REKAPITULASI TULANGAN KOLOM

TULANGAN SENGKANG TUMPUAN SENGKANG ℓ0


UTAMA
LANTAI 1 - 2
Kolom Sudut 20 D 22 4 D 13 - 100 6 D 13 - 300 750 mm
Kolom Tepi 24 D 22 6 D 13 - 100 6 D 13 - 200 750 mm
Kolom Tengah 28 D 22 4 D 13 - 100 6 D 13 - 300 750 mm
LANTAI 3 - 4
Kolom Sudut 16 D 22 4 D 13 - 100 6 D 13 - 350 700 mm
Kolom Tepi 20 D 22 5 D 13 - 100 6 D 13 - 250 700 mm
Kolom Tengah 24 22 6 13 100 6 13 200 700 mm
LANTAI 5 - 6
Kolom Sudut 5 D 22 5 D 22 - 100 5 D 22 - 100 mm
Kolom Tepi mm
Kolom Tengah mm
LANTAI 7
Kolom Sudut 5 D 22 5 D 22 - 100 5 D 22 - 100 mm
Kolom Tepi mm
Kolom Tengah mm
LANTAI 8
Kolom Sudut 5 D 22 5 D 22 - 100 5 D 22 - 100 mm
LIFT
Kolom Sudut 8 D 19 3 D 13 - 75 2 D 13 - 200 550 mm
Kolom Tepi 16 19 6 13 100 2 13 200 550 mm
PERHITUNGAN KOLOM TEPI

BL 1 BL2

BL 3

Data :
B = 300 mm =
H = 450 mm =
L Kolom = 3600 mm =
P = 40 mm
f'c = 30 MPa
b1 = 0.85
fy = 400 MPa
Dia. Tul Utama = 19 mm
Dia. Sengkang = 13 mm
d = 387.5 mm
d' = 62.5 mm
As Tul Utama = 283.528737 mm²
As Tul Sengkang = 132.73229 mm²
Ec = 25742.9602
Dimensi Balok BL 1 :
H = 300 mm
B = 250 mm
L = 2000 mm
Dimensi Balok BU2 :
H = 300 mm
B = 250 mm
L = 2000 mm
Dimensi Balok BU3 :
H = 300 mm
B = 250 mm
L = 2000 mm

1. Hasil Analisa Struktur


Kombinasi Atas
P M2 M3
No Kombinasi
KN KNm KNm
1 1,4 D 1233.844 10.367 36.649
2 1,2 D + 1,6 L + 0,5 R 1333.151 10.647 41.947
3 1,2 D + 1,6 R + 0,5 WKA 1048.230 9.637 31.930
4 1,2 D + 1,6 R + 0,5 WKI 1066.817 9.377 30.958
5 1,2 D + 1,0 WKA + L + 0,5 R 1211.083 12.368 39.458
6 1,2 D + 1,0 WKI + L + 0,5 R 45.000 12.469 37.085
7 1,2 D + 1,0 (100%Fx + 30%Fy) + L 1517.892 33.651 40.712
8 1,2 D + 1,0 (30%Fx + 100%Fy) + L 1309.561 111.266 32.789
9 0,9 D + 1,0 WKA 774.455 9.972 25.326
10 0,9 D + 1,0 WKI 811.628 10.134 22.649
11 0,9 D + 1,0 (100%Fx + 30%Fy) 1081.269 33.669 40.296
12 0,9 D + 1,0 (30%Fx + 100%Fy) 872.937 111.284 18.352
Nilai Maksimum 1517.892 111.266 41.947

Kombinasi Bawah
P M2 M3
No Kombinasi
KN KNm KNm
13 1,4 D 1244.829 10.749 43.827
14 1,2 D + 1,6 L + 0,5 R 1342.567 11.101 50.173
15 1,2 D + 1,6 R + 0,5 WKA 1057.646 10.277 38.064
16 1,2 D + 1,6 R + 0,5 WKI 1076.233 10.348 37.060
17 1,2 D + 1,0 WKA + L + 0,5 R 1220.499 13.991 46.799
18 1,2 D + 1,0 WKI + L + 0,5 R 1257.672 14.073 44.433
19 1,2 D + 1,0 (100%Fx + 30%Fy) + L 1527.308 40.371 56.024
20 1,2 D + 1,0 (30%Fx + 100%Fy) + L 1318.977 133.421 39.571
21 0,9 D + 1,0 WKA 781.517 11.276 30.002
22 0,9 D + 1,0 WKI 818.690 11.713 27.162
23 0,9 D + 1,0 (100%Fx + 30%Fy) 1088.331 40.388 54.504
24 0,9 D + 1,0 (30%Fx + 100%Fy) 879.999 133.437 23.245
Nilai Maksimum 1527.308 133.421 56.024

2. Perhtungan Tulangan Utama


Cek Gaya Aksial Ultimit
Pu = 1527.3081 KN
Pu > 0.1 x Ag x f'c
1527308.1 > 405000 OK

Cek Dimensi Penampang


B > 300
300 > 300 OK

Cek Rasio Penampang


B/H > 0.4
0.6666666667 > 0.4 OK
Cek Penampang Kolom Terhadap Panjang
Ig kolom = 0.7 x 1/12 x b x h^3
= 1594687500 mm4
EI Kolom = Ec x Ig (Dimensi Kolom Atas dan Bawah Sama)
= 41051976848312
Ig BU1 = 0.35 x 1/12 x b x h^3
= 196875000 mm4
EI BU1 = Ec x Ig
= 5068145289914.99
Ig BU2 = 0.35 x 1/12 x b x h^3
= 196875000 mm4
EI BU2 = Ec x Ig
= 5068145289914.99
Ig BU3 = 0.35 x 1/12 x b x h^3
= 196875000 mm4
EI BU3 = Ec x Ig
= 5068145289914.99
yA = ƩEI kolom / L kolom
ƩEI balok / L balok
= 3.000
yB = 1 (Tumpuan Jepit)

Maka,
K = 1.58
r = 0.3 x h
= 135 mm
Lu = L Kolom - H Balok
= 3300 mm

Cek,
K x Lu / r > 22
38.622 > 22 Kolom Langsing

Perencanaan Tulangan Utama


ρ = 3.7%
As perlu = rxbxd
= 4301.25 mm2
As D 19 = 1/4 x π x D^2
= 283.528737 mm2
n = As perlu
As D 19
= 15.1704199
= 16 buah
As terpasang = n x As D 19
= 4536.45979
r = As terpasang / (b x d )
3.902331 %
ρ min = 1%
ρ maks = 6%
Cek,
ρ min < r < ρ maks OK

P ( kN)
4000
(P ma x)

7 19
2 14 8 20
1138
15 1 7fs =0
43 111651 2 3
1902221 fs =0 .5 fy 12 24

6
-1 8 0 180
Mx (k N -m)

(P min )
6
-1 8 0 180

Mx (k N -m)

(P min )
-2 0 0 0

Factored Loads and Moments with Corres 1641.7


Pu Phi Mnx
NO
kN kN.m
1 1233.844 158.100
2 1333.151 156.500
3 1048.230 161.100
4 1066.817 160.800
5 1211.083 158.500
6 45.000 167.400
7 1517.892 153.100
8 1309.561 156.900
9 774.455 169.600
10 811.628 168.400
11 1081.269 160.500
12 872.937 166.200
13 1244.829 158.000
14 1342.567 156.300
15 1057.646 161.000
16 1076.233 160.500
17 1220.499 158.300
18 1257.672 157.800
19 1527.308 152.900
20 1318.977 156.700
21 781.517 169.400
22 818.690 168.200
23 1088.331 160.400
24 879.999 166.000

Dari Hasil Analisa diatas, didapat:


Mnx max = 152.900 KNm

3. Cek Kekuatan Kolom Terhadap Balok


Dimensi Balok Kiri = Kanan
kiri kanan
atas (-) 8D22 8D22
a (mm) 119.257 75.694
300 Mn (kN) 88.003 88.003
bawah (+) 6D22 6D22
a (mm) 50.463 50.463
250 Mn (kN) 69.734 69.734

Atas Kiri Bawah Kiri


D 16 mm D 16
n 6 n 4
As 1206.372 mm2 As 804.247719
sengkang 10 mm
d 242 mm
Atas Kanan Bawah Kanan
D 16 mm D 16
n 6 n 4
As 1206.372 mm2 As 804.247719
sengkang 10 mm
d 242 mm

- Cek Kekuatan Kolom Terhadap Balok


∑ Me > (6/5) ∑ Mg
∑ Me = 339.000
∑ Mg 1 = 157.737
∑ Mg 2 = 145.428
∑ Mg = 157.737
(6/5) ∑ Mg = 189.285

∑ Me > (6/5) ∑ Mg OK

4. Perhitungan Tulangan Geser


Nilai Fy dikalikan dengan 1.25 maka :
Fy = 500 Mpa

NO Pu Phi Mprx
kN kN.m
1 1233.844 253.000
2 1333.151 251.700
3 1048.230 254.800
4 1066.817 255.200
5 1211.083 253.300
6 45.000 215.300
7 1517.892 249.200
8 1309.561 252.000
9 774.455 247.000
10 811.628 248.100
11 1081.269 255.000
12 872.937 249.900
13 1244.829 252.900
14 1342.567 251.600
15 1057.646 255.100
16 1076.233 255.100
17 1220.499 253.200
18 1257.672 252.700
19 1527.308 249.000
20 1318.977 251.900
21 781.517 247.200
22 818.690 248.300
23 1088.331 254.900
24 879.999 250.100

Dari Hasil Analisa diatas, didapat:


Mprx = 215.300 KNm

Gaya Geser Rencana


å Mpr = 2 x Mpr
= 430.6 KNm

Ve = å Mpr / Ln
= 130.4848484848 KN
Vs = Ve / Ø
= 173.9797979798 KN

Jarak Tulangan Geser


Tumpuan
Sengkang tertutup (Sepanjang ℓ0 dari muka HBK)
ℓ0 = H Kolom = 450 mm
ℓ0 = 1/6 Ln = 550.000 mm
ℓ0 = 500 = 500 mm

Dipakai ℓ0 = 550 mm

Jarak Sengkang Minimum


S = 6D Tul = 114 mm
S = 1/4 H Kolom = 112.5 mm
S = 100 = 100 mm
Dipakai S = 100 mm

Av = Vs x S
fy x d
= 112.2450309547 mm2

hc = H Kolom - 2xP - Dia. Skg


= 357 mm
bc = B Kolom - 2xP - Dia. Skg
= 207 mm
Ag = BxH
= 135000 mm2
Ae = bc x hc
= 73899 mm2

Ash 1 = 0.3 x ( S x hc x f'c / fyh ) x ((Ag/Ae) - 1)


= 664.1413043478 mm2
Ash 2 = 0.09 x ( S x hc x f'c / fy )
= 240.975 mm2
Maka,
Ash = 664.141 mm2

Cek Av Terhadap Ash untuk Penentuan Hoops


Av = 112.245 mm2
Ash = 664.141 mm2
Maka, Digunakan
Av = 664.141 mm2
As Sengkang = 1/4 x π x D^2
= 132.732 mm2
Jumlah Kaki Sengkang,
n = Av / As sengkang
= 5.004
= 6 buah

Pada Lapangan
Ln/2 - lo = Vs Lap
Ln/2 Vs
1100 = Vn Lap
1650 173.9798
Vn Lap = 115.987 KN
d lapangan = 388
Jarak Tulangan:
S1 = 48 x Dia. Sengkang
= 624 mm
S2 = 15 X Dia. Tulangan
= 285 mm
S3 = 300 mm
S4 = Dimensi Terkecil antara B atau H
= 300 mm

Digunakan,
S = 200 mm
As Sengkang = 1/4 x π x D2
= 132.732 mm2
Av Perlu = Vs x S
fy x d
= 149.660 mm2
n = Av
As Sengkang
= 1.128
= 2.000 buah

Rekapitulasi Penulangan KT1


Tul. Utama 16 D 19
Sengkang
6 D 13 - 100
Tump
Sengkang Lap 2 D 13 - 200
0.3 m
0.45 m
3.6 m
mm

mm2

mm

mm2
PERHITUNGAN KOLOM SUDUT

BL 1

BL 2

Data :
B = 300 mm =
H = 300 mm =
L Kolom = 3600 mm =
P = 40 mm
f'c = 30 MPa
b1 = 0.85
fy = 400 MPa
Dia. Tul Utama = 19 mm
Dia. Sengkang = 13 mm
d = 237.5 mm
d' = 62.5 mm
As Tul Utama = 283.528737 mm²
As Tul Sengkang = 132.73229 mm²
Ec = 25742.9602
Dimensi Balok BL1 :
H = 300 mm
B = 250 mm
L = 2000 mm
Dimensi Balok BL2 :
H = 300 mm
B = 250 mm
L = 2000 mm
1. Hasil Analisa Struktur
Kombinasi Atas
P M2 M3
No Kombinasi
KN KNm KNm
1 1,4 D 595.638 15.236 15.097
2 1,2 D + 1,6 L + 0,5 R 650.164 17.188 17.115
3 1,2 D + 1,6 R + 0,5 WKA 495.032 13.488 13.428
4 1,2 D + 1,6 R + 0,5 WKI 525.135 12.659 12.365
5 1,2 D + 1,0 WKA + L + 0,5 R 566.755 16.961 16.954
6 1,2 D + 1,0 WKI + L + 0,5 R 626.962 14.839 14.399
7 1,2 D + 1,0 (100%Fx + 30%Fy) + L 944.100 34.567 36.676
8 1,2 D + 1,0 (30%Fx + 100%Fy) + L 813.853 25.818 27.476
9 0,9 D + 1,0 WKA 357.587 11.572 11.509
10 0,9 D + 1,0 WKI 412.063 9.285 8.734
11 0,9 D + 1,0 (100%Fx + 30%Fy) 729.205 39.211 40.771
12 0,9 D + 1,0 (30%Fx + 100%Fy) 598.958 26.101 27.221
Nilai Maksimum 944.100 39.211 40.771

