HARGA BIAYA
NO PEKERJAAN VOLUME SAT
(RP) (RP)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank 1.104,86 M1 43.200,00 47.729.828,57
2 Galian Tanah ( Dengan Alat ) 9.801,41 M3 101.300,00 992.882.354,86
3 Kayu Simpiran (3 cm) 375,60 M3 269.200,00 101.111.520,00
4 Urugan pasir 1.252,00 M3 146.900,00 183.918.800,00
Sub Total 1.325.642.503,44
II PEKERJAAN PERSIAPAN
1 Kayu Cerucuk dia. 10 - 4 M jarak 30 cm 59.813,00 Ttk 18.100,00 1.082.615.300,00
2 Timbunan dan Pemadatan tanah/15cm tebal 30 cm ( Dengan Alat ) 3.756,00 M3 135.400,00 508.562.400,00
3 Lapis Pondasi Atas Agregat kelas A tebal 30 cm 3.756,00 M3 567.600,00 2.131.905.600,00
Sub Total 3.723.083.300,00
III PEKERJAAN DRAINASE
1 Parit pas. Batu kali 0,6x/0,6x0,4 m tebal 20 cm diplester 4.595,87 M1 520.300,00 2.391.231.161,00
Sub Total 2.391.231.161,00
TOTAL 7.439.956.964,44
PPN 10% 743.995.696
TOTAL 8.183.952.660,88
DIPERBULAT 8.183.952.000,00
Terbilang : Delapan Milyar Seratus Delapan Puluh Tiga Juta Sembilan Ratus Lima Puluh Dua Ribu Rupiah
BILL OF QUANTITY
HARGA BIAYA
NO PEKERJAAN VOLUME SAT
(RP) (RP)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 30,00 M2 10.800,00 324.000,00
2 Papan bowplank 22,00 M2 43.200,00 950.400,00
II PEKERJAAN TANAH
1 Galian tanah 7,84 M3 78.600,00 616.224,00
2 Urugan tanah kembali 2,35 M3 26.200,00 61.622,40
3 Urugan pasir bwh pondasi/lantai 1,16 M3 146.900,00 170.404,00
4 Cerucuk ky bulat dia. 8-10 panj. 4 m 72,00 Btg 29.800,00 2.145.600,00
V PEKERJAAN KAYU
1 Kusen pintu / jendela kayu klas. I 0,05 M3 7.996.600,00 383.836,80
2 Lysplank papan ky.kls.I 2x2,5/20 22,00 M2 108.800,00 2.393.600,00
3 Pintu panil papan 1,00 Bh 1.240.920,00 1.240.920,00
4 Ventilasi besi Ø 8 2,00 M2 350.000,00 700.000,00
5 Pas. Rangka plafond kayu klas.II 21,80 M2 128.100,00 2.792.580,00
6 Penutup Plafond GRC 21,80 M2 71.800,00 1.565.240,00
7 List plafond kayu profil 14,00 M1 20.600,00 288.400,00
VI PEKERJAAN LANTAI
1 Lantai cor beton tbl. 15 cm 1,20 M3 1.183.600,00 1.420.320,00
2 Pas. lantai Keramik 40/40 12,00 M2 221.510,00 2.658.120,00
3 Pas. lantai Keramik rabatz 40/40 11,20 M2 221.510,00 2.480.912,00
4 Cor lantai rabatz beton 0,78 M3 1.183.600,00 927.942,40
5 Parit cucuran atap 22,00 M1 84.100,00 1.850.200,00
X PEKERJAAN LAIN-LAIN
1 Membeli mesin pompa air 1,00 Bh 5.390.000,00 5.390.000,00
2 Membeli mesin diesel yanmar 1,00 Bh 7.840.000,00 7.840.000,00
3 Pasang pipa pex dia. 2.5" 1.100,00 M1 98.000,00 107.800.000,00
4 Membuat sumur bor (water drilling) 2,00 Ttk 80.510.000,00 161.020.000,00
TOTAL 336.314.899,80
PPN 10% 33.631.489,98
TOTAL 369.946.389,78
DIPERBULAT 369.946.000,00
Terbilang : Tiga Ratus Enam Puluh Sembilan Juta Sembilan Ratus Empat Puluh Enam Ribu Rupiah
BILL OF QUANTITY
HARGA BIAYA
NO PEKERJAAN VOLUME SAT
(RP) (RP)
1 2 3 4 5 6
1 Timbunan dan Pemadatan tanah/15cm tebal 30 cm ( Dengan Alat ) 631,96 M3 135.400,00 85.566.707,00
TOTAL 85.566.707,00
PPN 10% 8.556.670,70
TOTAL 94.123.377,70
DIPERBULAT 94.123.000,00
Terbilang : Sembilan Puluh Empat Juta Seratus Dua Puluh Tiga Ribu Rupiah
BILL OF QUANTITY
HARGA JUMLAH
NO PEKERJAAN VOLUME SAT
(Rp) (Rp)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 374,00 M2 10.800,00 4.039.200,00
2 Pengukuran bouwplank 252,00 M1 43.200,00 10.886.400,00
Sub Total 14.925.600,00
II PEKERJAAN TANAH
1 Galian tanah pondasi 201,60 M3 78.600,00 15.845.760,00
2 Urugan tanah kembali 67,20 M3 26.200,00 1.760.640,00
3 Urugan pasir bwh pondasi/lantai 28,80 M3 146.900,00 4.230.720,00
4 Urugan tanah bawah lantai 445,93 M3 129.400,00 57.703.525,75
5 Cerucuk kayu bulat 1.496,00 Btg 29.800,00 44.580.800,00
Sub Total 124.121.445,75
III PEKERJAAN PASANGAN
1 Pondasi bt kosong/aanstamping 40,32 M3 646.300,00 26.058.816,00
2 Pondasi batu gunung 141,12 M3 1.121.800,00 158.308.416,00
3 Pasang bataco trasram 1:2 185,25 M2 119.300,00 22.100.325,00
4 Pasang bataco 1:4 555,75 M2 119.300,00 66.300.975,00
5 Kolom teras depan 20/20 7,04 M3 4.859.100,00 34.208.064,00
6 Bok Depan Pintu 1,44 M3 1.121.800,00 1.615.392,00
7 Sloof beton 20/30 15,12 M3 5.045.800,00 76.292.496,00
