Anda di halaman 1dari 4

TAHUN ANGGARAN 2014

MOBILISASI alat 288,000,000.00


bengkel 25,000,000.00
barak 100,000,000.00

DOKUMENTASI DAN PELAPORAN 3 TAHUN :5 4,000,000.00

SURVEI DAN PENGUKURAN 3 TAHUN :5 5,000,000.00

PAPAN NAMA PROYEK 3 TAHUN :3 500,000.00

MOBIL 52,000,000.00
RUMAH 39,000,000.00
BIAYA LISTRIK 26,000,000.00

LAND CLEARING 3 TAHUN STA 3+000 3 39,398,664.00

TIMBUNAN PILIHA 3 TAHUN STA 1+100 9,945.86 322,213.00

SALURAN STA 1+100 7,238.19 25,073.00

STRIIPING STA 1+100 720.00 29,035.00


TAHUN ANGGARAN 2015

MOBILISASI alat -
bengkel -
barak -

DOKUMENTASI DAN PELAPORAN 3 TAHUN :5 8,000,000.00

SURVEI DAN PENGUKURAN 3 TAHUN :5 10,000,000.00

PAPAN NAMA PROYEK 3 TAHUN :3 500,000.00

MOBIL -
RUMAH -
BIAYA LISTRIK -

LAND CLEARING 3 TAHUN STA 6+000 + 3+035 6.035 39,398,664.00

TIMBUNAN PILIHA 3 TAHUN STA 2+200 + 3+035 60,041.53 322,213.00

SALURAN STA 2+200 + 3+035 40,659.06 25,073.00

STRIIPING STA 1+100 7,050.00 29,035.00

PREPARE TIMBUNAN PILIHAN 4+349 66,933.69 322,213.00


PREPARE SALURAN 4+349 24,318.31 25,073.00
539,500,000.00

118,195,992.00

3,204,684,921.29

181,483,062.89

20,905,200.00
4,064,769,176.18
18,500,000.00

237,770,937.24

19,346,161,719.61

1,019,444,651.53

204,696,750.00
20,826,574,058.38
24,891,343,234.55

21,566,906,526.59 21,566,906,526.59
609,732,889.41 609,732,889.41
47,067,982,650.55