TANAH :

1 M3 MENGGALI TANAH BIASA SEDALAM 1 METER 78.603 78.603 78.600


0,7500 org/hr Pekerja 98.500 73.875
0,0250 org/hr Mandor 189.100 4.728
-
MENGURUG KEMBALI 1 M3 GALIAN 26.201 26.201 26.200
0,2500 org/hr Pekerja 98.500 24.625
0,0083 org/hr Mandor 189.100 1.576
-
MEMADATKAN 1 M3 TANAH (PER 20 CM) 58.705 58.705 58.700
0,5000 org/hr Pekerja 98.500 49.250
0,0500 org/hr Mandor 189.100 9.455
-
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
1 M3 MENGURUG PASIR URUG 115.440 31.441 146.881 146.900
0,3000 org/hr Pekerja 98.500 29.550
0,0100 org/hr Mandor 189.100 1.891
1,2000 M3 Pasir urug 96.200 115.440
-
1 M3 URUGAN TANAH TIMBUN 102.840 26.516 129.356 129.400
1,2 M3 Tanah timbun 85.700 102.840
0,25 org/hr pekerja 98.500 24.625
0,01 org/hr mandor 189.100 1.891
-
1 M3 URUGAN SIRTU + PEMADATAN 669.480 92.032 761.512 761.500
1,2 m3 sirtu 557.900 669.480
0,3 org/hr pekerja 98.500 29.550
0,02 org/hr mandor 189.100 3.782
1 m3 pemadatan 58.700 58.700

1 M3 GALIAN TANAH DENGAN EXCAVATOR 99.603 1.650 101.253 101.300


0,0085 Org/Hr Pekerja 98.500 837
0,0043 Org/Hr Mandor 189.100 813
0,0298 Jam Excavator on Track/ on Whell 256.000 7.629
0,4219 Jam Dump Truck 3-4m3/ 6 ton 218.000 91.974
-
1 M3 URUGAN TANAH DIPADATKAN DENGAN ALAT BERAT 106.091 29.353 135.443 135.400
0,2500 Org/Hr Pekerja 98.500 24.625
0,0250 Org/Hr Mandor 189.100 4.728
1,2000 M3 Tanah urug 85.700 102.840
0,0076 Jam Vibrating roller 6-8 ton 217.800 1.655
0,0071 Jam Water tank truck 6000 ltr 224.700 1.595
-
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
1 M3 URUGAN SIRTU ( AGREGAT KELAS C ) DIPADATKAN 675.758 29.353 705.111 705.100
0,2500 Org/Hr Pekerja 98.500 24.625
0,0250 Org/Hr Mandor 189.100 4.728
1,2000 M3 Sirtu 557.900 669.480
0,0215 Jam Vibrating roller 6-8 ton 217.800 4.683
0,0071 Jam Water tank truck 6000 ltr 224.700 1.595

PEKERJAAN PANCANG / PEMBONGKARAN

1 TTK PANCANG KAYU BULAT / MERAH / DOLKEN 18.100 11.741 29.841 29.800
1,0000 Btg Kayu bulat/dolken 8-10cm panj. 4 m 18.100 18.100
0,1000 Org/Hr Pekerja 98.500 9.850
0,0100 Org/Hr Mandor 189.100 1.891

1 TTK PANCANG KAYU BULAT / MERAH / DOLKEN - 11.741 11.741 11.700


1,0000 Btg Kayu bulat/dolken 12-15cm panj. 12 m - -
0,1000 Org/Hr Pekerja 98.500 9.850
0,0100 Org/Hr Mandor 189.100 1.891

PEKERJAAN PONDASI :

1 M3 PAS. PONDASI BATU KALI 1 :2 812.520 309.320 1.121.840 1.121.800


0,60 org/hr tukang batu 124.600 74.760
0,06 org/hr kepala tukang batu 162.000 9.720
2,25 org/hr pekerja 98.500 221.625
0,02 org/hr mandor 189.100 3.215
1,20 m3 batu kali 382.200 458.640
3,52 Zak semen 88.400 311.168
0,38 m3 pasir pasang 112.400 42.712

1 M3 MEMASANG PONDASI BATU BELAH CAMP. 1 PC : 4 PSR 843.088 267.533 1.110.621 1.110.600
1,50 org/hr Pekerja 98.500 147.750
0,75 org/hr Tukang batu 124.600 93.450
0,08 org/hr Kepala Tukang batu 162.000 12.150
0,08 org/hr Mandor 189.100 14.183
1,20 M3 batu belah 382.200 458.640
163,00 Kg Semen PC 2.000 326.000
0,52 M3 Pasir pasang 112.400 58.448
-
1 M3 MEMASANG PONDASI BATU BELAH CAMP. 1 PC : 5 PSR 791.786 267.533 1.059.318 1.059.300
1,500 org/hr Pekerja 98.500 147.750
0,750 org/hr Tukang batu 124.600 93.450
0,075 org/hr Kepala Tukang batu 162.000 12.150
0,075 org/hr Mandor 189.100 14.183
1,200 M3 batu belah 382.200 458.640
136,000 Kg Semen PC 2.000 272.000
0,544 M3 Pasir pasang 112.400 61.146
-
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
1 M3 MEMASANG PONDASI BATU KOSONG (ANSTAMPENG) 507.197 139.117 646.314 646.300
0,780 org/hr Pekerja 98.500 76.830
0,390 org/hr Tukang batu 124.600 48.594
0,039 org/hr Kepala Tukang batu 162.000 6.318
0,039 org/hr Mandor 189.100 7.375
1,200 M3 batu belah 382.200 458.640
0,432 M3 Pasir urug 112.400 48.557

PEKERJAAN BETON :

MEMBUAT 1 M3 PONDASI BETON BERTULANG (150 KG BESI + BEGESTING) 3.765.126 941.681 4.706.807 4.706.800
5,3000 org/hr Pekerja 98.500 522.050
0,2750 org/hr Tukang batu 124.600 34.265
1,3000 org/hr Tukang kayu 124.600 161.980
1,0500 org/hr Tukang besi 124.600 130.830
0,2620 org/hr Kepala Tukang 162.000 42.444
0,2650 org/hr Mandor 189.100 50.112
0,2000 M3 Kayu Begesting 2.682.100 536.420
1,5000 Kg Paku kayu 23.300 34.950
0,4000 Liter Minyak Begesting 7.000 2.800
157,5000 Kg Besi beton 12.400 1.953.000
2,2500 Kg Kawat beton 19.300 43.425
336,0000 Kg Semen PC 2.000 672.000
0,5400 M3 Pasir Beton 189.000 102.060
0,8100 M3 Kerikil 519.100 420.471

MEMBUAT 1 M3 SLOOF BETON BERTULANG (150 KG BESI + BEGESTING) 3.980.398 1.065.447 5.045.845 5.045.800
5,650 org/hr Pekerja 98.500 556.525
0,275 org/hr Tukang batu 124.600 34.265
1,560 org/hr Tukang kayu 124.600 194.376
1,400 org/hr Tukang besi 124.600 174.440
0,323 org/hr Kepala Tukang 162.000 52.326
0,283 org/hr Mandor 189.100 53.515
0,270 M3 Kayu Begesting 2.682.100 724.167
2,000 Kg Paku kayu 23.300 46.600
0,600 Liter Minyak Begesting 7.000 4.200
157,500 Kg Besi beton 12.400 1.953.000
3,000 Kg Kawat beton 19.300 57.900
336,000 Kg Semen PC 2.000 672.000
0,540 M3 Pasir Beton 189.000 102.060
0,810 M3 Kerikil 519.100 420.471
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
Membuat balok beton bertulang (150 kg besi + bekisting) tiap 1m³ 4.027.301 1.197.644 5.224.944 5.224.900
5,80 org/hr Pekerja 98.500 571.300
0,35 org/hr Tukang batu 124.600 43.610
2,80 org/hr Tukang kayu 124.600 348.880
1,05 org/hr Tukang besi 124.600 130.830
0,42 org/hr Kepala tukang 162.000 68.040
0,19 org/hr Mandor 189.100 34.984
0,210 m³ Kayu Begesting 2.682.100 563.241
3,200 kg Paku biasa 2"-5" 23.300 74.560
1,600 lt Minyak Bekisting 7.000 11.200
150,000 kg Besi beton polos 12.400 1.860.000
2,250 kg Kawat beton 19.300 43.425
323,000 kg Semen portland 2.000 646.000
0,520 m³ Pasir beton 189.000 98.280
0,780 m³ Batu pecah/split 2/3 519.100 404.898
0,121 m³ Papan mall 2.692.600 325.697
16,000 btg Kayu dolken Ø 8-10/400 cm - -

UNTUK 1 M3 KOLOM BETON DENGAN BESI 200 KG/M3 ADALAH : 5.036.471 1.240.758 6.277.229 6.277.200
7,0500 org/hr Pekerja 98.500 694.425
0,2750 org/hr Tukang batu 124.600 34.265
1,6500 org/hr Tukang kayu 124.600 205.590
1,4000 org/hr Tukang besi 124.600 174.440
0,4030 org/hr Kepala Tukang 162.000 65.286
0,3530 org/hr Mandor 189.100 66.752
0,4000 M3 Kayu Begesting 2.682.100 1.072.840
4,0000 Kg Paku kayu 23.300 93.200
2,0000 Liter Minyak Begesting 7.000 14.000
210,0000 Kg Besi beton 12.400 2.604.000
3,0000 Kg Kawat beton 19.300 57.900
336,0000 Kg Semen PC 2.000 672.000
0,5400 M3 Pasir Beton 189.000 102.060
0,8100 M3 Kerikil 519.100 420.471

UNTUK 1 M3 KOLOM BETON DENGAN BESI 150 KG/M3 ADALAH : 4.370.996 1.197.148 5.568.144 5.568.100
7,050 org/hr Pekerja 98.500 694.425
0,275 org/hr Tukang batu 124.600 34.265
1,650 org/hr Tukang kayu 124.600 205.590
1,050 org/hr Tukang besi 124.600 130.830
0,403 org/hr Kepala Tukang 162.000 65.286
0,353 org/hr Mandor 189.100 66.752
0,400 M3 Kayu Begesting 2.682.100 1.072.840
4,000 Kg Paku kayu 23.300 93.200
2,000 Liter Minyak Begesting 7.000 14.000
157,500 Kg Besi beton 12.400 1.953.000
2,250 Kg Kawat beton 19.300 43.425
336,000 Kg Semen PC 2.000 672.000
0,540 M3 Pasir Beton 189.000 102.060
0,810 M3 Kerikil 519.100 420.471
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
UNTUK 1 M3 KOLOM BETON DENGAN BESI 100 KG/M3 ADALAH : 3.705.521 1.153.538 4.859.059 4.859.100
7,0500 org/hr Pekerja 98.500 694.425
0,2750 org/hr Tukang batu 124.600 34.265
1,6500 org/hr Tukang kayu 124.600 205.590
0,7000 org/hr Tukang besi 124.600 87.220
0,4030 org/hr Kepala Tukang 162.000 65.286
0,3530 org/hr Mandor 189.100 66.752
0,4000 M3 Kayu Begesting 2.682.100 1.072.840
4,0000 Kg Paku kayu 23.300 93.200
2,0000 Liter Minyak Begesting 7.000 14.000
105,0000 Kg Besi beton 12.400 1.302.000
1,5000 Kg Kawat beton 19.300 28.950
336,0000 Kg Semen PC 2.000 672.000
0,5400 M3 Pasir Beton 189.000 102.060
0,8100 M3 Kerikil 519.100 420.471

Membuat tangga beton bertulang (150 kg besi + bekisting) tiap 1m³ 4.388.324 1.160.038 5.548.363 5.548.400
5,6 org/hr Pekerja 98.500 551.600
0,35 org/hr Tukang batu 124.600 43.610
2,3 org/hr Tukang kayu 124.600 286.580
1,4 org/hr Tukang besi 124.600 174.440
0,405 org/hr Kepala tukang 162.000 65.610
0,202 org/hr Mandor 189.100 38.198
0,250 m³ Kayu Begesting 2.682.100 670.525
3,000 kg Paku biasa 2"-5" 23.300 69.900
1,200 lt Minyak Bekisting 7.000 8.400
150,000 kg Besi beton polos 12.400 1.860.000
3,000 kg Kawat beton 19.300 57.900
323,000 kg Semen portland 2.000 646.000
0,520 m³ Pasir beton 189.000 98.280
0,780 m³ Batu pecah/split 2/3 519.100 404.898
0,105 m³ Kayu Begesting 2.682.100 281.621
0,108 m³ Papan mall 2.692.600 290.801
14,000 btg Kayu dolken Ø 8-10/400 cm - -

Membuat pelat lantai beton bertulang tebal 12 cm tiap 1 m² 463.123 132.460 595.583 595.600
0,647 org/hr Pekerja 98.500 63.730
0,330 org/hr Tukang kayu 124.600 41.118
0,087 org/hr Tukang besi 124.600 10.840
0,042 org/hr Tukang batu 124.600 5.233
0,046 org/hr Kepala tukang 162.000 7.436
0,022 org/hr Mandor 189.100 4.103
0,040 m³ Papan mall 3 cm 2.692.600 107.704
0,015 m³ Kayu Begesting 2.682.100 40.232
0,400 kg Paku biasa 2"-5" 23.300 9.320
0,200 lt Minyak Bekisting 7.000 1.400
4,500 btg Kayu dolken Ø 8-10/400 cm - -
12,950 kg Besi beton polos 12.400 160.580
0,185 kg Kawat beton 19.300 3.571
42,000 kg Semen portland 2.000 84.000
0,058 m³ Pasir beton 189.000 11.000
0,087 m³ Batu pecah/split 2/3 519.100 45.317
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
Pekerjaan Plat Lantai Beton tebal 12 cm, tiap 1 m3 4.963.333 - 4.963.333 4.963.300
8,3333 M2 Pek. Plat Lantai Beton tebal 12 cm 595.600 4.963.333

MEMBUAT 1 M' KOLOM PRAKTIS BETON BERTULANG (12 X 12 CM) 50.408 27.880 78.288 78.300
0,1800 org/hr Pekerja 98.500 17.730
0,0200 org/hr Tukang batu 124.600 2.492
0,0200 org/hr Tukang kayu 124.600 2.492
0,0200 org/hr Tukang besi 124.600 2.492
0,0060 org/hr Kepala Tukang 162.000 972
0,0090 org/hr Mandor 189.100 1.702
0,0020 M3 Kayu Begesting 2.682.100 5.364
0,0100 Kg Paku kayu 23.300 233
1,8000 Kg Besi beton 12.400 22.320
0,4500 Kg Kawat beton 19.300 8.685
4,0000 Kg Semen PC 2.000 8.000
0,0060 M3 Pasir Beton 189.000 1.134
0,0090 M3 Kerikil 519.100 4.672

Pekerjaan Kolom Praktis 12x12 cm tiap 1 m3 5.437.152 - 5.437.152 5.437.200


69,4400 M1 Kolom Penguat/praktis beton bertulang 12x12 78.300 5.437.152

MEMBUAT 1 M' RING BALOK BETON BERTULANG (10 X 15 CM) 74.605 46.046 120.651 120.700
0,2970 org/hr Pekerja 98.500 29.255
0,0330 org/hr Tukang batu 124.600 4.112
0,0330 org/hr Tukang kayu 124.600 4.112
0,0330 org/hr Tukang besi 124.600 4.112
0,0100 org/hr Kepala Tukang 162.000 1.620
0,0150 org/hr Mandor 189.100 2.837
0,0030 M3 Kayu Begesting 2.682.100 8.046
0,0200 Kg Paku kayu 23.300 466
3,6000 Kg Besi beton 12.400 44.640
0,0500 Kg Kawat beton 19.300 965
5,5000 Kg Semen PC 2.000 11.000
0,0090 M3 Pasir Beton 189.000 1.701
0,0150 M3 Kerikil 519.100 7.787
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
1 M2 MEMBUAT PLAT MEJA BETON BERTULANG TBL. 8 cm 106.139 67.382 173.521 173.500
0,3470 Org/Hr Pekerja 98.500 34.180
0,01220 Org/Hr Mandor 189.100 2.307
0,02150 Org/Hr Kepala tukang 162.000 3.483
0,0270 Org/Hr Tukang besi 124.600 3.364
0,1650 Org/Hr Tukang kayu 124.600 20.559
0,0280 Org/Hr Tukang batu 124.600 3.489
0,0040 M3 Kayu papan 2.682.100 10.728
0,1800 Kg Paku 23.300 4.194
4,1500 Kg Besi beton polos 12.400 51.460
0,0600 Kg Kawat beton 19.300 1.158
0,5600 Zak Semen 2.000 1.120
0,0390 M3 Pasir pasang 189.000 7.371
0,0580 M3 Kerikil 519.100 30.108

