Anda di halaman 1dari 107

PERINCIAN PENAWARAN PEKERJAAN

PEKERJAAN : KONSTRUKSI PEMBANGUNAN GEDUNG TOWER FMIPA JURUSAN FISIKA


LOKASI : JL. WILLEM ISKANDAR PASAR V, MEDAN

NO ITEM PEKERJAAN JUMLAH HARGA


( Rp. )

SUB GRAND REKAPITULASI

II. BANGUNAN UTAMA (FAKULTAS MIPA JURUSAN FISIKA)

A. PEKERJAAN STRUKTUR 12,060,110,698.663


B. PEKERJAAN ARSITEKTUR Err:509
C. PEKERJAAN MEKANIKAL Err:509
D. PEKERJAAN ELEKTRIKAL 2,701,707,680.000

TOTAL - II. BANGUNAN UTAMA (FAKULTAS MIPA JURUSAN FISIKA) : Err:509

III. PEKERJAAN SITE / HALAMAN

A. PEKERJAAN MEKANIKAL Masuk tahap ke.2


B. PEKERJAAN ELEKTRIKAL. Masuk tahap ke.2

TOTAL - III. PEKERJAAN SITE / HALAMAN : -

IV. PEKERJAAN RUANG ME.


A. PEKERJAAN ELEKTRIKAL
A.1 KOMISIONING PEK. ELEKTRIKAL BANGUNAN FMIPA JURUSAN FISIKA 13,500,000.000

TOTAL - IV. PEKERJAAN RUANG ME. : 13,500,000.000

V. PEKERJAAN SIPIL -

I PEKERJAAN PERKERASAN JALAN,PARKIR & PEDESTRIAN Masuk tahap ke.2


II PEKERJAAN DRAINASE Masuk tahap ke.2

TOTAL - V. PEKERJAAN SIPIL : -


KALENDER KERJA
Mei
SN SL RB KM JM SB MG
1 2 3 4 5 6 :I (PERTAMA) : 30 APRIL S/D 6 MEI 2018
7 8 9 10 11 12 13 : II (KEDUA) : 7 MEI S/D 13 MEI 2018
14 15 16 17 18 19 20 : III (KETIGA) : 14 MEI S/D 20 MEI 2018
21 22 23 24 25 26 27 : IV (KEEMPAT) : 21 MEI S/D 27 MEI 2018
28 29 30 31

Juni
SN SL RB KM JM SB MG
1 2 3 :V (KELIMA) : 28 MEI S/D 4 JUNI 2018
4 5 6 7 8 9 10 : VI (KEENAM) : 5 JUNI S/D 11 JUNI 2018
11 12 13 14 15 16 17 : VII (KETUJUH) : 12 JUNI S/D 18 JUNI 2018
18 19 20 21 22 23 24 : VIII (KEDELAPAN) : 19 JUNI S/D 25 JUNI 2018
25 26 27 28 29 30 : IX (KESEMBILAN) : 25 JUNI S/D 1 JULI 2018

Juli
SN SL RB KM JM SB MG
1
2 3 4 5 6 7 8 :X (KESEPULUH) : 2 JULI S/D 8 JULI 2018
9 10 11 12 13 14 15 : XI (KESEBELAS) : 9 JULI S/D 15 JULI 2018
16 17 18 19 20 21 22 : XII (KEDUA BELAS) : 16 JULI S/D 22 JULI 2018
23 24 25 26 27 28 29 : XIII (KETIGA BELAS) : 23 JULI S/D 29 JULI 2018
30 31
Agustus
SN SL RB KM JM SB MG
1 2 3 4 5 : XIV (KEEMPAT BELAS) : 30 JULI S/D 5 AGUSTUS 2018
6 7 8 9 10 11 12 : XV (KELIMA BELAS) : 6 AGUSTUS S/D 12 AGUSTUS 2018
13 14 15 16 17 18 19 : XVI (KEENAM BELAS) : 13 AGUSTUS S/D 19 AGUSTUS 2018
20 21 22 23 24 25 26 : XVII (KETUJUH BELAS) : 20 AGUSTUS S/D 26 AGUSTUS 2018
27 28 29 30 31 : XVIII (KEDELAPAN BELAS) : 27 AGUSTUS S/D 2 SEPTEMBER 2018

September
SN SL RB KM JM SB MG
1 2
3 4 5 6 7 8 9 : XIX (KESEMBILAN BELAS) : 3 SEPTEMBER S/D 9 SEPTEMBER 2018
10 11 12 13 14 15 16 : XX (KEDUA PULUH) : 10 SEPTEMBER S/D 16 SEPTEMBER 2018
17 18 19 20 21 22 23 : XXI (KEDUA PULUH SATU) : 17 SEPTEMBER S/D 23 SEPTEMBER 2018
24 25 26 27 28 29 30 : XXII (KEDUA PULUH DUA) : 24 SEPTEMBER S/D 30 SEPTEMBER 2018

Oktober
SN SL RB KM JM SB MG
1 2 3 4 5 6 7 : XXIII (KEDUA PULUH TIGA) : 1 OKTOBER S/D 7 OKTOBER 2018
8 9 10 11 12 13 14 : XXIV (KEDUA PULUH EMPAT) : 8 OKTOBER S/D 14 OKTOBER 2018
15 16 17 18 19 20 21 : XXV (KEDUA PULUH LIMA) : 15 OKTOBER S/D 21 OKTOBER 2018
22 23 24 25 26 27 28 : XXVI (KEDUA PULUH ENAM) : 22 OKTOBER S/D 28 OKTOBER 2018
29 30 31

November
SN SL RB KM JM SB MG
1 2 3 4 : XXVII (KEDUA PULUH TUJUH) : 29 OKTOBER S/D 4 NOVEMBER 2018
5 6 7 8 9 10 11 : XXVIII (KEDUA PULUH DELAPAN) : 5 NOVEMBER S/D 11 NOVEMBER 2018
12 13 14 15 16 17 18 : XXIX (KEDUA PULUH SEMBILAN) : 12 NOVEMBER S/D 18 NOVEMBER 2018
19 20 21 22 23 24 25 : XXX (KETIGA PULUH) : 19 NOVEMBER S/D 25 NOVEMBER 2018
26 27 28 29 30

Desember
SN SL RB KM JM SB MG
1 2 : XXXI (KETIGA PULUH SATU) : 26 NOVEMBER S/D 2 DESEMBER 2018
3 4 5 6 7 8 9 : XXXII (KETIGA PULUH DUA) : 3 DESEMBER S/D 9 DESEMBER 2018
10 11 12 13 14 15 16 : XXXIII (KETIGA PULUH TIGA) : 10 DESEMBER S/D 16 DESEMBER 2018
17 18 19 20 21 22 23 : XXXIV (KETIGA PULUH EMPAT) : 17 DESEMBER S/D 23 DESEMBER 2018
24 25 26 27 28 29 30 : XXXV (KETIGA PULUH LIMA) : 24 DESEMBER S/D 30 DESEMBER 2018
31

Januari
SN SL RB KM JM SB MG
1 2 3 4 5 6 : XXXVI (KETIGA PULUH ENAM) : 31 DESEMBER S/D 6 JANUARI 2019
7 8 9 10 11 12 13 : XXXVII (KETIGA PULUH TUJUH) : 7 JANUARI S/D 13 JANUARI 2019
14 15 16 17 18 19 20 : XXXVIII (KETIGA PULUH DELAPAN) : 14 JANUARI S/D 20 JANUARI 2019
21 22 23 24 25 26 27 : XXXIX (KETIGA PULUH SEMBILAN) : 21 JANUARI S/D 27 JANUARI 2019
28 29 30 31

Februari
SN SL RB KM JM SB MG
1 2 3 : XXXX (KEEMPAT PULUH) : 28 JANUARI S/D 3 FEBRUARI 2019
4 5 6 7 8 9 10 : XXXXI (KEEMPAT PULUH SATU) : 4 FEBRUARI S/D 10 FEBRUARI 2019
11 12 13 14 15 16 17 : XXXXII (KEEMPAT PULUH DUA) : 11 FEBRUARI S/D 17 FEBRUARI 2019
18 19 20 21 22 23 24 : XXXXIII (KEEMPAT PULUH TIGA) : 18 FEBRUARI S/D 24 FEBRUARI 2019
25 26 27 28

Maret
SN SL RB KM JM SB MG
1 2 3 : XXXXIV (KEEMPAT PULUH EMPAT) : 25 FEBRUARI S/D 3 MARET 2019
4 5 6 7 8 9 10 : XXXXV (KEEMPAT PULUH LIMA) :4 MARET S/D 10 MARET 2019
11 12 13 14 15 16 17 : XXXII (KETIGA PULUH DUA) : 3 DESEMBER S/D 9 DESEMBER 2018
18 19 20 21 22 23 24 : XXXIII (KETIGA PULUH TIGA) : 10 DESEMBER S/D 16 DESEMBER 2018
25 26 27 28 29 30 31 : XXXIV (KETIGA PULUH EMPAT) : 17 DESEMBER S/D 23 DESEMBER 2018
PEMILIK PROYEK Konsultan Pengawas, LAPORAN PROGRESS KONTRAKTOR PELAKSANA

UNIVERSITAS NEGERI MEDAN PT. Wahanacipta Bangunwisma PEKERJAAN KONSTRUKSI PT. GUNAKARYA NUSANTARA
PEMBANGUNAN GEDUNG TOWER FMIPA JURUSAN FISIKA
LOKASI JL. WILLEM ISKANDAR PASAR V, MEDAN
No. Kontrak :1465/UN33-PPK/PNBP/SP/2018
MINGGU KE : XXIX (KEDUA PULUH SEMBILAN)
PERIODE : 12 NOVEMBER S/D 18 NOVEMBER 2018
BOBOT BOBOT
NO ITEM PEKERJAAN
KONTRAK AWAL (CCO)
PROGRESS
MINGGU LALU MINGGU INI S/D MINGGU INI Laporan Harian
(%) (%) BOBOT (%) BOBOT (%) BOBOT (%) Hari Ke
GRAND REKAPITULASI 5 6 7 8 9 10 11

I. PEKERJAAN PENDAHULUAN 5.862 5.862 5.862 - 5.862


II. BANGUNAN UTAMA (FAKULTAS MIPA JURUSAN FISIKA)
A. PEKERJAAN STRUKTUR 47.897 49.189 25.172 4.903 30.076
B. PEKERJAAN ARSITEKTUR 24.437 23.832 - 0.206 0.206
C. PEKERJAAN MEKANIKAL 9.653 8.997 1.227 2.848 4.075
D. PEKERJAAN ELEKTRIKAL 10.730 10.700 4.186 2.674 6.861
III. PEKERJAAN SITE / HALAMAN
A. PEKERJAAN MEKANIKAL
B. PEKERJAAN ELEKTRIKAL.
IV. PEKERJAAN RUANG ME.
A. PEKERJAAN ELEKTRIKAL
A.1 KOMISIONING PEK. ELEKTRIKAL BANGUNAN FMIPA JURUSAN FISIKA 0.054 0.054 - - -
B. PEKERJAAN MEKANIKAL.
C. PEKERJAAN ARSITEKTUR 1.367 1.367 0.598 0.310 0.908
V. PEKERJAAN SIPIL
I PEKERJAAN PERKERASAN JALAN,PARKIR & PEDESTRIAN
II PEKERJAAN DRAINASE
VI. PEKERJAAN LANDSCAPE

TOTAL. I : 100.000 100.000 37.046 10.941 47.987

Medan, 30 Desember 2018


Disetujui : Mengetahui oleh: Diperiksa Oleh Diperiksa Oleh, Dibuat Oleh
Pejabat Pembuat Komitmen Pembantu Pengelola Teknis Konsultan Pengawas Konsultan Pengawas Kontraktor Pelaksana
UNIVERSITAS NEGERI MEDAN Staff Teknis Dinas Penataan Ruang dan Permukiman
PT. WAHANACIPTA BANGUNWISMA PT. WAHANACIPTA BANGUNWISMA PT. GUNAKARYA NUSANTARA
Provinsi Sumatera Utara

Drs. MUSLIM, ST,M.Pd DHANIL RAFONDA, ST ANGGONO PURWANTORO ANGGONO PURWANTORO ROLAND H. MANIK, ST
NIP. 19650916 199103 1 001 NIP. 19820628 200801 1 001 Team Leader Team Leader Site Manager -
PEMILIK PROYEK Konsultan Pengawas, LAPORAN PROGRESS KONTRAKTOR PELAKSANA

0 PT. Wahanacipta Bangunwisma PEKERJAAN KONSTRUKSI PT. GUNAKARYA NUSANTARA


PEMBANGUNAN GEDUNG TOWER FMIPA JURUSAN FISIKA
LOKASI JL. WILLEM ISKANDAR PASAR V, MEDAN
No. Kontrak :1465/UN33-PPK/PNBP/SP/2018
MINGGU KE : XXIX (KEDUA PULUH SEMBILAN)
PERIODE : 12 NOVEMBER S/D 18 NOVEMBER 2018
LINGKUP PEKERJAAN : STRUKTUR
KONTRAK CCO PROGRESS % BOBOT
NO ITEM PEKERJAAN AWAL MINGGU LALU MINGGU INI S/D MINGGU INI SELESAI
BOBOT BOBOT BOBOT (%) BOBOT (%) BOBOT (%)
(%) (%)
REKAPITULASI

A. PEKERJAAN STRUKTUR

II. BANGUNAN UTAMA (FAKULTAS MIPA JURUSAN FISIKA)

II.1. PEKERJAAN PERSIAPAN 0.036 0.036 0.036 - 0.036


- - - -
II.2. PEKERJAAN GALIAN TANAH & URUGAN 1.073 1.073 0.994 - 0.994
- - - -
II.3. PEKERJAAN STRUKTUR BAWAH - - - -
II.3.1. PEKERJAAN SUB STRUKTUR - - - -
II.3.1.1. Pekerjaan Pondasi 7.667 7.667 7.667 - 7.667
II.3.1.2. Pekerjaan Pile Cap / PC 2.853 2.370 0.404 2.774
- - - -
II.3.2. UPPER STRUKTUR. - - - -
II.3.2.2. Lantai - 1 (satu) Elev. -50 3.769 4.280 2.778 0.694 3.472
II.3.2.3. Lantai - 2 (dua) ( El. + 3.950 ) 3.830 4.154 3.600 0.553 4.153
II.3.2.4. Lantai - 3 (tiga) Elev. + 7.950 3.776 3.816 3.449 0.173 3.622
II.3.2.5. Lantai - 4 (empat) Elev. + 11.950 3.690 3.773 2.482 0.882 3.364
II.3.2.6. Lantai - 5 (lima) Elev. + 15.950 3.581 3.642 - 1.048 1.048
II.3.2.7. Lantai - 6 (enam) Elev. + 19.950 3.518 3.524 - - -
II.3.2.8. Lantai - 7 (tujuh) Elev. + 23.950 3.508 3.514 - - -
II.3.2.9. Lantai - 8 (delapan) Elev. + 27.950 3.403 3.409 - - -
II.3.2.10. Lantai - RL1 Elev. + 31.950 2.163 2.163 - - -
II.3.2.11. Lantai - RL2 Elev. + 35.950 0.341 0.341 - - -
- - - -
II.3.2.12. PEKERJAAN CROWN.( EL.+ 31.950 S/D + 35.000 ) - - - -
A. CROWN AS Y1 ( X1 - X3 ). 0.392 0.392 - - -
B. CROWN AS X1 ( Y2 - Y4 ). 0.392 0.392 - - -
C. CROWN AS X4 ( Y2 - Y4 ). 0.392 0.392 - - -
II.3.3. PEKERJAAN ATAP CANOPY. 0.091 0.091 - - -
- - - -
II.3.4 PEKERJAAN GROUNDTANK/RUANG ME. 3.675 3.675 1.795 1.149 2.944

TOTAL - II. BANGUNAN UTAMA (FAKULTAS MIPA JURUSAN FISIKA) : 45.299 49.189 25.172 4.903 30.076
PEMILIK PROYEK Konsultan Pengawas, LAPORAN PROGRESS KONTRAKTOR PELAKSANA

UNIVERSITAS NEGERI MEDAN PT. Wahanacipta Bangunwisma


PT. Wahanacipta Bangunwisma PEKERJAAN KONSTRUKSI PT. GUNAKARYA NUSANTARA
PEMBANGUNAN GEDUNG TOWER FMIPA JURUSAN FISIKA
LOKASI JL. WILLEM ISKANDAR PASAR V, MEDAN
No. Kontrak :1465/UN33-PPK/PNBP/SP/2018
MINGGU KE : XXIX (KEDUA PULUH SEMBILAN)
PERIODE : 12 NOVEMBER S/D 18 NOVEMBER 2018
LINGKUP PEKERJAAN : ARSITEKTUR
KONTRAK AWAL CCO PROGRESS % BOBOT
NO ITEM PEKERJAAN BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI SELESAI
(%) BOBOT (%) BOBOT (%) BOBOT (%)

REKAPITULASI
B. PEKERJAAN ARSITEKTUR

II. BANGUNAN UTAMA (FAKULTAS MIPA JURUSAN FISIKA)


I. PEKERJAAN DINDING DAN PASANGAN
I. 1. Lantai 1 (satu). 0.994 0.99 - - -
I. 2. Lantai 2 (dua). 1.035 0.76 - 0.11 0.11
I. 3. Lantai 3 (tiga). 0.973 0.76 - 0.07 0.07
I. 4. Lantai 4 (empat). 1.029 0.67 - - -
I. 5. Lantai 5 (lima). 0.854 0.68 - - -
I. 6. Lantai 6 (enam). 0.835 0.67 - - -
I. 7. Lantai 7 (tujuh). 0.815 0.67 - - -
I. 8. Lantai 8 (delapan). 0.911 0.67 - - -
I. 9. Lantai 9 (sembilan). 0.776 0.78 - - -
II. PEKERJAAN BETON
II. 1. Lantai 1 (satu). 0.159 0.16 - - -
II. 2. Lantai 2 (dua). 0.148 0.15 - 0.02 0.02
II. 3. Lantai 3 (tiga). 0.160 0.16 - 0.01 0.01
II. 4. Lantai 4 (empat). 0.165 0.16 - - -
II. 5. Lantai 5 (lima). 0.157 0.16 - - -
II. 6. Lantai 6 (enam). 0.142 0.14 - - -
II. 7. Lantai 7 (tujuh). 0.134 0.13 - - -
II. 8. Lantai 8 (delapan). 0.134 0.13 - - -
II. 9. Lantai 9 (sembilan). 0.083 0.08 - - -

6/107
KONTRAK AWAL CCO PROGRESS % BOBOT
NO ITEM PEKERJAAN BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI SELESAI
(%) BOBOT (%) BOBOT (%) BOBOT (%)

III. PEKERJAAN KUSEN, PINTU & JENDELA ALMUNIUM


(Lengkap dengan Kunci, Engsel + Kaca & Accessories) terpasang
III. 1. Lantai 1 (satu). 0.670 0.67 - - -
III. 2. Lantai 2 (dua). 0.865 0.86 - - -
III. 3. Lantai 3 (tiga). 0.522 0.52 - - -
III. 4. Lantai 4 (empat). 0.269 0.27 - - -
III. 5. Lantai 5 (lima). 0.261 0.26 - - -
III. 6. Lantai 6 (enam). 0.263 0.26 - - -
III. 7. Lantai 7 (tujuh). 0.263 0.26 - - -
III. 8. Lantai 8 (delapan). 0.590 0.19 - - -
III. 9. Lantai 9 (sembilan). - - - - -
IV. PEKERJAAN PENUTUP LANTAI DAN DINDING
IV. 1. Lantai 1 (satu). 1.953 2.38 - - -
IV. 2. Lantai 2 (dua). 0.953 2.09 - - -
IV. 3. Lantai 3 (tiga). 0.876 1.91 - - -
IV. 4. Lantai 4 (empat). 0.239 0.80 - - -
IV. 5. Lantai 5 (lima). 0.239 0.60 - - -
IV. 6. Lantai 6 (enam). 0.239 0.53 - - -
IV. 7. Lantai 7 (tujuh). 0.292 - - - -
IV. 8. Lantai 8 (delapan). 0.239 - - - -
IV. 9. Lantai 9 (sembilan). 0.203 - - - -
V. PEKERJAAN PLAFOND
V.1. Lantai 1 (satu). 0.260 0.26 - - -
V. 2. Lantai 2 (dua). 0.241 0.24 - - -
V. 3. Lantai 3 (tiga). 0.231 0.23 - - -
V. 4. Lantai 4 (empat). 0.248 0.25 - - -
V. 5. Lantai 5 (lima). 0.245 0.25 - - -
V. 6. Lantai 6 (enam). 0.244 0.24 - - -
V. 7. Lantai 7 (tujuh). 0.244 0.24 - - -
V. 8. Lantai 8 (delapan). 0.246 0.25 - - -
V. 9. Lantai 9 (sembilan). 0.018 0.02 - - -

7/107
KONTRAK AWAL CCO PROGRESS % BOBOT
NO ITEM PEKERJAAN BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI SELESAI
(%) BOBOT (%) BOBOT (%) BOBOT (%)

VI. PEKERJAAN SANITAIR


VI. 1. Lantai 1 (satu). 0.142 - - - -
VI. 2. Lantai 2 (dua). 0.144 - - - -
VI. 3. Lantai 3 (tiga). 0.125 - - - -
VI. 4. Lantai 4 (empat). 0.119 - - - -
VI. 5. Lantai 5 (lima). 0.117 - - - -
VI. 6. Lantai 6 (enam). 0.119 - - - -
VI. 7. Lantai 7 (tujuh). 0.117 - - - -
VI. 8. Lantai 8 (delapan). 0.119 - - - -
VII. PEKERJAAN PENUTUP ATAP 0.092 0.09 - - -
VIII. PEKERJAAN FINISHING
VIII. 1. Lantai 1 (satu). 0.238 0.24 - - -
VIII. 2. Lantai 2 (dua). 0.286 0.29 - - -
VIII. 3. Lantai 3 (tiga). 0.219 0.22 - - -
VIII. 4. Lantai 4 (empat). 0.385 0.39 - - -
VIII. 5. Lantai 5 (lima). 0.256 0.26 - - -
VIII. 6. Lantai 6 (enam). 0.256 0.26 - - -
VIII. 7. Lantai 7 (tujuh). 0.274 0.27 - - -
VIII. 8. Lantai 8 (delapan). 0.279 0.28 - - -
VIII. 9. Lantai 9 (sembilan). 0.029 0.03 - - -
IX. PEKERJAAN LAIN-LAIN
23.73 23.83 - 0.21 0.21

8/107
KONTRAK AWAL CCO PROGRESS % BOBOT
NO ITEM PEKERJAAN BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI SELESAI
(%) BOBOT (%) BOBOT (%) BOBOT (%)

B. R. POMPA, GROUND TANK, GENSET DAN PANEL

I. PEKERJAAN PASANGAN DAN PLESTERAN 0.45 0.45 0.30 0.13 0.44


II. PEKERJAAN BETON 0.04 0.04 - 0.03 0.03
III. PEKERJAAN KUSEN, PINTU & JENDELA 0.28 0.28 0.14 0.13 0.28
IV. PEKERJAAN PENUTUP LANTAI 0.27 0.27 0.16 0.01 0.17
V. PEKERJAAN PLAFOND 0.05 0.05 - - -
VI PEKERJAAN PENGECATAN 0.14 0.14 - - -
VII PEKERJAAN LAIN-LAIN 0.15 0.15 - - -
1.37 1.37 0.60 0.31 0.91

9/107
PEMILIK PROYEK Konsultan Pengawas, LAPORAN PROGRESS KONTRAKTOR PELAKSANA

UNIVERSITAS NEGERI MEDAN PT. Wahanacipta Bangunwisma PEKERJAAN KONSTRUKSI PT. GUNAKARYA NUSANTARA
PEMBANGUNAN GEDUNG TOWER FMIPA JURUSAN FISIKA
LOKASI JL. WILLEM ISKANDAR PASAR V, MEDAN
No. Kontrak :1465/UN33-PPK/PNBP/SP/2018
MINGGU KE : XXIX (KEDUA PULUH SEMBILAN)
PERIODE : 12 NOVEMBER S/D 18 NOVEMBER 2018
LINGKUP PEKERJAAN : MEKANIKAL
KONTRAK AWAL CCO PROGRESS % BOBOT
NO ITEM PEKERJAAN BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI SELESAI
(%) BOBOT (%) BOBOT (%) BOBOT (%)

REKAPITULASI

PEKERJAAN MEKANIKAL

A. BANGUNAN GEDUNG UTAMA


1, PEKERJAAN INSTALASI AIR BERSIH
PEKERJAAN LANTAI -1 (SATU) 0.05 0.05 0.02 0.01 0.03
PEKERJAAN LANTAI - 2 (DUA) 0.04 0.04 0.02 0.01 0.02
PEKERJAAN LANTAI - 3 (TIGA) 0.04 0.04 0.02 0.01 0.03
PEKERJAAN LANTAI - 4 (EMPAT) 0.04 0.04 0.01 0.01 0.02
PEKERJAAN LANTAI - 5 (LIMA) 0.04 0.04 0.01 0.00 0.01
PEKERJAAN LANTAI - 6 (ENAM) 0.04 0.04 - - -
PEKERJAAN LANTAI - 7 (TUJUH) 0.04 0.04 - - -
PEKERJAAN LANTAI - 8 (DELAPAN) 0.05 0.05 - - -
PEKERJAAN LANTAI - 9 (SEMBILAN) 0.27 - - - -
2, PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN
PEKERJAAN LANTAI -1 (SATU) 0.07 0.07 0.05 0.02 0.07
PEKERJAAN LANTAI - 2 (DUA) 0.06 0.06 0.04 0.02 0.05
PEKERJAAN LANTAI - 3 (TIGA) 0.06 0.06 0.03 0.02 0.05
PEKERJAAN LANTAI - 4 (EMPAT) 0.06 0.06 0.04 0.02 0.05
PEKERJAAN LANTAI - 5 (LIMA) 0.06 0.06 0.03 0.02 0.06
PEKERJAAN LANTAI - 6 (ENAM) 0.06 0.06 - 0.01 0.01
PEKERJAAN LANTAI - 7 (TUJUH) 0.06 0.06 - - -
PEKERJAAN LANTAI - 8 (DELAPAN) 0.06 0.06 - - -
PEKERJAAN LANTAI - 9 (SEMBILAN) 0.18 0.18 - - -
3, PEKERJAAN INSTALASI PEMADAM KEBAKARAN
PEKERJAAN LANTAI -1 (SATU) 0.69 0.64 0.15 0.08 0.23
PEKERJAAN LANTAI - 2 (DUA) 0.37 0.32 0.20 0.11 0.31
PEKERJAAN LANTAI - 3 (TIGA) 0.37 0.32 0.16 0.07 0.23
PEKERJAAN LANTAI - 4 (EMPAT) 0.37 0.36 0.16 0.07 0.23
PEKERJAAN LANTAI - 5 (LIMA) 0.37 0.32 0.16 0.07 0.23
PEKERJAAN LANTAI - 6 (ENAM) 0.37 0.32 0.14 0.05 0.19
PEKERJAAN LANTAI - 7 (TUJUH) 0.37 0.32 - - -
PEKERJAAN LANTAI - 8 (DELAPAN) 0.37 0.32 - - -
PEKERJAAN LANTAI - 9 (SEMBILAN) 0.01 - - - -

10/107
KONTRAK AWAL CCO PROGRESS % BOBOT
NO ITEM PEKERJAAN BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI SELESAI
(%) BOBOT (%) BOBOT (%) BOBOT (%)

4, PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN


PEKERJAAN LANTAI -1 (SATU) 0.06 0.06 - 0.00 0.00
PEKERJAAN LANTAI - 2 (DUA) 0.05 0.05 - 0.00 0.00
PEKERJAAN LANTAI - 3 (TIGA) 0.06 0.06 - 0.00 0.00
PEKERJAAN LANTAI - 4 (EMPAT) 0.06 0.06 - 0.00 0.00
PEKERJAAN LANTAI - 5 (LIMA) 0.06 0.06 - 0.00 0.00
PEKERJAAN LANTAI - 6 (ENAM) 0.06 0.06 - 0.00 0.00
PEKERJAAN LANTAI - 7 (TUJUH) 0.06 0.06 - - -
PEKERJAAN LANTAI - 8 (DELAPAN) 0.06 0.06 - - -
PEKERJAAN LANTAI - 9 (SEMBILAN) 0.17 0.17 - 0.05 0.05
5, PEKERJAAN INSTALASI AIR CONDITIONING (AC)
PEKERJAAN LANTAI -1 (SATU) 0.45 0.45 - 0.22 0.22
PEKERJAAN LANTAI - 2 (DUA) 0.58 0.58 - 0.40 0.40
PEKERJAAN LANTAI - 3 (TIGA) 0.52 0.52 - 0.28 0.28
PEKERJAAN LANTAI - 4 (EMPAT) 0.53 0.53 - 0.28 0.28
PEKERJAAN LANTAI - 5 (LIMA) 0.57 0.57 - 0.25 0.25
PEKERJAAN LANTAI - 6 (ENAM) 0.52 0.52 - 0.23 0.23
PEKERJAAN LANTAI - 7 (TUJUH) 0.63 0.63 - 0.25 0.25
PEKERJAAN LANTAI - 8 (DELAPAN) 0.62 0.62 - 0.27 0.27
PEKERJAAN LANTAI - 9 (SEMBILAN) 0.02 - - - -
6, PEKERJAAN INSTALASI ELEVATOR

X SITE
1, PEKERJAAN INSTALASI AIR BERSIH - SITE
2, PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN-SITE
3, PEKERJAAN INSTALASI PEMADAM KEBAKARAN - SITE

TOTAL PEKERJAAN MEKANIKAL : 9.65 9.00 1.23 2.85 4.07

11/107
PEMILIK PROYEK Konsultan Pengawas, LAPORAN PROGRESS KONTRAKTOR PELAKSANA

UNIVERSITAS NEGERI MEDAN PT. Wahanacipta Bangunwisma PEKERJAAN KONSTRUKSI PT. GUNAKARYA NUSANTARA
PEMBANGUNAN GEDUNG TOWER FMIPA JURUSAN FISIKA
LOKASI JL. WILLEM ISKANDAR PASAR V, MEDAN
No. Kontrak :1465/UN33-PPK/PNBP/SP/2018
MINGGU KE : XXIX (KEDUA PULUH SEMBILAN)
PERIODE : 12 NOVEMBER S/D 18 NOVEMBER 2018
LINGKUP PEKERJAAN : ELEKTRIKAL
KONTRAK AWAL CCO PROGRESS % BOBOT
BOBOT BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI SELESAI
NO ITEM PEKERJAAN
(%) (%) BOBOT (%) BOBOT (%) BOBOT (%)

