Lampiran 8 : RENCANA ANGGARAN BIAYA (RAB) (TEMPLATE SWAKELOLA - 8)

Lingkungan Pabuaran
Pekerjaan ………………………………………………………….
Tahun Anggaran 2021

KUANTITAS
KUANTITAS HARGA
No. JENIS PEKERJAAN CARA PERBAIKAN SATUAN RENCANA BIAYA SUB TOTAL
AWAL SATUAN
PELAKSANAAN
JADWAL PELAKSANAAN DENGAN KURVA S

Pekerjaan Saluran Tepi Jalan

NO JENIS PEKERJAAN VOL SATUAN HARGA SATUAN JUMLAH HARGA BOBOT %

I PEKERJAAN PENDAHULUAN
1 Pekerjaan persiapan 1 post 1,000,000.00 1,000,000.00 0.1114
2 Pekerjaan pengukuran 1 post 1,000,000.00 1,000,000.00 0.1114
3 Pasang rambu pengaman 1 post 1,000,000.00 1,000,000.00 0.1114

II PEKERJAAN SALURAN
1 Galian tanah keras 2000 M3 20,000.00 40,000,000.00 4.4543
2 Angkutan tanah ke luar proyek 1000 M3 15,000.00 15,000,000.00 1.6704
3 Pas. Batu kosongan tbl 20 cm 300 M3 100,000.00 30,000,000.00 3.3408
4 Pas. Batu kali 1 Pc : Psr 2000 M3 300,000.00 600,000,000.00 66.8151
5 Pas. Sloof beton 20x30 cm 100 M3 1,500,000.00 150,000,000.00 16.7038
6 Urugan tanah kembali 500 M3 10,000.00 5,000,000.00 0.5568
7 Benangan 2000 M3 5,000.00 10,000,000.00 1.1136
8 Plesteran Halus 1Pc : 4 Psr 2000 M3 20,000.00 40,000,000.00 4.4543
9 Pas. Gorong-gorong d-50 cm 4 bh 1,000,000.00 4,000,000.00 0.4454

III PEKERJAAN LAIN-LAIN


1 Pembersihan lokasi 1 Ls 1,000,000.00 1,000,000.00 0.1114
Jumlah 898,000,000.00 100.0000
PPN 10 % 89,500,000.00
Jumlah 987,500,000.00
Pembulatan 1,077,000,000.00
BOBOT %
RENCANA ANGGARAN
PANITIA HARI BESAR ISLAM
MAULID NABI BESAR MUHAMMAD S.A.W 1442 H
LINGKUNGAN PABUARAN

PENGELUARAN
HARGA
NO URAIAN PEKERJAAN VOL SATUAN JUMLAH
SATUAN

1 Belanja Plastik Kresek 1,250,000

- Ukuran Besar 1 paket 750,000 750,000

- Ukuran Sedang 1 paket 500,000 500,000

2 Amplop 1,000,000

- Amplop Besar 1 paket 500,000 500,000

- Amplop Kecil 1 paket 500,000 500,000

3 Belanja Cetak Spanduk 225,000

- Spanduk Selamat Datang (1x3 m2) 1 paket 25,000 75,000

- Spanduk Ucapan PHBI (2x3 m2) 1 paket 25,000 150,000

4 Belanja Cetak ID Card 150 buah 5,000 750,000

5 Sholawat 23,000,000

- Kiayi 20 Org 300,000 6,000,000

- Ustad 40 Org 100,000 4,000,000

- Tamu Undangan 80 Org 75,000 6,000,000

- Tim Terbang Gede 1 paket 5,000,000 5,000,000

- Tim Pendzikir 1 paket 2,000,000 2,000,000

6 Konsumsi 4,000,000

- Tim Terbang Gede 1 paket 1,000,000 1,000,000

- Tim Pendzikir 1 paket 1,000,000 1,000,000

- Panitia (Rokok, dll) 1 paket 2,000,000 2,000,000

7 Transportasi 1,050,000

- Transport Tamu Undangan (Panitia) 3 Org 100,000 300,000

- Transport Pengiriman Panjang 1 paket 750,000 750,000

8 Kebersihan 1 paket 550,000 550,000

9 Perlengkapan 3,250,000

- Tenda 1 paket 2,500,000 2,500,000

- Sound System 1 paket 750,000 750,000

10 Biaya Tak Terduga 1 2,500,000 2,500,000

JUMLAH 37,575,000
PEMASUKAN
HARGA
NO URAIAN PEKERJAAN VOL SATUAN JUMLAH
SATUAN

1 TAGIHAN WARGA -

- Tagihan Warga per KK KK -

- Donatur Org -

2 HASIL DARI BENDERA 1 paket -

JUMLAH
NO URAIAN/PAKET PEKERJAAN VOL SATUAN HARGA SATUAN JUMLAH

1 Interlock (26x16) 416 m2 180,000.00 74,880,000.00


2 Jaring Keliling D60/D48 416 m2 75,000.00 31,200,000.00
3 Gawang Futsal 1 Paket 5,000,000.00 5,000,000.00
4 Under Layer 416 m2 10,000.00 4,160,000.00
5 Jasa Pasang 416 m2 15,000.00 6,240,000.00
121,480,000.00
Rincian Pendanaan  :
HARGA SATUAN 
NO. U  R  A  I  A  N VOLUME
(Rp)
1 2 3
I. BAHAN
1. Semen (1 zak=50 kg) 250 Zak 85,000.00
2. Pasir beton 30 M 3
160,000.00
3. Pasir urug 65 M 3
140,000.00
4. Batu pecah 2/3 cm 41 M 3
300,000.00
5. Papan mal uk. 2/18 cm- 4m 24 Kpg 25,000.00
6. Kayu uk. 4/6 cm - 4 m 24 Btg 20,000.00
7. Wiremesh M5 (uk. 2,1 m x 5,4 m) 54 Lbr 250,000.00
8. Paku Campur 2 Kg 22,000.00
9. Interlock 416 M2 -
10. Jaring keliling D60 (PE) lengkap 416 M2 40,000.00
11. Tiang gawang dan jala (knockdown) 1 set 3,000,000.00
12. Tiang lapangan pipa besi 3"-t=2 mm 16 Btg 600,000.00
13 Penghubung tiang pipa besi 2"-t=2 mm 16 Btg 350,000.00
14 Bola futsal 2 bh 250,000.00
Jumlah Bahan
II. SEWA ALAT  (sesuai keperluan)
1. Gerobak Dorong 2 Bh 200,000.00
2. Concrete mixer (molen) & operasional 8 hari 400,000.00
Jumlah Alat
III. UPAH
1. Pekerja  64 ORG/HR/8 JAM 115,000.00
2. Tukang  8 ORG/HR/8 JAM 120,000.00
3. Kepala Tukang 8 ORG/HR/8 JAM 140,000.00
4. Mandor 8 ORG/HR/8 JAM 120,000.00
Jumlah Upah
Jumlah Kebutuhan
JUMLAH (Rp)

21,250,000.00
4,800,000.00
9,100,000.00
12,300,000.00
600,000.00
480,000.00
13,500,000.00
44,000.00
-
16,640,000.00
3,000,000.00
9,600,000.00
5,600,000.00
500,000.00
97,414,000.00

400,000.00
3,200,000.00
3,600,000.00

7,360,000.00
960,000.00
1,120,000.00
960,000.00
10,400,000.00
111,414,000.00