1 M3 MEMBUAT BETON CAMP. 1PC : 2 PSR : 3 KRL 967.178 212.853 1.180.031 1.180.000
0,080 org/hr Mandor 189.100 15.128
0,025 org/hr Kepala Tukang batu 162.000 4.050
0,250 org/hr Tukang Batu 124.600 31.150
1,650 org/hr Pekerja (Pembantu tukang) 98.500 162.525
232,000 Kg semen PC 2.000 464.000
0,520 M3 Pasir beton 189.000 98.280
0,780 M3 Kerikil beton 519.100 404.898

1 M3 BETON TUMBUK CAMP. 1 PC : 3 PSR : 6 KRL 970.784 212.853 1.183.637 1.183.600


0,080 org/hr Mandor 189.100 15.128
0,025 org/hr Kepala Tukang 162.000 4.050
0,250 org/hr Tukang Batu 124.600 31.150
1,650 org/hr Pembantu Tukang batu 98.500 162.525
0,940 M3 kerikil 519.100 487.954
197,000 Kg semen Portland 2.000 394.000
0,470 M3 Pasir Beton 189.000 88.830

Kg TULANGAN BESI BETON U-24 11.210 2.432 13.641 13.600


1,050 kg Besi Beton U-24 10.400 10.920
0,015 kg Kawat Benrat 19.300 290
0,007 org/hr Pekerja 98.500 690
0,007 org/hr Tukang Besi Tulangan 124.600 872
0,001 org/hr Kepala Tukang Besi 162.000 113
0,004 org/hr Mandor 189.100 756

Kg TULANGAN BESI BETON U-39 13.310 2.432 15.741 15.700


1,050 kg Besi Beton U-39 12.400 13.020
0,015 kg Kawat Benrat 19.300 290
0,007 org/hr Pekerja 98.500 690
0,007 org/hr Tukang Besi Tulangan 124.600 872
0,001 org/hr Kepala Tukang Besi 162.000 113
0,004 org/hr Mandor 189.100 756
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
100 kg TULANGAN BESI BETON U-24 TIAP 100 KG 1.120.950 168.266 1.289.216 1.289.200
105,00 kg Besi Beton U-24 10.400 1.092.000
1,50 kg Kawat Benrat 19.300 28.950
0,70 org/hr Pekerja 98.500 68.950
0,70 org/hr Tukang Besi Tulangan 124.600 87.220
0,07 org/hr Kepala Tukang Besi 162.000 11.340
0,00 org/hr Mandor 189.100 756

M3 BETON K - 175 1.074.653 217.021 1.291.674 1.291.700


6,520 zak Semen PC 88.400 576.368
0,543 m3 Pasir Beton 189.000 102.627
0,762 m3 Batu Split Pecah Mesin 1/2 519.100 395.658
1,650 org/hr Pekerja 98.500 162.525
0,275 org/hr Tukang Batu Kasar 124.600 34.265
0,028 org/hr Kepala Tukang Batu 162.000 4.536
0,083 org/hr Mandor 189.100 15.695

M3 BETON K - 200 1.111.876 217.021 1.328.898 1.328.900


7,040 zak Semen PC 88.400 622.336
0,522 m3 Pasir Beton 189.000 98.658
0,753 m3 Batu Split Pecah Mesin 1/2 519.100 390.882
1,650 org/hr Pekerja 98.500 162.525
0,275 org/hr Tukang Batu Kasar 124.600 34.265
0,028 org/hr Kepala Tukang Batu 162.000 4.536
0,083 org/hr Mandor 189.100 15.695

M3 BETON K - 225 1.175.733 217.021 1.392.754 1.392.800


7,680 zak Semen PC 88.400 678.912
0,499 m3 Pasir Beton 189.000 94.230
0,776 m3 Batu Split Pecah Mesin 1/2 519.100 402.591
1,650 org/hr Pekerja 98.500 162.525
0,275 org/hr Tukang Batu Kasar 124.600 34.265
0,028 org/hr Kepala Tukang Batu 162.000 4.536
0,083 org/hr Mandor 189.100 15.695

M3 BETON K - 250 1.189.527 217.021 1.406.548 1.406.500


7,880 zak Semen PC 88.400 696.592
0,494 m3 Pasir Beton 189.000 93.420
0,770 m3 Batu Split Pecah Mesin 1/2 519.100 399.515
1,650 org/hr Pekerja 98.500 162.525
0,275 org/hr Tukang Batu Kasar 124.600 34.265
0,028 org/hr Kepala Tukang Batu 162.000 4.536
0,083 org/hr Mandor 189.100 15.695
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
M2 PAS. LANTAI KERJA BETON TUMBUK 1:3:5 TEBAL 10 cm 81.512 28.776 110.288 110.300
0,300 zak Semen PC 88.400 26.520
0,063 m3 Pasir Beton 189.000 11.907
0,083 m3 Batu Split Pecah Mesin 1/2 519.100 43.085
0,130 org/hr Pekerja 98.500 12.805
0,100 org/hr Tukang Batu Kasar 124.600 12.460
0,010 org/hr Kepala Tukang Batu 162.000 1.620
0,010 org/hr Mandor 189.100 1.891

M2 PAS. RABATZ BETON , FINISH ACIAN 97.578 45.521 143.099 143.100


0,454 zak Semen PC 88.400 40.134
0,054 m3 Pasir Beton 189.000 10.206
0,091 m3 Batu Split Pecah Mesin 1/2 519.100 47.238
0,300 org/hr Pekerja 98.500 29.550
0,100 org/hr Tukang Batu Kasar 124.600 12.460
0,010 org/hr Kepala Tukang Batu 162.000 1.620
0,010 org/hr Mandor 189.100 1.891

PEKERJAAN DINDING

1 M2 Pasang Batako uk. 15/30/7 70.835 48.437 119.271 119.300


22,000 Bh Batako 15/30/7 (cetak mesin) 2.400 52.800
7,500 Kg Semen Portland 2.000 15.000
0,027 M3 Pasir Beton / Pasang 112.400 3.035
0,32 org/hr Pekerja 98.500 31.520
0,10 org/hr Tukang Batu Kasar 124.600 12.460
0,01 org/hr Kepala Tukang Batu 162.000 1.620
0,015 org/hr Mandor 189.100 2.837

1 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps 221.992 92.933 314.925 314.900


140 Bh Bata merah 900 126.000
43,5 Kg Semen portland 2.000 87.000
0,08 M3 Pasir pasang 112.400 8.992
0,6 org/hr Pekerja 98.500 59.100
0,2 org/hr Tukang batu 124.600 24.920
0,02 org/hr Kepala tukang 162.000 3.240
0,03 org/hr Mandor 189.100 5.673
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
1 M2 DINDING RABITZ TEBAL . 3 cm 70.788 42.711 113.499 113.499
0,350 zak semen 88.400 30.940
0,020 m3 pasir pasang 112.400 2.248
2,000 kg Kawat anyam / simpai 18.800 37.600
0,150 org/hr tukang batu 124.600 18.690
0,015 org/hr kepala tukang batu 162.000 2.430
0,200 org/hr pekerja 98.500 19.700
0,010 org/hr mandor 189.100 1.891

1 M2 PAS. KAWAT SIMPAI DINDING RABITZ 37.600 17.836 55.436 55.436


2,000 kg Kawat anyam / simpai 18.800 37.600
0,050 org/hr tukang batu 124.600 6.230
0,005 org/hr kepala tukang batu 162.000 810
0,100 org/hr pekerja 98.500 9.850
0,005 org/hr mandor 189.100 946

M2 Pas. Dinding partisi gypsumboard Rangka Kayu 3.495 266.664 270.159 270.200
0,028 m3 Balok kayu klas II - -
0,150 kg Paku 8 s/d 12 cm 23.300 3.495
0,860 lbr Gypsumboard t.9 mm ex Jayaboard - -
0,560 kg Lem Kayu - -
0,028 org/hr Pekerja 98.500 2.758
0,150 org/hr Tukang Kayu Halus 124.600 18.690
0,860 org/hr Kepala Tukang Kayu 162.000 139.320
0,560 org/hr Mandor 189.100 105.896

M2 Pas. Dinding partisi gypsumboard Rangka Metal Furing 57.000 266.664 323.664 323.700
1,000 m2 Rangka plafond Metal furing 57.000 57.000
0,860 lbr Gypsumboard t.9 mm ex Jayaboard - -
0,028 org/hr Pekerja 98.500 2.758
0,150 org/hr Tukang Kayu Halus 124.600 18.690
0,860 org/hr Kepala Tukang Kayu 162.000 139.320
0,560 org/hr Mandor 189.100 105.896

M2 Pas. Dinding partisi Toilet; Panel MDF + rangka alum. - 266.664 266.664 266.700
0,028 m3 Kusen Alm. 3" PC - -
0,860 lbr MDF t. 9 mm - -
6,000 bh Paku ripet - -
0,560 kg Lem Kayu - -
0,028 org/hr Pekerja 98.500 2.758
0,150 org/hr Tukang Kayu Halus 124.600 18.690
0,860 org/hr Kepala Tukang Kayu 162.000 139.320
0,560 org/hr Mandor 189.100 105.896
-
M2 Dinding triplek 4 mm untuk dinding pemisah 1.165 13.268 14.433 14.433
0,0500 Kg Paku biasa 23.300 1.165
0,4000 Lbr Triplek 4 mm - -
0,0250 Org/Hr Pekerja 98.500 2.463
0,0013 Org/Hr Mandor 189.100 246
0,0750 Org/Hr Tukang kayu 124.600 9.345
0,0075 Org/Hr Kepala tukang 162.000 1.215
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah

M2 Dinding pemisah rangka kayu 78.594 79.648 158.242 158.242


0,1500 Kg Paku biasa 23.300 3.495
0,0280 M3 Balok kayu 2.682.100 75.099
0,1500 Org/Hr Pekerja 98.500 14.775
0,0080 Org/Hr Mandor 189.100 1.513
0,4500 Org/Hr Tukang kayu 124.600 56.070
0,0450 Org/Hr Kepala tukang 162.000 7.290

PEKERJAAN PLESTERAN :

1 M2 PLESTERAN TEBAL 15 MM CAMP. 1 PC : 2 PSR 32.806 53.507 86.313 86.310


0,300 org/hr Pekerja 98.500 29.550
0,150 org/hr Tukang batu 124.600 18.690
0,015 org/hr Kepala tukang 162.000 2.430
0,015 org/hr Mandor 189.100 2.837
15,504 Kg Semen PC 2.000 31.008
0,016 M3 Pasir pasang 112.400 1.798

1 M2 PLESTERAN TEBAL 15 MM CAMP. 1 PC : 4 PSR 15.178 53.507 68.684 68.680


0,300 org/hr Pekerja 98.500 29.550
0,150 org/hr Tukang batu 124.600 18.690
0,015 org/hr Kepala tukang 162.000 2.430
0,015 org/hr Mandor 189.100 2.837
6,240 Kg Semen PC 2.000 12.480
0,024 M3 Pasir pasang 112.400 2.698

1 M2 PLESTERAN TEBAL 15 MM CAMP. 1 PC : 5 PSR 13.290 53.507 66.797 66.790


0,300 org/hr Pekerja 98.500 29.550
0,150 org/hr Tukang batu 124.600 18.690
0,015 org/hr Kepala tukang 162.000 2.430
0,015 org/hr Mandor 189.100 2.837
5,184 Kg Semen PC 2.000 10.368
0,026 M3 Pasir pasang 112.400 2.922

1 M2 BRAPEN PONDASI 1:4 10.411 32.104 42.515 42.500


0,085 zak semen 100.000 8.500
0,017 m3 pasir pasang 112.400 1.911
0,09 org/hr tukang batu 124.600 11.214
0,009 org/hr kepala tukang batu 162.000 1.458
0,18 org/hr pekerja 98.500 17.730
0,009 org/hr mandor 189.100 1.702

1 M2 MEMBUAT ACIAN 6.500 35.671 42.171 42.170


0,2000 org/hr Pekerja 98.500 19.700
0,1000 org/hr Tukang batu 124.600 12.460
0,0100 org/hr Kepala tukang 162.000 1.620
0,0100 org/hr Mandor 189.100 1.891
3,2500 Kg Semen PC 2.000 6.500
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah

1 M2 PLESTERAN CIPRAT/KAMPROT 1 Pc : 2 Ps 12.598 41.542 54.140 54.100


0,250 Oh Pekerja 98.500 24.625
0,100 Oh Tukang batu 124.600 12.460
0,010 Oh Kepala tukang 162.000 1.620
0,015 Oh Mandor 189.100 2.837
0,108 zak Semen 100.000 10.800
0,016 m3 Pasir pasang 112.400 1.798

PEKERJAAN LANTAI / DINDING KERAMIK

M2 PAS. LANTAI KERAMIK 600 x 600 262.655 116.023 378.678 378.700


1,068 m2 Keramik 60/60 cm KW1 ex Masterina 197.900 211.417
0,200 zak Semen PC 88.400 17.680
0,045 m3 Pasir Pasang 112.400 5.058
1,500 kg Semen Warna 19.000 28.500
0,620 org/hr Pekerja 98.500 61.070
0,350 org/hr Tukang Batu Kasar 124.600 43.610
0,035 org/hr Kepala Tukang Batu 162.000 5.670
0,030 org/hr Mandor 189.100 5.673

1 M2 MEMASANG KERAMIK 40X40 CM 105.491 116.023 221.514 221.510


0,6200 org/hr Pekerja 98.500 61.070
0,3500 org/hr Tukang batu 124.600 43.610
0,0350 org/hr Kepala tukang 162.000 5.670
0,0300 org/hr Mandor 189.100 5.673
6,6300 Buah Keramik 40x40 cm 12.192 80.833
9,8000 Kg Semen PC 2.000 19.600
0,0450 M3 Pasir pasang 112.400 5.058

1 M2 MEMASANG LANTAI KERAMIK 30X30 CM 104.441 116.023 220.464 220.460


0,6200 org/hr Pekerja 98.500 61.070
0,3500 org/hr Tukang batu 124.600 43.610
0,0350 org/hr Kepala tukang 162.000 5.670
0,0300 org/hr Mandor 189.100 5.673
11,8700 Buah Keramik 30x30 cm 6.688 79.383
10,0000 Kg Semen PC 2.000 20.000
0,0450 M3 Pasir pasang 112.400 5.058

1 M2 MEMASANG LANTAI KERAMIK 20X20 CM 108.644 116.023 224.667 224.660


0,6200 org/hr Pekerja 98.500 61.070
0,3500 org/hr Tukang batu 124.600 43.610
0,0350 org/hr Kepala tukang 162.000 5.670
0,0300 org/hr Mandor 189.100 5.673
26,5000 buah Keramik 20x20 cm 3.124 82.786
10,4000 Kg Semen PC 2.000 20.800
0,0450 M3 Pasir pasang 112.400 5.058
-
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
1 M2 MEMASANG LANTAI MOZAIK 30X30 CM CAMP. 1 PC : 3 PSR 70.684 116.023 186.707 186.700
0,6200 org/hr Pekerja 98.500 61.070
0,3500 org/hr Tukang batu 124.600 43.610
0,0350 org/hr Kepala tukang 162.000 5.670
0,0300 org/hr Mandor 189.100 5.673
11,8700 Buah Mozaik 30x30 cm - -
14,1500 Kg Semen PC 2.000 28.300
0,0390 M3 Pasir pasang 112.400 4.384
2,0000 Kg Semen Warna 19.000 38.000

1 M2 MEMASANG DINDING KERAMIK 20X25 CM 150.973 128.133 279.106 279.100


0,6000 org/hr Pekerja 98.500 59.100
0,4500 org/hr Tukang batu 124.600 56.070
0,0450 org/hr Kepala tukang 162.000 7.290
0,0300 org/hr Mandor 189.100 5.673
20,0000 Bh keramik 20 X 25 cm 3.905 78.100
9,3000 Kg Semen PC 2.000 18.600
0,0180 M3 Pasir pasang 112.400 2.023
2,7500 Kg Semen Warna 19.000 52.250

M2 PAS. DINDING BATU TEMPEL 24.708 116.023 140.731 140.700


1,100 m2 Batu tempel - -
0,235 zak Semen PC 88.400 20.774
0,035 m3 Pasir Pasang 112.400 3.934
0,620 org/hr Pekerja 98.500 61.070
0,350 org/hr Tukang Batu Kasar 124.600 43.610
0,035 org/hr Kepala Tukang Batu 162.000 5.670
0,030 org/hr Mandor 189.100 5.673

1 M2 PLESTERAN CIPRAT / KAMPROT 1 Pc : 2 Ps 12.598 41.542 54.140 54.100


0,108 zak Semen Portland 100.000 10.800
0,016 m3 Pasir pasang 112.400 1.798
0,250 Oh Pekerja 98.500 24.625
0,100 Oh Tukang batu 124.600 12.460
0,010 Oh Kepala tukang 162.000 1.620
0,015 Oh Mandor 189.100 2.837
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah

PEKERJAAN LANGIT-LANGIT

M2 Pas. Rangka Plafond Metal furing 59.850 63.831 123.681 123.700


1,050 m2 Rangka plafond Metal furing 57.000 59.850
8,000 bh Paku ripet - -
0,200 org/hr Pekerja 98.500 19.700
0,300 org/hr Tukang Besi Konstruksi 124.600 37.380
0,030 org/hr Kepala Tukang Besi 162.000 4.860
0,010 org/hr Mandor 189.100 1.891

1 M2 MEMASANG RANGKA LANGIT-LANGIT KAYU KLAS II (60X120 CM) 64.321 63.831 128.150 128.100
0,2000 org/hr Pekerja 98.500 19.700
0,3000 org/hr Tukang kayu 124.600 37.380
0,0300 org/hr Kepala tukang 162.000 4.860
0,0100 org/hr Mandor 189.100 1.891
0,0163 M3 Kayu klas II 3.588.700 58.496
0,2500 Kg paku kayu 23.300 5.825

1 M2 PENUTUP LANGIT-LANGIT PLYWOOD 3 MM 47.288 21.637 68.924 68.900


0,0035 org/hr Mandor 189.100 662
0,0100 org/hr Kepala tukang kayu 162.000 1.620
0,1000 org/hr Tukang kayu 124.600 12.460
0,0700 org/hr Pembantu tukang kayu 98.500 6.895
0,0300 Kg paku plywood - -
0,3750 Lbr Plywood 3 mm 126.100 47.288

1 M2 PENUTUP LANGIT-LANGIT TRIPLEKS 3 MM - 21.637 21.637 21.600


0,0035 org/hr Mandor 189.100 662
0,0100 org/hr Kepala tukang kayu 162.000 1.620
0,1000 org/hr Tukang kayu 124.600 12.460
0,0700 org/hr Pembantu tukang kayu 98.500 6.895
0,0300 Kg paku tripleks - -
0,3750 Lbr Tripleks 3 mm - -

1 M2 PENUTUP LANGIT-LANGIT MOULDING 169.691 43.274 212.965 213.000


0,0100 org/hr Mandor 189.100 1.891
0,0600 org/hr Kepala tukang kayu 162.000 9.720
0,6000 org/hr Tukang kayu 124.600 74.760
0,2000 org/hr Pembantu tukang kayu 98.500 19.700
0,1000 Kg paku biasa 23.300 2.330
2,7500 Kpg molding papan klas II 60.859 167.361

1 M2 PENUTUP LANGIT-LANGIT GYPSUM - 17.836 17.836 17.800


0,0050 org/hr Mandor 189.100 946
0,0050 org/hr Kepala tukang kayu 162.000 810
0,0500 org/hr Tukang kayu 124.600 6.230
0,1000 org/hr Pembantu tukang kayu 98.500 9.850
0,1100 Kg paku skerup - -
0,3640 Lbr papan gypsum - -
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah

1 M2 PENUTUP LANGIT-LANGIT GRC 53.954 17.836 71.790 71.800


0,0050 org/hr Mandor 189.100 946
0,0050 org/hr Kepala tukang kayu 162.000 810
0,0500 org/hr Tukang kayu 124.600 6.230
0,1000 org/hr Pembantu tukang kayu 98.500 9.850
0,1100 Kg paku skerup 34.500 3.795
0,3640 GRC 137.800 50.159

1 M' LIS LANGIT-LANGIT KAYU PROFIL 8.108 12.532 20.640 20.600


0,0030 org/hr Mandor 189.100 567
0,0050 org/hr Kepala tukang kayu 162.000 810
0,0500 org/hr Tukang kayu 124.600 6.230
0,0500 org/hr Pembantu tukang kayu 98.500 4.925
0,0100 Kg paku plywood 23.300 233
1,0500 m' list profil 7.500 7.875

1 M' LIS LANGIT-LANGIT GYPSUM 233 12.532 12.765 12.800


0,0030 org/hr Mandor 189.100 567
0,0050 org/hr Kepala tukang kayu 162.000 810
0,0500 org/hr Tukang kayu 124.600 6.230
0,0500 org/hr Pembantu tukang kayu 98.500 4.925
0,0100 Kg paku skrup 23.300 233
1,0500 m' list profil Gypsum - -

1 M2 RANGKA DAN PLAFOND GRC 4 x 8ft, 4 MM


( grid 50x100 cm) 128.338 72.752 201.090 201.100
0,004 m3 balok 3.588.700 14.355
0,014 m3 kaso 5/7 3.588.700 50.242
0,25 kg paku rata-rata 23.300 5.825
0,4 lbr GRC 4x8 ft, 4 mm 137.800 55.120
0,12 kg paku triplek 23.300 2.796
0,3 org/hr tukang kayu 124.600 37.380
0,05 org/hr kepala tukang kayu 162.000 8.100
0,25 org/hr pekerja 98.500 24.625
0,014 org/hr mandor 189.100 2.647

1 M2 Penutup plafon Gypsum 9 mm + rangka hollow tb. 0,3 mm 15.901 71.716 87.617 87.600
0,2600 Org/Hr Pekerja 98.500 25.610
0,0130 Org/Hr Mandor 189.100 2.458
0,0500 Org/Hr Tukang Gypsum 124.600 6.230
0,2600 Org/Hr Tukang Alumunium 124.600 32.396
0,0310 Org/Hr Kepala tukang 162.000 5.022
0,3900 Bh Paku peluru ramset 5.000 1.950
0,4590 btg Hollow 4x4 cm tb. 0,35 mm 11.800 5.416
0,4310 btg Hollow 2x4 cm tb. 0,35 mm 8.850 3.814
0,0100 Kg Paku beton - -
14,0000 Bh Sekrup 6 x 1-1,5 150 2.100
0,3640 Lbr Gypsum board 120x240 9 mm - -
21,0000 Bh Sekrup Gypsum - -
0,02400 Rol Textile tape 25.000 600
0,02000 Zak Compound Gypsum 80.000 1.600
0,10000 Lbr Amplas 4.200 420
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
-
1 M2 Penutup plafon GRC 4 mm + rangka hollow tb. 0,3 mm 66.060 71.716 137.776 137.800
0,2600 Org/Hr Pekerja 98.500 25.610
0,0130 Org/Hr Mandor 189.100 2.458
0,0500 Org/Hr Tukang GRC 124.600 6.230
0,2600 Org/Hr Tukang Alumunium 124.600 32.396
0,0310 Org/Hr Kepala tukang 162.000 5.022
0,3900 Bh Paku peluru ramset 5.000 1.950
0,4590 btg Hollow 4x4 cm tb. 0,35 mm 11.800 5.416
0,4310 btg Hollow 2x4 cm tb. 0,35 mm 8.850 3.814
0,0100 Kg Paku beton - -
14,0000 Bh Sekrup 6 x 1-1,5 150 2.100
0,3640 Lbr GRC 4 mm 137.800 50.159
21,0000 Bh Sekrup GRC - -
0,02400 Rol Textile tape 25.000 600
0,02000 Zak Compound GRC 80.000 1.600
0,10000 Lbr Amplas 4.200 420

PEKERJAAN PENUTUP ATAP

1 M2 PAS. RANGKA ATAP BAJA RINGAN 115.600 115.600

1 M2 PENUTUP ATAP GENTENG METAL 95.053 33.969 129.022 129.000


1,0200 M2 Genteng Metal 68.698 90.393
0,2000 Kg paku anti karat 23.300 4.660
0,0010 org/hr Mandor 189.100 189
0,0100 org/hr Kepala tukang kayu 162.000 1.620
0,1000 org/hr Tukang kayu 124.600 12.460
0,2000 org/hr Pembantu tukang kayu 98.500 19.700

M1 BUBUNGAN ATAP GENTENG METAL 41.425 48.203 89.628 89.600


1,100 bh Nok/Bumbungan Genteng Metal 1/2 lingk 36.600 40.260
0,050 kg Paku 23.300 1.165
0,250 org/hr Pekerja 98.500 24.625
0,150 org/hr Tukang Kayu 124.600 18.690
0,015 org/hr Kepala Tukang Kayu 162.000 2.430
0,013 org/hr Mandor 189.100 2.458

10m1 Talang Cucuran Atap 1/2 Lingkaran Ø 15cm Aluminium 0.3 351.300 1.027.865 1.379.165 1.379.200
5,000 org/hr Tukang Kayu 124.600 623.000
0,500 org/hr Kepala Tukang Kayu 162.000 81.000
3,000 org/hr Pekerja 98.500 295.500
0,150 org/hr Mandor 189.100 28.365
3,000 Lbr Aluminium plat 0.3 84.100 252.300
9,000 Bh Besi Penahan 11.000 99.000
Untuk I M' Pek. Talang 137.920
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
10m1 Pasang Pipa Pembuangan dari Talang Atap Ø 8cm aluminium 210.250 770.426 980.676 980.700
3,750 org/hr Tukang Kayu 124.600 467.250
0,375 org/hr Kepala Tukang Kayu 162.000 60.750
2,250 org/hr Pekerja 98.500 221.625
0,110 org/hr Mandor 189.100 20.801
2,500 Lbr Aluminium plat 0.3 84.100 210.250
Untuk I M' Pek. Pipa Pembuangan 98.070
M1 1m2 Pasang Talang Miring Seng BJLS 30 / Jurai Dalam 31.100 118.025 149.124 149.100
0,50 m2 Seng Plat BJLS 20 61.500 30.750
0,015 kg Paku 1/2" - 1" 23.300 350
0,019 M3 Papan Kayu Kelas 2 Tidak Ketam 3.381.300 64.245
0,000 Kg Meni 32.300 -
0,040 org/hr Pekerja 98.500 3.940
0,400 org/hr Tukang Kayu Kasar 124.600 49.840
0,025 org/hr Kepala Tukang Kayu 162.000
0,00125 org/hr Mandor 189.100

PEKERJAAN KAYU

M3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau, Topangan
Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian Uk. 9/9 9.401.940 4.242.840 13.644.780 13.644.800
24,000 org/hr Tukang Kayu 124.600 2.990.400
8,000 org/hr Pekerja 98.500 788.000
2,400 org/hr Kepala Tukang 162.000 388.800
0,400 org/hr Mandor 189.100 75.640
1,100 M3 Kayu Belian (Tidak Ketam uk. 9/9) 8.453.400 9.298.740
3,000 Kg Paku beton 34.400 103.200

M3 Pekerjaan Rangka Badan Kayu Belian Uk. 8/8 9.505.140 6.364.260 15.869.400 15.869.400
36,000 org/hr Tukang Kayu 124.600 4.485.600
12,000 org/hr Pekerja 98.500 1.182.000
3,600 org/hr Kepala Tukang 162.000 583.200
0,600 org/hr Mandor 189.100 113.460
1,100 M3 Kayu Belian (Ketam uk. 8/8) 8.453.400 9.298.740
6,000 Kg Paku belian 34.400 206.400

M3 Pekerjaan Rangka Badan Kayu Kelas I Uk. 8/8 139.800 6.364.260 6.504.060 6.504.100
36,000 org/hr Tukang Kayu 124.600 4.485.600
12,000 org/hr Pekerja 98.500 1.182.000
3,600 org/hr Kepala Tukang 162.000 583.200
0,600 org/hr Mandor 189.100 113.460
1,100 M3 Kayu Kelas I (Ketam Uk. 8/8) - -
6,000 Kg Paku 23.300 139.800
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
1 M3 MEMBUAT DAN MEMASANG KOSEN PINTU/JENDELA KAYU ULIN 9.341.740 3.712.485 13.054.225 13.054.200
7,0000 org/hr Pekerja 98.500 689.500
21,0000 org/hr Tukang kayu 124.600 2.616.600
2,1000 org/hr Kepala tukang 162.000 340.200
0,3500 org/hr Mandor 189.100 66.185
1,1000 M3 Kayu ulin 8.453.400 9.298.740
1,2500 Kg Paku ulin 34.400 43.000

1 M3 MEMBUAT DAN MEMASANG KOSEN PINTU/JENDELA KAYU KLAS I 4.814.440 3.182.130 7.996.570 7.996.600
6,0000 org/hr Pekerja 98.500 591.000
18,0000 org/hr Tukang kayu 124.600 2.242.800
1,8000 org/hr Kepala tukang 162.000 291.600
0,3000 org/hr Mandor 189.100 56.730
1,2000 M3 Kayu klas I 3.976.200 4.771.440
1,2500 Kg Paku Kayu 34.400 43.000

1 M3 MEMBUAT & MEMASANG KUDA-KUDA KONVENSIONAL KY. KLAS II 4.781.550 2.121.420 6.902.970 6.903.000
4,0000 org/hr Pekerja 98.500 394.000
12,0000 org/hr Tukang kayu 124.600 1.495.200
1,2000 org/hr Kepala tukang 162.000 194.400
0,2000 org/hr Mandor 189.100 37.820
1,1000 M3 Balok Kayu klas II 3.588.700 3.947.570
15,0000 Kg Besi strip 46.900 703.500
5,6000 Kg Paku kayu 23.300 130.480

1 M3 MEMBUAT DAN MEMASANG KONSTRUKSI GORDENG KAYU KLAS II 4.720.970 1.272.852 5.993.822 5.993.800
2,4000 org/hr Pekerja 98.500 236.400
7,2000 org/hr Tukang kayu 124.600 897.120
0,7200 org/hr Kepala tukang 162.000 116.640
0,1200 org/hr Mandor 189.100 22.692
1,1000 M3 Balok Kayu klas II 3.588.700 3.947.570
3,0000 Kg Paku kayu 23.300 69.900
15,0000 Kg Besi strip 46.900 703.500

1 M2 RANGKA ATAP KASAU 5/7 DAN RENG 3/5 KAYU KLAS II 81.905 24.876 106.781 106.800
UNTUK GENTENG METAL ROOF
0,1000 org/hr Pekerja 98.500 9.850
0,1000 org/hr Tukang kayu 124.600 12.460
0,0100 org/hr Kepala tukang kayu 162.000 1.620
0,0050 org/hr Mandor 189.100 946
0,0140 M3 Kasau 5/7 cm 3.588.700 50.242
0,0072 M3 Reng 3/4 cm 3.588.700 25.839
0,2500 Kg paku kayu 23.300 5.825
kasaunya saja 1/2 dari SNI -2008.06.17 40.952,72 12.437,75 53.390,47 53.400,00
rengnya saja 1/2 dari SNI -2008.06.17 40.952,72 12.437,75 53.390,47 53.400,00
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah

1 M' LISPLANK 3/20 CM PAPAN KAYU KLAS. I ATAU KLAS. II


0,0500 org/hr Mandor 189.100 9.455
0,0200 org/hr Kepala tukang kayu 162.000 3.240
0,0200 org/hr Tukang kayu 124.600 2.492
0,1000 org/hr Pembantu tukang kayu 98.500 9.850
0,0108 M3 Kayu papan kelas Kuat I 3.976.200 42.943
0,1000 Kg paku ulin 23.300 2.330
0,0108 M3 Kayu papan kelas Kuat II 3.381.300 36.518
0,1000 Kg paku kayu 23.300 2.330
Untuk Lysplank papan kayu klas I = 25.037,00 47.602,96 72.639,96 72.600,00
Untuk Lysplank papan kayu klas II = 25.037,00 41.178,04 66.215,04 66.200,00

1 M1 Mengerjakan lisplank kalsiplank 24.876 83.898 108.774 108.800


0,1000 Org/Hr Pekerja 98.500 9.850
0,0050 Org/Hr Mandor 189.100 946
0,1000 Org/Hr Tukang 124.600 12.460
0,0100 Org/Hr Kepala tukang 162.000 1.620
1,1000 M1 Kalsiplank 20 cm 75.000 82.500
0,0600 Kg Paku 23.300 1.398

1 M2 MEMBUAT & MEMASANG DAUN PINTU PANEL KY KLAS I / KLAS II


1,0000 org/hr Pekerja 98.500 98.500
3,0000 org/hr Tukang kayu 124.600 373.800
0,3000 org/hr Kepala tukang 162.000 48.600
0,0500 org/hr Mandor 189.100 9.455
0,0400 M3 Papan Kayu klas I 3.976.200 159.048
0,0400 M3 Papan Kayu klas II 3.381.300 135.252
0,5000 Lem kayu - -
Untuk Daun pintu panel kayu klas I = 530.355,00 159.048,00 689.403,00 689.400,00
Untuk Daun pintu panel kayu klas II = 530.355,00 135.252,00 665.607,00 665.600,00

1 M2 MEMBUAT DAN MEMASANG DAUN PINTU PANEL KACA KAYU KLAS I ATAU KLAS II
0,8000 org/hr Pekerja 98.500 78.800
2,4000 org/hr Tukang kayu 124.600 299.040
0,2400 org/hr Kepala tukang 162.000 38.880
0,0400 org/hr Mandor 189.100 7.564
0,0240 M3 Papan Kayu klas I 3.976.200 95.429
0,0240 M3 Papan Kayu klas II 3.381.300 81.151
0,3000 Lem kayu - -
0,7500 M2 Kaca Polos 5 mm 147.100 110.325
Untuk Daun pintu panel kaca kayu klas I = 424.284,00 205.753,80 630.037,80 630.000,00
Untuk Daun pintu panel kaca kayu klas II = 424.284,00 191.476,20 615.760,20 615.800,00