REKAPITULASI

D. PEKERJAAN ELEKTRIKAL

II. BANGUNAN UTAMA JURUSAN FISIKA

II.1. PEKERJAAN LANTAI -1 (SATU) 3.89 3.92 1.25 1.33 2.58

II.2 PEKERJAAN LANTAI - 2 (DUA) 1.38 1.38 0.89 0.36 1.26

II.3. PEKERJAAN LANTAI - 3 (TIGA) 0.69 0.69 0.44 0.16 0.60

II.4. PEKERJAAN LANTAI - 4 (EMPAT) 0.72 0.72 0.45 0.21 0.65

II.5. PEKERJAAN LANTAI - 5 (LIMA) 1.41 1.41 0.36 0.12 0.49

II.6. PEKERJAAN LANTAI - 6 (ENAM) 0.75 0.75 0.25 0.16 0.41

II.7. PEKERJAAN LANTAI - 7 (TUJUH) 0.65 0.60 0.21 0.11 0.33

II.8. PEKERJAAN LANTAI - 8 (DELAPAN) 0.72 0.72 0.25 0.15 0.41

II.9. PEKERJAAN LANTAI - 9 (SEMBILAN) 0.52 0.51 0.08 0.06 0.14

TOTAL - II.BANGUNAN UTAMA JURUSAN FISIKA : 10.73 10.70 4.19 2.67 6.86
PEMILIK PROYEK Konsultan Pengawas, LAPORAN PROGRESS KONTRAKTOR PELAKSANA

UNIVERSITAS NEGERI MEDAN PT. Wahanacipta Bangunwisma PEKERJAAN KONSTRUKSI PT. GUNAKARYA NUSANTARA
PEMBANGUNAN GEDUNG TOWER FMIPA JURUSAN FISIKA
LOKASI JL. WILLEM ISKANDAR PASAR V, MEDAN
No. Kontrak :1465/UN33-PPK/PNBP/SP/2018
MINGGU KE : XXIX (KEDUA PULUH SEMBILAN)
PERIODE : 12 NOVEMBER S/D 18 NOVEMBER 2018
LINGKUP PEKERJAAN : PENDAHULUAN
NO I T E M P E K E R J A A N KONTRAK AWAL CCO PROGRESS % BOBOT
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI SELESAI
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
I.
1 Direksi keet m2 40.00 0.15 40.00 0.15 40.00 0.15 - - 40.00 0.15 100.00
2 Papan Nama Proyek bh 1.00 0.00 1.00 0.00 1.00 0.00 - - 1.00 0.00 100.00
3 Gudang semen & barak kerja m2 40.00 0.24 40.00 0.24 40.00 0.24 - - 40.00 0.24 100.00
4 Pagar Sementara m' 200.00 0.12 200.00 0.12 200.00 0.12 - - 200.00 0.12 100.00
5 Air Kerja ls 1.00 0.04 1.00 0.04 0.89 0.03 0.11 0.00 1.00 0.04 100.00
6 Listrik Kerja ls 1.00 0.07 1.00 0.07 0.89 0.06 0.11 0.01 1.00 0.07 100.00
7 Peralatan Keselamatan & Kesehatan Kerja ( K - 3 ) ls 1.00 0.07 1.00 0.07 0.89 0.07 0.11 0.01 1.00 0.07 100.00
8 Keamanan Proyek ( 2 orang ) ls 1.00 0.07 1.00 0.07 0.89 0.06 0.11 0.01 1.00 0.07 100.00
9 Tower Krane ( 1 unit )
Tower Crane : 1,9 ton - 45 m ( 1 Unit ) bln 6.00 2.65 6.00 2.65 6.35 2.80 - 0.35 - 0.15 6.00 2.65 100.00
Genset 250 KVA ( 1 Unit ) + Bahan Bakar Solar bln 6.00 1.27 6.00 1.27 6.35 1.34 - 0.35 - 0.07 6.00 1.27 100.00
Pondasi, Bored Pile TC unit 1.00 0.18 1.00 0.18 1.00 0.18 - - 1.00 0.18 100.00
Pondasi Pile Cup 4,5 m x 4,5 m x 1,8 m unit 1.00 0.44 1.00 0.44 1.00 0.44 - - 1.00 0.44 100.00
Operator TC bln 6.00 0.17 6.00 0.17 6.15 0.18 - 0.15 - 0.00 6.00 0.17 100.00
Pembantu operator bln 6.00 0.06 6.00 0.06 6.15 0.06 - 0.15 - 0.00 6.00 0.06 100.00
10 Universal Lift / Passengger ( 1 unit ) bln 6.00 0.28 6.00 0.28 2.40 0.11 3.60 0.17 6.00 0.28 100.00
11 Mobilisasi & Demobilisasi Alat. ls 1.00 0.06 1.00 0.06 0.89 0.05 0.11 0.01 1.00 0.06 100.00
TOTAL - I. PEKERJAAN PENDAHULUAN : 5.862 5.862 5.895 - 0.034 5.862

Hal.13
PEMILIK PROYEK Konsultan Pengawas, LAPORAN PROGRESS KONTRAKTOR PELAKSANA

UNIVERSITAS NEGERI MEDAN PT. Wahanacipta BangunwismaPEKERJAAN KONSTRUKSI PT. GUNAKARYA NUSANTARA
PEMBANGUNAN GEDUNG TOWER FMIPA JURUSAN FISIKA
LOKASI JL. WILLEM ISKANDAR PASAR V, MEDAN
No. Kontrak :1465/UN33-PPK/PNBP/SP/2018

LINGKUP PEKERJAAN : STRUKTUR


NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

A. PEKERJAAN STRUKTUR
II BANGUNAN UTAMA (FAKULTAS MIPA JURUSAN FISIKA)
II.1. PEKERJAAN PERSIAPAN
1 Pek. Bouwplank m1 -
TOTAL. II.1. PEKERJAAN PERSIAPAN : -

II.2. PEKERJAAN GALIAN TANAH & URUGAN


1 Pek. Galian pile cap m3 -
2 Pek. Urugan pasir bawah pile cap & Sloof t.= 5 cm m3 -
3 Pek. Lantai kerja bawah pile cap & Sloof t. 5 cm m3 -
4 Pek. Urugan pasir bawah lantai t. = 5 cm m3 -
5 Pek. Lantai kerja bawah lantai t. = 5 cm m3 -
6 Pek.buangan tanah sisa galian pondasi m3 -
7 Pek.Urugan tanah dalam bangunan m3 -
8 Pek. Urugan tanah kembali m3 -
TOTAL. II.2. PEKERJAAN GALIAN TANAH & URUGAN : -

II.3. PEKERJAAN STRUKTUR BAWAH


II.3.1. PEKERJAAN SUB STRUKTUR
II.3.1.1. Pekerjaan Pondasi
1 Pondasi bore pile Ø 600 h = 19 m.
Pile Cap Type PC2. 3300x1680x1100 = 1 bh 2.00 bh
Pile Cap Type PC3. 3300x3083x1100 = 6 bh 18.00 bh
Pile Cap Type PC4. 3300x3300x1100 = 3 bh 12.00 bh
Pile Cap Type PC6. 3300x3300x1100 = 3 bh 18.00 bh
Pondasi Type PCSW.1 = 1 bh 16.00 bh
Pondasi Type PCSW.2 = 1 bh 22.00 bh
88.00 bh
2 Galian pondasi Ø 600 m1 -
3 Buangan tanah sisa galian m3 -
4 Beton K.350 113,90 kg/m3 m3 -
5 Besi beton spiral kg -
6 Besi beton utama kg -
7 Pemotongan kepala bore pile ttk -
8 PDA Test. ttk -
SUB TOTAL. II.3.1.1. Pekerjaan Pondasi : -

II.3.1.2. Pekerjaan Pile Cap / PC


1 Pile Cap Type PC2. 3300x1680x1100
Beton K.350 112.52 kg/m3 m3 -
Besi ulir atas kg -
Besi ulir peminggang kg -
Besi ulir bawah kg -
Bekisting m2 -
2 Pile Cap Type PC3. 3300x3083x1100
Beton K.350 79.00 kg/m3 m3 -
Besi ulir atas kg -
Besi ulir peminggang kg 17.05 0.00 17.05
Besi ulir bawah kg 534.18 0.03 267.09 267.09
Bekisting m2 -
3 Pile Cap Type PC4. 3300x3300x1100
Beton K.350 63.17 kg/m3 m3 -
Besi ulir atas kg 62.14 0.00 31.07 31.07
Besi ulir peminggang kg 123.29 0.01 123.29
Besi ulir bawah kg 2,419.04 0.13 1,209.52 1,209.52
Bekisting m2 -
4 Pile Cap Type PC6. 3300x4920x1100
Beton K.350 64.51 kg/m3 m3 -
Besi ulir atas kg 25.49 0.00 25.49

14/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

Besi ulir peminggang kg -


Besi ulir bawah kg 480.72 0.03 240.36 240.36
Bekisting m2 -
5 Pondasi Type PCSW.1
Beton K.350 104.12 kg/m3 m3 12.61 0.06 12.61
Besi ulir atas kg -
Besi ulir peminggang kg -
Besi ulir bawah kg 39.36 0.00 39.36
Bekisting m2 -
6 Pondasi Type PCSW.2
Beton K.350 110.69 kg/m3 m3 18.88 0.09 18.88
Besi ulir atas kg -
Besi ulir peminggang kg -
Besi ulir bawah kg 1,048.70 0.06 524.35 524.35
Bekisting m2 2.98 0.00
7 Pekerjaan Tangga Ramp.
a. Pek. Galian pondasi m3 -
b. Pek. Urugan pasir bawah pondasi t.= 5 cm m3 -
c. Pek. Lantai kerja bawah lantai t. 5 cm m3 -
d. Pek. Urugan pasir bawah lantai t. = 5 cm m3 -
e. Pek.buangan tanah sisa galian pondasi m3 -
f. Pek.Urugan tanah dalam bangunan m3 -
g. Pek. Urugan tanah kembali m3 -
h.Pasangan pondasi batu kali ( 1 Pc : 5 Psr ) m3 -
i.Pasangan batu kosongan t = 20 cm m3 -
y.Plat lantai beton t = 10 cm m3
Beton K.350 55.30 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
SUB TOTAL. II.3.1.2. Pekerjaan Pile Cap / PC : 0.40

II.3.2. UPPER STRUKTUR.


II.3.2.2. Lantai - 1 (satu) Elev. -50
1 Plat Lantai t = 12 cm
Beton K.350 107.98 kg/m3 m3 -
Besi ulir kg - - - -
Bekisting m2 - -
2 Balok TB1. 350x600
Beton K.350 193.71 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
3 Balok TB2 350x600
Beton K.350 158.23 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
4 Balok TB3. 300x400
Beton K.350 161.96 kg/m3 m3 6.16 0.03 6.16
Besi ulir kg 1,416.36 0.08 500.00 916.36
Bekisting m2 17.51 0.01 17.51
- Balok TB4. 300x400
Beton K.350 m3 2.08 0.01 2.08
Besi ulir kg 1,152.82 0.06 400.00 752.82
Bekisting m2 18.37 0.01 18.37
- Balok TB4.A 300x400
Beton K.350 m3 0.35 0.00 0.35
Besi ulir kg 227.38 0.01 227.38
Bekisting m2 6.33 0.01 6.33
- Balok TB5. 300x600
Beton K.350 m3 1.09 0.01 1.09
Besi ulir kg 305.58 0.02 305.58
Bekisting m2 9.08 0.01 9.08
- Balok CTB1. 300x700
Beton K.350 m3 2.32 0.01 2.32
Besi ulir kg 393.22 0.02 393.22
Bekisting m2 27.80 0.02 27.80
- Balok TBB1. 250x600
Beton K.350 m3 3.02 0.01 3.02
Besi ulir kg 842.31 0.04 200.00 642.31
Bekisting m2 27.81 0.02 27.81

15/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

- Balok TBB2. 250x400


Beton K.350 m3 1.80 0.01 1.80
Besi ulir kg 961.95 0.05 200.00 761.95
Bekisting m2 24.62 0.02 24.62
- Balok TBB3. 150x400
Beton K.350 m3 0.63 0.00 0.63
Besi ulir kg 112.52 0.01 112.52
Bekisting m2 9.32 0.01 9.32
- Balok CTBB1. 250x400
Beton K.350 m3 1.03 0.00 1.03
Besi ulir kg 228.94 0.01 228.94
Bekisting m2 21.86 0.02 21.86
5 Shear Waal P1 t = 25 cm
Beton K.350 438.74 kg/m3 m3 - -
Besi ulir kg 40.21 0.00 40.21
Bekisting m2 - -
6 Shear Waal P2 t = 25 cm
Beton K.350 390.74 kg/m3 m3 - -
Besi ulir kg 208.54 0.01 208.54
Bekisting m2 - -
7 Shear Waal P3 t = 25 cm
Beton K.350 187.92 kg/m3 m3 - -
Besi ulir kg 350.63 0.02 350.63
Bekisting m2 - -
8 Shear Waal P4 t = 25 cm
Beton K.350 423.20 kg/m3 m3 0.27 0.00 0.27
Besi ulir kg 339.90 0.02 339.90
Bekisting m2 2.17 0.00 2.17
9 Shear Waal P5 t = 25 cm
Beton K.350 408.88 kg/m3 m3 0.17 0.00 0.17
Besi ulir kg 121.71 0.01 121.71
Bekisting m2 1.35 0.00 1.35
10 Shear Waal P6 t = 25 cm
Beton K.350 372.14 kg/m3 m3 0.40 0.00 0.40
Besi ulir kg 313.20 0.02 313.20
Bekisting m2 4.44 0.01 4.44
11 Pasangan dinding 1/2 batu dibawah Tie Beam t = 98 cm ( 1Pc : 5 Psr ) m2 -
12 Pek.Pit lift t = 25 cm.
Beton K.350 87.36 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
13 Pek.Sparator Beam 150x200
Beton K.350 246.38 kg/m3 m3 - -
Besi ulir kg -
Bekisting m2 -
14 Kolom K1. 500x750 ( El.- 1.850 s/d + 3.950 )
Beton K.350 190.55 kg/m3 m3 -
Besi ulir kg 542.65 0.03 271.32 271.32
Bekisting m2 8.19 0.01 8.19
15 Kolom K1A. 500x750 ( El.- 1.850 s/d + 3.950 ).
Beton K.350 301.73 kg/m3 m3 0.01 0.00 0.01
Besi ulir kg 87.97 0.00 87.97
Bekisting m2 0.90 0.00 0.90
16 Kolom K2. 500x750 ( El.- 1.850 s/d + 3.950 )
Beton K.350 351.65 kg/m3 m3 0.04 0.00 0.04
Besi ulir kg 213.18 0.01 213.18
Bekisting m2 - -
17 Kolom K3. L 500x250 ( El.- 1.850 s/d + 3.950 )
Beton K.350 181.29 kg/m3 m3 0.01 0.00 0.01
Besi ulir kg 88.32 0.00 88.32
Bekisting m2 0.20 0.00 0.20
18 Kolom K4. L 500x250 ( El.- 1.850 s/d + 1.850 )
Beton K.350 410.89 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
19 Kolom K5. 500x500 ( El.- 1.850 s/d + 1.850 )
Beton K.350 257.45 kg/m3 m3 -
Besi ulir kg 27.15 0.00 27.15
Bekisting m2 -

16/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

20 Kolom K6. 500x500 ( El.- 1.850 s/d + 1.850 )


Beton K.350 200.73 kg/m3 m3 -
Besi ulir kg 62.13 0.00 31.07
Bekisting m2 -
21 Tangga Beton t = 15 cm as.Y1 ( X3 - X4 )
Beton K.350 125.70 kg/m3 m3 3.77 0.02 3.77
Besi ulir kg -
Bekisting m2 -
22 Tangga Beton t = 15 cm as.X1 ( Y3' - Y4 )
Beton K.350 125.70 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
23 Tangga Beton t = 15 cm ( Teras )
Beton K.350 173.97 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
SUB TOTAL. II.3.2.2. Lantai - 1 (satu) Elev. -50 : 0.69

II.3.2.3. Lantai - 2 (dua) ( El. + 3.950 )


1 Plat Lantai t = 12 cm ( El.+ 3.93 )
Beton K.350 107.98 kg/m3 m3 -
Besi ulir kg 305.67 0.02 305.67
Bekisting m2 4.07 0.01 4.07
2 Plat Canopy t = 10 cm ( El.+ 2.60 )
Beton K.350 64.79 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
3 Kolom K1. 500x750 ( El.+ 3.950 s/d + 7.950 )
Beton K.350 198.68 kg/m3 m3 -
Besi ulir kg 236.52 0.01 236.52
Bekisting m2 -
4 Kolom K1A. 500x750 ( El.+3.950 s/d + 7.950 )
Beton K.350 319.65 kg/m3 m3 -
Besi ulir kg 29.59 0.00 29.59
Bekisting m2 0.75 0.00 0.75
5 Kolom K2. 500x750 ( El.+ 3.950 s/d + 7.950 )
Beton K.350 373.55 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
6 Kolom K3. L 500x250 ( El.+3.950 s/d + 7.950 )
Beton K.350 188.30 kg/m3 m3 -
Besi ulir kg 46.73 0.00 46.73
Bekisting m2 -
7 Kolom K4. L 500x250 ( El.+ 3.950 s/d + 7.950 )
Beton K.350 435.31 kg/m3 m3 -
Besi ulir kg 128.76 0.01 128.76
Bekisting m2 -
8 Kolom K5. 500x500 ( El.+ 3.950 s/d + 7.950 )
Beton K.350 269.66 kg/m3 m3 -
Besi ulir kg 9.55 0.00 9.55
Bekisting m2 -
9 Kolom K6. 500x500 ( El.+ 3.950 s/d + 7.950 )
Beton K.350 208.87 kg/m3 m3 -
Besi ulir kg 12.74 0.00 12.74
Bekisting m2 -
10 Balok G1. 350x600
Beton K.350 339.11 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 8.69 0.01 8.69
11 Balok G2. 350x400 -
Beton K.350 432.70 kg/m3 m3 0.01 0.00 0.01
Besi ulir kg - -
Bekisting m2 7.65 0.01 7.65
12 Balok G2A. 350x400 -
Beton K.350 442.79 kg/m3 m3 - -
Besi ulir kg - -
Bekisting m2 1.20 0.00 1.20
13 Balok G3. 300x600 -
Beton K.350 249.31 kg/m3 m3 - -

17/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

Besi ulir kg - -
Bekisting m2 8.50 0.01 8.50
14 Balok G3A. 300x600 -
Beton K.350 590.06 kg/m3 m3 - -
Besi ulir kg - -
Bekisting m2 0.20 0.00 0.20
15 Balok G4. 300x400 -
Beton K.350 338.93 kg/m3 m3 - -
Besi ulir kg - -
Bekisting m2 2.89 0.00 2.89
16 Balok G4A. 300x400 -
Beton K.350 360.85 kg/m3 m3 - -
Besi ulir kg 28.13 0.00 28.13
Bekisting m2 0.25 0.00 0.25
17 Balok G5. 300x600
Beton K.350 289.67 kg/m3 m3 4.28 0.02 4.28
Besi ulir kg 1,273.21 0.07 636.60 636.60
Bekisting m2 39.89 0.05 39.89
18 Balok CG1. 300x700
Beton K.350 268.71 kg/m3 m3 3.81 0.02 3.81
Besi ulir kg -
Bekisting m2 6.96 0.01 6.96
19 Balok B1. 250x600
Beton K.350 289.47 kg/m3 m3 0.71 0.00 0.71
Besi ulir kg 258.37 0.01 258.37
Bekisting m2 9.22 0.01 9.22
20 Balok B1a. 250x600
Beton K.350 289.47 kg/m3 m3 - -
Besi ulir kg 30.87 0.00 30.87
Bekisting m2 - -
21 Balok B2. 250x400
Beton K.350 503.22 kg/m3 m3 - -
Besi ulir kg 90.45 0.00 90.45
Bekisting m2 5.01 0.01 5.01
22 Balok B3. 150x400
Beton K.350 315.71 kg/m3 m3 - -
Besi ulir kg - -
Bekisting m2 3.27 0.00 3.27
23 Balok CB1. 250x600 - 250x400
Beton K.350 200.45 kg/m3 m3 5.04 0.02 5.04
Besi ulir kg 335.49 0.02 335.49
Bekisting m2 11.04 0.01 11.04
24 Balok CB2. 250x400
Beton K.350 227.45 kg/m3 m3 - -
Besi ulir kg 145.35 0.01 145.35
Bekisting m2 0.43 0.00 0.43
25 Shear Waal P1 t = 25 cm
Beton K.350 369.11 kg/m3 m3 - -
Besi ulir kg - -
Bekisting m2 - -
26 Shear Waal P2 t = 25 cm
Beton K.350 462.40 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
27 Shear Waal P3 t = 25 cm
Beton K.350 218.65 kg/m3 m3 -
Besi ulir kg 143.08 0.01 143.08
Bekisting m2 -
28 Shear Waal P4 t = 25 cm
Beton K.350 428.32 kg/m3 m3 1.15 0.01 1.15
Besi ulir kg 249.82 0.01 249.82
Bekisting m2 9.21 0.02 9.21
29 Shear Waal P5 t = 25 cm -
Beton K.350 400.94 kg/m3 m3 -
Besi ulir kg 20.06 0.00 20.06
Bekisting m2 -
30 Shear Waal P6 t = 25 cm -
Beton K.350 385.32 kg/m3 m3 -
Besi ulir kg 496.45 0.03 248.22 248.22

18/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

Bekisting m2 -
31 Pek.Sparator Beam 150x200 -
Beton K.350 246.38 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
32 Tangga Beton t = 15 cm as.Y1 ( X3 - X4 ) -
Beton K.350 125.70 kg/m3 m3 3.59 0.02 3.59
Besi ulir kg 588.40 0.03 588.40
Bekisting m2 28.38 0.04 28.38
33 Tangga Beton t = 15 cm as.X1 ( Y3' - Y4 ) -
Beton K.350 125.70 kg/m3 m3 3.62 0.02 3.62
Besi ulir kg 131.60 0.01 131.60
Bekisting m2 1.06 0.00 1.06
SUB TOTAL. II.3.2.3. Lantai - 2 (dua) ( El. + 3.950 ) : 0.55 -

II.3.2.4. Lantai - 3 (tiga) Elev. + 7.950 -


1 Plat Lantai t = 12 cm ( El.+ 7.950 ).
Beton K.350 107.98 kg/m3 m3 - -
Besi ulir kg 305.67 0.02 152.84 152.84
Bekisting m2 4.07 0.01 4.07
2 Plat Canopy t = 10 cm
Beton K.350 64.79 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 - -
3 Kolom K1. 500x750 ( El.+ 3.950 s/d + 11.950 )
Beton K.350 198.68 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 - -
4 Kolom K1A. 500x750 ( El.+ 3.950 s/d + 11.950 )
Beton K.350 319.65 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 - -
5 Kolom K2. 500x750 ( El.+ 3.950 s/d + 11.950 )
Beton K.350 300.00 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 - -
6 Kolom K3. L 500x250 ( El.+ 3.950 s/d + 11.950 )
Beton K.350 188.30 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 - -
7 Kolom K4. L 500x250 ( El.+ 3.950 s/d + 11.950 )
Beton K.350 313.72 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 - -
8 Kolom K5. 500x500 ( El.+ 3.950 s/d + 11.950 )
Beton K.350 221.37 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 - -
9 Kolom K6. 500x500 ( El.+ 3.950 s/d + 11.950 )
Beton K.350 190.97 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 - -
10 Balok G1. 350x600
Beton K.350 339.11 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 8.69 0.01 8.69
11 Balok G2. 350x400
Beton K.350 432.70 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 3.62 0.00 3.62
12 Balok G2A. 350x400
Beton K.350 442.79 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 1.37 0.00 1.37
13 Balok G3. 300x600
Beton K.350 249.31 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 8.50 0.01 8.50
14 Balok G3A. 300x600

19/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

Beton K.350 590.06 kg/m3 m3 -


Besi ulir kg -
Bekisting m2 0.20 0.00 0.20
15 Balok G4. 300x400
Beton K.350 338.93 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 0.85 0.00 0.85
16 Balok G4A. 300x400
Beton K.350 360.85 kg/m3 m3 - -
Besi ulir kg 26.30 0.00 26.30
Bekisting m2 0.25 0.00 0.25
17 Balok G5. 300x600
Beton K.350 289.67 kg/m3 m3 - -
Besi ulir kg - -
Bekisting m2 1.13 0.00 1.13
18 Balok CG1. 300x700
Beton K.350 268.71 kg/m3 m3 - -
Besi ulir kg - -
Bekisting m2 6.96 0.01 6.96
19 Balok B1. 250x600
Beton K.350 289.47 kg/m3 m3 - -
Besi ulir kg 195.08 0.01
Bekisting m2 2.72 0.00 2.72
20 Balok B2. 250x400
Beton K.350 503.22 kg/m3 m3 - -
Besi ulir kg -
Bekisting m2 3.07 0.00 3.07
21 Balok B3. 150x400
Beton K.350 315.71 kg/m3 m3 0.01 0.00
Besi ulir kg -
Bekisting m2 3.27 0.00 3.27
22 Balok CB1. 250x600 - 250x400
Beton K.350 200.45 kg/m3 m3 0.17 0.00 0.17
Besi ulir kg 191.39 0.01 191.39
Bekisting m2 6.57 0.01 6.57
23 Balok CB2. 250x400
Beton K.350 227.45 kg/m3 m3 -
Besi ulir kg 69.16 0.00 69.16
Bekisting m2 0.43 0.00 0.43
24 Shear Waal P1 t = 25 cm
Beton K.350 300.34 kg/m3 m3 -
Besi ulir kg 36.17 0.00 36.17
Bekisting m2 -
25 Shear Waal P2 t = 25 cm
Beton K.350 328.57 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
26 Shear Waal P3 t = 25 cm
Beton K.350 269.24 kg/m3 m3 - -
Besi ulir kg - -
Bekisting m2 -
27 Shear Waal P4 t = 25 cm
Beton K.350 360.73 kg/m3 m3 1.15 0.01 1.15
Besi ulir kg 197.27 0.01 197.27
Bekisting m2 9.21 0.02 9.21
28 Shear Waal P5 t = 25 cm
Beton K.350 334.83 kg/m3 m3 -
Besi ulir kg 209.52 0.01 209.52
Bekisting m2 -
29 Shear Waal P6 t = 25 cm
Beton K.350 311.23 kg/m3 m3 -
Besi ulir kg 293.75 0.02 293.75
Bekisting m2 -
30 Pek.Sparator Beam 150x200
Beton K.350 246.38 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
31 Tangga Beton t = 15 cm as.Y1 ( X3 - X4 )
Beton K.350 125.70 kg/m3 m3 - -

20/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

Besi ulir kg - -
Bekisting m2 - -
32 Tangga Beton t = 15 cm as.X1 ( Y3' - Y4 )
Beton K.350 125.70 kg/m3 m3 - -
Besi ulir kg - -
Bekisting m2 - -
SUB TOTAL. II.3.2.4. Lantai - 3 (tiga) Elev. + 7.950 : 0.17

II.3.2.5. Lantai - 4 (empat) Elev. + 11.950


1 Plat Lantai t = 12 cm ( El. + 11.950 )
Beton K.350 107.98 kg/m3 m3 -
Besi ulir kg 305.67 0.02 305.67
Bekisting m2 4.07 0.01 4.07
2 Plat Canopy t = 10 cm
Beton K.350 64.79 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
3 Kolom K1. 500x750 ( El.+ 11.950 s/d + 15.950 )
Beton K.350 198.68 kg/m3 m3 - -
Besi ulir kg -
Bekisting m2 -
4 Kolom K1A. 500x750 ( El.+ 11.950 s/d + 15.950 )
Beton K.350 319.65 kg/m3 m3 - -
Besi ulir kg -
Bekisting m2 -
5 Kolom K2. 500x750 ( El.+ 11.950 s/d + 15.950 )
Beton K.350 300.00 kg/m3 m3 3.00 0.01 3.00
Besi ulir kg -
Bekisting m2 - -
6 Kolom K3. L 500x250 ( El.+ 11.950 s/d + 15.950 )
Beton K.350 313.72 kg/m3 m3 1.50 0.01 1.50
Besi ulir kg -
Bekisting m2 -
7 Kolom K4. L 500x250 ( El.+ 11.950 s/d + 15.950 )
Beton K.350 313.72 kg/m3 m3 2.25 0.01 2.25
Besi ulir kg -
Bekisting m2 24.00 0.03 24.00
8 Kolom K5. 500x500 ( El.+ 11.950 s/d + 15.950 )
Beton K.350 221.37 kg/m3 m3 1.00 0.00 1.00
Besi ulir kg -
Bekisting m2 8.00 0.01 8.00
9 Kolom K6. 500x500 ( El.+ 11.950 s/d + 15.950 ) -
Beton K.350 190.97 kg/m3 m3 5.00 0.02 5.00
Besi ulir kg - -
Bekisting m2 40.00 0.05 40.00
10 Balok G1. 350x600 -
Beton K.350 339.11 kg/m3 m3 5.63 0.03 5.63
Besi ulir kg 1,429.34 0.08 500.00 929.34
Bekisting m2 8.69 0.01 8.69
11 Balok G2. 350x400 -
Beton K.350 432.70 kg/m3 m3 2.13 0.01 2.13
Besi ulir kg 787.68 0.04 500.00 287.68
Bekisting m2 3.62 0.00 3.62
12 Balok G2A. 350x400
Beton K.350 442.79 kg/m3 m3 0.58 0.00 0.58
Besi ulir kg 292.06 0.02 500.00 - 207.94
Bekisting m2 1.20 0.00 1.20
13 Balok G3. 300x600
Beton K.350 249.31 kg/m3 m3 5.79 0.03 5.79
Besi ulir kg 1,514.09 0.08 500.00 1,014.09
Bekisting m2 8.50 0.01 8.50
14 Balok G3A. 300x600
Beton K.350 590.06 kg/m3 m3 0.96 0.00 0.96
Besi ulir kg 517.09 0.03 500.00 17.09
Bekisting m2 0.20 0.00 0.20
15 Balok G4. 300x400
Beton K.350 338.93 kg/m3 m3 1.44 0.01 1.44
Besi ulir kg 491.49 0.03 500.00 - 8.51
Bekisting m2 0.51 0.00 0.51

