Anda di halaman 1dari 41

DAFTAR HARGA BAHAN BANGUNAN

Kelompok :
Desa : GATTARENG
No. Tlp/Hp :

Harga
No Jenis Bahan Bangunan Satuan
Satuan
1 2 3 4 5
1 Tiang 12 / 12 Panjang 5 M Rp 244,800 Btg
2 Tiang 12 / 12 Panjang 4 M Rp 195,840 Btg
3 Tiang 10 / 10 Panjang 4 M Rp 136,000 Btg
4 Balok 6 / 12 Panjang 4 M Rp 85,000 Btg
5 Balok 5 / 15 Panjang 4 M Rp 102,000 Btg
6 Balok 5 / 10 Panjang 4 M Rp 68,000 Btg
7 Balok 5 / 7 Panjang 4 M Rp 47,600 Btg
8 Balok 6 / 6 Panjang 4 M Rp 48,960 Btg
9 Balok 5 / 5 Panjang 4 M Rp 34,000 Btg
10 Balok 3 / 5 Panjang 4 M Rp 20,400 Btg
11 Papan 2 / 25 Panjang 4 M Rp 68,000 Lbr
12 Papan 2 / 20 Panjang 4 M Rp 55,000 Lbr
13 Papan Lembar Seri 4 M Rp 225,000 Ikat
14 Papan Lembar Seri 2,5 M Rp 145,000 Ikat
SENG GELOMBANG BESAR
15 Seng 10 Kaki Gel. Besar Rp 89,000 Lbr
16 Seng 9 Kaki Gel. Besar Rp 80,100 Lbr
17 Seng 8 Kaki Gel. Besar Rp 71,200 Lbr
18 Seng 7 Kaki Gel. Besar Rp 62,300 Lbr
19 Seng 6 Kaki Gel. Besar Rp 53,400 Lbr
20 Seng 5 Kaki Gel. Besar Rp 44,500 Lbr
21 Seng Plat 40 cm Rp 22,000 M
22 Paku Seng Rp 52,000 Kg
23 Paku 3 cm Rp 22,000 Kg
Paku 5 cm Rp 22,000 Kg
Paku 7 cm Rp 22,000 Kg
Paku 10 cm Rp 22,000 Kg
24 Besi Ø 12 Rp 115,000 Btg
Besi Ø 10 Rp 95,000 Btg
Besi Ø 8 Rp 60,000 Btg
25 Kawat Beton Rp 25,000 Kg
26 Batu Bata Rp 800 Bh
27 Semen 40 Kg Rp 56,000 Zak
28 Pasir Rp 155,000 M³
29 Batu Kali Rp 165,000 M³
Catatan :
Prioritaskan/Utamakan bahan bangunan yang Penerima Bantuan
didahulukan di kerja

( ………………………………………… )
AN

Jumlah Ket
6(3x5) 7
Tiang
Tiang
Tiang
Kuda-kuda VOLUME JML/M3 HRG SATUAN
lepang pattolo 0.07 13.89 252,000
Kuda-kuda/lepang pattolo 0.06 17.36 201,600
0.03 34.72 100,800
0.03 33.33 105,000
0.02 50.00 70,000
0.01 71.43 49,000
0.01 69.44 50,400
0.01 100.00 35,000
0.01 166.67 21,000
0.04 25.00 140,000

0.02 62.50 56,000


0.02 50.00 70,000

8900 10 PER KAKI


8900 9
8900 8
8900 7
8900 6
8,900 5

620,000
660,000
Penerima Bantuan

……………………………………… )
RG SATUAN 3,500,000
Btg 12 /12 5m
Btg 12 /12 4m
Btg 6 /12 4 m
Btg 5 / 15 4 m
Btg 5 / 10 4 m
Btg 5/74m
Btg 6/64m
Btg 5/54m
Btg 354m
Btg 10 10 4 m
3,500,000
Lbr
Lbr
NO BNBA NAMA JENIS KELAMIN KTP ALAMAT UMUR PEKERJAAN PENGHASILAN
5,102 5,102 RAHMATAN L 7312051710710001 MADINING 50 Tahun IRT Rp 700,000
5,103 5,103 RUSLAN L 7312051002660001 MADINING 42 Tahun Buruh Harian Lepas Rp 500,000
5,104 5,104 SUMARTINI SAING P 7312054805660002 MADINING 49 Tahun Petani Rp 700,000
5,105 5,105 HENDRA L 7312053112760028 MADINING 56 Tahun IRT Rp 750,000
5,106 5,106 BASRI L 7312050107790035 MADINING 41 Tahun Petani Rp 900,000
5,107 5,107 FIRMAN L 7312053112570005 MADINING 63 Tahun Petani Rp 750,000
5,108 5,108 INISA P 7312057112630069 MADINING 46 Tahun IRT Rp 700,000
5,109 5,109 AHIRUDDING L 7312053001860001 MADINING 60 Tahun IRT Rp 700,000
5,110 5,110 FAROJAI L 7312053112450079 MADINING 54 Tahun Petani Rp 750,000
5,111 5,111 SITENG P 7312057112450103 MADINING 42 Tahun Petani Rp 700,000
5,112 5,112 SULLE L 7312050909650001 MADINING 84 Tahun IRT Rp 750,000
5,113 5,113 ACHMAD ALI L 7312051909870001 MADINING 47 Tahun Petani Rp 300,000
5,114 5,114 ASMAWATY P 7312054101750004 MADINING 57 Tahun Petani Rp 700,000
5,115 5,115 SAINAL ABIDIN L 7312051710620001 MADINING 66 Tahun IRT Rp 700,000
5,116 5,116 ASIRI P 7312051603650001 MADINING 61 Tahun IRT Rp 300,000
JL. OPU
16 16 ERMIATI Perempuan 7373075708940002 32 IRT Rp 700,000
TOHALIDE
JL. OPU
17 17 WANDI Laki-laki 7373071312890001 29 Petani Rp 300,000
TOHALIDE
JL. OPU
18 18 ISA Perempuan 7373077112310005 88 IRT Rp 300,000
TOHALIDE
JL. OPU
19 19 WAHIDAH Perempuan 7373074303810002 24 IRT Rp 500,000
TOHALIDE
JL. OPU
20 20 SONGE Laki-laki 7373070212790001 39 Petani Rp 700,000
TOHALIDE

21 21 Laki-laki 7373071003680001` JL. OPU 50 Petani Rp 800,000


MUH. YASIR TOHALIDE
JL. OPU
22 22 Laki-laki 7373072110740001 39 Rp 750,000
AGGE TOHALIDE Petani
JL. OPU
23 23 Perempuan 7317085905950004 Rp 700,000
NURIANI TOHALIDE 23 IRT
JL. OPU
24 24 Perempuan 7373077112860003 Rp 700,000
LINA TOHALIDE 32 IRT
JL. OPU
25 25 Laki-laki 7373072401670001 Rp 1,000,000
AMAN. M. ASIR TOHALIDE 51 Petani
FORMAT 16
RENCANA ANGGARAN BIAYA (RAB) BANTUAN STIMULAN PEERUMAHAN SWADAYA

Nomor BNBA : 5,116


NIK : 7312051603650001
Nama Penerima Bantuan : ASIRI
Alamat : MADINING
Desa : BATU-BATU
Kecamatan : MARIORIAWA
Kabupaten : SOPPENG
Jenis Kegiatan : PKRS BSPS

SUMBER DANA /BAHAN (Rp)


SWADAYA
Harga Satuan Total Harga
NO. URAIAN PEKERJAAN VOLUME Memakai
(Rp) (Rp)
BSPS Bahan
Dana Tunai
Bangunan
Lama
I Pekerjaan Persiapan 500,000 - 500,000 -
Bongkar Rumah Lama 1 ls 500,000 500,000 500,000
II Pekerjaan Pondasi - - - -
1 Galian Tanah Pondasi M³ - -
2 Urugan Pasir M³ - -
3 Pasangan Pondasi - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Kali M³ 165,000 - -
4 Urugan Kembali M³ - -
III Pekerjaan Sloof - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Sloof, Ukuran 15/20
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Balok Kayu
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 6 cm x 12 cm x 400 cm ) Btg 85,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
IV Pekerjaan Kolom 1,360,000 1,360,000 - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Kolom Ukuran 15/15 Min. T = 3 m
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Tiang Kayu
- Tiang 12 / 12 Panjang 5 M Btg 244,800 - -
- Tiang 12 / 12 Panjang 4 M Btg 195,840 - -
- Tiang 10 / 10 Panjang 4 M 10 Btg 136,000 1,360,000 1,360,000
V Dinding Permanen - - - -
1 Tembok
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Batu Bata Bh 800 - -
2 Pekerjaan Plester
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
V Dinding Kayu 3,140,000 3,140,000 - -
1 Papan
- Papan (2 cm x 20 cm x 400 cm) 20 Lbr 55,000 1,100,000 1,100,000
- Papan (2 cm x 25 cm x 400 cm) 30 Lbr 68,000 2,040,000 2,040,000
- Papan Lembar Seri 4 M Ikat 225,000 - -
- Papan Lembar Seri 2,5 M Ikat 145,000 - -
2 Balok Kayu
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
- Balok ( 5 cm x 5 cm x 400 cm ) Btg 34,000 - -
VI Pekerjaan Pintu dan Jendela - - - -
- Kusen Pintu Unit 100,000 - -
- Kusen Jendela Unit 100,000 - -
- Kusen Ventilasi Unit 75,000 - -
- Daun Pintu Kayu Unit - -
- Daun Pintu Jendela Unit - -
- Handle Pintu dan Kunci Pintu Set 146,250 - -
- Handle Jendela dan Kunci Jendela Set 44,250 - -
- Engsel Pintu Set 34,000 - -
- Engsel Jendela Set 24,500 - -
VII Ring Balok - - - -
1 Pekerjaan Bekisting M² - -
2 Pekerjaan Cor Beton
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
VII Ring Balok - - - -
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
VIII Pekerjaan Struktur Atap 6,188,000 6,188,000 - -
- Kayu rangka kuda-kuda (6 cm x 12 cm x Btg 85,000 - -
- Kayu rangka kuda-kuda (5 cm x 10 cm x 30 Btg 68,000 2,040,000 2,040,000
- Kayu gordeng /Usuk (5 cm x 7 cm x 400 Btg 47,600 - -
- Kayu gordeng /Usuk (6 cm x 6 cm x 400 50 Btg 48,960 2,448,000 2,448,000
- Kayu gordeng /Usuk (5 cm x 5 cm x 400 50 Btg 34,000 1,700,000 1,700,000
- Kayu gordeng /Usuk (3 cm x 5 cm x 400 Btg 20,400 - -
IX Pekerjaan Penutup Atap 6,230,000 6,230,000 - -
### 1 Penutup Atap
- Seng Gelombang Besar 10 Kaki Lbr 89,000 - -
- Seng Gelombang Besar 9 Kaki Lbr 80,100 - -
- Seng Gelombang Besar 8 Kaki Lbr 71,200 - -
- Seng Gelombang Besar 7 Kaki 100 Lbr 62,300 6,230,000 6,230,000
### - Seng Gelombang Besar 6 Kaki Lbr 53,400 - -
### - Seng Gelombang Besar 5 Kaki Lbr 44,500 - -
### 2 Bubungan Atap
Seng Plat @ 40 cm M 22,000 - -
X Pekerjaan Lantai - - - -
### 1 Lantai Rabat Beton
### - Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
### 2 Lantai Papan
- Papan (2 cm x 20 cm x 400 cm) lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) lbr 68,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
XI MCK - - - -
### - Tangki Septik Unit 250,000 - -
- Closet Jongkok Unit 155,000 - -
- Pipa Air Bersih 3/4 " Btg 200,000 - -
- Pipa Air Kotor 3 " Btg 95,000 - -
- Kran Bh - -
- Pintu Kamar Mandi Set - -
XII Lain - lain 582,000 582,000 - -
### - Paku biasa 10 cm 10 kg 22,000 220,000 220,000
- Paku biasa 7 cm 7 kg 22,000 154,000 154,000
- Paku biasa 5 cm kg 22,000 - -
- Paku biasa 3 cm kg 22,000 - -
- Paku Seng 4 kg 52,000 208,000 208,000
- Kawat Beton kg 25,000 - -
### - Baut @ 15 cm Bh - -
- Baut @ 20 cm Bh - -
- Baut @ 25 cm Bh - -
VI Upah Kerja 2,500,000 2,500,000 - -
- Tukang 10 Oh 150,000 1,500,000 1,500,000
- Pembantu Tukang 10 Oh 100,000 1,000,000 1,000,000
JUMLAH 20,500,000 20,000,000 500,000 -

BATU-BATU , 20
Didampingi Oleh, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB I Penerima Bantuan

DARSUNI DWI PUTRA DARWIS, ST RAHMATAN ASIRI

Diperiksa Oleh, Diperiksa Oleh,


Konsultan Provinsi Koordinator Kabupaten

AGUS SALIM, S.T MUKHLISAH, S.T


FORMAT 16
RENCANA ANGGARAN BIAYA (RAB) BANTUAN STIMULAN PEERUMAHAN SWADAYA

Nomor BNBA : 5,115


NIK : 7312051710620001
Nama Penerima Bantuan : SAINAL ABIDIN
Alamat : MADINING
Desa : BATU-BATU
Kecamatan : MARIORIAWA
Kabupaten : SOPPENG
Jenis Kegiatan : PKRS BSPS

