A. REKAPITULASI PEMBIAYAAN
Harga
N Satua
o Uraian Pekerjaan Volume Harga Satuan Jumlah Harga
n
( Rp ) ( Rp )
I PEKERJAAN TANAH DAN PASIR
1 Galian tanah 60 m³ 90,000 5,400,000
2 Urug tanah kembali 60 m³ 65,000 3,900,000
3 Urug pasir Bawah pondasi 6 m³ 450,000 2,808,000
Sub Jumlah 12,108,000
II PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan batu belah camp 1pc:5psr 9 m³ 925,000 8,325,000
2 Pasangan dinding 1:4 21 m² 158,000 3,318,000
3 Plesteran 1:4 168 m² 70,000 11,760,000
4 Acian 168 m² 45,000 7,560,000
5 Assesories Motif Lengkungan 1 Ls 3,000,000 3,000,000
6 Pasangan Roster Pintu Utama 21 m² 82,325 1,728,825
7 Pasangan Roster Assesoris Depan 6 m² 82,325 461,020
8 Pasangan Keramik 40/40 110 m² 155,000 17,050,000
Sub Jumlah 53,202,845
III PEKERJAAN STRUKTUR BETON BERTULANG
1 Sloof Beton 20/20 60 m 180,000 10,800,000
2 Kolom Beton 20/20 39 m 195,000 7,507,500
3 Beton ring Balok 15/20 120 m 153,000 18,360,000
4 Pelat Beton Talang 30 m 500,000 15,000,000
Sub Jumlah 51,667,500
V PEKERJAAN PINTU JENDELA
1 Kusen dan daun pintu Utama (Kiri, Belakang) 2 ls 3,000,000 6,000,000
2 Kusen dan daun Jendela Utama Kiri ,belakang 4 Ls 2,300,000 9,200,000
5 Pintu Ruang Sound dan Gudang 2 Ls 1,750,000 3,500,000
Sub Jumlah 18,700,000
VI PEKERJAAN ATAP
1 Rangka Atap kayu jati 154 m² 1,200,000 184,800,000
2 Penutup Atap Genteng pres 1 Ls 4,800,000 4,800,000
3 plapon kayu 60 m³ 200,000 12,000,000
plapon gipsum 66 155,000 10,230,000
Sub Jumlah 211,830,000
VI PEKERJAAN CAT
I 1 Cat Tembok 168 m² 35,000 5,880,000
2 melamin kayu 1 Ls 15,000,000 15,000,000
Sub Jumlah 20,880,000
VI SOUND SISTEM
II Ampli toa 1 Ls 2,500,000 2,500,000
horen 2 Ls 600,000 1,200,000
salon dalam 2 Ls 600,000 1,200,000
mic 2 Ls 200,000 400,000
Sub Jumlah 5,300,000
IX LISTRIK
pasang daya 900 W 1 Ls 2,000,000 2,000,000
intalasi 1 Ls 2,500,000 2,500,000
Sub Jumlah 4,500,000
Total 378,188,345
B. REKAPITULASI DANA
A. REKAPITULASI PEMBIAYAAN
3 Pengadaan cet
3.1 cat tembok 50 kg Rp 30,000 Rp 1,500,000
3.2 Cat kayu 5 kg Rp 45,000 Rp 225,000
3.3 Tiner 2 kg Rp 25,000 Rp 50,000
3.4 Kuas 15 biji Rp 7,500 Rp 112,500
Sub Total Rp 1,887,500
5 Tenaga kerja
tukang 1 45 Rp 70,000 Rp 3,150,000
wak tukang 2 45 Rp 65,000 Rp 5,850,000
kuli 2 45 Rp 55,000 Rp 4,950,000
Sub Total Rp 13,950,000
Jumlah Total
Rp 42,754,500