21/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

16 Balok G4A. 300x400


Beton K.350 360.85 kg/m3 m3 0.46 0.00 0.46
Besi ulir kg 26.30 0.00 500.00 - 473.70
Bekisting m2 0.25 0.00 0.25
17 Balok G5. 300x600
Beton K.350 289.67 kg/m3 m3 1.28 0.01 1.28
Besi ulir kg 420.90 0.02 500.00 - 79.10
Bekisting m2 6.17 0.01 6.17
18 Balok CG1. 300x700
Beton K.350 268.71 kg/m3 m3 1.55 0.01 1.55
Besi ulir kg 519.99 0.03 500.00 19.99
Bekisting m2 15.84 0.02 15.84
19 Balok B1. 250x600
Beton K.350 289.47 kg/m3 m3 2.47 0.01 2.47
Besi ulir kg 786.69 0.04 200.00 586.69
Bekisting m2 17.46 0.02 17.46
20 Balok B2. 250x400
Beton K.350 503.22 kg/m3 m3 1.68 0.01 1.68
Besi ulir kg 955.50 0.05 500.00
Bekisting m2 13.82 0.02 13.82
21 Balok B3. 150x400
Beton K.350 315.71 kg/m3 m3 1.38 0.01 1.38
Besi ulir kg 338.87 0.02 338.87
Bekisting m2 16.46 0.02 16.46
22 Balok CB1. 250x600 - 250x400
Beton K.350 200.45 kg/m3 m3 1.03 0.00 1.03
Besi ulir kg 191.39 0.01 191.39
Bekisting m2 8.37 0.01 8.37
23 Balok CB2. 250x400
Beton K.350 227.45 kg/m3 m3 0.61 0.00 0.61
Besi ulir kg 69.16 0.00 69.16
Bekisting m2 2.68 0.00 2.68
24 Shear Waal P1 t = 25 cm
Beton K.350 213.57 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
25 Shear Waal P2 t = 25 cm
Beton K.350 236.10 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
26 Shear Waal P3 t = 25 cm
Beton K.350 127.49 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
27 Shear Waal P4 t = 25 cm
Beton K.350 305.05 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
28 Shear Waal P5 t = 25 cm
Beton K.350 312.69 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
29 Shear Waal P6 t = 25 cm
Beton K.350 196.33 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
30 Pek.Sparator Beam 150x200
Beton K.350 246.38 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
31 Tangga Beton t = 15 cm as.Y1 ( X3 - X4 )
Beton K.350 125.70 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
32 Tangga Beton t = 15 cm as.X1 ( Y3' - Y4 )
Beton K.350 125.70 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
SUB TOTAL. II.3.2.5. Lantai - 4 (empat) Elev. + 11.950 : 0.88

22/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

II.3.2.6. Lantai - 5 (lima) Elev. + 15.950


1 Plat Lantai t = 12 cm ( El.+ 15.950 ).
Beton K.350 107.98 kg/m3 m3 43.42 0.21 18.00 25.42
Besi ulir kg 5,037.73 0.27 1,100.00 1,600.00 2,337.73
Bekisting m2 369.28 0.57 123.09 150.00 96.19
2 Plat Canopy t = 10 cm
Beton K.350 64.79 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
3 Kolom K1. 500x750 ( El.+ 15.950 s/d + 19.950 )
Beton K.350 198.68 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
4 Kolom K1A. 500x750 ( El.+ 15.950 s/d + 19.950 ).
Beton K.350 239.21 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
5 Kolom K2. 500x750 ( El.+ 15.950 s/d + 19.950 )
Beton K.350 198.68 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
6 Kolom K3. L 500x250 ( El.+ 15.950 s/d + 19.950 )
Beton K.350 188.30 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
7 Kolom K4. L 500x250 ( El.+ 15.950 s/d + 19.950 )
Beton K.350 188.30 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
8 Kolom K5. 500x500 ( El.+ 15.950 s/d + 19.950 )
Beton K.350 190.97 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
9 Kolom K6. 500x500 ( El.+ 15.950 s/d + 19.950 )
Beton K.350 190.97 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
10 Balok G1. 350x600
Beton K.350 339.11 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
11 Balok G2. 350x400
Beton K.350 432.70 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
12 Balok G2A. 350x400
Beton K.350 442.79 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
13 Balok G3. 300x600
Beton K.350 249.31 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
14 Balok G3A. 300x600
Beton K.350 590.06 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
15 Balok G4. 300x400
Beton K.350 338.93 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
16 Balok G4A. 300x400
Beton K.350 360.85 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
17 Balok G5. 300x600
Beton K.350 289.67 kg/m3 m3 -
Besi ulir kg -

23/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

Bekisting m2 -
18 Balok CG1. 300x700
Beton K.350 268.71 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
19 Balok B1. 250x600
Beton K.350 289.47 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
20 Balok B2. 250x400
Beton K.350 503.22 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
21 Balok B3. 150x400
Beton K.350 315.71 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
22 Balok CB1. 250x600 - 250x400
Beton K.350 200.45 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
23 Balok CB2. 250x400
Beton K.350 227.45 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
24 Shear Waal P1 t = 25 cm
Beton K.350 146.57 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
25 Shear Waal P2 t = 25 cm
Beton K.350 183.88 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
26 Shear Waal P3 t = 25 cm
Beton K.350 123.40 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
27 Shear Waal P4 t = 25 cm
Beton K.350 209.61 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
28 Shear Waal P5 t = 25 cm
Beton K.350 231.28 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
29 Shear Waal P6 t = 25 cm
Beton K.350 142.50 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
30 Pek.Sparator Beam 150x200
Beton K.350 246.38 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
31 Tangga Beton t = 15 cm as.Y1 ( X3 - X4 )
Beton K.350 125.70 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
32 Tangga Beton t = 15 cm as.X1 ( Y3' - Y4 )
Beton K.350 125.70 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
SUB TOTAL. II.3.2.6. Lantai - 5 (lima) Elev. + 15.950 : 1.05

II.3.2.7. Lantai - 6 (enam) Elev. + 19.950


1 Plat Lantai t = 12 cm ( El.+ 19.950 )
Beton K.350 107.98 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
2 Plat Canopy t = 10 cm

24/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

Beton K.350 64.79 kg/m3 m3 -


Besi ulir kg -
Bekisting m2 -
3 Kolom K1. 500x750 ( El.+ 19.950 s/d + 23.950 )
Beton K.350 198.68 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
4 Kolom K1A. 500x750 ( El.+ 19.950 s/d + 23.950 )
Beton K.350 239.21 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
5 Kolom K2. 500x750 ( El.+ 19.950 s/d + 23.950 )
Beton K.350 198.68 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
6 Kolom K3. L 500x250 ( El.+ 19.950 s/d + 23.950 )
Beton K.350 188.30 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
7 Kolom K4. L 500x250 ( El.+ 19.950 s/d + 23.950 )
Beton K.350 188.30 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
8 Kolom K5. 500x500 ( El.+ 19.950 s/d + 23.950 )
Beton K.350 190.97 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
9 Kolom K6. 500x500 ( El.+ 19.950 s/d + 23.950 )
Beton K.350 190.97 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
10 Balok G1. 350x600
Beton K.350 339.11 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
11 Balok G2. 350x400
Beton K.350 432.70 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
12 Balok G2A. 350x400
Beton K.350 442.79 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
13 Balok G3. 300x600
Beton K.350 249.31 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
14 Balok G3A. 300x600
Beton K.350 590.06 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
15 Balok G4. 300x400
Beton K.350 338.93 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
16 Balok G4A. 300x400
Beton K.350 360.85 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
17 Balok G5. 300x600
Beton K.350 289.67 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
18 Balok CG1. 300x700
Beton K.350 268.71 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
19 Balok B1. 250x600
Beton K.350 289.47 kg/m3 m3 -

25/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

Besi ulir kg -
Bekisting m2 -
20 Balok B2. 250x400
Beton K.350 503.22 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
21 Balok B3. 150x400
Beton K.350 315.71 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
22 Balok CB1. 250x600 - 250x400
Beton K.350 200.45 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
23 Balok CB2. 250x400
Beton K.350 227.45 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
24 Shear Waal P1 t = 25 cm
Beton K.350 86.96 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
25 Shear Waal P2 t = 25 cm
Beton K.350 109.69 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
26 Shear Waal P3 t = 25 cm
Beton K.350 123.40 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
27 Shear Waal P4 t = 25 cm
Beton K.350 163.61 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
28 Shear Waal P5 t = 25 cm
Beton K.350 88.90 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
29 Shear Waal P6 t = 25 cm
Beton K.350 91.90 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
30 Pek.Sparator Beam 150x200
Beton K.350 246.38 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
31 Tangga Beton t = 15 cm as.Y1 ( X3 - X4 )
Beton K.350 125.70 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
32 Tangga Beton t = 15 cm as.X1 ( Y3' - Y4 )
Beton K.350 125.70 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
SUB TOTAL. II.3.2.7. Lantai - 6 (enam) Elev. + 19.950 : -

II.3.2.8. Lantai - 7 (tujuh) Elev. + 23.950


1 Plat Lantai t = 12 cm ( El.+ 23.950 )
Beton K.350 107.98 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
2 Plat Canopy t = 10 cm
Beton K.350 64.79 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
3 Kolom K1. 500x750 ( El.+ 23.950 s/d + 27.950 )
Beton K.350 198.68 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -

26/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

4 Kolom K1A. 500x750 ( El.+ 23.950 s/d + 27.950 )


Beton K.350 198.68 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
5 Kolom K2. 500x750 ( El.+ 23.950 s/d + 27.950 )
Beton K.350 198.68 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
6 Kolom K3. L 500x250 ( El.+ 23.950 s/d + 27.950 )
Beton K.350 188.30 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
7 Kolom K4. L 500x250 ( El.+ 23.950 s/d + 27.950 )
Beton K.350 188.30 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
8 Kolom K5. 500x500 ( El.+ 23.950 s/d + 27.950 )
Beton K.350 190.97 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
9 Kolom K6. 500x500 ( El.+ 23.950 s/d + 27.950 )
Beton K.350 190.97 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
10 Balok G1. 350x600
Beton K.350 339.11 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
11 Balok G2. 350x400
Beton K.350 432.70 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
12 Balok G2A. 350x400
Beton K.350 442.79 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
13 Balok G3. 300x600
Beton K.350 249.31 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
14 Balok G3A. 300x600
Beton K.350 590.06 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
15 Balok G4. 300x400
Beton K.350 338.93 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
16 Balok G4A. 300x400
Beton K.350 360.85 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
17 Balok G5. 300x600
Beton K.350 289.67 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
18 Balok CG1. 300x700
Beton K.350 268.71 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
19 Balok B1. 250x600
Beton K.350 289.47 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
20 Balok B2. 250x400
Beton K.350 503.22 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
21 Balok B3. 150x400

27/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

Beton K.350 315.71 kg/m3 m3 -


Besi ulir kg -
Bekisting m2 -
22 Balok CB1. 250x600 - 250x400
Beton K.350 200.45 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
23 Balok CB2. 250x400
Beton K.350 227.45 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
24 Shear Waal P1 t = 25 cm
Beton K.350 72.89 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
25 Shear Waal P2 t = 25 cm
Beton K.350 67.93 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
26 Shear Waal P3 t = 25 cm
Beton K.350 123.40 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
27 Shear Waal P4 t = 25 cm
Beton K.350 77.13 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
28 Shear Waal P5 t = 25 cm
Beton K.350 217.49 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
29 Shear Waal P6 t = 25 cm
Beton K.350 112.33 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
30 Pek.Sparator Beam 150x200
Beton K.350 246.38 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
31 Tangga Beton t = 15 cm as.Y1 ( X3 - X4 )
Beton K.350 125.70 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
32 Tangga Beton t = 15 cm as.X1 ( Y3' - Y4 )
Beton K.350 125.70 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
SUB TOTAL. II.3.2.8. Lantai - 7 (tujuh) Elev. + 23.950 : -

II.3.2.9. Lantai - 8 (delapan) Elev. + 27.950


1 Plat Lantai t = 12 cm ( El.+ 27.950 )
Beton K.350 107.98 kg/m3 m3 - - -
Besi ulir kg - -
Bekisting m2 - -
2 Plat Canopy t = 10 cm
Beton K.350 64.79 kg/m3 m3 - -
Besi ulir kg - -
Bekisting m2 - -
3 Kolom K1. 500x750 ( El.+ 27.950 s/d + 31.950 )
Beton K.350 198.68 kg/m3 m3 -
Besi ulir kg - - -
Bekisting m2 - - -
4 Kolom K1A. 500x750 ( El.+ 27.950 s/d + 31.950 )
Beton K.350 198.68 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 - -
5 Kolom K2. 500x750 ( El.+ 27.950 s/d + 31.950 )
Beton K.350 198.68 kg/m3 m3 -
Besi ulir kg - -

28/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

Bekisting m2 - -
6 Kolom K3. L 500x250 ( El.+ 27.950 s/d + 31.950 )
Beton K.350 188.30 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
7 Kolom K4. L 500x250 ( El.+ 27.950 s/d + 31.950 )
Beton K.350 188.30 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
8 Kolom K5. 500x500 ( El.+ 27.950 s/d + 31.950 )
Beton K.350 190.97 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
9 Kolom K6. 500x500 ( El.+ 27.950 s/d + 31.950 )
Beton K.350 190.97 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
10 Balok G1. 350x600
Beton K.350 339.11 kg/m3 m3 - -
Besi ulir kg -
Bekisting m2 -
11 Balok G2. 350x400
Beton K.350 432.70 kg/m3 m3 - -
Besi ulir kg -
Bekisting m2 -
12 Balok G2A. 350x400
Beton K.350 442.79 kg/m3 m3 - -
Besi ulir kg -
Bekisting m2 -
13 Balok G3. 300x600
Beton K.350 249.31 kg/m3 m3 - -
Besi ulir kg -
Bekisting m2 -
14 Balok G3A. 300x600
Beton K.350 590.06 kg/m3 m3 - -
Besi ulir kg -
Bekisting m2 -
15 Balok G4. 300x400
Beton K.350 338.93 kg/m3 m3 - -
Besi ulir kg -
Bekisting m2 -
16 Balok G4A. 300x400
Beton K.350 360.85 kg/m3 m3 - -
Besi ulir kg -
Bekisting m2 -
17 Balok G5. 300x600
Beton K.350 289.67 kg/m3 m3 - -
Besi ulir kg -
Bekisting m2 -
18 Balok CG1. 300x700
Beton K.350 268.71 kg/m3 m3 - -
Besi ulir kg -
Bekisting m2 -
19 Balok B1. 250x600
Beton K.350 289.47 kg/m3 m3 - -
Besi ulir kg -
Bekisting m2 -
20 Balok B2. 250x400
Beton K.350 503.22 kg/m3 m3 - -
Besi ulir kg -
Bekisting m2 -
21 Balok B3. 150x400
Beton K.350 315.71 kg/m3 m3 - -
Besi ulir kg -
Bekisting m2 -
22 Balok CB1. 250x600 - 250x400
Beton K.350 200.45 kg/m3 m3 - -
Besi ulir kg -
Bekisting m2 -

29/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

23 Balok CB2. 250x400


Beton K.350 227.45 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
24 Shear Waal P1 t = 25 cm
Beton K.350 56.53 kg/m3 m3 - -
Besi ulir kg - -
Bekisting m2 - -
25 Shear Waal P2 t = 25 cm
Beton K.350 67.93 kg/m3 m3 - -
Besi ulir kg - -
Bekisting m2 - -
26 Shear Waal P3 t = 25 cm
Beton K.350 123.40 kg/m3 m3 - -
Besi ulir kg - -
Bekisting m2 - -
27 Shear Waal P4 t = 25 cm
Beton K.350 77.13 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 - -
28 Shear Waal P5 t = 25 cm
Beton K.350 88.90 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 - -
29 Shear Waal P6 t = 25 cm
Beton K.350 91.90 kg/m3 m3 - -
Besi ulir kg - -
Bekisting m2 - -
30 Pek.Sparator Beam 150x200
Beton K.350 246.38 kg/m3 m3 - -
Besi ulir kg - -
Bekisting m2 - -
31 Tangga Beton t = 15 cm as.Y1 ( X3 - X4 )
Beton K.350 125.70 kg/m3 m3 - -
Besi ulir kg - -
Bekisting m2 - -
SUB TOTAL. II.3.2.9. Lantai - 8 (delapan) Elev. + 27.950 : -

II.3.2.10. Lantai - RL1 Elev. + 31.950


1 Plat Lantai t = 12 cm ( El.+ 31.950 )
Beton K.350 107.98 kg/m3 m3 -
Besi ulir kg - - -
Bekisting m2 -
2 Plat Canopy t = 10 cm
Beton K.350 64.79 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
3 Kolom K1. 500x750 ( El.+ 31.950 s/d + 35.950 )
Beton K.350 133.93 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
4 Kolom K2. 500x750 ( El.+ 31.950 s/d + 35.950 )
Beton K.350 133.93 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
8 Balok G1. 350x600
Beton K.350 233.78 kg/m3 m3 -
Besi ulir kg - - -
Bekisting m2 -
9 Balok G2. 350x400
Beton K.350 284.86 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
9 Balok G2A. 350x400
Beton K.350 348.72 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
10 Balok G3. 300x600
Beton K.350 282.87 kg/m3 m3 -

30/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

Besi ulir kg - - -
Bekisting m2 -
11 Balok G4. 300x400
Beton K.350 284.91 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
12 Balok G4A. 300x400
Beton K.350 374.46 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
13 Balok G5. 300x600
Beton K.350 291.44 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
14 Balok CG1. 300x700
Beton K.350 268.71 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
15 Balok B1. 250x600
Beton K.350 234.70 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
15 Balok B1a. 250x600
Beton K.350 289.47 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
15 Balok B2. 250x400
Beton K.350 427.01 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
17 Balok B3. 150x400
Beton K.350 312.78 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
18 Balok CB1. 250x600 - 250x400
Beton K.350 280.61 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
19 Balok CB2. 250x400
Beton K.350 227.45 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
SUB TOTAL. II.3.2.10. Lantai - RL1 Elev. + 31.950 : -

II.3.2.11. Lantai - RL2 Elev. + 35.950


1 Plat Lantai t = 12 cm
Beton K.350 107.98 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
2 Balok G3. 300x600
Beton K.350 268.27 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
3 Balok B1. 250x600
Beton K.350 211.99 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -

SUB TOTAL. II.3.2.11. Lantai - RL2 Elev. + 35.950 : -

II.3.2.12. PEKERJAAN CROWN.( EL.+ 31.950 S/D + 35.000 )


A. CROWN AS Y1 ( X1 - X3 ).
1 Pek.Kolom KP.1 170x 300
Beton K.350 173.12 kg/m3 m3 -
Sengkang kg - -
Besi ulir kg - -
Bekisting m2 -

31/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

2 Pek.Kolom KP.2 170x 250


Beton K.350 207.75 kg/m3 m3 -
Sengkang kg - -
Besi ulir kg - -
Bekisting m2 -
3 Pek.Ring Balok RB.1 150x 200
Beton K.350 194.66 kg/m3 m3
Sengkang kg - -
Besi ulir kg - -
Bekisting m2
4 Pek.Ring Balok RB.2 150x 150
Beton K.350 248.88 kg/m3 m3
Sengkang kg - -
Besi ulir kg - -
Bekisting m2
5 Plat Lantai t = 15 cm ( Elevasi + 31.950 ).
Beton K.350 154.65 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
6 Plat Lantai t = 10 cm ( Elevasi + 35.000 ).
Beton K.350 84.00 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
7 Pek.Balok CGM.1 150x 500
Beton K.350 251.49 kg/m3 m3 -
Sengkang kg - -
Besi ulir kg - -
Bekisting m2 -
8 Pek.Balok CGM.2 150x 500
Beton K.350 214.75 kg/m3 m3 -
Sengkang kg - -
Besi ulir kg - -
Bekisting m2 -
9 Dinding Beton = 12 cm as.X1 - X3 ( Elevasi + 26.350 s/d El.+35.000 ).
Beton K.350 73.33 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
10 Dinding Beton = 12 cm as.X1 - X3 ( Elevasi + 31.950 s/d El.+35.000 ).
Beton K.350 73.33 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
SUB TOTAL. A. CROWN AS Y1 ( X1 - X3 ). : -

B. CROWN AS X1 ( Y2 - Y4 ).
1 Pek.Kolom KP.1 170x 300
Beton K.350 173.12 kg/m3 m3 -
Sengkang kg - -
Besi ulir kg - -
Bekisting m2 -
2 Pek.Kolom KP.2 170x 250
Beton K.350 207.75 kg/m3 m3 -
Sengkang kg - -
Besi ulir kg - -
Bekisting m2 -
3 Pek.Ring Balok RB.1 150x 200
Beton K.350 194.66 kg/m3 m3 -
Sengkang kg - -
Besi ulir kg - -
Bekisting m2 -
4 Pek.Ring Balok RB.2 150x 150
Beton K.350 248.88 kg/m3 m3 -
Sengkang kg - -
Besi ulir kg - -
Bekisting m2 -
5 Plat Lantai t = 15 cm ( Elevasi + 31.950 ).
Beton K.350 154.65 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
6 Plat Lantai t = 10 cm ( Elevasi + 35.000 ).

32/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

Beton K.350 84.00 kg/m3 m3 -


Besi ulir kg - -
Bekisting m2 -
7 Pek.Balok CGM.1 150x 500
Beton K.350 251.49 kg/m3 m3 -
Sengkang kg - -
Besi ulir kg - -
Bekisting m2 -
8 Pek.Balok CGM.2 150x 500
Beton K.350 214.75 kg/m3 m3 -
Sengkang kg - -
Besi ulir kg - -
Bekisting m2 -
9 Dinding Beton = 12 cm as.X1 - X3 ( Elevasi + 26.350 s/d El.+35.000 ).
Beton K.350 73.33 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
10 Dinding Beton = 12 cm as.X1 - X3 ( Elevasi + 31.950 s/d El.+35.000 ).
Beton K.350 73.33 kg/m3 m3 -
Besi ulir kg - -
Bekisting m2 -
SUB TOTAL. B. CROWN AS X1 ( Y2 - Y4 ). : -
C. CROWN AS X4 ( Y2 - Y4 ).
1 Pek.Kolom KP.1 170x 300
Beton K.350 173.12 kg/m3 m3 -
Sengkang kg -
Besi ulir kg -
Bekisting m2 -
2 Pek.Kolom KP.2 170x 250
Beton K.350 207.75 kg/m3 m3 -
Sengkang kg -
Besi ulir kg -
Bekisting m2 -
3 Pek.Ring Balok RB.1 150x 200
Beton K.350 194.66 kg/m3 m3 -
Sengkang kg -
Besi ulir kg -
Bekisting m2 -
4 Pek.Ring Balok RB.2 150x 150
Beton K.350 248.88 kg/m3 m3 -
Sengkang kg -
Besi ulir kg -
Bekisting m2 -
5 Plat Lantai t = 15 cm ( Elevasi + 31.950 ).
Beton K.350 154.65 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
6 Plat Lantai t = 10 cm ( Elevasi + 35.000 ).
Beton K.350 84.00 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
7 Pek.Balok CGM.1 150x 500
Beton K.350 251.49 kg/m3 m3 -
Sengkang kg -
Besi ulir kg -
Bekisting m2 -
8 Pek.Balok CGM.2 150x 500
Beton K.350 214.75 kg/m3 m3 -
Sengkang kg -
Besi ulir kg -
Bekisting m2 -
9 Dinding Beton = 12 cm as.X1 - X3 ( Elevasi + 26.350 s/d El.+35.000 ).
Beton K.350 73.33 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
10 Dinding Beton = 12 cm as.X1 - X3 ( Elevasi + 31.950 s/d El.+35.000 ).
Beton K.350 73.33 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -

33/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

SUB TOTAL. C. CROWN AS X4 ( Y2 - Y4 ). : -


SUB TOTAL. II.3.2.12. PEKERJAAN CROWN.( EL.+ 31.950 S/D + 35.000 ) : -
TOTAL. II.3.2. UPPER STRUKTUR. : 3.35

II.3.3. PEKERJAAN ATAP CANOPY.


1 WF.200x100x5,5x8 kg - -
2 WF.100x50x5x7 kg - -
3 Besi UNP.100x50x5 kg - -
4 Angkur 6 D 22 mm L = 300 mm bh - -
5 Base Plate 200x200x10 kg - -
6 Pipa Besi Ø 89,1 t = 5 mm kg - -
7 Plate t = 10 mm kg - -
8 Hollow 30x30 m1 - -
SUB TOTAL. II.3.3. PEKERJAAN ATAP CANOPY. : -

II.3.4 PEKERJAAN GROUNDTANK/RUANG ME.


1 Pek. Bouwplank m1 -
2 Pek. Galian pondasi. m3 -
3 Pek. Urugan pasir bawah pondasi & Sloof t.= 5 cm m3 -
4 Pek. Lantai kerja bawah pondasi & Sloof t. 5 cm m3 -
5 Pek. Urugan pasir bawah lantai t. = 5 cm m3 -
6 Pek. Lantai kerja bawah lantai t. = 5 cm m3 -
7 Pek.buangan tanah sisa galian pondasi m3 -
8 Pek.Urugan tanah dalam bangunan m3 -
9 Pek. Urugan tanah kembali m3 -
10 Pek.Pondasi Type PD1. 1500x1500x200
Beton K.350 120.49 kg/m3 m3 -
Besi ulir atas kg -
Besi ulir bawah kg -
Bekisting m2 -
11 Pas.Batu Kosongan t = 15 cm m3 -
12 Pas.Pondasi Batu Kali ( 1 Pc : 5 Psr ) m3 -
13 Pek.Pedestal K1. 250x250.
Beton K.350 315.62 kg/m3 m3 -
Besi Sengkang. kg 61.36 0.00
Besi ulir kg 31.27 0.00
Bekisting m2 -
14 Balok TB1. 250x400
Beton K.350 258.82 kg/m3 m3 0.60 0.00
Besi Sengkang. kg 71.79 0.00
Besi ulir kg 149.45 0.01
Bekisting m2 14.40 0.01
15 Balok TB2. 200x250
Beton K.350 333.44 kg/m3 m3 0.55 0.00
Besi Sengkang. kg 72.15 0.00
Besi ulir kg 179.77 0.01
Bekisting m2 5.50 0.00
16 Kolom K1. 250x250 ( El.- s/d + )
Beton K.350 305.96 kg/m3 m3 0.78 0.00
Besi Sengkang. kg 181.68 0.01
Besi ulir kg 197.33 0.01
Bekisting m2 12.36 0.02
17 Plat Lantai t = 10 cm ( El.- 0,050 )
Beton K.350 185.48 kg/m3 m3 2.07 0.01
Besi ulir kg 1,144.79 0.06
Bekisting m2 - -
18 Plat Lantai t = 30 cm ( El.- 0,450 )
Beton K.350 9.35 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
19 Pek.Pondasi Genset 3.295 x 5.200 x 800
Beton K.350 71.07 kg/m3 m3 -
Besi ulir kg 307.94 0.02
Bekisting m2 -
20 Pek.injuk + Pasir m1 -
21 Pek.Aspal m1 -
22 Pek.Saluran Kabel Tranch.

34/107
NO ITEM PEKERJAAN KONTRAK AWAL PROGRESS Laporan Harian
SAT. MINGGU INI Hari Ke
VOLUME BOBOT (%) 12 13 14 15 16 17 18

Beton K.350 115.17 kg/m3 m3 -


Besi ulir kg -
Bekisting m2 -
23 Pek Tutup Chequered Plate t = 3 mm + besi Siku 60 x 60 x6 kg -

PEK.PONDASI GROUND TANK.


