Anda di halaman 1dari 62

REKAPITULASI RENCANA PENGGUNAAN DANA TAHAP I DAN II

KEBUTUHAN BAHAN MATERIAL DAN UPAH TENAGA KERJA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

No Uraian Satuan Harga APBD Kabupaten Bogor Swadaya Masyarakat


Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7)
1Pasir m³ 170,000 120 20,400,000 6 1,020,000
2Semen Zak 65,000 340 22,100,000 9 585,000
3Batu Kali m³ 130,000 42 5,460,000 13 1,690,000
4Batako Trass bh 1,500 11,458 17,187,000 8,200 12,300,000
5Kayu 6/12 btg 90,000 192 17,280,000 131 11,790,000
6Kayu 5/10 btg 50,000 307 15,350,000 132 6,600,000
7Kaso 4/6 btg 25,000 377 9,425,000 260 6,500,000
8Bambu btg 10,000 417 4,170,000 273 2,730,000
9Papan 2/20 lbr 50,000 186 9,300,000 18 900,000
10Bilik lbr 35,000 85 2,975,000 81 2,835,000
11Triplek 3mm lbr 55,000 196 10,780,000 5 275,000
12GRC Board lbr 45,000 153 6,885,000 - -
13Paku campur kg 15,000 342 5,130,000 102 1,530,000
14Genteng bh 1,500 1,100 1,650,000 2,650 3,975,000
15Asbes Gelombang lbr 45,000 168 7,560,000 - -
16Nok Genteng bh 2,500 222 555,000 70 175,000
17Nok Asbes bh 15,000 85 1,275,000 - -
18Bonet 60cm m' 25,000 70 1,750,000 16 400,000
19Keramik uk 30/30 cm m² 45,000 453 20,385,000 20 900,000
20Daun Pintu bh 200,000 45 9,000,000 3 600,000
21Daun Jendela bh 150,000 78 11,700,000 5 750,000
22Kunci Pintu set 35,000 30 1,050,000 - -
23Engsel Pintu set 10,000 40 400,000 4 40,000
24Engsel Jendela set 10,000 67 670,000 3 30,000
25Kaca 3 mm lbr 75,000 66 4,273,000 4 300,000
26Kuas uk 4" bh 5,000 53 265,000 1 5,000
27Kuas uk 1,5" bh 5,000 50 250,000 - -
28Cat Tembok 5 Kg kaleng 50,000 61 3,050,000 - -
29Cat Kayu 1 Kg kaleng 45,000 63 2,835,000 - -
JUMLAH BAHAN Rp. 213,110,000 55,930,000
1 2 3 4 5 6 7 8
Upah
1 Tukang HOK 60,000 - - 350 21,000,000
2 Pekerja/Kenek HOK 40,000 - 525 21,000,000
JUMLAH UPAH Rp. 42,000,000
JUMLAH BAHAN DAN UPAH 213,110,000 97,930,000
JUMLAH TOTAL 311,040,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI


Mengetahui :
Camat Ciawi

Drs. AGUS MANJAR M.Si


NIP. 1965080111987121005
REKAPITULASI RENCANA PENGGUNAAN DANA TAHAP I
KEBUTUHAN BAHAN MATERIAL DAN UPAH TENAGA KERJA
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

No Uraian Satuan Harga APBD Kabupaten Bogor Swadaya Masyarakat


Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7)
1 Pasir m³ 170,000 70 11,900,000 3 510,000
2 Semen Zak 65,000 160 10,400,000 9 585,000
3 Batu Kali m³ 130,000 17 2,210,000 13 1,690,000
4 Batako Trass bh 1,500 6,852 10,278,000 2,850 4,275,000
5 Kayu 6/12 btg 90,000 112 10,080,000 42 3,780,000
6 Kayu 5/10 btg 50,000 128 6,400,000 43 2,150,000
7 Kaso 4/6 btg 25,000 172 4,300,000 135 3,375,000
8 Bambu btg 10,000 219 2,190,000 108 1,080,000
9 Papan 2/20 lbr 50,000 22 1,105,000 8 400,000
10 Bilik lbr 35,000 26 910,000 26 910,000
11 Triplek 3mm lbr 55,000 32 1,760,000 - -
12 GRC Board lbr 55,000 92 4,117,000 - -
13 Paku campur kg 15,000 121 1,807,000 102 1,530,000
14 Genteng bh 1,500 898 1,347,000 1,500 2,250,000
15 Asbes Gelombang lbr 37,000 36 1,332,000 - -
16 Nok Genteng bh 2,500 50 125,000 70 175,000
17 Nok Asbes bh 15,000 25 375,000 - -
18 Bonet 60cm m' 25,000 10 250,000 8 200,000
19 Keramik uk 30/30 cm m² 45,000 241 10,845,000 20 900,000
20 Daun Pintu bh 200,000 23 4,600,000 2 400,000
21 Daun Jendela bh 150,000 38 5,700,000 3 450,000
22 Kunci Pintu set 35,000 13 437,000 - -
23 Engsel Pintu set 10,000 13 130,000 4 40,000
24 Engsel Jendela set 10,000 26 260,000 2 20,000
25 Kaca 3 mm lbr 75,000 21 1,537,000 2 150,000
26 Kuas uk 4" bh 5,000 23 115,000 1 5,000
27 Kuas uk 1,5" bh 5,000 23 115,000 - -
28 Cat Tembok 5 Kg kaleng 50,000 35 1,750,000 - -
29 Cat Kayu 1 Kg kaleng 45,000 25 1,125,000 - -
JUMLAH BAHAN Rp. 97,500,000 24,875,000
1 2 3 4 5 6 7 8
Upah
1 Tukang HOK 60,000 - - 175 10,500,000
2 Pekerja/Kenek HOK 40,000 - 263 10,520,000
JUMLAH UPAH Rp. 21,020,000
JUMLAH BAHAN DAN UPAH 97,500,000 45,895,000
JUMLAH TOTAL 143,395,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI


Mengetahui :
Camat Ciawi
Drs. AGUS MANJAR M.Si
NIP. 1965080111987121005

REKAPITULASI RENCANA PENGGUNAAN DANA TAHAP II


KEBUTUHAN BAHAN MATERIAL DAN UPAH TENAGA KERJA
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

No Uraian Satuan Harga APBD Kabupaten Bogor Swadaya Masyarakat


Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7)
1 Pasir m³ 170,000 70 11,900,000 - -
2 Semen Zak 65,000 160 10,400,000 - -
3 Batu Kali m³ 130,000 - 17 2,210,000
4 Batako Trass bh 1,500 4,606 6,909,000 - -
5 Kayu 6/12 btg 90,000 112 10,080,000 - -
6 Kayu 5/10 btg 50,000 90 4,500,000 - -
7 Kaso 4/6 btg 25,000 102 2,550,000 - -
8 Bambu btg 10,000 218 2,180,000 - -
9 Papan 2/20 lbr 50,000 35 1,750,000 - -
10 Bilik lbr 35,000 - - 20 700,000
11 Triplek 3mm lbr 55,000 36 1,980,000 - -
12 GRC Board lbr 55,000 60 4,117,000 - -
13 Paku campur kg 15,000 20 1,807,000 - -
14 Genteng bh 1,500 897 1,345,500 - -
15 Asbes Gelombang lbr 45,000 48 2,160,000 - -
16 Nok Genteng bh 2,500 55 137,500 - -
17 Nok Asbes bh 15,000 25 375,000 - -
18 Bonet 60cm m' 25,000 50 1,250,000 8 200,000
19 Keramik uk 30/30 cm m² 45,000 241 10,845,000 20 900,000
20 Daun Pintu bh 200,000 23 4,600,000 2 400,000
21 Daun Jendela bh 150,000 38 5,700,000 3 450,000
22 Kunci Pintu set 35,000 23 437,000 15 525,000
23 Engsel Pintu set 10,000 13 130,000 4 40,000
24 Engsel Jendela set 10,000 26 260,000 2 20,000
25 Kaca 3 mm lbr 75,000 38 1,537,000 2 150,000
26 Kuas uk 4" bh 5,000 23 115,000 1 5,000
27 Kuas uk 1,5" bh 5,000 12 60,000 - -
28 Cat Tembok 5 Kg kaleng 50,000 35 1,750,000 - -
29 Cat Kayu 1 Kg kaleng 45,000 25 1,125,000 - -
JUMLAH BAHAN Rp. 90,000,000 5,600,000
1 2 3 4 5 6 7 8
Upah
1 Tukang HOK 60,000 - - 175 10,500,000
2 Pekerja/Kenek HOK 40,000 - 263 10,520,000
JUMLAH UPAH Rp. 21,020,000
JUMLAH BAHAN DAN UPAH 90,000,000 26,620,000
JUMLAH TOTAL 116,620,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI


Mengetahui :
Camat Ciawi
Drs. AGUS MANJAR M.Si
NIP. 1965080111987121005
38
7
266
3
798
DAFTAR RINCIAN PENGGUNAAN DANA
PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : NANANG SUKARNA


ALAMAT : KP.CIHERANG GEDE RT 01/ 05

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 9 1,530,000 - 1,530,000
2 Semen Zak 65,000 17 1,105,000 - 1,105,000
3 Batu Kali m³ 130,000 - 2 260,000 260,000
4 Batako Trass bh 1,500 600 900,000 - 900,000
5 Kayu 6/12 btg 90,000 20 1,800,000 4 360,000 2,160,000
6 Kayu 5/10 btg 50,000 15 750,000 - 750,000
7 Kaso 4/6 btg 25,000 - 10 250,000 250,000
8 Bambu btg 10,000 12 120,000 - 120,000
9 Papan 2/20 lbr 50,000 5 250,000 - 250,000
10 Bilik lbr 35,000 - 2 70,000 70,000
11 Triplek 3mm lbr 40,000 - - -
12 GRC Board lbr 45,000 - - -
13 Paku campur kg 15,000 10 150,000 - 150,000
14 Genteng bh 1,500 500 750,000 100 150,000 900,000
15 Asbes Gelombang lbr 50,000 20 1,000,000 - 1,000,000
16 Nok Genteng bh 2,500 - - -
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 - - 10 250,000 250,000
19 Keramik uk 30/30 cm m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 1 200,000 - 200,000
21 Daun Jendela bh 150,000 2 300,000 - 300,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pintu set 10,000 - - 1 10,000 10,000
24 Engsel Jendela set 10,000 - - -
25 Kaca 3 mm lbr 75,000 - - -
26 Kuas uk 4" bh 5,000 2 10,000 1 5,000 15,000
27 Kuas uk 1,5" bh 5,000 2 10,000 - 10,000
28 Cat Tembok 5 Kg kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10,000,000 1,355,000 11,355,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 700,000 - - 14 9,800,000 9,800,000
2 Pekerja/Kenek HOK 50,000 - 21 1,050,000 1,050,000
JUMLAH UPAH Rp. - 10,850,000 10,850,000
JUMLAH BAHAN DAN UPAH 10,000,000 12,205,000 22,205,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI,A.Md