SUMBER DANA /BAHAN (Rp)


SWADAYA
Harga Total Harga
NO. URAIAN PEKERJAAN VOLUME Memakai
Satuan (Rp) (Rp)
BSPS Bahan
Dana Tunai
Bangunan
Lama
I Pekerjaan Persiapan 500,000 - 500,000 -
Bongkar Rumah Lama 1 ls 500,000 500,000 500,000
II Pekerjaan Pondasi - - - -
1 Galian Tanah Pondasi M³ - -
2 Urugan Pasir M³ - -
3 Pasangan Pondasi - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Kali M³ 165,000 - -
4 Urugan Kembali M³ - -
III Pekerjaan Sloof - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Sloof, Ukuran 15/20
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Balok Kayu
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 6 cm x 12 cm x 400 cm ) Btg 85,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
IV Pekerjaan Kolom 2,937,600 2,937,600 - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Kolom Ukuran 15/15 Min. T = 3 m
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Tiang Kayu
- Tiang 12 / 12 Panjang 5 M 12 Btg 244,800 2,937,600 2,937,600
- Tiang 12 / 12 Panjang 4 M Btg 195,840 - -
- Tiang 10 / 10 Panjang 4 M Btg 136,000 - -
V Dinding Permanen - - - -
1 Tembok
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Batu Bata Bh 800 - -
2 Pekerjaan Plester
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
V Dinding Kayu 3,115,000 3,115,000 - -
1 Papan
- Papan (2 cm x 20 cm x 400 cm) 30 Lbr 55,000 1,650,000 1,650,000
- Papan (2 cm x 25 cm x 400 cm) 5 Lbr 68,000 340,000 340,000
- Papan Lembar Seri 4 M 5 Ikat 225,000 1,125,000 1,125,000
- Papan Lembar Seri 2,5 M Ikat 145,000 - -
2 Balok Kayu
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
- Balok ( 5 cm x 5 cm x 400 cm ) Btg 34,000 - -
VI Pekerjaan Pintu dan Jendela - - - -
- Kusen Pintu Unit 100,000 - -
- Kusen Jendela Unit 100,000 - -
- Kusen Ventilasi Unit 75,000 - -
- Daun Pintu Kayu Unit - -
- Daun Pintu Jendela Unit - -
- Handle Pintu dan Kunci Pintu Set 146,250 - -
- Handle Jendela dan Kunci Jendela Set 44,250 - -
- Engsel Pintu Set 34,000 - -
- Engsel Jendela Set 24,500 - -
VII Ring Balok - - - -
1 Pekerjaan Bekisting M² - -
2 Pekerjaan Cor Beton
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
VII Ring Balok - - - -
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
VIII Pekerjaan Struktur Atap 2,346,000 2,346,000 - -
- Kayu rangka kuda-kuda (6 cm x 12 cm x Btg 85,000 - -
- Kayu rangka kuda-kuda (5 cm x 10 cm x Btg 68,000 - -
- Kayu gordeng /Usuk (5 cm x 7 cm x 400 Btg 47,600 - -
- Kayu gordeng /Usuk (6 cm x 6 cm x 400 Btg 48,960 - -
- Kayu gordeng /Usuk (5 cm x 5 cm x 400 45 Btg 34,000 1,530,000 1,530,000
- Kayu gordeng /Usuk (3 cm x 5 cm x 400 40 Btg 20,400 816,000 816,000
IX Pekerjaan Penutup Atap 8,406,000 8,406,000 - -
### 1 Penutup Atap
- Seng Gelombang Besar 10 Kaki Lbr 89,000 - -
- Seng Gelombang Besar 9 Kaki Lbr 80,100 - -
- Seng Gelombang Besar 8 Kaki 75 Lbr 71,200 5,340,000 5,340,000
- Seng Gelombang Besar 7 Kaki 32 Lbr 62,300 1,993,600 1,993,600
### - Seng Gelombang Besar 6 Kaki 6 Lbr 53,400 320,400 320,400
### - Seng Gelombang Besar 5 Kaki 8 Lbr 44,500 356,000 356,000
### 2 Bubungan Atap
Seng Plat @ 40 cm 18 M 22,000 396,000 396,000
X Pekerjaan Lantai - - - -
### 1 Lantai Rabat Beton
### - Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
### 2 Lantai Papan
- Papan (2 cm x 20 cm x 400 cm) lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) lbr 68,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
XI MCK - - - -
### - Tangki Septik Unit 250,000 - -
- Closet Jongkok Unit 155,000 - -
- Pipa Air Bersih 3/4 " Btg 200,000 - -
- Pipa Air Kotor 3 " Btg 95,000 - -
- Kran Bh - -
- Pintu Kamar Mandi Set - -
XII Lain - lain 695,400 695,400 - -
### - Paku biasa 10 cm kg 22,000 - -
- Paku biasa 7 cm 5 kg 22,000 110,000 110,000
- Paku biasa 5 cm 6 kg 22,000 132,000 132,000
- Paku biasa 3 cm 4.1 kg 22,000 89,400 89,400
- Paku Seng 7 kg 52,000 364,000 364,000
- Kawat Beton kg 25,000 - -
### - Baut @ 15 cm Bh - -
- Baut @ 20 cm Bh - -
- Baut @ 25 cm Bh - -
VI Upah Kerja 2,500,000 2,500,000 - -
- Tukang 10 Oh 150,000 1,500,000 1,500,000
- Pembantu Tukang 10 Oh 100,000 1,000,000 1,000,000
JUMLAH 20,500,000 20,000,000 500,000 -

BATU-BATU , 202
Didampingi Oleh, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB I Penerima Bantuan

DARSUNI DWI PUTRA DARWIS, ST RAHMATAN SAINAL ABIDIN

Diperiksa Oleh, Diperiksa Oleh,


Konsultan Provinsi Koordinator Kabupaten

AGUS SALIM, S.T MUKHLISAH, S.T


FORMAT 16
RENCANA ANGGARAN BIAYA (RAB) BANTUAN STIMULAN PEERUMAHAN SWADAYA

Nomor BNBA : 5,114


NIK : 7312054101750004
Nama Penerima Bantuan : ASMAWATY
Alamat : MADINING
Desa : BATU-BATU
Kecamatan : MARIORIAWA
Kabupaten : SOPPENG
Jenis Kegiatan : PKRS BSPS

SUMBER DANA /BAHAN (Rp)


SWADAYA
Harga Total Harga
NO. URAIAN PEKERJAAN VOLUME Memakai
Satuan (Rp) (Rp)
BSPS Bahan
Dana Tunai
Bangunan
Lama
I Pekerjaan Persiapan 500,000 - 500,000 -
Bongkar Rumah Lama 1 ls 500,000 500,000 500,000
II Pekerjaan Pondasi - - - -
1 Galian Tanah Pondasi M³ - -
2 Urugan Pasir M³ - -
3 Pasangan Pondasi - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Kali M³ 165,000 - -
4 Urugan Kembali M³ - -
III Pekerjaan Sloof - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Sloof, Ukuran 15/20
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Balok Kayu
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 6 cm x 12 cm x 400 cm ) Btg 85,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
IV Pekerjaan Kolom 2,393,600 2,393,600 - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Kolom Ukuran 15/15 Min. T = 3 m
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Tiang Kayu
- Tiang 12 / 12 Panjang 5 M 7 Btg 244,800 1,713,600 1,713,600
- Tiang 12 / 12 Panjang 4 M Btg 195,840 - -
- Tiang 10 / 10 Panjang 4 M 5 Btg 136,000 680,000 680,000
V Dinding Permanen - - - -
1 Tembok
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Batu Bata Bh 800 - -
2 Pekerjaan Plester
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
V Dinding Kayu 1,430,000 1,430,000 - -
1 Papan
- Papan (2 cm x 20 cm x 400 cm) 26 Lbr 55,000 1,430,000 1,430,000
- Papan (2 cm x 25 cm x 400 cm) Lbr 68,000 - -
- Papan Lembar Seri 4 M Ikat 225,000 - -
- Papan Lembar Seri 2,5 M Ikat 145,000 - -
2 Balok Kayu
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
- Balok ( 5 cm x 5 cm x 400 cm ) Btg 34,000 - -
VI Pekerjaan Pintu dan Jendela - - - -
- Kusen Pintu Unit 100,000 - -
- Kusen Jendela Unit 100,000 - -
- Kusen Ventilasi Unit 75,000 - -
- Daun Pintu Kayu Unit - -
- Daun Pintu Jendela Unit - -
- Handle Pintu dan Kunci Pintu Set 146,250 - -
- Handle Jendela dan Kunci Jendela Set 44,250 - -
- Engsel Pintu Set 34,000 - -
- Engsel Jendela Set 24,500 - -
VII Ring Balok - - - -
1 Pekerjaan Bekisting M² - -
2 Pekerjaan Cor Beton
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
VII Ring Balok - - - -
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
VIII Pekerjaan Struktur Atap 4,746,400 4,746,400 - -
- Kayu rangka kuda-kuda (6 cm x 12 cm x Btg 85,000 - -
- Kayu rangka kuda-kuda (5 cm x 10 cm x 20 Btg 68,000 1,360,000 1,360,000
- Kayu gordeng /Usuk (5 cm x 7 cm x 400 Btg 47,600 - -
- Kayu gordeng /Usuk (6 cm x 6 cm x 400 65 Btg 48,960 3,182,400 3,182,400
- Kayu gordeng /Usuk (5 cm x 5 cm x 400 Btg 34,000 - -
- Kayu gordeng /Usuk (3 cm x 5 cm x 400 10 Btg 20,400 204,000 204,000
IX Pekerjaan Penutup Atap 8,384,000 8,384,000 - -
### 1 Penutup Atap
- Seng Gelombang Besar 10 Kaki Lbr 89,000 - -
- Seng Gelombang Besar 9 Kaki 100 Lbr 80,100 8,010,000 8,010,000
- Seng Gelombang Besar 8 Kaki Lbr 71,200 - -
- Seng Gelombang Besar 7 Kaki Lbr 62,300 - -
### - Seng Gelombang Besar 6 Kaki Lbr 53,400 - -
### - Seng Gelombang Besar 5 Kaki Lbr 44,500 - -
### 2 Bubungan Atap
Seng Plat @ 40 cm 17 M 22,000 374,000 374,000
X Pekerjaan Lantai - - - -
### 1 Lantai Rabat Beton
### - Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
### 2 Lantai Papan
- Papan (2 cm x 20 cm x 400 cm) lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) lbr 68,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
XI MCK - - - -
### - Tangki Septik Unit 250,000 - -
- Closet Jongkok Unit 155,000 - -
- Pipa Air Bersih 3/4 " Btg 200,000 - -
- Pipa Air Kotor 3 " Btg 95,000 - -
- Kran Bh - -
- Pintu Kamar Mandi Set - -
XII Lain - lain 546,000 546,000 - -
### - Paku biasa 10 cm 2 kg 22,000 44,000 44,000
- Paku biasa 7 cm 2 kg 22,000 44,000 44,000
- Paku biasa 5 cm 4.6364 kg 22,000 102,000 102,000
- Paku biasa 3 cm 2 kg 22,000 44,000 44,000
- Paku Seng 6 kg 52,000 312,000 312,000
- Kawat Beton kg 25,000 - -
### - Baut @ 15 cm Bh - -
- Baut @ 20 cm Bh - -
- Baut @ 25 cm Bh - -
VI Upah Kerja 2,500,000 2,500,000 - -
- Tukang 10 Oh 150,000 1,500,000 1,500,000
- Pembantu Tukang 10 Oh 100,000 1,000,000 1,000,000
JUMLAH 20,500,000 20,000,000 500,000 -

BATU-BATU , 202
Didampingi Oleh, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB I Penerima Bantuan

DARSUNI DWI PUTRA DARWIS, ST RAHMATAN ASMAWATY

Diperiksa Oleh, Diperiksa Oleh,


Konsultan Provinsi Koordinator Kabupaten

AGUS SALIM, S.T MUKHLISAH, S.T


FORMAT 16
RENCANA ANGGARAN BIAYA (RAB) BANTUAN STIMULAN PEERUMAHAN SWADAYA

Nomor BNBA : 5,113


NIK : 7312051909870001
Nama Penerima Bantuan : ACHMAD ALI
Alamat : MADINING
Desa : BATU-BATU
Kecamatan : MARIORIAWA
Kabupaten : SOPPENG
Jenis Kegiatan : PKRS BSPS

SUMBER DANA /BAHAN (Rp)