24 Plat Lantai t = 40 cm ( El.- 1.000 )
Beton K.350 86.90 kg/m3 m3 40.00 0.19
Besi ulir kg 3,476.00 0.18
Bekisting m2 16.00 0.02
25 Balok 250 x 1000 x 8000
Beton K.350 105.80 kg/m3 m3 10.00 0.05
Besi ulir kg 1,058.00 0.06
Bekisting m2 80.00 0.10

PEK.RL.1 ( Elevasi + 2.950 )


18 Balok G2. 200x250
Beton K.350 333.03 kg/m3 m3 2.25 0.01
Besi Sengkang. kg 214.13 0.01
Besi ulir kg 535.20 0.03
Bekisting m2 22.50 0.03
19 Balok CG2. 200x250
Beton K.350 426.98 kg/m3 m3 0.54 0.00
Besi Sengkang. kg 59.97 0.00
Besi ulir kg 170.60 0.01
Bekisting m2 5.40 0.01
20 Balok BL. 150x200
Beton K.350 177.43 kg/m3 m3 0.81 0.00
Besi Sengkang. kg 75.60 0.00
Besi ulir kg 68.12 0.00
Bekisting m2 10.80 0.01
21 Plat Lantai t = 10 cm ( El.- 0,050 )
Beton K.350 93.48 kg/m3 m3 10.39 0.05
Besi ulir kg 971.27 0.05
Bekisting m2 86.58 0.13

PEK.RL.2 ( Elevasi + 4.450 )


1 Balok G1. 250x400
Beton K.350 255.48 kg/m3 m3 -
Besi Sengkang. kg -
Besi ulir kg -
Bekisting m2 -
2 Balok G2. 200x250
Beton K.350 332.10 kg/m3 m3 -
Besi Sengkang. kg -
Besi ulir kg -
Bekisting m2 -
3 Balok CG2. 200x250
Beton K.350 426.98 kg/m3 m3 -
Besi Sengkang. kg -
Besi ulir kg -
Bekisting m2 -
4 Balok BL. 150x200
Beton K.350 177.89 kg/m3 m3 -
Besi Sengkang. kg -
Besi ulir kg -
Bekisting m2 -
5 Plat Lantai t = 12 cm ( El.+ 4.550 )
Beton K.350 206.62 kg/m3 m3 -
Besi ulir kg -
Bekisting m2 -
SUB TOTAL. II.3.4PEKERJAAN GROUNDTANK/RUANG ME. : 1.15

35/107
PEMILIK PROYEK Konsultan Pengawas, LAPORAN PROGRESS KONTRAKTOR PELAKSANA

UNIVERSITAS NEGERI MEDAN PT. Wahanacipta Bangunwisma PEKERJAAN KONSTRUKSI PT. GUNAKARYA NUSANTARA

PEMBANGUNAN GEDUNG TOWER FMIPA JURUSAN FISIKA


LOKASI JL. WILLEM ISKANDAR PASAR V, MEDAN
No. Kontrak :1465/UN33-PPK/PNBP/SP/2018
MINGGU KE : XXIX (KEDUA PULUH SEMBILAN)
PERIODE : 12 NOVEMBER
LINGKUP PEKERJAAN : ARSITEKTUR
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

PEKERJAAN ARSITEKTUR
I. PEKERJAAN DINDING DAN PASANGAN
I. 1. Lantai 1 (satu).
1 Pek. Pasangan Dinding Bata Ringan m2 456.57 0.28 456.57 0.28 - - -
2 Pek. Plesteran Dinding Bata Ringan m2 913.14 0.31 913.14 0.31 - -
3 Pek. Acian Dinding Bata Ringan. m2 715.92 0.13 715.92 0.13 - -
4 Pek. Acian Beton. m2 358.20 0.07 358.20 0.07 - -
5 Kolom & Ring BalokPraktis 13x13 cm ( Opening Kusen ) m1 93.86 0.03 93.86 0.03 - - -
6 Pek. Dinding Partisi Gypsum 2 Sisi, Rangka Metal Stud. m2 168.72 0.15 168.72 0.15 - -
7 Pek. Dinding Pembatas Koridor Gedung "MIPA". m2 10.62 0.01 10.62 0.01 - -
8 Pek. Bongkaran dinding dan Finishing bangunan lama dengan bangunan baru m2 9.61 0.00 9.61 0.00 - -
jalur selasar (Conecting)
Sub Total - I. 1. Lantai 1 (satu). : 0.99 0.99 - -
I. 2. Lantai 2 (dua).
1 Pek. Pasangan Dinding Bata Ringan m2 572.60 0.36 378.73 0.24 - 150.00 0.09 75.00 75.00
2 Pek. Plesteran Dinding Bata Ringan m2 1,072.06 0.36 757.46 0.25 - 50.00 0.02 25.00 25.00
3 Pek. Acian Dinding Bata Ringan. m2 1,023.32 0.19 757.46 0.14 - - - -
4 Pek. Acian Beton. m2 46.18 0.01 46.18 0.01 - - -
5 Kolom & Ring BalokPraktis 13x13 cm ( Opening Kusen ) m1 68.61 0.02 68.61 0.02 - - - -
6 Pek. Dinding Partisi Gypsum 2 Sisi, Rangka Metal Stud. m2 85.35 0.08 85.35 0.08 - - - -
7 Pek. Dinding Pembatas Koridor Gedung "MIPA". m2 10.62 0.01 10.62 0.01 - -
8 Pek. Pas. Windowstool Alumunium Profile. m1 3.60 0.00 3.60 0.00 - -
9 Pek. Bongkaran dinding dan Finishing bangunan lama dengan bangunan baru m2 9.61 0.00 9.61 0.00 - -
jalur selasar (Conecting)
Sub Total - I. 2. Lantai 2 (dua). : 1.04 0.76 - 0.11
I. 3. Lantai 3 (tiga).
1 Pek. Pasangan Dinding Bata Ringan m2 586.98 0.37 381.40 0.24 - 100.00 0.06 50.00 50.00
2 Pek. Plesteran Dinding Bata Ringan m2 1,008.44 0.34 762.80 0.26 - 30.00 0.01 15.00 15.00
3 Pek. Acian Dinding Bata Ringan. m2 800.64 0.15 762.80 0.14 - -
4 Pek. Acian Beton. m2 15.55 0.00 15.55 0.00 - -
5 Kolom & Ring BalokPraktis 13x13 cm ( Opening Kusen ) m1 74.51 0.02 74.51 0.02 - -
6 Pek. Dinding Partisi Gypsum 2 Sisi, Rangka Metal Stud. m2 85.35 0.08 85.35 0.08 - -
7 Pek. Dinding Pembatas Koridor Gedung "MIPA". m2 6.08 0.01 6.08 0.01 - -
8 Pek. Pas. Windowstool Alumunium Profile. m1 3.60 0.00 3.60 0.00 - -
9 Pek. Bongkaran dinding dan Finishing bangunan lama dengan bangunan baru m2 9.61 0.00 9.61 0.00 - -
jalur selasar (Conecting) -
Sub Total - I. 3. Lantai 3 (tiga). : 0.97 0.76 - 0.07
I. 4. Lantai 4 (empat).
1 Pek. Pasangan Dinding Bata Ringan m2 522.98 0.33 380.69 0.24 - -
2 Pek. Plesteran Dinding Bata Ringan m2 1,025.42 0.34 761.38 0.26 - -
3 Pek. Acian Dinding Bata Ringan. m2 1,008.12 0.19 761.38 0.14 - -
4 Pek. Acian Beton. m2 15.55 0.00 15.55 0.00 - -
5 Kolom & Ring BalokPraktis 13x13 cm ( Opening Kusen ) m1 89.05 0.03 89.05 0.03 - -
6 Pek. Dinding Partisi Gypsum 2 Sisi, Rangka Metal Stud. m2 147.60 0.13 -
7 Pek. Pas. Windowstool Alumunium Profile. m1 3.60 0.00 3.60 0.00 - -
Sub Total - I. 4. Lantai 4 (empat). : 1.03 0.67 - -
I. 5. Lantai 5 (lima).
1 Pek. Pasangan Dinding Bata Ringan m2 461.24 0.29 380.69 0.24 - -
2 Pek. Plesteran Dinding Bata Ringan m2 875.74 0.29 761.38 0.26 - -

36/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

3 Pek. Acian Dinding Bata Ringan. m2 830.40 0.16 761.38 0.14 - -


4 Pek. Acian Beton. m2 46.20 0.01 46.20 0.01 - -
5 Kolom & Ring BalokPraktis 13x13 cm ( Opening Kusen ) m1 83.55 0.03 83.55 0.03 - -
6 Pek. Dinding Partisi Gypsum 2 Sisi, Rangka Metal Stud. m2 85.35 0.08 -
7 Pek. Pas. Windowstool Alumunium Profile. m1 3.60 0.00 3.60 0.00 - -
Sub Total - I. 5. Lantai 5 (lima). : 0.85 0.68 - -
I. 6. Lantai 6 (enam).
1 Pek. Pasangan Dinding Bata Ringan m2 463.80 0.29 380.69 0.24 - -
2 Pek. Plesteran Dinding Bata Ringan m2 880.14 0.30 761.38 0.26 - -
3 Pek. Acian Dinding Bata Ringan. m2 834.16 0.16 761.38 0.14 - -
4 Pek. Acian Beton. m2 46.20 0.01 46.20 0.01 - -
5 Kolom & Ring BalokPraktis 13x13 cm ( Opening Kusen ) m1 67.50 0.02 67.50 0.02 - -
6 Pek. Dinding Partisi Gypsum 2 Sisi, Rangka Metal Stud. m2 65.25 0.06 -
7 Pek. Pas. Windowstool Alumunium Profile. m1 3.60 0.00 3.60 0.00 - -
Sub Total - I. 6. Lantai 6 (enam). : 0.83 0.67 - -
I. 7. Lantai 7 (tujuh).
1 Pek. Pasangan Dinding Bata Ringan m2 450.80 0.28 380.69 0.24 - -
2 Pek. Plesteran Dinding Bata Ringan m2 854.14 0.29 761.38 0.26 - -
3 Pek. Acian Dinding Bata Ringan. m2 810.14 0.15 761.38 0.14 - -
4 Pek. Acian Beton. m2 46.20 0.01 46.20 0.01 - -
5 Kolom & Ring BalokPraktis 13x13 cm ( Opening Kusen ) m1 74.00 0.02 74.00 0.02 - -
6 Pek. Dinding Partisi Gypsum 2 Sisi, Rangka Metal Stud. m2 65.25 0.06 -
7 Pek. Pas. Windowstool Alumunium Profile. m 1 3.60 0.00 3.60 0.00 - -
Sub Total - I. 7. Lantai 7 (tujuh). : 0.82 0.67 - -
I. 8. Lantai 8 (delapan).
1 Pek. Pasangan Dinding Bata Ringan m2 526.40 0.33 380.69 0.24 - -
2 Pek. Plesteran Dinding Bata Ringan m2 1,005.34 0.34 761.38 0.26 - -
3 Pek. Acian Dinding Bata Ringan. m2 1,005.34 0.19 761.38 0.14 - -
4 Pek. Acian Beton. m2 46.20 0.01 46.20 0.01 - -
5 Kolom & Ring BalokPraktis 13x13 cm ( Opening Kusen ) m1 75.80 0.02 75.80 0.02 - -
6 Pek. Dinding Partisi Gypsum 2 Sisi, Rangka Metal Stud. m2 21.51 0.02 -
7 Pek. Pas. Windowstool Alumunium Profile. m1 3.60 0.00 3.60 0.00 - -
Sub Total - I. 8. Lantai 8 (delapan). : 0.91 0.67 - -
I. 9. Lantai 9 (sembilan).
1 Pek. Pasangan Dinding Bata Ringan m2 306.40 0.19 306.40 0.19 - -
2 Pek. Plesteran Dinding Bata Ringan m2 612.80 0.21 612.80 0.21 - -
3 Pek. Acian Dinding Bata Ringan. m2 612.80 0.11 612.80 0.11 - -
4 Kolom & Ring BalokPraktis 13x13 cm ( Opening Kusen ) m1 11.40 0.00 11.40 0.00 - -
5 Pek. Ornamen Vertikal, Rangka Metal. unit 3.00 0.26 3.00 0.26 - -

Sub Total - I. 9. Lantai 9 (sembilan). : 0.78 0.78 - -


TOTAL. I (PEK. PASANGAN) : 8.22 6.65 - 0.18

II. PEKERJAAN BETON


II. 1. Lantai 1 (satu).
1 Pek. Kolom Praktis Beton Bertulang uk. 110 x 110 mm m1 211.51 0.07 211.51 0.07 - -
2 Pek. Ring Balok Praktis Beton Bertulang uk. 100 x 150 mm m³ 1.25 0.04 1.25 0.04 - -
3 Pek. Meja Beton Fin. Homogenous Area Toilet. m2 0.72 0.00 0.72 0.00 - -
4 Pek. Meja Beton Fin. Keramik 20 x 20 cm Area Pantry. m2 0.96 0.00 0.96 0.00 - -
5 Pek. Topian Beton Diatas Kusen. m2 20.25 0.05 20.25 0.05 - -
Sub Total - II. 1. Lantai 1 (satu). : 0.16 0.16 - -
II. 2. Lantai 2 (dua).
1 Pek. Kolom Praktis Beton Bertulang uk. 110 x 110 mm m1 193.12 0.06 193.12 0.06 - 48.00 0.02 48.00
2 Pek. Ring Balok Praktis Beton Bertulang uk. 100 x 150 mm m³ 1.19 0.04 1.19 0.04 - - -
3 Pek. Meja Beton Fin. Homogenous Area Toilet. m2 0.72 0.00 0.72 0.00 - -
4 Pek. Topian Beton Diatas Kusen. m2 20.25 0.05 20.25 0.05 - -
Sub Total - II. 2. Lantai 2 (dua). : 0.15 0.15 - 0.02
II. 3. Lantai 3 (tiga).

37/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

1 Pek. Kolom Praktis Beton Bertulang uk. 110 x 110 mm m1 225.30 0.07 225.30 0.07 - 24.00 0.01 12.00 12.00
2 Pek. Ring Balok Praktis Beton Bertulang uk. 100 x 150 mm m³ 1.14 0.04 1.14 0.04 - - -
3 Pek. Meja Beton Fin. Homogenous Area Toilet. m2 0.72 0.00 0.72 0.00 - -
4 Pek. Meja Beton Fin. Keramik 20 x 20 cm Area Pantry. m2 0.96 0.00 0.96 0.00 - -
5 Pek. Topian Beton Diatas Kusen. m2 20.25 0.05 20.25 0.05 - -
Sub Total - II. 3. Lantai 3 (tiga). : 0.16 0.16 - 0.01
II. 4. Lantai 4 (empat).
1 Pek. Kolom Praktis Beton Bertulang uk. 110 x 110 mm m1 239.10 0.08 239.10 0.08 - - -
2 Pek. Ring Balok Praktis Beton Bertulang uk. 100 x 150 mm m³ 1.13 0.03 1.13 0.03 - - -
3 Pek. Meja Beton Fin. Homogenous Area Toilet. m2 0.72 0.00 0.72 0.00 - -
4 Pek. Meja Beton Fin. Keramik 20 x 20 cm Area Pantry. m2 0.96 0.00 0.96 0.00 - -
5 Pek. Topian Beton Diatas Kusen. m2 20.59 0.05 20.59 0.05 - -
Sub Total - II. 4. Lantai 4 (empat). : 0.16 0.16 - -
II. 5. Lantai 5 (lima).
1 Pek. Kolom Praktis Beton Bertulang uk. 110 x 110 mm m1 216.11 0.07 216.11 0.07 - - -
2 Pek. Ring Balok Praktis Beton Bertulang uk. 100 x 150 mm m³ 1.13 0.03 1.13 0.03 - - -
3 Pek. Meja Beton Fin. Homogenous Area Toilet. m2 0.72 0.00 0.72 0.00 - -
4 Pek. Meja Beton Fin. Keramik 20 x 20 cm Area Pantry. m2 0.96 0.00 0.96 0.00 - -
5 Pek. Topian Beton Diatas Kusen. m2 20.59 0.05 20.59 0.05 - -
Sub Total - II. 5. Lantai 5 (lima). : 0.16 0.16 - -
II. 6. Lantai 6 (enam).
1 Pek. Kolom Praktis Beton Bertulang uk. 110 x 110 mm. m1 243.69 0.08 243.69 0.08 - -
2 Pek. Ring Balok Praktis Beton Bertulang uk. 100 x 150 mm m³ 1.07 0.03 1.07 0.03 - -
3 Pek. Meja Beton Fin. Homogenous Area Toilet. m2 0.72 0.00 0.72 0.00 - -
4 Pek. Meja Beton Fin. Keramik 20 x 20 cm Area Pantry. m2 0.96 0.00 0.96 0.00 - -
5 Pek. Topian Beton Diatas Kusen. m2 10.70 0.02 10.70 0.02 - -
Sub Total - II. 6. Lantai 6 (enam). : 0.14 0.14 - -
II. 7. Lantai 7 (tujuh).
1 Pek. Kolom Praktis Beton Bertulang uk. 110 x 110 mm m1 216.11 0.07 216.11 0.07 - -
2 Pek. Ring Balok Praktis Beton Bertulang uk. 100 x 150 mm m³ 1.12 0.03 1.12 0.03 - -
3 Pek. Meja Beton Fin. Homogenous Area Toilet. m2 0.72 0.00 0.72 0.00 - -
4 Pek. Meja Beton Fin. Keramik 20 x 20 cm Area Pantry. m2 0.96 0.00 0.96 0.00 - -
5 Pek. Topian Beton Diatas Kusen. m3 10.70 0.02 10.70 0.02 - -
Sub Total - II. 7. Lantai 7 (tujuh). : 0.13 0.13 - -
II. 8. Lantai 8 (delapan).
1 Pek. Kolom Praktis Beton Bertulang uk. 110 x 110 mm m1 216.11 0.07 216.11 0.07 - -
2 Pek. Ring Balok Praktis Beton Bertulang uk. 100 x 150 mm m³ 1.12 0.03 1.12 0.03 - -
3 Pek. Meja Beton Fin. Homogenous Area Toilet. m2 0.72 0.00 0.72 0.00 - -
4 Pek. Meja Beton Fin. Keramik 20 x 20 cm Area Pantry. m2 0.96 0.00 0.96 0.00 - -
5 Pek. Topian Beton Diatas Kusen. m2 10.70 0.02 10.70 0.02 - -
Sub Total - II. 8. Lantai 8 (delapan). : 0.13 0.13 - -
II. 9. Lantai 9 (sembilan).
1 Pek. Kolom Praktis Beton Bertulang uk. 110 x 110 mm m1 234.50 0.08 234.50 0.08 - -
2 Pek. Ring Balok Praktis Beton Bertulang uk. 100 x 150 mm m³ 0.03 0.00 0.03 0.00 - -
3 Pek. Topian Beton Diatas Kusen. m2 3.14 0.01 3.14 0.01 - -
Sub Total - II. 9. Lantai 9 (sembilan). : 0.08 0.08 - -
TOTAL. II (PEK. BETON) : 1.28 1.28 - 0.02

III. PEKERJAAN KUSEN, PINTU & JENDELA ALMUNIUM


(Lengkap dengan Kunci, Engsel + Kaca & Accessories) terpasang
III. 1. Lantai 1 (satu).
1 Pek. Kusen Pintu Kaca Type PD. 1. unit 1.00 0.09 1.00 0.09 - -
2 Pek. Kusen Pintu Alumunium Type PD. 3. unit 1.00 0.03 1.00 0.03 - -
3 Pek. Kusen Pintu Alumunium Type P. 1. unit 6.00 0.11 6.00 0.11 - -
4 Pek. Kusen Pintu Alumunium Type P. 1A. unit 1.00 0.02 1.00 0.02 - -
5 Pek. Kusen Pintu Alumunium Type P. 2. unit 1.00 0.02 1.00 0.02 - -
6 Pek. Kusen Pintu Alumunium Type P. 3. unit 4.00 0.07 4.00 0.07 - -
7 Pek. Kusen Pintu PVC Type P. 4. unit 3.00 0.01 3.00 0.01 - -
8 Pek. Kusen Pintu Besi Type PB. 1. unit 3.00 0.06 3.00 0.06 - -

38/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

9 Pek. Kusen Pintu Besi Type PB. 2. unit 3.00 0.02 3.00 0.02 - -
10 Pek. Kusen Pintu Besi Type PB. 2A. unit 1.00 0.01 1.00 0.01 - -
11 Pek. Kusen Pintu Type PS. 1. unit 1.00 0.01 1.00 0.01 - -
12 Pek. Kusen Jendela Alumunium Type J. 1. unit 1.00 0.04 1.00 0.04 - -
13 Pek. Kusen Jendela Alumunium Type J. 2. unit 14.00 0.11 14.00 0.11 - -
14 Pek. Kusen Jendela Alumunium Type J. 3. unit 2.00 0.00 2.00 0.00 - -
15 Pek. Kusen Jendela Alumunium Type BV. 1. unit 4.00 0.00 4.00 0.00 - -
16 Pek. Kusen Jendela Alumunium Type BV. 2. unit 7.00 0.01 7.00 0.01 - -
17 Pek. Kusen Jendela Alumunium Type BV. 3. unit 5.00 0.01 5.00 0.01 - -
18 Pek. Jalusi / Lovre Alumunium BV .6. unit 7.00 0.06 7.00 0.06 - -
Sub Total - III. 1. Lantai 1 (satu). : 0.67 0.67 - -
III. 2. Lantai 2 (dua).
1 Pek. Kusen Pintu Alumunium Type PD. 3. unit 4.00 0.11 4.00 0.11 - - -
2 Pek. Kusen Pintu Alumunium Type P. 1. unit 1.00 0.02 1.00 0.02 - -
3 Pek. Kusen Pintu Type PS. 1. (Toilet Difable) unit 1.00 0.02 1.00 0.02 - -
4 Pek. Kusen Pintu Alumunium Type P. 3. unit 3.00 0.05 3.00 0.05 - -
5 Pek. Kusen Pintu PVC Type P. 4. unit 3.00 0.01 3.00 0.01 - -
6 Pek. Kusen Pintu Besi Type PB. 1. unit 2.00 0.04 2.00 0.04 - -
7 Pek. Kusen Pintu Besi Type PB. 2. unit 3.00 0.02 3.00 0.02 - -
8 Pek. Kusen Pintu Besi Type PB. 2A. unit 1.00 0.01 1.00 0.01 - -
9 Pek. Kusen Jendela Alumunium Type J. 2. unit 14.00 0.11 14.00 0.11 - -
10 Pek. Kusen Jendela Alumunium Type J. 5 ( dari lantai 2 s/d lantai 8) unit 1.00 0.21 1.00 0.21 - -
11 Pek. Kusen Jendela Alumunium Type BV. 1. unit 4.00 0.00 4.00 0.00 - -
12 Pek. Kusen Jendela Alumunium Type BV. 2. unit 12.00 0.02 12.00 0.02 - -
13 Pek. Jalusi / Lovre Alumunium BV .6. unit 7.00 0.06 7.00 0.06 - -
14 Pek. Kusen Pintu Lipat Type PL-1 unit 1.00 0.20 1.00 0.20 - -
Sub Total - III. 2. Lantai 2 (dua). : 0.86 0.86 - -
III. 3. Lantai 3 (tiga).
1 Pek. Kusen Pintu Alumunium Type PD. 3. unit 4.00 4.00 -
2 Pek. Kusen Pintu Alumunium Type P. 1. unit 1.00 1.00 -
3 Pek. Kusen Pintu Alumunium Type P. 2. unit 1.00 1.00 -
4 Pek. Kusen Pintu Alumunium Type P. 3. unit 4.00 0.07 4.00 0.07 - -
5 Pek. Kusen Pintu PVC Type P. 4. unit 3.00 0.01 3.00 0.01 - -
6 Pek. Kusen Pintu Besi Type PB. 1. unit 2.00 0.04 2.00 0.04 - -
7 Pek. Kusen Pintu Besi Type PB. 2. unit 3.00 0.02 3.00 0.02 - -
8 Pek. Kusen Pintu Besi Type PB. 2A. unit 1.00 0.01 1.00 0.01 - -
9 Pek. Kusen Jendela Alumunium Type J. 2. unit 14.00 0.11 14.00 0.11 - -
10 Pek. Kusen Jendela Alumunium Type J. 5. unit - - - -
11 Pek. Kusen Jendela Alumunium Type BV. 1. unit 4.00 0.00 4.00 0.00 - -
12 Pek. Kusen Jendela Alumunium Type BV. 2. unit 7.00 0.01 7.00 0.01 - -
13 Pek. Kusen Jendela Alumunium Type BV. 3. unit 1.00 0.00 1.00 0.00 - -
14 Pek. Jalusi / Lovre Alumunium BV .6. unit 7.00 0.06 7.00 0.06 - -
15 Pek. Kusen Pintu Lipat Type PL-1 unit 1.00 0.20 1.00 0.20 - -
Sub Total - III. 3. Lantai 3 (tiga). : 0.52 0.52 - -
III. 4. Lantai 4 (empat).
1 Pek. Kusen Pintu Alumunium Type PD. 3. unit 5.00 5.00 -
2 Pek. Kusen Pintu Alumunium Type P. 1. unit 4.00 4.00 -
3 Pek. Kusen Pintu Alumunium Type P. 2. unit 1.00 1.00 -
4 Pek. Kusen Pintu Alumunium Type P. 3. unit 3.00 0.05 3.00 0.05 - -
5 Pek. Kusen Pintu PVC Type P. 4. unit 3.00 0.01 3.00 0.01 - -
6 Pek. Kusen Pintu Besi Type PB. 1. unit 2.00 2.00 -
7 Pek. Kusen Pintu Besi Type PB. 2. unit 3.00 3.00 -
8 Pek. Kusen Pintu Besi Type PB. 2A. unit 1.00 1.00 -
9 Pek. Kusen Jendela Alumunium Type J. 2. unit 14.00 0.11 14.00 0.11 - -
10 Pek. Kusen Jendela Alumunium Type J. 3A. unit 3.00 0.01 3.00 0.01 - -
11 Pek. Kusen Jendela Alumunium Type J. 4. unit 1.00 0.01 1.00 0.01 - -
12 Pek. Kusen Jendela Alumunium Type J. 5. unit - - - -
13 Pek. Kusen Jendela Alumunium Type BV. 1. unit 4.00 0.00 4.00 0.00 - -
14 Pek. Kusen Jendela Alumunium Type BV. 2. unit 3.00 0.01 3.00 0.01 - -
15 Pek. Kusen Jendela Alumunium Type BV. 3. unit 5.00 0.01 5.00 0.01 - -

39/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

16 Pek. Jalusi / Lovre Alumunium BV .6. unit 7.00 0.06 7.00 0.06 - -
17 Pek. Kusen Pintu Lipat Type PL-1 unit 1.00 - 1.00 -
Sub Total - III. 4. Lantai 4 (empat). : 0.27 0.27 - -
III. 5. Lantai 5 (lima).
1 Pek. Kusen Pintu Alumunium Type PD. 3. unit 5.00 5.00 -
2 Pek. Kusen Pintu Alumunium Type P. 1. unit 1.00 1.00 -
3 Pek. Kusen Pintu Alumunium Type P. 2. unit 1.00 1.00 -
4 Pek. Kusen Pintu Alumunium Type P. 3. unit 3.00 0.05 3.00 0.05 - -
5 Pek. Kusen Pintu PVC Type P. 4. unit 3.00 0.01 3.00 0.01 - -
6 Pek. Kusen Pintu Besi Type PB. 1. unit 2.00 2.00 -
7 Pek. Kusen Pintu Besi Type PB. 2. unit 3.00 3.00 -
8 Pek. Kusen Pintu Besi Type PB. 2A. unit 1.00 1.00 -
9 Pek. Kusen Jendela Alumunium Type J. 2. unit 14.00 0.11 14.00 0.11 - -
10 Pek. Kusen Jendela Alumunium Type J. 4. unit 1.00 0.01 1.00 0.01 - -
11 Pek. Kusen Jendela Alumunium Type J. 5. unit - - - -
12 Pek. Kusen Jendela Alumunium Type BV. 1. unit 4.00 0.00 4.00 0.00 - -
13 Pek. Kusen Jendela Alumunium Type BV. 2. unit 5.00 0.01 5.00 0.01 - -
14 Pek. Kusen Jendela Alumunium Type BV. 3. unit 5.00 0.01 5.00 0.01 - -
15 Pek. Jalusi / Lovre Alumunium BV .6. unit 7.00 0.06 7.00 0.06 - -
16 Pek. Kusen Pintu Lipat Type PL-1 unit 1.00 - 1.00 -
Sub Total - III. 5. Lantai 5 (lima). : 0.26 0.26 - -
III. 6. Lantai 6 (enam).
1 Pek. Kusen Pintu Alumunium Type P. 1. unit 1.00 1.00 -
2 Pek. Kusen Pintu Alumunium Type P. 1B. unit 5.00 5.00 -
3 Pek. Kusen Pintu Alumunium Type P. 2. unit 1.00 1.00 -
4 Pek. Kusen Pintu Alumunium Type P. 3. unit 3.00 0.05 3.00 0.05 - -
5 Pek. Kusen Pintu PVC Type P. 4. unit 3.00 0.01 3.00 0.01 - -
6 Pek. Kusen Pintu Besi Type PB. 1. unit 2.00 2.00 -
7 Pek. Kusen Pintu Besi Type PB. 2. unit 3.00 3.00 -
8 Pek. Kusen Pintu Besi Type PB. 2A. unit 1.00 1.00 -
9 Pek. Kusen Jendela Alumunium Type J. 2. unit 14.00 0.11 14.00 0.11 - -
10 Pek. Kusen Jendela Alumunium Type J. 4. unit 1.00 0.01 1.00 0.01 - -
11 Pek. Kusen Jendela Alumunium Type J. 5. unit - - - -
12 Pek. Kusen Jendela Alumunium Type BV. 1. unit 4.00 0.00 4.00 0.00 - -
13 Pek. Kusen Jendela Alumunium Type BV. 3. unit 9.00 0.02 9.00 0.02 - -
14 Pek. Jalusi / Lovre Alumunium BV .6. unit 7.00 0.06 7.00 0.06 - -
Sub Total - III. 6. Lantai 6 (enam). : 0.26 0.26 - -
III. 7. Lantai 7 (tujuh).
1 Pek. Kusen Pintu Alumunium Type PD. 3. unit 1.00 1.00 -
2 Pek. Kusen Pintu Alumunium Type P. 1. unit 1.00 1.00 -
3 Pek. Kusen Pintu Alumunium Type P. 1B. unit 5.00 5.00 -
4 Pek. Kusen Pintu Alumunium Type P. 2. unit 1.00 1.00 -
5 Pek. Kusen Pintu Alumunium Type P. 3. unit 3.00 0.05 3.00 0.05 - - -
6 Pek. Kusen Pintu PVC Type P. 4. unit 3.00 0.01 3.00 0.01 - - -
7 Pek. Kusen Pintu Besi Type PB. 1. unit 2.00 2.00 - -
8 Pek. Kusen Pintu Besi Type PB. 2. unit 3.00 3.00 - -
9 Pek. Kusen Pintu Besi Type PB. 2A. unit 1.00 1.00 - -
10 Pek. Kusen Jendela Alumunium Type J. 2. unit 14.00 0.11 14.00 0.11 - - -
11 Pek. Kusen Jendela Alumunium Type J. 4. unit 1.00 0.01 1.00 0.01 - - -
12 Pek. Kusen Jendela Alumunium Type J. 5. unit - - - - -
13 Pek. Kusen Jendela Alumunium Type BV. 1. unit 4.00 0.00 4.00 0.00 - - -
14 Pek. Kusen Jendela Alumunium Type BV. 2. unit - - - - -
15 Pek. Kusen Jendela Alumunium Type BV. 3. unit 9.00 0.02 9.00 0.02 - - -
16 Pek. Jalusi / Lovre Alumunium BV .6. unit 7.00 0.06 7.00 0.06 - - -
Sub Total - III. 7. Lantai 7 (tujuh). : 0.26 0.26 - -
III. 8. Lantai 8 (delapan).
1 Pek. Kusen Pintu Alumunium Type PD. 2. unit 2.00 2.00 -
2 Pek. Kusen Pintu Alumunium Type PD. 3. unit 1.00 1.00 -
3 Pek. Kusen Pintu Alumunium Type P. 1. unit 2.00 2.00 -
4 Pek. Kusen Pintu Alumunium Type P. 2. unit 1.00 1.00 -

40/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

5 Pek. Kusen Pintu Alumunium Type P. 3. unit 3.00 3.00 -


6 Pek. Kusen Pintu PVC Type P. 4. unit 3.00 3.00 -
7 Pek. Kusen Pintu Besi Type PB. 1. unit 2.00 2.00 -
8 Pek. Kusen Pintu Besi Type PB. 2. unit 3.00 3.00 -
9 Pek. Kusen Pintu Besi Type PB. 2A. unit 1.00 1.00 -
10 Pek. Kusen Jendela Alumunium Type J. 2. unit 14.00 0.11 14.00 0.11 - -
11 Pek. Kusen Jendela Alumunium Type J. 4. unit 1.00 0.01 1.00 0.01 - -
12 Pek. Kusen Jendela Alumunium Type J. 5. unit - - - -
13 Pek. Kusen Jendela Alumunium Type BV. 1. unit 4.00 0.00 4.00 0.00 - -
14 Pek. Kusen Jendela Alumunium Type BV. 3. unit 3.00 0.01 3.00 0.01 - -
15 Pek. Jalusi / Lovre Alumunium BV .6. unit 7.00 0.06 7.00 0.06 - -
16 Pek. Kusen Pintu Lipat Type PL-1 unit 2.00 0.40 2.00 -
Sub Total - III. 8. Lantai 8 (delapan). : 0.59 0.19 - -
III. 9. Lantai 9 (sembilan).
1 Pek. Kusen Pintu Alumunium Type P. 1. unit 1.00 1.00 -
2 Pek. Kusen Pintu Besi Type PB. 1. unit 1.00 1.00 -
Sub Total - III. 9. Lantai 9 (sembilan). :
TOTAL. III (PEK. KUSEN, PINTU & JENDELA ALMUNIUM) : 3.70 3.30 - -