Kombinasi Bawah
P M2 M3
No Kombinasi
KN KNm KNm
1 1,4 D 603.8766 18.1864 17.9082
2 1,2 D + 1,6 L + 0,5 R 657.226 20.3992 20.3299
3 1,2 D + 1,6 R + 0,5 WKA 502.0938 15.9789 15.9283
4 1,2 D + 1,6 R + 0,5 WKI 532.1971 15.4401 14.9715
5 1,2 D + 1,0 WKA + L + 0,5 R 573.8167 19.9137 19.9039
6 1,2 D + 1,0 WKI + L + 0,5 R 634.0233 18.0663 17.5181
7 1,2 D + 1,0 (100%Fx + 30%Fy) + L 951.1621 44.5258 48.8135
8 1,2 D + 1,0 (30%Fx + 100%Fy) + L 820.9147 31.4594 35.4487
9 0,9 D + 1,0 WKA 362.8831 13.5371 13.4876
10 0,9 D + 1,0 WKI 417.3589 11.3929 10.8759
11 0,9 D + 1,0 (100%Fx + 30%Fy) 734.5015 49.8201 52.6707
12 0,9 D + 1,0 (30%Fx + 100%Fy) 604.254 32.2407 34.9076
Nilai Maksimum 951.1621 49.8201 52.6707

2. Perhtungan Tulangan Utama


Cek Gaya Aksial Ultimit
Pu = 951.1621 KN
Pu > 0.1 x Ag x f'c
951162.1 > 270000 OK

Cek Dimensi Penampang


B > 300
300 > 300 OK

Cek Rasio Penampang


B/H > 0.4
1 > 0.4 OK
Cek Penampang Kolom Terhadap Panjang
Ig kolom = 0.7 x 1/12 x b x h^3
= 472500000 mm4
EI Kolom = Ec x Ig (Dimensi Kolom Atas dan Bawah Sama)
= 12163548695796
Ig BU1 = 0.35 x 1/12 x b x h^3
= 196875000 mm4
EI BU1 = Ec x Ig
= 5068145289914.99
Ig BU2 = 0.35 x 1/12 x b x h^3
= 196875000 mm4
EI BU2 = Ec x Ig
= 5068145289914.99

yA = ƩEI kolom / L kolom


ƩEI balok / L balok
= 1.333
yB = 1 (Tumpuan Jepit)

Maka,
K = 1.33
r = 0.3 x h
= 90 mm
Lu = L Kolom - H Balok
= 3300 mm

Cek,
K x Lu / r > 22
48.767 > 22 Kolom Langsing

Perencanaan Tulangan Utama


ρ = 3.0%
As perlu = rxbxd
= 2137.5 mm2
As D 19 = 1/4 x π x D^2
= 283.528737 mm2
n = As perlu
As D 19
= 7.53891836
= 8 buah
As terpasang = n x As D 19
= 2268.2299
r = As terpasang / (b x d )
3.18348056 %
ρ min = 1%
ρ maks = 6%
Cek,
ρ min < r < ρ maks OK

P ( kN)
2500
(P ma x)

7 19
8 20
fs =01 1 23
118
6121 3
4
1 2 2 4
4315 17 fs =0 .5 fy
165
1202
92 1

-1 2 0 120
Mx (k N -m)

(P min )
-1 0 0 0

Factored Loads and Moments with Corresponding Capacities:


Pu Phi Mnx
NO
kN kN.m
1 595.638 103.300
2 650.164 101.100
3 495.032 106.300
4 525.135 105.500
5 566.755 104.300
6 626.962 102.100
7 944.100 96.200
8 813.853 98.200
9 357.587 108.700
10 412.063 107.900
11 729.205 99.300
12 598.958 103.200
13 603.877 103.000
14 657.226 100.700
15 502.094 106.100
16 532.197 105.300
17 573.817 104.100
18 634.023 101.800
19 951.162 96.000
20 820.915 98.100
21 362.883 108.600
22 417.359 107.800
23 734.502 99.300
24 604.254 103.000

Dari Hasil Analisa diatas, didapat:


Mnx max = 96.000 KNm

3. Cek Kekuatan Kolom Terhadap Balok

kiri
atas (-) 8D22
a (mm) 119.257
300 Mn (kN) 88.003

bawah (+) 6D22


a (mm) 50.463
250 Mn (kN) 69.734

Atas Kiri Bawah Kiri


D 16 mm D 16
n 6 n 4
As 1206.372 mm2 As 804.247719
sengkang 10 mm
d 242 mm

- Cek Kekuatan Kolom Terhadap Balok


∑ Me > (6/5) ∑ Mg
∑ Me = 217.300
∑ Mg 1 = 88.003
∑ Mg 2 = 69.734
∑ Mg = 88.003
(6/5) ∑ Mg = 105.604

∑ Me > (6/5) ∑ Mg OK

4. Perhitungan Tulangan Geser


Nilai Fy dikalikan dengan 1.25 maka :
Fy = 500 Mpa

NO Pu Phi Mprx
kN kN.m
1 595.638 148.900
2 650.164 151.300
3 495.032 144.500
4 525.135 145.800
5 566.755 147.700
6 626.962 150.300
7 944.100 155.000
8 813.853 156.400
9 357.587 137.900
10 412.063 140.500
11 729.205 154.500
12 598.958 149.100
13 603.877 149.300
14 657.226 151.600
15 502.094 144.800
16 532.197 146.100
17 573.817 148.000
18 634.023 150.600
19 951.162 155.000
20 820.915 156.300
21 362.883 138.100
22 417.359 140.800
23 734.502 154.600
24 604.254 149.300

Dari Hasil Analisa diatas, didapat:


Mprx = 137.900 KNm

Gaya Geser Rencana


å Mpr = 2 x Mpr
= 275.8 KNm

Ve = å Mpr / Ln
= 83.57575757576 KN
Vs = Ve / Ø
= 111.4343434343 KN

Jarak Tulangan Geser


Tumpuan
Sengkang tertutup (Sepanjang ℓ0 dari muka HBK)
ℓ0 = H Kolom = 300 mm
ℓ0 = 1/6 Ln = 550.000 mm
ℓ0 = 500 = 500 mm

Dipakai ℓ0 = 550 mm

Jarak Sengkang Minimum


S = 6D Tul = 114 mm
S = 1/4 H Kolom = 75 mm
S = 100 = 100 mm

Dipakai S = 75 mm

Av = Vs x S
fy x d
= 87.97448165869 mm2

hc = H Kolom - 2xP - Dia. Skg


= 207 mm
bc = B Kolom - 2xP - Dia. Skg
= 207 mm
Ag = BxH
= 90000 mm2
Ae = bc x hc
= 42849 mm2
Ash 1 = 0.3 x ( S x hc x f'c / fyh ) x ((Ag/Ae) - 1)
= 384.3831521739 mm2
Ash 2 = 0.09 x ( S x hc x f'c / fy )
= 104.79375 mm2
Maka,
Ash = 384.383 mm2

Cek Av Terhadap Ash untuk Penentuan Hoops


Av = 87.974 mm2
Ash = 384.383 mm2
Maka, Digunakan
Av = 384.383 mm2
As Sengkang = 1/4 x π x D^2
= 132.732 mm2
Jumlah Kaki Sengkang,
n = Av / As sengkang
= 2.896
= 3 buah

Pada Lapangan
Ln/2 - lo = Vs Lap
Ln/2 Vs
1100 = Vn Lap
1650 111.4343
Vn Lap = 74.290 KN
d lapangan = 238

Jarak Tulangan:
S1 = 48 x Dia. Sengkang
= 624 mm
S2 = 15 X Dia. Tulangan
= 285 mm
S3 = 300 mm
S4 = Dimensi Terkecil antara B atau H
= 300 mm

Digunakan,
S = 200 mm
As Sengkang = 1/4 x π x D2
= 132.732 mm2
Av Perlu = Vs x S
fy x d
= 156.399 mm2
n = Av
As Sengkang
= 1.178
= 2.000 buah

Rekapitulasi Penulangan KT1


Tul. Utama 8 D 19
Sengkang
3 D 13 - 75
Tump
Sengkang Lap 2 D 13 - 200
0.3 m
0.3 m
3.6 m
wah Sama)
mm
mm2
PERHITUNGAN KOLOM TEPI

BU 1

BU4 BU 2

BU3
Data :
B = 700 mm =
H = 700 mm =
L Kolom = 3600 mm =
P = 40 mm
f'c = 30 MPa
b1 = 0.85
fy = 400 MPa
Dia. Tul Utama = 22 mm
Dia. Sengkang = 13 mm
d = 636 mm
d' = 64 mm
As Tul Utama = 380.132711 mm²
As Tul Sengkang = 132.73229 mm²
Ec = 25742.9602
Dimensi Balok BU1 :
H = 650 mm
B = 400 mm
L = 8000 mm
Dimensi Balok BU2 :
H = 650 mm
B = 400 mm
L = 8000 mm
Dimensi Balok BU3 :
H = 650 mm
B = 400 mm
L = 8000 mm
Dimensi Balok BU4 :
H = 650 mm
B = 400 mm
L = 8000 mm
1. Hasil Analisa Struktur
Kombinasi Atas
P M2 M3
No Kombinasi
KN KNm KNm
1 1,4 D 4599.905 103.837 112.171
2 1,2 D + 1,6 L + 0,5 R 5239.149 124.977 133.670
3 1,2 D + 1,6 R + 0,5 WKA 3942.950 98.347 83.496
4 1,2 D + 1,6 R + 0,5 WKI 3942.947 104.136 109.602
5 1,2 D + 1,0 WKA + L + 0,5 R 4752.981 133.291 110.235
6 1,2 D + 1,0 WKI + L + 0,5 R 4752.974 141.753 146.509
7 1,2 D + 1,0 (100%Fx + 30%Fy) + L 4754.564 229.729 455.470
8 1,2 D + 1,0 (30%Fx + 100%Fy) + L 4754.300 452.453 240.141
9 0,9 D + 1,0 WKA 2957.031 90.500 76.175
10 0,9 D + 1,0 WKI 2957.023 97.018 99.020
11 0,9 D + 1,0 (100%Fx + 30%Fy) 2959.679 185.268 408.765
12 0,9 D + 1,0 (30%Fx + 100%Fy) 2959.415 407.992 193.436
Nilai Maksimum 5239.149 452.453 455.470

Kombinasi Bawah
P M2 M3
No Kombinasi
KN KNm KNm
13 1,4 D 4655.573 185.165 182.217
14 1,2 D + 1,6 L + 0,5 R 5286.864 221.090 217.239
15 1,2 D + 1,6 R + 0,5 WKA 3990.666 143.334 142.526
16 1,2 D + 1,6 R + 0,5 WKI 3990.662 174.660 171.123
17 1,2 D + 1,0 WKA + L + 0,5 R 4800.697 178.658 169.319
18 1,2 D + 1,0 WKI + L + 0,5 R 4800.689 229.591 224.219
19 1,2 D + 1,0 (100%Fx + 30%Fy) + L 4802.279 356.985 657.161
20 1,2 D + 1,0 (30%Fx + 100%Fy) + L 4802.015 643.850 362.550
21 0,9 D + 1,0 WKA 2992.817 117.058 98.086
22 0,9 D + 1,0 WKI 2992.810 150.927 147.014
23 0,9 D + 1,0 (100%Fx + 30%Fy) 2995.465 278.321 579.957
24 0,9 D + 1,0 (30%Fx + 100%Fy) 2995.201 565.187 285.345
Nilai Maksimum 5286.864 643.850 657.161

2. Perhtungan Tulangan Utama


Cek Gaya Aksial Ultimit
Pu = 5286.8641 KN
Pu > 0.1 x Ag x f'c
5286864.1 > 1470000 OK