SWADAYA
Harga Total Harga
NO. URAIAN PEKERJAAN VOLUME Memakai
Satuan (Rp) (Rp)
BSPS Bahan
Dana Tunai
Bangunan
Lama
I Pekerjaan Persiapan 500,000 - 500,000 -
Bongkar Rumah Lama 1 ls 500,000 500,000 500,000
II Pekerjaan Pondasi - - - -
1 Galian Tanah Pondasi M³ - -
2 Urugan Pasir M³ - -
3 Pasangan Pondasi - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Kali M³ 165,000 - -
4 Urugan Kembali M³ - -
III Pekerjaan Sloof - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Sloof, Ukuran 15/20
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Balok Kayu
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 6 cm x 12 cm x 400 cm ) Btg 85,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
IV Pekerjaan Kolom 1,047,520 1,047,520 - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Kolom Ukuran 15/15 Min. T = 3 m
- Besi Beton Ø 12 mm SNI 4 Btg 115,000 460,000 460,000
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Tiang Kayu
- Tiang 12 / 12 Panjang 5 M Btg 244,800 - -
- Tiang 12 / 12 Panjang 4 M 3 Btg 195,840 587,520 587,520
- Tiang 10 / 10 Panjang 4 M Btg 136,000 - -
V Dinding Permanen 1,133,400 1,133,400 - -
1 Tembok
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg 10 Zak 56,000 560,000 560,000
- Batu Bata 523 Bh 800 418,400 418,400
2 Pekerjaan Plester
- Pasir Pasang 1 M³ 155,000 155,000 155,000
- Semen @ 40 kg Zak 56,000 - -
V Dinding Kayu 5,552,000 5,552,000 - -
1 Papan
- Papan (2 cm x 20 cm x 400 cm) Lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) 39 Lbr 68,000 2,652,000 2,652,000
- Papan Lembar Seri 4 M Ikat 225,000 - -
- Papan Lembar Seri 2,5 M 20 Ikat 145,000 2,900,000 2,900,000
2 Balok Kayu
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
- Balok ( 5 cm x 5 cm x 400 cm ) Btg 34,000 - -
VI Pekerjaan Pintu dan Jendela - - - -
- Kusen Pintu Unit 100,000 - -
- Kusen Jendela Unit 100,000 - -
- Kusen Ventilasi Unit 75,000 - -
- Daun Pintu Kayu Unit - -
- Daun Pintu Jendela Unit - -
- Handle Pintu dan Kunci Pintu Set 146,250 - -
- Handle Jendela dan Kunci Jendela Set 44,250 - -
- Engsel Pintu Set 34,000 - -
- Engsel Jendela Set 24,500 - -
VII Ring Balok - - - -
1 Pekerjaan Bekisting M² - -
2 Pekerjaan Cor Beton
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
VII Ring Balok - - - -
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
VIII Pekerjaan Struktur Atap 3,277,600 3,277,600 - -
- Kayu rangka kuda-kuda (6 cm x 12 cm x Btg 85,000 - -
- Kayu rangka kuda-kuda (5 cm x 10 cm x Btg 68,000 - -
- Kayu gordeng /Usuk (5 cm x 7 cm x 400 Btg 47,600 - -
- Kayu gordeng /Usuk (6 cm x 6 cm x 400 Btg 48,960 - -
- Kayu gordeng /Usuk (5 cm x 5 cm x 400 82 Btg 34,000 2,788,000 2,788,000
- Kayu gordeng /Usuk (3 cm x 5 cm x 400 24 Btg 20,400 489,600 489,600
IX Pekerjaan Penutup Atap 6,141,000 6,141,000 - -
### 1 Penutup Atap
- Seng Gelombang Besar 10 Kaki 20 Lbr 89,000 1,780,000 1,780,000
- Seng Gelombang Besar 9 Kaki Lbr 80,100 - -
- Seng Gelombang Besar 8 Kaki Lbr 71,200 - -
- Seng Gelombang Besar 7 Kaki 70 Lbr 62,300 4,361,000 4,361,000
### - Seng Gelombang Besar 6 Kaki Lbr 53,400 - -
### - Seng Gelombang Besar 5 Kaki Lbr 44,500 - -
### 2 Bubungan Atap
Seng Plat @ 40 cm M 22,000 - -
X Pekerjaan Lantai - - - -
### 1 Lantai Rabat Beton
### - Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
### 2 Lantai Papan
- Papan (2 cm x 20 cm x 400 cm) lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) lbr 68,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
XI MCK - - - -
### - Tangki Septik Unit 250,000 - -
- Closet Jongkok Unit 155,000 - -
- Pipa Air Bersih 3/4 " Btg 200,000 - -
- Pipa Air Kotor 3 " Btg 95,000 - -
- Kran Bh - -
- Pintu Kamar Mandi Set - -
XII Lain - lain 348,480 348,480 - -
### - Paku biasa 10 cm kg 22,000 - -
- Paku biasa 7 cm 2.9764 kg 22,000 65,480 65,480
- Paku biasa 5 cm 3 kg 22,000 66,000 66,000
- Paku biasa 3 cm 4 kg 22,000 88,000 88,000
- Paku Seng 2 kg 52,000 104,000 104,000
- Kawat Beton 1 kg 25,000 25,000 25,000
### - Baut @ 15 cm Bh - -
- Baut @ 20 cm Bh - -
- Baut @ 25 cm Bh - -
VI Upah Kerja 2,500,000 2,500,000 - -
- Tukang 10 Oh 150,000 1,500,000 1,500,000
- Pembantu Tukang 10 Oh 100,000 1,000,000 1,000,000
JUMLAH 20,500,000 20,000,000 500,000 -

BATU-BATU , 202
Didampingi Oleh, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB I Penerima Bantuan

DARSUNI DWI PUTRA DARWIS, ST RAHMATAN ACHMAD ALI

Diperiksa Oleh, Diperiksa Oleh,


Konsultan Provinsi Koordinator Kabupaten

AGUS SALIM, S.T MUKHLISAH, S.T


FORMAT 16
RENCANA ANGGARAN BIAYA (RAB) BANTUAN STIMULAN PEERUMAHAN SWADAYA

Nomor BNBA : 5,112


NIK : 7312050909650001
Nama Penerima Bantuan : SULLE
Alamat : MADINING
Desa : BATU-BATU
Kecamatan : MARIORIAWA
Kabupaten : SOPPENG
Jenis Kegiatan : PKRS BSPS

SUMBER DANA /BAHAN (Rp)


SWADAYA
Harga Total Harga
NO. URAIAN PEKERJAAN VOLUME Memakai
Satuan (Rp) (Rp)
BSPS Bahan
Dana Tunai
Bangunan
Lama
I Pekerjaan Persiapan 500,000 - 500,000 -
Bongkar Rumah Lama 1 ls 500,000 500,000 500,000
II Pekerjaan Pondasi - - - -
1 Galian Tanah Pondasi M³ - -
2 Urugan Pasir M³ - -
3 Pasangan Pondasi - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Kali M³ 165,000 - -
4 Urugan Kembali M³ - -
III Pekerjaan Sloof - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Sloof, Ukuran 15/20
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Balok Kayu
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 6 cm x 12 cm x 400 cm ) Btg 85,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
IV Pekerjaan Kolom 489,600 489,600 - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Kolom Ukuran 15/15 Min. T = 3 m
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Tiang Kayu
- Tiang 12 / 12 Panjang 5 M 2 Btg 244,800 489,600 489,600
- Tiang 12 / 12 Panjang 4 M Btg 195,840 - -
- Tiang 10 / 10 Panjang 4 M Btg 136,000 - -
V Dinding Permanen - - - -
1 Tembok
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Batu Bata Bh 800 - -
2 Pekerjaan Plester
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
V Dinding Kayu 5,708,000 5,708,000 - -
1 Papan
- Papan (2 cm x 20 cm x 400 cm) Lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) 31 Lbr 68,000 2,108,000 2,108,000
- Papan Lembar Seri 4 M 16 Ikat 225,000 3,600,000 3,600,000
- Papan Lembar Seri 2,5 M Ikat 145,000 - -
2 Balok Kayu
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
- Balok ( 5 cm x 5 cm x 400 cm ) Btg 34,000 - -
VI Pekerjaan Pintu dan Jendela - - - -
- Kusen Pintu Unit 100,000 - -
- Kusen Jendela Unit 100,000 - -
- Kusen Ventilasi Unit 75,000 - -
- Daun Pintu Kayu Unit - -
- Daun Pintu Jendela Unit - -
- Handle Pintu dan Kunci Pintu Set 146,250 - -
- Handle Jendela dan Kunci Jendela Set 44,250 - -
- Engsel Pintu Set 34,000 - -
- Engsel Jendela Set 24,500 - -
VII Ring Balok - - - -
1 Pekerjaan Bekisting M² - -
2 Pekerjaan Cor Beton
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
VII Ring Balok - - - -
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
VIII Pekerjaan Struktur Atap 2,074,000 2,074,000 - -
- Kayu rangka kuda-kuda (6 cm x 12 cm x Btg 85,000 - -
- Kayu rangka kuda-kuda (5 cm x 10 cm x Btg 68,000 - -
- Kayu gordeng /Usuk (5 cm x 7 cm x 400 Btg 47,600 - -
- Kayu gordeng /Usuk (6 cm x 6 cm x 400 Btg 48,960 - -
- Kayu gordeng /Usuk (5 cm x 5 cm x 400 43 Btg 34,000 1,462,000 1,462,000
- Kayu gordeng /Usuk (3 cm x 5 cm x 400 30 Btg 20,400 612,000 612,000
IX Pekerjaan Penutup Atap 8,759,000 8,759,000 - -
### 1 Penutup Atap
- Seng Gelombang Besar 10 Kaki 6 Lbr 89,000 534,000 534,000
- Seng Gelombang Besar 9 Kaki Lbr 80,100 - -
- Seng Gelombang Besar 8 Kaki 70 Lbr 71,200 4,984,000 4,984,000
- Seng Gelombang Besar 7 Kaki 10 Lbr 62,300 623,000 623,000
### - Seng Gelombang Besar 6 Kaki 20 Lbr 53,400 1,068,000 1,068,000
### - Seng Gelombang Besar 5 Kaki 20 Lbr 44,500 890,000 890,000
### 2 Bubungan Atap
Seng Plat @ 40 cm 30 M 22,000 660,000 660,000
X Pekerjaan Lantai - - - -
### 1 Lantai Rabat Beton
### - Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
### 2 Lantai Papan
- Papan (2 cm x 20 cm x 400 cm) lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) lbr 68,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
XI MCK - - - -
### - Tangki Septik Unit 250,000 - -
- Closet Jongkok Unit 155,000 - -
- Pipa Air Bersih 3/4 " Btg 200,000 - -
- Pipa Air Kotor 3 " Btg 95,000 - -
- Kran Bh - -
- Pintu Kamar Mandi Set - -
XII Lain - lain 469,400 469,400 - -
### - Paku biasa 10 cm kg 22,000 - -
- Paku biasa 7 cm 2 kg 22,000 44,000 44,000
- Paku biasa 5 cm 6 kg 22,000 132,000 132,000
- Paku biasa 3 cm 1.518 kg 22,000 33,400 33,400
- Paku Seng 5 kg 52,000 260,000 260,000
- Kawat Beton kg 25,000 - -
### - Baut @ 15 cm Bh - -
- Baut @ 20 cm Bh - -
- Baut @ 25 cm Bh - -
VI Upah Kerja 2,500,000 2,500,000 - -
- Tukang 10 Oh 150,000 1,500,000 1,500,000
- Pembantu Tukang 10 Oh 100,000 1,000,000 1,000,000
JUMLAH 20,500,000 20,000,000 500,000 -

BATU-BATU , 202
Didampingi Oleh, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB I Penerima Bantuan

DARSUNI DWI PUTRA DARWIS, ST RAHMATAN SULLE

Diperiksa Oleh, Diperiksa Oleh,


Konsultan Provinsi Koordinator Kabupaten

AGUS SALIM, S.T MUKHLISAH, S.T


FORMAT 16
RENCANA ANGGARAN BIAYA (RAB) BANTUAN STIMULAN PEERUMAHAN SWADAYA

Nomor BNBA : 5,111


NIK : 7312057112450103
Nama Penerima Bantuan : SITENG
Alamat : MADINING
Desa : BATU-BATU
Kecamatan : MARIORIAWA
Kabupaten : SOPPENG
Jenis Kegiatan : PKRS BSPS

SUMBER DANA /BAHAN (Rp)


