Anda di halaman 1dari 1

KETERANGAN : KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

- MUTU BETON DIREKTORAT JENDERAL CIPTA KARYA


A. Pondasi B A LA I P R A S A R A N A P E R M UK IM A N W IL A Y A H J A K A R T A M E T R OP OL IT A N
SATUAN KERJA PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH JAKARTA METROPOLITAN

* Pondasi Pile Cap & Tie Beam fc' = 30 MPa Jalan PAM Baru 1No.1, Pejompongan, Jakarta Pusat(10210), TELP./FAX. +622157930562-57974228

* Tiang Pancang 450x450 fc' = 50 MPa


B. Kolom, Balok dan Plat fc' = 30MPa
- MUTU BAJA REVIU DED
PEMBANGUNAN KAMPUS
* Diameter >/= D10mm (Ulir) fy = 400 MPa UNIVERSITAS ISLAM INTERNASIONAL
Nama Tumpuan Lapangan Nama Tumpuan Lapangan
* Diameter < Ø10mm fy = 240 MPa INDONESIA (TAHAP III)
* Profil Baja Bj37 (Fe360)
* Mur / Bout HTB A325
KEPALA SATUAN KERJA
PELAKSANAAN PRASARANA PERMUKIMAN
WILAYAH JAKARTA METROPOLITAN

Ir. Komang Raka Maharthana, MAP


NIP. 196510191996031001

DETAIL TIE BEAM PEJABAT PEMBUAT KOMITMEN


PENGEMBANGAN SARANANA DAN PRASARANA
PENDIDIKAN OLAHRAGA PASAR 1

Anwar Rahmad, ST,. MT.


NIP. 197412032008121002
KONSULTAN PERANCANG :

PT. WISWAKHARMAN KSO PT. INDAH KARYA

JOKO SUTRISNO, ST.


DIREKTUR

TENAGA AHLI NAMA PARAF


POTONGAN PC-1 POTONGAN PC-2 POTONGAN PC-3 TEAM LEADER Ir. Bambang Riyanto, MT.

CO-TEAM LEADER
Dr. Ir. Andy Siswanto, M.Arch., MSc.
ARSITEKTUR

ARSITEKTUR BANGUNAN Indro Kunto Baskoro, ST.

ARSITEKTUR INTERIOR Ardhiansyah Risnawan, ST.

LANSEKAP Ir. Sri Subar Puspaati

STRUKTUR BANGUNAN Prof. Buntara Sthenly Gan

MEKANIKAL Dudi Gunawan, ST.

ELEKTRIKAL Ir. Ahmad Mudawari

JUDUL GAMBAR SKALA


BANGUNAN
3. FAKULTAS 1

1 : 30
DETAIL PILE CAP & TIE BEAM

KEY PLAN

DETAIL PC-1 DETAIL PC-2 DETAIL PC-3


TANGGAL NO. GAMBAR JUMLAH LEMBAR

UIII-FK1-STR
1
(SB-2-01)