Cek Dimensi Penampang


B > 300
700 > 300 OK

Cek Rasio Penampang


B/H > 0.4
1 > 0.4 OK
Cek Penampang Kolom Terhadap Panjang
Ig kolom = 0.7 x 1/12 x b x h^3
= 14005833333.33 mm4
EI Kolom = Ec x Ig (Dimensi Kolom Atas dan Bawah Sama)
= 360551610106249
Ig BU1 = 0.35 x 1/12 x b x h^3
= 3203958333.333 mm4
EI BU1 = Ec x Ig
= 82479371866246.20
Ig BU2 = 0.35 x 1/12 x b x h^3
= 3203958333 mm4
EI BU2 = Ec x Ig
= 82479371866246.20
Ig BU3 = 0.35 x 1/12 x b x h^3
= 3203958333.333 mm4
EI BU3 = Ec x Ig
= 82479371866246.20
Ig BU4 = 0.35 x 1/12 x b x h^3
= 3203958333 mm4
EI BU4 = Ec x Ig
= 82479371866246.20
yA = ƩEI kolom / L kolom
ƩEI balok / L balok
= 4.857
yB = 1 (Tumpuan Jepit)
Maka,
K = 1.69
r = 0.3 x h
= 210 mm
Lu = L Kolom - H Balok
= 2950 mm

Cek,
K x Lu / r > 22
23.740 > 22 Kolom Langsing

Perencanaan Tulangan Utama


ρ = 2.0%
As perlu = ρ xbxd
= 8904 mm2
As D 22 = 1/4 x π x D^2
= 380.132711 mm2
n = As perlu
As D 22
= 23.4233986
= 24 buah
As terpasang = n x As D 22
= 9123.18507
ρ = As terpasang / (b x d )
2.04923294 %
ρ min = 1%
ρ maks = 6%
Cek,
ρ min < r < ρ maks OK

P ( kN)
12000 (P ma x)

2 14
1 71 8 2109
156 1 3 87
2 14
1 71 8 2109
156 1 3 fs =0 87
341156
fs =0 .5 fy
9120212 121 2243

-1 8 0 0 1800

Mx (k N -m)

(P min )
-4 0 0 0

Factored Loads and Moments with Corresponding Capacities:


Pu Phi Mnx
NO
kN kN.m
1 4599.905 1598.000
2 5239.149 1242.100
3 3942.950 1747.500
4 3942.947 1747.500
5 4752.981 1560.300
6 4752.974 1560.300
7 4754.564 1559.800
8 4754.300 1559.800
9 2957.031 1625.700
10 2957.023 1625.700
11 2959.679 1626.100
12 2959.415 1626.100
13 4655.573 1584.500
14 5286.864 1238.600
15 3990.666 1738.200
16 3990.662 1738.200
17 4800.697 1548.100
18 4800.689 1548.100
19 4802.279 1547.600
20 4802.015 1547.600
21 2992.817 1631.800
22 2992.810 1631.800
23 2995.465 1632.300
24 2995.201 1632.300
Dari Hasil Analisa diatas, didapat:
Mnx max = 1238.600 KNm

3. Cek Kekuatan Kolom Terhadap Balok


Dimensi Balok Kiri = Kanan
kiri kanan
atas (-) 13D22 13D22
a (mm) 119.257 193.793
650 Mn (kN) 1040.473 1040.473

bawah (+) 7D22 7D22


a (mm) 104.350 104.350
400 Mn (kN) 568.188 568.188

Atas Kiri Bawah Kiri


D 22 mm D 22
n 13 n 7
As 4941.725 mm2 As 2660.92898
sengkang 13 mm
d 586 mm
Atas Kanan Bawah Kanan
D 22 mm D 22
n 13 n 7
As 4941.725 mm2 As 2660.92898
sengkang 10 mm
d 586 mm

- Cek Kekuatan Kolom Terhadap Balok


∑ Me > (6/5) ∑ Mg
∑ Me = 2480.700
∑ Mg 1 = 1608.661
∑ Mg 2 = 1608.661
∑ Mg = 1608.661
(6/5) ∑ Mg = 1930.394

∑ Me > (6/5) ∑ Mg OK

4. Perhitungan Tulangan Geser


Nilai Fy dikalikan dengan 1.25 maka :
Fy = 500 Mpa

NO Pu Phi Mprx
kN kN.m
1 4599.905 2162.600
2 5239.149 2236.300
3 3942.950 2078.100
4 3942.947 2078.100
5 4752.981 2181.100
6 4752.974 2181.100
7 4754.564 2181.300
8 4754.300 2181.300
9 2957.031 1886.300
10 2957.023 1886.300
11 2959.679 1919.600
12 2959.415 1919.600
13 4655.573 2169.400
14 5286.864 2241.300
15 3990.666 2084.600
16 3990.662 2084.600
17 4800.697 2186.800
18 4800.689 2186.800
19 4802.279 2187.000
20 4802.015 2187.000
21 2992.817 1925.700
22 2992.810 1925.700
23 2995.465 1926.200
24 2995.201 2480.600

Dari Hasil Analisa diatas, didapat:


Mprx = 1886.300 KNm

Gaya Geser Rencana


å Mpr = 2 x Mpr
= 3772.6 KNm

Ve = å Mpr / Ln
= 1278.847457627 KN
Vs = Ve / Ø
= 1705.129943503 KN

Jarak Tulangan Geser


Tumpuan
Sengkang tertutup (Sepanjang ℓ0 dari muka HBK)
ℓ0 = H Kolom = 700 mm
ℓ0 = 1/6 Ln = 491.667 mm
ℓ0 = 500 = 500 mm

Dipakai ℓ0 = 700 mm

Jarak Sengkang Minimum


S = 6D Tul = 132 mm
S = 1/4 H Kolom = 175 mm
S = 100 = 100 mm

Dipakai S = 100 mm

Av = Vs x S
fy x d
= 670.2554809366 mm2

hc = H Kolom - 2xP - Dia. Skg


= 607 mm
bc = B Kolom - 2xP - Dia. Skg
= 607 mm
Ag = BxH
= 490000 mm2
Ae = bc x hc
= 368449 mm2

Ash 1 = 0.3 x ( S x hc x f'c / fyh ) x ((Ag/Ae) - 1)


= 450.5597199341 mm2
Ash 2 = 0.09 x ( S x hc x f'c / fy )
= 409.725 mm2
Maka,
Ash = 450.560 mm2

Cek Av Terhadap Ash untuk Penentuan Hoops


Av = 670.255 mm2
Ash = 450.560 mm2
Maka, Digunakan
Av = 670.255 mm2
As Sengkang = 1/4 x π x D^2
= 132.732 mm2
Jumlah Kaki Sengkang,
n = Av / As sengkang
= 5.050
= 6 buah

Pada Lapangan
Ln/2 - lo = Vs Lap
Ln/2 Vs
775 = Vn Lap
1475 1705.1299
Vn Lap = 895.916 KN
d lapangan = 636

Jarak Tulangan:
S1 = 48 x Dia. Sengkang
= 624 mm
S2 = 15 X Dia. Tulangan
= 330 mm
S3 = 300 mm
S4 = Dimensi Terkecil antara B atau H
= 700 mm

Digunakan,
S = 200 mm
As Sengkang = 1/4 x π x D2

= 132.732 mm2
Av Perlu = Vs x S
fy x d
= 704.336 mm2
n = Av
As Sengkang
= 5.306
= 6.000 buah

Rekapitulasi Penulangan KT1


Tul. Utama 24 D 22
Sengkang
6 D 13 - 100
Tump
Sengkang Lap 6 D 13 - 200
0.7 m
0.7 m
3.6 m
1800

Mx (k N-m)

=========================================================
Pu Mux fMnx
No. kN kN-m kN-m fMn/Mu
--- ------------ ------------ ------------ --------
1 4599.0 112.0 1286.2 11.484
2 5239.0 133.0 1242.1 9.339
3 3942.0 98.0 1430.5 14.597
4 3942.0 109.0 1430.5 13.124
5 4752.0 133.0 1276.2 9.596
6 4752.0 146.0 1276.2 8.741
7 4754.0 455.0 1276.1 2.805
8 4754.0 452.0 1276.1 2.823
9 2957.0 90.0 1579.0 17.544
10 2957.0 99.0 1579.0 15.949
11 2959.0 408.0 1579.2 3.871
12 2959.0 407.0 1579.2 3.880
13 4655.0 185.0 1282.6 6.933
14 5286.0 221.0 1238.6 5.604
15 3990.0 143.0 1419.4 9.926

06/06/18 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page


18:58:00 Licensed to: ajeng KOLOMTENGAH34

16 3990.0 174.0 1419.4 8.158


17 4800.0 178.0 1273.0 7.152
18 4800.0 229.0 1273.0 5.559
19 4802.0 657.0 1272.9 1.937
20 4802.0 643.0 1272.9 1.980
21 2992.0 117.0 1583.6 13.535
22 2992.0 150.0 1583.6 10.557
23 2995.0 579.0 1584.0 2.736
24 2995.0 565.0 1584.0 2.803

mm

mm2

mm

mm2
Factored Loads and Moments with Corresponding Capacities: (see user's manual for notation)
=========================================================
Pu Mux fMnx
No. kN kN-m kN-m fMn/Mu
--- ------------ ------------ ------------ --------
1 4599.0 112.0 2060.3 18.395
2 5239.0 133.0 2096.2 15.761
3 3942.0 98.0 1999.7 20.405
4 3942.0 109.0 1999.7 18.346
5 4752.0 133.0 2071.0 15.572
6 4752.0 146.0 2071.0 14.185
7 4754.0 455.0 2071.1 4.552
8 4754.0 452.0 2071.1 4.582
9 2957.0 90.0 1886.3 20.958
10 2957.0 99.0 1886.3 19.053
11 2959.0 408.0 1886.5 4.624
12 2959.0 407.0 1886.5 4.635
13 4655.0 185.0 2065.1 11.163
14 5286.0 221.0 2098.5 9.495
15 3990.0 143.0 2004.4 14.016

06/06/18 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 3


19:01:09 Licensed to: ajeng KOLOMTENGAH34

16 3990.0 174.0 2004.4 11.519


17 4800.0 178.0 2073.6 11.650
18 4800.0 229.0 2073.6 9.055
19 4802.0 657.0 2073.8 3.156
20 4802.0 643.0 2073.8 3.225
21 2992.0 117.0 1891.2 16.164
22 2992.0 150.0 1891.2 12.608
23 2995.0 579.0 1891.7 3.267
24 2995.0 565.0 1891.7 3.348
Page 3
TENGAH34
PERHITUNGAN KOLOM TEPI

BU 1 BU2

BU 3

Data :
B = 700 mm =
H = 700 mm =
L Kolom = 3600 mm =
P = 40 mm
f'c = 30 MPa
b1 = 0.85
fy = 400 MPa
Dia. Tul Utama = 22 mm
Dia. Sengkang = 13 mm
d = 636 mm
d' = 64 mm
As Tul Utama = 380.132711 mm²
As Tul Sengkang = 132.73229 mm²
Ec = 25742.9602
Dimensi Balok BU1 :
H = 650 mm
B = 400 mm
L = 8000 mm
Dimensi Balok BU2 :
H = 650 mm
B = 400 mm
L = 8000 mm
Dimensi Balok BU3 :
H = 650 mm
B = 400 mm
L = 8000 mm

1. Hasil Analisa Struktur


Kombinasi Atas
P M2 M3
No Kombinasi
KN KNm KNm
1 1,4 D 3044.674 138.829 139.763
2 1,2 D + 1,6 L + 0,5 R 3269.057 162.952 164.142
3 1,2 D + 1,6 R + 0,5 WKA 2600.489 128.242 127.130
4 1,2 D + 1,6 R + 0,5 WKI 2621.101 131.178 127.738
5 1,2 D + 1,0 WKA + L + 0,5 R 3003.152 165.253 162.180
6 1,2 D + 1,0 WKI + L + 0,5 R 3044.377 171.455 164.257
7 1,2 D + 1,0 (100%Fx + 30%Fy) + L 3114.593 214.854 351.686
8 1,2 D + 1,0 (30%Fx + 100%Fy) + L 3333.256 388.591 220.642
9 0,9 D + 1,0 WKA 1938.625 108.303 104.515
10 0,9 D + 1,0 WKI 1979.849 114.257 107.265
11 0,9 D + 1,0 (100%Fx + 30%Fy) 2050.097 157.656 308.943
12 0,9 D + 1,0 (30%Fx + 100%Fy) 2268.761 380.103 163.649
Nilai Maksimum 3333.256 388.591 351.686