SWADAYA
Harga Total Harga
NO. URAIAN PEKERJAAN VOLUME Memakai
Satuan (Rp) (Rp)
BSPS Bahan
Dana Tunai
Bangunan
Lama
I Pekerjaan Persiapan 500,000 - 500,000 -
Bongkar Rumah Lama 1 ls 500,000 500,000 500,000
II Pekerjaan Pondasi - - - -
1 Galian Tanah Pondasi M³ - -
2 Urugan Pasir M³ - -
3 Pasangan Pondasi - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Kali M³ 165,000 - -
4 Urugan Kembali M³ - -
III Pekerjaan Sloof - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Sloof, Ukuran 15/20
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Balok Kayu
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 6 cm x 12 cm x 400 cm ) Btg 85,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
IV Pekerjaan Kolom 680,000 680,000 - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Kolom Ukuran 15/15 Min. T = 3 m
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Tiang Kayu
- Tiang 12 / 12 Panjang 5 M Btg 244,800 - -
- Tiang 12 / 12 Panjang 4 M Btg 195,840 - -
- Tiang 10 / 10 Panjang 4 M 5 Btg 136,000 680,000 680,000
V Dinding Permanen - - - -
1 Tembok
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Batu Bata Bh 800 - -
2 Pekerjaan Plester
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
V Dinding Kayu 2,720,000 2,720,000 - -
1 Papan
- Papan (2 cm x 20 cm x 400 cm) Lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) 40 Lbr 68,000 2,720,000 2,720,000
- Papan Lembar Seri 4 M Ikat 225,000 - -
- Papan Lembar Seri 2,5 M Ikat 145,000 - -
2 Balok Kayu
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
- Balok ( 5 cm x 5 cm x 400 cm ) Btg 34,000 - -
VI Pekerjaan Pintu dan Jendela - - - -
- Kusen Pintu Unit 100,000 - -
- Kusen Jendela Unit 100,000 - -
- Kusen Ventilasi Unit 75,000 - -
- Daun Pintu Kayu Unit - -
- Daun Pintu Jendela Unit - -
- Handle Pintu dan Kunci Pintu Set 146,250 - -
- Handle Jendela dan Kunci Jendela Set 44,250 - -
- Engsel Pintu Set 34,000 - -
- Engsel Jendela Set 24,500 - -
VII Ring Balok - - - -
1 Pekerjaan Bekisting M² - -
2 Pekerjaan Cor Beton
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
VII Ring Balok - - - -
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
VIII Pekerjaan Struktur Atap 6,337,600 6,337,600 - -
- Kayu rangka kuda-kuda (6 cm x 12 cm x Btg 85,000 - -
- Kayu rangka kuda-kuda (5 cm x 10 cm x 30 Btg 68,000 2,040,000 2,040,000
- Kayu gordeng /Usuk (5 cm x 7 cm x 400 30 Btg 47,600 1,428,000 1,428,000
- Kayu gordeng /Usuk (6 cm x 6 cm x 400 10 Btg 48,960 489,600 489,600
- Kayu gordeng /Usuk (5 cm x 5 cm x 400 70 Btg 34,000 2,380,000 2,380,000
- Kayu gordeng /Usuk (3 cm x 5 cm x 400 Btg 20,400 - -
IX Pekerjaan Penutup Atap 7,027,000 7,027,000 - -
### 1 Penutup Atap
- Seng Gelombang Besar 10 Kaki Lbr 89,000 - -
- Seng Gelombang Besar 9 Kaki Lbr 80,100 - -
- Seng Gelombang Besar 8 Kaki 50 Lbr 71,200 3,560,000 3,560,000
- Seng Gelombang Besar 7 Kaki 50 Lbr 62,300 3,115,000 3,115,000
### - Seng Gelombang Besar 6 Kaki Lbr 53,400 - -
### - Seng Gelombang Besar 5 Kaki Lbr 44,500 - -
### 2 Bubungan Atap
Seng Plat @ 40 cm 16 M 22,000 352,000 352,000
X Pekerjaan Lantai - - - -
### 1 Lantai Rabat Beton
### - Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
### 2 Lantai Papan
- Papan (2 cm x 20 cm x 400 cm) lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) lbr 68,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
XI MCK - - - -
### - Tangki Septik Unit 250,000 - -
- Closet Jongkok Unit 155,000 - -
- Pipa Air Bersih 3/4 " Btg 200,000 - -
- Pipa Air Kotor 3 " Btg 95,000 - -
- Kran Bh - -
- Pintu Kamar Mandi Set - -
XII Lain - lain 735,400 735,400 - -
### - Paku biasa 10 cm 4 kg 22,000 88,000 88,000
- Paku biasa 7 cm 5 kg 22,000 110,000 110,000
- Paku biasa 5 cm 5 kg 22,000 110,000 110,000
- Paku biasa 3 cm ### kg 22,000 11,400 11,400
- Paku Seng 8 kg 52,000 416,000 416,000
- Kawat Beton kg 25,000 - -
### - Baut @ 15 cm Bh - -
- Baut @ 20 cm Bh - -
- Baut @ 25 cm Bh - -
VI Upah Kerja 2,500,000 2,500,000 - -
- Tukang 10 Oh 150,000 1,500,000 1,500,000
- Pembantu Tukang 10 Oh 100,000 1,000,000 1,000,000
JUMLAH 20,500,000 20,000,000 500,000 -

BATU-BATU , 202
Didampingi Oleh, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB I Penerima Bantuan

DARSUNI DWI PUTRA DARWIS, ST RAHMATAN SITENG

Diperiksa Oleh, Diperiksa Oleh,


Konsultan Provinsi Koordinator Kabupaten

AGUS SALIM, S.T MUKHLISAH, S.T


FORMAT 16
RENCANA ANGGARAN BIAYA (RAB) BANTUAN STIMULAN PEERUMAHAN SWADAYA

Nomor BNBA : 5,110


NIK : 7312053112450079
Nama Penerima Bantuan : FAROJAI
Alamat : MADINING
Desa : BATU-BATU
Kecamatan : MARIORIAWA
Kabupaten : SOPPENG
Jenis Kegiatan : PKRS BSPS

SUMBER DANA /BAHAN (Rp)


SWADAYA
Harga Total Harga
NO. URAIAN PEKERJAAN VOLUME Memakai
Satuan (Rp) (Rp)
BSPS Bahan
Dana Tunai
Bangunan
Lama
I Pekerjaan Persiapan 500,000 - 500,000 -
Bongkar Rumah Lama 1 ls 500,000 500,000 500,000
II Pekerjaan Pondasi - - - -
1 Galian Tanah Pondasi M³ - -
2 Urugan Pasir M³ - -
3 Pasangan Pondasi - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Kali M³ 165,000 - -
4 Urugan Kembali M³ - -
III Pekerjaan Sloof - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Sloof, Ukuran 15/20
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Balok Kayu
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 6 cm x 12 cm x 400 cm ) Btg 85,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
IV Pekerjaan Kolom 391,680 391,680 - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Kolom Ukuran 15/15 Min. T = 3 m
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Tiang Kayu
- Tiang 12 / 12 Panjang 5 M Btg 244,800 - -
- Tiang 12 / 12 Panjang 4 M 2 Btg 195,840 391,680 391,680
- Tiang 10 / 10 Panjang 4 M Btg 136,000 - -
V Dinding Permanen - - - -
1 Tembok
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Batu Bata Bh 800 - -
2 Pekerjaan Plester
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
V Dinding Kayu 9,350,000 9,350,000 - -
1 Papan
- Papan (2 cm x 20 cm x 400 cm) 170 Lbr 55,000 9,350,000 9,350,000
- Papan (2 cm x 25 cm x 400 cm) Lbr 68,000 - -
- Papan Lembar Seri 4 M Ikat 225,000 - -
- Papan Lembar Seri 2,5 M Ikat 145,000 - -
2 Balok Kayu
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
- Balok ( 5 cm x 5 cm x 400 cm ) Btg 34,000 - -
VI Pekerjaan Pintu dan Jendela - - - -
- Kusen Pintu Unit 100,000 - -
- Kusen Jendela Unit 100,000 - -
- Kusen Ventilasi Unit 75,000 - -
- Daun Pintu Kayu Unit - -
- Daun Pintu Jendela Unit - -
- Handle Pintu dan Kunci Pintu Set 146,250 - -
- Handle Jendela dan Kunci Jendela Set 44,250 - -
- Engsel Pintu Set 34,000 - -
- Engsel Jendela Set 24,500 - -
VII Ring Balok - - - -
1 Pekerjaan Bekisting M² - -
2 Pekerjaan Cor Beton
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
VII Ring Balok - - - -
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
VIII Pekerjaan Struktur Atap 4,420,000 4,420,000 - -
- Kayu rangka kuda-kuda (6 cm x 12 cm x Btg 85,000 - -
- Kayu rangka kuda-kuda (5 cm x 10 cm x Btg 68,000 - -
- Kayu gordeng /Usuk (5 cm x 7 cm x 400 Btg 47,600 - -
- Kayu gordeng /Usuk (6 cm x 6 cm x 400 Btg 48,960 - -
- Kayu gordeng /Usuk (5 cm x 5 cm x 400 100 Btg 34,000 3,400,000 3,400,000
- Kayu gordeng /Usuk (3 cm x 5 cm x 400 50 Btg 20,400 1,020,000 1,020,000
IX Pekerjaan Penutup Atap 2,776,800 2,776,800 - -
### 1 Penutup Atap
- Seng Gelombang Besar 10 Kaki Lbr 89,000 - -
- Seng Gelombang Besar 9 Kaki Lbr 80,100 - -
- Seng Gelombang Besar 8 Kaki Lbr 71,200 - -
- Seng Gelombang Besar 7 Kaki Lbr 62,300 - -
### - Seng Gelombang Besar 6 Kaki 52 Lbr 53,400 2,776,800 2,776,800
### - Seng Gelombang Besar 5 Kaki Lbr 44,500 - -
### 2 Bubungan Atap
Seng Plat @ 40 cm M 22,000 - -
X Pekerjaan Lantai - - - -
### 1 Lantai Rabat Beton
### - Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
### 2 Lantai Papan
- Papan (2 cm x 20 cm x 400 cm) lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) lbr 68,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
XI MCK - - - -
### - Tangki Septik Unit 250,000 - -
- Closet Jongkok Unit 155,000 - -
- Pipa Air Bersih 3/4 " Btg 200,000 - -
- Pipa Air Kotor 3 " Btg 95,000 - -
- Kran Bh - -
- Pintu Kamar Mandi Set - -
XII Lain - lain 561,520 561,520 - -
### - Paku biasa 10 cm 2 kg 22,000 44,000 44,000
- Paku biasa 7 cm 4.0691 kg 22,000 89,520 89,520
- Paku biasa 5 cm 10 kg 22,000 220,000 220,000
- Paku biasa 3 cm kg 22,000 - -
- Paku Seng 4 kg 52,000 208,000 208,000
- Kawat Beton kg 25,000 - -
### - Baut @ 15 cm Bh - -
- Baut @ 20 cm Bh - -
- Baut @ 25 cm Bh - -
VI Upah Kerja 2,500,000 2,500,000 - -
- Tukang 10 Oh 150,000 1,500,000 1,500,000
- Pembantu Tukang 10 Oh 100,000 1,000,000 1,000,000
JUMLAH 20,500,000 20,000,000 500,000 -

BATU-BATU , 2021
Didampingi Oleh, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB I Penerima Bantuan

DARSUNI DWI PUTRA DARWIS, ST RAHMATAN FAROJAI

Diperiksa Oleh, Diperiksa Oleh,


Konsultan Provinsi Koordinator Kabupaten

AGUS SALIM, S.T MUKHLISAH, S.T


FORMAT 16
RENCANA ANGGARAN BIAYA (RAB) BANTUAN STIMULAN PEERUMAHAN SWADAYA

Nomor BNBA : 5,109


NIK : 7312053001860001
Nama Penerima Bantuan : AHIRUDDING
Alamat : MADINING
Desa : BATU-BATU
Kecamatan : MARIORIAWA
Kabupaten : SOPPENG
Jenis Kegiatan : PKRS BSPS

SUMBER DANA /BAHAN (Rp)