DAFTAR RINCIAN PENGGUNAAN DANA
PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : JUJU
ALAMAT : Kp. CIHERANG GEDE RT 01/05

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 3 510,000 - - 510,000
2 Semen Zak 65,000 16 1,040,000 - 1,040,000
3 Batu Kali m³ 130,000 - 2 260,000 260,000
4 Batako Trass bh 1,500 500 750,000 500 750,000 1,500,000
5 Kayu 6/12 btg 90,000 15 1,350,000 10 900,000 2,250,000
6 Kayu 5/10 btg 50,000 19 950,000 10 500,000 1,450,000
7 Kaso 4/6 btg 25,000 25 625,000 - 625,000
8 Bambu btg 10,000 18 180,000 - 180,000
9 Papan 2/20 lbr 50,000 1 50,000 - 50,000
10 Bilik lbr 35,000 - - -
11 Triplek 3mm lbr 50,000 10 500,000 - 500,000
12 GRC Board lbr 55,000 20 1,100,000 - 1,100,000
13 Paku campur kg 15,000 9 135,000 - 135,000
14 Genteng bh 1,500 - - -
15 Asbes Gelombang lbr 50,000 10 500,000 - 500,000
16 Nok Genteng bh 2,500 - - -
17 Nok Asbes bh 15,000 20 300,000 - 300,000
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 - - -
21 Daun Jendela bh 150,000 4 600,000 - 600,000
22 Kunci Pintu set 35,000 - - -
23 Engsel Pintu set 10,000 - - -
24 Engsel Jendela set 10,000 - - -
25 Kaca 3 mm lbr 75,000 4 300,000 - 300,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5" bh 5,000 2 10,000 - 10,000
28 Cat Tembok 5 Kg kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10,000,000 2,410,000 12,410,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 4,090,000 14,090,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI


DAFTAR RINCIAN PENGGUNAAN DANA
PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : KUDUM
ALAMAT : Kp. CiHERANG GEDE RT 01/05

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 5 850,000 - 850,000
2 Semen Zak 65,000 14 910,000 - 910,000
3 Batu Kali m³ 130,000 - - -
4 Batako Trass bh 1,500 500 750,000 - 750,000
5 Kayu 6/12 btg 90,000 12 1,080,000 - 1,080,000
6 Kayu 5/10 btg 50,000 10 500,000 - 500,000
7 Kaso 4/6 btg 25,000 30 750,000 - 750,000
8 Bambu btg 10,000 30 300,000 - 300,000
9 Papan 2/20 lbr 50,000 3 150,000 - 150,000
10 Bilik lbr 35,000 - 2 70,000 70,000
11 Triplek 3mm lbr 40,000 4 160,000 - 160,000
12 GRC Board lbr 55,000 15 825,000 - 825,000
13 Paku campur kg 15,000 10 150,000 - 150,000
14 Genteng bh 1,500 - 200 300,000 300,000
15 Asbes Gelombang lbr 50,000 18 900,000 - 900,000
16 Nok Genteng bh 2,500 - 10 25,000 25,000
17 Nok Asbes bh 15,000 20 300,000 - 300,000
18 Bonet 60cm m' 25,000 - 6 150,000 150,000
19 Keramik uk 30/30 cm m² 45,000 15 675,000 - 675,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 5 750,000 - 750,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pintu set 10,000 1 10,000 - 10,000
24 Engsel Jendela set 10,000 2 20,000 - 20,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5" bh 5,000 2 10,000 - 10,000
28 Cat Tembok 5 Kg kaleng 50,000 3 150,000 - 150,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10,000,000 545,000 10,545,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 2,225,000 12,225,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEDN SUGANDA BABAN SUBANDI


DAFTAR RINCIAN PENGGUNAAN DANA
PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : NEMI
ALAMAT : KP.CIHERANG GEDE RT 03/05

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 5 850,000 - 850,000
2 Semen Zak 65,000 15 975,000 - 975,000
3 Batu Kali m³ 130,000 - - -
4 Batako Trass bh 1,500 500 750,000 - 750,000
5 Kayu 6/12 btg 90,000 12 1,080,000 - 1,080,000
6 Kayu 5/10 btg 50,000 10 500,000 - 500,000
7 Kaso 4/6 btg 25,000 30 750,000 - 750,000
8 Bambu btg 10,000 40 400,000 - 400,000
9 Papan 2/20 lbr 50,000 2 100,000 - 100,000
10 Bilik lbr 35,000 - 4 140,000 140,000
11 Triplek 3mm lbr 50,000 1 50,000 - 50,000
12 GRC Board lbr 55,000 15 825,000 - 825,000
13 Paku campur kg 15,000 9 135,000 - 135,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gelombang lbr 50,000 20 1,000,000 - 1,000,000
16 Nok Genteng bh 2,500 20 50,000 - 50,000
17 Nok Asbes bh 15,000 5 75,000 - 75,000
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 4 600,000 - 600,000
22 Kunci Pintu set 35,000 - - -
23 Engsel Pintu set 10,000 - 2 20,000 20,000
24 Engsel Jendela set 10,000 - 2 20,000 20,000
25 Kaca 3 mm lbr 75,000 4 300,000 - 300,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5" bh 5,000 2 10,000 - 10,000
28 Cat Tembok 5 Kg kaleng 50,000 3 150,000 - 150,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10000000 330000 10330000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 2,010,000 12,010,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi
DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : SADI
ALAMAT : KP.CIHERANG GEDE RT 03/05

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 6 1,020,000 - 1,020,000
2 Semen Zak 65,000 13 845,000 - 845,000
3 Batu Kali m³ 130,000 - 2 260,000 260,000
4 Batako Trass bh 1,500 700 1,050,000 - 1,050,000
5 Kayu 6/12 btg 90,000 14 1,260,000 - 1,260,000
6 Kayu 5/10 btg 50,000 10 500,000 - 500,000
7 Kaso 4/6 btg 25,000 22 550,000 - 550,000
8 Bambu btg 10,000 22 220,000 - 220,000
9 Papan 2/20 lbr 50,000 6 300,000 - 300,000
10 Bilik lbr 35,000 - 4 140,000 140,000
11 Triplek 3mm lbr 50,000 5 250,000 - 250,000
12 GRC Board lbr 55,000 15 825,000 - 825,000
13 Paku campur kg 15,000 10 150,000 - 150,000
14 Genteng bh 1,500 - 200 300,000 300,000
15 Asbes Gelombang lbr 50,000 15 750,000 - 750,000
16 Nok Genteng bh 2,500 - 20 50,000 50,000
17 Nok Asbes bh 15,000 15 225,000 - 225,000
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 45,000 18 810,000 - 810,000
20 Daun Pintu bh 200,000 1 200,000 - 200,000
21 Daun Jendela bh 150,000 3 450,000 - 450,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pintu set 10,000 1 10,000 - 10,000
24 Engsel Jendela set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 50,000 2 100,000 - 100,000
27 Kuas uk 1,5" bh 5,000 1 5,000 - 5,000
28 Cat Tembok 5 Kg kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10,000,000 750,000 10,750,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 2,430,000 12,430,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUGANDA

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : ACUN
ALAMAT : KP.TAPOS RT 01/01

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 6 1,020,000 - 1,020,000
2 Semen Zak 65,000 20 1,300,000 - 1,300,000
3 Batu Kali m³ 130,000 - 3 390,000 390,000
4 Batako Trass bh 1,500 550 825,000 - 825,000
5 Kayu 6/12 btg 90,000 15 1,350,000 - 1,350,000
6 Kayu 5/10 btg 50,000 11 550,000 - 550,000
7 Kaso 4/6 btg 25,000 30 750,000 - 750,000
8 Bambu btg 10,000 25 250,000 - 250,000
9 Papan 2/20 lbr 50,000 2 - -
10 Bilik lbr 35,000 - - -
11 Triplek 3mm lbr 50,000 15 750,000 - 750,000
12 GRC Board lbr 55,000 - - -
13 Paku campur kg 15,000 9 135,000 2 30,000 165,000
14 Genteng bh 1,500 - 200 300,000 300,000
15 Asbes Gelombang lbr 50,000 5 250,000 - 250,000
16 Nok Genteng bh 2,500 - - -
17 Nok Asbes bh 15,000 5 75,000 10 150,000 225,000
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 45,000 30 1,350,000 - 1,350,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 3 450,000 - 450,000
22 Kunci Pintu set 35,000 2 70,000 - 70,000
23 Engsel Pintu set 10,000 2 20,000 - 20,000
24 Engsel Jendela set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 1 5,000 - 5,000
27 Kuas uk 1,5" bh 5,000 1 5,000 - 5,000
28 Cat Tembok 5 Kg kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10,000,000 870,000 10,870,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 2,550,000 12,550,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : JAJA
ALAMAT : KP.TAPOS RT 02/01

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 5 850,000 - 850,000
2 Semen Zak 65,000 17 1,105,000 - 1,105,000
3 Batu Kali m³ 130,000 - 2 260,000 260,000
4 Batako Trass bh 1,500 600 900,000 - 900,000
5 Kayu 6/12 btg 90,000 18 1,620,000 - 1,620,000
6 Kayu 5/10 btg 50,000 20 1,000,000 - 1,000,000
7 Kaso 4/6 btg 25,000 - 10 250,000 250,000
8 Bambu btg 10,000 50 500,000 - 500,000
9 Papan 2/20 lbr 50,000 2 100,000 - 100,000
10 Bilik lbr 35,000 12 420,000 - 420,000
11 Triplek 3mm lbr 50,000 10 500,000 - 500,000
12 GRC Board lbr 45,000 - - -
13 Paku campur kg 15,000 13 195,000 - 195,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gelombang lbr 37,000 - - -
16 Nok Genteng bh 2,500 - - -
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 10 250,000 - 250,000
19 Keramik uk 30/30 cm m² 45,000 25 1,125,000 - 1,125,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 2 300,000 - 300,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pintu set 10,000 1 10,000 - 10,000
24 Engsel Jendela set 10,000 1 10,000 - 10,000
25 Kaca 3 mm lbr 75,000 5 375,000 - 375,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5" bh 5,000 2 10,000 - 10,000
28 Cat Tembok 5 Kg kaleng 50,000 3 150,000 - 150,000
29 Cat Kayu 1 Kg kaleng 45,000 3 135,000 - 135,000
JUMLAH BAHAN Rp. 10,000,000 660,000 10,660,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 2,340,000 12,340,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : ESA
ALAMAT : KP.LOJI RT 02/02

