Anda di halaman 1dari 2

DAFTAR GAMBAR

Gambar 2.1 Layout Galangan DRU Unit 1 8


Gambar 2.2 Lokasi PT DRU 9
Gambar 2.3 Struktur Organisasi PT DRU 10
Gambar 3.1 Alur Pembangunan Kapal 11
Gambar 3.2 Diagram Garis Mould Lofting 14
Gambar 3.3 Pemotongan Dengan Cara Manual 16
Gambar 3.4 Pemotongan Dengan Mesin CNC 16
Gambar 3.5 Mesin Rolling 17
Gambar 3.6 Mesin Press/Bending 17
Gambar 3.7 Proses Fairing 18
Gambar 3.8 Proses Sub-Assembling 18
Gambar 3.9 Proses Assembling 19
Gambar 3.10 Proses Erection 21
Gambar 3.11 Hasil Erection 21
Gambar 4.1 Scantling Check 27
Gambar 4.2 Welding Check 27
Gambar 4.3 Hydro Test 28
Gambar 4.4 Leakage Test 28
Gambar 4.5 Flushing Pipe Line 29
Gambar 4.6 Dimention Check 29
Gambar 5.1 Contoh Drawing Pembangunan Kapal dengan Sistem Blok 35
Gambar 5.2 Pipa Baja dan Galvanis 36
Gambar 5.3 Seawater Cooling Schematic 37
Gambar 5.4 Fuel Oil Schematic 38
Gambar 5.5 Bilge and Ballast Schematic 39
Gambar 6.1 Landing Ship Tank 40
Gambar 6.2 Lines plan Landing Ship Tank 41
Gambar 6.3 General Arrangement Landing Ship Tank 41
Gambar 6.4 Engine Room Lay Out 42
Gambar 6.5 Proses sebelum peluncuran 43

iv
Gambar 6.6 Proses sea trial 43
Gambar 7.1 Air Bag 46
Gambar 7.2 Struktur air bag 47
Gambar 7.3 Air Bag 50
Gambar 7.4 Air Bag yang sudah terisi udara 50
Gambar 7.5 Platform yang sudah terlepas dari bantalan 51
Gambar 7.6 Pendorongan dengan menggunakan forklift 51
Gambar 7.7 Doa bersama 52
Gambar 7.8 Proses peluncuran 53

Anda mungkin juga menyukai