SWADAYA
Harga Total Harga
NO. URAIAN PEKERJAAN VOLUME Memakai
Satuan (Rp) (Rp)
BSPS Bahan
Dana Tunai
Bangunan
Lama
I Pekerjaan Persiapan 500,000 - 500,000 -
Bongkar Rumah Lama 1 ls 500,000 500,000 500,000
II Pekerjaan Pondasi - - - -
1 Galian Tanah Pondasi M³ - -
2 Urugan Pasir M³ - -
3 Pasangan Pondasi - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Kali M³ 165,000 - -
4 Urugan Kembali M³ - -
III Pekerjaan Sloof 1,020,000 1,020,000 - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Sloof, Ukuran 15/20
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Balok Kayu
- Balok ( 5 cm x 15 cm x 400 cm ) 10 Btg 102,000 1,020,000 1,020,000
- Balok ( 6 cm x 12 cm x 400 cm ) Btg 85,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
IV Pekerjaan Kolom 1,468,800 1,468,800 - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Kolom Ukuran 15/15 Min. T = 3 m
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Tiang Kayu
- Tiang 12 / 12 Panjang 5 M 6 Btg 244,800 1,468,800 1,468,800
- Tiang 12 / 12 Panjang 4 M Btg 195,840 - -
- Tiang 10 / 10 Panjang 4 M Btg 136,000 - -
V Dinding Permanen - - - -
1 Tembok
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Batu Bata Bh 800 - -
2 Pekerjaan Plester
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
V Dinding Kayu 6,324,000 6,324,000 - -
1 Papan
- Papan (2 cm x 20 cm x 400 cm) Lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) 93 Lbr 68,000 6,324,000 6,324,000
- Papan Lembar Seri 4 M Ikat 225,000 - -
- Papan Lembar Seri 2,5 M Ikat 145,000 - -
2 Balok Kayu
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 6 cm x 6 cm x 400 cm ) Btg 48,960 - -
- Balok ( 5 cm x 5 cm x 400 cm ) Btg 34,000 - -
VI Pekerjaan Pintu dan Jendela - - - -
- Kusen Pintu Unit 100,000 - -
- Kusen Jendela Unit 100,000 - -
- Kusen Ventilasi Unit 75,000 - -
- Daun Pintu Kayu Unit - -
- Daun Pintu Jendela Unit - -
- Handle Pintu dan Kunci Pintu Set 146,250 - -
- Handle Jendela dan Kunci Jendela Set 44,250 - -
- Engsel Pintu Set 34,000 - -
- Engsel Jendela Set 24,500 - -
VII Ring Balok - - - -
1 Pekerjaan Bekisting M² - -
2 Pekerjaan Cor Beton
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
VII Ring Balok - - - -
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
VIII Pekerjaan Struktur Atap 3,332,000 3,332,000 - -
- Kayu rangka kuda-kuda (6 cm x 12 cm x Btg 85,000 - -
- Kayu rangka kuda-kuda (5 cm x 10 cm x Btg 68,000 - -
- Kayu gordeng /Usuk (5 cm x 7 cm x 400 5 Btg 47,600 238,000 238,000
- Kayu gordeng /Usuk (6 cm x 6 cm x 400 Btg 48,960 - -
- Kayu gordeng /Usuk (5 cm x 5 cm x 400 91 Btg 34,000 3,094,000 3,094,000
- Kayu gordeng /Usuk (3 cm x 5 cm x 400 Btg 20,400 - -
IX Pekerjaan Penutup Atap 4,930,600 4,930,600 - -
### 1 Penutup Atap
- Seng Gelombang Besar 10 Kaki Lbr 89,000 - -
- Seng Gelombang Besar 9 Kaki Lbr 80,100 - -
- Seng Gelombang Besar 8 Kaki Lbr 71,200 - -
- Seng Gelombang Besar 7 Kaki 20 Lbr 62,300 1,246,000 1,246,000
### - Seng Gelombang Besar 6 Kaki 69 Lbr 53,400 3,684,600 3,684,600
### - Seng Gelombang Besar 5 Kaki Lbr 44,500 - -
### 2 Bubungan Atap
Seng Plat @ 40 cm M 22,000 - -
X Pekerjaan Lantai - - - -
### 1 Lantai Rabat Beton
### - Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
### 2 Lantai Papan
- Papan (2 cm x 20 cm x 400 cm) lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) lbr 68,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
XI MCK - - - -
### - Tangki Septik Unit 250,000 - -
- Closet Jongkok Unit 155,000 - -
- Pipa Air Bersih 3/4 " Btg 200,000 - -
- Pipa Air Kotor 3 " Btg 95,000 - -
- Kran Bh - -
- Pintu Kamar Mandi Set - -
XII Lain - lain 424,600 424,600 - -
### - Paku biasa 10 cm kg 22,000 - -
- Paku biasa 7 cm 5 kg 22,000 110,000 110,000
- Paku biasa 5 cm 5 kg 22,000 110,000 110,000
- Paku biasa 3 cm 2.2091 kg 22,000 48,600 48,600
- Paku Seng 3 kg 52,000 156,000 156,000
- Kawat Beton kg 25,000 - -
### - Baut @ 15 cm Bh - -
- Baut @ 20 cm Bh - -
- Baut @ 25 cm Bh - -
VI Upah Kerja 2,500,000 2,500,000 - -
- Tukang 10 Oh 150,000 1,500,000 1,500,000
- Pembantu Tukang 10 Oh 100,000 1,000,000 1,000,000
JUMLAH 20,500,000 20,000,000 500,000 -

BATU-BATU , 202
Didampingi Oleh, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB I Penerima Bantuan

DARSUNI DWI PUTRA DARWIS, ST RAHMATAN AHIRUDDING

Diperiksa Oleh, Diperiksa Oleh,


Konsultan Provinsi Koordinator Kabupaten

AGUS SALIM, S.T MUKHLISAH, S.T


FORMAT 16
RENCANA ANGGARAN BIAYA (RAB) BANTUAN STIMULAN PEERUMAHAN SWADAYA

Nomor BNBA : 5,108


NIK : 7312057112630069
Nama Penerima Bantuan : INISA
Alamat : MADINING
Desa : BATU-BATU
Kecamatan : MARIORIAWA
Kabupaten : SOPPENG
Jenis Kegiatan : PKRS BSPS

SUMBER DANA /BAHAN (Rp)


SWADAYA
Harga Total Harga
NO. URAIAN PEKERJAAN VOLUME Memakai
Satuan (Rp) (Rp)
BSPS Bahan
Dana Tunai
Bangunan
Lama
I Pekerjaan Persiapan 500,000 - 500,000 -
Bongkar Rumah Lama 1 ls 500,000 500,000 500,000
II Pekerjaan Pondasi 660,000 660,000 - -
1 Galian Tanah Pondasi M³ - -
2 Urugan Pasir M³ - -
3 Pasangan Pondasi - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Kali 4 M³ 165,000 660,000 660,000
4 Urugan Kembali M³ - -
III Pekerjaan Sloof - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Sloof, Ukuran 15/20
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Balok Kayu
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 6 cm x 12 cm x 400 cm ) Btg 85,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
IV Pekerjaan Kolom - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Kolom Ukuran 15/15 Min. T = 3 m
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Tiang Kayu
- Tiang 12 / 12 Panjang 5 M Btg 244,800 - -
- Tiang 12 / 12 Panjang 4 M Btg 195,840 - -
- Tiang 10 / 10 Panjang 4 M Btg 136,000 - -
V Dinding Permanen 277,400 277,400 - -
1 Tembok
- Pasir Pasang 1 M³ 155,000 155,000 155,000
- Semen @ 40 kg 2 Zak 56,000 112,000 112,000
- Batu Bata 13 Bh 800 10,400 10,400
2 Pekerjaan Plester
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
V Dinding Kayu 5,818,000 5,818,000 - -
1 Papan
- Papan (2 cm x 20 cm x 400 cm) Lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) 58 Lbr 68,000 3,944,000 3,944,000
- Papan Lembar Seri 4 M Ikat 225,000 - -
- Papan Lembar Seri 2,5 M 8 Ikat 145,000 1,160,000 1,160,000
2 Balok Kayu
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 3 cm x 5 cm x 400 cm ) 35 Btg 20,400 714,000 714,000
- Balok ( 5 cm x 5 cm x 400 cm ) Btg 34,000 - -
VI Pekerjaan Pintu dan Jendela - - - -
- Kusen Pintu Unit 100,000 - -
- Kusen Jendela Unit 100,000 - -
- Kusen Ventilasi Unit 75,000 - -
- Daun Pintu Kayu Unit - -
- Daun Pintu Jendela Unit - -
- Handle Pintu dan Kunci Pintu Set 146,250 - -
- Handle Jendela dan Kunci Jendela Set 44,250 - -
- Engsel Pintu Set 34,000 - -
- Engsel Jendela Set 24,500 - -
VII Ring Balok - - - -
1 Pekerjaan Bekisting M² - -
2 Pekerjaan Cor Beton
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
VII Ring Balok - - - -
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
VIII Pekerjaan Struktur Atap - - - -
- Kayu rangka kuda-kuda (6 cm x 12 cm x Btg 85,000 - -
- Kayu rangka kuda-kuda (5 cm x 10 cm x Btg 68,000 - -
- Kayu gordeng /Usuk (5 cm x 7 cm x 400 Btg 47,600 - -
- Kayu gordeng /Usuk (6 cm x 6 cm x 400 Btg 48,960 - -
- Kayu gordeng /Usuk (5 cm x 5 cm x 400 Btg 34,000 - -
- Kayu gordeng /Usuk (3 cm x 5 cm x 400 Btg 20,400 - -
IX Pekerjaan Penutup Atap 10,217,900 10,217,900 - -
### 1 Penutup Atap
- Seng Gelombang Besar 10 Kaki Lbr 89,000 - -
- Seng Gelombang Besar 9 Kaki 22 Lbr 80,100 1,762,200 1,762,200
- Seng Gelombang Besar 8 Kaki Lbr 71,200 - -
- Seng Gelombang Besar 7 Kaki 75 Lbr 62,300 4,672,500 4,672,500
### - Seng Gelombang Besar 6 Kaki 33 Lbr 53,400 1,762,200 1,762,200
### - Seng Gelombang Besar 5 Kaki 38 Lbr 44,500 1,691,000 1,691,000
### 2 Bubungan Atap
Seng Plat @ 40 cm 15 M 22,000 330,000 330,000
X Pekerjaan Lantai - - - -
### 1 Lantai Rabat Beton
### - Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
### 2 Lantai Papan
- Papan (2 cm x 20 cm x 400 cm) lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) lbr 68,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
XI MCK - - - -
### - Tangki Septik Unit 250,000 - -
- Closet Jongkok Unit 155,000 - -
- Pipa Air Bersih 3/4 " Btg 200,000 - -
- Pipa Air Kotor 3 " Btg 95,000 - -
- Kran Bh - -
- Pintu Kamar Mandi Set - -
XII Lain - lain 526,700 526,700 - -
### - Paku biasa 10 cm kg 22,000 - -
- Paku biasa 7 cm 1.0318 kg 22,000 22,700 22,700
- Paku biasa 5 cm 3 kg 22,000 66,000 66,000
- Paku biasa 3 cm 1 kg 22,000 22,000 22,000
- Paku Seng 8 kg 52,000 416,000 416,000
- Kawat Beton kg 25,000 - -
### - Baut @ 15 cm Bh - -
- Baut @ 20 cm Bh - -
- Baut @ 25 cm Bh - -
VI Upah Kerja 2,500,000 2,500,000 - -
- Tukang 10 Oh 150,000 1,500,000 1,500,000
- Pembantu Tukang 10 Oh 100,000 1,000,000 1,000,000
JUMLAH 20,500,000 20,000,000 500,000 -

BATU-BATU , 2021
Didampingi Oleh, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB I Penerima Bantuan

DARSUNI DWI PUTRA DARWIS, ST RAHMATAN INISA

Diperiksa Oleh, Diperiksa Oleh,


Konsultan Provinsi Koordinator Kabupaten

AGUS SALIM, S.T MUKHLISAH, S.T


FORMAT 16
RENCANA ANGGARAN BIAYA (RAB) BANTUAN STIMULAN PEERUMAHAN SWADAYA

Nomor BNBA : 5,107


NIK : 7312053112570005
Nama Penerima Bantuan : FIRMAN
Alamat : MADINING
Desa : BATU-BATU
Kecamatan : MARIORIAWA
Kabupaten : SOPPENG
Jenis Kegiatan : PKRS BSPS

SUMBER DANA /BAHAN (Rp)


SWADAYA
Harga Total Harga
NO. URAIAN PEKERJAAN VOLUME Memakai
Satuan (Rp) (Rp)
BSPS Bahan
Dana Tunai
Bangunan
Lama
I Pekerjaan Persiapan 500,000 - 500,000 -
Bongkar Rumah Lama 1 ls 500,000 500,000 500,000
II Pekerjaan Pondasi - - - -
1 Galian Tanah Pondasi M³ - -
2 Urugan Pasir M³ - -
3 Pasangan Pondasi - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Kali M³ 165,000 - -
4 Urugan Kembali M³ - -
III Pekerjaan Sloof - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Sloof, Ukuran 15/20
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Balok Kayu
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 6 cm x 12 cm x 400 cm ) Btg 85,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
IV Pekerjaan Kolom - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Kolom Ukuran 15/15 Min. T = 3 m
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Tiang Kayu
- Tiang 12 / 12 Panjang 5 M Btg 244,800 - -
- Tiang 12 / 12 Panjang 4 M Btg 195,840 - -
- Tiang 10 / 10 Panjang 4 M Btg 136,000 - -
V Dinding Permanen - - - -
1 Tembok
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Batu Bata Bh 800 - -
2 Pekerjaan Plester
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
V Dinding Kayu 330,000 330,000 - -
1 Papan
- Papan (2 cm x 20 cm x 400 cm) 6 Lbr 55,000 330,000 330,000
- Papan (2 cm x 25 cm x 400 cm) Lbr 68,000 - -
- Papan Lembar Seri 4 M Ikat 225,000 - -
- Papan Lembar Seri 2,5 M Ikat 145,000 - -
2 Balok Kayu
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
- Balok ( 5 cm x 5 cm x 400 cm ) Btg 34,000 - -
VI Pekerjaan Pintu dan Jendela - - - -
- Kusen Pintu Unit 100,000 - -
- Kusen Jendela Unit 100,000 - -
- Kusen Ventilasi Unit 75,000 - -
- Daun Pintu Kayu Unit - -
- Daun Pintu Jendela Unit - -
- Handle Pintu dan Kunci Pintu Set 146,250 - -
- Handle Jendela dan Kunci Jendela Set 44,250 - -
- Engsel Pintu Set 34,000 - -
- Engsel Jendela Set 24,500 - -
VII Ring Balok - - - -
1 Pekerjaan Bekisting M² - -
2 Pekerjaan Cor Beton
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
VII Ring Balok - - - -
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
VIII Pekerjaan Struktur Atap 3,264,000 3,264,000 - -
- Kayu rangka kuda-kuda (6 cm x 12 cm Btg 85,000 - -
- Kayu rangka kuda-kuda (5 cm x 10 cm Btg 68,000 - -
- Kayu gordeng /Usuk (5 cm x 7 cm x 400 Btg 47,600 - -
- Kayu gordeng /Usuk (6 cm x 6 cm x 400 Btg 48,960 - -
- Kayu gordeng /Usuk (5 cm x 5 cm x 400 60 Btg 34,000 2,040,000 2,040,000
- Kayu gordeng /Usuk (3 cm x 5 cm x 400 60 Btg 20,400 1,224,000 1,224,000
IX Pekerjaan Penutup Atap 12,455,000 12,455,000 - -
### 1 Penutup Atap
- Seng Gelombang Besar 10 Kaki 60 Lbr 89,000 5,340,000 5,340,000
- Seng Gelombang Besar 9 Kaki 60 Lbr 80,100 4,806,000 4,806,000
- Seng Gelombang Besar 8 Kaki Lbr 71,200 - -
- Seng Gelombang Besar 7 Kaki 30 Lbr 62,300 1,869,000 1,869,000
### - Seng Gelombang Besar 6 Kaki Lbr 53,400 - -
### - Seng Gelombang Besar 5 Kaki Lbr 44,500 - -
### 2 Bubungan Atap
Seng Plat @ 40 cm 20 M 22,000 440,000 440,000
X Pekerjaan Lantai - - - -
### 1 Lantai Rabat Beton
### - Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
### 2 Lantai Papan
- Papan (2 cm x 20 cm x 400 cm) lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) lbr 68,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
XI MCK - - - -
### - Tangki Septik Unit 250,000 - -
- Closet Jongkok Unit 155,000 - -
- Pipa Air Bersih 3/4 " Btg 200,000 - -
- Pipa Air Kotor 3 " Btg 95,000 - -
- Kran Bh - -
- Pintu Kamar Mandi Set - -
XII Lain - lain 1,451,000 1,451,000 - -
### - Paku biasa 10 cm 10.00 kg 22,000 220,000 220,000
- Paku biasa 7 cm 20 kg 22,000 440,000 440,000
- Paku biasa 5 cm 10 kg 22,000 220,000 220,000
- Paku biasa 3 cm 2.318182 kg 22,000 51,000 51,000
- Paku Seng 10 kg 52,000 520,000 520,000
- Kawat Beton kg 25,000 - -
### - Baut @ 15 cm Bh - -
- Baut @ 20 cm Bh - -
- Baut @ 25 cm Bh - -
VI Upah Kerja 2,500,000 2,500,000 - -
- Tukang 10 Oh 150,000 1,500,000 1,500,000
- Pembantu Tukang 10 Oh 100,000 1,000,000 1,000,000
JUMLAH 20,500,000 20,000,000 500,000 -

