Bahtera case :
(500jt+350jt+100jt)+((500jt+350jt+100jt)*0.2)
= Rp 1.140.000.000
Jarak tempuh = (SBY – JKT = 379 mil) (JKT - BTM = 469 mil)
(crane 7 unit, 18 TGH, max 12 jam kerja) => 1512 x muat / hari
= 3 hari 23 jam
(crane 8 unit, 18 TGH, max 12 jam kerja) => 1728 x muat / hari
= 4 hari 1 jam
(crane 5 unit, 19 TGH, max 15 jam kerja) => 1425 muat / hari
= 2 hari 3 jam
= 1 hari 10 jam