8 Ring balk beton 15/20 7,56 M3 5.045.800,00 38.146.248,00
9 Plester dinding 1:2 185,25 M2 86.310,00 15.988.927,50
10 Plester dinding 1:4 1.111,50 M2 68.680,00 76.337.820,00
11 Pas. Dinding kamprot 185,25 M2 54.100,00 10.022.025,00
Sub Total 525.379.504,50
IV PENUTUP ATAP BJ. RINGAN
1 Kuda-kuda atap baja Ringan 374,00 M2 115.600,00 43.234.400,00
2 Pasang atap genteng metal 374,00 M2 129.000,00 48.246.000,00
3 Pasang Nok genteng metal 48,70 M1 89.600,00 4.363.520,00
Sub Total 95.843.920,00
V PEKERJAAN KAYU
1 Kusen pintu/jendela ky. Klas I 0,45 M3 7.996.600,00 3.574.480,20
2 Lysplank GRC 79,00 M1 108.800,00 8.595.200,00
3 Pintu panil double papan 6,00 Bh 2.343.960,00 14.063.760,00
4 Pintu panil papan 2,00 Bh 1.240.920,00 2.481.840,00
5 Jendela double kaca panil 14,00 Bh 544.590,00 7.624.260,00
6 Rangka plafond kayu klas II 374,00 M2 128.100,00 47.909.400,00
7 Penutup Plafond GRC 374,00 M2 71.800,00 26.853.200,00
8 List plafond kayu profil 334,00 M1 20.600,00 6.880.400,00
9 Jalusi Jendela dan Pintu 13,80 M2 617.300,00 8.518.740,00
Sub Total 126.501.280,20
VI PEKERJAAN LANTAI
1 Pas. Keramik lantai 40/40 288,00 M2 221.510,00 63.794.880,00
2 Meja Saji Lengkap Keramik uk 20/20 3,00 Bh 1.000.000,00 3.000.000,00
3 Cor Lantai Tebal 10 cm 57,60 M3 1.183.600,00 68.175.360,00
4 Cor lantai keliling rabatz beton 12,90 M3 1.183.600,00 15.268.440,00
5 Parit cucuran atap 79,00 M1 84.100,00 6.643.900,00
6 Parit pas. Batu kali 0,6x/0,6x0,4m tebal 20 cm diplester 46,20 M3 520.300,00 24.035.778,80
7 Plat Deuker 1,5 x 1,5 m tebal 10cm 2,00 Bh 4.963.300,00 9.926.600,00
Sub Total 190.844.958,80
VII PEK. ALAT GANTUNG
1 Kunci pintu 14,00 Bh 307.600,00 4.306.400,00
2 Engsel pintu 42,00 Psg 61.000,00 2.562.000,00
3 Engsel jendela 56,00 Psg 45.500,00 2.548.000,00
4 Hak angin 28,00 Bh 42.500,00 1.190.000,00
5 Grendel 84,00 Bh 47.100,00 3.956.400,00
6 Handle jendela 28,00 Bh 48.700,00 1.363.600,00
Sub Total 15.926.400,00
VIII PEKERJAAN LISTRIK + AIR
1 Titik mata lampu 10,00 Ttk 175.600,00 1.756.000,00
2 Stop kontak setara Broco 4,00 Ttk 37.200,00 148.800,00
3 Saklar ganda 6,00 Bh 53.000,00 318.000,00
4 Lampu XL 18 watt 6,00 Bh 120.100,00 720.600,00
5 Pas. Lampu TL 20 watt 4,00 Bh 74.600,00 298.400,00
6 Kast zekering 4 group 1,00 Bh 110.000,00 110.000,00
7 Arde BC draad 6 mm 60,00 M1 190.000,00 11.400.000,00
Sub Total 14.751.800,00
IX PEKERJAAN PENGECATAN
1 Cat dinding tembok+plafond 1.485,95 M2 20.700,00 30.759.165,00
2 Cat kayu / kilap 32,56 M2 61.900,00 2.015.464,00
Sub Total 32.774.629,00
JUMLAH 1.141.069.538,25
PPN 10 % 114.106.953,82
TOTAL 1.255.176.492,07
RUMDIS K-45 / 1KK 1.255.176.000,00
Terbilang : Satu Milyar Dua Ratus Lima Puluh Lima Juta Seratus Tujuh Puluh Enam Ribu Rupiah
DAFTAR UPAH PEKERJA
D A E R A H : KAB. PONTIANAK
HARGA
NO. JENIS BAHAN SAT KET.
(Rp)
1 Pekerja Hr 98.500,00
2 Mandor Hr 189.100,00
3 Tukang listrik Hr 124.600,00
4 Kep. tk. LIstrik Hr 162.000,00
5 Tukang kayu Hr 124.600,00
6 Kep. tk. kayu Hr 162.000,00
7 Tukang batu Hr 124.600,00
8 Kep. tk. batu Hr 162.000,00
9 Tukang besi Hr 124.600,00
10 T u k a n g b e s i konstruksi Hr 124.600,00
11 K e p . t k . b e s i Hr 162.000,00
12 T u k a n g c a t Hr 124.600,00
13 K e p . t k . c a t Hr 162.000,00
14 T u k a n g p l i t u r Hr 124.600,00
15 T u k a n g j a l a n Hr 124.600,00
16 T u k a n g g a l i Hr 124.600,00
17 Tukang masak aspal Hr 124.600,00
18 T k . l e i d e n g Hr 124.600,00
19 Operator Hr 311.500,00
20 P e m b . Operator Hr 137.100,00
21 P e n j a g a a p i Hr 186.900,00
22 P e n j a g a m a l a m Hr 186.900,00
23 Sopir Hr 249.200,00
24 Pembantu Sopir Hr 112.100,00
25 Mekanik Hr 373.800,00
26 Operator alat berat Hr 311.500,00
DAFTAR HARGA SATUAN UPAH DAN BAHAN
( BASIC PRICE )
Kabupaten PONTIANAK
Provinsi KALIMANTAN BARAT
Tahun 2016
Lokasi
I. PEKERJAAN PERSIAPAN :
M2 Pembuatan Direksi Keet / Gudang Bahan Bangunan dan Alat / Bedeng Pekerja 598.111 389.555 987.666 987.700
1,250 Btg Kayu Pancang (Dolken) d = 10cm, p = 4m - -
0,186 M3 Kayu Kelas III 2.682.100 498.871
0,300 Kg Paku 23.300 6.990