BATU-BATU , 2
Didampingi Oleh, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB I Penerima Bantuan

DARSUNI DWI PUTRA DARWIS, ST RAHMATAN FIRMAN

Diperiksa Oleh, Diperiksa Oleh,


Konsultan Provinsi Koordinator Kabupaten

AGUS SALIM, S.T MUKHLISAH, S.T


FORMAT 16
RENCANA ANGGARAN BIAYA (RAB) BANTUAN STIMULAN PEERUMAHAN SWADAYA

Nomor BNBA : 5,106


NIK : 7312050107790035
Nama Penerima Bantuan : BASRI
Alamat : MADINING
Desa : BATU-BATU
Kecamatan : MARIORIAWA
Kabupaten : SOPPENG
Jenis Kegiatan : PKRS BSPS

SUMBER DANA /BAHAN (Rp)


SWADAYA
Harga Total Harga
NO. URAIAN PEKERJAAN VOLUME
Satuan (Rp) (Rp)
BSPS
Dana Tunai

I Pekerjaan Persiapan 500,000 - 500,000


Bongkar Rumah Lama 1 ls 500,000 500,000 500,000
II Pekerjaan Pondasi - - -
1 Galian Tanah Pondasi M³ - -
2 Urugan Pasir M³ - -
3 Pasangan Pondasi - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Kali M³ 165,000 - -
4 Urugan Kembali M³ - -
III Pekerjaan Sloof - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Sloof, Ukuran 15/20
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Balok Kayu
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 6 cm x 12 cm x 400 cm ) Btg 85,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
IV Pekerjaan Kolom 1,904,000 1,904,000 -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Kolom Ukuran 15/15 Min. T = 3 m
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Tiang Kayu
- Tiang 12 / 12 Panjang 5 M 5 Btg 244,800 1,224,000 1,224,000
- Tiang 12 / 12 Panjang 4 M Btg 195,840 - -
- Tiang 10 / 10 Panjang 4 M 5 Btg 136,000 680,000 680,000
V Dinding Permanen 8,000 8,000 -
1 Tembok
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Batu Bata 10 Bh 800 8,000 8,000
2 Pekerjaan Plester
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
V Dinding Kayu 4,080,000 4,080,000 -
1 Papan
- Papan (2 cm x 20 cm x 400 cm) Lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) 60 Lbr 68,000 4,080,000 4,080,000
- Papan Lembar Seri 4 M Ikat 225,000 - -
- Papan Lembar Seri 2,5 M Ikat 145,000 - -
2 Balok Kayu
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
- Balok ( 3 cm x 5 cm x 400 cm ) Btg 20,400 - -
VI Pekerjaan Pintu dan Jendela - - -
- Kusen Pintu Unit 100,000 - -
- Kusen Jendela Unit 100,000 - -
- Kusen Ventilasi Unit 75,000 - -
- Daun Pintu Kayu Unit - -
- Daun Pintu Jendela Unit - -
- Handle Pintu dan Kunci Pintu Set 146,250 - -
- Handle Jendela dan Kunci Jendela Set 44,250 - -
- Engsel Pintu Set 34,000 - -
- Engsel Jendela Set 24,500 - -
VII Ring Balok - - -
1 Pekerjaan Bekisting M² - -
2 Pekerjaan Cor Beton
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
VII Ring Balok - - -
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
VIII Pekerjaan Struktur Atap 3,740,000 3,740,000 -
- Kayu rangka kuda-kuda (5 cm x 15 cm x 400 10 Btg 102,000 1,020,000 1,020,000
- Kayu rangka kuda-kuda (5 cm x 10 cm x 400 Btg 68,000 - -
- Kayu gordeng /Usuk (5 cm x 7 cm x 400 cm) 20 Btg 47,600 952,000 952,000
- Kayu gordeng /Usuk (6 cm x 6 cm x 400 cm) Btg 48,960 - -
- Kayu gordeng /Usuk (5 cm x 5 cm x 400 cm) 40 Btg 34,000 1,360,000 1,360,000
- Kayu gordeng /Usuk (3 cm x 5 cm x 400 cm) 20 Btg 20,400 408,000 408,000
IX Pekerjaan Penutup Atap 7,307,600 7,307,600 -
### 1 Penutup Atap
- Seng Gelombang Besar 10 Kaki Lbr 89,000 - -
- Seng Gelombang Besar 9 Kaki Lbr 80,100 - -
- Seng Gelombang Besar 8 Kaki 56 Lbr 71,200 3,987,200 3,987,200
- Seng Gelombang Besar 7 Kaki Lbr 62,300 - -
### - Seng Gelombang Besar 6 Kaki 21 Lbr 53,400 1,121,400 1,121,400
### - Seng Gelombang Besar 5 Kaki 42 Lbr 44,500 1,869,000 1,869,000
### 2 Bubungan Atap
Seng Plat @ 40 cm 15 M 22,000 330,000 330,000
X Pekerjaan Lantai - - -
### 1 Lantai Rabat Beton
### - Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
### 2 Lantai Papan
- Papan (2 cm x 20 cm x 400 cm) lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) lbr 68,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
XI MCK - - -
### - Tangki Septik Unit 250,000 - -
- Closet Jongkok Unit 155,000 - -
- Pipa Air Bersih 3/4 " Btg 200,000 - -
- Pipa Air Kotor 3 " Btg 95,000 - -
- Kran Bh -
- Pintu Kamar Mandi Set - -
XII Lain - lain 460,400 460,400 -
### - Paku biasa 10 cm kg 22,000 - -
- Paku biasa 7 cm 2 kg 22,000 44,000 44,000
- Paku biasa 5 cm 1.3818 kg 22,000 30,400 30,400
- Paku biasa 3 cm 1 kg 22,000 22,000 22,000
- Paku Seng 7 kg 52,000 364,000 364,000
- Kawat Beton kg - -
### - Baut @ 15 cm Bh - -
- Baut @ 20 cm Bh - -
- Baut @ 25 cm Bh - -
VI Upah Kerja 2,500,000 2,500,000 -
- Tukang 10 Oh 150,000 1,500,000 1,500,000
- Pembantu Tukang 10 Oh 100,000 1,000,000 1,000,000
JUMLAH 20,500,000 20,000,000 500,000

BATU-BATU , 202
Didampingi Oleh, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB I Penerima Bantuan

DARSUNI DWI PUTRA DARWIS, ST RAHMATAN BASRI

Diperiksa Oleh, Diperiksa Oleh,


Konsultan Provinsi Koordinator Kabupaten

AGUS SALIM, S.T MUKHLISAH, S.T


FORMAT 16
ARAN BIAYA (RAB) BANTUAN STIMULAN PEERUMAHAN SWADAYA

SUMBER DANA /BAHAN (Rp)


SWADAYA
Memakai
Bahan
Bangunan
Lama
-

-
-

, 202
Diajukan oleh,
Penerima Bantuan

BASRI

Diperiksa Oleh,
Koordinator Kabupaten

MUKHLISAH, S.T
FORMAT 16
RENCANA ANGGARAN BIAYA (RAB) BANTUAN STIMULAN PEERUMAHAN SWADAYA

Nomor BNBA : 5,105


NIK : 7312053112760028
Nama Penerima Bantuan : HENDRA
Alamat : MADINING
Desa : BATU-BATU
Kecamatan : MARIORIAWA
Kabupaten : SOPPENG
Jenis Kegiatan : PKRS BSPS

SUMBER DANA /BAHAN (Rp)


SWADAYA
Harga Total Harga
NO. URAIAN PEKERJAAN VOLUME Memakai
Satuan (Rp) (Rp)
BSPS Bahan
Dana Tunai
Bangunan
Lama
I Pekerjaan Persiapan 500,000 - 500,000 -
Bongkar Rumah Lama 1 ls 500,000 500,000 500,000
II Pekerjaan Pondasi - - - -
1 Galian Tanah Pondasi M³ - -
2 Urugan Pasir M³ - -
3 Pasangan Pondasi - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Kali M³ 165,000 - -
4 Urugan Kembali M³ - -
III Pekerjaan Sloof - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Sloof, Ukuran 15/20
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Balok Kayu
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 6 cm x 12 cm x 400 cm ) Btg 85,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
IV Pekerjaan Kolom 1,300,160 1,300,160 - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Kolom Ukuran 15/15 Min. T = 3 m
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Tiang Kayu
- Tiang 12 / 12 Panjang 5 M 1 Btg 244,800 244,800 244,800
- Tiang 12 / 12 Panjang 4 M 4 Btg 195,840 783,360 783,360
- Tiang 10 / 10 Panjang 4 M 2 Btg 136,000 272,000 272,000
V Dinding Permanen 17,600 17,600 - -
1 Tembok
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Batu Bata 22 Bh 800 17,600 17,600
2 Pekerjaan Plester
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
V Dinding Kayu 3,620,000 3,620,000 - -
1 Papan
- Papan (2 cm x 20 cm x 400 cm) Lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) 40 Lbr 68,000 2,720,000 2,720,000
- Papan Lembar Seri 4 M 4 Ikat 225,000 900,000 900,000
- Papan Lembar Seri 2,5 M Ikat 145,000 - -
2 Balok Kayu
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
- Balok ( 5 cm x 5 cm x 400 cm ) Btg 34,000 - -
VI Pekerjaan Pintu dan Jendela - - - -
- Kusen Pintu Unit 100,000 - -
- Kusen Jendela Unit 100,000 - -
- Kusen Ventilasi Unit 75,000 - -
- Daun Pintu Kayu Unit - -
- Daun Pintu Jendela Unit - -
- Handle Pintu dan Kunci Pintu Set 146,250 - -
- Handle Jendela dan Kunci Jendela Set 44,250 - -
- Engsel Pintu Set 34,000 - -
- Engsel Jendela Set 24,500 - -
VII Ring Balok - - - -
1 Pekerjaan Bekisting M² - -
2 Pekerjaan Cor Beton
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
VII Ring Balok - - - -
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
VIII Pekerjaan Struktur Atap 4,297,600 4,297,600 - -
- Kayu rangka kuda-kuda (6 cm x 12 cm x Btg 85,000 - -
- Kayu rangka kuda-kuda (5 cm x 10 cm x Btg 68,000 - -
- Kayu gordeng /Usuk (5 cm x 7 cm x 400 Btg 47,600 - -
- Kayu gordeng /Usuk (6 cm x 6 cm x 400 60 Btg 48,960 2,937,600 2,937,600
- Kayu gordeng /Usuk (5 cm x 5 cm x 400 10 Btg 34,000 340,000 340,000
- Kayu gordeng /Usuk (3 cm x 5 cm x 400 50 Btg 20,400 1,020,000 1,020,000
IX Pekerjaan Penutup Atap 7,895,000 7,895,000 - -
### 1 Penutup Atap
- Seng Gelombang Besar 10 Kaki Lbr 89,000 - -
- Seng Gelombang Besar 9 Kaki Lbr 80,100 - -
- Seng Gelombang Besar 8 Kaki Lbr 71,200 - -
- Seng Gelombang Besar 7 Kaki 70 Lbr 62,300 4,361,000 4,361,000
### - Seng Gelombang Besar 6 Kaki 60 Lbr 53,400 3,204,000 3,204,000
### - Seng Gelombang Besar 5 Kaki Lbr 44,500 - -
### 2 Bubungan Atap
Seng Plat @ 40 cm 15 M 22,000 330,000 330,000
X Pekerjaan Lantai - - - -
### 1 Lantai Rabat Beton
### - Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
### 2 Lantai Papan
- Papan (2 cm x 20 cm x 400 cm) lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) lbr 68,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
XI MCK - - - -
### - Tangki Septik Unit 250,000 - -
- Closet Jongkok Unit 155,000 - -
- Pipa Air Bersih 3/4 " Btg 200,000 - -
- Pipa Air Kotor 3 " Btg 95,000 - -
- Kran Bh - -
- Pintu Kamar Mandi Set - -
XII Lain - lain 369,640 369,640 - -
### - Paku biasa 10 cm kg 22,000 - -
- Paku biasa 7 cm 4.9836 kg 22,000 109,640 109,640
- Paku biasa 5 cm kg 22,000 - -
- Paku biasa 3 cm kg 22,000 - -
- Paku Seng 5 kg 52,000 260,000 260,000
- Kawat Beton kg 25,000 - -
### - Baut @ 15 cm Bh - -
- Baut @ 20 cm Bh - -
- Baut @ 25 cm Bh - -
VI Upah Kerja 2,500,000 2,500,000 - -
- Tukang 10 Oh 150,000 1,500,000 1,500,000
- Pembantu Tukang 10 Oh 100,000 1,000,000 1,000,000
JUMLAH 20,500,000 20,000,000 500,000 -