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 6 1,020,000 3 510,000 1,530,000
2 Semen Zak 65,000 16 1,040,000 4 260,000 1,300,000
3 Batu Kali m³ 130,000 - 2 260,000 260,000
4 Batako Trass bh 1,500 700 1,050,000 - 1,050,000
5 Kayu 6/12 btg 90,000 18 1,620,000 5 450,000 2,070,000
6 Kayu 5/10 btg 50,000 15 750,000 5 250,000 1,000,000
7 Kaso 4/6 btg 25,000 24 600,000 20 500,000 1,100,000
8 Bambu btg 10,000 - 20 200,000 200,000
9 Papan 2/20 lbr 50,000 5 250,000 - 250,000
10 Bilik lbr 35,000 - 4 140,000 140,000
11 Triplek 3mm lbr 55,000 17 935,000 - 935,000
12 GRC Board lbr 45,000 - - -
13 Paku campur kg 15,000 16 240,000 - 240,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gelombang lbr 37,000 - - -
16 Nok Genteng bh 2,500 - 20 50,000 50,000
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 45,000 27 1,215,000 - 1,215,000
20 Daun Pintu bh 200,000 3 600,000 - 600,000
21 Daun Jendela bh 150,000 2 300,000 - 300,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pintu set 10,000 - 1 10,000 10,000
24 Engsel Jendela set 10,000 - 1 10,000 10,000
25 Kaca 3 mm lbr 75,000 - 1 75,000 75,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5" bh 5,000 1 5,000 - 5,000
28 Cat Tembok 5 Kg kaleng 50,000 3 150,000 - 150,000
29 Cat Kayu 1 Kg kaleng 45,000 4 180,000 - 180,000
JUMLAH BAHAN Rp. 10,000,000 2,865,000 12,865,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 4,545,000 14,545,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : DIDIH SUKANDI


ALAMAT : KP.LOJI RT 04/02

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 6 1,020,000 - 1,020,000
2 Semen Zak 65,000 15 975,000 - 975,000
3 Batu Kali m³ 130,000 - - -
4 Batako Trass bh 1,500 700 1,050,000 1,000 1,500,000 2,550,000
5 Kayu 6/12 btg 90,000 10 900,000 7 630,000 1,530,000
6 Kayu 5/10 btg 50,000 11 550,000 5 250,000 800,000
7 Kaso 4/6 btg 25,000 17 425,000 30 750,000 1,175,000
8 Bambu btg 10,000 - 50 500,000 500,000
9 Papan 2/20 lbr 50,000 52 2,600,000 - 2,600,000
10 Bilik lbr 35,000 - - -
11 Triplek 3mm lbr 55,000 10 550,000 - 550,000
12 GRC Board lbr 45,000 - - -
13 Paku campur kg 15,000 9 135,000 - 135,000
14 Genteng bh 1,500 - 300 450,000 450,000
15 Asbes Gelombang lbr 37,000 - - -
16 Nok Genteng bh 2,500 - - -
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 45,000 15 675,000 - 675,000
20 Daun Pintu bh 200,000 2 400,000 2 400,000 800,000
21 Daun Jendela bh 150,000 2 300,000 2 300,000 600,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pintu set 10,000 1 10,000 - 10,000
24 Engsel Jendela set 10,000 2 20,000 - 20,000
25 Kaca 3 mm lbr 75,000 2 150,000 - 150,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5" bh 5,000 2 10,000 - 10,000
28 Cat Tembok 5 Kg kaleng 50,000 1 50,000 - 50,000
29 Cat Kayu 1 Kg kaleng 45,000 3 135,000 - 135,000
JUMLAH BAHAN Rp. 10,000,000 4,780,000 14,780,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 6,460,000 16,460,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : SAIN
ALAMAT : KP. CILEUNGSI RT 06/03

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 8 1,360,000 - 1,360,000
2 Semen Zak 65,000 20 1,300,000 5 325,000 1,625,000
3 Batu Kali m³ 130,000 - - -
4 Batako Trass bh 1,500 900 1,350,000 300 450,000 1,800,000
5 Kayu 6/12 btg 90,000 20 1,800,000 4 360,000 2,160,000
6 Kayu 5/10 btg 50,000 19 950,000 10 500,000 1,450,000
7 Kaso 4/6 btg 25,000 - 30 750,000 750,000
8 Bambu btg 10,000 20 200,000 3 30,000 230,000
9 Papan 2/20 lbr 50,000 - 5 250,000 250,000
10 Bilik lbr 35,000 - 4 140,000 140,000
11 Triplek 3mm lbr 40,000 15 600,000 5 200,000 800,000
12 GRC Board lbr 45,000 - - -
13 Paku campur kg 15,000 15 225,000 - 225,000
14 Genteng bh 1,500 - 50 75,000 75,000
15 Asbes Gelombang lbr 37,000 - - -
16 Nok Genteng bh 2,500 - 20 50,000 50,000
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 45,000 20 900,000 10 450,000 1,350,000
20 Daun Pintu bh 200,000 2 400,000 1 200,000 600,000
21 Daun Jendela bh 150,000 2 300,000 3 450,000 750,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pintu set 10,000 3 30,000 - 30,000
24 Engsel Jendela set 10,000 6 60,000 - 60,000
25 Kaca 3 mm lbr 75,000 - 3 225,000 225,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5" bh 5,000 2 10,000 - 10,000
28 Cat Tembok 5 Kg kaleng 50,000 4 200,000 - 200,000
29 Cat Kayu 1 Kg kaleng 45,000 6 270,000 - 270,000
JUMLAH BAHAN Rp. 10,000,000 4,455,000 14,455,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 6,135,000 16,135,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : ENOY KINDI


ALAMAT : KP.CILEUNGSI RT 01/03

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 5 850,000 - 850,000
2 Semen Zak 65,000 15 975,000 - 975,000
3 Batu Kali m³ 130,000 - 2 260,000 260,000
4 Batako Trass bh 1,500 800 1,200,000 - 1,200,000
5 Kayu 6/12 btg 90,000 10 900,000 3 270,000 1,170,000
6 Kayu 5/10 btg 50,000 5 250,000 4 200,000 450,000
7 Kaso 4/6 btg 25,000 21 525,000 20 500,000 1,025,000
8 Bambu btg 10,000 15 150,000 10 100,000 250,000
9 Papan 2/20 lbr 50,000 4 200,000 3 150,000 350,000
10 Bilik lbr 35,000 - - -
11 Triplek 3mm lbr 55,000 15 825,000 - 825,000
12 GRC Board lbr 55,000 15 825,000 - 825,000
13 Paku campur kg 15,000 9 135,000 - 135,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gelombang lbr 45,000 15 675,000 - 675,000
16 Nok Genteng bh 2,500 - - -
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 45,000 18 810,000 - 810,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 5 750,000 - 750,000
22 Kunci Pintu set 35,000 2 70,000 - 70,000
23 Engsel Pintu set 10,000 2 20,000 - 20,000
24 Engsel Jendela set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 2 150,000 - 150,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5" bh 5,000 2 10,000 - 10,000
28 Cat Tembok 5 Kg kaleng 50,000 3 150,000 - 150,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10,000,000 1,630,000 11,630,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 3,310,000 13,310,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : SUGANDI
ALAMAT : KP.CILEUNGSI RT 05/03

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 6 1,020,000 - 1,020,000
2 Semen Zak 65,000 20 1,300,000 - 1,300,000
3 Batu Kali m³ 130,000 7 910,000 - 910,000
4 Batako Trass bh 1,500 800 1,200,000 700 1,050,000 2,250,000
5 Kayu 6/12 btg 90,000 10 900,000 6 540,000 1,440,000
6 Kayu 5/10 btg 50,000 11 550,000 6 300,000 850,000
7 Kaso 4/6 btg 25,000 10 250,000 10 250,000 500,000
8 Bambu btg 10,000 10 100,000 10 100,000 200,000
9 Papan 2/20 lbr 50,000 5 250,000 - 250,000
10 Bilik lbr 35,000 4 140,000 4 140,000 280,000
11 Triplek 3mm lbr 55,000 8 440,000 - 440,000
12 GRC Board lbr 45,000 12 540,000 - 540,000
13 Paku campur kg 15,000 9 135,000 - 135,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gelombang lbr 37,000 - - -
16 Nok Genteng bh 2,500 26 65,000 - 65,000
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 3 450,000 - 450,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pintu set 10,000 2 20,000 - 20,000
24 Engsel Jendela set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 2 150,000 - 150,000
26 Kuas uk 4" bh 5,000 3 15,000 - 15,000
27 Kuas uk 1,5" bh 5,000 2 10,000 - 10,000
28 Cat Tembok 5 Kg kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10,000,000 2,530,000 12,530,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 4,210,000 14,210,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : SAEPUL
ALAMAT : Kp. CIPAOK RT 02/04

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 6 1,020,000 - 1,020,000
2 Semen Zak 65,000 15 975,000 - 975,000
3 Batu Kali m³ 130,000 3 390,000 - 390,000
4 Batako Trass bh 1,500 900 1,350,000 700 1,050,000 2,400,000
5 Kayu 6/12 btg 90,000 8 720,000 6 540,000 1,260,000
6 Kayu 5/10 btg 50,000 9 450,000 6 300,000 750,000
7 Kaso 4/6 btg 25,000 15 375,000 10 250,000 625,000
8 Bambu btg 10,000 13 130,000 10 100,000 230,000
9 Papan 2/20 lbr 50,000 1 50,000 - 50,000
10 Bilik lbr 35,000 4 140,000 4 140,000 280,000
11 Triplek 3mm lbr 55,000 10 550,000 - 550,000
12 GRC Board lbr 45,000 7 315,000 - 315,000
13 Paku campur kg 15,000 90 1,350,000 - 1,350,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gelombang lbr 37,000 - - -
16 Nok Genteng bh 2,500 20 50,000 - 50,000
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 45,000 17 765,000 - 765,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 3 450,000 - 450,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pintu set 10,000 2 20,000 - 20,000
24 Engsel Jendela set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5" bh 5,000 2 10,000 - 10,000
28 Cat Tembok 5 Kg kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10,000,000 2,530,000 12,530,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 4,210,000 14,210,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : SUTARNO
ALAMAT : KP.CIPAOK RT 02/04

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 8 1,360,000 - 1,360,000
2 Semen Zak 65,000 20 1,300,000 - 1,300,000
3 Batu Kali m³ 130,000 3 390,000 - 390,000
4 Batako Trass bh 1,500 900 1,350,000 700 1,050,000 2,400,000
5 Kayu 6/12 btg 90,000 10 900,000 6 540,000 1,440,000
6 Kayu 5/10 btg 50,000 11 550,000 6 300,000 850,000
7 Kaso 4/6 btg 25,000 10 250,000 10 250,000 500,000
8 Bambu btg 10,000 12 120,000 10 100,000 220,000
9 Papan 2/20 lbr 50,000 5 250,000 - 250,000
10 Bilik lbr 35,000 4 140,000 4 140,000 280,000
11 Triplek 3mm lbr 55,000 8 440,000 - 440,000
12 GRC Board lbr 45,000 9 405,000 - 405,000
13 Paku campur kg 15,000 9 135,000 - 135,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gelombang lbr 45,000 - - -
16 Nok Genteng bh 2,500 20 50,000 - 50,000
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 3 450,000 - 450,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pintu set 10,000 2 20,000 - 20,000
24 Engsel Jendela set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5" bh 5,000 2 10,000 - 10,000
28 Cat Tembok 5 Kg kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 Kg kaleng 45,000 4 180,000 - 180,000
JUMLAH BAHAN Rp. 10,000,000 2,530,000 12,530,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 4,210,000 14,210,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : ACE
ALAMAT : KP.CIPAOK RT 04/04

