Anda di halaman 1dari 12

Paket Pekerjaan: No. Paket - CORE TEAM 2021 Judul Gambar: No.

Lembar
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Digambar Direncanakan Diperiksa
No. Ruas - Jml. Lembar
D IR E KTOR A T J EN D E RA L B IN A M A RG A PENURUNAN GRADE JALAN S. PARMAN
BALAI BESAR PELAKSANAAN JALAN NASIONAL KALIMANTAN TIMUR Nama Ruas - PLAN DAN PROFILE
S AT UAN KERJA PERENCANAAN DAN PENGAWASAN JALAN NAS IO NAL PRO VINSI KALI MANT AN TI MUR BONTANG Skala H=
Perum. Balikpapan Baru Cluster San Fransisco Blok FA No.11, 76114, Tlp. 0542-8706618 Provinsi KALIMANTAN TIMUR Rizqi Maulana, ST AW Efendi ST., MT Ir. Dody Widodo V=
PT. ADIYA WIDYAJASA Operator Cad 2 Ahli Struktur 1 Ketua Tim

Jalan Frontage
Secant Pile
ARAH KEDALAM KOTA BONTANG
ARAH KELUAR KOTA BONTANG Main Road Kedalam Kota Bontang
Area Lahan Pengukuran :
38.250 m2

0+200
0+150

0+250
AKHIR PENANGANAN STA 0+740

0+300

0+350
0+100
0+050

N : 1561.350

0
0+40
0+000

E : 550167.321
Z : 11.947

0
0+45
Main Road Keluar Kota Bontang
Secant Pile

0
0+50
Jalan Frontage

0
0+55
AWAL PENANGANAN STA 0+000

0+600
N : 15691.378

0+650

0+700
E : 549441.160

0+739
Z : 37.627

CATATAN
1. Panjang Penanganan 740 meter
2. Luas Area Pengukuran 3,825 Ha

60
55
50
45

BVCS: 0+330.92

EVCS: 0+390.92
BVCE: 35.88

EVCE: 35.28
HIGH POINT STA:0+357.59 HIGH POINT STA:0+598.86

40
LOW POINT STA: 0+174.208 HIGH POINT ELEV:36.944 LOW POINT STA: 0+540.277 HIGH POINT ELEV:19.038 LOW POINT STA: 0+691.412
LOW POINT ELEV:24.337 PVI STA:0+360.923 LOW POINT ELEV:21.967 PVI STA:0+607.777 LOW POINT ELEV:13.042
PVI STA:0+199.663 PVI ELEV:38.277 PVI STA:0+507.777 PVI ELEV:18.592 PVI STA:0+669.167
K:50.910 K:3.333 K:65.000 K:7.000 K:44.490