1,500 Lbr Seng Gelombang BJLS 0.20 61.500 92.250
1,3500 Lbr Triplek 4mm - -
2,000 org/hr Tukang Kayu 124.600 249.200
1,000 org/hr Pekerja 98.500 98.500
0,200 org/hr Kepala Tukang 162.000 32.400
0,050 org/hr Mandor 189.100 9.455
PEKERJAAN TANAH :
1 TTK PANCANG KAYU BULAT / MERAH / DOLKEN 18.100 11.741 29.841 29.800
1,0000 Btg Kayu bulat/dolken 8-10cm panj. 4 m 18.100 18.100
0,1000 Org/Hr Pekerja 98.500 9.850
0,0100 Org/Hr Mandor 189.100 1.891
PEKERJAAN PONDASI :
1 M3 MEMASANG PONDASI BATU BELAH CAMP. 1 PC : 4 PSR 843.088 267.533 1.110.621 1.110.600
1,50 org/hr Pekerja 98.500 147.750
0,75 org/hr Tukang batu 124.600 93.450
0,08 org/hr Kepala Tukang batu 162.000 12.150
0,08 org/hr Mandor 189.100 14.183
1,20 M3 batu belah 382.200 458.640
163,00 Kg Semen PC 2.000 326.000
0,52 M3 Pasir pasang 112.400 58.448
-
1 M3 MEMASANG PONDASI BATU BELAH CAMP. 1 PC : 5 PSR 791.786 267.533 1.059.318 1.059.300
1,500 org/hr Pekerja 98.500 147.750
0,750 org/hr Tukang batu 124.600 93.450
0,075 org/hr Kepala Tukang batu 162.000 12.150
0,075 org/hr Mandor 189.100 14.183
1,200 M3 batu belah 382.200 458.640
136,000 Kg Semen PC 2.000 272.000
0,544 M3 Pasir pasang 112.400 61.146
-
ANALISA HARSA SATUAN
( UNIT PRICE )
PEKERJAAN BETON :
MEMBUAT 1 M3 PONDASI BETON BERTULANG (150 KG BESI + BEGESTING) 3.765.126 941.681 4.706.807 4.706.800
5,3000 org/hr Pekerja 98.500 522.050
0,2750 org/hr Tukang batu 124.600 34.265
1,3000 org/hr Tukang kayu 124.600 161.980
1,0500 org/hr Tukang besi 124.600 130.830
0,2620 org/hr Kepala Tukang 162.000 42.444
0,2650 org/hr Mandor 189.100 50.112
0,2000 M3 Kayu Begesting 2.682.100 536.420
1,5000 Kg Paku kayu 23.300 34.950
0,4000 Liter Minyak Begesting 7.000 2.800
157,5000 Kg Besi beton 12.400 1.953.000
2,2500 Kg Kawat beton 19.300 43.425
336,0000 Kg Semen PC 2.000 672.000
0,5400 M3 Pasir Beton 189.000 102.060
0,8100 M3 Kerikil 519.100 420.471
MEMBUAT 1 M3 SLOOF BETON BERTULANG (150 KG BESI + BEGESTING) 3.980.398 1.065.447 5.045.845 5.045.800
5,650 org/hr Pekerja 98.500 556.525
0,275 org/hr Tukang batu 124.600 34.265
1,560 org/hr Tukang kayu 124.600 194.376
1,400 org/hr Tukang besi 124.600 174.440
0,323 org/hr Kepala Tukang 162.000 52.326
0,283 org/hr Mandor 189.100 53.515
0,270 M3 Kayu Begesting 2.682.100 724.167
2,000 Kg Paku kayu 23.300 46.600
0,600 Liter Minyak Begesting 7.000 4.200
157,500 Kg Besi beton 12.400 1.953.000
3,000 Kg Kawat beton 19.300 57.900
336,000 Kg Semen PC 2.000 672.000
0,540 M3 Pasir Beton 189.000 102.060
0,810 M3 Kerikil 519.100 420.471
ANALISA HARSA SATUAN
( UNIT PRICE )
UNTUK 1 M3 KOLOM BETON DENGAN BESI 200 KG/M3 ADALAH : 5.036.471 1.240.758 6.277.229 6.277.200
7,0500 org/hr Pekerja 98.500 694.425
0,2750 org/hr Tukang batu 124.600 34.265
1,6500 org/hr Tukang kayu 124.600 205.590
1,4000 org/hr Tukang besi 124.600 174.440
0,4030 org/hr Kepala Tukang 162.000 65.286
0,3530 org/hr Mandor 189.100 66.752
0,4000 M3 Kayu Begesting 2.682.100 1.072.840
4,0000 Kg Paku kayu 23.300 93.200
2,0000 Liter Minyak Begesting 7.000 14.000
210,0000 Kg Besi beton 12.400 2.604.000
3,0000 Kg Kawat beton 19.300 57.900
336,0000 Kg Semen PC 2.000 672.000
0,5400 M3 Pasir Beton 189.000 102.060
0,8100 M3 Kerikil 519.100 420.471
UNTUK 1 M3 KOLOM BETON DENGAN BESI 150 KG/M3 ADALAH : 4.370.996 1.197.148 5.568.144 5.568.100
7,050 org/hr Pekerja 98.500 694.425
0,275 org/hr Tukang batu 124.600 34.265
1,650 org/hr Tukang kayu 124.600 205.590
1,050 org/hr Tukang besi 124.600 130.830
0,403 org/hr Kepala Tukang 162.000 65.286
0,353 org/hr Mandor 189.100 66.752
0,400 M3 Kayu Begesting 2.682.100 1.072.840
4,000 Kg Paku kayu 23.300 93.200
2,000 Liter Minyak Begesting 7.000 14.000
157,500 Kg Besi beton 12.400 1.953.000
2,250 Kg Kawat beton 19.300 43.425
336,000 Kg Semen PC 2.000 672.000
0,540 M3 Pasir Beton 189.000 102.060
0,810 M3 Kerikil 519.100 420.471
ANALISA HARSA SATUAN
( UNIT PRICE )
Membuat tangga beton bertulang (150 kg besi + bekisting) tiap 1m³ 4.388.324 1.160.038 5.548.363 5.548.400
5,6 org/hr Pekerja 98.500 551.600
0,35 org/hr Tukang batu 124.600 43.610
2,3 org/hr Tukang kayu 124.600 286.580