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 7 1,190,000 3 510,000 1,700,000
2 Semen Zak 65,000 20 1,300,000 - 1,300,000
3 Batu Kali m³ 130,000 5 650,000 - 650,000
4 Batako Trass bh 1,500 900 1,350,000 800 1,200,000 2,550,000
5 Kayu 6/12 btg 90,000 15 1,350,000 - 1,350,000
6 Kayu 5/10 btg 50,000 10 500,000 - 500,000
7 Kaso 4/6 btg 25,000 12 300,000 10 250,000 550,000
8 Bambu btg 10,000 20 200,000 - 200,000
9 Papan 2/20 lbr 50,000 6 300,000 - 300,000
10 Bilik lbr 35,000 - 5 175,000 175,000
11 Triplek 3mm lbr 55,000 12 660,000 - 660,000
12 GRC Board lbr - - -
13 Paku campur kg 15,000 10 150,000 - 150,000
14 Genteng bh 1,500 - 500 750,000 750,000
15 Asbes Gelombang lbr 45,000 15 675,000 - 675,000
16 Nok Genteng bh 2,500 - - -
17 Nok Asbes bh 15,000 5 75,000 - 75,000
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 45,000 - 20 900,000 900,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 2 300,000 - 300,000
22 Kunci Pintu set 35,000 2 70,000 - 70,000
23 Engsel Pintu set 10,000 1 10,000 - 10,000
24 Engsel Jendela set 10,000 2 20,000 - 20,000
25 Kaca 3 mm lbr 75,000 2 150,000 - 150,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5" bh 5,000 2 10,000 - 10,000
28 Cat Tembok 5 Kg kaleng 50,000 3 150,000 - 150,000
29 Cat Kayu 1 Kg kaleng 45,000 4 180,000 - 180,000
JUMLAH BAHAN Rp. 10,000,000 3,785,000 13,785,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 5,465,000 15,465,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : ROROH
ALAMAT : KP.CILEUNGSI RT 05/03

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 7 1,190,000 - 1,190,000
2 Semen Zak 65,000 20 1,300,000 - 1,300,000
3 Batu Kali m³ 130,000 - - -
4 Batako Trass bh 1,500 - - -
5 Kayu 6/12 btg 90,000 15 1,350,000 10 900,000 2,250,000
6 Kayu 5/10 btg 50,000 10 500,000 10 500,000 1,000,000
7 Kaso 4/6 btg 25,000 10 250,000 10 250,000 500,000
8 Bambu btg 10,000 23 230,000 20 200,000 430,000
9 Papan 2/20 lbr 50,000 10 500,000 2 100,000 600,000
10 Bilik lbr 35,000 15 525,000 4 140,000 665,000
11 Triplek 3mm lbr 40,000 4 160,000 - 160,000
12 GRC Board lbr 55,000 10 550,000 - 550,000
13 Paku campur kg 15,000 10 150,000 - 150,000
14 Genteng bh 1,500 300 450,000 - 450,000
15 Asbes Gelombang lbr 45,000 - 20 900,000 900,000
16 Nok Genteng bh 2,500 - - -
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 15 375,000 - 375,000
19 Keramik uk 30/30 cm m² 45,000 18 810,000 - 810,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 4 600,000 - 600,000
22 Kunci Pintu set 35,000 2 70,000 - 70,000
23 Engsel Pintu set 10,000 2 20,000 - 20,000
24 Engsel Jendela set 10,000 4 40,000 - 40,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5" bh 5,000 2 10,000 - 10,000
28 Cat Tembok 5 Kg kaleng 50,000 3 150,000 - 150,000
29 Cat Kayu 1 Kg kaleng 45,000 3 135,000 - 135,000
JUMLAH BAHAN Rp. 10,000,000 2,990,000 12,990,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 4,670,000 14,670,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : SADUNG
ALAMAT : KP.CILEUNGSI RT 03/03

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 6 1,020,000 - 1,020,000
2 Semen Zak 65,000 15 975,000 - 975,000
3 Batu Kali m³ 130,000 - - -
4 Batako Trass bh 1,500 - - -
5 Kayu 6/12 btg 90,000 20 1,800,000 10 900,000 2,700,000
6 Kayu 5/10 btg 50,000 15 750,000 10 500,000 1,250,000
7 Kaso 4/6 btg 25,000 20 500,000 10 250,000 750,000
8 Bambu btg 10,000 30 300,000 20 200,000 500,000
9 Papan 2/20 lbr 50,000 12 600,000 2 100,000 700,000
10 Bilik lbr 35,000 10 350,000 4 140,000 490,000
11 Triplek 3mm lbr 55,000 9 495,000 - 495,000
12 GRC Board lbr 45,000 - - -
13 Paku campur kg 15,000 10 150,000 - 150,000
14 Genteng bh 1,500 100 150,000 - 150,000
15 Asbes Gelombang lbr 45,000 - 15 675,000 675,000
16 Nok Genteng bh 2,500 - - -
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 15 375,000 - 375,000
19 Keramik uk 30/30 cm m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 4 600,000 - 600,000
22 Kunci Pintu set 35,000 2 70,000 - 70,000
23 Engsel Pintu set 10,000 4 40,000 - 40,000
24 Engsel Jendela set 10,000 4 40,000 - 40,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5" bh 5,000 2 10,000 - 10,000
28 Cat Tembok 5 Kg kaleng 50,000 3 150,000 - 150,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10,000,000 2,765,000 12,765,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 4,445,000 14,445,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : SAMAN
ALAMAT : KP.CILEUNGSI RT 05/03

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 7 1,190,000 - 1,190,000
2 Semen Zak 65,000 20 1,300,000 - 1,300,000
3 Batu Kali m³ 130,000 5 650,000 - 650,000
4 Batako Trass bh 1,500 900 1,350,000 700 1,050,000 2,400,000
5 Kayu 6/12 btg 90,000 10 900,000 6 540,000 1,440,000
6 Kayu 5/10 btg 50,000 8 400,000 6 300,000 700,000
7 Kaso 4/6 btg 25,000 9 225,000 10 250,000 475,000
8 Bambu btg 10,000 15 150,000 10 100,000 250,000
9 Papan 2/20 lbr 50,000 5 250,000 - 250,000
10 Bilik lbr 35,000 4 140,000 4 140,000 280,000
11 Triplek 3mm lbr 55,000 8 440,000 - 440,000
12 GRC Board lbr 55,000 10 550,000 - 550,000
13 Paku campur kg 15,000 9 135,000 - 135,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gelombang lbr 45,000 15 675,000 - 675,000
16 Nok Genteng bh 2,500 20 50,000 - 50,000
17 Nok Asbes bh 15,000 15 225,000 - 225,000
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 35,000 - - - -
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 3 450,000 - 450,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pintu set 10,000 2 20,000 - 20,000
24 Engsel Jendela set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5" bh 5,000 2 10,000 - 10,000
28 Cat Tembok 5 Kg kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10,000,000 2,530,000 12,530,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 4,210,000 14,210,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : OMAH
ALAMAT : KP.CILEUNGSI RT 01/03
Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total
No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 6 1,020,000 - 1,020,000
2 Semen Zak 65,000 15 975,000 - 975,000
3 Batu Kali m³ 130,000 - - -
4 Batako Trass bh 1,500 - - -
5 Kayu 6/12 btg 90,000 21 1,890,000 10 900,000 2,790,000
6 Kayu 5/10 btg 50,000 20 1,000,000 10 500,000 1,500,000
7 Kaso 4/6 btg 25,000 15 375,000 10 250,000 625,000
8 Bambu btg 10,000 22 220,000 20 200,000 420,000
9 Papan 2/20 lbr 50,000 10 500,000 2 100,000 600,000
10 Bilik lbr 35,000 10 350,000 4 140,000 490,000
11 Triplek 3mm lbr 40,000 4 160,000 - 160,000
12 GRC Board lbr 55,000 10 550,000 - 550,000
13 Paku campur kg 15,000 10 150,000 - 150,000
14 Genteng bh 1,500 100 150,000 - 150,000
15 Asbes Gelombang lbr 37,000 - - -
16 Nok Genteng bh 2,500 - - -
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 15 375,000 - 375,000
19 Keramik uk 30/30 cm m² 45,000 15 675,000 - 675,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 4 600,000 - 600,000
22 Kunci Pintu set 35,000 2 70,000 - 70,000
23 Engsel Pintu set 10,000 2 20,000 - 20,000
24 Engsel Jendela set 10,000 4 40,000 - 40,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 1 5,000 - 5,000
27 Kuas uk 1,5" bh 5,000 2 10,000 - 10,000
28 Cat Tembok 5 Kg kaleng 50,000 3 150,000 - 150,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10,000,000 2,090,000 12,090,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 3,770,000 13,770,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014
NAMA : EROM
ALAMAT : KP.CILEUNGSI RT 02/03

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 8 1,360,000 - 1,360,000
2 Semen Zak 65,000 20 1,300,000 - 1,300,000
3 Batu Kali m³ 130,000 - - -
4 Batako Trass bh 1,500 800 1,200,000 - 1,200,000
5 Kayu 6/12 btg 90,000 15 1,350,000 10 900,000 2,250,000
6 Kayu 5/10 btg 50,000 10 500,000 10 500,000 1,000,000
7 Kaso 4/6 btg 25,000 10 250,000 10 250,000 500,000
8 Bambu btg 10,000 20 200,000 20 200,000 400,000
9 Papan 2/20 lbr 50,000 6 300,000 2 100,000 400,000
10 Bilik lbr 35,000 10 350,000 4 140,000 490,000
11 Triplek 3mm lbr 40,000 6 240,000 - 240,000
12 GRC Board lbr 45,000 - - -
13 Paku campur kg 15,000 20 300,000 - 300,000
14 Genteng bh 1,500 100 150,000 - 150,000
15 Asbes Gelombang lbr 37,000 - - -
16 Nok Genteng bh 2,500 - - -
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 15 375,000 - 375,000
19 Keramik uk 30/30 cm m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 - 2 400,000 400,000
21 Daun Jendela bh 150,000 4 600,000 - 600,000
22 Kunci Pintu set 35,000 2 70,000 - 70,000
23 Engsel Pintu set 10,000 2 20,000 - 20,000
24 Engsel Jendela set 10,000 4 40,000 - 40,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 3 15,000 - 15,000
27 Kuas uk 1,5" bh 5,000 3 15,000 - 15,000
28 Cat Tembok 5 Kg kaleng 50,000 3 150,000 - 150,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10,000,000 2,490,000 12,490,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 4,170,000 14,170,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : HALIMAH
ALAMAT : KP.BABAKAN CITAPEN RT 01/04