IV. PEKERJAAN PENUTUP LANTAI DAN DINDING


IV. 1. Lantai 1 (satu).
1 Pek. Rabat Beton mutu f'c = 7.4 Mpa (K100) m2 84.08 0.04 84.08 0.04 - -
2 Pek. Lantai Homogenous Tile uk. 60 x 60 cm. m2 277.67 0.82 304.86 0.90 - -
3 Pek. Lantai Keramik uk. 60 x 60 cm. m2 27.19 0.05 -
4 Pek. Lantai Keramik uk. 40 x 40 cm. m2 52.94 0.06 -
5 Pek. Lantai Keramik uk. 20 x 20 cm. m2 18.01 0.02 -
6 Pek. Dinding Keramik uk. 20 x 25 cm. m2 131.50 0.18 -
7 Pek. Border Keramik uk. 10 x 20 cm. m1 47.14 0.01 -
8 Pek. Step Nosing Homogenous Tile uk. 10 x 60 cm Tangga Entrance . m1 24.00 0.01 24.00 0.01 - -
9 Pek. Plint Homogenous Tile uk. 10 x 60 cm. m 1 178.08 0.23 270.17 0.36 - -
10 Pek. Plint Keramik uk. 10 x 60 cm. m1 22.63 0.00 -
11 Pek. Plint Keramik uk. 10 x 40 cm. m1 69.46 0.01 -
12 Pek. Plint Kayu Finish Melamik. m¹ 180.00 0.05 180.00 0.05 - -
13 Pek. Pas. Koral Sikat Lantai Ramps. m2 16.85 0.01 16.85 0.01 - -
14 Pek. Pas. Granit Dry System Dinding Lift. m2 20.00 0.07 -
15 Pek. Pas. Batu Alam Dinding Fasade. m2 228.54 0.37 228.54 0.37 - -
16 Pek. Pas. Penutup Delatasi Bangunan. m1 12.00 0.01 12.00 0.01 - -
17 Pek. Pas. Waterproofing Coating Pit Lift. m2 36.45 0.01 -
11 Pek. Lantai Homogenous Tile uk. 60 x 60 cm Kamar Mandi m2 - 19.41 0.06 - -
12 Pek. Dinding Homogenous Tile uk. 60 x 60 cm Kamar Mandi m2 - 108.71 0.32 - -
7 Pek. Border Homogenous Tile uk. 10 x 60 cm m1 - 194.12 0.26 - -
Sub Total - IV. 1. Lantai 1 (satu). : 1.95 2.38 - -
IV. 2. Lantai 2 (dua).
1 Pek. Lantai Homogenous Tile uk. 60 x 60 cm. m2 45.59 0.13 338.59 1.00 - - -
2 Pek. Lantai Keramik uk. 60 x 60 cm. m2 276.84 0.46 -
3 Pek. Lantai Keramik uk. 40 x 40 cm. m2 16.16 0.02 -
4 Pek. Lantai Keramik uk. 20 x 20 cm. m2 15.70 0.02 -
5 Pek. Dinding Keramik uk. 20 x 25 cm. m2 111.47 0.15 -
6 Pek. Border Keramik uk. 10 x 20 cm. m1 39.81 0.01 -
7 Pek. Plint Homogenous Tile uk. 10 x 60 cm. m1 5.45 0.01 223.54 0.29 - - -
8 Pek. Plint Keramik uk. 10 x 60 cm. m 1 148.63 0.03 -
9 Pek. Plint Keramik uk. 10 x 40 cm. m1 69.46 0.01 -
10 Pek. Plint Kayu Finish Melamik. m¹ 180.92 0.05 180.92 0.05 - -
11 Pek. Pas. Granit Dry System Dinding Lift. m2 15.00 0.05 -
12 Pek. Waterproofing Coating ( KM / WC ). m2 28.54 0.01 28.54 0.01 - - -
13 Pek. Lantai Homogenous Tile uk. 60 x 60 cm Kamar Mandi m2 - 23.46 0.07 - - -
14 Pek. Dinding Homogenous Tile uk. 60 x 60 cm Kamar Mandi m2 - 125.99 0.37 - - -
15 Pek. Border Homogenous Tile uk. 10 x 60 cm m1 - 224.90 0.30 - - -

41/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

Sub Total - IV. 2. Lantai 2 (dua). : 0.95 2.09 - -


IV. 3. Lantai 3 (tiga).
1 Pek. Lantai Homogenous Tile uk. 60 x 60 cm. m2 9.00 0.03 304.58 0.90 - - - -
2 Pek. Lantai Keramik uk. 60 x 60 cm. m2 277.76 0.46 -
3 Pek. Lantai Keramik uk. 40 x 40 cm. m2 17.82 0.02 -
4 Pek. Lantai Keramik uk. 20 x 20 cm. m2 16.09 0.02 -
6 Pek. Dinding Keramik uk. 20 x 25 cm. m2 111.47 0.15 -
8 Pek. Border Keramik uk. 10 x 20 cm. m1 39.81 0.01 -
9 Pek. Plint Keramik uk. 10 x 60 cm. m1 148.63 0.03 -
10 Pek. Plint Keramik uk. 10 x 40 cm. m1 69.46 0.01 -
11 Pek. Plint Kayu Finish Melamik. m¹ 302.40 0.08 302.40 0.08 - -
12 Pek. Pas. Granit Dry System Dinding Lift. m2 15.00 0.05 -
13 Pek. Waterproofing Coating ( KM / WC ). m2 28.54 0.01 -
5 Pek. Lantai Homogenous Tile uk. 60 x 60 cm Kamar Mandi m2 - 19.41 0.06 - - -
7 Pek. Dinding Homogenous Tile uk. 60 x 60 cm Kamar Mandi m2 - 108.71 0.32 - - -
7 Pek. Border Homogenous Tile uk. 10 x 60 cm m1 - 194.11 0.26 - - -
14 Pek. Plint Homogenous Tile uk. 10 x 60 cm. m1 - 218.09 0.29 - - -
Sub Total - IV. 3. Lantai 3 (tiga). : 0.88 1.91 - - -
IV. 4. Lantai 4 (empat).
1 Pek. Lantai Homogenous Tile uk. 60 x 60 cm. m2 9.00 -
2 Pek. Lantai Keramik uk. 60 x 60 cm. m2 267.62 -
3 Pek. Lantai Keramik uk. 40 x 40 cm. m2 22.95 -
4 Pek. Lantai Keramik uk. 20 x 20 cm. m2 16.09 0.02 -
5 Pek. Dinding Keramik uk. 20 x 25 cm. m2 111.47 0.15 -

42/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

6 Pek. Border Keramik uk. 10 x 20 cm. m1 39.81 0.01 -


7 Pek. Plint Keramik uk. 10 x 60 cm. m 1 174.58 -
8 Pek. Plint Keramik uk. 10 x 40 cm. m1 69.46 -
9 Pek. Plint Kayu Finish Melamik. m¹ 302.40 -
10 Pek. Pas. Granit Dry System Dinding Lift. m2 15.00 0.05 -
11 Pek. Waterproofing Coating ( KM / WC ). m2 28.54 0.01 -
5 Pek. Lantai Homogenous Tile uk. 60 x 60 cm Kamar Mandi m2 - 29.26 0.09 - - -
6 Pek. Dinding Homogenous Tile uk. 60 x 60 cm Kamar Mandi m2 - 158.97 0.47 - - -
7 Pek. Border Homogenous Tile uk. 10 x 60 cm m1 - 183.48 0.24 - - -
Sub Total - IV. 4. Lantai 4 (empat). : 0.24 0.80 - -
IV. 5. Lantai 5 (lima).
1 Pek. Lantai Homogenous Tile uk. 60 x 60 cm. m2 9.00 -
2 Pek. Lantai Keramik uk. 60 x 60 cm. m2 273.15 -
3 Pek. Lantai Keramik uk. 40 x 40 cm. m2 22.95 -
4 Pek. Lantai Keramik uk. 20 x 20 cm. m2 16.09 0.02 -
5 Pek. Dinding Keramik uk. 20 x 25 cm. m2 111.47 0.15 -
6 Pek. Border Keramik uk. 10 x 20 cm. m1 39.81 0.01 -
7 Pek. Plint Keramik uk. 10 x 60 cm. m1 232.88 -
8 Pek. Plint Keramik uk. 10 x 40 cm. m 1 69.46 -
9 Pek. Plint Kayu Finish Melamik. m¹ 86.40 -
10 Pek. Pas. Granit Dry System Dinding Lift. m2 15.00 0.05 -
11 Pek. Waterproofing Coating ( KM / WC ). m2 28.54 0.01 -
5 Pek. Lantai Homogenous Tile uk. 60 x 60 cm Kamar Mandi m2 - 18.33 0.05 - - -
6 Pek. Dinding Homogenous Tile uk. 60 x 60 cm Kamar Mandi m2 - 102.75 0.30 - - -
7 Pek. Border Homogenous Tile uk. 10 x 60 cm m1 - 183.48 0.24 - - -
Sub Total - IV. 5. Lantai 5 (lima). : 0.24 0.60 - -
IV. 6. Lantai 6 (enam).
1 Pek. Lantai Homogenous Tile uk. 60 x 60 cm. m2 9.00 -
2 Pek. Lantai Keramik uk. 60 x 60 cm. m2 273.15 -
3 Pek. Lantai Keramik uk. 40 x 40 cm. m2 22.95 -
4 Pek. Lantai Keramik uk. 20 x 20 cm. m2 16.09 0.02 -
5 Pek. Dinding Keramik uk. 20 x 25 cm. m2 111.47 0.15 -
6 Pek. Border Keramik uk. 10 x 20 cm. m1 39.81 0.01 -
7 Pek. Plint Keramik uk. 10 x 60 cm. m1 315.88 -
8 Pek. Plint Keramik uk. 10 x 40 cm. m1 69.46 -
9 Pek. Plint Kayu Finish Melamik. m¹ 79.20 -
10 Pek. Pas. Granit Dry System Dinding Lift. m2 15.00 0.05 -
11 Pek. Waterproofing Coating ( KM / WC ). m2 28.54 0.01 -
5 Pek. Lantai Homogenous Tile uk. 60 x 60 cm Kamar Mandi m2 - 16.01 0.05 - -
6 Pek. Dinding Homogenous Tile uk. 60 x 60 cm Kamar Mandi m2 - 90.71 0.27 - -
7 Pek. Border Homogenous Tile uk. 10 x 60 cm m1 - 161.98 0.21 - -
Sub Total - IV. 6. Lantai 6 (enam). : 0.24 0.53 - -
IV. 7. Lantai 7 (tujuh).
1 Pek. Lantai Homogenous Tile uk. 60 x 60 cm. m2 9.00 -
2 Pek. Lantai Keramik uk. 60 x 60 cm. m2 273.15 -
3 Pek. Lantai Keramik uk. 40 x 40 cm. m2 22.95 -
4 Pek. Lantai Keramik uk. 20 x 20 cm. m2 16.09 0.02 -
5 Pek. Dinding Keramik uk. 20 x 25 cm. m2 111.47 0.15 -
6 Pek. Border Keramik uk. 10 x 20 cm. m1 309.81 0.06 -
7 Pek. Plint Keramik uk. 10 x 60 cm. m1 315.88 -
8 Pek. Plint Keramik uk. 10 x 40 cm. m1 69.46 -
9 Pek. Plint Kayu Finish Melamik. m¹ 79.20 -
10 Pek. Pas. Granit Dry System Dinding Lift. m2 15.00 0.05 -
11 Pek. Waterproofing Coating ( KM / WC ). m2 28.54 0.01 -

43/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

Sub Total - IV. 7. Lantai 7 (tujuh). : 0.29 - - -


IV. 8. Lantai 8 (delapan).
1 Pek. Lantai Homogenous Tile uk. 60 x 60 cm. m2 9.00 -
2 Pek. Lantai Keramik uk. 60 x 60 cm. m2 273.15 -
3 Pek. Lantai Keramik uk. 40 x 40 cm. m2 22.95 -
4 Pek. Lantai Keramik uk. 20 x 20 cm. m2 16.09 0.02 -
5 Pek. Dinding Keramik uk. 20 x 25 cm. m2 111.47 0.15 -
6 Pek. Border Keramik uk. 10 x 20 cm. m1 39.81 0.01 -
7 Pek. Plint Keramik uk. 10 x 60 cm. m1 117.00 -
8 Pek. Plint Keramik uk. 10 x 40 cm. m1 69.46 -
9 Pek. Plint Kayu Finish Melamik. m¹ 43.20 -
10 Pek. Pas. Granit Dry System Dinding Lift. m2 15.00 0.05 -
11 Pek. Waterproofing Coating ( KM / WC ). m2 28.54 0.01 -
5 Pek. Lantai Homogenous Tile uk. 60 x 60 cm Kamar Mandi m2 - - -
6 Pek. Dinding Homogenous Tile uk. 60 x 60 cm Kamar Mandi m2 - - -
7 Pek. Border Homogenous Tile uk. 10 x 60 cm m1 - -
Sub Total - IV. 8. Lantai 8 (delapan). : 0.24 - - -
IV. 9. Lantai 9 (sembilan).
1 Pek. Lantai Keramik uk. 40 x 40 cm. m2 18.89 0.02 -
2 Pek. Waterproofing Dak / Atap Beton + Screed. m2 382.77 0.18 -
Sub Total - IV. 9. Lantai 9 (sembilan). : 0.20 - - -
TOTAL. IV ( PEK. LANTAI ) : 5.23 8.31 - -

V. PEKERJAAN PLAFOND
V.1. Lantai 1 (satu).
1 Pek. Plafond Gypsum board tebal 9 mm Rangka Metal Furing m2 272.61 0.12 272.61 0.12 - -
2 Pek. Plafond Calciboard tebal 6 mm m2 21.24 0.01 21.24 0.01 - - -
3 Pek. Drop Ceiling Plafond Gypsum. m2 9.80 0.01 9.80 0.01 - - -
4 Pek. Listprofil m¹ 265.74 0.03 265.74 0.03 - -
5 Pas. Plafond Aluminium Linier m2 24.16 0.03 24.16 0.03 - -
6 Pas. Curtain Box Alumunium Profil. m1 32.00 0.03 32.00 0.03 - -
8 Pek. Perforated Metal m2 13.97 0.03 13.97 0.03 - -
Sub Total - V.1. Lantai 1 (satu). : 0.26 0.26 - -

V. 2. Lantai 2 (dua).
1 Pek. Plafond Gypsum board tebal 9 mm Rangka Metal Furing m2 269.02 0.12 269.02 0.12 - -
2 Pek. Plafond Calciboard tebal 6 mm m2 20.20 0.01 20.20 0.01 - -
3 Pek. Drop Ceiling Plafond Gypsum m2 9.80 0.01 9.80 0.01 - -
4 Pek. Listprofil m¹ 201.07 0.02 201.07 0.02 - -
5 Pas. Plafond Aluminium Linier m2 17.50 0.03 17.50 0.03 - -
6 Pas. Curtain Box Alumunium Profil. m1 32.00 0.03 32.00 0.03 - -
7 Pek. Perforated Metal m2 13.97 0.03 13.97 0.03 - -
Sub Total - V. 2. Lantai 2 (dua). : 0.24 0.24 - -

V. 3. Lantai 3 (tiga).
1 Pek. Plafond Gypsum board tebal 9 mm Rangka Metal Furing m2 270.82 0.12 270.82 0.12 - - -
2 Pek. Plafond Calciboard tebal 6 mm m2 20.48 0.01 20.48 0.01 - - -
3 Pek. Drop Ceiling Plafond Gypsum m2 9.80 0.01 9.80 0.01 - -
4 Pek. Listprofil m¹ 119.01 0.01 119.01 0.01 - -
5 Pas. Plafond Aluminium Linier m2 17.50 0.03 17.50 0.03 - -
6 Pas. Curtain Box Alumunium Profil. m1 32.00 0.03 32.00 0.03 - -
7 Pek. Perforated Metal m2 13.97 0.03 13.97 0.03 - -
Sub Total - V. 3. Lantai 3 (tiga). : 0.23 0.23 - -

V. 4. Lantai 4 (empat).
1 Pek. Plafond Gypsum board tebal 9 mm Rangka Metal Furing m2 269.68 0.12 269.68 0.12 - - -
2 Pek. Plafond Calciboard tebal 6 mm m2 24.30 0.01 24.30 0.01 - - -
3 Pek. Drop Ceiling Plafond Gypsum m2 9.80 0.01 9.80 0.01 - -

44/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

4 Pek. Listprofil m¹ 240.11 0.03 240.11 0.03 - -


5 Pas. Plafond Aluminium Linier m2 17.50 0.03 17.50 0.03 - -
6 Pas. Curtain Box Alumunium Profil. m1 32.00 0.03 32.00 0.03 - -
7 Pek. Perforated Metal m2 13.97 0.03 13.97 0.03 - -
Sub Total - V. 4. Lantai 4 (empat). : 0.25 0.25 - -

V. 5. Lantai 5 (lima).
1 Pek. Plafond Gypsum board tebal 9 mm Rangka Metal Furing m2 270.77 0.12 270.77 0.12 - - -
2 Pek. Plafond Calciboard tebal 6 mm m2 25.58 0.01 25.58 0.01 - -
3 Pek. Drop Ceiling Plafond Gypsum m2 9.80 0.01 9.80 0.01 - -
4 Pek. Listprofil m¹ 213.12 0.03 213.12 0.03 - -
5 Pas. Plafond Aluminium Linier m2 17.50 0.03 17.50 0.03 - -
6 Pas. Curtain Box Alumunium Profil. m1 32.00 0.03 32.00 0.03 - -
7 Pek. Perforated Metal m2 13.97 0.03 13.97 0.03 - -
Sub Total - V. 5. Lantai 5 (lima). : 0.25 0.25 - -

V. 6. Lantai 6 (enam).
1 Pek. Plafond Gypsum board tebal 9 mm Rangka Metal Furing m2 272.05 0.12 272.05 0.12 - -
2 Pek. Plafond Calciboard tebal 6 mm m2 24.66 0.01 24.66 0.01 - -
3 Pek. Drop Ceiling Plafond Gypsum m2 9.80 0.01 9.80 0.01 - -
4 Pek. Listprofil m¹ 202.16 0.02 202.16 0.02 - -
5 Pas. Plafond Aluminium Linier m2 17.50 0.03 17.50 0.03 - -
6 Pas. Curtain Box Alumunium Profil. m1 32.00 0.03 32.00 0.03 - -
7 Pek. Perforated Metal m2 13.97 0.03 13.97 0.03 - -
Sub Total - V. 6. Lantai 6 (enam). : 0.24 0.24 - -

V. 7. Lantai 7 (tujuh).
1 Pek. Plafond Gypsum board tebal 9 mm Rangka Metal Furing m2 272.05 0.12 272.05 0.12 - -
2 Pek. Plafond Calciboard tebal 6 mm m2 25.58 0.01 25.58 0.01 - -
3 Pek. Drop Ceiling Plafond Gypsum m2 9.80 0.01 9.80 0.01 - -
4 Pek. Listprofil m¹ 200.46 0.02 200.46 0.02 - -
5 Pas. Plafond Aluminium Linier m2 17.50 0.03 17.50 0.03 - -
6 Pas. Curtain Box Alumunium Profil. m1 32.00 0.03 32.00 0.03 - -
7 Pek. Perforated Metal m2 13.97 0.03 13.97 0.03 - -
Sub Total - V. 7. Lantai 7 (tujuh). : 0.24 0.24 - -

V. 8. Lantai 8 (delapan).
1 Pek. Plafond Gypsum board tebal 9 mm Rangka Metal Furing m2 272.25 0.12 272.25 0.12 - -
2 Pek. Plafond Calciboard tebal 6 mm m2 24.66 0.01 24.66 0.01 - -
3 Pek. Drop Ceiling Plafond Gypsum m2 9.80 0.01 9.80 0.01 - -
4 Pek. Listprofil m¹ 214.75 0.03 214.75 0.03 - -
5 Pas. Plafond Aluminium Linier m2 17.50 0.03 17.50 0.03 - -
6 Pas. Curtain Box Alumunium Profil. m1 32.00 0.03 32.00 0.03 - -
7 Pek. Perforated Metal m2 13.97 0.03 13.97 0.03 - -
Sub Total - V. 8. Lantai 8 (delapan). : 0.25 0.25 - -

V. 9. Lantai 9 (sembilan).
1 Pek. Beton Ekspose m2 51.84 0.02 51.84 0.02 - -
Sub Total - V. 9. Lantai 9 (sembilan). : 0.02 0.02 - -
TOTAL. V ( PEK. PLAFOND ) : 1.98 1.98 - -

VI. PEKERJAAN SANITAIR


VI. 1. Lantai 1 (satu).
1 Pek. Kloset Duduk. bh 5.00 0.08 -
2 Pek. Urinoir. bh 2.00 0.02 -
3 Pek. Kran Dinding. bh 5.00 0.00 -
4 Pek. Floor Drain. bh 6.00 0.00 -
5 Pek. Wastafel. bh 3.00 0.02 -

45/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

6 Pek. Pas. Bak Cuci Piring Stainless Steel. bh 1.00 0.00 -


7 Pek. Kran Kitchen Sink. bh 1.00 0.00 -
8 Pek. Penyekat Urinoir. bh 1.00 0.00 -
9 Pek. Jet Shower bh 5.00 0.01 -
10 Pek. Tempat Sabun. bh 5.00 0.00 -
11 Pek. Pas. Cermin Uk. 600 mm x 800 mm (Dibevel), sejumlah 3 unit m2 1.44 0.00 -
Sub Total - VI. 1. Lantai 1 (satu). : 0.14 - - -

VI. 2. Lantai 2 (dua).


1 Pek. Kloset Duduk. bh 4.00 0.06 -
2 Pek. Kloset Duduk Difable Toilet. bh 1.00 0.02 -
3 Pek. Urinoir. bh 2.00 0.02 -
4 Pek. Kran Dinding. bh 5.00 0.00 -
5 Pek. Floor Drain. bh 6.00 0.00 -
6 Pek. Wastafel. bh 2.00 0.01 -
7 Pek. Penyekat Urinoir. bh 1.00 0.00 -
8 Pek. Jet Shower bh 5.00 0.01 -
9 Pek. Tempat Sabun. bh 5.00 0.00 -
10 Pek. Pas. Cermin Uk. 600 mm x 800 mm (Dibevel), sejumlah 2 unit m2 0.96 0.00 -
11 Pek. Hand Rail Stainless Toilet Difable bh 2.00 0.01 -
Sub Total - VI. 2. Lantai 2 (dua). : 0.14 - - -

VI. 3. Lantai 3 (tiga).


1 Pek. Kloset Duduk. bh 4.00 0.06 -
2 Pek. Urinoir. bh 2.00 0.02 -
3 Pek. Kran Dinding. bh 5.00 0.00 -
4 Pek. Floor Drain. bh 7.00 0.00 -
5 Pek. Wastafel. bh 3.00 0.02 -
6 Pek. Penyekat Urinoir. bh 1.00 0.00 -
7 Pek. Jet Shower bh 4.00 0.01 -
8 Pek. Pas. Bak Cuci Piring Stainless Steel. bh 1.00 0.00 -
9 Pek. Kran Kitchen Sink. bh 1.00 0.00 -
10 Pek. Tempat Sabun. bh 4.00 0.00 -
11 Pek. Pas. Cermin Uk. 600 mm x 800 mm (Dibevel), sejumlah 3 unit m2 1.44 0.00 -
Sub Total - VI. 3. Lantai 3 (tiga). : 0.12 - - - -

VI. 4. Lantai 4 (empat).


1 Pek. Kloset Duduk. bh 4.00 0.06 -
2 Pek. Urinoir. bh 2.00 0.02 -
3 Pek. Kran Dinding. bh 4.00 0.00 -
4 Pek. Pasang Kran Wudhu. bh 3.00 0.00 -
5 Pek. Floor Drain. bh 6.00 0.00 -
6 Pek. Wastafel. bh 2.00 0.01 -
7 Pek. Penyekat Urinoir. bh 1.00 0.00 -
8 Pek. Jet Shower bh 4.00 0.01 -
9 Pek. Pas. Bak Cuci Piring Stainless Steel. bh 1.00 0.00 -
10 Pek. Kran Kitchen Sink. bh 1.00 0.00 -
11 Pek. Tempat Sabun. bh 4.00 0.00 -
12 Pek. Pas. Cermin Uk. 600 mm x 800 mm (Dibevel), sejumlah 2 unit m2 0.96 0.00 -
Sub Total - VI. 4. Lantai 4 (empat). : 0.12 - - -

VI. 5. Lantai 5 (lima).


1 Pek. Kloset Duduk. bh 4.00 0.06 -
2 Pek. Urinoir. bh 2.00 0.02 -
3 Pek. Kran Dinding. bh 4.00 0.00 -
4 Pek. Pasang Kran Wudhu. bh - - -
5 Pek. Floor Drain. bh 5.00 0.00 -
6 Pek. Wastafel. bh 2.00 0.01 -
7 Pek. Penyekat Urinoir. bh 1.00 0.00 -
8 Pek. Jet Shower bh 4.00 0.01 -

46/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

9 Pek. Pas. Bak Cuci Piring Stainless Steel. bh 1.00 0.00 -


10 Pek. Kran Kitchen Sink. bh 1.00 0.00 -
11 Pek. Tempat Sabun. bh 4.00 0.00 -
12 Pek. Pas. Cermin Uk. 600 mm x 800 mm (Dibevel), sejumlah 2 unit m2 0.96 0.00 -
Sub Total - VI. 5. Lantai 5 (lima). : 0.12 - - -

VI. 6. Lantai 6 (enam).


1 Pek. Kloset Duduk. bh 4.00 0.06 -
2 Pek. Urinoir. bh 2.00 0.02 -
3 Pek. Kran Dinding. bh 4.00 0.00 -
4 Pek. Pasang Kran Wudhu. bh 3.00 0.00 -
5 Pek. Floor Drain. bh 6.00 0.00 -
6 Pek. Wastafel. bh 2.00 0.01 -
7 Pek. Penyekat Urinoir. bh 1.00 0.00 -
8 Pek. Jet Shower bh 4.00 0.01 -
9 Pek. Pas. Bak Cuci Piring Stainless Steel. bh 1.00 0.00 -
10 Pek. Kran Kitchen Sink. bh 1.00 0.00 -
11 Pek. Tempat Sabun. bh 4.00 0.00 -
12 Pek. Pas. Cermin Uk. 600 mm x 800 mm (Dibevel), sejumlah 2 unit m2 0.96 0.00 -
Sub Total - VI. 6. Lantai 6 (enam). : 0.12 - - -

VI. 7. Lantai 7 (tujuh).


1 Pek. Kloset Duduk. bh 4.00 0.06 -
2 Pek. Urinoir. bh 2.00 0.02 -
3 Pek. Kran Dinding. bh 4.00 0.00 -
4 Pek. Pasang Kran Wudhu. bh - - -
5 Pek. Floor Drain. bh 5.00 0.00 -
6 Pek. Wastafel. bh 2.00 0.01 -
7 Pek. Penyekat Urinoir. bh 1.00 0.00 -
8 Pek. Jet Shower bh 4.00 0.01 -
9 Pek. Pas. Bak Cuci Piring Stainless Steel. bh 1.00 0.00 -
10 Pek. Kran Kitchen Sink. bh 1.00 0.00 -
11 Pek. Tempat Sabun. bh 4.00 0.00 -
12 Pek. Pas. Cermin Uk. 600 mm x 800 mm (Dibevel), sejumlah 2 unit m2 0.96 0.00 -
Sub Total - VI. 7. Lantai 7 (tujuh). : 0.12 - - -

VI. 8. Lantai 8 (delapan).


1 Pek. Kloset Duduk. bh 4.00 0.06 -
2 Pek. Urinoir. bh 2.00 0.02 -
3 Pek. Kran Dinding. bh 4.00 0.00 -
4 Pek. Pasang Kran Wudhu. bh 3.00 0.00 -
5 Pek. Floor Drain. bh 6.00 0.00 -
6 Pek. Wastafel. bh 2.00 0.01 -
7 Pek. Penyekat Urinoir. bh 1.00 0.00 -
8 Pek. Jet Shower bh 4.00 0.01 -
9 Pek. Pas. Bak Cuci Piring Stainless Steel. bh 1.00 0.00 -
10 Pek. Kran Kitchen Sink. bh 1.00 0.00 -
11 Pek. Tempat Sabun. bh 4.00 0.00 -
12 Pek. Pas. Cermin Uk. 600 mm x 800 mm (Dibevel), sejumlah 2 unit m2 0.96 0.00 -
Sub Total - VI. 8. Lantai 8 (delapan). : 0.12 - - -
TOTAL. VI ( PEK. SANITAIR ) : 1.00 - - -

VII. PEKERJAAN PENUTUP ATAP


1 Kanopi Spandek Di Area Entrance. m2 33.50 0.06 33.50 0.06 - -
2 Flashing Atap. m1 7.60 0.00 7.60 0.00 - -
3 BJLS 40 m2 33.50 0.01 33.50 0.01 - -
4 Pek. Pasang GRC + Rangka Pembungkus Pipa Talang. m2 16.00 0.02 16.00 0.02 - -
TOTAL. VII ( PEK. KAP/KUDA-KUDA + ATAP ) : 0.09 0.09 - -

47/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

VIII. PEKERJAAN FINISHING


VIII. 1. Lantai 1 (satu).
1 Pek.Pengecatan Dinding Tembok ( Interior ). m2 790.65 0.14 790.65 0.14 - -
2 Pek.Pengecatan Dinding Tembok (Exterior) Weathershield. m2 252.34 0.07 252.34 0.07 - -
3 Pek. Pengecatan Plafond m2 333.51 0.04 333.51 0.04 - -
Sub Total - VIII. 1. Lantai 1 (satu). : 0.24 0.24 - -

VIII. 2. Lantai 2 (dua).


1 Pek.Pengecatan Dinding Tembok ( Interior ). m2 1,042.98 0.18 1,042.98 0.18 - -
2 Pek.Pengecatan Dinding Tembok (Exterior) Weathershield. m2 290.00 0.08 290.00 0.08 - -
3 Pek. Pengecatan Plafond. m2 282.92 0.03 282.92 0.03 - -
Sub Total - VIII. 2. Lantai 2 (dua). : 0.29 0.29 - -

VIII. 3. Lantai 3 (tiga).


1 Pek.Pengecatan Dinding Tembok ( Interior ). m2 623.34 0.11 623.34 0.11 - -
2 Pek.Pengecatan Dinding Tembok (Exterior) Weathershield. m2 290.00 0.08 290.00 0.08 - -
3 Pek. Pengecatan Plafond. m2 332.92 0.04 332.92 0.04 - -
Sub Total - VIII. 3. Lantai 3 (tiga). : 0.22 0.22 - -

VIII. 4. Lantai 4 (empat).


1 Pek.Pengecatan Dinding Tembok ( Interior ). m2 1,595.17 0.27 1,595.17 0.27 - -
2 Pek.Pengecatan Dinding Tembok (Exterior) Weathershield. m2 290.00 0.08 290.00 0.08 - -
3 Pek. Pengecatan Plafond. m2 328.28 0.04 328.28 0.04 - -
Sub Total - VIII. 4. Lantai 4 (empat). : 0.39 0.39 - -