Kombinasi Bawah
P M2 M3
No Kombinasi
KN KNm KNm
13 1,4 D 3100.342 237.993 237.048
14 1,2 D + 1,6 L + 0,5 R 3316.773 279.405 278.396
15 1,2 D + 1,6 R + 0,5 WKA 2648.204 211.171 208.327
16 1,2 D + 1,6 R + 0,5 WKI 2668.816 194.663 192.809
17 1,2 D + 1,0 WKA + L + 0,5 R 3050.867 265.479 260.476
18 1,2 D + 1,0 WKI + L + 0,5 R 3092.092 232.463 229.442
19 1,2 D + 1,0 (100%Fx + 30%Fy) + L 3162.308 273.292 413.079
20 1,2 D + 1,0 (30%Fx + 100%Fy) + L 3380.972 470.857 288.225
21 0,9 D + 1,0 WKA 1974.411 167.348 162.673
22 0,9 D + 1,0 WKI 2015.636 141.514 139.740
23 0,9 D + 1,0 (100%Fx + 30%Fy) 2085.884 192.318 380.182
24 0,9 D + 1,0 (30%Fx + 100%Fy) 2304.547 468.972 206.340
Nilai Maksimum 3380.972 470.857 413.079

2. Perhtungan Tulangan Utama


Cek Gaya Aksial Ultimit
Pu = 3380.9716 KN
Pu > 0.1 x Ag x f'c
3380971.6 > 1470000 OK

Cek Dimensi Penampang


B > 300
700 > 300 OK

Cek Rasio Penampang


B/H > 0.4
1 > 0.4 OK
Cek Penampang Kolom Terhadap Panjang
Ig kolom = 0.7 x 1/12 x b x h^3
= 14005833333.33 mm4
EI Kolom = Ec x Ig (Dimensi Kolom Atas dan Bawah Sama)
= 360551610106249
Ig BU1 = 0.35 x 1/12 x b x h^3
= 3203958333.333 mm4
EI BU1 = Ec x Ig
= 82479371866246.20
Ig BU2 = 0.35 x 1/12 x b x h^3
= 3203958333 mm4
EI BU2 = Ec x Ig
= 82479371866246.20
Ig BU3 = 0.35 x 1/12 x b x h^3
= 3203958333.333 mm4
EI BU3 = Ec x Ig
= 82479371866246.20
yA = ƩEI kolom / L kolom
ƩEI balok / L balok
= 6.476
yB = 1 (Tumpuan Jepit)

Maka,
K = 1.75
r = 0.3 x h
= 210 mm
Lu = L Kolom - H Balok
= 2950 mm

Cek,
K x Lu / r > 22
24.583 > 22 Kolom Langsing

Perencanaan Tulangan Utama


ρ = 1.65%
As perlu = rxbxd
= 7345.8 mm2
As D 22 = 1/4 x π x D^2
= 380.132711 mm2
n = As perlu
As D 22
= 19.3243038
= 20 buah
As terpasang = n x As D 22
= 7602.65422
r = As terpasang / (b x d )
1.70769412 %
ρ min = 1%
ρ maks = 6%
Cek,
ρ min < r < ρ maks OK
P ( kN)
12000
(P ma x)

fs =0

2 14 8 20
156 11837 7 1fs9=0 .5 fy
4
3 1165
12 24
9120221 1 1 2 3

-1 6 0 0 1600

Mx (k N -m)

(P min )
12 24
9120221 1123

-1 6 0 0 1600
Mx (k N -m)

(P min )

-4 0 0 0

Factored Loads and Moments with Corresponding Capacities:


Pu Phi Mnx
NO
kN kN.m
1 3044.674 1640.800
2 3269.057 1678.800
3 2600.489 1561.900
4 2621.101 1565.700
5 3003.152 1633.700
6 3044.377 1640.800
7 3114.593 1652.800
8 3333.256 1689.400
9 1938.625 1292.300
10 1979.849 1432.600
11 2050.097 1449.200
12 2268.761 1498.600
13 3100.342 1650.400
14 3316.773 1686.600
15 2648.204 1570.700
16 2668.816 1574.300
17 3050.867 1641.800
18 3092.092 1649.000
19 3162.308 1660.900
20 3380.972 1697.100
21 1974.411 1298.900
22 2015.636 1441.100
23 2085.884 1457.300
24 2304.547 1506.900

Dari Hasil Analisa diatas, didapat:


Mnx max = 1292.300 KNm

3. Cek Kekuatan Kolom Terhadap Balok


Dimensi Balok Kiri = Kanan
kiri kanan
atas (-) 13D22 13D22
a (mm) 119.257 193.793
650 Mn (kN) 1040.473 1040.473
bawah (+) 7D22 7D22
a (mm) 104.350 104.350
400 Mn (kN) 568.188 568.188

Atas Kiri Bawah Kiri


D 22 mm D 22
n 13 n 7
As 4941.725 mm2 As 2660.92898
sengkang 13 mm
d 586 mm
Atas Kanan Bawah Kanan
D 22 mm D 22
n 13 n 7
As 4941.725 mm2 As 2660.92898
sengkang 13 mm
d 586 mm

- Cek Kekuatan Kolom Terhadap Balok


∑ Me > (6/5) ∑ Mg
∑ Me = 2591.200
∑ Mg 1 = 1608.661
∑ Mg 2 = 1608.661
∑ Mg = 1608.661
(6/5) ∑ Mg = 1930.394

∑ Me > (6/5) ∑ Mg OK

4. Perhitungan Tulangan Geser


Nilai Fy dikalikan dengan 1.25 maka :
Fy = 500 Mpa

NO Pu Phi Mprx Factored Loads and Mom


kN kN.m =================
1 3044.674 1935.200 Pu Mu
2 3269.057 1975.700 No. kN kN
3 2600.489 1852.000 --- ------------ ---------
4 2621.101 1856.000 1 3044.0 13
5 3003.152 1927.700 2 3269.0 16
6 3044.377 1935.200 3 2600.0 12
7 3114.593 1947.900 4 2621.0 13
8 3333.256 1987.000 5 3003.0 16
9 1938.625 1552.300 6 3044.0 17
10 1979.849 1729.000 7 3114.0 35
11 2050.097 1743.400 8 3333.0 38
12 2268.761 1787.200 9 1938.0 10
13 3100.342 1945.400 10 1979.0 11
14 3316.773 1984.000 11 2050.0 30
15 2648.204 1861.200 12 2268.0 38
16 2668.816 1865.000 13 3100.0 23
17 3050.867 1936.300 14 3316.0 27
18 3092.092 1943.900 15 2648.0 21
19 3162.308 1956.600
20 3380.972 1995.200
21 1974.411 1728.000 06/06/18 pcaColumn V3
22 2015.636 1736.300 19:12:45 Licensed to: aj
23 2085.884 1750.400
24 2304.547 1794.400 16 2668.0 19
17 3050.0 26
Dari Hasil Analisa diatas, didapat: 18 3092.0 23
Mprx = 1552.300 KNm 19 3162.0 41
20 3380.0 47
Gaya Geser Rencana 21 1974.0 16
å Mpr = 2 x Mpr 22 2015.0 14
= 3104.6 KNm 23 2085.0 38
24 2304.0 46
Ve = å Mpr / Ln
= 1052.406779661 KN *** Program comple
Vs = Ve / Ø
= 1403.209039548 KN

Jarak Tulangan Geser


Tumpuan
Sengkang tertutup (Sepanjang ℓ0 dari muka HBK)
ℓ0 = H Kolom = 700 mm
ℓ0 = 1/6 Ln = 491.667 mm
ℓ0 = 500 = 500 mm

Dipakai ℓ0 = 700 mm

Jarak Sengkang Minimum


S = 6D Tul = 132 mm
S = 1/4 H Kolom = 175 mm
S = 100 = 100 mm
Dipakai S = 100 mm

Av = Vs x S
fy x d
= 551.5758803255 mm2

hc = H Kolom - 2xP - Dia. Skg


= 607 mm
bc = B Kolom - 2xP - Dia. Skg
= 607 mm
Ag = BxH
= 490000 mm2
Ae = bc x hc
= 368449 mm2

Ash 1 = 0.3 x ( S x hc x f'c / fyh ) x ((Ag/Ae) - 1)


= 450.5597199341 mm2
Ash 2 = 0.09 x ( S x hc x f'c / fy )
= 409.725 mm2
Maka,
Ash = 450.560 mm2

Cek Av Terhadap Ash untuk Penentuan Hoops


Av = 551.576 mm2
Ash = 450.560 mm2
Maka, Digunakan
Av = 551.576 mm2
As Sengkang = 1/4 x π x D^2
= 132.732 mm2
Jumlah Kaki Sengkang,
n = Av / As sengkang
= 4.156
= 5 buah

Pada Lapangan
Ln/2 - lo = Vs Lap
Ln/2 Vs
775 = Vn Lap
1475 1403.2090
Vn Lap = 737.279 KN
d lapangan = 636
Jarak Tulangan:
S1 = 48 x Dia. Sengkang
= 624 mm
S2 = 15 X Dia. Tulangan
= 330 mm
S3 = 300 mm
S4 = Dimensi Terkecil antara B atau H
= 700 mm

Digunakan,
S = 250 mm
As Sengkang = 1/4 x π x D2
= 132.732 mm2
Av Perlu = Vs x S
fy x d
= 724.528 mm2
n = Av
As Sengkang
= 5.459
= 6.000 buah

Rekapitulasi Penulangan KT1


Tul. Utama 20 D 22
Sengkang
5 D 13 - 100
Tump
Sengkang Lap 6 D 13 - 250
0.7 m
0.7 m
3.6 m
1600

Mx (k N -m)
1600
Mx (k N -m)

Factored Loads and Moments with Corresponding Capacities: (see user's manual for notation)
=========================================================
Pu Mux fMnx
No. kN kN-m kN-m fMn/Mu
--- ------------ ------------ ------------ --------
1 3044.0 139.0 1469.9 10.575
2 3269.0 164.0 1488.1 9.074
3 2600.0 128.0 1402.8 10.960
4 2621.0 131.0 1406.1 10.734
5 3003.0 165.0 1463.9 8.872
6 3044.0 171.0 1469.9 8.596
7 3114.0 351.0 1479.9 4.216
8 3333.0 388.0 1476.8 3.806
9 1938.0 108.0 1292.3 11.966
10 1979.0 114.0 1299.8 11.402
11 2050.0 308.0 1312.7 4.262
12 2268.0 380.0 1349.2 3.551
13 3100.0 237.0 1477.9 6.236
14 3316.0 279.0 1479.7 5.304
15 2648.0 211.0 1410.3 6.684

06/06/18 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 3


19:09:48 Licensed to: ajeng KOLOM34

16 2668.0 194.0 1413.5 7.286


17 3050.0 260.0 1470.7 5.657
18 3092.0 232.0 1476.8 6.365
19 3162.0 413.0 1486.7 3.600
20 3380.0 470.0 1468.4 3.124
21 1974.0 167.0 1298.9 7.778
22 2015.0 141.0 1306.4 9.265
23 2085.0 380.0 1318.6 3.470
24 2304.0 468.0 1355.2 2.896
*** Program completed as requested! ***

mm

mm2

mm

mm2

actored Loads and Moments with Corresponding Capacities: (see user's manual for notation)
=========================================================
Pu Mux fMnx
No. kN kN-m kN-m fMn/Mu
--- ------------ ------------ ------------ --------
1 3044.0 139.0 1735.0 12.482
2 3269.0 164.0 1763.3 10.752
3 2600.0 128.0 1667.4 13.027
4 2621.0 131.0 1670.9 12.755
5 3003.0 165.0 1729.8 10.484
6 3044.0 171.0 1735.0 10.146
7 3114.0 351.0 1743.9 4.968
8 3333.0 388.0 1771.2 4.565
9 1938.0 108.0 1552.3 14.373
10 1979.0 114.0 1559.7 13.681
11 2050.0 308.0 1572.4 5.105
12 2268.0 380.0 1610.8 4.239
13 3100.0 237.0 1742.2 7.351
14 3316.0 279.0 1769.1 6.341
15 2648.0 211.0 1675.4 7.940

6/06/18 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 3


9:12:45 Licensed to: ajeng KOLOM34

16 2668.0 194.0 1678.7 8.653


17 3050.0 260.0 1735.8 6.676
18 3092.0 232.0 1741.1 7.505
19 3162.0 413.0 1750.0 4.237
20 3380.0 470.0 1777.0 3.781
21 1974.0 167.0 1558.8 9.334
22 2015.0 141.0 1566.1 11.107
23 2085.0 380.0 1578.6 4.154
24 2304.0 468.0 1617.1 3.455

