DIGAMBAR
PAS BATA TRASRAAM
0531 19 037
DIPERIKSA
DISETUJUI
A
JML.LBR NO.LBR
SEPTICTANK
41 40
1
PIPA UDARA Ø1"
PROGRAM
1 DENAH SEPTICTANK DAN REMBESAN 3 DENAH BAK KONTROL STUDY
MEP-006 SKALA 1 : 20 MEP-008 SKALA 1 : 20
TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS PAKUAN
BOGOR 2020
KETERANGAN
100 Fibre Mast Ø2"
SpitZen
BS Sch20 Ø2"
Fibre Mast Ø2" 150
100
50
100M
R=
500
Down Conductor
NYA 70mm2
B 50
Spitzen
-Control Box
DIGAMBAR
-Arde
penahan bocor
450
BS Sch20 Ø4" Muhammad Nasir Rifai
100M
R=
klem Ø2,5"
srumbung Ø2,5"
0531 19 037
-Control Box
-Arde
A
Spitzen
support (dilas pada rangka)
DIPERIKSA
100
2000
13 DISETUJUI
25
50
SITUASI
SKALA 1:200
BC 70mm2
JML.LBR NO.LBR
600 BS Sch20 Ø6"
Disolder
Galv. Ø1½"
45 41
PVC Ø1 "
SKRUP BC 70mm2
600
Control box/besi plat 2mm
Control Box 30 ±0.00 (permukaan tanah)
Watermoer Ø1 "
NYA 70mm2 Angkar
Schoen 70mm2
Schoen 70mm2 PROGRAM
>150.0
BC 70mm2 PONDASI STUDY
Watermoer Ø1 "
PVC Ø1 " Mur + Baut (M10)
TEKNIK SIPIL
FAKULTAS TEKNIK
BC 70mm2
Arde UNIVERSITAS PAKUAN
BOGOR 2017
DETAIL CONTROL BOX DETAIL ARDE DETAIL TIANG B
TANPA SKALA SKALA 1:50 SKALA 1:50