Anda di halaman 1dari 1

Catatan :

Semua ukuran dalam Meter


Skala 1 : 300

Potongan Melintang - STA 3+526


Nama Proyek

14
KERJA PROYEK
PERENCANAAN JALAN TOL
13

DAN JEMBATAN
12
JALAN SYEKH NAWAWI - JALAN
11
RAYA SYEKH NAWAWI TANARAA
SERANG - TANGERANG, BANTEN
10

9 Judul Gambar
Lampu
8
Jalan

7
POTONGAN MELINTANG
6

Digambar Oleh :
4

Concrete Concrete
1. Ananta Aditya P. 1801413012
Guard Guard
3
Rail
Barrier Barrier
Rail 2. Fina Mayumi BM 1801413003
2
3. Muhammad Rifa 1801413010
4. Nazya Tiara S. 1801413014
1

Drainase Bahu Lajur 2 Lajur 1 Bahu Bahu Lajur 1 Lajur 2 Bahu Drainase 5. Sanju Yedo Oksa 1801413002
Datum: 0.00 Luar Dalam Dalam Luar
ELEVASI Pembimbing:
2.015

2.000

2.000

2.000

2.015

0.490
1.853

1.655

1.655

1.735

1.875

1.945

1.945

1.875

1.735

1.655

1.655
DESAIN

ELEVASI Achmad Nadjam, S.T., M.T.

0.490
1.853
1.655

1.655

1.425

1.565

1.635

1.705

1.705

1.705

1.635

1.565

1.425

1.655

1.655
EXISTING
Andi Indianto, Drs., S.T., M.T.
Budi Damianto, S.T., M.Si
Endang Kamdhari, S.T., M.T.
Diperiksa dan Disetujui oleh

Kode Gambar

G-20

Anda mungkin juga menyukai