VIII. 5. Lantai 5 (lima).


1 Pek.Pengecatan Dinding Tembok ( Interior ). m2 839.44 0.14 839.44 0.14 - -
2 Pek.Pengecatan Dinding Tembok (Exterior) Weathershield. m2 290.00 0.08 290.00 0.08 - -
3 Pek. Pengecatan Plafond. m2 328.28 0.04 328.28 0.04 - -
Sub Total - VIII. 5. Lantai 5 (lima). : 0.26 0.26 - -

VIII. 6. Lantai 6 (enam).


1 Pek.Pengecatan Dinding Tembok ( Interior ). m2 841.72 0.14 841.72 0.14 - -
2 Pek.Pengecatan Dinding Tembok (Exterior) Weathershield. m2 290.00 0.08 290.00 0.08 - -
3 Pek. Pengecatan Plafond. m2 328.28 0.04 328.28 0.04 - -
Sub Total - VIII. 6. Lantai 6 (enam). : 0.26 0.26 - -

VIII. 7. Lantai 7 (tujuh).


1 Pek.Pengecatan Dinding Tembok ( Interior ). m2 947.37 0.16 947.37 0.16 - -
2 Pek.Pengecatan Dinding Tembok (Exterior) Weathershield. m2 290.00 0.08 290.00 0.08 - -
3 Pek. Pengecatan Plafond. m2 328.28 0.04 328.28 0.04 - -
Sub Total - VIII. 7. Lantai 7 (tujuh). : 0.27 0.27 - -

VIII. 8. Lantai 8 (delapan).


1 Pek.Pengecatan Dinding Tembok ( Interior ). m2 975.27 0.17 975.27 0.17 - -
2 Pek.Pengecatan Dinding Tembok (Exterior) Weathershield. m2 290.00 0.08 290.00 0.08 - -
3 Pek. Pengecatan Plafond. m2 328.28 0.04 328.28 0.04 - -
Sub Total - VIII. 8. Lantai 8 (delapan). : 0.28 0.28 - -

VIII. 9. Lantai 9 (sembilan).


1 Pek.Pengecatan Dinding Tembok ( Interior ) m2 22.85 0.00 22.85 0.00 - -
2 Pek.Pengecatan Dinding Tembok (Exterior) Weathershield m2 72.50 0.02 72.50 0.02 - -
3 Pek. Pengecatan Plafond m2 51.84 0.01 51.84 0.01 - -
Sub Total - VIII. 9. Lantai 9 (sembilan). : 0.03 0.03 - -
TOTAL. VIII ( PEK. FINISHING ) : 2.22 2.22 - -

IX. PEKERJAAN LAIN-LAIN


A. TANGGA

48/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

1 Pek. Railing Tangga dan Ramp Stainless Stell Entrance. m1 35.24 0.08 -
2 Pek. Tangga Darurat Lantai 1. - -
- Pas. Step Nosing Keramik m¹ 35.75 0.01 -
- Pas. Expose Beton Bawah Tangga m2 45.02 0.02 -
- Pek. Railling Tangga BSP. m¹ 28.00 0.05 -
3 Pek. Tangga Darurat Lantai 2. - -
- Pas. Step Nosing Keramik m¹ 35.75 0.01 -
- Pas. Expose Beton Bawah Tangga m2 45.02 0.02 -
- Pek. Railling Tangga BSP. m¹ 64.00 0.11 -
4 Pek. Tangga Darurat Lantai 3. - -
- Pas. Step Nosing HT m¹ 35.75 0.01 -
- Pas. Expose Beton Bawah Tangga m2 45.02 0.02 -
- Pek. Railling Tangga BSP. m¹ 64.00 0.11 -
5 Pek. Tangga Darurat Lantai 4. - -
- Pas. Step Nosing Keramik m¹ 35.75 0.01 -
- Pas. Expose Beton Bawah Tangga m2 45.02 0.02 -
- Pek. Railling Tangga BSP. m¹ 64.00 -
6 Pek. Tangga Darurat Lantai 5. - -
- Pas. Step Nosing Keramik m¹ 35.75 0.01 -
- Pas. Expose Beton Bawah Tangga m2 45.02 0.02 -
- Pek. Railling Tangga BSP. m¹ 64.00 -
7 Pek. Tangga Darurat Lantai 6. - -
- Pas. Step Nosing Keramik m¹ 35.75 -
- Pas. Expose Beton Bawah Tangga m2 45.02 -
- Pek. Railling Tangga BSP. m¹ 64.00 -
8 Pek. Tangga Darurat Lantai 7. - -
- Pas. Step Nosing Keramik m¹ 35.75 -
- Pas. Expose Beton Bawah Tangga m2 45.02 -
- Pek. Railling Tangga BSP. m¹ 64.00 -
9 Pek. Tangga Darurat Lantai 8. - -
- Pas. Step Nosing Keramik m¹ 35.75 -
- Pas. Expose Beton Bawah Tangga m2 64.00 -
- Pek. Railling Tangga BSP. m¹ 64.00 -
10 Pek. Signage Hairline Stainless Steel "FISIKA" ls 1.00 -
tinggi huruf 27.7 cm, tebal = 0.8 mm - -
- -
B. ALMARI - -
1 Pek. Lemari Built in di Asrama Lantai 1 s/d 8. unit 56.00 -
- -
- -
C. CROWN - -
As Y-1( X-1 s/d X3 ) - -
Pek. Plesteran sirip beton m2 77.77 0.03 -
Pek. Plesteran bawah plat beton m2 21.72 0.01 -
Pek. Acian beton m2 99.49 0.02 -
Pek. Waterproofing Dak / Atap Beton + Screed. m2 22.21 0.01 -
Pek. Cat sirip beton (Cat eksterior) m2 77.77 0.02 -
Pek. Cat bawah plat beton (Cat eksterior) m2 21.72 0.00 -
As X-1( Y-2 s/d Y4 ) - -
Pek. Plesteran sirip beton m2 77.77 0.03 -
Pek. Plesteran bawah plat beton m2 22.50 0.01 -
Pek. Acian beton m2 100.27 0.02 -
Pek. Waterproofing Dak / Atap Beton + Screed. m2 23.10 0.01 -
Pek. Cat sirip beton (Cat eksterior) m2 77.77 0.02 -
Pek. Cat bawah plat beton (Cat eksterior) m2 22.50 0.00 -
As X-4( Y-2 s/d Y4 ) - -
Pek. Plesteran sirip beton m2 77.77 0.03 -
Pek. Plesteran bawah plat beton m2 22.50 0.01 -
Pek. Acian beton m2 100.27 0.02 -
Pek. Waterproofing Dak / Atap Beton + Screed. m2 23.10 0.01 -

49/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

Pek. Cat sirip beton (Cat eksterior) m2 77.77 0.02 -


Pek. Cat bawah plat beton (Cat eksterior) m2 22.50 0.00 -
TOTAL. IX ( PEK. LAIN-LAIN ) : 0.70 - - -

50/107
PEMILIK PROYEK Konsultan Pengawas, LAPORAN PROGRESS KONTRAKTOR PELAKSANA

UNIVERSITAS NEGERI MEDAN PT. Wahanacipta Bangunwisma PEKERJAAN KONSTRUKSI PT. GUNAKARYA NUSANTARA
PEMBANGUNAN GEDUNG TOWER FMIPA JURUSAN FISIKA
LOKASI JL. WILLEM ISKANDAR PASAR V, MEDAN
No. Kontrak :1465/UN33-PPK/PNBP/SP/2018
MINGGU KE : XXIX (KEDUA PULUH SEMBILAN)
PERIODE : 12 NOVEMBER S/D 18 NOVEMBER 2018
LINGKUP PEKERJAAN : ARSITEKTUR R. POMPA, GROUND TANK, GENSET DAN PANEL
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

B. R. POMPA, GROUND TANK, GENSET DAN PANEL

I. PEKERJAAN PASANGAN DAN PLESTERAN


1 Pek. Pasangan Dinding Bata Ringan m2 253.59 0.16 253.59 0.16 200.00 0.12 53.59 0.03 26.80 26.80
2 Pek. Plesteran Dinding Bata Ringan m2 507.18 0.17 507.18 0.17 300.00 0.10 187.74 0.06 37.55 37.55 37.55 37.55 37.55
3 Pek. Acian Dinding Bata Ringan. m2 507.18 0.10 507.18 0.10 300.00 0.06 187.74 0.04 46.94 46.94 46.94 46.94
4 Pek. Acian Beton. (kolom, balok dan lisplank) m2 135.53 0.03 135.53 0.03 100.00 0.02 15.20 0.00 15.20
TOTAL .I. ( PEKERJAAN PASANGAN DAN PLESTERAN) : 0.45 0.45 0.30 0.13

II. PEKERJAAN BETON


1 Pek. Openingan kusen m' 125.67 0.04 125.67 0.04 - 100.54 0.03 20.11 20.11 20.11 20.11 20.11
TOTAL .II. ( PEKERJAAN BETON) : 0.04 0.04 - 0.03

III. PEKERJAAN KUSEN, PINTU & JENDELA


(Lengkap dengan Kunci, Engsel + Kaca & Accessories) terpasang
R. POMPA
1 Pek. Kusen Pintu Besi Type PB. 1. (Power House, Rumah Pompa & GWT) unit 1.00 0.03 1.00 0.03 0.50 0.02 0.50 0.02 0.50
2 Pek. Kusen Bowven Besi Type VB. 1. (Power House, Rumah Pompa & GWT) unit 2.00 0.01 2.00 0.01 0.50 0.00 1.50 0.01 1.50
3 Pek. Kusen Bowven Besi Type VB. 1A. (Power House, Rumah Pompa & GWT) unit 2.00 0.01 2.00 0.01 1.00 0.01 1.00 0.01 1.00
- -
R. GENSET - -
1 Pek. Kusen Pintu Besi Type PB. 1. (Power House, Rumah Pompa & GWT) unit 2.00 0.07 2.00 0.07 1.00 0.03 1.00 0.03 1.00
2 Pek. Kusen Bowven Besi Type VB. 1. (Power House, Rumah Pompa & GWT) unit 4.00 0.02 4.00 0.02 3.00 0.02 1.00 0.01 1.00
3 Pek. Kusen Bowven Besi Type VB. 4. (Power House, Rumah Pompa & GWT) unit 2.00 0.04 2.00 0.04 1.00 0.02 1.00 0.02 1.00
- -
R. PANEL TR - -
1 Pek. Kusen Pintu Besi Type PB. 2. (Power House, Rumah Pompa & GWT) unit 1.00 0.03 1.00 0.03 0.50 0.01 0.50 0.01 0.50
2 Pek. Kusen Bowven Besi Type VB. 1. (Power House, Rumah Pompa & GWT) unit 2.00 0.01 2.00 0.01 1.00 0.01 1.00 0.01 1.00
3 Pek. Kusen Bowven Besi Type VB. 3. (Power House, Rumah Pompa & GWT) unit 1.00 0.01 1.00 0.01 0.50 0.00 0.50 0.00 0.50
- -
R. TRAFO & KUBIKAL TM - -
1 Pek. Kusen Pintu Besi Type PB. 2. (Power House, Rumah Pompa & GWT) unit 1.00 0.03 1.00 0.03 0.50 0.01 0.50 0.01 0.50
2 Pek. Kusen Bowven Besi Type VB. 2. (Power House, Rumah Pompa & GWT) unit 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
3 Pek. Kusen Bowven Besi Type VB. 3. (Power House, Rumah Pompa & GWT) unit 2.00 0.01 2.00 0.01 1.00 0.01 1.00 0.01 1.00
TOTAL .III. ( PEKERJAAN KUSEN, PINTU & JENDELA) : 0.28 0.28 0.14 0.13

IV. PEKERJAAN PENUTUP LANTAI


R. POMPA
1 Pek. floor harderner m2 46.23 0.03 46.23 0.03 - - -
- -
R. GENSET - -
1 Pek. floor harderner m2 77.95 0.04 77.95 0.04 - - -
- -
R. PANEL TR - -
1 Pek. floor harderner m2 30.43 0.02 30.43 0.02 - - -
- - -
R. TRAFO & KUBIKAL TM - -
1 Pek. floor harderner m2 22.58 0.01 22.58 0.01 - - -
- -
KELILING BANGUNAN - -

51/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

1 Pek. Rabat beton keliling bangunan m2 82.70 0.04 82.70 0.04 50.00 0.02 20.30 0.01 20.30
- -
DAK BETON - -
1 Pek. Waterproofing Dak / Atap Beton + Screed. m2 284.80 0.14 284.80 0.14 284.80 0.14 - -
TOTAL .IV. ( PEKERJAAN PENUTUP LANTAI) : 0.27 0.27 0.16 0.01

V. PEKERJAAN PLAFOND
R. POMPA
1 Pek. Perapihan Beton ( bawah plat beton ) m2 45.89 0.01 45.89 0.01 - - -
- -
R. GENSET - -
1 Pek. Perapihan Beton ( bawah plat beton ) m2 77.26 0.01 77.26 0.01 - - -
- -
R. PANEL TR - -
1 Pek. Perapihan Beton ( bawah plat beton ) m2 30.19 0.01 30.19 0.01 - - -
- -
R. TRAFO & KUBIKAL TM - -
1 Pek. Perapihan Beton ( bawah plat beton ) m2 22.34 0.00 22.34 0.00 - - -
- -
KELILING BANGUNAN - -
1 Pek. Perapihan Beton ( bawah plat beton ) m2 83.49 0.02 83.49 0.02 - - -
TOTAL .V. ( PEKERJAAN PLAFOND) : 0.05 0.05 - -

VI PEKERJAAN PENGECATAN
R. POMPA
1 Pek. Cat dinding dalam (Cat interior) m2 123.65 0.02 123.65 0.02 - - -
2 Pek. bawah plat beton m2 45.89 0.01 45.89 0.01 - - -
- -
R. GENSET - -
1 Pek. Cat dinding dalam (Cat interior) m2 160.38 0.02 160.38 0.02 - - -
2 Pek. bawah plat beton m2 77.26 0.01 77.26 0.01 - - -
- -
R. PANEL TR - -
1 Pek. Cat dinding dalam (Cat interior) m2 67.97 0.01 67.97 0.01 - - -
2 Pek. bawah plat beton m2 30.19 0.00 30.19 0.00 - - -
- -
R. TRAFO & KUBIKAL TM - -
1 Pek. Cat dinding dalam (Cat interior) m2 62.21 0.01 62.21 0.01 - - -
2 Pek. bawah plat beton m2 22.34 0.00 22.34 0.00 - - -
- -
KELILING BANGUNAN - -
1 Pek. Cat dinding luar (Cat eksterior) m2 263.55 0.04 263.55 0.04 - - -
2 Pek. bawah plat beton m2 83.49 0.01 83.49 0.01 - - -
3 Pek. Lisplank beton m2 60.73 0.01 60.73 0.01 - - -
TOTAL .VI ( PEKERJAAN PENGECATAN) : 0.14 0.14 - -

VII PEKERJAAN LAIN-LAIN


R. TRAFO & KUBIKAL TM
1 Pek. Pagar GRC m' 2.75 0.00 2.75 0.00 - - -
- - -
DAK BETON - - -
1 Pek. Roof drain bh 8.00 0.01 8.00 0.01 - - -
- - -
DINDING KARAWANG / ROSTER - - -
1 Pek. Galian Tanah m3 9.15 0.00 9.15 0.00 - - -
2 Pek. Urugan Tanah kembali (tanah bekas galian) m3 1.57 0.00 1.57 0.00 - - -
3 Pek. Urugan pasir urug , tebal = 10 cm m3 1.31 0.00 1.31 0.00 - - -
4 Pek. Pas. Pondasi Batu belah, campuran 1SP : 5PP m3 6.27 0.02 6.27 0.02 - - -
5 Pek. Pasangan Dinding Bata Ringan m2 13.94 0.01 13.94 0.01 - - -
6 Pek. Plesteran Dinding Bata Ringan m2 27.88 0.01 27.88 0.01 - - -

52/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

7 Pek. Acian Dinding Bata Ringan. m2 27.88 0.01 27.88 0.01 - - -


8 Pek. Kolom Praktis beton bertulang uk. 11 x 11 cm. m3 0.40 0.01 0.40 0.01 - - -
9 Pek. Sloof 15/20 cm m3 0.78 0.01 0.78 0.01 - - -
10 Pek. Ring Balok Praktis beton bertulang uk. 10 x 15 cm. m3 0.39 0.01 0.39 0.01 - - -
11 Pek. Pas. Dinding rooster, campuran 1SP : 4PP m2 63.18 0.04 63.18 0.04 - - -
12 Pek. Cat dinding luar (Cat eksterior) m2 27.88 0.00 27.88 0.00 - - -
TOTAL .VII ( PEKERJAAN LAIN-LAIN) : 0.15 0.15 - -

53/107
PEMILIK PROYEK Konsultan Pengawas, LAPORAN PROGRESS KONTRAKTOR PELAKSANA

UNIVERSITAS NEGERI MEDAN PT. Wahanacipta Bangunwisma PEKERJAAN KONSTRUKSI PT. GUNAKARYA NUSANTARA
PEMBANGUNAN GEDUNG TOWER FMIPA JURUSAN FISIKA
LOKASI JL. WILLEM ISKANDAR PASAR V, MEDAN
No. Kontrak :1465/UN33-PPK/PNBP/SP/2018

MINGGU KE : XXIX (KEDUA PULUH SEMBILAN)


PERIODE : 12 NOVEMBER S/D 18 NOVEMBER 2018
LINGKUP PEKERJAAN : MEKANIKAL
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

PEKERJAAN MEKANIKAL

PEKERJAAN INSTALASI AIR BERSIH


Pengadaan dan pemasangan peralatan air bersih dan instalasi pipa air bersih dalam dan luar gedung berikut fixtures,
fittings, aksesoris, hanger & support, dan perlengkapannya beserta pengetesan sistem dan instalasi.

1.A. PEKERJAAN INSTALASI AIR BERSIH - LANTAI 1


1 Pipa Poly Propelene Random (PPR), PN 10 :
~ Pipa dia. 20 mm m 62.00 0.01 62.00 0.01 20.00 0.00 11.00 0.00 11.00
~ Pipa dia. 25 mm m 6.00 0.00 6.00 0.00 4.00 0.00 2.00 0.00 2.00
~ Pipa dia. 32 mm m 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
~ Pipa dia. 40 mm m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Pipa dia. 50 mm m - - - -
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m - - - -
~ Pipa dia. 25 mm (datar & tegak ke KT) m 5.00 0.00 5.00 0.00 3.00 0.00 2.00 0.00 2.00
~ Pipa dia. 40 mm (tegak dari Lt-1 ) m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Fitting & aksesoris ls 1.00 0.01 1.00 0.01 0.60 0.00 0.30 0.00 0.30
2 Pipa Galvanized Steel Pipe (GSP), Medium Class - -
~ Pipa dia. 65 mm (LP ke RT ) m 9.00 0.01 9.00 0.01 6.00 0.01 3.00 0.00 3.00
~ Fitting & aksesoris ls 1.00 0.00 1.00 0.00 0.60 0.00 0.30 0.00 0.30
3 Valves JIS 10 K - -
~ Gate valve dia. 25 mm (ke KT) pcs 1.00 0.00 1.00 0.00 1.00 0.00 -
~ Globe valve dia. 40 mm pcs 1.00 0.00 1.00 0.00 - - -
4 Galian Tanah dan Urugan kembali jalur pipa. m 4.00 0.00 4.00 0.00 4.00 0.00 -
5 Test & commissioning pekerjaan instalasi air bersih. lot 1.00 0.01 1.00 0.01 - - -

SUB JUMLAH - 1.A. PEKERJAAN INSTALASI AIR BERSIH - LANTAI 1 : 0.05 0.05 0.02 0.01

1.B. PEKERJAAN INSTALASI AIR BERSIH - LANTAI 2


1 Pipa Poly Propelene Random (PPR), PN 10 :
~ Pipa dia. 20 mm m 59.00 0.01 59.00 0.01 25.00 0.01 4.50 0.00 4.50
~ Pipa dia. 25 mm m 6.00 0.00 6.00 0.00 4.00 0.00 2.00 0.00 2.00
~ Pipa dia. 32 mm m 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
~ Pipa dia. 40 mm m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Pipa dia. 50 mm m - - - -
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m - - - -
~ Pipa dia. 50 mm (tegak dari Lt-2) m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Fitting & aksesoris ls 1.00 0.00 1.00 0.00 0.60 0.00 0.30 0.00 0.30
2 Pipa Galvanized Steel Pipe (GSP), Medium Class - -
~ Pipa dia. 65 mm (LP ke RT ) m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Fitting & aksesoris ls 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
3 Valves JIS 10 K - -
~ Globe valve dia. 40 mm pcs 1.00 0.00 1.00 0.00 - - -
4 Test & commissioning pekerjaan instalasi air bersih. lot 1.00 0.01 1.00 0.01 - - -
- -
SUB JUMLAH - 1.B. PEKERJAAN INSTALASI AIR BERSIH - LANTAI 2 : 0.04 0.04 0.02 0.01

1.C. PEKERJAAN INSTALASI AIR BERSIH - LANTAI 3


1 Pipa Poly Propelene Random (PPR), PN 10 :
~ Pipa dia. 20 mm m 62.00 0.01 62.00 0.01 42.00 0.01 20.00 0.00 20.00

54/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

~ Pipa dia. 25 mm m 6.00 0.00 6.00 0.00 4.00 0.00 2.00 0.00 2.00
~ Pipa dia. 32 mm m 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
~ Pipa dia. 40 mm m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Pipa dia. 50 mm m - - - -
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m - - - -
~ Pipa dia. 65 mm (tegak dari Lt-2) m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Fitting & aksesoris ls 1.00 0.01 1.00 0.01 0.50 0.00 0.50 0.00 0.50
2 Pipa Galvanized Steel Pipe (GSP), Medium Class - -
~ Pipa dia. 65 mm (LP ke RT ) m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Fitting & aksesoris ls 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
3 Valves JIS 10 K - -
~ Globe valve dia. 40 mm pcs 1.00 0.00 1.00 0.00 - - -
4 Test & commissioning pekerjaan instalasi air bersih. lot 1.00 0.01 1.00 0.01 - - -

SUB JUMLAH - 1.C. PEKERJAAN INSTALASI AIR BERSIH - LANTAI 3 : 0.04 0.04 0.02 0.01

1.D. PEKERJAAN INSTALASI AIR BERSIH - LANTAI 4


1 Pipa Poly Propelene Random (PPR), PN 10 :
~ Pipa dia. 20 mm m 62.00 0.01 62.00 0.01 - - -
~ Pipa dia. 25 mm m 6.00 0.00 6.00 0.00 - - -
~ Pipa dia. 32 mm m 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
~ Pipa dia. 40 mm m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Pipa dia. 50 mm m - - - -
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m - - - -
~ Pipa dia. 65 mm (tegak dari Lt-2) m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Fitting & aksesoris ls 1.00 0.01 1.00 0.01 0.60 0.00 0.30 0.00 0.30
2 Pipa Galvanized Steel Pipe (GSP), Medium Class - -
~ Pipa dia. 65 mm (LP ke RT ) m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Fitting & aksesoris ls 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
3 Valves JIS 10 K - -
~ Globe valve dia. 40 mm pcs 1.00 0.00 1.00 0.00 - - -
4 Test & commissioning pekerjaan instalasi air bersih. lot 1.00 0.01 1.00 0.01 - - -

SUB JUMLAH - 1.D. PEKERJAAN INSTALASI AIR BERSIH - LANTAI 4 : 0.04 0.04 0.01 0.01

1.E. PEKERJAAN INSTALASI AIR BERSIH - LANTAI 5


1 Pipa Poly Propelene Random (PPR), PN 10 :
~ Pipa dia. 20 mm m 62.00 0.01 62.00 0.01 - - -
~ Pipa dia. 25 mm m 6.00 0.00 6.00 0.00 4.00 0.00 2.00 0.00 2.00
~ Pipa dia. 32 mm m 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
~ Pipa dia. 40 mm m 4.00 0.00 4.00 0.00 - - - -
~ Pipa dia. 50 mm m - - - -
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m - - - -
~ Pipa dia. 80 mm (tegak dari Lt-2) m 4.00 0.01 4.00 0.01 3.00 0.00 1.00 0.00 1.00
~ Fitting & aksesoris ls 1.00 0.01 1.00 0.01 0.60 0.00 0.30 0.00 0.30
2 Pipa Galvanized Steel Pipe (GSP), Medium Class - -
~ Pipa dia. 65 mm (LP ke RT ) m 4.00 0.00 4.00 0.00 - - -
~ Fitting & aksesoris ls 1.00 0.00 1.00 0.00 - - -
3 Valves JIS 10 K - -
~ Globe valve dia. 40 mm pcs 1.00 0.00 1.00 0.00 - - -
4 Test & commissioning pekerjaan instalasi air bersih. lot 1.00 0.01 1.00 0.01 - - -

SUB JUMLAH - 1.E. PEKERJAAN INSTALASI AIR BERSIH - LANTAI 5 : 0.04 0.04 0.01 0.00

1.F. PEKERJAAN INSTALASI AIR BERSIH - LANTAI 6


1 Pipa Poly Propelene Random (PPR), PN 10 :
~ Pipa dia. 20 mm m 62.00 0.01 62.00 0.01 - - -
~ Pipa dia. 25 mm m 6.00 0.00 6.00 0.00 - - -

55/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

~ Pipa dia. 32 mm m 2.00 0.00 2.00 0.00 - - -


~ Pipa dia. 40 mm m 4.00 0.00 4.00 0.00 - - -
~ Pipa dia. 50 mm m - - - -
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m - - - -
~ Pipa dia. 80 mm (tegak dari Lt-2) m 4.00 0.01 4.00 0.01 - - -
~ Fitting & aksesoris ls 1.00 0.01 1.00 0.01 - - -
2 Pipa Galvanized Steel Pipe (GSP), Medium Class - -
~ Pipa dia. 65 mm (LP ke RT ) m 4.00 0.00 4.00 0.00 - - -
~ Fitting & aksesoris ls 1.00 0.00 1.00 0.00 - - -
3 Valves JIS 10 K - -
~ Globe valve dia. 40 mm pcs 1.00 0.00 1.00 0.00 - - -
4 Test & commissioning pekerjaan instalasi air bersih. lot 1.00 0.01 1.00 0.01 - - -
- -
SUB JUMLAH - 1.F. PEKERJAAN INSTALASI AIR BERSIH - LANTAI 6 : 0.04 0.04 - -

1.G. PEKERJAAN INSTALASI AIR BERSIH - LANTAI 7


1 Pipa Poly Propelene Random (PPR), PN 10 :
~ Pipa dia. 20 mm m 62.00 0.01 62.00 0.01 - - -
~ Pipa dia. 25 mm m 6.00 0.00 6.00 0.00 - - -
~ Pipa dia. 32 mm m 2.00 0.00 2.00 0.00 - - -
~ Pipa dia. 40 mm m 4.00 0.00 4.00 0.00 - - -
~ Pipa dia. 50 mm m - - - -
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m - - - -
~ Pipa dia. 40 mm (tegak dari BP ke Lt-7) m 4.00 0.00 4.00 0.00 - - -
~ Pipa dia. 80 mm (tegak dari RT ke Lt-6) m 4.00 0.01 4.00 0.01 - - -
~ Fitting & aksesoris ls 1.00 0.01 1.00 0.01 - - -
2 Pipa Galvanized Steel Pipe (GSP), Medium Class - -
~ Pipa dia. 65 mm (LP ke RT ) m 4.00 0.00 4.00 0.00 - - -
~ Fitting & aksesoris ls 1.00 0.00 1.00 0.00 - - -
3 Valves JIS 10 K - -
~ Globe valve dia. 40 mm pcs 1.00 0.00 1.00 0.00 - - -
4 Test & commissioning pekerjaan instalasi air bersih. lot 1.00 0.01 1.00 0.01 - - -
- -
SUB JUMLAH - 1.G. PEKERJAAN INSTALASI AIR BERSIH - LANTAI 7 : 0.04 0.04 - -

1.H. PEKERJAAN INSTALASI AIR BERSIH - LANTAI 8


1 Pipa Poly Propelene Random (PPR), PN 10 :
~ Pipa dia. 20 mm m 62.00 0.01 62.00 0.01 - - -
~ Pipa dia. 25 mm m 6.00 0.00 6.00 0.00 - - -
~ Pipa dia. 32 mm m 2.00 0.00 2.00 0.00 - - -
~ Pipa dia. 40 mm m 4.00 0.00 4.00 0.00 - - -
~ Pipa dia. 50 mm m - - - -
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m - - - -
~ Pipa dia. 50 mm (tegak dari BP ke Lt-7&8) m 4.00 0.00 4.00 0.00 - - -
~ Pipa dia. 80 mm (tegak dari RT ke Lt-6) m 4.00 0.01 4.00 0.01 - - -
~ Fitting & aksesoris ls 1.00 0.01 1.00 0.01 - - -
2 Pipa Galvanized Steel Pipe (GSP), Medium Class - -
~ Pipa dia. 65 mm (LP ke RT ) m 4.00 0.00 4.00 0.00 - - -
~ Fitting & aksesoris ls 1.00 0.00 1.00 0.00 - - -
3 Valves JIS 10 K - -
~ Globe valve dia. 40 mm pcs 1.00 0.00 1.00 0.00 - - -
4 Test & commissioning pekerjaan instalasi air bersih. lot 1.00 0.01 1.00 0.01 - - -
- -
SUB JUMLAH - 1.H. PEKERJAAN INSTALASI AIR BERSIH - LANTAI 8 : 0.05 0.05 - -

1.D. PEKERJAAN INSTALASI AIR BERSIH - ATAP


1 Instalasi tanki air (roof tank)
a. Tanki air (roof tank) : unit 2.00 0.16 -

56/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

Tipe : Fibreglass Reinforced Panel - -


Material : Fibreglass Reinforced Panel - -
Dimensi : 2 x 2 x 1.5 m3 - -
Kapasitas : 6 m3 - -
Servis : Bangunan A - -
Kode : RT - A - 01 - -
b. Pipa uPVC AW Class, 10 kg/cm2 (untuk venting tanki air) - -
~ Pipa dia. 100 mm (venting) m 1.00 0.00 -
~ Fittings pipa uPVC AW Class, 10 kg/cm2 (untuk venting tanki air) ls 1.00 0.00 -
c. Pipa Poly Propelene Random (PPR), PN 10 : - -
~ Pipa dia. 100 mm (drain & overflow) m 4.00 0.01 -
~ Fitting & aksesoris ls 1.00 0.00 -
f. Valve JIS 10 K - -
~ Gate valve dia. 100 mm (drain) pcs 2.00 0.02 -
h. Test & commisioning Tanki Roof Tank ls 1.00 0.01 -
2 Instalasi pipa transfer & distribusi. - -
a. Pipa Poly Propelene Random (PPR), PN 10 : - -
~ Pipa dia. 50 mm (datar & tegak dari RT ke Lt-7&8) m 5.00 0.00 -
~ Pipa dia. 80 mm (datar & tegak dari RT ke Lt 1 s/d 6) m 5.00 0.01 -
~ Pipa dia. 100 mm (Header) m 4.00 0.01 -
~ Fitting & aksesoris ls 1.00 0.00 -
b. Pipa GSP Medium Class - -
~ Pipa dia. 65 mm (dari LP ke RT) m 14.00 0.02 -
~ Fitting & aksesoris ls 1.00 0.00 -
c. Valve JIS 10 K - -
~ Gate valve dia. 50 mm pcs 1.00 0.00 -
~ Gate valve dia. 65 mm pcs - - -
~ Gate valve dia. 80 mm pcs 1.00 0.01 -
~ Gate valve dia. 100 mm pcs 2.00 0.02 -
d. Test & commisioning instalasi pipa distribusi ls 1.00 0.01 -

SUB JUMLAH - 1.D. PEKERJAAN INSTALASI AIR BERSIH - ATAP : 0.27 - - -


JUMLAH - 1, PEKERJAAN INSTALASI AIR BERSIH : 0.61 0.34 0.08 0.04

Pengadaan dan pemasangan instalasi air bekas, air kotor, air hujan, dan pipa ventilasinya dalam gedung berikut fixtures,
fittings& aksesoris, hanger & support dan perlengkapannya beserta pengetesan sistem dan instalasi.

