Diketahui Floordeck :
F'c = 30 Mpa
Lx = 3000 mm
Ly = 4000 mm
Tebal Deck = 0.95 mm
Berat Deck = 11.3 kg/m2
Fy Deck = 5500 kg/cm2
BJ Beton = 2400 kg/m3
qLL Pekerja = 100 kg/m2
qLL Ruang = 250 kg/m2
Tebal Lantai = 120 mm 4 m
Tahap 1 : Saat beton di cor dan belum mengeras ( belum terjadi aksi komposit ), beban dipikul oleh floordeck
1 Menghitung modulus section floordeck
Statis momen terhadap sisi bawah :
1000 mm
120 mm 1 1 1
Ў 2 2 3 2 3 2
40 40 40
ΣMo = 0 1 2 3
= (11 x 40 x 25) + (22 x 28 x 28/2) + (1000-(11 x 40))x 0 = (1000+ 22 x 25) x Ў
Ў= 13 mm
3000 m 3000 m
M lap ( positif ) = (9/128) qu x L^2 = 328.5309375 kgm
M (negatif ) = (1/8) qu x L^2 = 584.055 kgm
Tahap 2 : Komposit
Beban yang bekerja
Berat Floordeck = 11.3 kg/m2
B. Pelat Beton = 180 kg/m2
B. Penutup Lantai = 60 kg/m2
qDL = 299.3 kg/m
qLL = 250 kg/m
qu = 759.16 kg/m
M Lap (positif) = 160.135313 kgm
M (negatif) = 284.685 kgm
Ec = 25742.9602 Mpa
Es = 200000 Mpa
n= Es/Ec = 7.77
1000 mm
120 mm 1 1 1
ya 2 2 3 2 2 3 2
40 40 40
ul oleh floordeck
Panjang efektif floordeck = 1000 mm
Jumlah bukit dalam 1m = 11
Jumlah lembah dalam 1m = 12
Jumlah miring dalam 1m = 22
Panjang bukit / lembah = 40 mm
2 25 mm Tinggi bukit ke lembah = 25 mm
panjang sisi miring = 28 mm
OK
OK
OK
L = 4m
Jarak Antara Balok = 3m
F'c = 30 mpa
fy = 250 Mpa
t pelat lantai = 120 mm tw tf
Digunakan Profil = 150 75 5 7
Properti Penampang
A = 17.85 cm2 1785
r = 8 mm
h = 136 mm
E = 200000 mpa
Ec = 25742.960203 mpa
Cek Kekuatan Momen Penampang komposit tersebut & beberapa shear connector yg diperlukan!
Karena,
Min. < x < Max. OK
Perhitungan Balok Utama
n balok = 4
Lx = 6
Ly = 4
Lb = 3
2. Preliminary design
Mu = 108.3072 Kn.m
Fy = 250 Mpa
Ø = 0.9 Lentur
Zx = Mu/ Ø Fy
= 0.000481 m3
481.3653 Cm3
Periksa
Batasan Untuk Sayap
Es = 200000 Mpa
Fy = 250 Mpa
Kc = 4/sqrt(h/tw)
0.8
λp = 0,38.sqrt(E/fy)
= 10.74802 Batas Kompak
λr = 0,95.sqrt(Kc.E/Fy)
= 24.03331 Batas Non Kompak
λsayap = b/2.tf
8.333333 Kompak
rts = bf/sqrt12(1+1/6.htw/bftf)
54.77226
J = 26.45 cm4
Lr = 10.45
Ma (1/4L) = 60.192
MB(1/2L) = 80512.82
Mc (3/4L) = 180.576
Cb = 12,5 Mmaks/2,5Mmaks+3Ma+4Mb+3Mc
= 1.920426
C = 1
1. pelelehan
Mn = Mp penampang kompak
Mp = Fy . Zx
Mp = 1.31E+08 Nmm
= 131.37 KNm
Dipilih Mn terkecil
Mn = 131.37 KNm
PU = 1,2 DI + 1,6 LI
= 722 KN
1. Preliminari design =
PU < Ø Pn
Pu < Ø Ag x Fcr
Ag = Pu/Ø x Fcr
Ag = 0.0037604167 37.60417 cm2
B H Tw Tf
Profil IWF 300 300 10 15
A = 119.8 cm2
berat = 94 kg/m
Ix = 20400 cm4
Iy = 6750 cm4
ix = 13.1 cm
iy = 7.51 cm
r = 18 mm
Sx = 1360 cm2
Zx = 1501.12 cm3
3. Syarat Kelangsingan
Syarat : K x L /r < 200
K = 0.8 Tumpuan sendi jepit
Tinggi Kolom = 3.85 m
= 3850 mm
4. Klasifikasi Penampang
Batasan Rasio tebal terhadap lebar = 1,49 x sqrt(E/Fy)
= 43.012595055 Badan
Sayap = Bx0,5 / tf
10 KOMPAK Sayap
Badan = (H-2 x tf)/tw
= 27 KOMPAK
Fe = 1172.3781961
Fcr = (0,658^(Fy/Fe))
= 0.9178857791
PEMBEBANAN
Momen
M = 1/8*q*Lkuadrat
= 174.164375 Kg.m
Mu = 1/4*Mdl