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 7 1,190,000 - 1,190,000
2 Semen Zak 65,000 20 1,300,000 - 1,300,000
3 Batu Kali m³ 130,000 5 650,000 - 650,000
4 Batako Trass bh 1,500 900 1,350,000 - 1,350,000
5 Kayu 6/12 btg 90,000 10 900,000 10 900,000 1,800,000
6 Kayu 5/10 btg 50,000 15 750,000 10 500,000 1,250,000
7 Kaso 4/6 btg 25,000 15 375,000 30 750,000 1,125,000
8 Bambu btg 10,000 18 180,000 10 100,000 280,000
9 Papan 2/20 lbr 50,000 11 550,000 2 100,000 650,000
10 Bilik lbr - 8 - -
11 Triplek 3mm lbr 55,000 7 385,000 - 385,000
12 GRC Board lbr 45,000 - - -
13 Paku campur kg 15,000 10 150,000 - 150,000
14 Genteng bh 1,500 - - -
15 Asbes Gelombang lbr 45,000 - - -
16 Nok Genteng bh 2,500 36 90,000 - 90,000
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 2 300,000 - 300,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pintu set 10,000 2 20,000 - 20,000
24 Engsel Jendela set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 3 15,000 - 15,000
27 Kuas uk 1,5" bh 5,000 3 15,000 - 15,000
28 Cat Tembok 5 Kg kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10,000,000 2,350,000 12,350,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 4,030,000 14,030,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI


DAFTAR RINCIAN PENGGUNAAN DANA
PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : SYAHRUDIN
ALAMAT : KP. LOJI RT 10/02

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 7 1,190,000 - 1,190,000
2 Semen Zak 65,000 20 1,300,000 - 1,300,000
3 Batu Kali m³ 130,000 3 390,000 - 390,000
4 Batako Trass bh 1,500 900 1,350,000 700 1,050,000 2,400,000
5 Kayu 6/12 btg 90,000 12 1,080,000 6 540,000 1,620,000
6 Kayu 5/10 btg 50,000 10 500,000 6 300,000 800,000
7 Kaso 4/6 btg 25,000 20 500,000 10 250,000 750,000
8 Bambu btg 10,000 20 200,000 10 100,000 300,000
9 Papan 2/20 lbr 50,000 15 750,000 - 750,000
10 Bilik lbr 35,000 - 4 140,000 140,000
11 Triplek 3mm lbr 55,000 5 275,000 - 275,000
12 GRC Board lbr 45,000 - 4 180,000 180,000
13 Paku campur kg 15,000 9 135,000 - 135,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gelombang lbr 37,000 - - -
16 Nok Genteng bh 2,500 20 50,000 - 50,000
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 3 450,000 - 450,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pintu set 10,000 2 20,000 - 20,000
24 Engsel Jendela set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 3 15,000 - 15,000
27 Kuas uk 1,5" bh 5,000 3 15,000 - 15,000
28 Cat Tembok 5 Kg kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10,000,000 2,710,000 12,710,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 4,390,000 14,390,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI


DAFTAR RINCIAN PENGGUNAAN DANA
PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : SA'IT
ALAMAT : KP.LOJI RT 08/02

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 7 1,190,000 - 1,190,000
2 Semen Zak 65,000 20 1,300,000 - 1,300,000
3 Batu Kali m³ 130,000 4 520,000 - 520,000
4 Batako Trass bh 1,500 800 1,200,000 700 1,050,000 2,250,000
5 Kayu 6/12 btg 90,000 12 1,080,000 6 540,000 1,620,000
6 Kayu 5/10 btg 50,000 10 500,000 6 300,000 800,000
7 Kaso 4/6 btg 25,000 12 300,000 10 250,000 550,000
8 Bambu btg 10,000 18 180,000 10 100,000 280,000
9 Papan 2/20 lbr 50,000 3 150,000 - 150,000
10 Bilik lbr 35,000 4 140,000 4 140,000 280,000
11 Triplek 3mm lbr 55,000 2 110,000 - 110,000
12 GRC Board lbr 45,000 - - -
13 Paku campur kg 15,000 9 135,000 - 135,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gelombang lbr 45,000 20 900,000 - 900,000
16 Nok Genteng bh 2,500 20 50,000 - 50,000
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 3 450,000 - 450,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pintu set 10,000 2 20,000 - 20,000
24 Engsel Jendela set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5" bh 5,000 1 5,000 - 5,000
28 Cat Tembok 5 Kg kaleng 40,000 2 80,000 - 80,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10,000,000 2,530,000 12,530,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 4,210,000 14,210,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI


DAFTAR RINCIAN PENGGUNAAN DANA
PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : NURSIAH
ALAMAT : KP.LOJI 05/02

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 7 1,190,000 - 1,190,000
2 Semen Zak 65,000 20 1,300,000 - 1,300,000
3 Batu Kali m³ 130,000 4 520,000 - 520,000
4 Batako Trass bh 1,500 600 900,000 700 1,050,000 1,950,000
5 Kayu 6/12 btg 90,000 12 1,080,000 6 540,000 1,620,000
6 Kayu 5/10 btg 50,000 10 500,000 6 300,000 800,000
7 Kaso 4/6 btg 25,000 10 250,000 10 250,000 500,000
8 Bambu btg 10,000 15 150,000 10 100,000 250,000
9 Papan 2/20 lbr 50,000 7 350,000 - 350,000
10 Bilik lbr 35,000 4 140,000 4 140,000 280,000
11 Triplek 3mm lbr 55,000 5 275,000 - 275,000
12 GRC Board lbr 55,000 8 440,000 - 440,000
13 Paku campur kg 15,000 9 135,000 - 135,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gelombang lbr 45,000 15 675,000 - 675,000
16 Nok Genteng bh 2,500 20 50,000 - 50,000
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 45,000 15 675,000 - 675,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 3 450,000 - 450,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pintu set 10,000 2 20,000 - 20,000
24 Engsel Jendela set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5" bh 5,000 2 10,000 - 10,000
28 Cat Tembok 5 Kg kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10,000,000 2,530,000 12,530,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 4,210,000 14,210,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi
DEDEN SEGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : CIAH
ALAMAT : KP.CIPOK RT 03/04

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 7 1,190,000 - 1,190,000
2 Semen Zak 65,000 20 1,300,000 - 1,300,000
3 Batu Kali m³ 130,000 3 390,000 - 390,000
4 Batako Trass bh 1,500 800 1,200,000 700 1,050,000 2,250,000
5 Kayu 6/12 btg 90,000 13 1,170,000 6 540,000 1,710,000
6 Kayu 5/10 btg 50,000 13 650,000 6 300,000 950,000
7 Kaso 4/6 btg 25,000 10 250,000 10 250,000 500,000
8 Bambu btg 10,000 20 200,000 10 100,000 300,000
9 Papan 2/20 lbr 50,000 8 400,000 - 400,000
10 Bilik lbr 35,000 4 140,000 4 140,000 280,000
11 Triplek 3mm lbr 55,000 6 330,000 - 330,000
12 GRC Board lbr 45,000 7 315,000 - 315,000
13 Paku campur kg 15,000 9 135,000 - 135,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gelombang lbr 37,000 - - -
16 Nok Genteng bh 2,500 20 50,000 - 50,000
17 Nok Asbes bh 15,000 - - -
18 Bonet 60cm m' 25,000 - - -
19 Keramik uk 30/30 cm m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jendela bh 150,000 3 450,000 - 450,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pintu set 10,000 2 20,000 - 20,000
24 Engsel Jendela set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 3 15,000 - 15,000
27 Kuas uk 1,5" bh 5,000 3 15,000 - 15,000
28 Cat Tembok 5 Kg kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 Kg kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 10,000,000 2,530,000 12,530,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/Kenek HOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 10,000,000 4,210,000 14,210,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI


96
274
583
11458
183
225
303
385
57
96
60
157
239
400
51
216
5
70
80
43
70
29
38
67
57
48
48
59
50
6 3 3 3 3 3 3 6 6 6
15 15 10 12 10 13 10 12 12 15
3
600 700 210 700 550 400 694 804
6 10 6 5 8 5 12 10 8 10
15 20 4 5 10 8 15 10 10 20
30 37 20 20 20 10
20 10 40 23 25 40 17
2 1 3 2 2 2 2 2 2
4 12
4 1 2 2 2 2 6 5
10 10 15 10 11 10
10 9 10 10 10 9 10 10 9 10

20 10 6
20

10
20 15 20
1 2 2 1 2 2 1 2 1
2 6 3 3 2 1 2 3
1 1 1 2 1 1 1 1
1 1 2 1 1 3
2 2 3 3 1 2 6
3 1 3 3 2 2
2 2 2 2 2 1 2 2 2 2
2 2 2 2 2 1 1 2 2 2
2 2 3 3 2 2 2 2 3 3
2 2 2 2 2 2 2 2 2 2

1 2 3 4 5 6 7 8 9 10
3
4 5
2 2 3 2 2
500 1000 300
4 10 5 7 4
10 5 5 10
10 10 20 30 30
10 20 50 3
5
2 2 4 4 4 4
5

2
100 200 100 200 200 100 100 300 50

10 20 20 20

10 6
10 10
2 1
2 3

1 2 1
2 1
1 3
1
4 4 2 52 1
10 10 5 149 2
3 2 7.5 3
100 700 350 5808 4
2 6 3 91 5
2 6 3 128 6
20 10 5 172 7
10 10 5 200 8
3 1 0 22.1 9
4 4 2 26 10
2 2 2 30 11
15 7 4 91.5 12
10 9 5 120.5 13
14
36 15
20 10 50 16
17
10 18
25 80 19
2 2 1 19 20
5 3 2 31.5 21
2 1 1 12.5 22
2 2 1 14 23
3 3 2 26.5 24
2 3 2 20.5 25
2 2 1 24 26
2 2 1 23 27
3 2 1 30 28
2 2 1 25 29

11 12 13
3 1
9 2
2 13 3
700 350 2850 4
3 6 3 42 5
4 6 3 43 6
20 10 5 135 7
10 10 5 108 8
3 8 9
4 2 26 10
5 11
12
100 102 13
100 50 1500 14
15
70 16
17
16 18
20 19
3 20
5 21
22
4 23
3 24
4 25
1 26
27
28
29
REKAPITULASI PENGGUNAAN DANA
KEBUTUHAN BAHAN MATERIAL DAN UPAH TENAGA KERJA
PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CIBEDUG KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2012