M2 Daun Pintu double teakwood; rangka kayu KW.II tertutup 85.232 397.430 482.662 482.700
0,025 m3 Papan Kayu klas II 3.381.300 84.533
0,500 kg Lem Kayu - -
0,030 kg Paku 1 s/d 3 cm 23.300 699
2,000 lbr Teakwood t. 3 mm - -
0,600 org/hr Pekerja 98.500 59.100
2,000 org/hr Tukang Kayu Halus 124.600 249.200
0,200 org/hr Kepala Tukang Kayu 162.000 32.400
0,300 org/hr Mandor 189.100 56.730
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
M2 Daun Pintu double triplex; rangka kayu KW.II tertutup 85.232 424.284 509.516 509.500
0,025 m3 Papan Kayu klas II 3.381.300 84.533
0,500 kg Lem Kayu - -
0,030 kg Paku 1 s/d 3 cm 23.300 699
2,000 lbr Triplex t. 4 mm - -
0,800 org/hr Pekerja 98.500 78.800
2,400 org/hr Tukang Kayu Halus 124.600 299.040
0,240 org/hr Kepala Tukang Kayu 162.000 38.880
0,040 org/hr Mandor 189.100 7.564

1 M2 DAUN JENDELA KACA 5 MM KAYU KLS II 367.964 237.095 605.059 605.100,00


0,035 m3 Balok kayu klas. II 3.588.700 125.605
0,05 kg paku 23.300 1.165
0,75 m2 kaca 5 mm 147.100 110.325
2,00 org/hr tukang kayu 124.600 249.200
0,20 org/hr kepala tukang kayu 162.000 32.400
0,80 org/hr pekerja 98.500 78.800
0,04 org/hr mandor 189.100 7.564

1 M2 MEMBUAT DAN MEMASANG JALUSI KAYU KLAS II 410.944 206.373 617.317 617.300,00
0,6700 org/hr Pekerja 98.500 65.995
2,0000 org/hr Tukang kayu 124.600 249.200
0,2000 org/hr Kepala tukang 162.000 32.400
0,3350 org/hr Mandor 189.100 63.349
0,0600 M3 Papan Kayu klas II 3.381.300 202.878
0,1500 Kg Paku kayu 23.300 3.495

1 M3 PEKERJAAN RANGKA BADAN KAYU KLAS.I ATAU KLAS.II


1,100 m3 Kayu Kelas I (Ketam Uk. 8/8) - -
1,100 m3 Kayu Kelas II (Ketam Uk. 8/8) 3.588.700 3.947.570
6,000 kg Paku 23.300 139.800
24,000 org/hr Tukang Kayu 124.600 2.990.400
8,000 org/hr Pekerja 98.500 788.000
2,400 org/hr Kepala Tukang 162.000 388.800
0,400 org/hr Mandor 189.100 75.640
Untuk Rangka badan kayu klas I = 139.800,00 4.242.840,00 4.382.640,00 4.382.600,00
Untuk Rangka badan kayu klas II = 4.087.370,00 4.242.840,00 8.330.210,00 8.330.200,00
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
PEKERJAAN PENGECATAN

1 M2 MENGECAT KILAP KAYU (1 LPS PLAMIR, 1 LPS CAT DASAR DAN 2 LPS CAT KILAP)
0,0025 org/hr Mandor 189.100 472,75
0,0040 org/hr Kepala tukang cat 162.000 648,00
0,1050 org/hr Tukang cat 124.600 13.083,00
0,0700 org/hr Pembantu tukang cat 98.500 6.895,00
0,2000 Kg cat menie kayu 32.300 6.460,00
0,1500 Kg plamur kayu 51.600 7.740,00
0,1700 Kg cat dasar 32.300 5.491,00
0,2600 Kg Cat Kilap 81.200 21.112,00
21.099 40.803,00 61.902 61.900

M2 Cat bidang kayu lama 27.005 17.928 44.933 44.933


0,1500 kg dempul kayu 51.400 7.710
- lbr amplas 4.200 -
0,1700 kg cat dasar 32.300 5.491
0,1700 kg cat kayu 81.200 13.804
- ltr thinner 315.800 -
- bh kuas 16.800 -
0,0750 org/hr tukang cat 124.600 9.345
0,0075 org/hr kepala tukang cat 162.000 1.215
0,0700 org/hr pekerja 98.500 6.895
0,0025 org/hr mandor 189.100 473

1 M2 MENGECAT TEMBOK (1 LPS PLAMIR, 1 LPS CAT DASAR DAN 2 LPS CAT TEMBOK)
0,0025 org/hr Mandor 189.100 472,75
0,0063 org/hr Kepala tukang cat 162.000 1.020,60
0,0630 org/hr Tukang cat 124.600 7.849,80
0,0200 org/hr Pembantu tukang cat 98.500 1.970,00
0,1000 Kg plamur tembok 16.300 1.630,00
0,1200 Kg cat dasar tembok 26.900 3.228,00
0,2600 Kg cat tembok 17.500 4.550,00
11.313 9.408,00 20.721 20.700

M2 Cat plafond acrylic emulsion KW.II 6.378 11.313 17.691 17.700


0,000 kg Plamir Tembok 16.300 -
0,120 kg Cat Dasar Emulsion ex Mowilex 26.900 3.228
0,180 kg Cat Akhir Emulsion ex Mowilex 17.500 3.150
0,020 org/hr Pekerja 98.500 1.970
0,063 org/hr Tukang Cat Biasa 124.600 7.850
0,006 org/hr Kepala Tukang Cat 162.000 1.021
0,003 org/hr Mandor 189.100 473

M2 Cat dinding / tembok vinilex


( Renovasi / Dinding lama , 2 lapis ) 6.117 23.471 29.588 29.588
0,100 Kg plamur tembok 16.300 1.630
0,300 Lbr amplas 4.200 1.260
0,170 Kg cat tembok vinilex 17.500 2.975
0,015 Bh kuas roll 16.800 252
0,125 org/hr tukang cat 124.600 15.575
0,013 org/hr kepala tukang cat 162.000 2.025
0,050 org/hr pekerja 98.500 4.925
0,005 org/hr mandor 189.100 946
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
M2 Cat permukaan baja dgn menie besi 9.968 30.319 40.287 40.300
0,0200 Org/Hr Pekerja 98.500 1.970
0,0010 Org/Hr Mandor 189.100 189
0,2000 Org/Hr Tukang cat 124.600 24.920
0,0200 Org/Hr Kepala tukang 162.000 3.240
0,0100 Bh Kuas 16.800 168
0,1000 Kg Cat meni besi 81.200 8.120
0,4000 Lbr Amplas 4.200 1.680

M2 Melamik kayu 1.553.175 101.928 1.655.103 1.655.100


0,033 Kg Wood Filler - -
0,003 Kg Sending sealer - -
0,001 Kg Wood stain - -
0,325 Kg Clear Melamic - -
4,875 Ltr Thinner 315.800 1.539.525
3,250 Lbr Amplas Kayu 4.200 13.650
0,000 org/hr Pekerja 98.500 -
0,000 org/hr Tukang Cat Biasa 124.600 -
0,600 org/hr Kepala Tukang Cat 162.000 97.200
0,025 org/hr Mandor 189.100 4.728
-
M2 Politur kayu 776.588 50.964 827.551 827.600
0,016 Kg Wood Filler - -
0,000 Kg Wood stain - -
2,438 Ltr Thinner 315.800 769.763
1,625 Lbr Amplas Kayu 4.200 6.825
0,000 org/hr Pekerja 98.500 -
0,000 org/hr Tukang Cat Biasa 124.600 -
0,300 org/hr Kepala Tukang Cat 162.000 48.600
0,013 org/hr Mandor 189.100 2.364

1 M2 Pengecatan water profing (coating) 3.360 11.313 14.673 14.700


0,0200 Org/Hr Pekerja 98.500 1.970
0,0025 Org/Hr Mandor 189.100 473
0,0630 Org/Hr Tukang cat 124.600 7.850
0,0063 Org/Hr Kepala tukang 162.000 1.021
0,3000 Kg Waterprofing (coating) - -
0,2000 Lbr Kuas 16.800 3.360

1 M2 MENGETER BIDANG KAYU DENGAN RESIDU 10.985 - 10.985 11.000


0,0060 Mandor 189.100 1.134,60
0,1000 Pembantu tukang cat 98.500 9.850,00
0,3500 Kg Ter/residu - -
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah

PEKERJAAN KUNCI DAN PENGGANTUNG

1 BH MEMASANG KUNCI TANAM BESAR 241.800 65.851 307.651 307.600


1,0000 Bh kunci tanam 2 Slaagh 241.800 241.800
0,0050 org/hr Mandor 189.100 946
0,0100 org/hr kepala Tukang kayu 162.000 1.620
0,5000 org/hr Tukang kayu 124.600 62.300
0,0100 org/hr Pembantu tukang kayu 98.500 985

1 BH MEMASANG KUNCI TANAM BIASA 72.300 65.851 138.151 138.100


1,0000 Bh kunci tanam kecil 72.300 72.300
0,0050 org/hr Mandor 189.100 946
0,0100 org/hr kepala Tukang kayu 162.000 1.620
0,5000 org/hr Tukang kayu 124.600 62.300
0,0100 org/hr Pembantu tukang kayu 98.500 985

1 BH Pas. Kunci knob pintu kamar mandi - 84.480 84.480 84.500


1,000 bh Handel knob + Kunci ex Alpha - -
0,000 org/hr Pekerja 98.500 -
0,600 org/hr Tukang Kayu Halus 124.600 74.760
0,060 org/hr Kepala Tukang Kayu 162.000 9.720
0,000 org/hr Mandor 189.100 -

MEMASANG 1 BH ENGSEL PINTU 38.300 22.739 61.039 61.000


1,0000 Engsel pintu 4" 38.300 38.300
0,0008 org/hr Mandor 189.100 142
0,0150 org/hr kepala Tukang kayu 162.000 2.430
0,1500 org/hr Tukang kayu 124.600 18.690
0,0150 org/hr Pembantu tukang kayu 98.500 1.478

MEMASANG 1 BH ENGSEL JENDELA 30.400 15.160 45.560 45.500


1,0000 Engsel jendela 3" 30.400 30.400
0,0005 org/hr Mandor 189.100 95
0,0100 org/hr kepala Tukang kayu 162.000 1.620
0,1000 org/hr Tukang kayu 124.600 12.460
0,0100 org/hr Pembantu tukang kayu 98.500 985

MEMASANG 1 BH HAK ANGIN 18.400 24.110 42.510 42.500


0,0080 org/hr Mandor 189.100 1.513 -
0,0150 org/hr kepala Tukang kayu 162.000 2.430
0,1500 org/hr Tukang kayu 124.600 18.690
0,0150 org/hr Pembantu tukang kayu 98.500 1.478
1,0000 Bh Hak angin 18.400 18.400
-
MEMASANG 1 BH KUNCI SELOT (GRENDEL) 16.800 30.319 47.119 47.100
0,0010 org/hr Mandor 189.100 189
0,0200 org/hr kepala Tukang kayu 162.000 3.240
0,2000 org/hr Tukang kayu 124.600 24.920
0,0200 org/hr Pembantu tukang kayu 98.500 1.970
1,0000 Bh kunci selot (Grendel) 16.800 16.800
-
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
MEMASANG 1 BH PEGANGAN JENDELA ATAU PINTU 18.400 30.319 48.719 48.700
0,0010 org/hr Mandor 189.100 189
0,0200 org/hr kepala Tukang kayu 162.000 3.240
0,2000 org/hr Tukang kayu 124.600 24.920
0,0200 org/hr Pembantu tukang kayu 98.500 1.970
1,0000 Bh Pegangan jendela/pintu 18.400 18.400

BH Pas. Kunci pintu ruangan - 70.400 70.400 70.400


1,000 bh Handle Pintu ex Solid; termasuk Kunci - -
0,000 org/hr Pekerja 98.500 -
0,500 org/hr Tukang Kayu Halus 124.600 62.300
0,050 org/hr Kepala Tukang Kayu 162.000 8.100
0,000 org/hr Mandor 189.100 -

BH Pas. Kunci tanam pintu Almunium - 70.400 70.400 70.400


1,000 bh Handle pintu type HRE 75.01 ex CISA - -
0,000 org/hr Pekerja 98.500 -
0,500 org/hr Tukang Kayu Halus 124.600 62.300
0,050 org/hr Kepala Tukang Kayu 162.000 8.100
0,000 org/hr Mandor 189.100 -

BH Pas. Silinder pintu Almunium - 70.400 70.400 70.400


1,000 bh Selinder CISA type 08510 ex CISA - -
0,000 org/hr Pekerja 98.500 -
0,500 org/hr Tukang Kayu Halus 124.600 62.300
0,050 org/hr Kepala Tukang Kayu 162.000 8.100
0,000 org/hr Mandor 189.100 -

BH Pas. Door Stoper - 84.480 84.480 84.500


1,000 bh Door Stoper - -
0,000 org/hr Pekerja 98.500 -
0,600 org/hr Tukang Kayu Halus 124.600 74.760
0,060 org/hr Kepala Tukang Kayu 162.000 9.720
0,000 org/hr Mandor 189.100 -

BH Pas. Door Closer - 84.480 84.480 84.500


1,000 bh Door closer - -
0,000 org/hr Pekerja 98.500 -
0,600 org/hr Tukang Kayu Halus 124.600 74.760
0,060 org/hr Kepala Tukang Kayu 162.000 9.720
0,000 org/hr Mandor 189.100 -
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah

M Rel pintu gantung - 422.400 422.400 422.400


1,000 bh Rel Pintu Lipat 4 Pintu Zinkalume Lokal - -
0,000 org/hr Pekerja 98.500 -
3,000 org/hr Tukang Kayu Halus 124.600 373.800
0,300 org/hr Kepala Tukang Kayu 162.000 48.600
0,000 org/hr Mandor 189.100 -

BH Pas. Slot tanam pintu doble - 35.200 35.200 35.200


1,000 bh Slot Tanam - -
0,000 org/hr Pekerja 98.500 -
0,250 org/hr Tukang Kayu Halus 124.600 31.150
0,025 org/hr Kepala Tukang Kayu 162.000 4.050
0,000 org/hr Mandor 189.100 -

BH Pas. Rel pintu lipat 4 pintu - 17.681 17.681 17.700


1,000 bh Rel Pintu Lipat 4 Pintu Zinkalume Lokal - -
0,000 org/hr Pekerja 98.500 -
0,125 org/hr Tukang Kayu Halus 124.600 15.575
0,013 org/hr Kepala Tukang Kayu 162.000 2.106
0,000 org/hr Mandor 189.100 -

PEKERJAAN KACA

MEMASANG 1 M2 KACA TEBAL 5 MM 147.100 22.749 169.849 169.800


0,0008 org/hr Mandor 189.100 151 -
0,0150 org/hr kepala Tukang kayu 162.000 2.430
0,1500 org/hr Tukang kayu 124.600 18.690
0,0150 org/hr Pembantu tukang kayu 98.500 1.478
1,0000 m2 kaca bening tebal 5mm 147.100 147.100
1,0000 m2 kaca ryben tebal 5mm 327.100 327.100
1 M2 PASANG KACA POLOS 169.849 169.800
1 M2 PASANG KACA RAYBEN 349.849 349.800

BH PAS. KACA POLOS 6 mm - 39.801 39.801 39.800


1,050 m2 Kaca Polos 6 mm - -
0,160 org/hr Pekerja 98.500 15.760
0,160 org/hr Tukang Kayu Halus 124.600 19.936
0,016 org/hr Kepala Tukang Kayu 162.000 2.592
0,008 org/hr Mandor 189.100 1.513

BH PAS. KACA 8 mm - 39.801 39.801 39.800


1,050 m2 Kaca Polos 8 mm - -
0,160 org/hr Pekerja 98.500 15.760
0,160 org/hr Tukang Kayu Halus 124.600 19.936
0,016 org/hr Kepala Tukang Kayu 162.000 2.592
0,008 org/hr Mandor 189.100 1.513
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
PEKERJAAN SANITASI

BH Pas. Washtafel keramik 5.900 342.080 347.980 348.000


1,000 bh Wastafel LW 240 CJ ex Toto - -
1,000 bh Seal tape 5.900 5.900
1,200 org/hr Pekerja 98.500 118.200
1,450 org/hr Tukang Batu Halus 124.600 180.670
0,150 org/hr Kepala Tukang Batu 162.000 24.300
0,100 org/hr Mandor 189.100 18.910