*** Program completed as requested! ***


Page 3
PERHITUNGAN KOLOM SUDUT

BU 1

BU 2

Data :
B = 700 mm =
H = 700 mm =
L Kolom = 3600 mm =
P = 40 mm
f'c = 30 MPa
b1 = 0.85
fy = 400 MPa
Dia. Tul Utama = 22 mm
Dia. Sengkang = 13 mm
d = 636 mm
d' = 64 mm
As Tul Utama = 380.132711 mm²
As Tul Sengkang = 132.73229 mm²
Ec = 25742.9602
Dimensi Balok BU1 :
H = 650 mm
B = 400 mm
L = 8000 mm
Dimensi Balok BU2 :
H = 650 mm
B = 400 mm
L = 8000 mm
1. Hasil Analisa Struktur
Kombinasi Atas
P M2 M3
No Kombinasi
KN KNm KNm
1 1,4 D 1564.522 67.471 85.473
2 1,2 D + 1,6 L + 0,5 R 1675.424 80.077 95.212
3 1,2 D + 1,6 R + 0,5 WKA 1324.178 67.342 65.521
4 1,2 D + 1,6 R + 0,5 WKI 1360.986 71.226 78.148
5 1,2 D + 1,0 WKA + L + 0,5 R 1516.246 91.291 84.712
6 1,2 D + 1,0 WKI + L + 0,5 R 1589.861 99.368 96.751
7 1,2 D + 1,0 (100%Fx + 30%Fy) + L 1925.312 140.477 289.563
8 1,2 D + 1,0 (30%Fx + 100%Fy) + L 1950.369 325.711 157.900
9 0,9 D + 1,0 WKA 971.982 63.078 56.291
10 0,9 D + 1,0 WKI 1045.597 71.074 64.717
11 0,9 D + 1,0 (100%Fx + 30%Fy) 1381.064 112.183 257.528
12 0,9 D + 1,0 (30%Fx + 100%Fy) 1406.121 297.417 129.829
Nilai Maksimum 1950.369 325.711 289.563

Kombinasi Bawah
P M2 M3
No Kombinasi
KN KNm KNm
13 1,4 D 1620.19 109.2493 133.8869
14 1,2 D + 1,6 L + 0,5 R 1723.1395 131.4593 149.1384
15 1,2 D + 1,6 R + 0,5 WKA 1371.8935 99.3971 111.7254
16 1,2 D + 1,6 R + 0,5 WKI 1408.7011 89.9327 115.9801
17 1,2 D + 1,0 WKA + L + 0,5 R 1563.9608 128.7872 130.1766
18 1,2 D + 1,0 WKI + L + 0,5 R 1637.576 118.0462 138.6859
19 1,2 D + 1,0 (100%Fx + 30%Fy) + L 1973.0272 166.6452 329.8083
20 1,2 D + 1,0 (30%Fx + 100%Fy) + L 1998.0843 361.0727 198.7572
21 0,9 D + 1,0 WKA 1007.7681 81.741 80.0001
22 0,9 D + 1,0 WKI 1081.3833 78.0855 88.5095
23 0,9 D + 1,0 (100%Fx + 30%Fy) 1416.8503 126.6845 282.5198
24 0,9 D + 1,0 (30%Fx + 100%Fy) 1441.9074 321.112 157.86
Nilai Maksimum 1998.0843 361.0727 329.8083

2. Perhtungan Tulangan Utama


Cek Gaya Aksial Ultimit
Pu = 1998.084 KN
Pu > 0.1 x Ag x f'c
1998084.3 > 1470000 OK

Cek Dimensi Penampang


B > 300
700 > 300 OK

Cek Rasio Penampang


B/H > 0.4
1 > 0.4 OK
Cek Penampang Kolom Terhadap Panjang
Ig kolom = 0.7 x 1/12 x b x h^3
= 14005833333.33 mm4
EI Kolom = Ec x Ig (Dimensi Kolom Atas dan Bawah Sama)
= 360551610106249
Ig BU1 = 0.35 x 1/12 x b x h^3
= 3203958333.333 mm4
EI BU1 = Ec x Ig
= 82479371866246.20
Ig BU2 = 0.35 x 1/12 x b x h^3
= 3203958333 mm4
EI BU2 = Ec x Ig
= 82479371866246.20

yA = ƩEI kolom / L kolom


ƩEI balok / L balok
= 9.714
yB = 1 (Tumpuan Jepit)

Maka,
K = 1.89
r = 0.3 x h
= 210 mm
Lu = L Kolom - H Balok
= 2950 mm

Cek,
K x Lu / r > 22
26.550 > 22 Kolom Langsing

Perencanaan Tulangan Utama


ρ = 1.35%
As perlu = rxbxd
= 6010.2 mm2
As D 22 = 1/4 x π x D^2
= 380.132711 mm2
n = As perlu
As D 22
= 15.810794
= 16 buah
As terpasang = n x As D 22
= 6082.12338
r = As terpasang / (b x d )
1.3661553 %
ρ min = 1%
ρ maks = 6%
Cek,
ρ min < r < ρ maks OK

P ( kN)
12000
(P ma x)

fs =0

fs =0 .5 fy

20
7 81 9
1526 1117384 12113224
34 1 56
9122012

-1 4 0 0 1400

Mx (k N -m)

(P min )

-4 0 0 0

Factored Loads and Moments with Corresponding Capacities:


Pu Phi Mnx
NO
kN kN.m
1 1564.522 1332.700
2 1675.424 1359.900
3 1324.178 1272.800
4 1360.986 1281.900
5 1516.246 1320.900
6 1589.861 1338.900
7 1925.312 1419.900
8 1950.369 1425.800
9 971.982 939.800
10 1045.597 1201.500
11 1381.064 1287.200
12 1406.121 1293.400
13 1620.190 1346.500
14 1723.140 1371.600
15 1371.894 1284.700
16 1408.701 1293.900
17 1563.961 1332.500
18 1637.576 1350.700
19 1973.027 1431.200
20 1998.084 1437.100
21 1007.768 948.100
22 1081.383 1210.800
23 1416.850 1295.900
24 1441.907 1302.200

Dari Hasil Analisa diatas, didapat:


Mnx max = 939.800 KNm

3. Cek Kekuatan Kolom Terhadap Balok

kiri
atas (-) 13D22
a (mm) 119.257
650 Mn (kN) 1040.473

bawah (+) 7D22


a (mm) 104.350
400 Mn (kN) 568.188

Atas Kiri Bawah Kiri


D 22 mm D 22
n 13 n 7
As 4941.725 mm2 As 2660.92898
sengkang 13 mm
d 586 mm

- Cek Kekuatan Kolom Terhadap Balok


∑ Me > (6/5) ∑ Mg
∑ Me = 1887.900
∑ Mg 1 = 1040.473
∑ Mg 2 = 568.188
∑ Mg = 1040.473
(6/5) ∑ Mg = 1248.568

∑ Me > (6/5) ∑ Mg OK

4. Perhitungan Tulangan Geser


Nilai Fy dikalikan dengan 1.25 maka :
Fy = 500 Mpa

NO Pu Phi Mprx
kN kN.m
1 1564.522 1639.100
2 1675.424 1665.500
3 1324.178 1580.900
4 1360.986 1589.700
5 1516.246 1627.500
6 1589.861 1645.000
7 1925.312 1718.000
8 1950.369 1723.100
9 971.982 1166.200
10 1045.597 1511.600
11 1381.064 1594.800
12 1406.121 1600.900
13 1620.190 1652.400
14 1723.140 1676.600
15 1371.894 1592.400
16 1408.701 1601.400
17 1563.961 1638.800
18 1637.576 1656.500
19 1973.027 1727.800
20 1998.084 1732.800
21 1007.768 1502.000
22 1081.383 1520.600
23 1416.850 1603.400
24 1441.907 1609.400

Dari Hasil Analisa diatas, didapat:


Mprx = 1166.200 KNm

Gaya Geser Rencana


å Mpr = 2 x Mpr
= 2332.4 KNm

Ve = å Mpr / Ln
= 790.6440677966 KN
Vs = Ve / Ø
= 1054.192090395 KN

Jarak Tulangan Geser


Tumpuan
Sengkang tertutup (Sepanjang ℓ0 dari muka HBK)
ℓ0 = H Kolom = 700 mm
ℓ0 = 1/6 Ln = 491.667 mm
ℓ0 = 500 = 500 mm

Dipakai ℓ0 = 700 mm

Jarak Sengkang Minimum


S = 6D Tul = 132 mm
S = 1/4 H Kolom = 175 mm
S = 100 = 100 mm

Dipakai S = 100 mm

Av = Vs x S
fy x d
= 414.3836833316 mm2

hc = H Kolom - 2xP - Dia. Skg


= 607 mm
bc = B Kolom - 2xP - Dia. Skg
= 607 mm
Ag = BxH
= 490000 mm2
Ae = bc x hc
= 368449 mm2
Ash 1 = 0.3 x ( S x hc x f'c / fyh ) x ((Ag/Ae) - 1)
= 450.5597199341 mm2
Ash 2 = 0.09 x ( S x hc x f'c / fy )
= 409.725 mm2
Maka,
Ash = 450.560 mm2

Cek Av Terhadap Ash untuk Penentuan Hoops


Av = 414.384 mm2
Ash = 450.560 mm2
Maka, Digunakan
Av = 450.560 mm2
As Sengkang = 1/4 x π x D^2
= 132.732 mm2
Jumlah Kaki Sengkang,
n = Av / As sengkang
= 3.394
= 4 buah

Pada Lapangan
Ln/2 - lo = Vs Lap
Ln/2 Vs
775 = Vn Lap
1475 1054.1921
Vn Lap = 553.898 KN
d lapangan = 636

Jarak Tulangan:
S1 = 48 x Dia. Sengkang
= 624 mm
S2 = 15 X Dia. Tulangan
= 330 mm
S3 = 300 mm
S4 = Dimensi Terkecil antara B atau H
= 700 mm

Digunakan,
S = 350 mm
As Sengkang = 1/4 x π x D2
= 132.732 mm2
Av Perlu = Vs x S
fy x d
= 762.045 mm2
n = Av
As Sengkang
= 5.741
= 6.000 buah

Rekapitulasi Penulangan KT1


Tul. Utama 16 D 22
Sengkang
4 D 13 - 100
Tump
Sengkang Lap 6 D 13 - 350
0.7 m
0.7 m
3.6 m
wah Sama)
1400

Mx (k N -m)

Factored Loads and Moments with Corresponding Capacities: (see user's manual for notation)
=========================================================
Pu Mux fMnx
No. kN kN-m kN-m fMn/Mu
--- ------------ ------------ ------------ --------
1 1564.0 85.0 1072.8 12.621
2 1675.0 95.0 1096.8 11.546
3 1324.0 67.0 1019.8 15.221
4 1360.0 78.0 1027.8 13.177
5 1516.0 91.0 1062.3 11.674
6 1589.0 99.0 1078.2 10.891
7 1925.0 289.0 1149.8 3.978
8 1950.0 325.0 1155.0 3.554
9 971.0 63.0 939.8 14.917
10 1045.0 71.0 956.8 13.475
11 1381.0 257.0 1032.5 4.018
12 1406.0 297.0 1038.1 3.495
13 1620.0 133.0 1085.0 8.158
14 1723.0 149.0 1107.1 7.430
15 1371.0 111.0 1030.3 9.282

06/06/18 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page


19:25:08 Licensed to: ajeng KOLOMSUDUT34

16 1408.0 115.0 1038.5 9.030


17 1563.0 130.0 1072.6 8.251
18 1637.0 138.0 1088.6 7.889
19 1973.0 329.0 1159.7 3.525
20 1998.0 361.0 1164.9 3.227
21 1007.0 81.0 948.1 11.704
22 1081.0 88.0 965.0 10.966
23 1416.0 282.0 1040.3 3.689
24 1441.0 321.0 1045.8 3.258

*** Program completed as requested! ***

mm
mm2

Factored Loads and Moments with Corresponding Capacities: (see user's manual for notation)
=========================================================
Pu Mux fMnx
No. kN kN-m kN-m fMn/Mu
--- ------------ ------------ ------------ --------
1 1564.0 85.0 1296.9 15.258
2 1675.0 95.0 1320.5 13.900
3 1324.0 67.0 1244.9 18.581
4 1360.0 78.0 1252.8 16.061
5 1516.0 91.0 1286.6 14.139
6 1589.0 99.0 1302.2 13.154
7 1925.0 289.0 1372.5 4.749
8 1950.0 325.0 1377.6 4.239
9 971.0 63.0 1166.2 18.512
10 1045.0 71.0 1182.9 16.661
11 1381.0 257.0 1257.4 4.892
12 1406.0 297.0 1262.8 4.252
13 1620.0 133.0 1308.8 9.841
14 1723.0 149.0 1330.6 8.930
15 1371.0 111.0 1255.2 11.308

06/06/18 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 3


19:27:38 Licensed to: ajeng KOLOMSUDUT34

16 1408.0 115.0 1263.2 10.985


17 1563.0 130.0 1296.7 9.975
18 1637.0 138.0 1312.5 9.511
19 1973.0 329.0 1382.3 4.201
20 1998.0 361.0 1387.3 3.843
21 1007.0 81.0 1174.4 14.498
22 1081.0 88.0 1191.0 13.534
23 1416.0 282.0 1265.0 4.486
24 1441.0 321.0 1270.4 3.958

