Anda di halaman 1dari 12

1 WEEKLY REPORT (LAPORAN MINGGUAN)

PEKERJAAN :
LOKASI :
PELAKSANA KONSTRUKSI :
NO.KONTRAK :
TGL.KONTRAK :
TAHUN ANGGARAN :

PERINCIAN
BOBOT KEMAJUAN PEKERJAAN

RENCANA REALISASI
NO URAIAN PEKERJAAN SATUAN MINGGU LALU MINGGU INI S/D MIGGU INI KET %
VOLUME BOBOT
VOL BOBOT VOL BOBOT VOL BOBOT
I PEKERJAAN PENDAHULUAN 1.39
1 Pekerjaan Pembersihan Area Pekerjaan ls 1.00 0.67 0.00 0.00 1.00 0.67 1.00 0.67 100.00
2 Pekerjaan Pengukuran / Bauwplank ls 1.00 0.71 0.00 0.00 1.00 0.71 1.00 0.71 100.00

II PEKERJAAN STRUKTUR 45.33


1 Galian Tanah m3 9.00 0.93 0.00 0.00
2 Urugan Tanah Kembali m3 7.25 0.36
3 Urugan Pasir Bawah Pondasi m3 0.40 0.18
4 Pas. Batu Kosong m3 1.35 1.28
5 Pek. Pondasi Poer Plat m3 1.35 13.01
6 Pek. Sloof Beton 15x20 m3 0.24 2.31
7 Pek. Kolom Beton 20x20 m3 2.35 22.64
8 Pek. Ringbalk Beton 15x20 m3 0.48 4.63

III FINISHING ARSITEKTUR 51.77


1 Pas. Dinding Batu Bata 1:4 m3 48.00 10.66
2 Plesteran Dinding 1:4 m3 96.00 8.93
3 Pas. Dinding Granit 60x60 m3 21.50 14.34
4 Pas. Dinding Batu Alam m3 6.80 3.47
5 Acian Dinding m3 96.00 2.89
6 Cat Dinding ex. Mowilex m3 96.00 2.74
7 Cat Batu Alam ex. Propan m3 6.80 0.49
8 Pek. Konsol Kuda Kuda Atap Baja Ringan m3 17.20 5.48
9 Pas. Atap Metal Roof m3 17.20 2.78

IV INSTALASI LISTRIK 0.84


1 Inst. Pengkabelan Siap Nyala titik 3.00 0.58
2 Pas. Stop Kontak ex. Broco bh 1.00 0.04
3 Pas. Saklar Tunggal ex. Broco bh 2.00 0.06
4 Pas. Fitting Lampu bh 2.00 0.10
5 Pas. Box MCB bh 1.00 0.07

V PEKERJAAN AKHIR 0.67


1 Pekerjaan Akhir ls 1.00 0.67

100.00
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBUATAN GAPURA


LOKASI : DESA WATANG KASSA KEC. BATULAPPA KAB. PINRANG
TAHUN ANGGARAN : 2020

I. PEKERJAAN PENDAHULUAN

NO URAIAN PEKERJAAN VOLUME

1 Pekerjaan Pembersihan Area Pekerjaan 1.00


2 Pekerjaan Pengukuran / Bauwplank 1.00
Sub Total I

II. PEKERJAAN STRUKTUR

NO URAIAN PEKERJAAN VOLUME

2.1 Pondasi
2.1.1 Galian Tanah 9.00
2.1.2 Urugan Tanah Kembali 7.25
2.1.3 Urugan Pasir Bawah Pondasi 0.40
2.1.4 Pasangan Batu Kosong 1.35

2.2 Sloef, Kolom, dan Ringbalk


2.2.1 Pek. Pondasi Poer Plat 1.35
2.2.2 Pek. Sloef Beton 15 x 20 0.24
2.2.3 Pek. Kolom Beton 20 x 20 2.35
2.2.4 Pek. Ringbalk Beton 15 x 20 0.48

Sub Total II

III. FINISHING ARSITEKTUR


NO URAIAN PEKERJAAN VOLUME

3.1 Finishing Arsitektur


3.1.1 Pekerjaan Dinding
3.1.1.1 Pasangan Dinding Batu Bata 1 : 4 48.00
3.1.1.2 Plesteran Dinding 1 : 4 96.00
3.1.1.3 Pas. Dinding Granit 60 x 60 21.50
3.1.1.4 Pas. Dinding Batu Alam 6.80
3.1.1.5 Acian Dinding 96.00

3.1.2 Pekerjaan Pengecatan


3.1.2.1 Cat Dinding ex. Mowilex 96.00
3.1.2.2 Cat Batu Alam ex. Propan 6.80

3.1.3 Pekerjaan Konsol Atap


3.1.2.1 Pek. Konsol Kuda-Kuda Atap Baja Ring 17.20
3.1.2.2 Pas. Atap Metal Roof 17.20

Sub Total III

IV. INSTALASI LISTRIK


NO URAIAN PEKERJAAN VOLUME
1 Inst. Pengkabelan Siap Nyala 3.00
2 Pas. Stop Kontak ex. Broco 1.00
3 Pas. Saklar Tunggal ex. Broco 2.00
4 Pas. Fitting Lampu 2.00
5 Pas. Box MCB 1.00
Sub Total IV