1,4 org/hr Tukang besi 124.600 174.440
0,405 org/hr Kepala tukang 162.000 65.610
0,202 org/hr Mandor 189.100 38.198
0,250 m³ Kayu Begesting 2.682.100 670.525
3,000 kg Paku biasa 2"-5" 23.300 69.900
1,200 lt Minyak Bekisting 7.000 8.400
150,000 kg Besi beton polos 12.400 1.860.000
3,000 kg Kawat beton 19.300 57.900
323,000 kg Semen portland 2.000 646.000
0,520 m³ Pasir beton 189.000 98.280
0,780 m³ Batu pecah/split 2/3 519.100 404.898
0,105 m³ Kayu Begesting 2.682.100 281.621
0,108 m³ Papan mall 2.692.600 290.801
14,000 btg Kayu dolken Ø 8-10/400 cm - -
Membuat pelat lantai beton bertulang tebal 12 cm tiap 1 m² 463.123 132.460 595.583 595.600
0,647 org/hr Pekerja 98.500 63.730
0,330 org/hr Tukang kayu 124.600 41.118
0,087 org/hr Tukang besi 124.600 10.840
0,042 org/hr Tukang batu 124.600 5.233
0,046 org/hr Kepala tukang 162.000 7.436
0,022 org/hr Mandor 189.100 4.103
0,040 m³ Papan mall 3 cm 2.692.600 107.704
0,015 m³ Kayu Begesting 2.682.100 40.232
0,400 kg Paku biasa 2"-5" 23.300 9.320
0,200 lt Minyak Bekisting 7.000 1.400
4,500 btg Kayu dolken Ø 8-10/400 cm - -
12,950 kg Besi beton polos 12.400 160.580
0,185 kg Kawat beton 19.300 3.571
42,000 kg Semen portland 2.000 84.000
0,058 m³ Pasir beton 189.000 11.000
0,087 m³ Batu pecah/split 2/3 519.100 45.317
ANALISA HARSA SATUAN
( UNIT PRICE )
MEMBUAT 1 M' KOLOM PRAKTIS BETON BERTULANG (12 X 12 CM) 50.408 27.880 78.288 78.300
0,1800 org/hr Pekerja 98.500 17.730
0,0200 org/hr Tukang batu 124.600 2.492
0,0200 org/hr Tukang kayu 124.600 2.492
0,0200 org/hr Tukang besi 124.600 2.492
0,0060 org/hr Kepala Tukang 162.000 972
0,0090 org/hr Mandor 189.100 1.702
0,0020 M3 Kayu Begesting 2.682.100 5.364
0,0100 Kg Paku kayu 23.300 233
1,8000 Kg Besi beton 12.400 22.320
0,4500 Kg Kawat beton 19.300 8.685
4,0000 Kg Semen PC 2.000 8.000
0,0060 M3 Pasir Beton 189.000 1.134
0,0090 M3 Kerikil 519.100 4.672
MEMBUAT 1 M' RING BALOK BETON BERTULANG (10 X 15 CM) 74.605 46.046 120.651 120.700
0,2970 org/hr Pekerja 98.500 29.255
0,0330 org/hr Tukang batu 124.600 4.112
0,0330 org/hr Tukang kayu 124.600 4.112
0,0330 org/hr Tukang besi 124.600 4.112
0,0100 org/hr Kepala Tukang 162.000 1.620
0,0150 org/hr Mandor 189.100 2.837
0,0030 M3 Kayu Begesting 2.682.100 8.046
0,0200 Kg Paku kayu 23.300 466
3,6000 Kg Besi beton 12.400 44.640
0,0500 Kg Kawat beton 19.300 965
5,5000 Kg Semen PC 2.000 11.000
0,0090 M3 Pasir Beton 189.000 1.701
0,0150 M3 Kerikil 519.100 7.787
ANALISA HARSA SATUAN
( UNIT PRICE )
1 M3 MEMBUAT BETON CAMP. 1PC : 2 PSR : 3 KRL 967.178 212.853 1.180.031 1.180.000
0,080 org/hr Mandor 189.100 15.128
0,025 org/hr Kepala Tukang batu 162.000 4.050
0,250 org/hr Tukang Batu 124.600 31.150
1,650 org/hr Pekerja (Pembantu tukang) 98.500 162.525
232,000 Kg semen PC 2.000 464.000
0,520 M3 Pasir beton 189.000 98.280
0,780 M3 Kerikil beton 519.100 404.898
PEKERJAAN DINDING
M2 Pas. Dinding partisi gypsumboard Rangka Kayu 3.495 266.664 270.159 270.200
0,028 m3 Balok kayu klas II - -
0,150 kg Paku 8 s/d 12 cm 23.300 3.495
0,860 lbr Gypsumboard t.9 mm ex Jayaboard - -
0,560 kg Lem Kayu - -
0,028 org/hr Pekerja 98.500 2.758
0,150 org/hr Tukang Kayu Halus 124.600 18.690
0,860 org/hr Kepala Tukang Kayu 162.000 139.320
0,560 org/hr Mandor 189.100 105.896
M2 Pas. Dinding partisi gypsumboard Rangka Metal Furing 57.000 266.664 323.664 323.700
1,000 m2 Rangka plafond Metal furing 57.000 57.000
0,860 lbr Gypsumboard t.9 mm ex Jayaboard - -
0,028 org/hr Pekerja 98.500 2.758
0,150 org/hr Tukang Kayu Halus 124.600 18.690
0,860 org/hr Kepala Tukang Kayu 162.000 139.320
0,560 org/hr Mandor 189.100 105.896
M2 Pas. Dinding partisi Toilet; Panel MDF + rangka alum. - 266.664 266.664 266.700
0,028 m3 Kusen Alm. 3" PC - -
0,860 lbr MDF t. 9 mm - -
6,000 bh Paku ripet - -
0,560 kg Lem Kayu - -
0,028 org/hr Pekerja 98.500 2.758
0,150 org/hr Tukang Kayu Halus 124.600 18.690
0,860 org/hr Kepala Tukang Kayu 162.000 139.320
0,560 org/hr Mandor 189.100 105.896
-
M2 Dinding triplek 4 mm untuk dinding pemisah 1.165 13.268 14.433 14.433
0,0500 Kg Paku biasa 23.300 1.165