35
LVC:50.9 LVC:60.0 LVC:65.0 LVC:17.8 LVC:44.5

8.00% -10.00%
BVCS: 0+174.21

EVCS: 0+691.41
EVCS: 0+225.12

BVCS: 0+475.28

EVCS: 0+540.28

BVCS: 0+598.86

EVCS: 0+616.69

BVCS: 0+646.92
BVCE: 24.34

EVCE: 27.41

BVCE: 15.64

EVCE: 13.04
BVCE: 26.84

EVCE: 21.97

BVCE: 19.04

EVCE: 17.92
30
4.08%
25 -5.00%
20 -7.55%
15 -4.12%
DATUM : 11.9M
12

0+739.16
0+000

0+050

0+100

0+150

0+200

0+250

0+300

0+350

0+400

0+450

0+500

0+550

0+600

0+650

0+700
0+025

0+075

0+125

0+175

0+225

0+275

0+325

0+375

0+425

0+475

0+525

0+575

0+625

0+675

0+725
STATION
32.401

28.111

36.121

38.801

41.293

43.920

44.790

41.887
37.627

27.686

25.116

23.030

22.328

23.869

24.970

25.724

32.753

39.470

37.275

34.062

30.618

27.794

25.218

22.778

19.368

17.394

15.816

13.604

12.616

11.993

11.947
Elevasi
Eksisting

22.821

21.481

20.231
22.328

23.348

24.370

25.646

27.404

29.404

29.370

26.870
31.404

33.404

35.404

36.858

36.489

34.370

31.870

24.605

18.980

17.292

15.409

13.822

12.688
Elevasi
Rencana
Paket Pekerjaan: No. Paket - CORE TEAM 2021 Judul Gambar: No. Lembar
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Digambar Direncanakan Diperiksa
No. Ruas - Jml. Lembar
D I R E K T OR A T JE N D E R AL B I N A M A R GA PENURUNAN GRADE JALAN S. PARMAN
BALAI BESAR PELAKSANAAN JALAN NASIONAL KALIMANTAN TIMUR PLAN DAN PETA
BONTANG Nama Ruas - Skala H=
SA TUAN KERJA P ER ENC ANA AN D AN P ENG AWA SAN JAL AN N ASI ONAL P ROV I NSI KA LI MAN TAN T IM UR
Perum. Balikpapan Baru Cluster San Fransisco Blok FA No.11, 76114, Tlp. 0542-8706618 Provinsi KALIMANTAN TIMUR Rizqi Maulana, ST AW Efendi ST., MT Ir. Dody Widodo V=
PT. ADIYA WIDYAJASA Operator Cad 2 Ahli Struktur 1 Ketua Tim

Jalan Frontage
Secant Pile
ARAH KEDALAM KOTA BONTANG
ARAH KELUAR KOTA BONTANG Main Road Kedalam Kota Bontang
Area Lahan Pengukuran :
38.250 m2

0+200
0+150

0+250

0+300

0+350
0+100
0+050

0
0+40
0+000

0
0+45
Main Road Keluar Kota Bontang
Secant Pile

0
0+50
Jalan Frontage

0+550

0+600

0+650

0+700

0+739
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
TITIK PENGUJIAN BORING SPT
CATATAN :
1. UNTUK NILAI N<9, PENGEBORAN DILAKUKAN DENGAN METODE
DRY BORING /BOR
KERING. UNTUK NILAI ≥9 BOLEH DILAKUKAN DENGAN PEMBERIAN AIR, NAMUN
SIFATNYA HANYA SEBAGAI PELICIN, BUKAN DIKOCOR AIR/ BORING
WASH
2. PENCATATAN MUKA AIR WAJIB DILAKUKAN
3. PENGEBORAN DIHENTIKAN SAMPAI BACAAN NSPT 3XNSPT 60

BH02 (STA 00+375)


N = 549814.898
E = 15700.597

ARAH KELUAR KOTA BONTANG BH03 (STA 00+450)


N = 549890.406
E = 15677.856

0+200
0+150

0+250

0+300
0+100

0+350
0+ 050

00
00

0+4
0+0

50
0+4

00
BH01 (STA 00+300)

0+5
N = 549740.140

50
E = 15704.474

0+5

00
0+6

50

00
0+6

39
0+7

0+7
ARAH KEDALAM KOTA BONTANG

BH02
BH01 BH03
STA
STA STA
00+375
00+300 00+450

60
55
50
45
BVCS: 0+330.92

EVCS: 0+390.92
BVCE: 35.88

EVCE: 35.28
HIGH POINT STA:0+598.86

40 LOW POINT STA: 0+174.208


LOW POINT ELEV:24.337
PVI STA:0+199.663
K:50.910
LOW POINT STA: 0+540.277
LOW POINT ELEV:21.967
PVI STA:0+507.777
K:65.000
HIGH POINT ELEV:19.038
PVI STA:0+607.777
PVI ELEV:18.592
K:7.000
LOW POINT STA: 0+691.412
LOW POINT ELEV:13.042
PVI STA:0+669.167
K:44.490

35 LVC:50.9

8.00% -10.00%
LVC:65.0 LVC:17.8 LVC:44.5
BVCS: 0+174.21

EVCS: 0+691.41
EVCS: 0+225.12

BVCS: 0+475.28

EVCS: 0+540.28

BVCS: 0+598.86

EVCS: 0+616.69

BVCS: 0+646.92
BVCE: 24.34

EVCE: 27.41

EVCE: 13.04
BVCE: 26.84

EVCE: 21.97

BVCE: 19.04

EVCE: 17.92

BVCE: 15.64
30
25 4.08%
-5.00%
20 -7.55%
15 -4.12%
DATUM : 11.9M

0+739.16
12
0+000

0+025

0+050

0+075

0+100

0+125

0+150

0+175

0+200

0+225

0+250

0+275

0+300

0+325

0+350

0+375

0+400

0+425

0+450

0+475

0+500

0+525

0+550

0+575

0+600

0+625

0+650

0+675

0+700

0+725
STATION
TITIK PENGUJIAN GEOLISTRIK (OPSIONAL)