BH Pas. Kloset Duduk Keramik - 482.956 482.956 483.000


1,000 bh Kloset duduk CW 600 J / SW 660 J ex Toto - -
1,000 tb Sealant clear neutral (300 ml) - -
3,300 org/hr Pekerja 98.500 325.050
1,100 org/hr Tukang Batu Halus 124.600 137.060
0,110 org/hr Kepala Tukang Batu 162.000 17.820
0,016 org/hr Mandor 189.100 3.026

BH Pas. Urinoir Keramik 986.200 482.956 1.469.156 1.469.200


1,000 bh Urinoir type U 57 M ex Toto 986.200 986.200
1,000 tb Sealant clear neutral (300 ml) - -
3,300 org/hr Pekerja 98.500 325.050
1,100 org/hr Tukang Batu Halus 124.600 137.060
0,110 org/hr Kepala Tukang Batu 162.000 17.820
0,016 org/hr Mandor 189.100 3.026

BH Pas. Kloset Jongkok Keramik 159.108 157.906 317.014 317.000


1,000 bh Kloset Jongkok type CE 6 ex Toto 148.500 148.500
0,120 zak Semen PC Gresik (50 Kg) 88.400 10.608
0,000 org/hr Pekerja 98.500 -
1,100 org/hr Tukang Batu Halus 124.600 137.060
0,110 org/hr Kepala Tukang Batu 162.000 17.820
0,016 org/hr Mandor 189.100 3.026
Perlengkapan

1 Bh Memasang bak cuci piring stenlis steel 400.950 45.479 446.429 446.400
0,0300 Org/Hr Pekerja 98.500 2.955
0,3000 Org/Hr Tukang 124.600 37.380
0,0015 Org/Hr Mandor 189.100 284
0,0300 Org/Hr Kepala tukang 162.000 4.860
1,0000 Bh Bak cuci stenlis steel 297.000 297.000
1,0000 Set Water drain + asesories 103.950 103.950

BH Pas. Bak Air Fiberglass 266.300 669.935 936.235 936.200


1,000 bh Bak air fibreglass uk. 55x55x60 cm 266.300 266.300
1,800 org/hr Pekerja 98.500 177.300
2,700 org/hr Tukang Batu Halus 124.600 336.420
0,540 org/hr Kepala Tukang Batu 162.000 87.480
0,110 org/hr Mandor 189.100 20.801
0,180 harga Perlengkapan 266.300 47.934
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
1 Bh Pasang bak mandi bata lapis keramik volume 0,3 m3 536.280 1.070.130 1.606.410 1.606.400
6,000 Org/Hr Pekerja 98.500 591.000
0,300 Org/Hr Mandor 189.100 56.730
3,000 Org/Hr Tukang batu 124.600 373.800
0,300 Org/Hr Kepala tukang 162.000 48.600
196,000 Bh Bata merah 900 176.400
2,400 Zak Semen 88.400 212.160
0,300 M3 Pasir 112.400 33.720
110,000 Bh Ubin keramik 20 x20 - -
6,000 Kg Semen warna/ putih 19.000 114.000

BH Pas. Shower spray 148 14.080 14.228 14.200


1,000 bh Shower Spray type THX 20 NBPIV ex Toto - -
0,025 bh Seal tape 5.900 148
0,000 org/hr Pekerja 98.500 -
0,100 org/hr Tukang Batu Halus 124.600 12.460
0,010 org/hr Kepala Tukang Batu 162.000 1.620
0,000 org/hr Mandor 189.100 -

BH Pas. Shower set 148 157.906 158.053 158.100


1,000 bh Shower Set type TX 423 SZ ex Toto - -
0,025 bh Seal tape 5.900 148
0,000 org/hr Pekerja 98.500 -
1,100 org/hr Tukang Batu Halus 124.600 137.060
0,110 org/hr Kepala Tukang Batu 162.000 17.820
0,016 org/hr Mandor 189.100 3.026

BH Pas. Tempat sabun keramik 10.608 32.770 43.378 43.400


1,000 bh Tempat Sabun S 11 N - -
0,120 zak Semen PC 88.400 10.608
0,000 org/hr Pekerja 98.500 -
0,250 org/hr Tukang Batu Halus 124.600 31.150
0,010 org/hr Kepala Tukang Batu 162.000 1.620
0,000 org/hr Mandor 189.100 -

BH Pas. Kitchenzink stainlees stell 1 lubang 150.540 258.210 408.750 408.800


1,000 bh Kitchenzink stainless steel 1 lubang 115.800 115.800
0,300 set Fitting, Stop valve & support 115.800 34.740
0,010 m3 Sealant clear neutral (300 ml) - -
1,000 org/hr Pekerja 98.500 98.500
1,000 org/hr Tukang Batu Halus 124.600 124.600
0,100 org/hr Kepala Tukang Batu 162.000 16.200
0,100 org/hr Mandor 189.100 18.910

BH Pas. Kran zink 17.148 14.080 31.228 31.200


1,000 bh Kran zink type T 30 AR13NV7N ex Toto 17.000 17.000
0,025 bh Seal tape 5.900 148
0,000 org/hr Pekerja 98.500 -
0,100 org/hr Tukang Batu Halus 124.600 12.460
0,010 org/hr Kepala Tukang Batu 162.000 1.620
0,000 org/hr Mandor 189.100 -
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
BH Pas. Kran dinding 17.148 14.080 31.228 31.200
1,000 bh Kran dinding 17.000 17.000
0,025 bh Seal tape 5.900 148
0,000 org/hr Pekerja 98.500 -
0,100 org/hr Tukang Batu Halus 124.600 12.460
0,010 org/hr Kepala Tukang Batu 162.000 1.620
0,000 org/hr Mandor 189.100 -

Pasang 1 bh fool drain stenlist 17.800 16.011 33.811 33.811


1,000 bh fool drain stainless 17.800 17.800
0,100 org/hr tukang 124.600 12.460
0,010 org/hr kep. Tukang kayu 162.000 1.620
0,010 org/hr pekerja 98.500 985
0,005 org/hr Mandor 189.100 946

BH Pas. Floor Drain - 157.906 157.906 157.900


1,000 bh Floordrain type TX 1B ex Toto - -
0,120 zak Semen PC Gresik (50 Kg) - -
0,000 org/hr Pekerja 98.500 -
1,100 org/hr Tukang Batu Halus 124.600 137.060
0,110 org/hr Kepala Tukang Batu 162.000 17.820
0,016 org/hr Mandor 189.100 3.026

BH Pas. Roof Drain - 157.906 157.906 157.900


1,000 bh Roof Drain Metal - -
0,120 zak Semen PC Gresik (50 Kg) - -
0,000 org/hr Pekerja 98.500 -
1,100 org/hr Tukang Batu Halus 124.600 137.060
0,110 org/hr Kepala Tukang Batu 162.000 17.820
0,016 org/hr Mandor 189.100 3.026

PEKERJAAN PIPA

m' Memasang Pipa Beton, Ø 40 cm - 100 cm #REF! 67.775 #REF! #REF!

Bahan
1,1 Buah Pipa Beton #REF! #REF!

0,55 m3 Batu Bata 900 495

10,3 Kg Portland Semen 2.000 20.600

0,061 m3 Pasir Pasang 112.400 6.856

0,069 m3 Pasir Urug 96.200 6.638

Tenaga -

0,38 OH Pekerja 98.500 37.430

0,19 OH Tukang Batu 124.600 23.674

0,019 OH Kepala Tukang 162.000 3.078

0,019 OH Mandor 189.100 3.593


ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah

bh Memasang 'Gate Valve All Flange 10. Ø 6" - 12.334 12.334 12.300

Bahan -

1,0 m' Gate Valve All Flange 10. Ø 6" - -

Tenaga -

0,036 OH Pekerja 98.500 3.546

0,06 OH Tukang Ledeng 124.600 7.476

0,006 OH Kepala Tukang 162.000 972

0,0018 OH Mandor 189.100 340

bh Memasang 'Gate Valve All Flange 10. Ø 4" - 12.334 12.334 12.300

Bahan -

1,0 m' Gate Valve All Flange 10. Ø 4" - -

Tenaga -

0,036 OH Pekerja 98.500 3.546

0,06 OH Tukang Ledeng 124.600 7.476

0,006 OH Kepala Tukang 162.000 972

0,0018 OH Mandor 189.100 340

m' Memasang Pipa GIV 2" - 12.334 12.334 12.300

Bahan -

1,2 m' Pipa GIV. 2" - -

0,35 Perlengkapan 35% Harga Pipa - -

Tenaga -

0,036 OH Pekerja 98.500 3.546

0,06 OH Tukang Ledeng 124.600 7.476

0,006 OH Kepala Tukang 162.000 972

0,0018 OH Mandor 189.100 340

m' Memasang Pipa GIV 2,5" - 12.334 12.334 12.300

Bahan -

1,2 m' Pipa GIV. 2,5" - -

0,35 Perlengkapan 35% Harga Pipa - -

Tenaga -

0,036 OH Pekerja 98.500 3.546

0,06 OH Tukang Ledeng 124.600 7.476

0,006 OH Kepala Tukang 162.000 972

0,0018 OH Mandor 189.100 340


-
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah

m' Memasang Pipa GIV 3" - 12.334 12.334 12.300

Bahan -

1,2 m' Pipa GIV. 3" - -

0,35 Perlengkapan 35% Harga Pipa - -

Tenaga -

0,036 OH Pekerja 98.500 3.546

0,06 OH Tukang Ledeng 124.600 7.476

0,006 OH Kepala Tukang 162.000 972

0,0018 OH Mandor 189.100 340

m' Memasang Pipa GIV 4" - 12.334 12.334 12.300

Bahan -

1,2 m' Pipa GIV. 4" - -

0,35 Perlengkapan 35% Harga Pipa - -

Tenaga -

0,036 OH Pekerja 98.500 3.546

0,06 OH Tukang Ledeng 124.600 7.476

0,006 OH Kepala Tukang 162.000 972

0,0018 OH Mandor 189.100 340

m' Memasang Pipa GIV 6" - 12.334 12.334 12.300

Bahan -

1,2 m' Pipa GIV. 6" - -

0,35 Perlengkapan 35% Harga Pipa - -

Tenaga -

0,036 OH Pekerja 98.500 3.546

0,06 OH Tukang Ledeng 124.600 7.476

0,006 OH Kepala Tukang 162.000 972

0,0018 OH Mandor 189.100 340

m' Memasang Pipa PVC type SCJ Ø 8" - 23.622 23.622 23.600

Bahan
1,2 m' Pipa PVC 8" SCJ - -

0,35 m' Perlengkapan 35% Harga Pipa - -

Tenaga
0,081 0 Pekerja 98.500 7.979

0,135 0 Tukang Ledeng 98.500 13.298

0,014 0 Kepala Tukang 124.600 1.682

0,0041 0 Mandor 162.000 664


ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah

m' Memasang Pipa PVC type SCJ Ø 6" - 27.762 27.762 27.800

Bahan
1,2 m' Pipa PVC 6" SCJ - -

0,35 m' Perlengkapan 35% Harga Pipa - -

Tenaga
0,081 org/hr Pekerja 98.500 7.979

0,135 org/hr Tukang Ledeng 124.600 16.821

0,014 org/hr Kepala Tukang 162.000 2.187

0,0041 org/hr Mandor 189.100 775

m' Memasang Pipa PVC type SCJ Ø 5" - 27.762 27.762 27.800

Bahan
1,2 m' Pipa PVC 5" SCJ - -

0,35 m' Perlengkapan 35% Harga Pipa - -

Tenaga
0,081 org/hr Pekerja 98.500 7.979

0,135 org/hr Tukang Ledeng 124.600 16.821

0,014 org/hr Kepala Tukang 162.000 2.187

0,0041 org/hr Mandor 189.100 775

m' Memasang Pipa PVC type SCJ Ø 4" #REF! 27.762 #REF! #REF!

Bahan
1,2 m' Pipa PVC 4" SCJ #REF! #REF!

0,35 m' Perlengkapan 35% Harga Pipa #REF! #REF!

Tenaga
0,081 org/hr Pekerja 98.500 7.979

0,135 org/hr Tukang Ledeng 124.600 16.821

0,014 org/hr Kepala Tukang 162.000 2.187

0,0041 org/hr Mandor 189.100 775

m' Memasang Pipa PVC type SCJ Ø 3" #REF! 27.762 #REF! #REF!

Bahan
1,2 m' Pipa PVC 3" SCJ #REF! #REF!

0,35 m' Perlengkapan 35% Harga Pipa #REF! #REF!

Tenaga
0,081 org/hr Pekerja 98.500 7.979

0,135 org/hr Tukang Ledeng 124.600 16.821

0,014 org/hr Kepala Tukang 162.000 2.187

0,0041 org/hr Mandor 189.100 775


ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah

m' Memasang Pipa PVC type SCJ Ø 2" #REF! 18.502 #REF! #REF!

Bahan
1,2 m' Pipa PVC 2" SCJ #REF! #REF!

0,35 m' Perlengkapan 35% Harga Pipa #REF! #REF!

Tenaga
0,054 org/hr Pekerja 98.500 5.319

0,09 org/hr Tukang Ledeng 124.600 11.214

0,009 org/hr Kepala Tukang 162.000 1.458

0,0027 org/hr Mandor 189.100 511

m' Memasang Pipa PVC type SCJ Ø 1,5" 101.835 18.502 120.337 120.300

Bahan
1,2 m' Pipa PVC 1,5" SCJ 65.700 78.840

0,35 m' Perlengkapan 35% Harga Pipa 65.700 22.995

Tenaga
0,054 org/hr Pekerja 98.500 5.319

0,09 org/hr Tukang Ledeng 124.600 11.214

0,009 org/hr Kepala Tukang 162.000 1.458

0,0027 org/hr Mandor 189.100 511

m' Memasang Pipa PVC type SCJ Ø 1" - 18.502 18.502 18.500

Bahan
1,2 m' Pipa PVC 1" SCJ - -

0,35 m' Perlengkapan 35% Harga Pipa - -

Tenaga
0,054 org/hr Pekerja 98.500 5.319

0,09 org/hr Tukang Ledeng 124.600 11.214

0,009 org/hr Kepala Tukang 162.000 1.458

0,0027 org/hr Mandor 189.100 511


ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah

M1 Pipa PVC dia. 4" AW 91.140 27.762 118.902 118.900


1,200 m Pipa PVC dia 4" AW ex Wavin 58.800 70.560
0,350 m Perlengkapan 58.800 20.580
0,081 org/hr Pekerja 98.500 7.979
0,135 org/hr Tukang Batu Halus 124.600 16.821
0,014 org/hr Kepala Tukang Batu 162.000 2.187
0,004 org/hr Mandor 189.100 775

M1 Pipa PVC dia. 4" D 22.785 27.762 50.547 50.500


1,200 m Pipa PVC dia 4" D ex Wavin 14.700 17.640
0,350 m Perlengkapan 14.700 5.145
0,081 org/hr Pekerja 98.500 7.979
0,135 org/hr Tukang Batu Halus 124.600 16.821
0,014 org/hr Kepala Tukang Batu 162.000 2.187
0,004 org/hr Mandor 189.100 775

M1 Pipa PVC dia. 3" AW - 27.743 27.743 27.700


1,200 m Pipa PVC dia 3" AW ex Wavin - -
0,350 m Perlengkapan - -
0,081 org/hr Pekerja 98.500 7.979
0,135 org/hr Tukang Batu Halus 124.600 16.821
0,014 org/hr Kepala Tukang Batu 162.000 2.187
0,004 org/hr Mandor 189.100 756

M1 Pipa PVC dia. 3" D - 27.743 27.743 27.700


1,200 m Pipa PVC dia 3" D ex Wavin - -
0,350 m Perlengkapan - -
0,081 org/hr Pekerja 98.500 7.979
0,135 org/hr Tukang Batu Halus 124.600 16.821
0,014 org/hr Kepala Tukang Batu 162.000 2.187
0,004 org/hr Mandor 189.100 756

M1 Pipa PVC dia. 2" AW 30.380 18.502 48.882 48.900


1,200 m Pipa PVC dia 2" AW ex Wavin 19.600 23.520
0,350 m Perlengkapan 19.600 6.860
0,054 org/hr Pekerja 98.500 5.319
0,090 org/hr Tukang Batu Halus 124.600 11.214
0,009 org/hr Kepala Tukang Batu 162.000 1.458
0,003 org/hr Mandor 189.100 511

M1 Pipa PVC dia. 2" D - 18.502 18.502 18.500


1,200 m Pipa PVC dia 2" D ex Wavin - -
0,350 m Perlengkapan - -
0,054 org/hr Pekerja 98.500 5.319
0,090 org/hr Tukang Batu Halus 124.600 11.214
0,009 org/hr Kepala Tukang Batu 162.000 1.458
0,003 org/hr Mandor 189.100 511
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
M1 Pipa PVC dia. 1" AW - 12.334 12.334 12.300
1,200 m Pipa PVC dia 1" AW ex Wavin - -
0,350 m Perlengkapan - -
0,036 org/hr Pekerja 98.500 3.546
0,060 org/hr Tukang Batu Halus 124.600 7.476
0,006 org/hr Kepala Tukang Batu 162.000 972
0,002 org/hr Mandor 189.100 340