BATU-BATU , 2021
Didampingi Oleh, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB I Penerima Bantuan

DARSUNI DWI PUTRA DARWIS, ST RAHMATAN HENDRA

Diperiksa Oleh, Diperiksa Oleh,


Konsultan Provinsi Koordinator Kabupaten

AGUS SALIM, S.T MUKHLISAH, S.T


FORMAT 16
RENCANA ANGGARAN BIAYA (RAB) BANTUAN STIMULAN PEERUMAHAN SWADAYA

Nomor BNBA : 5,104


NIK : 7312054805660002
Nama Penerima Bantuan : SUMARTINI SAING
Alamat : MADINING
Desa : BATU-BATU
Kecamatan : MARIORIAWA
Kabupaten : SOPPENG
Jenis Kegiatan : PKRS BSPS

SUMBER DANA /BAHAN (Rp)


SWADAYA
Harga Total Harga
NO. URAIAN PEKERJAAN VOLUME Memakai
Satuan (Rp) (Rp)
BSPS Bahan
Dana Tunai
Bangunan
Lama
I Pekerjaan Persiapan 500,000 - 500,000 -
Bongkar Rumah Lama 1 ls 500,000 500,000 500,000
II Pekerjaan Pondasi - - - -
1 Galian Tanah Pondasi M³ - -
2 Urugan Pasir M³ - -
3 Pasangan Pondasi - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Kali M³ 165,000 - -
4 Urugan Kembali M³ - -
III Pekerjaan Sloof - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Sloof, Ukuran 15/20
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Balok Kayu
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 6 cm x 12 cm x 400 cm ) Btg 85,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
IV Pekerjaan Kolom 1,762,560 1,762,560 - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Kolom Ukuran 15/15 Min. T = 3 m
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Tiang Kayu
- Tiang 12 / 12 Panjang 5 M 4 Btg 244,800 979,200 979,200
- Tiang 12 / 12 Panjang 4 M 4 Btg 195,840 783,360 783,360
- Tiang 10 / 10 Panjang 4 M Btg 136,000 - -
V Dinding Permanen - - - -
1 Tembok
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Batu Bata Bh 800 - -
2 Pekerjaan Plester
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
V Dinding Kayu 3,850,000 3,850,000 - -
1 Papan
- Papan (2 cm x 20 cm x 400 cm) 70 Lbr 55,000 3,850,000 3,850,000
- Papan (2 cm x 25 cm x 400 cm) Lbr 68,000 - -
- Papan Lembar Seri 4 M Ikat 225,000 - -
- Papan Lembar Seri 2,5 M Ikat 145,000 - -
2 Balok Kayu
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
- Balok ( 5 cm x 5 cm x 400 cm ) Btg 34,000 - -
VI Pekerjaan Pintu dan Jendela - - - -
- Kusen Pintu Unit 100,000 - -
- Kusen Jendela Unit 100,000 - -
- Kusen Ventilasi Unit 75,000 - -
- Daun Pintu Kayu Unit - -
- Daun Pintu Jendela Unit - -
- Handle Pintu dan Kunci Pintu Set 146,250 - -
- Handle Jendela dan Kunci Jendela Set 44,250 - -
- Engsel Pintu Set 34,000 - -
- Engsel Jendela Set 24,500 - -
VII Ring Balok - - - -
1 Pekerjaan Bekisting M² - -
2 Pekerjaan Cor Beton
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
VII Ring Balok - - - -
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
VIII Pekerjaan Struktur Atap 4,420,000 4,420,000 - -
- Kayu rangka kuda-kuda (6 cm x 12 cm x Btg 85,000 - -
- Kayu rangka kuda-kuda (5 cm x 10 cm x 16 Btg 68,000 1,088,000 1,088,000
- Kayu gordeng /Usuk (5 cm x 7 cm x 400 20 Btg 47,600 952,000 952,000
- Kayu gordeng /Usuk (6 cm x 6 cm x 400 Btg 48,960 - -
- Kayu gordeng /Usuk (5 cm x 5 cm x 400 70 Btg 34,000 2,380,000 2,380,000
- Kayu gordeng /Usuk (3 cm x 5 cm x 400 Btg 20,400 - -
IX Pekerjaan Penutup Atap 7,209,000 7,209,000 - -
### 1 Penutup Atap
- Seng Gelombang Besar 10 Kaki Lbr 89,000 - -
- Seng Gelombang Besar 9 Kaki 90 Lbr 80,100 7,209,000 7,209,000
- Seng Gelombang Besar 8 Kaki Lbr 71,200 - -
- Seng Gelombang Besar 7 Kaki Lbr 62,300 - -
### - Seng Gelombang Besar 6 Kaki Lbr 53,400 - -
### - Seng Gelombang Besar 5 Kaki Lbr 44,500 - -
### 2 Bubungan Atap
Seng Plat @ 40 cm M 22,000 - -
X Pekerjaan Lantai - - - -
### 1 Lantai Rabat Beton
### - Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
### 2 Lantai Papan
- Papan (2 cm x 20 cm x 400 cm) lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) lbr 68,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
XI MCK - - - -
### - Tangki Septik Unit 250,000 - -
- Closet Jongkok Unit 155,000 - -
- Pipa Air Bersih 3/4 " Btg 200,000 - -
- Pipa Air Kotor 3 " Btg 95,000 - -
- Kran Bh - -
- Pintu Kamar Mandi Set - -
XII Lain - lain 258,440 258,440 - -
### - Paku biasa 10 cm kg 22,000 - -
- Paku biasa 7 cm 1 kg 22,000 22,000 22,000
- Paku biasa 5 cm 1.2927 kg 22,000 28,440 28,440
- Paku biasa 3 cm kg 22,000 - -
- Paku Seng 4 kg 52,000 208,000 208,000
- Kawat Beton kg 25,000 - -
### - Baut @ 15 cm Bh - -
- Baut @ 20 cm Bh - -
- Baut @ 25 cm Bh - -
VI Upah Kerja 2,500,000 2,500,000 - -
- Tukang 10 Oh 150,000 1,500,000 1,500,000
- Pembantu Tukang 10 Oh 100,000 1,000,000 1,000,000
JUMLAH 20,500,000 20,000,000 500,000 -

BATU-BATU , 202
Didampingi Oleh, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB I Penerima Bantuan

DARSUNI DWI PUTRA DARWIS, ST RAHMATAN SUMARTINI SAING

Diperiksa Oleh, Diperiksa Oleh,


Konsultan Provinsi Koordinator Kabupaten

AGUS SALIM, S.T MUKHLISAH, S.T


FORMAT 16
RENCANA ANGGARAN BIAYA (RAB) BANTUAN STIMULAN PEERUMAHAN SWADAYA

Nomor BNBA : 5,103


NIK : 7312051002660001
Nama Penerima Bantuan : RUSLAN
Alamat : MADINING
Desa : BATU-BATU
Kecamatan : MARIORIAWA
Kabupaten : SOPPENG
Jenis Kegiatan : PKRS BSPS

SUMBER DANA /BAHAN (Rp)


SWADAYA
Harga Total Harga
NO. URAIAN PEKERJAAN VOLUME Memakai
Satuan (Rp) (Rp)
BSPS Bahan
Dana Tunai
Bangunan
Lama
I Pekerjaan Persiapan 500,000 - 500,000 -
Bongkar Rumah Lama 1 ls 500,000 500,000 500,000
II Pekerjaan Pondasi - - - -
1 Galian Tanah Pondasi M³ - -
2 Urugan Pasir M³ - -
3 Pasangan Pondasi - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Kali M³ 165,000 - -
4 Urugan Kembali M³ - -
III Pekerjaan Sloof - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Sloof, Ukuran 15/20
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Balok Kayu
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 6 cm x 12 cm x 400 cm ) Btg 85,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
IV Pekerjaan Kolom - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Kolom Ukuran 15/15 Min. T = 3 m
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Tiang Kayu
- Tiang 12 / 12 Panjang 5 M Btg 244,800 - -
- Tiang 12 / 12 Panjang 4 M Btg 195,840 - -
- Tiang 10 / 10 Panjang 4 M Btg 136,000 - -
V Dinding Permanen 17,600 17,600 - -
1 Tembok
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Batu Bata 22 Bh 800 17,600 17,600
2 Pekerjaan Plester
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
V Dinding Kayu 4,080,000 4,080,000 - -
1 Papan
- Papan (2 cm x 20 cm x 400 cm) Lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) 60 Lbr 68,000 4,080,000 4,080,000
- Papan Lembar Seri 4 M Ikat 225,000 - -
- Papan Lembar Seri 2,5 M Ikat 145,000 - -
2 Balok Kayu
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
- Balok ( 5 cm x 5 cm x 400 cm ) Btg 34,000 - -
VI Pekerjaan Pintu dan Jendela - - - -
- Kusen Pintu Unit 100,000 - -
- Kusen Jendela Unit 100,000 - -
- Kusen Ventilasi Unit 75,000 - -
- Daun Pintu Kayu Unit - -
- Daun Pintu Jendela Unit - -
- Handle Pintu dan Kunci Pintu Set 146,250 - -
- Handle Jendela dan Kunci Jendela Set 44,250 - -
- Engsel Pintu Set 34,000 - -
- Engsel Jendela Set 24,500 - -
VII Ring Balok - - - -
1 Pekerjaan Bekisting M² - -
2 Pekerjaan Cor Beton
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
VII Ring Balok - - - -
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
VIII Pekerjaan Struktur Atap 5,611,360 5,611,360 - -
- Kayu rangka kuda-kuda (6 cm x 12 cm x Btg 85,000 - -
- Kayu rangka kuda-kuda (5 cm x 10 cm x Btg 68,000 - -
- Kayu gordeng /Usuk (5 cm x 7 cm x 400 Btg 47,600 - -
- Kayu gordeng /Usuk (6 cm x 6 cm x 400 66 Btg 48,960 3,231,360 3,231,360
- Kayu gordeng /Usuk (5 cm x 5 cm x 400 40 Btg 34,000 1,360,000 1,360,000
- Kayu gordeng /Usuk (3 cm x 5 cm x 400 50 Btg 20,400 1,020,000 1,020,000
IX Pekerjaan Penutup Atap 7,272,000 7,272,000 - -
### 1 Penutup Atap
- Seng Gelombang Besar 10 Kaki 15 Lbr 89,000 1,335,000 1,335,000
- Seng Gelombang Besar 9 Kaki Lbr 80,100 - -
- Seng Gelombang Besar 8 Kaki 36 Lbr 71,200 2,563,200 2,563,200
- Seng Gelombang Besar 7 Kaki 36 Lbr 62,300 2,242,800 2,242,800
### - Seng Gelombang Besar 6 Kaki 15 Lbr 53,400 801,000 801,000
### - Seng Gelombang Besar 5 Kaki Lbr 44,500 - -
### 2 Bubungan Atap
Seng Plat @ 40 cm 15 M 22,000 330,000 330,000
X Pekerjaan Lantai - - - -
### 1 Lantai Rabat Beton
### - Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
### 2 Lantai Papan
- Papan (2 cm x 20 cm x 400 cm) lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) lbr 68,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
XI MCK - - - -
### - Tangki Septik Unit 250,000 - -
- Closet Jongkok Unit 155,000 - -
- Pipa Air Bersih 3/4 " Btg 200,000 - -
- Pipa Air Kotor 3 " Btg 95,000 - -
- Kran Bh - -
- Pintu Kamar Mandi Set - -
XII Lain - lain 519,040 519,040 - -
### - Paku biasa 10 cm 2 kg 22,000 44,000 44,000
- Paku biasa 7 cm 1.7745 kg 22,000 39,040 39,040
- Paku biasa 5 cm 7 kg 22,000 154,000 154,000
- Paku biasa 3 cm 1 kg 22,000 22,000 22,000
- Paku Seng 5 kg 52,000 260,000 260,000
- Kawat Beton kg 25,000 - -
### - Baut @ 15 cm Bh - -
- Baut @ 20 cm Bh - -
- Baut @ 25 cm Bh - -
VI Upah Kerja 2,500,000 2,500,000 - -
- Tukang 10 Oh 150,000 1,500,000 1,500,000
- Pembantu Tukang 10 Oh 100,000 1,000,000 1,000,000
JUMLAH 20,500,000 20,000,000 500,000 -