V. PEKERJAAN AKHIR
NO URAIAN PEKERJAAN VOLUME
1 Pekerjaan Akhir 1.00
Sub Total I
BIAYA (RAB)

63,629,047.59

HARGA SATUAN JUMLAH


SATUAN
(Rp) (Rp)
ls 427,273.00 427,273.00 0.67
ls 454,545.00 454,545.00 0.71
881,818.00 1.39

HARGA SATUAN JUMLAH


SATUAN
(Rp) (Rp)

m
3
65,454.55 589,090.91 0.93
m
3
31,381.82 227,518.18 0.36
m
3
282,372.73 112,949.09 0.18
m
3
604,393.64 815,931.41 1.28
JUMLAH 1,745,489.59

m
3
6,131,336.36 8,277,304.09 13.01
m
3
6,131,336.36 1,471,520.73 2.31
m
3
6,131,336.36 14,408,640.45 22.64
m
3
6,131,336.36 2,943,041.45 4.63
JUMLAH 27,100,506.73
28,845,996.32 45.33

HARGA SATUAN JUMLAH


SATUAN
(Rp) (Rp)
m
3 141,262.73 6,780,610.91 10.66
m
3 59,159.09 5,679,272.73 8.93
m
3 424,445.45 9,125,577.27 14.34
m
3 324,445.45 2,206,229.09 3.47
m
3 19,127.18 1,836,209.45 2.89
JUMLAH 25,627,899.45

m
3 18,151.82 1,742,574.55 2.74
m
3 45,706.36 310,803.27 0.49
JUMLAH 2,053,377.82

m
3 202,663.64 3,485,814.55 5.48
m
3 102,936.36 1,770,505.45 2.78
JUMLAH 5,256,320.00
32,937,597.27 51.77

HARGA SATUAN JUMLAH


SATUAN
(Rp) (Rp)
titik 122,727.00 368,181.00 0.58
bh 22,727.00 22,727.00 0.04
bh 18,182.00 36,364.00 0.06
bh 31,818.00 63,636.00 0.10
bh 45,455.00 45,455.00 0.07
536,363.00 0.84

HARGA SATUAN JUMLAH


SATUAN
(Rp) (Rp)
ls 427,273.00 427,273.00 0.67
427,273.00 #DIV/0!
1.39

45.33
51.77

100.00

0.84

100.00
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
INSTANSI : DINAS KEHUTANAN PROVINSI SULAWESI SELATAN
TAHUN ANGGARAN : 2020
LOKASI : DESA WATANG KASSA KEC. BATULAPPA KAB. PINRANG
PEKERJAAN : BELANJA MODAL PENGADAAN KONTRUKSI BANGUNAN PEMBUATAN GAP
REKAPITULASI BOQ

NO JENIS BIAYA
I PEKERJAAN PENDAHULUAN
II PEKERJAAN STRUKTUR
2.1 Pondasi
2.2 Sloef, Kolom, dan Ringbalk
III FINISHING ARSITEKTUR
3.1 FINISHING ARSITEKTUR
IV INSTALASI LISTRIK
V PEKERJAAN AKHIR
TOTAL
PPN 10%
TOTAL PENJUMLAHAN
DIBULATKAN
TERBILANG : ENAM PULUH SEMBILAN JUTA SEMBILAN RATUS SEMBILAN PULUH SATU

Makassar, 23 November 2020

Disetujui, Dibuat Oleh :


KUASA PENGGUNA ANGGARAN (KPA) CV. RIMBUN CIPTA SEM

ANDI ARMAN, S.Hut


NIP : 19750319 200212 1 002
IBNU CHALDON, S.S
Direktur
ANDI ARMAN, S.Hut
NIP : 19750319 200212 1 002
IBNU CHALDON, S.S
Direktur

Mengetahui,
KEPALA DINAS KEHUTANAN PROV. SUL-SEL

Ir. H. ANDI PARENRENGI, MP


NIP : 19631231 199703 1 020
ASI
N BIAYA (RAB)
LAWESI SELATAN
ULAPPA KAB. PINRANG
UKSI BANGUNAN PEMBUATAN GAPURA

JUMLAH
881,818.00

1,745,489.59
27,100,506.73

32,937,597.27
536,363.00
427,273.00
63,629,047.59
6,362,904.76
69,991,952.35
69,991,000.00
ATUS SEMBILAN PULUH SATU RIBU RUPIAH

Makassar, 23 November 2020

Dibuat Oleh :
CV. RIMBUN CIPTA SEMESTA

IBNU CHALDON, S.Sos


Direktur
IBNU CHALDON, S.Sos
Direktur

PROV. SUL-SEL

NGI, MP
3 1 020