0,4000 Lbr Triplek 4 mm - -
0,0250 Org/Hr Pekerja 98.500 2.463
0,0013 Org/Hr Mandor 189.100 246
0,0750 Org/Hr Tukang kayu 124.600 9.345
0,0075 Org/Hr Kepala tukang 162.000 1.215
ANALISA HARSA SATUAN
( UNIT PRICE )
PEKERJAAN PLESTERAN :
PEKERJAAN LANGIT-LANGIT
1 M2 MEMASANG RANGKA LANGIT-LANGIT KAYU KLAS II (60X120 CM) 64.321 63.831 128.150 128.100
0,2000 org/hr Pekerja 98.500 19.700
0,3000 org/hr Tukang kayu 124.600 37.380
0,0300 org/hr Kepala tukang 162.000 4.860
0,0100 org/hr Mandor 189.100 1.891
0,0163 M3 Kayu klas II 3.588.700 58.496
0,2500 Kg paku kayu 23.300 5.825
1 M2 Penutup plafon Gypsum 9 mm + rangka hollow tb. 0,3 mm 15.901 71.716 87.617 87.600
0,2600 Org/Hr Pekerja 98.500 25.610
0,0130 Org/Hr Mandor 189.100 2.458
0,0500 Org/Hr Tukang Gypsum 124.600 6.230
0,2600 Org/Hr Tukang Alumunium 124.600 32.396
0,0310 Org/Hr Kepala tukang 162.000 5.022
0,3900 Bh Paku peluru ramset 5.000 1.950
0,4590 btg Hollow 4x4 cm tb. 0,35 mm 11.800 5.416
0,4310 btg Hollow 2x4 cm tb. 0,35 mm 8.850 3.814
0,0100 Kg Paku beton - -
14,0000 Bh Sekrup 6 x 1-1,5 150 2.100
0,3640 Lbr Gypsum board 120x240 9 mm - -
21,0000 Bh Sekrup Gypsum - -
0,02400 Rol Textile tape 25.000 600
0,02000 Zak Compound Gypsum 80.000 1.600
0,10000 Lbr Amplas 4.200 420
ANALISA HARSA SATUAN
( UNIT PRICE )
10m1 Talang Cucuran Atap 1/2 Lingkaran Ø 15cm Aluminium 0.3 351.300 1.027.865 1.379.165 1.379.200
5,000 org/hr Tukang Kayu 124.600 623.000
0,500 org/hr Kepala Tukang Kayu 162.000 81.000
3,000 org/hr Pekerja 98.500 295.500
0,150 org/hr Mandor 189.100 28.365
3,000 Lbr Aluminium plat 0.3 84.100 252.300
9,000 Bh Besi Penahan 11.000 99.000
Untuk I M' Pek. Talang 137.920
ANALISA HARSA SATUAN
( UNIT PRICE )
PEKERJAAN KAYU
M3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau, Topangan
Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian Uk. 9/9 9.401.940 4.242.840 13.644.780 13.644.800
24,000 org/hr Tukang Kayu 124.600 2.990.400
8,000 org/hr Pekerja 98.500 788.000
2,400 org/hr Kepala Tukang 162.000 388.800
0,400 org/hr Mandor 189.100 75.640
1,100 M3 Kayu Belian (Tidak Ketam uk. 9/9) 8.453.400 9.298.740
3,000 Kg Paku beton 34.400 103.200
M3 Pekerjaan Rangka Badan Kayu Belian Uk. 8/8 9.505.140 6.364.260 15.869.400 15.869.400
36,000 org/hr Tukang Kayu 124.600 4.485.600
12,000 org/hr Pekerja 98.500 1.182.000
3,600 org/hr Kepala Tukang 162.000 583.200
0,600 org/hr Mandor 189.100 113.460
1,100 M3 Kayu Belian (Ketam uk. 8/8) 8.453.400 9.298.740
6,000 Kg Paku belian 34.400 206.400
M3 Pekerjaan Rangka Badan Kayu Kelas I Uk. 8/8 139.800 6.364.260 6.504.060 6.504.100
36,000 org/hr Tukang Kayu 124.600 4.485.600
12,000 org/hr Pekerja 98.500 1.182.000
3,600 org/hr Kepala Tukang 162.000 583.200
0,600 org/hr Mandor 189.100 113.460
1,100 M3 Kayu Kelas I (Ketam Uk. 8/8) - -
6,000 Kg Paku 23.300 139.800
ANALISA HARSA SATUAN
( UNIT PRICE )
1 M3 MEMBUAT DAN MEMASANG KOSEN PINTU/JENDELA KAYU KLAS I 4.814.440 3.182.130 7.996.570 7.996.600
6,0000 org/hr Pekerja 98.500 591.000
18,0000 org/hr Tukang kayu 124.600 2.242.800
1,8000 org/hr Kepala tukang 162.000 291.600
0,3000 org/hr Mandor 189.100 56.730
1,2000 M3 Kayu klas I 3.976.200 4.771.440
1,2500 Kg Paku Kayu 34.400 43.000
1 M3 MEMBUAT & MEMASANG KUDA-KUDA KONVENSIONAL KY. KLAS II 4.781.550 2.121.420 6.902.970 6.903.000
4,0000 org/hr Pekerja 98.500 394.000
12,0000 org/hr Tukang kayu 124.600 1.495.200
1,2000 org/hr Kepala tukang 162.000 194.400
0,2000 org/hr Mandor 189.100 37.820
1,1000 M3 Balok Kayu klas II 3.588.700 3.947.570
15,0000 Kg Besi strip 46.900 703.500
5,6000 Kg Paku kayu 23.300 130.480
1 M3 MEMBUAT DAN MEMASANG KONSTRUKSI GORDENG KAYU KLAS II 4.720.970 1.272.852 5.993.822 5.993.800
2,4000 org/hr Pekerja 98.500 236.400
7,2000 org/hr Tukang kayu 124.600 897.120
0,7200 org/hr Kepala tukang 162.000 116.640
0,1200 org/hr Mandor 189.100 22.692
1,1000 M3 Balok Kayu klas II 3.588.700 3.947.570
3,0000 Kg Paku kayu 23.300 69.900
15,0000 Kg Besi strip 46.900 703.500
1 M2 RANGKA ATAP KASAU 5/7 DAN RENG 3/5 KAYU KLAS II 81.905 24.876 106.781 106.800
UNTUK GENTENG METAL ROOF