BATU-BATU , 202
Didampingi Oleh, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB I Penerima Bantuan

DARSUNI DWI PUTRA DARWIS, ST RAHMATAN RUSLAN

Diperiksa Oleh, Diperiksa Oleh,


Konsultan Provinsi Koordinator Kabupaten

AGUS SALIM, S.T MUKHLISAH, S.T


FORMAT 16
RENCANA ANGGARAN BIAYA (RAB) BANTUAN STIMULAN PEERUMAHAN SWADAYA

Nomor BNBA : 5,102


NIK : 7312051710710001
Nama Penerima Bantuan : RAHMATAN
Alamat : MADINING
Kelurahan : Batu - Batu
Kecamatan : MARIORIAWA
Kabupaten : SOPPENG
Jenis Kegiatan : PKRS BSPS

SUMBER DANA /BAHAN (Rp)


SWADAYA
Harga Total Harga
NO. URAIAN PEKERJAAN VOLUME Memakai
Satuan (Rp) (Rp)
BSPS Bahan
Dana Tunai
Bangunan
Lama
I Pekerjaan Persiapan 500,000 - 500,000 -
Bongkar Rumah Lama 1 ls 500,000 500,000 500,000
II Pekerjaan Pondasi - - - -
1 Galian Tanah Pondasi M³ - -
2 Urugan Pasir M³ - -
3 Pasangan Pondasi - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Kali M³ 165,000 - -
4 Urugan Kembali M³ - -
III Pekerjaan Sloof - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Sloof, Ukuran 15/20
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Balok Kayu
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 6 cm x 12 cm x 400 cm ) Btg 85,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
IV Pekerjaan Kolom 680,000 680,000 - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Kolom Ukuran 15/15 Min. T = 3 m
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Tiang Kayu
- Tiang 12 / 12 Panjang 5 M Btg 244,800 - -
- Tiang 12 / 12 Panjang 4 M Btg 195,840 - -
- Tiang 10 / 10 Panjang 4 M 5 Btg 136,000 680,000 680,000
V Dinding Permanen - - - -
1 Tembok
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Batu Bata Bh 800 - -
2 Pekerjaan Plester
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
V Dinding Kayu 1,100,000 1,100,000 - -
1 Papan
- Papan (2 cm x 20 cm x 400 cm) 20 Lbr 55,000 1,100,000 1,100,000
- Papan (2 cm x 25 cm x 400 cm) Lbr 68,000 - -
- Papan Lembar Seri 4 M Ikat 225,000 - -
- Papan Lembar Seri 2,5 M Ikat 145,000 - -
2 Balok Kayu
- Balok ( 6 cm x 12 cm x 400 cm ) Btg 85,000 - -
- Balok ( 6 cm x 6 cm x 400 cm ) Btg 48,960 - -
- Balok ( 5 cm x 5 cm x 400 cm ) Btg 34,000 - -
VI Pekerjaan Pintu dan Jendela - - - -
- Kusen Pintu Unit 100,000 - -
- Kusen Jendela Unit 100,000 - -
- Kusen Ventilasi Unit 75,000 - -
- Daun Pintu Kayu Unit - -
- Daun Pintu Jendela Unit - -
- Handle Pintu dan Kunci Pintu Set 146,250 - -
- Handle Jendela dan Kunci Jendela Set 44,250 - -
- Engsel Pintu Set 34,000 - -
- Engsel Jendela Set 24,500 - -
VII Ring Balok - - - -
1 Pekerjaan Bekisting M² - -
2 Pekerjaan Cor Beton
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
VII Ring Balok - - - -
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
VIII Pekerjaan Struktur Atap 4,046,000 4,046,000 - -
- Kayu rangka kuda-kuda (6 cm x 12 cm x 400 cm) Btg 85,000 - -
- Kayu rangka kuda-kuda (5 cm x 10 cm x 400 cm) 25 Btg 68,000 1,700,000 1,700,000
- Kayu gordeng /Usuk (5 cm x 7 cm x 400 cm) Btg 47,600 - -
- Kayu gordeng /Usuk (6 cm x 6 cm x 400 cm) Btg 48,960 - -
- Kayu gordeng /Usuk (5 cm x 5 cm x 400 cm) 69 Btg 34,000 2,346,000 2,346,000
- Kayu gordeng /Usuk (3 cm x 5 cm x 400 cm) Btg 20,400 - -
IX Pekerjaan Penutup Atap 11,196,400 11,196,400 - -
### 1 Penutup Atap
- Seng Gelombang Besar 10 Kaki Lbr 89,000 - -
- Seng Gelombang Besar 9 Kaki 120 Lbr 80,100 9,612,000 9,612,000
- Seng Gelombang Besar 8 Kaki 17 Lbr 71,200 1,210,400 1,210,400
- Seng Gelombang Besar 7 Kaki Lbr 62,300 - -
### - Seng Gelombang Besar 6 Kaki Lbr 53,400 - -
### - Seng Gelombang Besar 5 Kaki Lbr 44,500 - -
### 2 Bubungan Atap
Seng Plat @ 40 cm 17 M 22,000 374,000 374,000
X Pekerjaan Lantai - - - -
### 1 Lantai Rabat Beton
### - Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
### 2 Lantai Papan
- Papan (2 cm x 20 cm x 400 cm) lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) lbr 68,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
XI MCK - - - -
### - Tangki Septik Unit 250,000 - -
- Closet Jongkok Unit 155,000 - -
- Pipa Air Bersih 3/4 " Btg 200,000 - -
- Pipa Air Kotor 3 " Btg 95,000 - -
- Kran Bh - -
- Pintu Kamar Mandi Set - -
XII Lain - lain 477,600 477,600 - -
### - Paku biasa 10 cm 6.8909 kg 22,000 151,600 151,600
- Paku biasa 7 cm kg 22,000 - -
- Paku biasa 5 cm 2 kg 22,000 44,000 44,000
- Paku biasa 3 cm 1 kg 22,000 22,000 22,000
- Paku Seng 5 kg 52,000 260,000 260,000
- Kawat Beton kg 25,000 - -
### - Baut @ 15 cm Bh - -
- Baut @ 20 cm Bh - -
- Baut @ 25 cm Bh - -
VI Upah Kerja 2,500,000 2,500,000 - -
- Tukang 10 Oh 150,000 1,500,000 1,500,000
- Pembantu Tukang 10 Oh 100,000 1,000,000 1,000,000
JUMLAH 20,500,000 20,000,000 500,000 -

Batu - Batu , 2021


Didampingi Oleh, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB I Penerima Bantuan

DARSUNI DWI PUTRA DARWIS, ST RAHMATAN RAHMATAN

Diperiksa Oleh, Diperiksa Oleh,


Konsultan Provinsi Koordinator Kabupaten

AGUS SALIM, S.T MUKHLISAH, S.T


FORMAT 16
RENCANA ANGGARAN BIAYA (RAB) BANTUAN STIMULAN PEERUMAHAN SWADAYA

Nomor BNBA : 5,102


NIK : 7312051710710001
Nama Penerima Bantuan : RAHMATAN
Alamat : MADINING
Desa : BATU-BATU
Kecamatan : MARIORIAWA
Kabupaten : SOPPENG
Jenis Kegiatan : PKRS BSPS

SUMBER DANA /BAHAN (Rp)


SWADAYA
Harga Total Harga
NO. URAIAN PEKERJAAN VOLUME Memakai
Satuan (Rp) (Rp)
BSPS Bahan
Dana Tunai
Bangunan
Lama
I Pekerjaan Persiapan 500,000 - 500,000 -
Bongkar Rumah Lama 1 ls 500,000 500,000 500,000
II Pekerjaan Pondasi - - - -
1 Galian Tanah Pondasi M³ - -
2 Urugan Pasir M³ - -
3 Pasangan Pondasi - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Kali M³ 165,000 - -
4 Urugan Kembali M³ - -
III Pekerjaan Sloof - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Sloof, Ukuran 15/20
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Balok Kayu
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 6 cm x 12 cm x 400 cm ) Btg 85,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
IV Pekerjaan Kolom - - - -
1 Pekerjaan Bekisting M² - -
2 Cor Beton Kolom Ukuran 15/15 Min. T = 3 m
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
1 Tiang Kayu
- Tiang 12 / 12 Panjang 5 M Btg 244,800 - -
- Tiang 12 / 12 Panjang 4 M Btg 195,840 - -
- Tiang 10 / 10 Panjang 4 M Btg 136,000 - -
V Dinding Permanen - - - -
1 Tembok
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Batu Bata Bh 800 - -
2 Pekerjaan Plester
- Pasir Pasang M³ 155,000 - -
- Semen @ 40 kg Zak 56,000 - -
V Dinding Kayu - - - -
1 Papan
- Papan (2 cm x 20 cm x 400 cm) Lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) Lbr 68,000 - -
- Papan Lembar Seri 4 M Ikat 225,000 - -
- Papan Lembar Seri 2,5 M Ikat 145,000 - -
2 Balok Kayu
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
- Balok ( 5 cm x 5 cm x 400 cm ) Btg 34,000 - -
VI Pekerjaan Pintu dan Jendela - - - -
- Kusen Pintu Unit 100,000 - -
- Kusen Jendela Unit 100,000 - -
- Kusen Ventilasi Unit 75,000 - -
- Daun Pintu Kayu Unit - -
- Daun Pintu Jendela Unit - -
- Handle Pintu dan Kunci Pintu Set 146,250 - -
- Handle Jendela dan Kunci Jendela Set 44,250 - -
- Engsel Pintu Set 34,000 - -
- Engsel Jendela Set 24,500 - -
VII Ring Balok - - - -
1 Pekerjaan Bekisting M² - -
2 Pekerjaan Cor Beton
- Besi Beton Ø 10 mm SNI Btg 95,000 - -
- Besi Beton Ø 8 mm SNI Btg 60,000 - -
- Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
- Batu Pecah M³ 350,000 - -
VII Ring Balok - - - -
- Balok ( 5 cm x 15 cm x 400 cm ) Btg 102,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
VIII Pekerjaan Struktur Atap - - - -
- Kayu rangka kuda-kuda (6 cm x 12 cm x Btg 85,000 - -
- Kayu rangka kuda-kuda (5 cm x 10 cm x Btg 68,000 - -
- Kayu gordeng /Usuk (5 cm x 7 cm x 400 Btg 47,600 - -
- Kayu gordeng /Usuk (6 cm x 6 cm x 400 Btg 48,960 - -
- Kayu gordeng /Usuk (5 cm x 5 cm x 400 Btg 34,000 - -
- Kayu gordeng /Usuk (3 cm x 5 cm x 400 Btg 20,400 - -
IX Pekerjaan Penutup Atap - - - -
### 1 Penutup Atap
- Seng Gelombang Besar 10 Kaki Lbr 89,000 - -
- Seng Gelombang Besar 9 Kaki Lbr 80,100 - -
- Seng Gelombang Besar 8 Kaki Lbr 71,200 - -
- Seng Gelombang Besar 7 Kaki Lbr 62,300 - -
### - Seng Gelombang Besar 6 Kaki Lbr 53,400 - -
### - Seng Gelombang Besar 5 Kaki Lbr 44,500 - -
### 2 Bubungan Atap
Seng Plat @ 40 cm M 22,000 - -
X Pekerjaan Lantai - - - -
### 1 Lantai Rabat Beton
### - Semen @ 40 kg Zak 56,000 - -
- Pasir Beton M³ 155,000 - -
### 2 Lantai Papan
- Papan (2 cm x 20 cm x 400 cm) lbr 55,000 - -
- Papan (2 cm x 25 cm x 400 cm) lbr 68,000 - -
- Balok ( 5 cm x 10 cm x 400 cm ) Btg 68,000 - -
- Balok ( 5 cm x 7 cm x 400 cm ) Btg 47,600 - -
XI MCK - - - -
### - Tangki Septik Unit 250,000 - -
- Closet Jongkok Unit 155,000 - -
- Pipa Air Bersih 3/4 " Btg 200,000 - -
- Pipa Air Kotor 3 " Btg 95,000 - -
- Kran Bh - -
- Pintu Kamar Mandi Set - -
XII Lain - lain - - - -
### - Paku biasa 10 cm kg 22,000 - -
- Paku biasa 7 cm kg 22,000 - -
- Paku biasa 5 cm kg 22,000 - -
- Paku biasa 3 cm kg 22,000 - -
- Paku Seng kg 52,000 - -
- Kawat Beton kg 25,000 - -
### - Baut @ 15 cm Bh - -
- Baut @ 20 cm Bh - -
- Baut @ 25 cm Bh - -
VI Upah Kerja 2,500,000 2,500,000 - -
- Tukang 10 Oh 150,000 1,500,000 1,500,000
- Pembantu Tukang 10 Oh 100,000 1,000,000 1,000,000
JUMLAH 3,000,000 2,500,000 500,000 -

BATU-BATU , 2021
Didampingi Oleh, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB I Penerima Bantuan

DARSUNI DWI PUTRA DARWIS, ST RAHMATAN RAHMATAN

Diperiksa Oleh, Diperiksa Oleh,


Konsultan Provinsi Koordinator Kabupaten

AGUS SALIM, S.T MUKHLISAH, S.T

Anda mungkin juga menyukai