SHOP DRAWING JALAN TOL TRANS SUMATERA JUDUL GAMBAR : NO. GAMBAR JUMLAH GAMBAR SEKSI : BINJAI - PANGKALAN BRANDAN Digambar RUAS : BINJAI - LANGSA Diperiksa ( SUMATERA UTARA ) .......................... REVISI : Tanggal Project Engineer STRIPMAP AREA KERJA ZONA 3 SP-64 24+225 315 M 24+540 25+445 200 M 25+645 L1= 388 M3 L2= 482 M3 L2= 246 M3 R1= 482 M3 R1= 308 M3 R2= 388 M3 250 M 25+495 Volume Total= 3.518 M3 L2= 1224 M 995 M 25+495 25+495