= 43.54109375 Kgm
0.4354109375 KNm
435.4109375 Nm
Terpusat pada kolom
P = (qL)/2
= 180.95 Kg
Pu = 1,4 P
= 253.33 Kg
2.5333 KN
2533.3 N
Kc = 0.89
Pn = (A x Fy)/w
2538930.6402 N
2538.9306402 KN
Pu/ØPn = 0.0011738615 < 0.2
Mux = σbx * Mu
0.4354109375 KNm
Kontrol Penampang
untuk sayap
b/2tf < 170/sqrtfy
10 < 10.973452814
Kompak, maka gunakan Mnx = Mpx
Untuk Badan
hw/tw = 23.4
= 1680/sqrt(fy)(1-(2,75Pu)ØPn)
108.1244
23.4 < 108.1244 Kompak
Maka gunakan Mnx = Mpx
Lateral buckling
Lb = 385 cm
3.85 m
dari tabel iwf tanpa sokongan
Lr = 771 cm
7.71 m
Lp = 155 cm
1.55 m
Maka,
Lp < Lb < Lr = bentang menengah
Mn = Cb(Mr+(Mp-Mr)(Lr-Lb)/(Lr-Lp)))
= 312.07752727 KNm
Persamaan Interaksi
Mn = Mp
= 360.2688 Knm
Mn = 312.07752727
Maka = Pu Mux
2ØPn
= 0.0015508105 < 1
AMAN-DAPAT DIGUNAKAN
= 216.11
OK
ʎr = 43.0126
ʎr = 28.86751
OK
Prelimanary Design
Data
F'c = 30 Mpa
Baseplate Seluasan Pedestal
Pu = 722 KN
= 722000 N
Φ = 0.85
PP = Pu
Φ
= 849.411764705882 N
PP = 0,85xf'cxA1
A1 = 33.3102652825836 mm2
1. KUAT AKSIAL
B=N = 300 mm
d = 200 mm
bf = 200 mm
m = N-0,95d
2
= 55 mm
n = B - 0,8.bf
2
= 70
PU < 0,6 x 1,7 f'c x B x N
722000 < 2754000 OK
3. Kuat Geser
Kolom Lt 1 Kolom Lt 2
Beban V2 (KN) V2 (KN)
DL 0.0804 0.0917
LL 0 0
1,4DL 0.11256 0.12838
1,2DL + 1,6LL 0.09648 0.11004
D baut = 16 mm
Ab = 200.96 mm2
Vu ≤ 0,75*Fv*Ab*n
24.37 = 0,75*250*1000*200,96/1000000*n
okayy
n = 1.54616331555191
n = 2 buah
24.37
4.Kuat Tarik
Kolom Lantai 1 Kolom Lantai 2
Beban
P(KN) M(KNm) P(KN) M(KNm)
DL -26.7201 -0.3427 -10.5286 0.3543
LL 0 0 0 0
1,4 DL -37.40814 -0.47978 -14.74004 0.49602
1,2 DL + 1,6 LL -32.06412 -0.41124 -12.63432 0.42516
fc1 = 8.02658987654321
fc2 = 8.01785456790124
a = 150.081666666667 mm
Tu = Mu - Pu . X1
x2
Tu = 24.1731203849486 KN
Ag = 200.96 mm2
Tu = Φb . Ag . Fy . n/2
24.173120385 = 0,9 . 200,96 . 250 . n/2
n/2 = 0.534614304338035
n = 1.06922860867607
n pakai = 2 buah
Panjang Angkur
ld = Tu / (Φ . phi . D . Fcl . n/2) 11.304
= 0.002566148660823 m
= 2.56614866082257 mm
Id pakai = 400 mm
m
m
Las fillet
Tebal las = 3 mm
Panjang Efektif las
Lw1 = (B-tw)/2xtebal las+Bx2
= 432 mm
Lw2 = 4xH
800 mm
LW = Lw 1 + Lw 2
= 1232 mm
Mutu Las
fy = 250 mpa
fu = 490 mpa
Ru
Beban Balok Lt 1
DL 4.8584
LL 0
1,4 DL 6.80176
1,2 DL 5.83008
1,2 DL + 1,6 LL 5.83008
Ru < φ Rnw
5.83008 < 1536.486 OK
Las fillet
Tebal las = 3 mm
Panjang Efektif las
Lw1 = (B-tw)/2xtebal las+Bx2
= 171.6667 mm
Lw2 = 4xH
300 mm
LW = Lw 1 + Lw 2
= 471.6667 mm
Mutu Las
fy = 250 mpa
fu = 490 mpa
φ Rnw = 0,75 x (0,6.fu.0,707.tw.LW)
= 588238.1 N
= 588.2381 KN
Ru
Beban Balok Lt 1
DL 4.8584
LL 0
1,4 DL 6.80176
1,2 DL 5.83008
1,2 DL + 1,6 LL 5.83008
Ru < φ Rnw
5.83008 < 588.2381 OK
Kolom Lantai 1 Kolom Lantai 2 Story 1 DL
Beban
P(KN) M(KNm) P(KN) M(KNm)
DL -26.7201 -0.3427 -10.5286 0.3543 LL
LL 0 0 0 0
1,4 DL -37.40814 -0.47978 -14.74004 0.49602 Story 2 DL
1,2 DL + 1,6 LL -32.06412 -0.41124 -12.63432 0.42516
LL
P max
M max
P max
M max
P max
M max
P max
M max