0,1000 org/hr Pekerja 98.500 9.850
0,1000 org/hr Tukang kayu 124.600 12.460
0,0100 org/hr Kepala tukang kayu 162.000 1.620
0,0050 org/hr Mandor 189.100 946
0,0140 M3 Kasau 5/7 cm 3.588.700 50.242
0,0072 M3 Reng 3/4 cm 3.588.700 25.839
0,2500 Kg paku kayu 23.300 5.825
kasaunya saja 1/2 dari SNI -2008.06.17 40.952,72 12.437,75 53.390,47 53.400,00
rengnya saja 1/2 dari SNI -2008.06.17 40.952,72 12.437,75 53.390,47 53.400,00
ANALISA HARSA SATUAN
( UNIT PRICE )
1 M2 MEMBUAT DAN MEMASANG DAUN PINTU PANEL KACA KAYU KLAS I ATAU KLAS II
0,8000 org/hr Pekerja 98.500 78.800
2,4000 org/hr Tukang kayu 124.600 299.040
0,2400 org/hr Kepala tukang 162.000 38.880
0,0400 org/hr Mandor 189.100 7.564
0,0240 M3 Papan Kayu klas I 3.976.200 95.429
0,0240 M3 Papan Kayu klas II 3.381.300 81.151
0,3000 Lem kayu - -
0,7500 M2 Kaca Polos 5 mm 147.100 110.325
Untuk Daun pintu panel kaca kayu klas I = 424.284,00 205.753,80 630.037,80 630.000,00
Untuk Daun pintu panel kaca kayu klas II = 424.284,00 191.476,20 615.760,20 615.800,00
M2 Daun Pintu double teakwood; rangka kayu KW.II tertutup 85.232 397.430 482.662 482.700
0,025 m3 Papan Kayu klas II 3.381.300 84.533
0,500 kg Lem Kayu - -
0,030 kg Paku 1 s/d 3 cm 23.300 699
2,000 lbr Teakwood t. 3 mm - -
0,600 org/hr Pekerja 98.500 59.100
2,000 org/hr Tukang Kayu Halus 124.600 249.200
0,200 org/hr Kepala Tukang Kayu 162.000 32.400
0,300 org/hr Mandor 189.100 56.730
ANALISA HARSA SATUAN
( UNIT PRICE )
1 M2 MEMBUAT DAN MEMASANG JALUSI KAYU KLAS II 410.944 206.373 617.317 617.300,00
0,6700 org/hr Pekerja 98.500 65.995
2,0000 org/hr Tukang kayu 124.600 249.200
0,2000 org/hr Kepala tukang 162.000 32.400
0,3350 org/hr Mandor 189.100 63.349
0,0600 M3 Papan Kayu klas II 3.381.300 202.878
0,1500 Kg Paku kayu 23.300 3.495
1 M2 MENGECAT KILAP KAYU (1 LPS PLAMIR, 1 LPS CAT DASAR DAN 2 LPS CAT KILAP)
0,0025 org/hr Mandor 189.100 472,75
0,0040 org/hr Kepala tukang cat 162.000 648,00
0,1050 org/hr Tukang cat 124.600 13.083,00
0,0700 org/hr Pembantu tukang cat 98.500 6.895,00
0,2000 Kg cat menie kayu 32.300 6.460,00
0,1500 Kg plamur kayu 51.600 7.740,00
0,1700 Kg cat dasar 32.300 5.491,00
0,2600 Kg Cat Kilap 81.200 21.112,00
21.099 40.803,00 61.902 61.900
1 M2 MENGECAT TEMBOK (1 LPS PLAMIR, 1 LPS CAT DASAR DAN 2 LPS CAT TEMBOK)
0,0025 org/hr Mandor 189.100 472,75
0,0063 org/hr Kepala tukang cat 162.000 1.020,60
0,0630 org/hr Tukang cat 124.600 7.849,80
0,0200 org/hr Pembantu tukang cat 98.500 1.970,00
0,1000 Kg plamur tembok 16.300 1.630,00
0,1200 Kg cat dasar tembok 26.900 3.228,00
0,2600 Kg cat tembok 17.500 4.550,00
11.313 9.408,00 20.721 20.700
PEKERJAAN KACA
1 Bh Memasang bak cuci piring stenlis steel 400.950 45.479 446.429 446.400
0,0300 Org/Hr Pekerja 98.500 2.955
0,3000 Org/Hr Tukang 124.600 37.380
0,0015 Org/Hr Mandor 189.100 284
0,0300 Org/Hr Kepala tukang 162.000 4.860
1,0000 Bh Bak cuci stenlis steel 297.000 297.000
1,0000 Set Water drain + asesories 103.950 103.950
PEKERJAAN PIPA
Bahan
1,1 Buah Pipa Beton #REF! #REF!
Tenaga -
bh Memasang 'Gate Valve All Flange 10. Ø 6" - 12.334 12.334 12.300
Bahan -
Tenaga -
bh Memasang 'Gate Valve All Flange 10. Ø 4" - 12.334 12.334 12.300
Bahan -
Tenaga -
Bahan -
Tenaga -
Bahan -
Tenaga -
Bahan -
Tenaga -
Bahan -
Tenaga -
Bahan -
Tenaga -
m' Memasang Pipa PVC type SCJ Ø 8" - 23.622 23.622 23.600
Bahan
1,2 m' Pipa PVC 8" SCJ - -
Tenaga
0,081 0 Pekerja 98.500 7.979
m' Memasang Pipa PVC type SCJ Ø 6" - 27.762 27.762 27.800
Bahan
1,2 m' Pipa PVC 6" SCJ - -
Tenaga
0,081 org/hr Pekerja 98.500 7.979
m' Memasang Pipa PVC type SCJ Ø 5" - 27.762 27.762 27.800
Bahan
1,2 m' Pipa PVC 5" SCJ - -
Tenaga
0,081 org/hr Pekerja 98.500 7.979
m' Memasang Pipa PVC type SCJ Ø 4" #REF! 27.762 #REF! #REF!
Bahan
1,2 m' Pipa PVC 4" SCJ #REF! #REF!
Tenaga
0,081 org/hr Pekerja 98.500 7.979
m' Memasang Pipa PVC type SCJ Ø 3" #REF! 27.762 #REF! #REF!
Bahan
1,2 m' Pipa PVC 3" SCJ #REF! #REF!
Tenaga
0,081 org/hr Pekerja 98.500 7.979
m' Memasang Pipa PVC type SCJ Ø 2" #REF! 18.502 #REF! #REF!
Bahan
1,2 m' Pipa PVC 2" SCJ #REF! #REF!