No Uraian Satuan Harga APBD Kabupaten Bogor Swadaya Masyarakat


Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7)
1 Pasir m³ 170,000 ### ### 6 1,020,000
2 Semen Zak 57,000 ### ### 9 513,000
3 Batu Kali m³ 130,000 916,000 ### 13 1,690,000
4 Batako Tra bh 1,500 11,458 17,187,000 8,200 12,300,000
5 Kayu 6/12 btg 90,000 656,000 ### 131 11,790,000
6 Kayu 5/10 btg 50,000 710,000 ### 132 6,600,000
7 Kaso 4/6 btg 25,000 365,000 9,125,000,000 260 6,500,000
8 Bambu btg 10,000 350,000 3,500,000,000 273 2,730,000
9 Papan 2/2 lbr 50,000 430,000 ### 18 900,000
10 Bilik lbr 35,000 580,000 ### 81 2,835,000
11 Triplek 3m lbr 40,000 595,000 ### 5 200,000
12 GRC Board lbr 45,000 480,000 ### - -
13 Paku camp kg 15,000 236,000 3,540,000,000 102 1,530,000
14 Genteng bh 1,500 223,500 335,250,000 2,650 3,975,000
15 Asbes Gel lbr 37,000 209,000 7,733,000,000 - -
16 Nok Gente bh 2,500 254,500 636,250,000 70 175,000
17 Nok Asbes bh 15,000 185,000 2,775,000,000 - -
18 Bonet 60c m' 25,000 365,000 9,125,000,000 16 400,000
19 Keramik uk m² 35,000 ### ### 20 700,000
20 Daun Pintu bh 200,000 ### ### 3 600,000
21 Daun Jende bh 150,000 ### ### 5 750,000
22 Kunci Pintu set 35,000 815,000 ### - -
23 Engsel Pint set 10,000 230,000 2,300,000,000 4 40,000
24 Engsel Jen set 10,000 67 670,000 3 30,000
25 Kaca 3 mm lbr 75,000 435,000 4,273,000 4 300,000
26 Kuas uk 4" bh 5,000 345,000 1,725,000,000 1 5,000
27 Kuas uk 1,5 bh 5,000 290,000 1,450,000,000 - -
28 Cat Tembok kaleng 40,000 450,000 ### - -
29 Cat Kayu 1 kaleng 45,000 425,000 ### - -
JUMLAH BAHAN Rp. ### 55,583,000
1 2 3 4 5 6 7 8
Upah
1 Tukang HOK 60,000 - - - -
2 Pekerja/Ke HOK 40,000 - - -
JUMLAH UPAH Rp. -
JUMLAH BAHAN DAN UPAH ### 55,583,000
JUMLAH TOTAL ###

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cibedug Ketua Pokja Desa Cibedug

DENI S. MINTAWINATA, S.IP. M.Si H. MUHYADI


Mengetahui :
Camat Ciawi

Drs. AGUS MANJAR M.Si


NIP. 1965080111987121005

REKAPITULASI PENGGUNAAN DANA


KEBUTUHAN BAHAN MATERIAL DAN UPAH TENAGA KERJA
LOKASI : DESA CIBEDUG KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2012

No Uraian Satuan Harga APBD Kabupaten Bogor Swadaya Masyarakat


Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7)
1 Pasir m³ 170,000 52 8,840,000 3 510,000
2 Semen Zak 57,000 149 8,493,000 9 513,000
3 Batu Kali m³ 130,000 8 975,000 13 1,690,000
4 Batako Tra bh 1,500 5,808 8,712,000 2,850 4,275,000
5 Kayu 6/12 btg 90,000 91 8,190,000 42 3,780,000
6 Kayu 5/10 btg 50,000 128 6,400,000 43 2,150,000
7 Kaso 4/6 btg 25,000 172 4,300,000 135 3,375,000
8 Bambu btg 10,000 200 2,000,000 108 1,080,000
9 Papan 2/2 lbr 50,000 22 1,105,000 8 400,000
10 Bilik lbr 35,000 26 910,000 26 910,000
11 Triplek 3m lbr 40,000 30 1,200,000 - -
12 GRC Board lbr 45,000 92 4,117,000 - -
13 Paku camp kg 15,000 121 1,807,000 102 1,530,000
14 Genteng bh 1,500 - - 1,500 2,250,000
15 Asbes Gel lbr 37,000 36 1,332,000 - -
16 Nok Gente bh 2,500 50 125,000 70 175,000
17 Nok Asbes bh 15,000 - - - -
18 Bonet 60c m' 25,000 10 250,000 8 200,000
19 Keramik uk m² 35,000 80 2,800,000 20 700,000
20 Daun Pintu bh 200,000 19 3,800,000 2 400,000
21 Daun Jende bh 150,000 32 4,725,000 3 450,000
22 Kunci Pintu set 35,000 13 437,000 - -
23 Engsel Pint set 10,000 13 130,000 4 40,000
24 Engsel Jen set 10,000 26 260,000 2 20,000
25 Kaca 3 mm lbr 75,000 21 1,537,000 2 150,000
26 Kuas uk 4" bh 5,000 23 115,000 1 5,000
27 Kuas uk 1,5 bh 5,000 23 115,000 - -
28 Cat Tembok kaleng 40,000 30 1,200,000 - -
29 Cat Kayu 1 kaleng 45,000 25 1,125,000 - -
JUMLAH BAHAN Rp. 75,000,000 24,603,000
1 2 3 4 5 6 7 8
Upah
1 Tukang HOK 60,000 - - 175 10,500,000
2 Pekerja/Ke HOK 40,000 - 263 10,520,000
JUMLAH UPAH Rp. 21,020,000
JUMLAH BAHAN DAN UPAH 75,000,000 45,623,000
JUMLAH TOTAL 120,623,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cibedug Ketua Pokja Desa Cibedug

DENI S. MINTAWINATA, S.IP. M.Si H. MUHYADI


Mengetahui :
Camat Ciawi

Drs. AGUS MANJAR M.Si


NIP. 1965080111987121005

REKAPITULASI PENGGUNAAN DANA


KEBUTUHAN BAHAN MATERIAL DAN UPAH TENAGA KERJA
PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CIBEDUG KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2012

No Uraian Satuan Harga APBD Kabupaten Bogor Swadaya Masyarakat


Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7)
1 Pasir m³ 170,000 ### ### 6 1,020,000
2 Semen Zak 57,000 ### ### 9 513,000
3 Batu Kali m³ 130,000 915,993 ### 13 1,690,000
4 Batako Tra bh 1,500 5,650 8,475,000 8,200 12,300,000
5 Kayu 6/12 btg 90,000 656,091 ### 131 11,790,000
6 Kayu 5/10 btg 50,000 709,872 ### 132 6,600,000
7 Kaso 4/6 btg 25,000 364,828 9,120,700,000 260 6,500,000
8 Bambu btg 10,000 349,800 3,498,000,000 273 2,730,000
9 Papan 2/2 lbr 50,000 429,978 ### 18 900,000
10 Bilik lbr 35,000 579,974 ### 81 2,835,000
11 Triplek 3m lbr 40,000 594,970 ### 5 200,000
12 GRC Board lbr 45,000 479,909 ### - -
13 Paku camp kg 15,000 235,880 3,538,192,500 102 1,530,000
14 Genteng bh 1,500 - - 2,650 3,975,000
15 Asbes Gel lbr 37,000 135,000 4,995,000,000 - -
16 Nok Gente bh 2,500 249,500 623,750,000 70 175,000
17 Nok Asbes bh 15,000 155,000 2,325,000,000 - -
18 Bonet 60c m' 25,000 315,000 7,875,000,000 16 400,000
19 Keramik uk m² 35,000 ### ### 20 700,000
20 Daun Pintu bh 200,000 ### ### 3 600,000
21 Daun Jende bh 150,000 ### ### 5 750,000
22 Kunci Pintu set 35,000 745,000 ### - -
23 Engsel Pint set 10,000 210,000 2,100,000,000 4 40,000
24 Engsel Jen set 10,000 67 670,000 3 30,000
25 Kaca 3 mm lbr 75,000 285,000 4,273,000 4 300,000
26 Kuas uk 4" bh 5,000 335,000 1,675,000,000 1 5,000
27 Kuas uk 1,5 bh 5,000 280,000 1,400,000,000 - -
28 Cat Tembok kaleng 40,000 350,000 ### - -
29 Cat Kayu 1 kaleng 45,000 335,000 ### - -
JUMLAH BAHAN Rp. ### 55,583,000
1 2 3 4 5 6 7 8
Upah
1 Tukang HOK 60,000 - - - -
2 Pekerja/Ke HOK 40,000 - - -
JUMLAH UPAH Rp. -
JUMLAH BAHAN DAN UPAH ### 55,583,000
JUMLAH TOTAL ###

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cibedug Ketua Pokja Desa Cibedug

DENI S. MINTAWINATA, S.IP. M.Si H. MUHYADI


Mengetahui :
Camat Ciawi

Drs. AGUS MANJAR M.Si


NIP. 1965080111987121005
DAFTAR RINCIAN PENGGUNAAN DANA
PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : ACUN
ALAMAT : KP.TAPOS RT 01/01

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 4 680,000 - 680,000
2 Semen Zak 65,000 15 975,000 - 975,000
3 Batu Kali m³ 130,000 - 3 390,000 390,000
4 Batako Tra bh 1,500 550 825,000 - 825,000
5 Kayu 6/12 btg 90,000 5 450,000 - 450,000
6 Kayu 5/10 btg 50,000 8 400,000 - 400,000
7 Kaso 4/6 btg 25,000 20 500,000 - 500,000
8 Bambu btg 10,000 25 250,000 - 250,000
9 Papan 2/2 lbr 50,000 2 100,000 - 100,000
10 Bilik lbr 35,000 4 140,000 - 140,000
11 Triplek 3m lbr 50,000 15 750,000 - 750,000
12 GRC Board lbr 45,000 - - -
13 Paku camp kg 15,000 9 135,000 2 30,000 165,000
14 Genteng bh 1,500 - 200 300,000 300,000
15 Asbes Gel lbr 37,000 - - -
16 Nok Gente bh 2,500 - - -
17 Nok Asbes bh 15,000 - - -
18 Bonet 60c m' 25,000 - - -
19 Keramik uk m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jende bh 150,000 3 450,000 - 450,000
22 Kunci Pintu set 35,000 2 70,000 - 70,000
23 Engsel Pint set 10,000 2 20,000 - 20,000
24 Engsel Jen set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 1 5,000 - 5,000
27 Kuas uk 1,5 bh 5,000 1 5,000 - 5,000
28 Cat Tembok kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 7,500,000 720,000 8,220,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/KeHOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 7,500,000 2,400,000 9,900,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : JAJA
ALAMAT : KP.TAPOS RT 02/01

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 5 850,000 - 850,000
2 Semen Zak 65,000 10 650,000 - 650,000
3 Batu Kali m³ 130,000 - 2 260,000 260,000
4 Batako Tra bh 1,500 400 600,000 - 600,000
5 Kayu 6/12 btg 90,000 13 1,170,000 - 1,170,000
6 Kayu 5/10 btg 50,000 15 750,000 - 750,000
7 Kaso 4/6 btg 25,000 - 10 250,000 250,000
8 Bambu btg 10,000 40 400,000 - 400,000
9 Papan 2/2 lbr 50,000 2 100,000 - 100,000
10 Bilik lbr 35,000 12 420,000 - 420,000
11 Triplek 3m lbr 50,000 3 150,000 - 150,000
12 GRC Board lbr 45,000 - - -
13 Paku camp kg 15,000 10 150,000 - 150,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gel lbr 37,000 - - -
16 Nok Gente bh 2,500 - - -
17 Nok Asbes bh 15,000 - - -
18 Bonet 60c m' 25,000 10 250,000 - 250,000
19 Keramik uk m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jende bh 150,000 2 300,000 - 300,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pint set 10,000 1 10,000 - 10,000
24 Engsel Jen set 10,000 1 10,000 - 10,000
25 Kaca 3 mm lbr 75,000 2 150,000 - 150,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5 bh 5,000 1 5,000 - 5,000
28 Cat Tembok kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 7,500,000 660,000 8,160,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/KeHOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 7,500,000 2,340,000 9,840,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : ESA
ALAMAT : KP.LOJI RT 02/02

