Anda di halaman 1dari 1

DIAJUKAN OLEH, DIPERIKSA DAN DISETUJUI OLEH,

KONSULTAN PENGAWAS KONTRAKTOR DESIGN & BUILD KONTRAKTOR KONSULTAN PENGAWAS


SHOP DRAWING
JALAN TOL TRANS SUMATERA
JUDUL GAMBAR : NO. GAMBAR JUMLAH GAMBAR
SEKSI : BINJAI - PANGKALAN BRANDAN Digambar
RUAS : BINJAI - LANGSA Diperiksa
( SUMATERA UTARA ) .......................... REVISI :
Tanggal Project Engineer
STRIPMAP AREA KERJA ZONA 3 SP-64
24+225 315 M 24+540 25+445 200 M 25+645
L1= 388 M3
L2= 482 M3 L2= 246 M3
R1= 482 M3 R1= 308 M3
R2= 388 M3
250 M
25+495
Volume Total= 3.518 M3
L2= 1224 M
995 M
25+495 25+495