Tenaga
0,054 org/hr Pekerja 98.500 5.319
m' Memasang Pipa PVC type SCJ Ø 1,5" 101.835 18.502 120.337 120.300
Bahan
1,2 m' Pipa PVC 1,5" SCJ 65.700 78.840
Tenaga
0,054 org/hr Pekerja 98.500 5.319
m' Memasang Pipa PVC type SCJ Ø 1" - 18.502 18.502 18.500
Bahan
1,2 m' Pipa PVC 1" SCJ - -
Tenaga
0,054 org/hr Pekerja 98.500 5.319
PEKERJAAN ELEKTRIKAL
1 Ttk Pasang instalasi lampu dgn NYM 3x2,5 mm (tdk termasuk fiting,sakelar+lampu)
Catatan : Asumsi tinggi plafon 4 m, bentang ruang 8 m, uk. Kabel standart PUIL 2000
12,0000 M1 Kabel NYM 3 x 2,5 mm 15.100 181.200
12,0000 M1 Conduit pipa PVC dia 5/8" C 2.083 25.000
1,0000 Bh Tee dos 1.500 1.500
1,0000 Bh Inbow doos 3.960 3.960
3,0000 Bh Sock 1.100 3.300
9,0000 Bh Klem conduit 1.100 9.900
3,0000 Bh Lastdop 1.650 4.950
1,0000 M1 Fleksible pipa 2.083 2.083
10,0000 % Paku,sekrup,fisher(10% hrg conduit) 2.083 20.833
2,0000 Bh Elbow 660 1.320
0,3000 Org/Hr Instalator 162.000 48.600
0,1500 Org/Hr Pekerja 98.500 14.775
0,0150 Org/Hr Mandor 189.100 2.837
302.647 17.612 320.258 320.300
-
1 Ttk Pasang instalasi Stop kontak (tdk termasuk stop kontak)
Stop kontak tdk dimasukan dlm analis tergantung merk dll
12,0000 Ml Kabel NYM 3 x 2,5 mm 15.100 181.200
12,0000 Ml Conduit PVC ex. EGA clipsal 2.083 25.000
1,0000 Bh Tee dos 1.500 1.500
1,0000 Bh Inbow doos 3.960 3.960
3,0000 Bh Sock 1.100 3.300
9,0000 Bh Klem conduit 1.100 9.900
3,0000 Bh Lasdop 1.650 4.950
10,0000 % Paku,sekrup,fisher(10% hrg conduit 2.083 20.833
2,0000 Bh Elbow 660 1.320
0,3000 Org/Hr Instalator 162.000 48.600
0,1500 Org/Hr Pekerja 98.500 14.775
0,0150 Org/Hr Mandor 189.100 2.837
251.963 66.212 318.175 318.200
ANALISA HARSA SATUAN
( UNIT PRICE )
M2 Pintu besi plat baja t. 2 mm rangkap; rangka besi siku 965 261.098 262.063 262.100
15,000 kg Besi Siku Rata-rata - -
32,800 kg Besi Plat rata2 1 s/d 5 mm - -
0,050 kg Kawat Benrat 19.300 965
1,050 org/hr Pekerja 98.500 103.425
1,050 org/hr Tukang Besi Konstruksi 124.600 130.830
0,105 org/hr Kepala Tukang Besi 162.000 17.010
0,052 org/hr Mandor 189.100 9.833
unt 133,333 Kusen & Pintu PVC toilet - 23.866 23.866 23.900
1,000 bh Kusen & Pintu PVC toilet - -
6,000 bh Paku ripet - -
0,045 org/hr Pekerja 98.500 4.433
0,135 org/hr Tukang Kayu Halus 124.600 16.821
0,014 org/hr Kepala Tukang Kayu 162.000 2.187
0,002 org/hr Mandor 189.100 425
PEKERJAAN PRASARANA
M1 Saluran air bt kali lbr bwh 80 cm tinggi 100 cm 786.111 435.388 1.221.499 1.221.500
2,98348 Org/Hr Pekerja 98.500 293.873
0,21855 Org/Hr Mandor 189.100 41.328
0,6920 Org/Hr Tukang 124.600 86.223
0,0862 Org/Hr Kepala tukang 162.000 13.964
1,0120 M3 Batu belah 382.200 386.786
3,8680 Zak Semen 88.400 341.931
0,46440 M3 Pasir pasang 112.400 52.199
0,092640 jam Tamper hand/ compactor 56.075 5.195
-
M1 Saluran air bt kali lbr bwh 100 cm tinggi 120 cm 996.979 584.209 1.581.189 1.581.200
4,10480 Org/Hr Pekerja 98.500 404.323
0,30945 Org/Hr Mandor 189.100 58.517
0,8620 Org/Hr Tukang 124.600 107.405
0,0862 Org/Hr Kepala tukang 162.000 13.964
1,2870 M3 Batu belah 382.200 491.891
4,8996 Zak Semen 88.400 433.125
0,58825 M3 Pasir pasang 112.400 66.119
0,104220 jam Tamper hand/ compactor 56.075 5.844
ANALISA HARSA SATUAN
( UNIT PRICE )
1 M1 Pemb. Kawat duri, T=1,8m (pondasi cor beton 1:3:5, 48.780 80.400 129.180 129.200
30x30x40 tiap jarak 1,5 m)
0,200 zak semen 88.400 17.680
0,026 m3 pasir pasang 112.400 2.922
0,044 m3 Batu splite 2/3 534.500 23.518
0,330 btg besi siku 50.50.5 - -
2,000 kg kawat duri - -
0,200 kg paku rata-rata 23.300 4.660
0,250 org/hr tukang batu 124.600 31.150
0,500 org/hr pekerja 98.500 49.250
UNIT Septictank Pas. Bata kap. 3,00 m3 + Rembesan 8.549.349 - 8.549.349 8.549.300
3,000 m3 Galian tanah, dalam s/d 1 m 78.600 235.800
0,300 m3 Pas. Urugan pasir 96.200 28.860
3,000 m2 Pas. Lantai kerja beton tumbuk 1:3:5 110.300 330.900
10,500 m2 Pas. Dinding batu bata; ad 1:2 314.900 3.306.450
12,000 m2 Pas. Plester acian; ad. 1:2 42.170 506.040
0,360 m3 Beton K - 200 1.328.900 478.404
5,400 m' Pipa PVC dia. 4" AW 118.900 642.060
1,200 m' Pipa PVC dia. 1" AW 12.300 14.760
3,375 m3 Galian tanah, dalam s/d 1 m 78.600 265.275
5,400 m2 Pasangan injuk 200.000 1.080.000
1,050 m3 Batu Kerikil 534.500 561.225
9,000 m' Pipa PVC dia. 4" AW 118.900 1.070.100
1,125 m3 Urugan tanah kembali 26.200 29.475
ANALISA HARSA SATUAN
( UNIT PRICE )
1 Unit Resapan dia 80 m (digali 1m), dalam 1m (digali 1,9 m) kap. 0,5 m3
1,0500 Org/Hr Pekerja 98.500 103.425