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 6 1,020,000 3 510,000 1,530,000
2 Semen Zak 65,000 12 780,000 4 260,000 1,040,000
3 Batu Kali m³ 130,000 - 2 260,000 260,000
4 Batako Tra bh 1,500 1,000 1,500,000 - 1,500,000
5 Kayu 6/12 btg 90,000 10 900,000 5 450,000 1,350,000
6 Kayu 5/10 btg 50,000 10 500,000 5 250,000 750,000
7 Kaso 4/6 btg 25,000 20 500,000 20 500,000 1,000,000
8 Bambu btg 10,000 - 20 200,000 200,000
9 Papan 2/2 lbr 50,000 2 100,000 - 100,000
10 Bilik lbr 35,000 - 4 140,000 140,000
11 Triplek 3m lbr 55,000 10 550,000 - 550,000
12 GRC Board lbr 45,000 - - -
13 Paku camp kg 15,000 10 150,000 - 150,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gel lbr 37,000 - - -
16 Nok Gente bh 2,500 - 20 50,000 50,000
17 Nok Asbes bh 15,000 - - -
18 Bonet 60c m' 25,000 - - -
19 Keramik uk m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 1 200,000 - 200,000
21 Daun Jende bh 150,000 1 150,000 - 150,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pint set 10,000 - 1 10,000 10,000
24 Engsel Jen set 10,000 - 1 10,000 10,000
25 Kaca 3 mm lbr 75,000 - 1 75,000 75,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5 bh 5,000 3 15,000 - 15,000
28 Cat Tembok kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 7,500,000 2,865,000 10,365,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/KeHOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 7,500,000 4,545,000 12,045,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI


DAFTAR RINCIAN PENGGUNAAN DANA
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : DIDIH SUKANDI


ALAMAT : KP.LOJI RT 04/02

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 6 1,020,000 - 1,020,000
2 Semen Zak 65,000 15 975,000 - 975,000
3 Batu Kali m³ 130,000 - - -
4 Batako Tra bh 1,500 900 1,350,000 1,000 1,500,000 2,850,000
5 Kayu 6/12 btg 90,000 8 720,000 7 630,000 1,350,000
6 Kayu 5/10 btg 50,000 10 500,000 5 250,000 750,000
7 Kaso 4/6 btg 25,000 10 250,000 30 750,000 1,000,000
8 Bambu btg 10,000 - 50 500,000 500,000
9 Papan 2/2 lbr 50,000 2 100,000 - 100,000
10 Bilik lbr 35,000 - - -
11 Triplek 3m lbr 55,000 6 330,000 - 330,000
12 GRC Board lbr 45,000 - - -
13 Paku camp kg 15,000 9 135,000 - 135,000
14 Genteng bh 1,500 - 300 450,000 450,000
15 Asbes Gel lbr 37,000 - - -
16 Nok Gente bh 2,500 - - -
17 Nok Asbes bh 15,000 - - -
18 Bonet 60c m' 25,000 - - -
19 Keramik uk m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 2 400,000 2 400,000 800,000
21 Daun Jende bh 150,000 2 300,000 2 300,000 600,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pint set 10,000 1 10,000 - 10,000
24 Engsel Jen set 10,000 2 20,000 - 20,000
25 Kaca 3 mm lbr 75,000 2 150,000 - 150,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5 bh 5,000 2 10,000 - 10,000
28 Cat Tembok kaleng 50,000 3 150,000 - 150,000
29 Cat Kayu 1 kaleng 45,000 3 135,000 - 135,000
JUMLAH BAHAN Rp. 7,500,000 4,780,000 12,280,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/KeHOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 7,500,000 6,460,000 13,960,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : SAIN
ALAMAT : KP. CILEUNGSI RT 06/03

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 6 1,020,000 - 1,020,000
2 Semen Zak 65,000 15 975,000 5 325,000 1,300,000
3 Batu Kali m³ 130,000 - - -
4 Batako Tra bh 1,500 800 1,200,000 300 450,000 1,650,000
5 Kayu 6/12 btg 90,000 10 900,000 4 360,000 1,260,000
6 Kayu 5/10 btg 50,000 19 950,000 10 500,000 1,450,000
7 Kaso 4/6 btg 25,000 - 30 750,000 750,000
8 Bambu btg 10,000 17 170,000 3 30,000 200,000
9 Papan 2/2 lbr 50,000 - 5 250,000 250,000
10 Bilik lbr 35,000 - 4 140,000 140,000
11 Triplek 3m lbr 40,000 5 200,000 5 200,000 400,000
12 GRC Board lbr 45,000 - - -
13 Paku camp kg 15,000 10 150,000 - 150,000
14 Genteng bh 1,500 - 50 75,000 75,000
15 Asbes Gel lbr 37,000 - - -
16 Nok Gente bh 2,500 - 20 50,000 50,000
17 Nok Asbes bh 15,000 - - -
18 Bonet 60c m' 25,000 - - -
19 Keramik uk m² 45,000 20 900,000 10 450,000 1,350,000
20 Daun Pintu bh 200,000 1 200,000 1 200,000 400,000
21 Daun Jende bh 150,000 3 450,000 3 450,000 900,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pint set 10,000 3 30,000 - 30,000
24 Engsel Jen set 10,000 6 60,000 - 60,000
25 Kaca 3 mm lbr 75,000 - 3 225,000 225,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5 bh 5,000 2 10,000 - 10,000
28 Cat Tembok kaleng 50,000 3 150,000 - 150,000
29 Cat Kayu 1 kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 7,500,000 4,455,000 11,955,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/KeHOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 7,500,000 6,135,000 13,635,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI


DAFTAR RINCIAN PENGGUNAAN DANA
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : ENOY KINDI


ALAMAT : KP.CILEUNGSI RT 01/03

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 4 680,000 - 680,000
2 Semen Zak 65,000 10 650,000 - 650,000
3 Batu Kali m³ 130,000 - 2 260,000 260,000
4 Batako Tra bh 1,500 100 150,000 - 150,000
5 Kayu 6/12 btg 90,000 2 180,000 3 270,000 450,000
6 Kayu 5/10 btg 50,000 2 100,000 4 200,000 300,000
7 Kaso 4/6 btg 25,000 20 500,000 20 500,000 1,000,000
8 Bambu btg 10,000 10 100,000 10 100,000 200,000
9 Papan 2/2 lbr 50,000 3 150,000 3 150,000 300,000
10 Bilik lbr 35,000 - - -
11 Triplek 3m lbr 55,000 10 550,000 - 550,000
12 GRC Board lbr 55,000 15 825,000 - 825,000
13 Paku camp kg 15,000 9 135,000 - 135,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gel lbr 45,000 15 675,000 - 675,000
16 Nok Gente bh 2,500 - - -
17 Nok Asbes bh 15,000 - - -
18 Bonet 60c m' 25,000 - - -
19 Keramik uk m² 45,000 25 1,125,000 - 1,125,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jende bh 150,000 5 750,000 - 750,000
22 Kunci Pintu set 35,000 2 70,000 - 70,000
23 Engsel Pint set 10,000 2 20,000 - 20,000
24 Engsel Jen set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 2 150,000 - 150,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5 bh 5,000 2 10,000 - 10,000
28 Cat Tembok kaleng 50,000 3 150,000 - 150,000
29 Cat Kayu 1 kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 7,500,000 1,630,000 9,130,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/KeHOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 7,500,000 3,310,000 10,810,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : SUGANDI
ALAMAT : KP.CILEUNGSI RT 05/03

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 4 680,000 - 680,000
2 Semen Zak 65,000 15 975,000 - 975,000
3 Batu Kali m³ 130,000 3 390,000 - 390,000
4 Batako Tra bh 1,500 700 1,050,000 700 1,050,000 2,100,000
5 Kayu 6/12 btg 90,000 6 540,000 6 540,000 1,080,000
6 Kayu 5/10 btg 50,000 6 300,000 6 300,000 600,000
7 Kaso 4/6 btg 25,000 10 250,000 10 250,000 500,000
8 Bambu btg 10,000 10 100,000 10 100,000 200,000
9 Papan 2/2 lbr 50,000 1 50,000 - 50,000
10 Bilik lbr 35,000 4 140,000 4 140,000 280,000
11 Triplek 3m lbr 55,000 6 330,000 - 330,000
12 GRC Board lbr 45,000 7 315,000 - 315,000
13 Paku camp kg 15,000 9 135,000 - 135,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gel lbr 37,000 - - -
16 Nok Gente bh 2,500 20 50,000 - 50,000
17 Nok Asbes bh 15,000 - - -
18 Bonet 60c m' 25,000 - - -
19 Keramik uk m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jende bh 150,000 3 450,000 - 450,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pint set 10,000 2 20,000 - 20,000
24 Engsel Jen set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 2 150,000 - 150,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5 bh 5,000 2 10,000 - 10,000
28 Cat Tembok kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 7,500,000 2,530,000 10,030,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/KeHOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 7,500,000 4,210,000 11,710,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : SAEPUL
ALAMAT : Kp. CIPAOK RT 02/04

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 4 680,000 - 680,000
2 Semen Zak 65,000 10 650,000 - 650,000
3 Batu Kali m³ 130,000 3 390,000 - 390,000
4 Batako Tra bh 1,500 700 1,050,000 700 1,050,000 2,100,000
5 Kayu 6/12 btg 90,000 6 540,000 6 540,000 1,080,000
6 Kayu 5/10 btg 50,000 6 300,000 6 300,000 600,000
7 Kaso 4/6 btg 25,000 10 250,000 10 250,000 500,000
8 Bambu btg 10,000 13 130,000 10 100,000 230,000
9 Papan 2/2 lbr 50,000 1 50,000 - 50,000
10 Bilik lbr 35,000 4 140,000 4 140,000 280,000
11 Triplek 3m lbr 55,000 10 550,000 - 550,000
12 GRC Board lbr 45,000 7 315,000 - 315,000
13 Paku camp kg 15,000 9 135,000 - 135,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gel lbr 37,000 - - -
16 Nok Gente bh 2,500 20 50,000 - 50,000
17 Nok Asbes bh 15,000 - - -
18 Bonet 60c m' 25,000 - - -
19 Keramik uk m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jende bh 150,000 3 450,000 - 450,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pint set 10,000 2 20,000 - 20,000
24 Engsel Jen set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5 bh 5,000 2 10,000 - 10,000
28 Cat Tembok kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 7,500,000 2,530,000 10,030,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/KeHOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 7,500,000 4,210,000 11,710,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI


DAFTAR RINCIAN PENGGUNAAN DANA
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : SUTARNO
ALAMAT : KP.CIPAOK RT 02/04

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 4 680,000 - 680,000
2 Semen Zak 65,000 10 650,000 - 650,000
3 Batu Kali m³ 130,000 3 390,000 - 390,000
4 Batako Tra bh 1,500 800 1,200,000 700 1,050,000 2,250,000
5 Kayu 6/12 btg 90,000 7 630,000 6 540,000 1,170,000
6 Kayu 5/10 btg 50,000 6 300,000 6 300,000 600,000
7 Kaso 4/6 btg 25,000 10 250,000 10 250,000 500,000
8 Bambu btg 10,000 11 110,000 10 100,000 210,000
9 Papan 2/2 lbr 50,000 1 50,000 - 50,000
10 Bilik lbr 35,000 4 140,000 4 140,000 280,000
11 Triplek 3m lbr 55,000 6 330,000 - 330,000
12 GRC Board lbr 45,000 7 315,000 - 315,000
13 Paku camp kg 15,000 9 135,000 - 135,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gel lbr 45,000 - - -
16 Nok Gente bh 2,500 20 50,000 - 50,000
17 Nok Asbes bh 15,000 - - -
18 Bonet 60c m' 25,000 - - -
19 Keramik uk m² 45,000 20 900,000 - 900,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jende bh 150,000 3 450,000 - 450,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pint set 10,000 2 20,000 - 20,000
24 Engsel Jen set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5 bh 5,000 2 10,000 - 10,000
28 Cat Tembok kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 7,500,000 2,530,000 10,030,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/KeHOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 7,500,000 4,210,000 11,710,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : ACE
ALAMAT : KP.CIPAOK RT 04/04

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 5 850,000 3 510,000 1,360,000
2 Semen Zak 65,000 15 975,000 - 975,000
3 Batu Kali m³ 130,000 3 390,000 - 390,000
4 Batako Tra bh 1,500 700 1,050,000 800 1,200,000 2,250,000
5 Kayu 6/12 btg 90,000 10 900,000 - 900,000
6 Kayu 5/10 btg 50,000 10 500,000 - 500,000
7 Kaso 4/6 btg 25,000 11 275,000 10 250,000 525,000
8 Bambu btg 10,000 20 200,000 - 200,000
9 Papan 2/2 lbr 50,000 2 100,000 - 100,000
10 Bilik lbr 35,000 - 5 175,000 175,000
11 Triplek 3m lbr 55,000 10 550,000 - 550,000
12 GRC Board lbr - - -
13 Paku camp kg 15,000 10 150,000 - 150,000
14 Genteng bh 1,500 - 500 750,000 750,000
15 Asbes Gel lbr 45,000 15 675,000 - 675,000
16 Nok Gente bh 2,500 - - -
17 Nok Asbes bh 15,000 5 75,000 - 75,000
18 Bonet 60c m' 25,000 - - -
19 Keramik uk m² 45,000 - 20 900,000 900,000
20 Daun Pintu bh 200,000 1 200,000 - 200,000
21 Daun Jende bh 150,000 1 150,000 - 150,000
22 Kunci Pintu set 35,000 2 70,000 - 70,000
23 Engsel Pint set 10,000 1 10,000 - 10,000
24 Engsel Jen set 10,000 2 20,000 - 20,000
25 Kaca 3 mm lbr 75,000 2 150,000 - 150,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5 bh 5,000 2 10,000 - 10,000
28 Cat Tembok kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 7,500,000 3,785,000 11,285,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/KeHOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 7,500,000 5,465,000 12,965,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI


DAFTAR RINCIAN PENGGUNAAN DANA
PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : KUDUM
ALAMAT : Kp. CiHERANG GEDE RT 01/05

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 5 850,000 - 850,000
2 Semen Zak 65,000 15 975,000 - 975,000
3 Batu Kali m³ 130,000 - - -
4 Batako Tra bh 1,500 - - -
5 Kayu 6/12 btg 90,000 6 540,000 - 540,000
6 Kayu 5/10 btg 50,000 4 200,000 - 200,000
7 Kaso 4/6 btg 25,000 30 750,000 - 750,000
8 Bambu btg 10,000 - 10 100,000 100,000
9 Papan 2/2 lbr 50,000 3 150,000 - 150,000
10 Bilik lbr 35,000 - 2 70,000 70,000
11 Triplek 3m lbr 40,000 4 160,000 - 160,000
12 GRC Board lbr 45,000 10 450,000 - 450,000
13 Paku camp kg 15,000 10 150,000 - 150,000
14 Genteng bh 1,500 - 200 300,000 300,000
15 Asbes Gel lbr 50,000 18 900,000 - 900,000
16 Nok Gente bh 2,500 - 10 25,000 25,000
17 Nok Asbes bh 15,000 - - -
18 Bonet 60c m' 25,000 - 6 150,000 150,000
19 Keramik uk m² 45,000 15 675,000 - 675,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jende bh 150,000 5 750,000 - 750,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pint set 10,000 1 10,000 - 10,000
24 Engsel Jen set 10,000 2 20,000 - 20,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5 bh 5,000 2 10,000 - 10,000
28 Cat Tembok kaleng 50,000 3 150,000 - 150,000
29 Cat Kayu 1 kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 7,500,000 645,000 8,145,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/KeHOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 7,500,000 2,325,000 9,825,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEDN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : NEMI
ALAMAT : KP.CIHERANG GEDE RT 03/05

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 5 850,000 - 850,000
2 Semen Zak 65,000 15 975,000 - 975,000
3 Batu Kali m³ 130,000 - - -
4 Batako Tra bh 1,500 210 315,000 - 315,000
5 Kayu 6/12 btg 90,000 5 450,000 - 450,000
6 Kayu 5/10 btg 50,000 6 300,000 - 300,000
7 Kaso 4/6 btg 25,000 36 900,000 - 900,000
8 Bambu btg 10,000 40 400,000 - 400,000
9 Papan 2/2 lbr 50,000 2 100,000 - 100,000
10 Bilik lbr 35,000 - 4 140,000 140,000
11 Triplek 3m lbr 50,000 1 50,000 - 50,000
12 GRC Board lbr 55,000 10 550,000 - 550,000
13 Paku camp kg 15,000 10 150,000 - 150,000
14 Genteng bh 1,500 - 100 150,000 150,000
15 Asbes Gel lbr 50,000 20 1,000,000 - 1,000,000
16 Nok Gente bh 2,500 20 50,000 - 50,000
17 Nok Asbes bh 15,000 5 75,000 - 75,000
18 Bonet 60c m' 25,000 - - -
19 Keramik uk m² 45,000 15 675,000 - 675,000
20 Daun Pintu bh 200,000 2 400,000 - 400,000
21 Daun Jende bh 150,000 - - -
22 Kunci Pintu set 35,000 - - -
23 Engsel Pint set 10,000 - 2 20,000 20,000
24 Engsel Jen set 10,000 - 2 20,000 20,000
25 Kaca 3 mm lbr 75,000 - - -
26 Kuas uk 4" bh 5,000 2 10,000 - 10,000
27 Kuas uk 1,5 bh 5,000 2 10,000 - 10,000
28 Cat Tembok kaleng 50,000 3 150,000 - 150,000
29 Cat Kayu 1 kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 7500000 330000 7830000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/KeHOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 7,500,000 2,010,000 9,510,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi

DEDEN SUGANDA BABAN SUBANDI

DAFTAR RINCIAN PENGGUNAAN DANA


PEKERJAAN REHABILITASI RUMAH TIDAK LAYAK HUNI
LOKASI : DESA CILEUNGSI KECAMATAN CIAWI
KABUPATEN BOGOR - TAHUN 2014

NAMA : SADI
ALAMAT : KP.CIHERANG GEDE RT 03/05

Uraian Harga APBD Kabupaten Bogor Swadaya Masyarakat Jumlah Total


No Sat.
No Sat.
Bahan / Upah Satuan (Rp) Volume Jumlah (Rp) Volume Jumlah (Rp) (Rp)
1 2 3 4 5 6 = (4x5) 7 8 = (4x7) 9 = (6+8)
1 Pasir m³ 170,000 4 680,000 - 680,000
2 Semen Zak 65,000 13 845,000 - 845,000
3 Batu Kali m³ 130,000 - 2 260,000 260,000
4 Batako Tra bh 1,500 700 1,050,000 - 1,050,000
5 Kayu 6/12 btg 90,000 8 720,000 - 720,000
6 Kayu 5/10 btg 50,000 10 500,000 - 500,000
7 Kaso 4/6 btg 25,000 19 475,000 - 475,000
8 Bambu btg 10,000 22 220,000 - 220,000
9 Papan 2/2 lbr 50,000 2 100,000 - 100,000
10 Bilik lbr 35,000 - 4 140,000 140,000
11 Triplek 3m lbr 50,000 3 150,000 - 150,000
12 GRC Board lbr 55,000 10 550,000 - 550,000
13 Paku camp kg 15,000 10 150,000 - 150,000
14 Genteng bh 1,500 - 200 300,000 300,000
15 Asbes Gel lbr 37,000 - - -
16 Nok Gente bh 2,500 - 20 50,000 50,000
17 Nok Asbes bh 15,000 - - -
18 Bonet 60c m' 25,000 - - -
19 Keramik uk m² 45,000 18 810,000 - 810,000
20 Daun Pintu bh 200,000 1 200,000 - 200,000
21 Daun Jende bh 150,000 3 450,000 - 450,000
22 Kunci Pintu set 35,000 1 35,000 - 35,000
23 Engsel Pint set 10,000 1 10,000 - 10,000
24 Engsel Jen set 10,000 3 30,000 - 30,000
25 Kaca 3 mm lbr 75,000 3 225,000 - 225,000
26 Kuas uk 4" bh 50,000 2 100,000 - 100,000
27 Kuas uk 1,5 bh 5,000 2 10,000 - 10,000
28 Cat Tembok kaleng 50,000 2 100,000 - 100,000
29 Cat Kayu 1 kaleng 45,000 2 90,000 - 90,000
JUMLAH BAHAN Rp. 7,500,000 750,000 8,250,000
1 2 3 4 5 6 7 8 9
Upah
1 Tukang HOK 60,000 - 14 840,000 840,000
2 Pekerja/KeHOK 40,000 - 21 840,000 840,000
JUMLAH UPAH Rp. - 1,680,000 1,680,000
JUMLAH BAHAN DAN UPAH 7,500,000 2,430,000 9,930,000

Dibuat Oleh :
Penanggungjawab : Tim Pelaksana Kegiatan
Kepala Desa Cileungsi Ketua Pokja Desa Cileungsi
DEDEN SUGANDA BABAN SUGANDA