*** Program completed as requested! ***


s manual for notation)
Page 3
PERHITUNGAN KOLOM TEPI

BU 1

BU4 BU 2

BU3
Data :
B = 750 mm =
H = 750 mm =
L Kolom = 3600 mm =
P = 40 mm
f'c = 30 MPa
b1 = 0.85
fy = 400 MPa
Dia. Tul Utama = 22 mm
Dia. Sengkang = 13 mm
d = 686 mm
d' = 64 mm
As Tul Utama = 380.132711 mm²
As Tul Sengkang = 132.73229 mm²
Ec = 25742.9602
Dimensi Balok BU1 :
H = 650 mm
B = 400 mm
L = 8000 mm
Dimensi Balok BU2 :
H = 650 mm
B = 400 mm
L = 8000 mm
Dimensi Balok BU3 :
H = 650 mm
B = 400 mm
L = 8000 mm
Dimensi Balok BU4 :
H = 650 mm
B = 400 mm
L = 8000 mm
1. Hasil Analisa Struktur
Kombinasi Atas
P M2 M3
No Kombinasi
KN KNm KNm
1 1,4 D 6671.468 149.133 150.686
2 1,2 D + 1,6 L + 0,5 R 7617.582 174.861 176.553
3 1,2 D + 1,6 R + 0,5 WKA 5718.679 118.460 122.842
4 1,2 D + 1,6 R + 0,5 WKI 5718.457 135.886 137.834
5 1,2 D + 1,0 WKA + L + 0,5 R 6905.567 138.487 146.144
6 1,2 D + 1,0 WKI + L + 0,5 R 6905.123 173.339 176.128
7 1,2 D + 1,0 (100%Fx + 30%Fy) + L 6901.210 230.322 389.404
8 1,2 D + 1,0 (30%Fx + 100%Fy) + L 6904.116 393.006 242.620
9 0,9 D + 1,0 WKA 4288.955 77.135 84.234
10 0,9 D + 1,0 WKI 4288.512 111.986 114.218
11 0,9 D + 1,0 (100%Fx + 30%Fy) 4284.661 168.969 327.493
12 0,9 D + 1,0 (30%Fx + 100%Fy) 4287.566 331.654 180.710
Nilai Maksimum 7617.582 393.006 389.404

Kombinasi Bawah
P M2 M3
No Kombinasi
KN KNm KNm
13 1,4 D 6734.558 187.000 208.440
14 1,2 D + 1,6 L + 0,5 R 7671.659 219.302 246.410
15 1,2 D + 1,6 R + 0,5 WKA 5772.756 177.670 174.066
16 1,2 D + 1,6 R + 0,5 WKI 5772.534 145.328 197.737
17 1,2 D + 1,0 WKA + L + 0,5 R 6959.644 234.683 223.474
18 1,2 D + 1,0 WKI + L + 0,5 R 6959.200 167.255 259.152
19 1,2 D + 1,0 (100%Fx + 30%Fy) + L 6955.288 303.956 1040.917
20 1,2 D + 1,0 (30%Fx + 100%Fy) + L 6958.193 1057.118 367.732
21 0,9 D + 1,0 WKA 4329.513 159.844 146.246
22 0,9 D + 1,0 WKI 4329.070 119.990 172.145
23 0,9 D + 1,0 (100%Fx + 30%Fy) 4325.219 302.532 1014.383
24 0,9 D + 1,0 (30%Fx + 100%Fy) 4328.124 1056.914 328.948
Nilai Maksimum 7671.659 1057.118 1040.917

2. Perhtungan Tulangan Utama


Cek Gaya Aksial Ultimit
Pu = 7671.6592 KN
Pu > 0.1 x Ag x f'c
7671659.2 > 1687500 OK

Cek Dimensi Penampang


B > 300
750 > 300 OK

Cek Rasio Penampang


B/H > 0.4
1 > 0.4 OK
Cek Penampang Kolom Terhadap Panjang
Ig kolom = 0.7 x 1/12 x b x h^3
= 18457031250 mm4
EI Kolom = Ec x Ig (Dimensi Kolom Atas dan Bawah Sama)
= 475138620929530
Ig BU1 = 0.35 x 1/12 x b x h^3
= 3203958333.333 mm4
EI BU1 = Ec x Ig
= 82479371866246.20
Ig BU2 = 0.35 x 1/12 x b x h^3
= 3203958333 mm4
EI BU2 = Ec x Ig
= 82479371866246.20
Ig BU3 = 0.35 x 1/12 x b x h^3
= 3203958333.333 mm4
EI BU3 = Ec x Ig
= 82479371866246.20
Ig BU4 = 0.35 x 1/12 x b x h^3
= 3203958333 mm4
EI BU4 = Ec x Ig
= 82479371866246.20
yA = ƩEI kolom / L kolom
ƩEI balok / L balok
= 6.401
yB = 1 (Tumpuan Jepit)
Maka,
K = 1.75
r = 0.3 x h
= 225 mm
Lu = L Kolom - H Balok
= 2950 mm

Cek,
K x Lu / r > 22
22.944 > 22 Kolom Langsing

Perencanaan Tulangan Utama


ρ = 2.0%
As perlu = ρ xbxd
= 10290 mm2
As D 22 = 1/4 x π x D^2
= 380.132711 mm2
n = As perlu
As D 22
= 27.0694936
= 28 buah
As terpasang = n x As D 22
= 10643.7159
ρ = As terpasang / (b x d )
2.06874945 %
ρ min = 1%
ρ maks = 6%
Cek,
ρ min < r < ρ maks OK

P ( kN)
14000 (P ma x)

2 14
56113178 78 1290
1

341156
2 14
56113178 78 1290
1

341156
fs =0
91 2
0212 1 12 2 23 4
fs =0 .5 fy

-2 0 0 0 2000
Mx (k N -m)

-4 0 0 0 (P min )

Factored Loads and Moments with Corresponding Capacities:


Pu Phi Mnx
NO
kN kN.m
1 6671.468 1487.100
2 7617.582 1383.800
3 5718.679 1570.500
4 5718.457 1570.500
5 6905.567 1463.600
6 6905.123 1463.600
7 6901.210 1464.000
8 6904.116 1463.700
9 4288.955 1850.100
10 4288.512 1850.100
11 4284.661 1851.000
12 4287.566 1850.400
13 6734.558 1480.900
14 7671.659 1377.200
15 5772.756 1566.400
16 5772.534 1566.400
17 6959.644 1458.000
18 6959.200 1458.000
19 6955.288 1458.400
20 6958.193 1458.100
21 4329.513 1840.900
22 4329.070 1840.900
23 4325.219 1841.800
24 4328.124 1841.100
Dari Hasil Analisa diatas, didapat:
Mnx max = 1377.200 KNm

3. Cek Kekuatan Kolom Terhadap Balok


Dimensi Balok Kiri = Kanan
kiri kanan
atas (-) 13D22 13D22
a (mm) 119.257 193.793
650 Mn (kN) 1040.473 1040.473

bawah (+) 7D22 7D22


a (mm) 104.350 104.350
400 Mn (kN) 568.188 568.188

Atas Kiri Bawah Kiri


D 22 mm D 22
n 13 n 7
As 4941.725 mm2 As 2660.92898
sengkang 13 mm
d 586 mm
Atas Kanan Bawah Kanan
D 22 mm D 22
n 13 n 7
As 4941.725 mm2 As 2660.92898
sengkang 10 mm
d 586 mm

- Cek Kekuatan Kolom Terhadap Balok


∑ Me > (6/5) ∑ Mg
∑ Me = 2761.000
∑ Mg 1 = 1608.661
∑ Mg 2 = 1608.661
∑ Mg = 1608.661
(6/5) ∑ Mg = 1930.394

∑ Me > (6/5) ∑ Mg OK

4. Perhitungan Tulangan Geser


Nilai Fy dikalikan dengan 1.25 maka :
Fy = 500 Mpa

NO Pu Phi Mprx
kN kN.m
1 6671.468 2647.100
2 7617.582 2619.400
3 5718.679 2604.100
4 5718.457 1604.100
5 6905.567 2653.700
6 6905.123 2653.700
7 6901.210 2653.600
8 6904.116 2653.700
9 4288.955 2476.600
10 4288.512 2476.600
11 4284.661 2476.100
12 4287.566 2476.400
13 6734.558 2649.200
14 7671.659 2615.900
15 5772.756 2607.000
16 5772.534 2607.000
17 6959.644 2655.100
18 6959.200 2655.100
19 6955.288 2655.000
20 6958.193 2655.000
21 4329.513 2480.700
22 4329.070 2480.700
23 4325.219 2480.300
24 4328.124 2480.600

Dari Hasil Analisa diatas, didapat:


Mprx = 1604.100 KNm

Gaya Geser Rencana


å Mpr = 2 x Mpr
= 3208.2 KNm

Ve = å Mpr / Ln
= 1087.525423729 KN
Vs = Ve / Ø
= 1450.033898305 KN

Jarak Tulangan Geser


Tumpuan
Sengkang tertutup (Sepanjang ℓ0 dari muka HBK)
ℓ0 = H Kolom = 750 mm
ℓ0 = 1/6 Ln = 491.667 mm
ℓ0 = 500 = 500 mm

Dipakai ℓ0 = 750 mm

Jarak Sengkang Minimum


S = 6D Tul = 132 mm
S = 1/4 H Kolom = 187.5 mm
S = 100 = 100 mm

Dipakai S = 100 mm

Av = Vs x S
fy x d
= 528.4380095864 mm2

hc = H Kolom - 2xP - Dia. Skg


= 657 mm
bc = B Kolom - 2xP - Dia. Skg
= 657 mm
Ag = BxH
= 562500 mm2
Ae = bc x hc
= 431649 mm2

Ash 1 = 0.3 x ( S x hc x f'c / fyh ) x ((Ag/Ae) - 1)


= 448.1198630137 mm2
Ash 2 = 0.09 x ( S x hc x f'c / fy )
= 443.475 mm2
Maka,
Ash = 448.120 mm2

Cek Av Terhadap Ash untuk Penentuan Hoops


Av = 528.438 mm2
Ash = 448.120 mm2
Maka, Digunakan
Av = 528.438 mm2
As Sengkang = 1/4 x π x D^2
= 132.732 mm2
Jumlah Kaki Sengkang,
n = Av / As sengkang
= 3.981
= 4 buah

Pada Lapangan
Ln/2 - lo = Vs Lap
Ln/2 Vs
725 = Vn Lap
1475 1450.0339
Vn Lap = 712.729 KN
d lapangan = 686

Jarak Tulangan:
S1 = 48 x Dia. Sengkang
= 624 mm
S2 = 15 X Dia. Tulangan
= 330 mm
S3 = 300 mm
S4 = Dimensi Terkecil antara B atau H
= 750 mm

Digunakan,
S = 300 mm
As Sengkang = 1/4 x π x D2

= 132.732 mm2
Av Perlu = Vs x S
fy x d
= 779.222 mm2
n = Av
As Sengkang
= 5.871
= 6.000 buah

Rekapitulasi Penulangan KT1


Tul. Utama 28 D 22
Sengkang
4 D 13 - 100
Tump
Sengkang Lap 6 D 13 - 300
0.75 m
0.75 m
3.6 m
2000
Mx (k N -m)
mm

mm2

mm

mm2
PERHITUNGAN KOLOM TEPI

BU 1 BU2

BU 3

Data :
B = 750 mm =
H = 750 mm =
L Kolom = 3600 mm =
P = 40 mm
f'c = 30 MPa
b1 = 0.85
fy = 400 MPa
Dia. Tul Utama = 22 mm
Dia. Sengkang = 13 mm
d = 686 mm
d' = 64 mm
As Tul Utama = 380.132711 mm²
As Tul Sengkang = 132.73229 mm²
Ec = 25742.9602
Dimensi Balok BU1 :
H = 650 mm
B = 400 mm
L = 8000 mm
Dimensi Balok BU2 :
H = 650 mm
B = 400 mm
L = 8000 mm
Dimensi Balok BU3 :
H = 650 mm
B = 400 mm
L = 8000 mm

1. Hasil Analisa Struktur


Kombinasi Atas
P M2 M3
No Kombinasi
KN KNm KNm
1 1,4 D 4292.501 137.050 135.870
2 1,2 D + 1,6 L + 0,5 R 4640.215 160.706 159.016
3 1,2 D + 1,6 R + 0,5 WKA 3663.279 122.301 120.768
4 1,2 D + 1,6 R + 0,5 WKI 3698.991 123.106 120.546
5 1,2 D + 1,0 WKA + L + 0,5 R 4247.662 154.152 151.674
6 1,2 D + 1,0 WKI + L + 0,5 R 4319.085 156.884 152.292
7 1,2 D + 1,0 (100%Fx + 30%Fy) + L 4424.690 206.628 290.232
8 1,2 D + 1,0 (30%Fx + 100%Fy) + L 4766.664 382.882 161.001
9 0,9 D + 1,0 WKA 2727.248 97.762 95.961
10 0,9 D + 1,0 WKI 2798.672 103.748 96.769
11 0,9 D + 1,0 (100%Fx + 30%Fy) 2904.308 154.760 302.547
12 0,9 D + 1,0 (30%Fx + 100%Fy) 3246.282 331.014 109.901
Nilai Maksimum 4766.664 382.882 302.547