M1 Pipa PVC dia. 3/4" AW - 12.334 12.334 12.300


1,200 m Pipa PVC dia 3/4" AW ex Wavin - -
0,350 m Perlengkapan - -
0,036 org/hr Pekerja 98.500 3.546
0,060 org/hr Tukang Batu Halus 124.600 7.476
0,006 org/hr Kepala Tukang Batu 162.000 972
0,002 org/hr Mandor 189.100 340

M1 Pipa PVC dia. 1/2" AW 39.370 12.334 51.704 51.700


1,200 m Pipa PVC dia 1/2" AW ex Wavin 25.400 30.480
0,350 m Perlengkapan 25.400 8.890
0,036 org/hr Pekerja 98.500 3.546
0,060 org/hr Tukang Batu Halus 124.600 7.476
0,006 org/hr Kepala Tukang Batu 162.000 972
0,002 org/hr Mandor 189.100 340

M1 Pipa Pex dia. 3" 85.715 12.334 98.049 98.000


1,200 m Pipa Pex dia 3" 55.300 66.360
0,350 m Perlengkapan 55.300 19.355
0,036 org/hr Pekerja 98.500 3.546
0,060 org/hr Tukang Batu Halus 124.600 7.476
0,006 org/hr Kepala Tukang Batu 162.000 972
0,002 org/hr Mandor 189.100 340

M1 Stop kran dia. 1/2" - 12.334 12.334 12.300


1,000 bh Stop kran dia 1/2" ex onda - -
0,350 bh Perlengkapan - -
0,036 org/hr Pekerja 98.500 3.546
0,060 org/hr Tukang Batu Halus 124.600 7.476
0,006 org/hr Kepala Tukang Batu 162.000 972
0,002 org/hr Mandor 189.100 340

M1 Stop kran dia. 3/4" 61.695 12.334 74.029 74.000


1,000 bh Stop kran dia 3/4" ex onda 45.700 45.700
0,350 bh Perlengkapan 45.700 15.995
0,036 org/hr Pekerja 98.500 3.546
0,060 org/hr Tukang Batu Halus 124.600 7.476
0,006 org/hr Kepala Tukang Batu 162.000 972
0,002 org/hr Mandor 189.100 340

M1 Stop kran dia. 1" - 12.334 12.334 12.300


1,000 bh Stop kran dia 1" ex onda - -
0,350 bh Perlengkapan - -
0,036 org/hr Pekerja 98.500 3.546
0,060 org/hr Tukang Batu Halus 124.600 7.476
0,006 org/hr Kepala Tukang Batu 162.000 972
0,002 org/hr Mandor 189.100 340
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
M1 Klep diameter 3/4" - 12.334 12.334 12.300
1,200 m Klep diameter 3/4" ex Maspion - -
0,350 m Perlengkapan - -
0,036 org/hr Pekerja 98.500 3.546
0,060 org/hr Tukang Batu Halus 124.600 7.476
0,006 org/hr Kepala Tukang Batu 162.000 972
0,002 org/hr Mandor 189.100 340

M1 Klem pipa - 12.334 12.334 12.300


1,200 m Klem pipa dia. 3/4" ex Maspion - -
0,350 m Perlengkapan - -
0,036 org/hr Pekerja 98.500 3.546
0,060 org/hr Tukang Batu Halus 124.600 7.476
0,006 org/hr Kepala Tukang Batu 162.000 972
0,002 org/hr Mandor 189.100 340

PEKERJAAN ELEKTRIKAL

1 Ttk Pasang instalasi lampu dgn NYM 3x2,5 mm (tdk termasuk fiting,sakelar+lampu)
Catatan : Asumsi tinggi plafon 4 m, bentang ruang 8 m, uk. Kabel standart PUIL 2000
12,0000 M1 Kabel NYM 3 x 2,5 mm 15.100 181.200
12,0000 M1 Conduit pipa PVC dia 5/8" C 2.083 25.000
1,0000 Bh Tee dos 1.500 1.500
1,0000 Bh Inbow doos 3.960 3.960
3,0000 Bh Sock 1.100 3.300
9,0000 Bh Klem conduit 1.100 9.900
3,0000 Bh Lastdop 1.650 4.950
1,0000 M1 Fleksible pipa 2.083 2.083
10,0000 % Paku,sekrup,fisher(10% hrg conduit) 2.083 20.833
2,0000 Bh Elbow 660 1.320
0,3000 Org/Hr Instalator 162.000 48.600
0,1500 Org/Hr Pekerja 98.500 14.775
0,0150 Org/Hr Mandor 189.100 2.837
302.647 17.612 320.258 320.300
-
1 Ttk Pasang instalasi Stop kontak (tdk termasuk stop kontak)
Stop kontak tdk dimasukan dlm analis tergantung merk dll
12,0000 Ml Kabel NYM 3 x 2,5 mm 15.100 181.200
12,0000 Ml Conduit PVC ex. EGA clipsal 2.083 25.000
1,0000 Bh Tee dos 1.500 1.500
1,0000 Bh Inbow doos 3.960 3.960
3,0000 Bh Sock 1.100 3.300
9,0000 Bh Klem conduit 1.100 9.900
3,0000 Bh Lasdop 1.650 4.950
10,0000 % Paku,sekrup,fisher(10% hrg conduit 2.083 20.833
2,0000 Bh Elbow 660 1.320
0,3000 Org/Hr Instalator 162.000 48.600
0,1500 Org/Hr Pekerja 98.500 14.775
0,0150 Org/Hr Mandor 189.100 2.837
251.963 66.212 318.175 318.200
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
1 Unit Pasang panel pembagi daya 1300 VA/ 6 A (3 grup @ 6 A)
Belum termasuk penyambungan daya listrik PLN
10,0000 M1 Kabel NYM 3 x 4 mm - -
30,0000 M1 Kabel NYM 3 x 2,5 mm 15.100 453.000,00
40,0000 M1 Conduit pipa PVC dia 5/8" C 2.083 83.333,33
1,0000 Bh MCB box isi 4 - -
4,0000 Bh MCB 6 A 49.500 198.000,00
4,0000 Bh Tee dos 1.500 6.000,00
10,0000 Bh Sock 1.100 11.000,00
27,0000 Bh Klem conduit 1.100 29.700,00
12,0000 Bh Lastdop 1.650 19.800,00
2,0000 Bh Elbow 660 1.320,00
10,0000 % Paku,sekrup,fisher(10% hrg conduit 2.083 20.833,33
0,8000 Org/Hr Instalator 162.000 129.600,00
0,4000 Org/Hr Pekerja 98.500 39.400,00
0,0400 Org/Hr Mandor 189.100 7.564,00
822.987 176.564 999.551 999.600

TTK Pas. Box Panel 189.600 335.850 525.450 525.500


1,000 bh Box panel PVC isi 4 MCB - -
2,000 bh MCB 6 A 49.500 99.000
2,000 bh MCB 4 A - -
6,000 m Kabel NYM 3 x 2,5 mm2 15.100 90.600
0,500 org/hr Pekerja 98.500 49.250
1,000 org/hr Tukang Listrik 124.600 124.600
1,000 org/hr Kepala Tukang listrik 162.000 162.000
0,000 org/hr Mandor 189.100 -

TTK Pas. Instalasi stop kontak 136.700 42.527 179.227 179.200


6,000 m Kabel NYM 3 x 2,5 mm2 15.100 90.600
0,500 bh Isolasi 3.400 1.700
3,000 bh Klem 14.800 44.400
0,050 org/hr Pekerja 98.500 4.925
0,020 org/hr Tukang Listrik 124.600 2.492
0,100 org/hr Kepala Tukang listrik 162.000 16.200
0,100 org/hr Mandor 189.100 18.910

TTK Pas. Instalasi lampu 133.100 42.527 175.627 175.600


6,000 m Kabel NYM 2 x 2,5 mm2 14.500 87.000
0,500 bh Isolasi 3.400 1.700
3,000 bh Klem 14.800 44.400
0,050 org/hr Pekerja 98.500 4.925
0,020 org/hr Tukang Listrik 124.600 2.492
0,100 org/hr Kepala Tukang listrik 162.000 16.200
0,100 org/hr Mandor 189.100 18.910
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
BH Pas. Saklar engkel 17.850 35.138 52.988 53.000
1,000 bh Saklar Tunggal 15.800 15.800
1,000 bh Mangkok Listrik 1.200 1.200
0,250 bh Isolasi 3.400 850
0,100 org/hr Pekerja 98.500 9.850
0,100 org/hr Tukang Listrik 124.600 12.460
0,050 org/hr Kepala Tukang listrik 162.000 8.100
0,025 org/hr Mandor 189.100 4.728

BH Pas. Saklar doble 17.850 35.138 52.988 53.000


1,000 bh Saklar Ganda 15.800 15.800
1,000 bh Mangkok Listrik 1.200 1.200
0,250 bh isolasi 3.400 850
0,100 org/hr Pekerja 98.500 9.850
0,100 org/hr Tukang Listrik 124.600 12.460
0,050 org/hr Kepala Tukang listrik 162.000 8.100
0,025 org/hr Mandor 189.100 4.728

BH Pas. Stop kontak 2.050 35.138 37.188 37.200


1,000 bh Stopkontak - -
1,000 bh Mangkok Listrik 1.200 1.200
0,250 bh isolasi 3.400 850
0,100 org/hr Pekerja 98.500 9.850
0,100 org/hr Tukang Listrik 124.600 12.460
0,050 org/hr Kepala Tukang listrik 162.000 8.100
0,025 org/hr Mandor 189.100 4.728

BH Pas. Outlet TV 2.050 35.138 37.188 37.200


1,000 bh Outlet TV - -
1,000 bh Mangkok Listrik 1.200 1.200
0,250 bh isolasi 3.400 850
0,100 org/hr Pekerja 98.500 9.850
0,100 org/hr Tukang Listrik 124.600 12.460
0,050 org/hr Kepala Tukang listrik 162.000 8.100
0,025 org/hr Mandor 189.100 4.728

BH Pas. Outlet telephone 2.050 35.138 37.188 37.200


1,000 bh Outlet telephone - -
1,000 bh Mangkok Listrik 1.200 1.200
0,250 bh isolasi 3.400 850
0,100 org/hr Pekerja 98.500 9.850
0,100 org/hr Tukang Listrik 124.600 12.460
0,050 org/hr Kepala Tukang listrik 162.000 8.100
0,025 org/hr Mandor 189.100 4.728

BH Pas. Outlet exhausefan 2.050 35.138 37.188 37.200


1,000 bh Saklar exhause - -
1,000 bh Mangkok Listrik 1.200 1.200
0,250 bh isolasi 3.400 850
0,100 org/hr Pekerja 98.500 9.850
0,100 org/hr Tukang Listrik 124.600 12.460
0,050 org/hr Kepala Tukang listrik 162.000 8.100
0,025 org/hr Mandor 189.100 4.728
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
BH Pas. Down light & PLC 13 W 850 35.138 35.988 36.000
1,000 bh Down light / PLC 13 W - -
0,250 bh isolasi 3.400 850
0,100 org/hr pekerja 98.500 9.850
0,100 org/hr Tukang listrik 124.600 12.460
0,050 org/hr Kepala Tukang 162.000 8.100
0,025 org/hr Mandor 189.100 4.728

BH Pas. Fitting plafond + Lampu SL 850 35.138 35.988 36.000


1,000 bh Fitting plafond + lampu SL - -
0,250 bh isolasi 3.400 850
0,100 org/hr Pekerja 98.500 9.850
0,100 org/hr Tukang Listrik 124.600 12.460
0,050 org/hr Kepala Tukang listrik 162.000 8.100
0,025 org/hr Mandor 189.100 4.728

BH Pas. Lampu TL 2 x 18 watt grille 850 35.138 35.988 36.000


1,000 bh Lampu TL 2 x 18 watt grille - -
0,250 bh isolasi 3.400 850
0,100 org/hr Pekerja 98.500 9.850
0,100 org/hr Tukang Listrik 124.600 12.460
0,050 org/hr Kepala Tukang listrik 162.000 8.100
0,025 org/hr Mandor 189.100 4.728

BH Pas. Lampu TL 20 watt 39.450 35.138 74.588 74.600


1,000 bh Lampu TL 20 watt 38.600 38.600
0,250 bh isolasi 3.400 850
0,100 org/hr Pekerja 98.500 9.850
0,100 org/hr Tukang Listrik 124.600 12.460
0,050 org/hr Kepala Tukang listrik 162.000 8.100
0,025 org/hr Mandor 189.100 4.728

BH Pas. Lampu XL 18 watt 84.950 35.138 120.088 120.100


1,000 bh Lampu XL 18 watt 84.100 84.100
0,250 bh isolasi 3.400 850
0,100 org/hr Pekerja 98.500 9.850
0,100 org/hr Tukang Listrik 124.600 12.460
0,050 org/hr Kepala Tukang listrik 162.000 8.100
0,025 org/hr Mandor 189.100 4.728
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
PEKERJAAN BESI BAJA / KUSEN ALUMUNIUM
-
1 Kg PASANG BESI PROFIL - 14.925 14.925 14.900
0,0600 Org/Hr Pekerja 98.500 5.910
0,0030 Org/Hr Mandor 189.100 567
0,0600 Org/Hr Tukang las 124.600 7.476
0,0060 Org/Hr Kepala tukang 162.000 972
1,1500 Kg Besi profil - -
-
1 Kg PEKERJAAN BAJA WF #REF! 10.973 #REF! #REF!
1,025 kg baja WF - -
0,025 kg kawat las #REF! #REF!
0,02 ltr solar - -
0,0025 ltr oli / pelumas - -
0,0025 uit sewa alat 60.000 150
0,02 org/hr tukang las 124.600 2.492
0,005 org/hr kepala tukang besi 162.000 810
0,075 org/hr pekerja 98.500 7.388
0,0015 org/hr mandor 189.100 284

1 Kg PEKERJAAN BAJA SIKU #REF! 12.705,15 #REF! #REF!


1,025 kg baja siku - -
0,04 kg kawat las #REF! #REF!
0,03 ltr solar - -
0,004 ltr oli / pelumas - -
0,0015 uit sewa alat 60.000 90,00
0,03 org/hr tukang las 124.600 3.738,00
0,008 org/hr kepala tukang besi 162.000 1.296,00
0,075 org/hr pekerja 98.500 7.387,50
0,0015 org/hr mandor 189.100 283,65

1 M2 Pasang kawat nyamuk/kasa 5.294 24.025 29.318 29.300


1,1000 M2 Kawat nyamuk - -
0,0200 Kg Paku 23.300 466
0,0018 M3 Kayu 2.682.100 4.828
0,1000 Org/Hr Tukang kayu 124.600 12.460
0,1000 Org/Hr Pekerja 98.500 9.850
0,0100 Org/Hr Kepala tukang 162.000 1.620
0,0005 Org/Hr Mandor 189.100 95

1 M2 MEMASANG KAWAT SIMPAI 466 24.025 24.491 24.500


0,0005 Mandor 189.100 95
0,0100 Kepala tukang Batu 162.000 1.620
0,1000 Tukang kayu 124.600 12.460
0,1000 Pembantu tukang kayu 98.500 9.850
2,0000 Kg Kawat simpai - -
0,0200 Kg Paku Kayu 23.300 466
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
M2 Canopy rangka besi hollow & Penutup atap Polycarbonate 502.000 26.929 528.929 528.900
25,000 kg Besi Hollow 40.40.4 mm 11.800 295.000
1,000 m2 Polycarbonate t. 8 mm - -
6,000 bh Paku payung 34.500 207.000
0,150 org/hr Pekerja 98.500 14.775
0,075 org/hr Tukang Batu Kasar 124.600 9.345
0,008 org/hr Kepala Tukang Batu 162.000 1.296
0,008 org/hr Mandor 189.100 1.513

0,0002 Org/Hr Kepala tukang 162.000 32

M Railing Tangga Besi Hollow 252.700 26.929 279.629 279.600


15,000 kg Besi Hollow 40.40.4 mm 11.800 177.000
6,000 bh Murboud 5.900 35.400
1,000 m Cat besi synthetic 40.300 40.300
0,150 org/hr Pekerja 98.500 14.775
0,075 org/hr Tukang Batu Kasar 124.600 9.345
0,008 org/hr Kepala Tukang Batu 162.000 1.296
0,008 org/hr Mandor 189.100 1.513

M2 Pintu besi plat baja t. 2 mm rangkap; rangka besi siku 965 261.098 262.063 262.100
15,000 kg Besi Siku Rata-rata - -
32,800 kg Besi Plat rata2 1 s/d 5 mm - -
0,050 kg Kawat Benrat 19.300 965
1,050 org/hr Pekerja 98.500 103.425
1,050 org/hr Tukang Besi Konstruksi 124.600 130.830
0,105 org/hr Kepala Tukang Besi 162.000 17.010
0,052 org/hr Mandor 189.100 9.833