2.A. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 1
1 Instalasi air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm m 8.50 0.00 8.50 0.00 6.00 0.00 2.50 0.00 2.50
~ Pipa dia. 50 mm m 17.00 0.00 17.00 0.00 15.00 0.00 2.00 0.00 2.00
~ Pipa dia. 65 mm m - - - - -
~ Pipa dia. 80 mm m 9.00 0.00 9.00 0.00 6.00 0.00 3.00 0.00 3.00
~ Pipa dia. 100 mm m 5.00 0.00 5.00 0.00 3.00 0.00 2.00 0.00 2.00
~ Pipa dia. 100 mm (datar & tegak dari Lt-2 ke Saluran) m 11.00 0.01 11.00 0.01 8.00 0.01 3.00 0.00 3.00
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.01 1.00 0.01 0.50 0.00 0.50 0.00 0.50
b. Fixtures : - -
~ Floor clean out dia. 80 mm pcs 1.00 0.00 1.00 0.00 - - -
~ Floor clean out dia. 100 mm pcs 1.00 0.00 1.00 0.00 - - -
c. Grease trap unit : unit 1.00 0.01 1.00 0.01 - - -
~ Material : Stainless steel, 1 mm thickness - -
~ Dimension : 400 mm(L) x 300 mm(W) x 250 mm(D) - -
~ lengkap dengan Basket strainer plate perforated, f3 mm & accessories - -
2 Instalasi air kotor : - -
a. Pipa uPVC AW Class, 10 kg/cm2 : - -
~ Pipa dia. 50 mm m 5.00 0.00 5.00 0.00 4.00 0.00 1.00 0.00 1.00
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m - - - -
~ Pipa dia. 100 mm m 22.00 0.02 22.00 0.02 18.00 0.01 4.00 0.00 4.00

57/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

~ Pipa dia. 100 mm (datar & tegak dari Lt-2 ke Saluran) m 11.00 0.01 11.00 0.01 9.00 0.01 2.00 0.00 2.00
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.01 1.00 0.01 0.50 0.00 0.50 0.00 0.50
b. Fixtures : - -
~ Floor clean out dia. 100 mm pcs 2.00 0.00 2.00 0.00 - - -
3 Instalasi venting : - -
a. Pipa uPVC D Class, 5 kg/cm2 : - -
~ Pipa dia. 32 mm m - - - -
~ Pipa dia. 40 mm m - - - -
~ Pipa dia. 50 mm m 8.00 0.00 8.00 0.00 6.00 0.00 2.00 0.00 2.00
~ Pipa tegak dia. 80 mm (tegak ke Lt-2) m 5.00 0.00 5.00 0.00 4.00 0.00 1.00 0.00 1.00
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
b. Fixtures : - -
4 Test & commissioning pekerjaan instalasi air bekas, air kotor & vent lot 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00

SUB JUMLAH - 2.A. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 1 : 0.07 0.07 0.05 0.02

58/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

2.B. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI 2
1 Instalasi air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm m 8.50 0.00 8.50 0.00 6.00 0.00 2.50 0.00 2.50
~ Pipa dia. 50 mm m 17.00 0.00 17.00 0.00 15.00 0.00 2.00 0.00 2.00
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m 9.00 0.00 9.00 0.00 7.00 0.00 2.00 0.00 2.00
~ Pipa dia. 100 mm m 5.00 0.00 5.00 0.00 4.00 0.00 1.00 0.00 1.00
~ Pipa dia. 100 mm ( tegak dari Lt-3) m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
b. Fixtures : - -
~ Floor clean out dia. 80 mm pcs 1.00 0.00 1.00 0.00 - - -
~ Floor clean out dia. 100 mm pcs 1.00 0.00 1.00 0.00 - - -
2 Instalasi air kotor : - -
a. Pipa uPVC AW Class, 10 kg/cm2 : - -
~ Pipa dia. 50 mm m 5.00 0.00 5.00 0.00 3.00 0.00 2.00 0.00 2.00
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m - - - -
~ Pipa dia. 100 mm m 22.00 0.02 22.00 0.02 17.00 0.01 5.00 0.00 5.00
~ Pipa dia. 100 mm ( tegak dari Lt-3) m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
b. Fixtures : - -
~ Floor clean out dia. 100 mm pcs 2.00 0.00 2.00 0.00 - - -
3 Instalasi venting : - -
a. Pipa uPVC D Class, 5 kg/cm2 : - -
~ Pipa dia. 32 mm m - - - -
~ Pipa dia. 40 mm m - - - -
~ Pipa dia. 50 mm m 8.00 0.00 8.00 0.00 6.00 0.00 2.00 0.00 2.00
~ Pipa tegak dia. 80 mm (tegak ke Lt-2) m 5.00 0.00 5.00 0.00 3.00 0.00 2.00 0.00 2.00
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
b. Fixtures : - -
4 Test & commissioning pekerjaan instalasi air bekas, air kotor & vent lot 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00

SUB JUMLAH - 2.B. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI 2 : 0.06 0.06 0.04 0.02

2.C. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI 3
1 Instalasi air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm m 8.50 0.00 8.50 0.00 6.00 0.00 2.50 0.00 2.50
~ Pipa dia. 50 mm m 17.00 0.00 17.00 0.00 14.00 0.00 3.00 0.00 3.00
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m 9.00 0.00 9.00 0.00 6.00 0.00 3.00 0.00 3.00
~ Pipa dia. 100 mm m 5.00 0.00 5.00 0.00 3.00 0.00 2.00 0.00 2.00
~ Pipa dia. 100 mm ( tegak dari Lt-3) m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
b. Fixtures : - -
~ Floor clean out dia. 80 mm pcs 1.00 0.00 1.00 0.00 - - -
~ Floor clean out dia. 100 mm pcs 1.00 0.00 1.00 0.00 - - -
c. Grease trap unit : unit 1.00 0.01 1.00 0.01 - - -
~ Material : Stainless steel, 1 mm thickness - -
~ Dimension : 400 mm(L) x 300 mm(W) x 250 mm(D) - -
~ lengkap dengan Basket strainer plate perforated, f3 mm & accessories - -
2 Instalasi air kotor : - -
a. Pipa uPVC AW Class, 10 kg/cm2 : - -
~ Pipa dia. 50 mm m 5.00 0.00 5.00 0.00 3.00 0.00 2.00 0.00 2.00
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m - - - -
~ Pipa dia. 100 mm m 22.00 0.02 22.00 0.02 17.00 0.01 5.00 0.00 5.00
~ Pipa dia. 100 mm ( tegak dari Lt-3) m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
b. Fixtures : - -

59/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

~ Floor clean out dia. 100 mm pcs 2.00 0.00 2.00 0.00 - - -
3 Instalasi venting : - -
a. Pipa uPVC D Class, 5 kg/cm2 : - -
~ Pipa dia. 32 mm m - - - -
~ Pipa dia. 40 mm m - - - -
~ Pipa dia. 50 mm m 8.00 0.00 8.00 0.00 6.00 0.00 2.00 0.00 2.00
~ Pipa tegak dia. 80 mm (tegak ke Lt-2) m 5.00 0.00 5.00 0.00 3.00 0.00 2.00 0.00 2.00
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
b. Fixtures : - -
4 Test & commissioning pekerjaan instalasi air bekas, air kotor & vent lot 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00

SUB JUMLAH - 2.C. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI 3 : 0.06 0.06 0.03 0.02

2.D. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI 4
1 Instalasi air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm m 8.50 0.00 8.50 0.00 6.00 0.00 2.50 0.00 2.50
~ Pipa dia. 50 mm m 17.00 0.00 17.00 0.00 15.00 0.00 2.00 0.00 2.00
~ Pipa dia. 65 mm m - - - - -
~ Pipa dia. 80 mm m 9.00 0.00 9.00 0.00 6.00 0.00 3.00 0.00 3.00
~ Pipa dia. 100 mm m 5.00 0.00 5.00 0.00 3.00 0.00 2.00 0.00 2.00
~ Pipa dia. 100 mm ( tegak dari Lt-3) m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
b. Fixtures : - -
~ Floor clean out dia. 80 mm pcs 1.00 0.00 1.00 0.00 - - -
~ Floor clean out dia. 100 mm pcs 1.00 0.00 1.00 0.00 - - -
c. Grease trap unit : unit 1.00 0.01 1.00 0.01 - - -
~ Material : Stainless steel, 1 mm thickness - -
~ Dimension : 400 mm(L) x 300 mm(W) x 250 mm(D) - -
~ lengkap dengan Basket strainer plate perforated, f3 mm & accessories - -
2 Instalasi air kotor : - -
a. Pipa uPVC AW Class, 10 kg/cm2 : - -
~ Pipa dia. 50 mm m 5.00 0.00 5.00 0.00 3.00 0.00 2.00 0.00 2.00
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m - - - -
~ Pipa dia. 100 mm m 22.00 0.02 22.00 0.02 17.00 0.01 5.00 0.00 5.00
~ Pipa dia. 100 mm ( tegak dari Lt-3) m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
b. Fixtures : - -
~ Floor clean out dia. 100 mm pcs 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
3 Instalasi venting : - -
a. Pipa uPVC D Class, 5 kg/cm2 : - -
~ Pipa dia. 32 mm m - - - -
~ Pipa dia. 40 mm m - - - -
~ Pipa dia. 50 mm m 8.00 0.00 8.00 0.00 6.00 0.00 2.00 0.00 2.00
~ Pipa tegak dia. 80 mm (tegak ke Lt-2) m 5.00 0.00 5.00 0.00 3.00 0.00 2.00 0.00 2.00
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
b. Fixtures : - -
4 Test & commissioning pekerjaan instalasi air bekas, air kotor & vent lot 1.00 0.00 1.00 0.00 - - -

SUB JUMLAH - 2.D. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI 4 : 0.06 0.06 0.04 0.02

2.E. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI 5
1 Instalasi air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm m 8.50 0.00 8.50 0.00 6.00 0.00 2.50 0.00 2.50
~ Pipa dia. 50 mm m 17.00 0.00 17.00 0.00 15.00 0.00 2.00 0.00 2.00
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m 9.00 0.00 9.00 0.00 7.00 0.00 2.00 0.00 2.00
~ Pipa dia. 100 mm m 5.00 0.00 5.00 0.00 3.00 0.00 2.00 0.00 2.00
~ Pipa dia. 100 mm ( tegak dari Lt-3) m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00

60/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
b. Fixtures : - -
~ Floor clean out dia. 80 mm pcs 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
~ Floor clean out dia. 100 mm pcs 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
c. Grease trap unit : unit 1.00 0.01 1.00 0.01 - 1.00 0.01 1.00
~ Material : Stainless steel, 1 mm thickness - - -
~ Dimension : 400 mm(L) x 300 mm(W) x 250 mm(D) - -
~ lengkap dengan Basket strainer plate perforated, f3 mm & accessories - -
2 Instalasi air kotor : - -
a. Pipa uPVC AW Class, 10 kg/cm2 : - -
~ Pipa dia. 50 mm m 5.00 0.00 5.00 0.00 3.00 0.00 2.00 0.00 2.00
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m - - - -
~ Pipa dia. 100 mm m 22.00 0.02 22.00 0.02 15.00 0.01 7.00 0.00 7.00
~ Pipa dia. 100 mm ( tegak dari Lt-3) m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
b. Fixtures : - -
~ Floor clean out dia. 100 mm pcs 2.00 0.00 2.00 0.00 - - -
3 Instalasi venting : - -
a. Pipa uPVC D Class, 5 kg/cm2 : - -
~ Pipa dia. 32 mm m - - - -
~ Pipa dia. 40 mm m - - - -
~ Pipa dia. 50 mm m 8.00 0.00 8.00 0.00 6.00 0.00 2.00 0.00 2.00
~ Pipa tegak dia. 80 mm (tegak ke Lt-2) m 5.00 0.00 5.00 0.00 3.00 0.00 2.00 0.00 2.00
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
b. Fixtures : - -
4 Test & commissioning pekerjaan instalasi air bekas, air kotor & vent lot 1.00 0.00 1.00 0.00 - - -

SUB JUMLAH - 2.E. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI 5 : 0.06 0.06 0.03 0.02

2.F. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI 6
1 Instalasi air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm m 8.50 0.00 8.50 0.00 - - -
~ Pipa dia. 50 mm m 17.00 0.00 17.00 0.00 - - -
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m 9.00 0.00 9.00 0.00 - - -
~ Pipa dia. 100 mm m 5.00 0.00 5.00 0.00 - - -
~ Pipa dia. 100 mm ( tegak dari Lt-3) m 4.00 0.00 4.00 0.00 - 4.00 0.00 4.00
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
b. Fixtures : - -
~ Floor clean out dia. 80 mm pcs 1.00 0.00 1.00 0.00 - - -
~ Floor clean out dia. 100 mm pcs 1.00 0.00 1.00 0.00 - - -
c. Grease trap unit : unit 1.00 0.01 1.00 0.01 - - -
~ Material : Stainless steel, 1 mm thickness - -
~ Dimension : 400 mm(L) x 300 mm(W) x 250 mm(D) - -
~ lengkap dengan Basket strainer plate perforated, f3 mm & accessories - -
2 Instalasi air kotor : - -
a. Pipa uPVC AW Class, 10 kg/cm2 : - -
~ Pipa dia. 50 mm m 5.00 0.00 5.00 0.00 - - -
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m - - - -
~ Pipa dia. 100 mm m 22.00 0.02 22.00 0.02 - - -
~ Pipa dia. 100 mm ( tegak dari Lt-3) m 4.00 0.00 4.00 0.00 - - -
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 - - -
b. Fixtures : - -
~ Floor clean out dia. 100 mm pcs 2.00 0.00 2.00 0.00 - - -
3 Instalasi venting : - -
a. Pipa uPVC D Class, 5 kg/cm2 : - -
~ Pipa dia. 32 mm m - - - -
~ Pipa dia. 40 mm m - - - -

61/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

~ Pipa dia. 50 mm m 8.00 0.00 8.00 0.00 - - -


~ Pipa tegak dia. 80 mm (tegak ke Lt-2) m 5.00 0.00 5.00 0.00 - - -
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 - - -
b. Fixtures : - -
4 Test & commissioning pekerjaan instalasi air bekas, air kotor & vent lot 1.00 0.00 1.00 0.00 - - -

SUB JUMLAH - 2.F. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI 6 : 0.06 0.06 - 0.01

2.G. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI 7
1 Instalasi air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm m 8.50 0.00 8.50 0.00 - - -
~ Pipa dia. 50 mm m 17.00 0.00 17.00 0.00 - - -
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m 9.00 0.00 9.00 0.00 - - -
~ Pipa dia. 100 mm m 5.00 0.00 5.00 0.00 - - -
~ Pipa dia. 100 mm ( tegak dari Lt-3) m 4.00 0.00 4.00 0.00 - - -
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 - - -
b. Fixtures : - -
~ Floor clean out dia. 80 mm pcs 1.00 0.00 1.00 0.00 - - -
~ Floor clean out dia. 100 mm pcs 1.00 0.00 1.00 0.00 - - -
c. Grease trap unit : unit 1.00 0.01 1.00 0.01 - - -
~ Material : Stainless steel, 1 mm thickness - -
~ Dimension : 400 mm(L) x 300 mm(W) x 250 mm(D) - -
~ lengkap dengan Basket strainer plate perforated, f3 mm & accessories - -
2 Instalasi air kotor : - -
a. Pipa uPVC AW Class, 10 kg/cm2 : - -
~ Pipa dia. 50 mm m 5.00 0.00 5.00 0.00 - - -
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m - - - -
~ Pipa dia. 100 mm m 22.00 0.02 22.00 0.02 - - -
~ Pipa dia. 100 mm ( tegak dari Lt-3) m 4.00 0.00 4.00 0.00 - - -
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 - - -
b. Fixtures : - -
~ Floor clean out dia. 100 mm pcs 2.00 0.00 2.00 0.00 - - -
3 Instalasi venting : - - -
a. Pipa uPVC D Class, 5 kg/cm2 : - -
~ Pipa dia. 32 mm m - - - -
~ Pipa dia. 40 mm m - - - -
~ Pipa dia. 50 mm m 8.00 0.00 8.00 0.00 - - -
~ Pipa tegak dia. 80 mm (tegak ke Lt-2) m 5.00 0.00 5.00 0.00 - - -
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 - - -
b. Fixtures : - -
4 Test & commissioning pekerjaan instalasi air bekas, air kotor & vent lot 1.00 0.00 1.00 0.00 - - -

SUB JUMLAH - 2.G. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI 7 : 0.06 0.06 - -

2.H. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI 8
1 Instalasi air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm m 8.50 0.00 8.50 0.00 - - -
~ Pipa dia. 50 mm m 17.00 0.00 17.00 0.00 - - -
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m 9.00 0.00 9.00 0.00 - - -
~ Pipa dia. 100 mm m 5.00 0.00 5.00 0.00 - - -
~ Pipa dia. 100 mm ( tegak dari Lt-3) m 4.00 0.00 4.00 0.00 - - -
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 - - -
b. Fixtures : - -
~ Floor clean out dia. 80 mm pcs 1.00 0.00 1.00 0.00 - - -
~ Floor clean out dia. 100 mm pcs 1.00 0.00 1.00 0.00 - - -
c. Grease trap unit : unit 1.00 0.01 1.00 0.01 - - -

62/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

~ Material : Stainless steel, 1 mm thickness - -


~ Dimension : 400 mm(L) x 300 mm(W) x 250 mm(D) - -
~ lengkap dengan Basket strainer plate perforated, f3 mm & accessories - -
2 Instalasi air kotor : - -
a. Pipa uPVC AW Class, 10 kg/cm2 : - -
~ Pipa dia. 50 mm m 5.00 0.00 5.00 0.00 - - -
~ Pipa dia. 65 mm m - - - -
~ Pipa dia. 80 mm m - - - -
~ Pipa dia. 100 mm m 22.00 0.02 22.00 0.02 - - -
~ Pipa dia. 100 mm ( tegak dari Lt-3) m 4.00 0.00 4.00 0.00 - - -
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 - - -
b. Fixtures : - -
~ Floor clean out dia. 100 mm pcs 2.00 0.00 2.00 0.00 - - -
3 Instalasi venting : - -
a. Pipa uPVC D Class, 5 kg/cm2 : - -
~ Pipa dia. 32 mm m - - - -
~ Pipa dia. 40 mm m - - - -
~ Pipa dia. 50 mm m 8.00 0.00 8.00 0.00 - - -
~ Pipa tegak dia. 80 mm (tegak ke Lt-2) m 5.00 0.00 5.00 0.00 - - -
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 - - -
b. Fixtures : - -
~ Vent Cap dia. 100 mm pcs 1.00 0.00 1.00 0.00 - - -
4 Test & commissioning pekerjaan instalasi air bekas, air kotor & vent lot 1.00 0.00 1.00 0.00 - - -

SUB JUMLAH - 2.H. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI 8 : 0.06 0.06 - -

2.E. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI ATAP
1 Instalasi pipa air hujan
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.100 mm (pipa tegak dari dak R. Mesin Lift & Tangga) m 10.00 0.01 10.00 0.01 - - -
~ Pipa dia.100 mm (pipa tegak dari dak atap) m 192.00 0.15 192.00 0.15 - - -
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls 1.00 0.00 1.00 0.00 - - -
b. Fixtures : - -
~ Roof. drain dia. 100 mm pcs 8.00 0.00 8.00 0.00 - - -
2 Test & commissioning pekerjaan instalasi air bekas, air kotor & air hujan atap lot 1.00 0.01 1.00 0.01 - - -

SUB JUMLAH - 2.E. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI ATAP : 0.18 0.18 - -
JUMLAH - 2, PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN : 0.68 0.68 0.18 0.11

3, PEKERJAAN INSTALASI PEMADAM KEBAKARAN


Pengadaan dan pemasangan peralatan pemadam kebakaran dan instalasi pemadam kebakaran dalam gedung,
fittings, hanger & support dan perlengkapannya, beserta pengetesan sistem dan instalasi.

3.A. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI - 1

1 Instalasi Hydrant
a. Pipa BS , Sch 40
~ Pipa dia. 40 mm m 0.50 0.00 0.50 0.00 - 0.50 0.00 0.50
~ Pipa dia. 65 mm m 23.50 0.02 23.50 0.02 18.00 0.02 5.50 0.01 5.50
~ Pipa dia. 100 mm m - - - -
~ Pipa dia. 150 mm m 6.60 0.03 6.60 0.03 4.00 0.02 2.60 0.01 2.60
~ Pipa tegak dia. 150 mm (tegak hydrant) m 5.00 0.02 5.00 0.02 3.00 0.01 2.00 0.01 2.00
~ Fitting dan accessories ls 1.00 0.02 1.00 0.02 0.50 0.01 0.50 0.01 0.50
b. Valves , 16 kg/cm2 dan accessories - -
~ Ball Valve dia. 15 mm (cock) pcs 1.00 0.00 1.00 0.00 - - -
~ Butterfly Valve dia. 65 mm pcs 1.00 0.00 1.00 0.00 - - -
~ Pressure Gauge dia. 100 mm pcs 1.00 0.00 1.00 0.00 - - -
c. Hydrant Box Indoor unit 2.00 0.04 -
~ dia.ire Hose dia. 40 mm - 30 m - -
~ Nozzle dia. 40 mm - -
~ Angle Valve dia.40 mm - -

63/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

~ Landing Valve dia.65mm - -


~ Coupling dia. 40 mm & dia.65 mm - -
~ Garpu / sisir gantungan - -
~ accesories - -
2 Instalasi Sprinkler. - -
a. Pipa BS , Sch 40 - -
~ Pipa f 25 mm m 54.30 0.02 54.30 0.02 40.00 0.01 14.30 0.01 14.30
~ Pipa f 32 mm m 12.50 0.01 12.50 0.01 10.00 0.00 2.50 0.00 2.50
~ Pipa f 40 mm m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Pipa f 50 mm m 12.00 0.01 12.00 0.01 9.00 0.01 3.00 0.00 3.00
~ Pipa f 65 mm m 25.50 0.02 25.50 0.02 19.00 0.02 6.50 0.01 6.50
~ Pipa f 80 mm (drin ke saluran) m 3.00 0.01 3.00 0.01 2.00 0.00 1.00 0.00 1.00
~ Pipa f 80 mm (tegak drain sprinkler) m 5.00 0.01 5.00 0.01 4.00 0.01 1.00 0.00 1.00
~ Pipa f 150 mm ( tegak sprinkler) m 8.00 0.03 8.00 0.03 6.00 0.03 2.00 0.01 2.00
~ Fitting dan accessories ls 1.00 0.03 1.00 0.03 0.50 0.01 0.50 0.01 0.50
b Sprinkler Head - -
~ Type : Up Right, 57o C unit 21.00 0.00 21.00 0.00 - - -
~ Type : Upright, 79 C
o
unit - - - -
c. Valves, 20 kg/cm2 & accessories - -
~ Gate Valve f 32 mm (test/drain Sprinkler) pcs 1.00 0.00 1.00 0.00 - - -
~ Gate Valve f 32 mm (test/drain PRV) pcs 1.00 0.00 1.00 0.00 - - -
~ Gate Valve f 80 mm (test/drain Sprinkler) pcs 1.00 0.02 1.00 0.02 - - -
d. Pressure Reducing Valve Set - -
~ Butterfly Valve dia. 65 mm pcs 3.00 0.00 3.00 0.00 - - -
~ Y Strainer , dia. 65 mm pcs 1.00 0.01 1.00 0.01 - - -
~ Pressure Relief Valve dia. 65 mm pcs 1.00 0.03 1.00 0.03 - - -
~ Safety Relief Valve dia. 65 mm pcs 1.00 0.03 1.00 0.03 - - -
~ Flow Switch dia. 65 mmm pcs 1.00 0.00 1.00 0.00 - - -
~ Sight Glass dia. 65 mmm pcs 1.00 0.00 1.00 0.00 - - -
~ Ball Valve f 15 mm (cock) pcs 2.00 0.00 2.00 0.00 - - -
~ Pressure Gauge f 100 mm, 25 kg/cm2 pcs 2.00 0.00 2.00 0.00 - - -
f. Pressure Reducing Valve Set - -
~ Butterfly Valve dia 150 mm pcs 3.00 0.01 3.00 0.01 - - -
~ Y Strainer , dia 150 mm pcs 1.00 0.03 1.00 0.03 - - -
~ Pressure Relief Valve dia. 150 mm pcs 1.00 0.12 1.00 0.12 - - -
~ Safety Relief Valve dia. 50 mm pcs 1.00 0.03 1.00 0.03 - - -
~ Ball Valve f 15 mm (cock) pcs 2.00 0.00 2.00 0.00 - - -
~ Pressure Gauge f 100 mm, 25 kg/cm2 pcs 2.00 0.00 2.00 0.00 - - -
g. Instalasi Alarm Check Valve c/w Alarm Gong.(trimset) :, 20 kg/cm2 - -
~ Alarm Check Valve c/w Alarm Gong.(trimset) f 150 mm pcs 1.00 0.06 1.00 0.06 - - -
~ Pipa Black Steel Sch 40, f 25 mm m 15.00 0.01 15.00 0.01 - - -
~ Ball Valve f 15 mm, 20 kg/cm2 (cock) pcs 2.00 0.00 2.00 0.00 - - -
~ Gate Valve f 150 mm pcs 1.00 0.04 1.00 0.04 - - -
~ Pressure Gauge f 100 mm, 25 kg/cm2 pcs 2.00 0.00 2.00 0.00 - - -
3 Fire Extinguisher : - -
a. Fire Extinguisher : unit 3.00 0.01 -
Agent : Dry Chemical, Mutipurpose - -
Tipe : Portable - -
Agent : 2,0 kg - -
b. Fire Extinguisher : unit - - -
Agent : Dry Chemical, Mutipurpose - -
Tipe : Portable - -
Agent : 3,0 kg - -
c. Fire Extinguisher : unit 1.00 0.00 -
Agent : Carbon dioxide (CO2) - -
Tipe : Portable - -
Agent : 2,0 kg - -
4 Test dan Commisioning instalasi pipa pemadam kebakaran. ls 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00

SUB JUMLAH - 3.A. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI - 1 : 0.69 0.64 0.15 0.08

64/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

3.B. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI - 2

1 Instalasi Hydrant
a. Pipa BS , Sch 40
~ Pipa dia. 40 mm m 0.50 0.00 0.50 0.00 0.50 0.00 - - -
~ Pipa dia. 65 mm m 23.50 0.02 23.50 0.02 18.00 0.02 5.50 0.01 5.50
~ Pipa dia. 100 mm m - - - - -
~ Pipa dia. 150 mm m 6.60 0.03 6.60 0.03 4.00 0.02 2.60 0.01 2.60
~ Pipa tegak dia. 150 mm (tegak hydrant) m 5.00 0.02 5.00 0.02 4.00 0.01 1.00 0.00 1.00
~ Fitting dan accessories ls 1.00 0.02 1.00 0.02 0.50 0.01 0.50 0.01 0.50
b. Valves , 16 kg/cm2 dan accessories - -
~ Ball Valve dia. 15 mm (cock) pcs 1.00 0.00 1.00 0.00 - - -
~ Butterfly Valve dia. 65 mm pcs 1.00 0.00 1.00 0.00 - - -
~ Pressure Gauge dia. 100 mm pcs 1.00 0.00 1.00 0.00 - - -
c. Hydrant Box Indoor unit 2.00 0.04 -
~ dia.ire Hose dia. 40 mm - 30 m - -
~ Nozzle dia. 40 mm - -
~ Angle Valve dia.40 mm - -
~ Landing Valve dia.65mm - -
~ Coupling dia. 40 mm & dia.65 mm - -
~ Garpu / sisir gantungan - -
~ accesories - -
2 Instalasi Sprinkler. - -
a. Pipa BS , Sch 40 - -
~ Pipa f 25 mm m 54.30 0.02 54.30 0.02 44.00 0.02 10.30 0.00 10.30
~ Pipa f 32 mm m 12.50 0.01 12.50 0.01 10.00 0.00 2.50 0.00 2.50
~ Pipa f 40 mm m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Pipa f 50 mm m 12.00 0.01 12.00 0.01 10.00 0.01 2.00 0.00 2.00
~ Pipa f 65 mm m 25.50 0.02 25.50 0.02 21.00 0.02 4.50 0.00 4.50
~ Pipa f 80 mm (drin ke saluran) m 3.00 0.01 3.00 0.01 2.00 0.00 1.00 0.00 1.00
~ Pipa f 80 mm (tegak drain sprinkler) m 5.00 0.01 5.00 0.01 4.00 0.01 1.00 0.00 1.00
~ Pipa f 150 mm ( tegak sprinkler) m 8.00 0.03 8.00 0.03 6.00 0.03 2.00 0.01 2.00
~ Fitting dan accessories ls 1.00 0.03 1.00 0.03 0.50 0.01 0.50 0.01 0.50
b Sprinkler Head - -
~ Type : Up Right, 57o C unit 21.00 0.00 21.00 0.00 - - -
~ Type : Upright, 79 C
o
unit - - - -
c. Valves, 20 kg/cm2 & accessories - -
~ Gate Valve f 32 mm (test/drain Sprinkler) pcs 1.00 0.00 1.00 0.00 - - -
~ Gate Valve f 32 mm (test/drain PRV) pcs 1.00 0.00 1.00 0.00 - - -
d. Pressure Reducing Valve Set - -
~ Butterfly Valve dia. 65 mm pcs 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
~ Y Strainer , dia. 65 mm pcs 1.00 0.01 1.00 0.01 0.50 0.00 0.50 0.00 0.50
~ Pressure Relief Valve dia. 65 mm pcs 1.00 0.03 1.00 0.03 0.50 0.02 0.50 0.02 0.50
~ Safety Relief Valve dia. 65 mm pcs 1.00 0.03 1.00 0.03 0.50 0.01 0.50 0.01 0.50
~ Flow Switch dia. 65 mmm pcs 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
~ Sight Glass dia. 65 mmm pcs 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
~ Ball Valve f 15 mm (cock) pcs 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
~ Pressure Gauge f 100 mm, 25 kg/cm2 pcs 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
3 Fire Extinguisher : - -
a. Fire Extinguisher : unit 3.00 0.01 -
Agent : Dry Chemical, Mutipurpose - -
Tipe : Portable - -
Agent : 2,0 kg - -
b. Fire Extinguisher : unit - - -
Agent : Dry Chemical, Mutipurpose - -
Tipe : Portable - -
Agent : 2,0 kg - -
c. Fire Extinguisher : unit 1.00 0.00 -
Agent : Carbon dioxide (CO2) - -
Tipe : Portable - -
Agent : 2,0 kg - -
4 Test dan Commisioning instalasi pipa pemadam kebakaran. ls 1.00 0.00 1.00 0.00 - 1.00 0.00
65/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