Kombinasi Bawah
P M2 M3
No Kombinasi
KN KNm KNm
1 1,4 D 4355.591 235.101 235.202
2 1,2 D + 1,6 L + 0,5 R 4694.292 275.774 275.700
3 1,2 D + 1,6 R + 0,5 WKA 3717.356 215.400 187.093
4 1,2 D + 1,6 R + 0,5 WKI 3753.068 221.787 216.355
5 1,2 D + 1,0 WKA + L + 0,5 R 4301.739 276.099 218.896
6 1,2 D + 1,0 WKI + L + 0,5 R 4373.163 288.470 277.420
7 1,2 D + 1,0 (100%Fx + 30%Fy) + L 4478.767 379.767 963.594
8 1,2 D + 1,0 (30%Fx + 100%Fy) + L 4820.741 1099.625 388.237
9 0,9 D + 1,0 WKA 2767.806 179.268 129.033
10 0,9 D + 1,0 WKI 2839.230 191.679 180.708
11 0,9 D + 1,0 (100%Fx + 30%Fy) 2944.866 328.991 936.548
12 0,9 D + 1,0 (30%Fx + 100%Fy) 3286.840 1099.487 373.598
Nilai Maksimum 4820.741 1099.625 963.594

2. Perhtungan Tulangan Utama


Cek Gaya Aksial Ultimit
Pu = 4820.7411 KN
Pu > 0.1 x Ag x f'c
4820741.1 > 1687500 OK

Cek Dimensi Penampang


B > 300
750 > 300 OK

Cek Rasio Penampang


B/H > 0.4
1 > 0.4 OK
Cek Penampang Kolom Terhadap Panjang
Ig kolom = 0.7 x 1/12 x b x h^3
= 18457031250 mm4
EI Kolom = Ec x Ig (Dimensi Kolom Atas dan Bawah Sama)
= 475138620929530
Ig BU1 = 0.35 x 1/12 x b x h^3
= 3203958333.333 mm4
EI BU1 = Ec x Ig
= 82479371866246.20
Ig BU2 = 0.35 x 1/12 x b x h^3
= 3203958333 mm4
EI BU2 = Ec x Ig
= 82479371866246.20
Ig BU3 = 0.35 x 1/12 x b x h^3
= 3203958333.333 mm4
EI BU3 = Ec x Ig
= 82479371866246.20
yA = ƩEI kolom / L kolom
ƩEI balok / L balok
= 8.534
yB = 1 (Tumpuan Jepit)

Maka,
K = 1.83
r = 0.3 x h
= 225 mm
Lu = L Kolom - H Balok
= 2950 mm

Cek,
K x Lu / r > 22
23.993 > 22 Kolom Langsing

Perencanaan Tulangan Utama


ρ = 1.8%
As perlu = rxbxd
= 9003.75 mm2
As D 22 = 1/4 x π x D^2
= 380.132711 mm2
n = As perlu
As D 22
= 23.6858069
= 24 buah
As terpasang = n x As D 22
= 9123.18507
r = As terpasang / (b x d )
1.77321381 %
ρ min = 1%
ρ maks = 6%
Cek,
ρ min < r < ρ maks OK

P ( kN)
14000
(P ma x)

fs =0
2 14 8 20
156 1 131778 19
4 1 56
3 fs =0 .5 fy
12 24
1 0 2 2 1 1 23
9 21

-2 0 0 0 2000

Mx (k N -m)
12 24
91 02212 1 1 23

-2 0 0 0 2000
Mx (k N -m)

(P min )
-4 0 0 0

Factored Loads and Moments with Corresponding Capacities:


Pu Phi Mnx
NO
kN kN.m
1 4292.501 1759.300
2 4640.215 1761.500
3 3663.279 1983.600
4 3698.991 1976.700
5 4247.662 1859.300
6 4319.085 1843.200
7 4424.690 1814.100
8 4766.664 1645.100
9 2727.248 1863.100
10 2798.672 1874.900
11 2904.308 1892.500
12 3246.282 1947.700
13 4355.591 1834.900
14 4694.292 1747.700
15 3717.356 1973.000
16 3753.068 1965.800
17 4301.739 1847.200
18 4373.163 1830.800
19 4478.767 1801.300
20 4820.741 1631.200
21 2767.806 1869.800
22 2839.230 1881.700
23 2944.866 1899.000
24 3286.840 1953.900

Dari Hasil Analisa diatas, didapat:


Mnx max = 1631.200 KNm

3. Cek Kekuatan Kolom Terhadap Balok


Dimensi Balok Kiri = Kanan
kiri kanan
atas (-) 13D22 13D22
a (mm) 119.257 193.793
650 Mn (kN) 1040.473 1040.473
bawah (+) 7D22 7D22
a (mm) 104.350 104.350
400 Mn (kN) 568.188 568.188

Atas Kiri Bawah Kiri


D 22 mm D 22
n 13 n 7
As 4941.725 mm2 As 2660.92898
sengkang 13 mm
d 586 mm
Atas Kanan Bawah Kanan
D 22 mm D 22
n 13 n 7
As 4941.725 mm2 As 2660.92898
sengkang 13 mm
d 586 mm

- Cek Kekuatan Kolom Terhadap Balok


∑ Me > (6/5) ∑ Mg
∑ Me = 3276.300
∑ Mg 1 = 1608.661
∑ Mg 2 = 1608.661
∑ Mg = 1608.661
(6/5) ∑ Mg = 1930.394

∑ Me > (6/5) ∑ Mg OK

4. Perhitungan Tulangan Geser


Nilai Fy dikalikan dengan 1.25 maka :
Fy = 500 Mpa

NO Pu Phi Mprx
kN kN.m
1 4292.501 2477.000
2 4640.215 2511.100
3 3663.279 2394.600
4 3698.991 2399.500
5 4247.662 2472.100
6 4319.085 2497.700
7 4424.690 2490.100
8 4766.664 2523.100
9 2727.248 2066.900
10 2798.672 2268.500
11 2904.308 2285.700
12 3246.282 2335.900
13 4355.591 2483.200
14 4694.292 2516.300
15 3717.356 2402.100
16 3753.068 2407.000
17 4301.739 2477.000
18 4373.163 2485.000
19 4478.767 2495.400
20 4820.741 2528.100
21 2767.806 2263.000
22 2839.230 2275.700
23 2944.866 2291.600
24 3286.840 2341.700

Dari Hasil Analisa diatas, didapat:


Mprx = 2066.900 KNm

Gaya Geser Rencana


å Mpr = 2 x Mpr
= 4133.8 KNm

Ve = å Mpr / Ln
= 1401.288135593 KN
Vs = Ve / Ø
= 1868.384180791 KN

Jarak Tulangan Geser


Tumpuan
Sengkang tertutup (Sepanjang ℓ0 dari muka HBK)
ℓ0 = H Kolom = 750 mm
ℓ0 = 1/6 Ln = 491.667 mm
ℓ0 = 500 = 500 mm

Dipakai ℓ0 = 750 mm

Jarak Sengkang Minimum


S = 6D Tul = 132 mm
S = 1/4 H Kolom = 187.5 mm
S = 100 = 100 mm
Dipakai S = 100 mm

Av = Vs x S
fy x d
= 680.8980250696 mm2

hc = H Kolom - 2xP - Dia. Skg


= 657 mm
bc = B Kolom - 2xP - Dia. Skg
= 657 mm
Ag = BxH
= 562500 mm2
Ae = bc x hc
= 431649 mm2

Ash 1 = 0.3 x ( S x hc x f'c / fyh ) x ((Ag/Ae) - 1)


= 448.1198630137 mm2
Ash 2 = 0.09 x ( S x hc x f'c / fy )
= 443.475 mm2
Maka,
Ash = 448.120 mm2

Cek Av Terhadap Ash untuk Penentuan Hoops


Av = 680.898 mm2
Ash = 448.120 mm2
Maka, Digunakan
Av = 680.898 mm2
As Sengkang = 1/4 x π x D^2
= 132.732 mm2
Jumlah Kaki Sengkang,
n = Av / As sengkang
= 5.130
= 6 buah

Pada Lapangan
Ln/2 - lo = Vs Lap
Ln/2 Vs
725 = Vn Lap
1475 1868.3842
Vn Lap = 918.358 KN
d lapangan = 686
Jarak Tulangan:
S1 = 48 x Dia. Sengkang
= 624 mm
S2 = 15 X Dia. Tulangan
= 330 mm
S3 = 300 mm
S4 = Dimensi Terkecil antara B atau H
= 750 mm

Digunakan,
S = 200 mm
As Sengkang = 1/4 x π x D2
= 132.732 mm2
Av Perlu = Vs x S
fy x d
= 669.357 mm2
n = Av
As Sengkang
= 5.043
= 6.000 buah

Rekapitulasi Penulangan KT1


Tul. Utama 24 D 22
Sengkang
6 D 13 - 100
Tump
Sengkang Lap 6 D 13 - 200
0.75 m
0.75 m
3.6 m
=========================================================
Pu Mux fMnx
No. kN kN-m kN-m fMn/Mu
--- ------------ ------------ ------------ --------
1 4292.0 137.0 1759.3 12.842
2 4640.0 160.0 1676.8 10.480
3 3663.0 122.0 1872.0 15.344
4 3698.0 123.0 1876.9 15.259
5 4247.0 154.0 1769.2 11.489
6 4319.0 156.0 1753.3 11.239
7 4424.0 290.0 1729.3 5.963
8 4766.0 382.0 1645.1 4.307
9 2727.0 97.0 1726.1 17.795
10 2798.0 103.0 1739.2 16.885
11 2904.0 302.0 1758.3 5.822
12 3246.0 331.0 1811.8 5.474
13 4355.0 235.0 1745.2 7.426
14 4694.0 275.0 1663.3 6.048
15 3717.0 215.0 1879.5 8.742

06/06/18 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 3


18:47:08 Licensed to: ajeng KOLOMTEPI12

16 3753.0 221.0 1880.5 8.509


17 4301.0 276.0 1757.3 6.367
18 4373.0 288.0 1741.1 6.045
19 4478.0 963.0 1716.6 1.783
20 4820.0 1099.0 1631.2 1.484
21 2767.0 179.0 1733.5 9.684
22 2839.0 191.0 1746.6 9.144
23 2944.0 936.0 1765.4 1.886
24 3286.0 1099.0 1817.8 1.654
mm

mm2

mm

mm2

Factored Loads and Moments with Corresponding Capacities: (see user's manual for notation)
=========================================================
Pu Mux fMnx
No. kN kN-m kN-m fMn/Mu
--- ------------ ------------ ------------ --------
1 4292.0 137.0 2301.1 16.797
2 4640.0 160.0 2339.6 14.622
3 3663.0 122.0 2217.7 18.178
4 3698.0 123.0 2223.1 18.074
5 4247.0 154.0 2296.0 14.909
6 4319.0 156.0 2304.2 14.770
7 4424.0 290.0 2315.9 7.986
8 4766.0 382.0 2353.0 6.160
9 2727.0 97.0 2066.9 21.309
10 2798.0 103.0 2078.9 20.183
11 2904.0 302.0 2096.6 6.942
12 3246.0 331.0 2152.5 6.503
13 4355.0 235.0 2308.2 9.822
14 4694.0 275.0 2345.4 8.529
15 3717.0 215.0 2225.9 10.353

06/06/18 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 3


18:49:13 Licensed to: ajeng KOLOMTEPI12

16 3753.0 221.0 2231.4 10.097


17 4301.0 276.0 2302.2 8.341
18 4373.0 288.0 2310.3 8.022
19 4478.0 963.0 2321.9 2.411
20 4820.0 1099.0 2358.7 2.146
21 2767.0 179.0 2073.7 11.585
22 2839.0 191.0 2085.8 10.920
23 2944.0 936.0 2103.2 2.247
24 3286.0 1099.0 2158.9 1.964
Page 3
PERHITUNGAN KOLOM SUDUT

BU 1

BU 2

Data :
B = 750 mm =
H = 750 mm =
L Kolom = 3600 mm =
P = 40 mm
f'c = 30 MPa
b1 = 0.85
fy = 400 MPa
Dia. Tul Utama = 22 mm
Dia. Sengkang = 13 mm
d = 686 mm
d' = 64 mm
As Tul Utama = 380.132711 mm²
As Tul Sengkang = 132.73229 mm²
Ec = 25742.9602
Dimensi Balok BU1 :
H = 650 mm
B = 400 mm
L = 8000 mm
Dimensi Balok BU2 :
H = 650 mm
B = 400 mm
L = 8000 mm
1. Hasil Analisa Struktur
Kombinasi Atas
P M2 M3
No Kombinasi
KN KNm KNm
1 1,4 D 2240.056 65.907 82.432
2 1,2 D + 1,6 L + 0,5 R 2404.957 78.311 91.751
3 1,2 D + 1,6 R + 0,5 WKA 1890.823 61.161 73.364
4 1,2 D + 1,6 R + 0,5 WKI 1954.416 64.699 73.882
5 1,2 D + 1,0 WKA + L + 0,5 R 2164.572 80.285 92.646
6 1,2 D + 1,0 WKI + L + 0,5 R 2291.756 89.934 90.293
7 1,2 D + 1,0 (100%Fx + 30%Fy) + L 2809.965 140.869 212.029
8 1,2 D + 1,0 (30%Fx + 100%Fy) + L 2849.094 326.655 103.791
9 0,9 D + 1,0 WKA 1381.486 56.240 63.487
10 0,9 D + 1,0 WKI 1508.670 64.387 59.445
11 0,9 D + 1,0 (100%Fx + 30%Fy) 2026.895 115.323 214.123
12 0,9 D + 1,0 (30%Fx + 100%Fy) 2066.023 301.108 72.942
Nilai Maksimum 2849.094 326.655 214.123