M2 Pagar Besi Hollow 295.965 261.098 557.063 557.100


25,000 kg Besi Hollow 40.40.4 mm 11.800 295.000
0,050 kg Kawat Benrat 19.300 965
1,050 org/hr Pekerja 98.500 103.425
1,050 org/hr Tukang Besi Konstruksi 124.600 130.830
0,105 org/hr Kepala Tukang Besi 162.000 17.010
0,052 org/hr Mandor 189.100 9.833
-
M2 Pagar Besi Tempa 965 261.098 262.063 262.100
1,200 m2 Besi tempa - -
0,050 kg Kawat Benrat 19.300 965
1,050 org/hr Pekerja 98.500 103.425
1,050 org/hr Tukang Besi Konstruksi 124.600 130.830
0,105 org/hr Kepala Tukang Besi 162.000 17.010
0,052 org/hr Mandor 189.100 9.833
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
M 133,333 Kusen Pintu dan Jendela Alumunium CA - 23.866 23.866 23.900
1,050 m Kusen Alm. 3" CA - -
1,000 bh Paku ripet - -
0,045 org/hr Pekerja 98.500 4.433
0,135 org/hr Tukang Kayu Halus 124.600 16.821
0,014 org/hr Kepala Tukang Kayu 162.000 2.187
0,002 org/hr Mandor 189.100 425

M 133,333 Kusen Pintu dan Jendela Alumunium PC - 23.866 23.866 23.900


1,050 m Kusen Alm. 3" PC - -
1,000 bh Paku ripet - -
0,045 org/hr Pekerja 98.500 4.433
0,135 org/hr Tukang Kayu Halus 124.600 16.821
0,014 org/hr Kepala Tukang Kayu 162.000 2.187
0,002 org/hr Mandor 189.100 425

unt 133,333 Kusen & Pintu PVC toilet - 23.866 23.866 23.900
1,000 bh Kusen & Pintu PVC toilet - -
6,000 bh Paku ripet - -
0,045 org/hr Pekerja 98.500 4.433
0,135 org/hr Tukang Kayu Halus 124.600 16.821
0,014 org/hr Kepala Tukang Kayu 162.000 2.187
0,002 org/hr Mandor 189.100 425

M 133,333 Rangka Pintu Alumunium CA - 23.866 23.866 23.900


1,050 m Rangka Pintu Alm. CA - -
1,000 bh Paku ripet - -
0,045 org/hr Pekerja 98.500 4.433
0,135 org/hr Tukang Kayu Halus 124.600 16.821
0,014 org/hr Kepala Tukang Kayu 162.000 2.187
0,002 org/hr Mandor 189.100 425

M 133,333 Rangka Pintu Alumunium PC - 23.866 23.866 23.900


1,050 m Rangka Pintu Alm. PC - -
1,000 bh Paku ripet - -
0,045 org/hr Pekerja 98.500 4.433
0,135 org/hr Tukang Kayu Halus 124.600 16.821
0,014 org/hr Kepala Tukang Kayu 162.000 2.187
0,002 org/hr Mandor 189.100 425
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
M 133,333 Rangka Jendela Alumunium - 23.866 23.866 23.900
1,050 m Rangka Jendela Alm. CA - -
1,000 bh Paku ripet - -
0,045 org/hr Pekerja 98.500 4.433
0,135 org/hr Tukang Kayu Halus 124.600 16.821
0,014 org/hr Kepala Tukang Kayu 162.000 2.187
0,002 org/hr Mandor 189.100 425

M 133,333 Rangka Jendela Alumunium - 23.866 23.866 23.900


1,050 m Rangka Jendela Alm. PC - -
1,000 bh Paku ripet - -
0,045 org/hr Pekerja 98.500 4.433
0,135 org/hr Tukang Kayu Halus 124.600 16.821
0,014 org/hr Kepala Tukang Kayu 162.000 2.187
0,002 org/hr Mandor 189.100 425

PEKERJAAN PRASARANA

M1 Parit cucuran atap pasang bata 84.143 - 84.143 84.100


0,16 M3 Galian tanah 78.600 12.576
0,008 M2 Pas batu bata 1:2 314.900 2.519
0,80 M2 plesteran 1:2 86.310 69.048

M1 Parit pasangan 60 x/60 x 40 tebal 20 cm 520.262 - 520.262 520.300


1,000 Galian tanah ( 0,35 x L 29 ) 27.510 27.510
1,000 Pas batu gunung ( 0,32X L.186 ) 355.392 355.392
1,000 plesteran 1:4 ( 2 X L. 624 ) 137.360 137.360

M1 Parit cor beton tebal 20 cm 710.377 - 710.377 710.400


1,000 Galian tanah ( 0,35 x L 29 ) 27.510 27.510
1,000 Pas batu gunung ( 0,32X Beton K.175 ) 413.344 413.344
1,000 plesteran 1:2 ( 2 X L. 624 ) 137.360 137.360
1,000 Besi dia. 8 - 15 cm (8.418 X L 411) 132.163 132.163

M1 Saluran air bt kali lbr bwh 80 cm tinggi 100 cm 786.111 435.388 1.221.499 1.221.500
2,98348 Org/Hr Pekerja 98.500 293.873
0,21855 Org/Hr Mandor 189.100 41.328
0,6920 Org/Hr Tukang 124.600 86.223
0,0862 Org/Hr Kepala tukang 162.000 13.964
1,0120 M3 Batu belah 382.200 386.786
3,8680 Zak Semen 88.400 341.931
0,46440 M3 Pasir pasang 112.400 52.199
0,092640 jam Tamper hand/ compactor 56.075 5.195
-
M1 Saluran air bt kali lbr bwh 100 cm tinggi 120 cm 996.979 584.209 1.581.189 1.581.200
4,10480 Org/Hr Pekerja 98.500 404.323
0,30945 Org/Hr Mandor 189.100 58.517
0,8620 Org/Hr Tukang 124.600 107.405
0,0862 Org/Hr Kepala tukang 162.000 13.964
1,2870 M3 Batu belah 382.200 491.891
4,8996 Zak Semen 88.400 433.125
0,58825 M3 Pasir pasang 112.400 66.119
0,104220 jam Tamper hand/ compactor 56.075 5.844
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
M1 Pekerjaan kansteen 126.954 10.796 137.750 137.700
0,070 m3 pek.galian tanah 78.600 5.502
0,100 m1 pek.bouwplank 43.200 4.320
0,018 m3 pek.urugan pasir 5 cm padat 146.900 2.644
2,500 bh beton kansteen 41.334 103.336
0,015 m3 adukan 1:4 utk penahan 66.790 1.002
0,100 zak semen utk pengikat 88.400 8.840
0,050 m3 urugan tanah kembali 26.200 1.310
0,100 org/hr pekerja 98.500 9.850
0,005 org/hr mandor 189.100 946

M2 Pas. Pavingblock t. 6 cm 39.740 116.023 155.763 155.800


25,000 bh Paving Blok Type Segi Enam t. 6 cm ( 20x20 cm ) Natural - -
0,100 m3 Pasir Pasang 112.400 11.240
1,500 kg Semen Warna 19.000 28.500
0,620 org/hr Pekerja 98.500 61.070
0,350 org/hr Tukang Batu Kasar 124.600 43.610
0,035 org/hr Kepala Tukang Batu 162.000 5.670
0,030 org/hr Mandor 189.100 5.673

1 M2 Pekerjaan Paving jalan setapak 119.389 51.065 170.454 170.500


( warna abu ; T 16 ; uk 8 x 10,5 x 21 )
+ Urugan pasir 5 cm dan urugan sirtu 20 cm
0,25 m3 Pekerjaan galian tanah 78.600 19.650
0,06 m3 Pekerjaan urugan pasir urug 5 cm 146.900 8.814
0,5 m2 Pek. Urugan sirtu 20 cm 152.300 76.150
0,2 m3 Pemadatan 58.700 11.740
25 m2 Paving block - -
0,027 m3 Pasir pasang untuk pengisian 112.400 3.035
0,24 org/hr tukang batu 124.600 29.904
0,024 org/hr Kepala tukang batu 162.000 3.888
0,16 org/hr Pekerja 98.500 15.760
0,008 org/hr Mandor 189.100 1.513

M2 Pek. Paving parkir kendaraan


(warna abu; T 16 ; 8x10.5x21, urugan pasir 5 cm dan urugan sirtu 20 cm) 61.564 40.900 102.464 102.500
0,1350 Jam Tamper/ Hand compactor 56.075 7.570
0,0337 Jam Plate compactor 56.075 1.890
0,2400 M3 Sirtu 189.000 45.360
0,0180 M3 Abu batu - -
1,1000 M2 Paving - -
0,0600 M3 Pasir urug 112.400 6.744
0,1200 org/hr Tukang 124.600 14.952
0,0120 org/hr Kepala tukang 162.000 1.944
0,2125 org/hr Pekerja 98.500 20.931
0,01625 org/hr Mandor 189.100 3.073
-
M2 Pekerjaan gebalan rumput 15.000 9.653 24.653 24.700
0,05000 Org/Hr Pekerja 98.500 4.925
0,02500 Org/Hr Mandor 189.100 4.728
0,2000 Btg Bambu panjang 4 m - -
1,0000 M2 Gebalan rumput 15.000 15.000
-
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
M1 Parit cucuran atap pasang bata #REF! - #REF! #REF!
0,1500 M3 Pek. galian tanah 78.600 11.790
0,0250 M3 Pek. Urugan pasir 146.900 3.673
0,4000 M2 Pek. Pasangan bata 1 : 4 #REF! #REF!
0,6000 M2 Plesteran 1 : 4 68.680 41.208
0,0500 M3 Urugan tanah kembali 26.200 1.310

1 M1 PEK. TURAP BATU KALI (tinggi 2 M) 1.473.606 - 1.473.606 1.473.600


0,64 m3 pek. galian tanah 78.600 50.304
0,12 m3 pek.urugan pasir 96.200 11.544
0,4 m3 pondasi batu kali 1:3 1.121.800 448.720
0,74 m3 dinding turap batu kali 1:3 1.121.800 830.132
2,4 m2 brapen 1:4 42.500 102.000
0,45 m2 plesteran 1:4 68.680 30.906
1 ls alat bantu - -

M2 Jembatan beton uk 1 x 1 m tebal 10 cm 1.436.098 - 1.436.098 1.436.100


1,0000 Galian tanah ( 0,32 x B.1a ) 25.152 25.152
1,0000 Pas. Batu gunung ( 0,8 x D.2 ) 888.480 888.480
1,0000 Plat beton ( 0,1 x SUV.E.3b ) 470.680 470.680
1,0000 Plesteran 1 : 2 ( 0,6 x D.6b ) 51.786 51.786

M2 Jembatan beton uk 1,5 x 1,5 m tebal 10 cm 3.230.791 - 3.230.791 3.230.800


1,0000 Galian tanah ( 0,62 x B.Ia ) 48.732 48.732
1,0000 Pas. Batu gunung ( 1,1 x D.2 ) 1.221.660 1.221.660
1,0000 Plat beton ( 0,4 x SUV.E.3b ) 1.882.720 1.882.720
1,0000 Plesteran 1 : 2 ( 0.9 x D.6b ) 77.679 77.679

M2 Pembuatan direksi keet 473.955 185.866 659.821 659.800


0,050 m3 Kayu klas III 5/7 2.682.100 134.105
0,800 lbr Triplex t. 4 mm - -
0,700 lbr Triplex t. 4 mm - -
0,500 kg Paku 4 s/d 7 cm 23.300 11.650
9,000 bh Paku payung 34.500 310.500
0,060 m2 Triplex t. 9 mm - -
1,000 m2 Cat plafond acrylic emulsion KW.III 17.700 17.700
1,200 org/hr Pekerja 98.500 118.200
0,400 org/hr Tukang Kayu Kasar 124.600 49.840
0,040 org/hr Kepala Tukang Kayu 162.000 6.480
0,060 org/hr Mandor 189.100 11.346
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
Bh Pembuatan papan nama proyek 279.858 284.065 563.923 563.900
0,025 m3 Papan kayu klas II 3.381.300 84.533
0,090 m3 Balok Kayu klas II - -
0,600 kg Paku 4 s/d 7 cm 23.300 13.980
0,750 kg Meni kayu ex Nippon 32.300 24.225
0,300 kg Plamir Kayu 51.600 15.480
2,000 lbr Amplas Kayu 4.200 8.400
0,200 bh Kwas cat 16.800 3.360
0,400 kg Cat kayu synthetic 61.900 24.760
0,500 zak Semen PC Gresik (50 Kg) 88.400 44.200
0,060 m3 Pasir Beton 189.000 11.340
0,100 m3 Batu Split Pecah Mesin 3/5 495.800 49.580
0,630 org/hr Pekerja 98.500 62.055
1,000 org/hr Tukang Kayu Kasar 124.600 124.600
0,500 org/hr Tukang Cat Biasa 124.600 62.300
0,100 org/hr Kepala Tukang Kayu 162.000 16.200
0,100 org/hr Mandor 189.100 18.910

1 M1 Pemb. Kawat duri, T=1,8m (pondasi cor beton 1:3:5, 48.780 80.400 129.180 129.200
30x30x40 tiap jarak 1,5 m)
0,200 zak semen 88.400 17.680
0,026 m3 pasir pasang 112.400 2.922
0,044 m3 Batu splite 2/3 534.500 23.518
0,330 btg besi siku 50.50.5 - -
2,000 kg kawat duri - -
0,200 kg paku rata-rata 23.300 4.660
0,250 org/hr tukang batu 124.600 31.150
0,500 org/hr pekerja 98.500 49.250

UNIT Septictank Pas. Bata kap. 3,00 m3 + Rembesan 8.549.349 - 8.549.349 8.549.300
3,000 m3 Galian tanah, dalam s/d 1 m 78.600 235.800
0,300 m3 Pas. Urugan pasir 96.200 28.860
3,000 m2 Pas. Lantai kerja beton tumbuk 1:3:5 110.300 330.900
10,500 m2 Pas. Dinding batu bata; ad 1:2 314.900 3.306.450
12,000 m2 Pas. Plester acian; ad. 1:2 42.170 506.040
0,360 m3 Beton K - 200 1.328.900 478.404
5,400 m' Pipa PVC dia. 4" AW 118.900 642.060
1,200 m' Pipa PVC dia. 1" AW 12.300 14.760
3,375 m3 Galian tanah, dalam s/d 1 m 78.600 265.275
5,400 m2 Pasangan injuk 200.000 1.080.000
1,050 m3 Batu Kerikil 534.500 561.225
9,000 m' Pipa PVC dia. 4" AW 118.900 1.070.100
1,125 m3 Urugan tanah kembali 26.200 29.475
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
UNIT Septictank Pas. Bata + Rembesan kap. 6,00 m3 10.089.359 - 10.089.359 10.089.400
6,000 m3 Galian tanah, dalam s/d 1 m 78.600 471.600
0,300 m3 Pas. Urugan pasir 96.200 28.860
3,000 m2 Pas. Lantai kerja beton tumbuk 1:3:5 110.300 330.900
17,000 m2 Pas. Dinding batu bata; ad 1:2 314.900 5.353.300
20,000 m2 Pas. Plester acian; ad. 1:2 42.170 843.400
0,360 m3 Beton K - 200 1.328.900 478.404
5,400 m' Pipa PVC dia. 4" AW 118.900 642.060
1,200 m' Pipa PVC dia. 1" AW 12.300 14.760
3,375 m3 Galian tanah, dalam s/d 1 m 78.600 265.275
5,400 m2 Pasangan injuk - -
1,050 m3 Batu Kerikil 534.500 561.225
9,000 m' Pipa PVC dia. 4" AW 118.900 1.070.100
1,125 m3 Urugan tanah kembali 26.200 29.475

1 Unit Resapan dia 80 m (digali 1m), dalam 1m (digali 1,9 m) kap. 0,5 m3
1,0500 Org/Hr Pekerja 98.500 103.425
0,2700 Org/Hr Tukang 124.600 33.642
0,0969 Org/Hr Mandor 189.100 18.324
0,0270 Org/Hr Kepala tukang 162.000 4.374
0,6030 m3 Kerikil 534.500 322.304
0,7160 Kg Ijuk - -
2,0000 M1 Pipa PVC dia 4" 14.700 29.400
351.704 159.765 511.468 511.500