0,2700 Org/Hr Tukang 124.600 33.642
0,0969 Org/Hr Mandor 189.100 18.324
0,0270 Org/Hr Kepala tukang 162.000 4.374
0,6030 m3 Kerikil 534.500 322.304
0,7160 Kg Ijuk - -
2,0000 M1 Pipa PVC dia 4" 14.700 29.400
351.704 159.765 511.468 511.500
M1 Pagar bata merah t. 2m + plester dan cat tembok 952.325 513.191 1.465.516 1.465.500
2,6610 Org/Hr Pekerja 98.500 262.109
0,1860 Org/Hr Tukang kayu 124.600 23.176
0,1120 Org/Hr Tukang besi 124.600 13.955
1,0290 Org/Hr Tukang batu 124.600 128.213
0,2520 Org/Hr Tukang cat 124.600 31.399
0,1580 Org/Hr Kepala tukang 162.000 25.596
0,1520 Org/Hr Mandor 189.100 28.743
0,3600 M3 Batu belah 382.200 137.592
0,0600 M3 Batu pecah split 2/3 534.500 32.070
100,0000 Biji Bata merah 900 90.000
2,1094 Zak Semen 88.400 186.471
0,0280 M3 Pasir urug 96.200 2.694
0,2650 M3 Pasir pasang 112.400 29.786
0,0380 M3 Pasir beton 112.400 4.271
0,0140 M3 Kayu balok 2.682.100 37.549
0,1670 Kg Paku 23.300 3.891
14,7000 Kg Besi beton polos 27.400 402.780
0,8680 Kg Kawat 19.300 16.752
0,4000 Kg Plamir tembok 16.300 6.520
0,4000 Kg Cat tembok (cat dasar) - -
1,0400 Kg Cat tembok (cat penutup) - -
0,03474 jam Tamper hand/ compactor 56.075 1.948
ANALISA HARSA SATUAN
( UNIT PRICE )
M1 Pagar BRC 0,9m t. jadi 1,2 m (pond. bt kali,sloof beton, 1/2 bata 30 cm, plester dan cat)
1,1880 Org/Hr Pekerja 98.500 117.018
0,1040 Org/Hr Tukang kayu 124.600 12.958
0,0720 Org/Hr Tukang besi 124.600 8.971
0,3410 Org/Hr Tukang batu 124.600 42.489
0,07245 Org/Hr Tukang cat 124.600 9.027
0,0590 Org/Hr Kepala tukang 162.000 9.558
0,0710 Org/Hr Mandor 189.100 13.426
0,2740 M3 Batu belah 382.200 104.723
0,0022 M3 Batu pecah split 2/3 534.500 1.176
15,0000 Biji Bata merah 900 13.500
0,8752 Zak Semen 88.400 77.368
0,0250 M3 Pasir urug 96.200 2.405
0,1200 M3 Pasir pasang 112.400 13.488
0,0146 M3 Pasir beton 112.400 1.641
0,0060 M3 Kayu balok 2.682.100 16.093
0,1200 Kg Paku 23.300 2.796
4,4400 Kg Besi beton polos 27.400 121.656
0,0640 Kg Kawat 19.300 1.235
1,0000 M1 Pagar BRC tinggi 0,9m -
0,5550 Bh Tiang pagar BRC t. 0,9m -
0,1150 Kg Plamir tembok 16.300 1.875
0,1150 Kg Cat tembok (cat dasar) - -
0,2990 Kg Cat tembok (cat penutup) - -
357.955 213.448 571.402 571.400
PEKERJAAN JALAN
M2 Penyiapan badan jalan / tanah dasar (subgrade) 398 2.538 2.936 2.900
0,0250 Org/Hr Pekerja 98.500 2.463
0,0004 Org/Hr Mandor 189.100 76
0,0033 Jam Vibrating roller 6-8 ton - -
0,0071 Jam Water tank truck 3000-4500 Ltr 56.075 398
-
M2 Lapis Pondasi bawah kelas C sirtu tb. 10 cm 22.803 2.935 25.739 25.700
0,0250 Org/Hr Pekerja 98.500 2.463
0,0025 Org/Hr Mandor 189.100 473
0,1200 M3 Sirtu 189.000 22.680
0,0033 Jam Vibrating roller 6-8 ton - -
0,0022 Jam Water tank truck 3000-4500 Ltr 56.075 123
-
M2 Lapis Pondasi jalan tanpa penutup aspal Macadam 540.195 104.929 645.125 645.100
1,0000 Org/Hr Pekerja 98.500 98.500
0,0340 Org/Hr Mandor 189.100 6.429
0,9350 M3 Batu pecah 5/7 557.900 521.637
0,1650 M3 Pasir urug 96.200 15.873
0,0268 Jam Three wheel roller 8-10 ton 56.075 1.503
0,0211 Jam Water tank truck 3000-4500 Ltr 56.075 1.183
-
ANALISA HARSA SATUAN
( UNIT PRICE )
I KONTRUKSI
1 Ruang Makan 288,00 M2 4.358.250,00 1.255.176.000,00
Sub Total 1.255.176.000,00
II PRASARANA
1 Pembuatan badan jalan 2.380,00 M2 3.438.635,29 8.183.952.000,00
2 Instalasi air bersih Tahap-2 (air baku sungai) 1,00 Ls 369.946.000,00 369.946.000,00
3 Pematangan lahan 1,00 Ls 94.123.000,00 94.123.000,00
Sub Total 8.648.021.000,00
TOTAL = I + II 9.903.197.000,00
Terbilang : Sembilan Milyar Sembilan Ratus Tiga Juta Seratus Sembilan Puluh Tujuh Ribu Rupiah
Kepada Yth.
KETUA POKJA ULP KODAM XII/TANJUNGPURA
di -
Kubu Raya
Penawaran ini berlaku selama 60 (Enam Puluh) Hari Kalender sejak batas akhir pemasukan
Dokumen
Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk
pada semua ketentuan yang tercantum dalam Dokumen Pengadaan
Penawar,
PT. VISTA EMAS SEJATI
MINGGU KE
URAIAN
No (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ket.
A Ruang Makan
1 PEKERJAAN PERSIAPAN 0,17 0,08 0,08
2 PEKERJAAN TANAH 1,38 0,46 0,46 0,46
3 PEKERJAAN PASANGAN 5,84 0,58 0,58 0,58 0,58 0,58 0,58 0,58 0,58 0,58 0,58
4 PENUTUP ATAP BJ. RINGAN 1,06 0,35 0,35 0,35
5 PEKERJAAN KAYU 1,41 0,47 0,47 0,47
6 PEKERJAAN LANTAI 2,12 0,71 0,71 0,71
7 PEK. ALAT GANTUNG 0,18 0,18
8 PEKERJAAN LISTRIK + AIR 0,16 0,16
9 PEKERJAAN PENGECATAN 0,36 0,18 0,18
D Pematangan lahan
1 Timbunan dan Pemadatan tanah/15cm tebal 30 cm ( Dengan Alat
0,95) 0,48 0,48