CATATAN :
1. PANJANG GEOLISTRIK 1 LINTASAN 150 METER
2. JARAK ANTAR ELEKTRODA MAK. 5 METER

LINTASAN 1 LINTASAN LONG SECTION 1


(CROSS 1) LINTASAN 2
(CROSS 2) LINTASAN CROSS SECTION
LINTASAN 3
(CROSS 3)

ARAH KELUAR KOTA BONTANG


0+200
0+150

2500

0+300
0+100

0+350
0+25
0+050

0+

00
00

0+4
0+0

50
LINTASAN LONG SECTION

0+4

00++5500
00

50
0+5

00
0+6

0 5

00
0+6
00+300 00+375

39
0+7

0+7
00+450

ARAH KEDALAM KOTA BONTANG


Paket Pekerjaan: No. Paket CORE TEAM 2021 Judul Gambar: No. Lembar
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Digambar Direncanakan Diperiksa
No. Ruas Jml. Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A
BALAI BESAR PELAKSANAAN JALAN NASIONAL KALIMANTAN TIMUR PENANGANAN JALAN BONTANG KUALA Nama Ruas
LAYOUT H=
SATUAN KERJA PERENCANAAN DAN PENGAWASAN JA LAN NASIONAL PROVINSI KALIM ANTAN TIMUR
Skala
P erum. Bali kpapan Baru Cl uster San Fransisco Bl ok FA No. 11, 76114 , Tl p. 0542-8706618 Provinsi KALIMANTAN TIMUR Rizqi Maulana, ST AW Efendi ST., MT Ir. Dody Widodo V=
PT. ADIYA WIDYAJASA Operator Cad 2 Ahli Struktur 1 Ketua Tim

AKHIR PENANGANAN
STA. 0+960

AWAL PENANGANAN
0+000

AREA LAHAN PENGUKURAN


48230.651 m2

CATATAN :
1. Panjang Penanganan 960 meter
2. Luas Area Pengukuran 4,823 Ha
Paket Pekerjaan: No. Paket CORE TEAM 2021 Judul Gambar: No. Lembar
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Digambar Direncanakan Diperiksa
No. Ruas Jml. Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A
BALAI BESAR PELAKSANAAN JALAN NASIONAL KALIMANTAN TIMUR PENANGANAN JALAN BONTANG KUALA Nama Ruas PLAN DAN PROFILE H=
SATUAN KERJA PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN TIMUR
Skala
Perum . Bali kp apan Baru Clu ster San Fransi sc o Bl ok FA No.1 1, 7 611 4, T lp. 054 2-87 066 18 Provinsi KALIMANTAN TIMUR Rizqi Maulana, ST AW Efendi ST., MT Ir. Dody Widodo V=
PT. ADIYA WIDYAJASA Operator Cad 2 Ahli Struktur 1 Ketua Tim
DRY
BORING ≥

WASH BORING

BH 01 (STA 00+950)
N = 557276.805
E = 15325.573

BH04 (STA 00+750)


N = 557092.487
E = 15247.938

BH03 (STA 00+550)


N = 556908.170
E = 15170.303
AKHIR PENANGANAN
STA. 0+960

BH02 (STA 00+350)


N = 556730.252
E = 15080.586

BH 01 (STA 00+150)
N = 556566.272
E = 14966.085 AREA LAHAN PENGUKURAN
48230.651 m2

© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS


AWAL PENANGANAN
0+000
RENCANA KEDALAMAN BORING & JUMLAH LINTASAN GEOLISTRIK

JL. LETJEN S.PARMAN

RENCANA KEDALAMAN BORING NSPT


TITIK STA KEDALAMAN PERKIRAAN KEDALAMAN (M)
BH01 00+300 3XNSPT 60 20
BH02 00+375 3XNSPT 60 20
BH03 00+450 3XNSPT 60 20
TOTAL (A) 60 M

RENCANA JUMLAH LINTASAN GEOLISTRIK (OPSIONAL)


3 CROSS SECTION
1 LONG SECTION
TOTAL 4 LINTASAN

BONTANG KOALA

RENCANA KEDALAMAN BORING NSPT


TITIK STA KEDALAMAN
BH01 00+150 40
BH02 00+350 40
BH03 00+550 40
BH04 00+750 40
BH05 00+950 40
TOTAL (B)+ 200 M

TOTAL BORING SPT (A+B) 260 M


TOTAL LINTASAN GEOLISTRIK 4 LINTASAN