M1 Pagar bata merah t. 2m + plester dan cat tembok 952.325 513.191 1.465.516 1.465.500
2,6610 Org/Hr Pekerja 98.500 262.109
0,1860 Org/Hr Tukang kayu 124.600 23.176
0,1120 Org/Hr Tukang besi 124.600 13.955
1,0290 Org/Hr Tukang batu 124.600 128.213
0,2520 Org/Hr Tukang cat 124.600 31.399
0,1580 Org/Hr Kepala tukang 162.000 25.596
0,1520 Org/Hr Mandor 189.100 28.743
0,3600 M3 Batu belah 382.200 137.592
0,0600 M3 Batu pecah split 2/3 534.500 32.070
100,0000 Biji Bata merah 900 90.000
2,1094 Zak Semen 88.400 186.471
0,0280 M3 Pasir urug 96.200 2.694
0,2650 M3 Pasir pasang 112.400 29.786
0,0380 M3 Pasir beton 112.400 4.271
0,0140 M3 Kayu balok 2.682.100 37.549
0,1670 Kg Paku 23.300 3.891
14,7000 Kg Besi beton polos 27.400 402.780
0,8680 Kg Kawat 19.300 16.752
0,4000 Kg Plamir tembok 16.300 6.520
0,4000 Kg Cat tembok (cat dasar) - -
1,0400 Kg Cat tembok (cat penutup) - -
0,03474 jam Tamper hand/ compactor 56.075 1.948
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah

M1 Pagar BRC 0,9m t. jadi 1,2 m (pond. bt kali,sloof beton, 1/2 bata 30 cm, plester dan cat)
1,1880 Org/Hr Pekerja 98.500 117.018
0,1040 Org/Hr Tukang kayu 124.600 12.958
0,0720 Org/Hr Tukang besi 124.600 8.971
0,3410 Org/Hr Tukang batu 124.600 42.489
0,07245 Org/Hr Tukang cat 124.600 9.027
0,0590 Org/Hr Kepala tukang 162.000 9.558
0,0710 Org/Hr Mandor 189.100 13.426
0,2740 M3 Batu belah 382.200 104.723
0,0022 M3 Batu pecah split 2/3 534.500 1.176
15,0000 Biji Bata merah 900 13.500
0,8752 Zak Semen 88.400 77.368
0,0250 M3 Pasir urug 96.200 2.405
0,1200 M3 Pasir pasang 112.400 13.488
0,0146 M3 Pasir beton 112.400 1.641
0,0060 M3 Kayu balok 2.682.100 16.093
0,1200 Kg Paku 23.300 2.796
4,4400 Kg Besi beton polos 27.400 121.656
0,0640 Kg Kawat 19.300 1.235
1,0000 M1 Pagar BRC tinggi 0,9m -
0,5550 Bh Tiang pagar BRC t. 0,9m -
0,1150 Kg Plamir tembok 16.300 1.875
0,1150 Kg Cat tembok (cat dasar) - -
0,2990 Kg Cat tembok (cat penutup) - -
357.955 213.448 571.402 571.400

PEKERJAAN JALAN

M2 Penyiapan badan jalan / tanah dasar (subgrade) 398 2.538 2.936 2.900
0,0250 Org/Hr Pekerja 98.500 2.463
0,0004 Org/Hr Mandor 189.100 76
0,0033 Jam Vibrating roller 6-8 ton - -
0,0071 Jam Water tank truck 3000-4500 Ltr 56.075 398
-
M2 Lapis Pondasi bawah kelas C sirtu tb. 10 cm 22.803 2.935 25.739 25.700
0,0250 Org/Hr Pekerja 98.500 2.463
0,0025 Org/Hr Mandor 189.100 473
0,1200 M3 Sirtu 189.000 22.680
0,0033 Jam Vibrating roller 6-8 ton - -
0,0022 Jam Water tank truck 3000-4500 Ltr 56.075 123
-
M2 Lapis Pondasi jalan tanpa penutup aspal Macadam 540.195 104.929 645.125 645.100
1,0000 Org/Hr Pekerja 98.500 98.500
0,0340 Org/Hr Mandor 189.100 6.429
0,9350 M3 Batu pecah 5/7 557.900 521.637
0,1650 M3 Pasir urug 96.200 15.873
0,0268 Jam Three wheel roller 8-10 ton 56.075 1.503
0,0211 Jam Water tank truck 3000-4500 Ltr 56.075 1.183
-
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
M2 Lapis pondasi atas Agregat kelas A 462.692 104.929 567.621 567.600
1,0000 Org/Hr Pekerja 98.500 98.500
0,0340 Org/Hr Mandor 189.100 6.429
0,7680 m3 Batu pecah 2/3 534.500 410.496
0,4320 M3 Pasir urug 96.200 41.558
0,0268 Jam Three wheel roller 6-8 ton 220.000 5.896
0,0211 Jam Water tank truck 6000 Ltr 224.700 4.741
-
M2 Aspal untuk palaburan 342 258 600 600
0,0022 Org/Hr Pekerja 98.500 217
0,00022 Org/Hr Mandor 189.100 42
1,1000 Kg Aspal polimer lokal - -
0,0520 Ltr Minyak tanah - -
0,0015 Jam Asphalt Sprayer 56.075 84
0,0031 Jam Air Compressor 56.075 174
0,0015 Jam Dump Truck 3-4 M2 / 6 Ton 56.075 84
-
M2 Lapisan penetrasi (lapen) permukaan macadam 5 cm 37.301 15.287 52.588 52.600
0,1415 Org/Hr Pekerja 98.500 13.938
0,0043 Org/Hr Mandor 189.100 813
0,0043 Org/Hr Tukang aspal 124.600 536
0,0400 m3 Batu pecah/ split 3/5 495.800 19.832
0,0220 m3 Batu pecah/ split 2/3 534.500 11.759
0,0110 m3 Batu pecah/ split 1/2 519.100 5.710
0,0025 m3 Abu batu - -
4,8000 Kg Aspal polimer lokal - -
0,3220 Ltr Minyak tanah - -
-
M2 Lapisan tipis aspal beton tbl. 3 cm 17.478 293 17.771 17.800
0,0024 Org/Hr Pekerja 98.500 236
0,0003 Org/Hr Mandor 189.100 57
0,0122 m3 Batu pecah / split 1/2 519.100 6.333
0,0233 m3 Abu batu - -
4,7975 Kg Filler utk hotmix (semen) 2.000 9.595
5,2991 Kg Aspal polimer lokal - -
0,0010 Jam Wheel Loader 1,0 - 1,6 M3 56.075 56
0,0017 Jam Asphalt Mixing Plant (AMP) 90.350 154
0,0017 Jam Generator Set 125 KVA 56.075 95
0,0183 Jam Dump Truck 3-4 M2 / 6 Ton 56.075 1.026
0,0021 Jam Asphalt Finisher 56.075 118
0,0018 Jam Tandem roller 6-8 Ton 56.075 101
0,0013 Jam Pneumatic Tyre Roller 8 - 12 Ton - -
-
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
M2 Lapisan permukaan aspal beton (Laston/AC aspal concrete) tbl. 5 cm 36.354 460 36.814 36.800
0,0039 Org/Hr Pekerja 98.500 384
0,0004 Org/Hr Mandor 189.100 76
0,0421 m3 Batu pecah / split 1/2 519.100 21.854
0,0186 m3 Abu batu - -
6,0019 Kg Filler utk hotmix (semen) 2.000 12.004
8,2688 Kg Aspal polimer lokal - -
0,0016 Jam Wheel Loader 1,0 - 1,6 M3 56.075 90
0,0028 Jam Asphalt Mixing Plant (AMP) 90.350 253
0,0028 Jam Generator Set 125 KVA 56.075 157
0,0305 Jam Dump Truck 3-4 M2 / 6 Ton 56.075 1.710
0,0034 Jam Asphalt Finisher 56.075 191
0,0017 Jam Tandem roller 6-8 Ton 56.075 95
0,0019 Jam Pneumatic Tyre Roller 8 - 12 Ton - -
-
M2 Pembuatan jalan aspal biasa
Sirtu tb. 10 cm, Agregat kelas A tb. 20 cm & Permukaan macadam tb. 5 cm 158.091 41.746 199.837 199.800
0,3915 Org/Hr Pekerja 98.500 38.563
0,0140 Org/Hr Mandor 189.100 2.647
0,0043 Org/Hr Tukang aspal 124.600 536
0,1200 m3 Sirtu 189.000 22.680
0,0400 m3 Batu pecah / split 3/5 495.800 19.832
0,1756 m3 Batu pecah / split 2/3 534.500 93.858
0,0110 m3 Batu pecah / split 1/2 519.100 5.710
0,0025 m3 Abu batu - -
4,8000 Kg Aspal polimer lokal - -
0,0864 M3 Pasir urug 96.200 8.312
0,3220 Ltr Minyak tanah - -
0,0066 Jam Vibrating roller 6-8 ton 56.075 370
0,01352 Jam Water tank truck 3000-4500 ltr 224.700 3.038
0,0081 Jam Three wheel roller 8-10 ton 220.000 1.773
0,0144 Jam Asphalt Sprayer 56.075 807
0,0305 Jam Dump Truck 3-4 M2 / 6 Ton 56.075 1.710
-
ANALISA HARSA SATUAN
( UNIT PRICE )

Berdasarkan SNI 2007 / 2008


JUMLAH HARGA
UNIT KOEF. SAT. URAIAN HARGA TOTAL DIBULATKAN
Material Upah
M2 Pembuatan jalan aspal beton tb. 5 cm
(Sirtu tb. 10 cm, Agregat kelas A tb. 20 cm, Laston AC tb. 5 cm) #REF! 27.409 #REF! #REF!
0,25734 Org/Hr Pekerja 98.500 25.348
0,0109 Org/Hr Mandor 189.100 2.061
0,1200 m3 Sirtu 189.000 22.680
0,1536 m3 Batu pecah / split 2/3 534.500 82.099
0,0864 M3 Pasir urug 96.200 8.312
8,78216 Kg Aspal polimer lokal - -
0,39112 Ltr Minyak tanah - -
0,0421 m3 Batu pecah / split 1/2 519.100 21.854
0,0186 m3 Abu batu - -
6,0019 Kg Filler utk hotmix (semen) 2.000 12.004
0,0066 Jam Vibrating roller 6-8 ton 56.075 370
0,01352 Jam Water tank truck 3000-4500 ltr 224.700 3.038
0,00536 Jam Three wheel roller 8-10 ton 220.000 1.179
0,0024 Jam Asphalt Sprayer 56.075 135
0,00248 Jam Air Compressor #REF! #REF!
0,0329 Jam Dump Truck 3-4 M2 / 6 Ton 56.075 1.845
0,0016 Jam Wheel Loader 1,0 - 1,6 M3 56.075 90
0,0028 Jam Asphalt Mixing Plant (AMP) 90.350 253
0,0028 Jam Generator Set 125 KVA 56.075 157
0,0034 Jam Asphalt Finisher 56.075 191
0,0017 Jam Tandem roller 6-8 Ton 56.075 95
0,0019 Jam Pneumatic Tyre Roller 8 - 12 Ton - -
REKAPITULASI BILL OF QUANTITY

PEKERJAAN : PEMBANGUNAN YONKAV KODAM XII/TPR


LOKASI : PENITI KAB. PONTIANAK
TA. : 2016

HARGA SAT. JMLH. HARGA


NO PEKERJAAN VOLUME SAT
(Rp) (Rp)
1 2 3 4 5 6

I KONTRUKSI
1 Ruang Makan 288,00 M2 4.358.250,00 1.255.176.000,00
Sub Total 1.255.176.000,00
II PRASARANA
1 Pembuatan badan jalan 2.380,00 M2 3.438.635,29 8.183.952.000,00
2 Instalasi air bersih Tahap-2 (air baku sungai) 1,00 Ls 369.946.000,00 369.946.000,00
3 Pematangan lahan 1,00 Ls 94.123.000,00 94.123.000,00
Sub Total 8.648.021.000,00
TOTAL = I + II 9.903.197.000,00

Terbilang : Sembilan Milyar Sembilan Ratus Tiga Juta Seratus Sembilan Puluh Tujuh Ribu Rupiah

Pontianak, 7 April 2016


Penawar,
PT. VISTA EMAS SEJATI

ENDANG MASRONI, SH, MH


Direktur Utama
Pontianak, 7 April 2016
Nomor : 17/PEN-VES/IV/2016
Lampiran : 1 (satu) File

Kepada Yth.
KETUA POKJA ULP KODAM XII/TANJUNGPURA
di -
Kubu Raya

Perihal : Penawaran Pekerjaan Pembangunan Yonkav Kodam XII/TPR (Paket-VI)

Sehubungan dengan Pengumuman Pelelangan Umum dengan Pascakualifikasi dan Dokumen


Pengadaan Nomor : 24/DOK-JK/POKJA/III/2016 tanggal 28 Maret 2016 dan setelah kami
mempelajari dengan seksama dokumen pengadaan dan Berita Acara Pemberian Penjelasan (serta
Adendum Dokumen Pengadaan) dengan ini kami mengajukan penawaran untuk Pekerjaan :
Pembangunan Yonkam Kodam XII/TPR (Paket VI)
Sebesar Rp 9.903.197.000,00 Terbilang (Sembilan Milyar Sembilan Ratus Tiga Juta Seratus
Sembilan Puluh Tujuh Ribu Rupiah)
Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen
Pengadaan untuk melaksanakan pekerjaan tersebut diatas

Penawaran ini berlaku selama 60 (Enam Puluh) Hari Kalender sejak batas akhir pemasukan
Dokumen

Sesuai dengan persyaratan, bersama surat penawaran ini kami lampirkan :


1. Daftar Kuantitas dan Harga
2. Analisa Harga Stuan Pekerjaan (AHSP)
3. Daftar Harga Satuan Bahan dan Upah
4. Analisa Teknis Satuan Pekerjaan (ATSP)
5. Dokumen Penawaran Teknis, terdiri dari
- Metoda Pelaksanaan
- Jadwal dan Jangka Waktu Pelaksanaan Pekerjaan sampai dengan PHO
- Jenis, kapasitas, komposisi dan jumlah peralatan
- Spesifikasi Teknis (bahan/barang tertentu apabila ada)
- Daftar Personil inti
6. Formulir Rekapitulasi Perhitungan Tingkat Komponen dalam Negeri (TKDN), apabila memenuhi
syarat untuk diberikan preferensi harga) dan
7. Pra RK3K
8. Dokumen Kualifikasi

Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk
pada semua ketentuan yang tercantum dalam Dokumen Pengadaan

Penawar,
PT. VISTA EMAS SEJATI

ENDANG MASRONI, SH, MH


Direktur Utama
TIME SCHEDULE
PEKERJAAN : PEBANGUNAN YONKAV KODAM XII/TPR

MINGGU KE
URAIAN
No (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ket.

A Ruang Makan
1 PEKERJAAN PERSIAPAN 0,17 0,08 0,08
2 PEKERJAAN TANAH 1,38 0,46 0,46 0,46
3 PEKERJAAN PASANGAN 5,84 0,58 0,58 0,58 0,58 0,58 0,58 0,58 0,58 0,58 0,58
4 PENUTUP ATAP BJ. RINGAN 1,06 0,35 0,35 0,35
5 PEKERJAAN KAYU 1,41 0,47 0,47 0,47
6 PEKERJAAN LANTAI 2,12 0,71 0,71 0,71
7 PEK. ALAT GANTUNG 0,18 0,18
8 PEKERJAAN LISTRIK + AIR 0,16 0,16
9 PEKERJAAN PENGECATAN 0,36 0,18 0,18

B Pembuatan badan jalan


1 PEKERJAAN PERSIAPAN 14,72 4,908 4,908 4,908
2 PEKERJAAN PERSIAPAN 41,35 13,78 13,78 13,78
3 PEKERJAAN DRAINASE 26,56 3,32 3,32 3,32 3,32 3,32 3,32 3,32 3,32

C Instalasi air bersih Tahap-2 (air baku sungai)


1 PEKERJAAN PERSIAPAN 0,01 0,01
2 PEKERJAAN TANAH 0,03 0,03
3 PEKERJAAN PASANGAN 0,23 0,06 0,06 0,06 0,06
4 PENUTUP ATAP BJ. RINGAN 0,08 0,04 0,04
5 PEKERJAAN KAYU 0,10 0,03 0,03 0,03
6 PEKERJAAN LANTAI 0,10 0,03 0,03 0,03 0,03
7 PEK. ALAT GANTUNG 0,01 0,01
8 PEKERJAAN LISTRIK + AIR 0,02 0,02
9 PEKERJAAN PENGECATAN 0,02 0,02
10 PEKERJAAN LAIN-LAIN 3,13 1,57 1,57

D Pematangan lahan
1 Timbunan dan Pemadatan tanah/15cm tebal 30 cm ( Dengan Alat
0,95) 0,48 0,48

Jumlah Nilai Pekerjaan 100,00


Kemajuan Pekerjaan Mingguan 0,08 0,54 0,46 1,04 0,58 0,60 0,62 0,99 5,90 6,37 19,37 14,41 17,73 3,82 3,82 4,05 4,05 4,05 3,52 3,49 0,68 0,68 1,57 1,57
Kemajuan Pekerjaan Komulatif Mingguan 0,08 0,63 1,08 2,13 2,71 3,31 3,93 4,92 10,82 17,20 36,56 50,97 68,70 72,52 76,34 80,40 84,45 88,50 92,02 95,51 96,19 96,87 98,43 100,00