Kombinasi Bawah
P M2 M3
No Kombinasi
KN KNm KNm
13 1,4 D 2303.146 114.0219 147.0949
14 1,2 D + 1,6 L + 0,5 R 2459.0343 135.2736 163.6568
15 1,2 D + 1,6 R + 0,5 WKA 1944.9008 109.8812 111.7381
16 1,2 D + 1,6 R + 0,5 WKI 2008.4932 120.0989 134.1018
17 1,2 D + 1,0 WKA + L + 0,5 R 2218.649 146.9468 120.8792
18 1,2 D + 1,0 WKI + L + 0,5 R 2345.8338 166.1496 165.6065
19 1,2 D + 1,0 (100%Fx + 30%Fy) + L 2864.0428 318.0411 933.6304
20 1,2 D + 1,0 (30%Fx + 100%Fy) + L 2903.1708 1079.1327 388.2366
21 0,9 D + 1,0 WKA 1422.0435 99.4183 87.4029
22 0,9 D + 1,0 WKI 1549.2283 148.0747 119.7463
23 0,9 D + 1,0 (100%Fx + 30%Fy) 2067.4532 307.9238 917.4113
24 0,9 D + 1,0 (30%Fx + 100%Fy) 2106.5813 1064.0705 373.5982
Nilai Maksimum 2903.1708 1079.1327 933.6304

2. Perhtungan Tulangan Utama


Cek Gaya Aksial Ultimit
Pu = 2903.171 KN
Pu > 0.1 x Ag x f'c
2903170.8 > 1687500 OK

Cek Dimensi Penampang


B > 300
750 > 300 OK

Cek Rasio Penampang


B/H > 0.4
1 > 0.4 OK
Cek Penampang Kolom Terhadap Panjang
Ig kolom = 0.7 x 1/12 x b x h^3
= 18457031250 mm4
EI Kolom = Ec x Ig (Dimensi Kolom Atas dan Bawah Sama)
= 475138620929530
Ig BU1 = 0.35 x 1/12 x b x h^3
= 3203958333.333 mm4
EI BU1 = Ec x Ig
= 82479371866246.20
Ig BU2 = 0.35 x 1/12 x b x h^3
= 3203958333 mm4
EI BU2 = Ec x Ig
= 82479371866246.20

yA = ƩEI kolom / L kolom


ƩEI balok / L balok
= 12.802
yB = 1 (Tumpuan Jepit)

Maka,
K = 1.9
r = 0.3 x h
= 225 mm
Lu = L Kolom - H Balok
= 2950 mm

Cek,
K x Lu / r > 22
24.911 > 22 Kolom Langsing

Perencanaan Tulangan Utama


ρ = 1.45%
As perlu = rxbxd
= 7460.25 mm2
As D 22 = 1/4 x π x D^2
= 380.132711 mm2
n = As perlu
As D 22
= 19.6253829
= 20 buah
As terpasang = n x As D 22
= 7602.65422
r = As terpasang / (b x d )
1.47767818 %
ρ min = 1%
ρ maks = 6%
Cek,
ρ min < r < ρ maks OK

P ( kN)
14000

(P ma x)

fs =0

fs =0 .5 fy
7 8 19 20
2 11174
4 51156381 1 1 2
16 23 24
3
1 20 12 2
9

-1 8 0 0 180

Mx (k N -m)

(P min )

-4 0 0 0

Factored Loads and Moments with Corresponding Capacities:


Pu Phi Mnx
NO
kN kN.m
1 2240.056 1779.000
2 2404.957 1808.800
3 1890.823 1708.700
4 1954.416 1722.000
5 2164.572 1764.700
6 2291.756 1788.000
7 2809.965 1876.800
8 2849.094 1883.400
9 1381.486 1287.200
10 1508.670 1623.200
11 2026.895 1736.700
12 2066.023 1744.900
13 2303.146 1790.100
14 2459.034 1871.300
15 1944.901 1719.900
16 2008.493 1733.100
17 2218.649 1775.100
18 2345.834 1797.500
19 2864.043 1885.900
20 2903.171 1892.300
21 1422.044 1297.500
22 1549.228 1632.600
23 2067.453 1745.100
24 2106.581 1753.000

Dari Hasil Analisa diatas, didapat:


Mnx max = 1287.200 KNm

3. Cek Kekuatan Kolom Terhadap Balok

kiri
atas (-) 13D22
a (mm) 119.257
650 Mn (kN) 1040.473

bawah (+) 7D22


a (mm) 104.350
400 Mn (kN) 568.188

Atas Kiri Bawah Kiri


D 22 mm D 22
n 13 n 7
As 4941.725 mm2 As 2660.92898
sengkang 13 mm
d 586 mm

- Cek Kekuatan Kolom Terhadap Balok


∑ Me > (6/5) ∑ Mg
∑ Me = 2584.700
∑ Mg 1 = 1040.473
∑ Mg 2 = 568.188
∑ Mg = 1040.473
(6/5) ∑ Mg = 1248.568

∑ Me > (6/5) ∑ Mg OK

4. Perhitungan Tulangan Geser


Nilai Fy dikalikan dengan 1.25 maka :
Fy = 500 Mpa

NO Pu Phi Mprx Factored Loads and Mom


kN kN.m =================
1 2240.056 2167.300 Pu Mux
2 2404.957 2197.600 No. kN kN
3 1890.823 2101.200 --- ------------ ----------
4 1954.416 2113.500 1 2240.0 82
5 2164.572 2153.100 2 2404.0 91
6 2291.756 2176.800 3 1890.0 73
7 2809.965 2270.400 4 1954.0 73
8 2849.094 22757.400 5 2164.0 92
9 1381.486 1594.800 6 2291.0 90
10 1508.670 2027.200 7 2809.0 212
11 2026.895 2127.100 8 2849.0 326
12 2066.023 2134.700 9 1381.0 63
13 2303.146 2179.000 10 1508.0 64
14 2459.034 2207.700 11 2026.0 21
15 1944.901 2111.600 12 2066.0 30
16 2008.493 2123.700 13 2303.0 14
17 2218.649 2163.200 14 2459.0 16
18 2345.834 2186.800 15 1944.0 11
19 2864.043 2279.800
20 2903.171 2285.500
21 1422.044 2010.300 06/06/18 pcaColumn V3
22 1549.228 2035.300 19:21:36 Licensed to: aje
23 2067.453 2134.900
24 2106.581 2142.200 16 2008.0 13
17 2218.0 14
Dari Hasil Analisa diatas, didapat: 18 2345.0 16
Mprx = 1594.800 KNm 19 2864.0 93
20 2903.0 107
Gaya Geser Rencana 21 1422.0 99
å Mpr = 2 x Mpr 22 1549.0 14
= 3189.6 KNm 23 2067.0 91
24 2106.0 106
Ve = å Mpr / Ln
= 1081.220338983 KN *** Program complet
Vs = Ve / Ø
= 1441.627118644 KN

Jarak Tulangan Geser


Tumpuan
Sengkang tertutup (Sepanjang ℓ0 dari muka HBK)
ℓ0 = H Kolom = 750 mm
ℓ0 = 1/6 Ln = 491.667 mm
ℓ0 = 500 = 500 mm

Dipakai ℓ0 = 750 mm

Jarak Sengkang Minimum


S = 6D Tul = 132 mm
S = 1/4 H Kolom = 187.5 mm
S = 100 = 100 mm

Dipakai S = 100 mm

Av = Vs x S
fy x d
= 525.3743143747 mm2

hc = H Kolom - 2xP - Dia. Skg


= 657 mm
bc = B Kolom - 2xP - Dia. Skg
= 657 mm
Ag = BxH
= 562500 mm2
Ae = bc x hc
= 431649 mm2
Ash 1 = 0.3 x ( S x hc x f'c / fyh ) x ((Ag/Ae) - 1)
= 448.1198630137 mm2
Ash 2 = 0.09 x ( S x hc x f'c / fy )
= 443.475 mm2
Maka,
Ash = 448.120 mm2

Cek Av Terhadap Ash untuk Penentuan Hoops


Av = 525.374 mm2
Ash = 448.120 mm2
Maka, Digunakan
Av = 525.374 mm2
As Sengkang = 1/4 x π x D^2
= 132.732 mm2
Jumlah Kaki Sengkang,
n = Av / As sengkang
= 3.958
= 4 buah

Pada Lapangan
Ln/2 - lo = Vs Lap
Ln/2 Vs
725 = Vn Lap
1475 1441.6271
Vn Lap = 708.596 KN
d lapangan = 686

Jarak Tulangan:
S1 = 48 x Dia. Sengkang
= 624 mm
S2 = 15 X Dia. Tulangan
= 330 mm
S3 = 300 mm
S4 = Dimensi Terkecil antara B atau H
= 750 mm

Digunakan,
S = 300 mm
As Sengkang = 1/4 x π x D2
= 132.732 mm2
Av Perlu = Vs x S
fy x d
= 774.704 mm2
n = Av
As Sengkang
= 5.837
= 6.000 buah

Rekapitulasi Penulangan KT1


Tul. Utama 20 D 22
Sengkang
4 D 13 - 100
Tump
Sengkang Lap 6 D 13 - 300
0.75 m
0.75 m
3.6 m
wah Sama)
19 20
23 24

1800

Mx (k N -m)

Factored Loads and Moments with Corresponding Capacities: (see user's manual for notation)
=========================================================
Pu Mux fMnx
No. kN kN-m kN-m fMn/Mu
--- ------------ ------------ ------------ --------
1 2240.0 82.0 1492.6 18.203
2 2404.0 91.0 1525.7 16.766
3 1890.0 73.0 1411.6 19.338
4 1954.0 73.0 1426.8 19.545
5 2164.0 92.0 1475.5 16.038
6 2291.0 90.0 1504.1 16.712
7 2809.0 212.0 1599.6 7.545
8 2849.0 326.0 1606.7 4.929
9 1381.0 63.0 1287.2 20.431
10 1508.0 64.0 1318.9 20.607
11 2026.0 214.0 1443.6 6.746
12 2066.0 301.0 1452.9 4.827
13 2303.0 147.0 1506.6 10.249
14 2459.0 163.0 1535.9 9.423
15 1944.0 111.0 1424.4 12.832

06/06/18 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 3


19:19:49 Licensed to: ajeng KOLOMSUDUT12

16 2008.0 134.0 1439.4 10.742


17 2218.0 146.0 1487.8 10.190
18 2345.0 166.0 1514.6 9.124
19 2864.0 933.0 1609.4 1.725
20 2903.0 1079.0 1616.2 1.498
21 1422.0 99.0 1297.5 13.106
22 1549.0 148.0 1329.0 8.980
23 2067.0 917.0 1453.2 1.585
24 2106.0 1064.0 1462.2 1.374

*** Program completed as requested! ***

mm
mm2

actored Loads and Moments with Corresponding Capacities: (see user's manual for notation)
=========================================================
Pu Mux fMnx
No. kN kN-m kN-m fMn/Mu
--- ------------ ------------ ------------ --------
1 2240.0 82.0 1781.7 21.728
2 2404.0 91.0 1814.0 19.934
3 1890.0 73.0 1710.9 23.437
4 1954.0 73.0 1723.9 23.615
5 2164.0 92.0 1766.5 19.202
6 2291.0 90.0 1791.8 19.909
7 2809.0 212.0 1891.7 8.923
8 2849.0 326.0 1899.2 5.826
9 1381.0 63.0 1594.8 25.315
10 1508.0 64.0 1625.6 25.400
11 2026.0 214.0 1738.5 8.124
12 2066.0 301.0 1746.6 5.803
13 2303.0 147.0 1794.2 12.205
14 2459.0 163.0 1824.7 11.195
15 1944.0 111.0 1721.9 15.512

6/06/18 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 3


9:21:36 Licensed to: ajeng KOLOMSUDUT12
16 2008.0 134.0 1734.9 12.947
17 2218.0 146.0 1777.3 12.173
18 2345.0 166.0 1802.4 10.858
19 2864.0 933.0 1902.0 2.039
20 2903.0 1079.0 1909.2 1.769
21 1422.0 99.0 1604.8 16.210
22 1549.0 148.0 1635.5 11.050
23 2067.0 917.0 1746.8 1.905
24 2106.0 1064.0 1754.6 1.649

*** Program completed as requested! ***