FORMULIR A

KRAWU PROJECT PLAN


PERKIRAAN INVESTASI

NO. KETERANGAN VOLUME UNIT Umur Ekonomis HARGA TOTAL


(bulan) PER-UNIT HARGA
I Tempat Usaha:
1 Kontrak Ruangan 1 Unit 12 24,000,000 24,000,000
2 Renovasi 1 lump Sump 12 6,000,000 6,000,000
Sub-Total 30,000,000
II Mesin & Perlengkapan
1 Kompor Gas + tabung 2 Unit 36 3,600,000 7,200,000
2 Kompor Listrik 1 Unit 36 2,880,000 2,880,000
3 Peralatan masak lainnya 1 Lump Sum 5,000,000 5,000,000
4 Kursi, meja, Lemari 1 Lump Sum 5,000,000 5,000,000
5 Kulkas 1 Unit 36 3,500,000 3,500,000
6 Heater 1 Unit 36 1,000,000 1,000,000
7 Lain-lain 1 Lump Sum 2,000,000 2,000,000
Sub-Total 26,580,000
III Kendaraan
1. Mobil (Minibus second) 1 Unit 36 90,000,000 90,000,000
2. Motor 1 Unit 36 9,000,000 9,000,000
Sub-Total 99,000,000
IV Legalitas
1. Biaya Perizinan 1 Lump Sum 12 8,400,000 8,400,000
2. Royalty Fee 0 Lump Sum 12 0 0
Sub-Total 8,400,000

TOTAL 163,980,000

Analyst Yung Tanjung 1


FORMULIR B Per-bulan
KRAWU PROJECT PLAN
BIAYA OPERASIONAL
HARGA TOTAL
NO. KETERANGAN VOLUME UNIT
PER-UNIT HARGA
1 Tenaga Kerja 4 Orang
Kepala 1 Orang 6,000,000 6,000,000
Karyawan 3 Orang 2,000,000 6,000,000
Sub-Total 12,000,000
2 Asuransi & Kesehatan: Link
Tempat Usaha: 0.37% % 30,000,000 111,000
Mesin & Perlengkapan 0.37% % 26,580,000 98,346
Kendaraan 0.37% % 99,000,000 366,300
Tenaga Kerja 2.00% % 12,000,000 240,000
Sub-Total 815,646
3 Perbaikan & Pemeliharaan: link
Tempat Usaha: 0.25% % 30,000,000 75,000
Mesin & Perlengkapan 0.25% % 26,580,000 66,450
Kendaraan 0.25% % 99,000,000 247,500
Tenaga Kerja 1.00% % 12,000,000 120,000
Sub-Total 508,950
4 Biaya Operasi
Service Charge 1 Lump Sum 200,000 200,000
Promosi & Marketing 1 Lump Sum 500,000 500,000
Transportasi 1 Lump Sum 500,000 500,000
Bahan Bakar 1 Lump Sum 300,000 300,000
Supply 1 Lump Sum 200,000 200,000
Lain-lain 1 Lump Sum 100,000 100,000
Sub-Total 1,800,000
GRAND TOTAL 15,124,596

Analyst Yung Tanjung 2


FORMULIR C Per-bulan
KRAWU PROJECT PLAN
KELOMPOK DAN PORSI PENJUALAN BARANG
Penjualan
NO. KETERANGAN Volume UNIT Harga Jual Per-bulan
30

1 Harga Jual (Rp/kg) 150 Porsi 20,000 90,000,000

2 Harga Pokok (Rp/kg) Presentasi HPP HPP Per-bulan


Harga Pokok 50% 10,000 45,000,000

Analyst Yung Tanjung 3


FORMULIR D
KRAWU PROJECT PLAN
RASIO & ASUMSI KEUANGAN

NO. KETERANGAN Asumsi UNIT

1 Porsi Kredit:
Investasi 78% %
Modal Kerja 22% %
2 Modal Kerja:
3 Bulan berjalannya biaya operasional 3 bulan
(dihitung dari bulan pertama dimulainya usaha)
3 Suku Bunga:
Kredit 24% %
4 Persediaan:
Bahan Baku 3 Bulan
5 Porsi Pembayaran atas Pembelian Barang (Hutang Dagang)
- Tunai 80%
- Kredit 20% (1 bulan)
6 Porsi Pembayaran atas Penjualan Produk (Piutang)
- Tunai 100%
- Credit Card 0% (1 bulan)
Antisipasi atas Inflasi:
7 Kenaikan Harga Jual 0% per-bulan
8 Kenaikan Harga Pokok 0% per-bulan
9 Kenaikan Biaya Operasinal 0% per-bulan

Investasi 163,980,000
Modal Kerja 45,373,788
Persediaan Bahan Baku 0
Total Investasi 209,353,788

Analyst Yung Tanjung 4