SUB JUMLAH - 3.B. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI - 2 : 0.37 0.32 0.20 0.11

3.C. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI - 3

1 Instalasi Hydrant
a. Pipa BS , Sch 40
~ Pipa dia. 40 mm m 0.50 0.00 0.50 0.00 - 0.50 0.00 0.50
~ Pipa dia. 65 mm m 23.50 0.02 23.50 0.02 18.00 0.02 5.50 0.01 5.50
~ Pipa dia. 100 mm m - - - - -
~ Pipa dia. 150 mm m 6.60 0.03 6.60 0.03 4.00 0.02 2.60 0.01 2.60
~ Pipa tegak dia. 150 mm (tegak hydrant) m 5.00 0.02 5.00 0.02 4.00 0.01 1.00 0.00 1.00
~ Fitting dan accessories ls 1.00 0.02 1.00 0.02 0.50 0.01 0.50 0.01
b. Valves , 16 kg/cm2 dan accessories - -
~ Ball Valve dia. 15 mm (cock) pcs 1.00 0.00 1.00 0.00 - - -
~ Butterfly Valve dia. 65 mm pcs 1.00 0.00 1.00 0.00 - - -
~ Pressure Gauge dia. 100 mm pcs 1.00 0.00 1.00 0.00 - - -
c. Hydrant Box Indoor unit 2.00 0.04 -
~ dia.ire Hose dia. 40 mm - 30 m - -
~ Nozzle dia. 40 mm - -
~ Angle Valve dia.40 mm - -
~ Landing Valve dia.65mm - -
~ Coupling dia. 40 mm & dia.65 mm - -
~ Garpu / sisir gantungan - -
~ accesories - -
2 Instalasi Sprinkler. - -
a. Pipa BS , Sch 40 - -
~ Pipa f 25 mm m 54.30 0.02 54.30 0.02 45.00 0.02 9.30 0.00 9.30
~ Pipa f 32 mm m 12.50 0.01 12.50 0.01 11.00 0.01 1.50 0.00 1.50
~ Pipa f 40 mm m 4.00 0.00 4.00 0.00 2.00 0.00 2.00 0.00 2.00
~ Pipa f 50 mm m 12.00 0.01 12.00 0.01 10.00 0.01 2.00 0.00 2.00
~ Pipa f 65 mm m 25.50 0.02 25.50 0.02 20.00 0.02 5.50 0.01 5.50
~ Pipa f 80 mm (drin ke saluran) m 3.00 0.01 3.00 0.01 2.00 0.00 1.00 0.00 1.00
~ Pipa f 80 mm (tegak drain sprinkler) m 5.00 0.01 5.00 0.01 4.00 0.01 1.00 0.00 1.00
~ Pipa f 150 mm ( tegak sprinkler) m 8.00 0.03 8.00 0.03 6.00 0.03 2.00 0.01 2.00
~ Fitting dan accessories ls 1.00 0.03 1.00 0.03 0.50 0.01 0.50 0.01 0.50
b Sprinkler Head - -
~ Type : Up Right, 57o C unit 21.00 0.00 21.00 0.00 - - -
~ Type : Upright, 79 C
o
unit - - - -
c. Valves, 20 kg/cm2 & accessories - -
~ Gate Valve f 32 mm (test/drain Sprinkler) pcs 1.00 0.00 1.00 0.00 - - -
~ Gate Valve f 32 mm (test/drain PRV) pcs 1.00 0.00 1.00 0.00 - - -
d. Pressure Reducing Valve Set - -
~ Butterfly Valve dia. 65 mm pcs 3.00 0.00 3.00 0.00 - - -
~ Y Strainer , dia. 65 mm pcs 1.00 0.01 1.00 0.01 - - -
~ Pressure Relief Valve dia. 65 mm pcs 1.00 0.03 1.00 0.03 - - -
~ Safety Relief Valve dia. 65 mm pcs 1.00 0.03 1.00 0.03 - - -
~ Flow Switch dia. 65 mmm pcs 1.00 0.00 1.00 0.00 - - -
~ Sight Glass dia. 65 mmm pcs 1.00 0.00 1.00 0.00 - - -
~ Ball Valve f 15 mm (cock) pcs 2.00 0.00 2.00 0.00 - - -
~ Pressure Gauge f 100 mm, 25 kg/cm2 pcs 2.00 0.00 2.00 0.00 - - -
3 Fire Extinguisher : - -
a. Fire Extinguisher : unit 3.00 0.01 -
Agent : Dry Chemical, Mutipurpose - -
Tipe : Portable - -
Agent : 2,0 kg - -
b. Fire Extinguisher : unit - - -
Agent : Dry Chemical, Mutipurpose - -
Tipe : Portable - -
Agent : 3,0 kg - -
c. Fire Extinguisher : unit 1.00 0.00 -

66/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

Agent : Carbon dioxide (CO2) - -


Tipe : Portable - -
Agent : 2,0 kg - -
4 Test dan Commisioning instalasi pipa pemadam kebakaran. ls 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00

SUB JUMLAH - 3.C. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI - 3 : 0.37 0.32 0.16 0.07

3.D. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI - 4

1 Instalasi Hydrant
a. Pipa BS , Sch 40
~ Pipa dia. 40 mm m 0.50 0.00 0.50 0.00 - 0.50 0.00 0.50
~ Pipa dia. 65 mm m 23.50 0.02 23.50 0.02 18.00 0.02 5.50 0.01 5.50
~ Pipa dia. 100 mm m - -
~ Pipa dia. 150 mm m 6.60 0.03 6.60 0.03 4.00 0.02 2.60 0.01 2.60
~ Pipa tegak dia. 150 mm (tegak hydrant) m 5.00 0.02 5.00 0.02 4.00 0.01 1.00 0.00 1.00
~ Fitting dan accessories ls 1.00 0.02 1.00 0.02 0.50 0.01 0.50 0.01 0.50
b. Valves , 16 kg/cm2 dan accessories - -
~ Ball Valve dia. 15 mm (cock) pcs 1.00 0.00 1.00 0.00 - - -
~ Butterfly Valve dia. 65 mm pcs 1.00 0.00 1.00 0.00 - - -
~ Pressure Gauge dia. 100 mm pcs 1.00 0.00 1.00 0.00 - - -
c. Hydrant Box Indoor unit 2.00 0.04 2.00 0.04 - - -
~ dia.ire Hose dia. 40 mm - 30 m - -
~ Nozzle dia. 40 mm - -
~ Angle Valve dia.40 mm - -
~ Landing Valve dia.65mm - -
~ Coupling dia. 40 mm & dia.65 mm - -
~ Garpu / sisir gantungan - -
~ accesories - -
2 Instalasi Sprinkler. - -
a. Pipa BS , Sch 40 - -
~ Pipa f 25 mm m 54.30 0.02 54.30 0.02 40.00 0.01 14.30 0.01 14.30
~ Pipa f 32 mm m 12.50 0.01 12.50 0.01 10.00 0.00 2.50 0.00 2.50
~ Pipa f 40 mm m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Pipa f 50 mm m 12.00 0.01 12.00 0.01 10.00 0.01 2.00 0.00 2.00
~ Pipa f 65 mm m 25.50 0.02 25.50 0.02 23.00 0.02 2.50 0.00 2.50
~ Pipa f 80 mm (drin ke saluran) m 3.00 0.01 3.00 0.01 2.00 0.00 1.00 0.00 1.00
~ Pipa f 80 mm (tegak drain sprinkler) m 5.00 0.01 5.00 0.01 3.00 0.01 2.00 0.00 2.00
~ Pipa f 150 mm ( tegak sprinkler) m 8.00 0.03 8.00 0.03 6.00 0.03 2.00 0.01 2.00
~ Fitting dan accessories ls 1.00 0.03 1.00 0.03 0.50 0.01 0.50 0.01 0.50
b Sprinkler Head - - -
~ Type : Up Right, 57o C unit 21.00 0.00 21.00 0.00 - - -
~ Type : Upright, 79 C
o
unit - - - -
c. Valves, 20 kg/cm2 & accessories - -
~ Gate Valve f 32 mm (test/drain Sprinkler) pcs 1.00 0.00 1.00 0.00 - - -
~ Gate Valve f 32 mm (test/drain PRV) pcs 1.00 0.00 1.00 0.00 - - -
d. Pressure Reducing Valve Set - -
~ Butterfly Valve dia. 65 mm pcs 3.00 0.00 3.00 0.00 - - -
~ Y Strainer , dia. 65 mm pcs 1.00 0.01 1.00 0.01 - - -
~ Pressure Relief Valve dia. 65 mm pcs 1.00 0.03 1.00 0.03 - - -
~ Safety Relief Valve dia. 65 mm pcs 1.00 0.03 1.00 0.03 - - -
~ Flow Switch dia. 65 mmm pcs 1.00 0.00 1.00 0.00 - - -
~ Sight Glass dia. 65 mmm pcs 1.00 0.00 1.00 0.00 - - -
~ Ball Valve f 15 mm (cock) pcs 2.00 0.00 2.00 0.00 - - -
~ Pressure Gauge f 100 mm, 25 kg/cm2 pcs 2.00 0.00 2.00 0.00 - - -
3 Fire Extinguisher : - -
a. Fire Extinguisher : unit 3.00 0.01 -
Agent : Dry Chemical, Mutipurpose - -
Tipe : Portable - -
Agent : 2,0 kg - -
b. Fire Extinguisher : unit - - -

67/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

Agent : Dry Chemical, Mutipurpose - -


Tipe : Portable - -
Agent : 3,0 kg - -
c. Fire Extinguisher : unit 1.00 0.00 -
Agent : Carbon dioxide (CO2) - -
Tipe : Portable - -
Agent : 2,0 kg - -
4 Test dan Commisioning instalasi pipa pemadam kebakaran. ls 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
- -
SUB JUMLAH - 3.D. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI - 4 : 0.37 0.36 0.16 0.07

3.E. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI --5

1 Instalasi Hydrant
a. Pipa BS , Sch 40 0.50
~ Pipa dia. 40 mm m 0.50 0.00 0.50 0.00 - 0.50 0.00 3.50
~ Pipa dia. 65 mm m 23.50 0.02 23.50 0.02 20.00 0.02 3.50 0.00 -
~ Pipa dia. 100 mm m - - - - 2.60
~ Pipa dia. 150 mm m 6.60 0.03 6.60 0.03 4.00 0.02 2.60 0.01 1.00
~ Pipa tegak dia. 150 mm (tegak hydrant) m 5.00 0.02 5.00 0.02 4.00 0.01 1.00 0.00 0.50
~ Fitting dan accessories ls 1.00 0.02 1.00 0.02 0.50 0.01 0.50 0.01 -
b. Valves , 16 kg/cm2 dan accessories - -
~ Ball Valve dia. 15 mm (cock) pcs 1.00 0.00 1.00 0.00 - - -
~ Butterfly Valve dia. 65 mm pcs 1.00 0.00 1.00 0.00 - - -
~ Pressure Gauge dia. 100 mm pcs 1.00 0.00 1.00 0.00 - - -
c. Hydrant Box Indoor unit 2.00 0.04 -
~ dia.ire Hose dia. 40 mm - 30 m - -
~ Nozzle dia. 40 mm - -
~ Angle Valve dia.40 mm - -
~ Landing Valve dia.65mm - -
~ Coupling dia. 40 mm & dia.65 mm - -
~ Garpu / sisir gantungan - -
~ accesories - -
2 Instalasi Sprinkler. - -
a. Pipa BS , Sch 40 - -
~ Pipa f 25 mm m 54.30 0.02 54.30 0.02 44.00 0.02 10.30 0.00 10.30
~ Pipa f 32 mm m 12.50 0.01 12.50 0.01 10.00 0.00 2.50 0.00 2.50
~ Pipa f 40 mm m 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
~ Pipa f 50 mm m 12.00 0.01 12.00 0.01 10.00 0.01 2.00 0.00 2.00
~ Pipa f 65 mm m 25.50 0.02 25.50 0.02 20.00 0.02 5.50 0.01 5.50
~ Pipa f 80 mm (drin ke saluran) m 3.00 0.01 3.00 0.01 3.00 0.01 - -
~ Pipa f 80 mm (tegak drain sprinkler) m 5.00 0.01 5.00 0.01 3.00 0.01 2.00 0.00 2.00
~ Pipa f 150 mm ( tegak sprinkler) m 8.00 0.03 8.00 0.03 6.00 0.03 2.00 0.01 2.00
~ Fitting dan accessories ls 1.00 0.03 1.00 0.03 0.50 0.01 0.50 0.01 0.50
b Sprinkler Head - -
~ Type : Up Right, 57o C unit 21.00 0.00 21.00 0.00 - - -
~ Type : Upright, 79o C unit - - - -
c. Valves, 20 kg/cm2 & accessories - -
~ Gate Valve f 32 mm (test/drain Sprinkler) pcs 1.00 0.00 1.00 0.00 - - -
~ Gate Valve f 32 mm (test/drain PRV) pcs 1.00 0.00 1.00 0.00 - - -
d. Pressure Reducing Valve Set - -
~ Butterfly Valve dia. 65 mm pcs 3.00 0.00 3.00 0.00 - - -
~ Y Strainer , dia. 65 mm pcs 1.00 0.01 1.00 0.01 - - -
~ Pressure Relief Valve dia. 65 mm pcs 1.00 0.03 1.00 0.03 - - -
~ Safety Relief Valve dia. 65 mm pcs 1.00 0.03 1.00 0.03 - - -
~ Flow Switch dia. 65 mmm pcs 1.00 0.00 1.00 0.00 - - -
~ Sight Glass dia. 65 mmm pcs 1.00 0.00 1.00 0.00 - - -
~ Ball Valve f 15 mm (cock) pcs 2.00 0.00 2.00 0.00 - - -
~ Pressure Gauge f 100 mm, 25 kg/cm2 pcs 2.00 0.00 2.00 0.00 - - -
3 Fire Extinguisher : - -
a. Fire Extinguisher : unit 3.00 0.01 -

68/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

Agent : Dry Chemical, Mutipurpose - -


Tipe : Portable - -
Agent : 2,0 kg - -
b. Fire Extinguisher : unit - - -
Agent : Dry Chemical, Mutipurpose - -
Tipe : Portable - -
Agent : 3,0 kg - -
c. Fire Extinguisher : unit 1.00 0.00 -
Agent : Carbon dioxide (CO2) - -
Tipe : Portable - -
Agent : 2,0 kg - -
4 Test dan Commisioning instalasi pipa pemadam kebakaran. ls 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
- -
SUB JUMLAH - 3.E. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI --5 : 0.37 0.32 0.16 0.07

3.F. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI --6

1 Instalasi Hydrant
a. Pipa BS , Sch 40
~ Pipa dia. 40 mm m 0.50 0.00 0.50 0.00 0.43 0.00 - -
~ Pipa dia. 65 mm m 23.50 0.02 23.50 0.02 18.00 0.02 1.98 0.00 1.98
~ Pipa dia. 100 mm m - - - - -
~ Pipa dia. 150 mm m 6.60 0.03 6.60 0.03 4.00 0.02 1.61 0.01 1.61
~ Pipa tegak dia. 150 mm (tegak hydrant) m 5.00 0.02 5.00 0.02 3.00 0.01 1.25 0.00 1.25
~ Fitting dan accessories ls 1.00 0.02 1.00 0.02 0.40 0.01 0.45 0.01 0.45
b. Valves , 16 kg/cm2 dan accessories - - -
~ Ball Valve dia. 15 mm (cock) pcs 1.00 0.00 1.00 0.00 - - -
~ Butterfly Valve dia. 65 mm pcs 1.00 0.00 1.00 0.00 - - -
~ Pressure Gauge dia. 100 mm pcs 1.00 0.00 1.00 0.00 - - -
c. Hydrant Box Indoor unit 2.00 0.04 -
~ dia.ire Hose dia. 40 mm - 30 m - -
~ Nozzle dia. 40 mm - -
~ Angle Valve dia.40 mm - -
~ Landing Valve dia.65mm - -
~ Coupling dia. 40 mm & dia.65 mm - -
~ Garpu / sisir gantungan - -
~ accesories - -
2 Instalasi Sprinkler. - -
a. Pipa BS , Sch 40 - -
~ Pipa f 25 mm m 54.30 0.02 54.30 0.02 40.00 0.01 6.16 0.00 6.16
~ Pipa f 32 mm m 12.50 0.01 12.50 0.01 8.00 0.00 2.63 0.00 2.63
~ Pipa f 40 mm m 4.00 0.00 4.00 0.00 2.00 0.00 1.40 0.00 1.40
~ Pipa f 50 mm m 12.00 0.01 12.00 0.01 8.00 0.01 2.20 0.00 2.20
~ Pipa f 65 mm m 25.50 0.02 25.50 0.02 16.00 0.01 5.68 0.01 5.68
~ Pipa f 80 mm (drin ke saluran) m 3.00 0.01 3.00 0.01 2.00 0.00 0.55 0.00 0.55
~ Pipa f 80 mm (tegak drain sprinkler) m 5.00 0.01 5.00 0.01 3.00 0.01 1.25 0.00 1.25
~ Pipa f 150 mm ( tegak sprinkler) m 8.00 0.03 8.00 0.03 5.00 0.02 1.80 0.01 1.80
~ Fitting dan accessories ls 1.00 0.03 1.00 0.03 0.50 0.01 0.35 0.01 0.35
b Sprinkler Head - -
~ Type : Up Right, 57o C unit 21.00 0.00 21.00 0.00 - - -
~ Type : Upright, 79o C unit - - - -
c. Valves, 20 kg/cm2 & accessories - -
~ Gate Valve f 32 mm (test/drain Sprinkler) pcs 1.00 0.00 1.00 0.00 - - -
~ Gate Valve f 32 mm (test/drain PRV) pcs 1.00 0.00 1.00 0.00 - - -
d. Pressure Reducing Valve Set - -
~ Butterfly Valve dia. 65 mm pcs 3.00 0.00 3.00 0.00 - - -
~ Y Strainer , dia. 65 mm pcs 1.00 0.01 1.00 0.01 - - -
~ Pressure Relief Valve dia. 65 mm pcs 1.00 0.03 1.00 0.03 - - -
~ Safety Relief Valve dia. 65 mm pcs 1.00 0.03 1.00 0.03 - - -
~ Flow Switch dia. 65 mmm pcs 1.00 0.00 1.00 0.00 - - -
~ Sight Glass dia. 65 mmm pcs 1.00 0.00 1.00 0.00 - - -

69/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

~ Ball Valve f 15 mm (cock) pcs 2.00 0.00 2.00 0.00 - - -


~ Pressure Gauge f 100 mm, 25 kg/cm2 pcs 2.00 0.00 2.00 0.00 - - -
3 Fire Extinguisher : - -
a. Fire Extinguisher : unit 3.00 0.01 -
Agent : Dry Chemical, Mutipurpose - -
Tipe : Portable - -
Agent : 2,0 kg - -
b. Fire Extinguisher : unit - - -
Agent : Dry Chemical, Mutipurpose - -
Tipe : Portable - -
Agent : 3,0 kg - -
c. Fire Extinguisher : unit 1.00 0.00 -
Agent : Carbon dioxide (CO2) - -
Tipe : Portable - -
Agent : 2,0 kg - -
4 Test dan Commisioning instalasi pipa pemadam kebakaran. ls 1.00 0.00 1.00 0.00 - - -

SUB JUMLAH - 3.F. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI --6 : 0.37 0.32 0.14 0.05

3.G. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI --7

1 Instalasi Hydrant
a. Pipa BS , Sch 40
~ Pipa dia. 40 mm m 0.50 0.00 0.50 0.00 - - -
~ Pipa dia. 65 mm m 23.50 0.02 23.50 0.02 - - -
~ Pipa dia. 100 mm m - - - -
~ Pipa dia. 150 mm m 6.60 0.03 6.60 0.03 - - -
~ Pipa tegak dia. 150 mm (tegak hydrant) m 5.00 0.02 5.00 0.02 - - -
~ Fitting dan accessories ls 1.00 0.02 1.00 0.02 - - -
b. Valves , 16 kg/cm2 dan accessories - -
~ Ball Valve dia. 15 mm (cock) pcs 1.00 0.00 1.00 0.00 - - -
~ Butterfly Valve dia. 65 mm pcs 1.00 0.00 1.00 0.00 - - -
~ Pressure Gauge dia. 100 mm pcs 1.00 0.00 1.00 0.00 - - -
c. Hydrant Box Indoor unit 2.00 0.04 -
~ dia.ire Hose dia. 40 mm - 30 m - -
~ Nozzle dia. 40 mm - -
~ Angle Valve dia.40 mm - -
~ Landing Valve dia.65mm - -
~ Coupling dia. 40 mm & dia.65 mm - -
~ Garpu / sisir gantungan - -
~ accesories - -
2 Instalasi Sprinkler. - -
a. Pipa BS , Sch 40 - -
~ Pipa f 25 mm m 54.30 0.02 54.30 0.02 - - -
~ Pipa f 32 mm m 12.50 0.01 12.50 0.01 - - -
~ Pipa f 40 mm m 4.00 0.00 4.00 0.00 - - -
~ Pipa f 50 mm m 12.00 0.01 12.00 0.01 - - -
~ Pipa f 65 mm m 25.50 0.02 25.50 0.02 - - -
~ Pipa f 80 mm (drin ke saluran) m 3.00 0.01 3.00 0.01 - - -
~ Pipa f 80 mm (tegak drain sprinkler) m 5.00 0.01 5.00 0.01 - - -
~ Pipa f 150 mm ( tegak sprinkler) m 8.00 0.03 8.00 0.03 - - -
~ Fitting dan accessories ls 1.00 0.03 1.00 0.03 - - -
b Sprinkler Head - -
~ Type : Up Right, 57o C unit 21.00 0.00 21.00 0.00 - - -
~ Type : Upright, 79o C unit - - - -
c. Valves, 20 kg/cm2 & accessories - -
~ Gate Valve f 32 mm (test/drain Sprinkler) pcs 1.00 0.00 1.00 0.00 - - -
~ Gate Valve f 32 mm (test/drain PRV) pcs 1.00 0.00 1.00 0.00 - - -
d. Pressure Reducing Valve Set - -
~ Butterfly Valve dia. 65 mm pcs 3.00 0.00 3.00 0.00 - - -
~ Y Strainer , dia. 65 mm pcs 1.00 0.01 1.00 0.01 - - -

70/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

~ Pressure Relief Valve dia. 65 mm pcs 1.00 0.03 1.00 0.03 - - -


~ Safety Relief Valve dia. 65 mm pcs 1.00 0.03 1.00 0.03 - - -
~ Flow Switch dia. 65 mmm pcs 1.00 0.00 1.00 0.00 - - -
~ Sight Glass dia. 65 mmm pcs 1.00 0.00 1.00 0.00 - - -
~ Ball Valve f 15 mm (cock) pcs 2.00 0.00 2.00 0.00 - - -
~ Pressure Gauge f 100 mm, 25 kg/cm2 pcs 2.00 0.00 2.00 0.00 - - -
3 Fire Extinguisher : - -
a. Fire Extinguisher : unit 3.00 0.01 -
Agent : Dry Chemical, Mutipurpose - -
Tipe : Portable - -
Agent : 2,0 kg - -
b. Fire Extinguisher : unit - - -
Agent : Dry Chemical, Mutipurpose - -
Tipe : Portable - -
Agent : 3,0 kg - -
c. Fire Extinguisher : unit 1.00 0.00 -
Agent : Carbon dioxide (CO2) - -
Tipe : Portable - -
Agent : 2,0 kg - -
4 Test dan Commisioning instalasi pipa pemadam kebakaran. ls 1.00 0.00 1.00 0.00 - - -

SUB JUMLAH - 3.G. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI --7 : 0.37 0.32 - -

3.H. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI -- 8

1 Instalasi Hydrant
a. Pipa BS , Sch 40
~ Pipa dia. 40 mm m 0.50 0.00 0.50 0.00 - - -
~ Pipa dia. 65 mm m 23.50 0.02 23.50 0.02 - - -
~ Pipa dia. 100 mm m - - - -
~ Pipa dia. 150 mm m 6.60 0.03 6.60 0.03 - - -
~ Pipa tegak dia. 150 mm (tegak hydrant) m 5.00 0.02 5.00 0.02 - - -
~ Fitting dan accessories ls 1.00 0.02 1.00 0.02 - - -
b. Valves , 16 kg/cm2 dan accessories - -
~ Ball Valve dia. 15 mm (cock) pcs 1.00 0.00 1.00 0.00 - - -
~ Butterfly Valve dia. 65 mm pcs 1.00 0.00 1.00 0.00 - - -
~ Pressure Gauge dia. 100 mm pcs 1.00 0.00 1.00 0.00 - - -
c. Hydrant Box Indoor unit 2.00 0.04 -
~ dia.ire Hose dia. 40 mm - 30 m - -
~ Nozzle dia. 40 mm - -
~ Angle Valve dia.40 mm - -
~ Landing Valve dia.65mm - -
~ Coupling dia. 40 mm & dia.65 mm - -
~ Garpu / sisir gantungan - -
~ accesories - -
2 Instalasi Sprinkler. - -
a. Pipa BS , Sch 40 - -
~ Pipa f 25 mm m 54.30 0.02 54.30 0.02 - - -
~ Pipa f 32 mm m 12.50 0.01 12.50 0.01 - - -
~ Pipa f 40 mm m 4.00 0.00 4.00 0.00 - - -
~ Pipa f 50 mm m 12.00 0.01 12.00 0.01 - - -
~ Pipa f 65 mm m 25.50 0.02 25.50 0.02 - - -
~ Pipa f 80 mm (drin ke saluran) m 3.00 0.01 3.00 0.01 - - -
~ Pipa f 80 mm (tegak drain sprinkler) m 5.00 0.01 5.00 0.01 - - -
~ Pipa f 150 mm ( tegak sprinkler) m 8.00 0.03 8.00 0.03 - - -
~ Fitting dan accessories ls 1.00 0.03 1.00 0.03 - - -
b Sprinkler Head - -
~ Type : Up Right, 57o C unit 21.00 0.00 21.00 0.00 - - -
~ Type : Upright, 79 Co
unit - - - -
c. Valves, 20 kg/cm2 & accessories - -
~ Gate Valve f 32 mm (test/drain Sprinkler) pcs 1.00 0.00 1.00 0.00 - - -

71/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

~ Gate Valve f 32 mm (test/drain PRV) pcs 1.00 0.00 1.00 0.00 - - -


d. Pressure Reducing Valve Set - -
~ Butterfly Valve dia. 65 mm pcs 3.00 0.00 3.00 0.00 - - -
~ Y Strainer , dia. 65 mm pcs 1.00 0.01 1.00 0.01 - - -
~ Pressure Relief Valve dia. 65 mm pcs 1.00 0.03 1.00 0.03 - - -
~ Safety Relief Valve dia. 65 mm pcs 1.00 0.03 1.00 0.03 - - -
~ Flow Switch dia. 65 mmm pcs 1.00 0.00 1.00 0.00 - - -
~ Sight Glass dia. 65 mmm pcs 1.00 0.00 1.00 0.00 - - -
~ Ball Valve f 15 mm (cock) pcs 2.00 0.00 2.00 0.00 - - -
~ Pressure Gauge f 100 mm, 25 kg/cm2 pcs 2.00 0.00 2.00 0.00 - - -
3 Fire Extinguisher : - -
a. Fire Extinguisher : unit 3.00 0.01 -
Agent : Dry Chemical, Mutipurpose - -
Tipe : Portable - -
Agent : 2,0 kg - -
b. Fire Extinguisher : unit - - -
Agent : Dry Chemical, Mutipurpose - -
Tipe : Portable - -
Agent : 3,0 kg - -
c. Fire Extinguisher : unit 1.00 0.00 -
Agent : Carbon dioxide (CO2) - -
Tipe : Portable - -
Agent : 2,0 kg - -
4 Test dan Commisioning instalasi pipa pemadam kebakaran. ls 1.00 0.00 1.00 0.00 - - -
- -
SUB JUMLAH - 3.H. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI -- 8 : 0.37 0.32 - -

3.I. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI ATAP

1 Fire Extinguisher :
a. Fire Extinguisher : unit 1.00 0.00 -
Agent : Dry Chemical, Mutipurpose
Tipe : Portable
Agent : 3,0 kg
b. Fire Extinguisher : unit 1.00 0.00 -
Agent : Carbon dioxide (CO2)
Tipe : Portable
Agent : 2,0 kg

SUB JUMLAH - 3.I. PEKERJAAN INSTALASI PEMADAM KEBAKARAN - LANTAI ATAP : 0.01 - - -
JUMLAH - 3, PEKERJAAN INSTALASI PEMADAM KEBAKARAN : 3.30 2.93 0.96 0.45

4, PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN


Pengadaan dan pemasangan exhaust fan dan ducting tanpa isolasi,
kabel & kontrol operasi, fitting ducting, hanger & support,
dan perlengkapannya beserta pengetesan sistem dan instalasi.

4.A. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI 1


1 Pekerjaan Instalasi Exhaust Fan - 01
a. Exhaust Fan Unit unit 1.00 0.02 1.00 0.02 - - -
Ruang : R. Toilet Pria & Wanita - -
Type : Minitube Axial Fan - -
Kap. : 400 m3/jam - -
St. Press. : 41 Pa - -
Power : 58 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 101 - -
lengkap dengan peralatan pendukung (anciliries) - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
c. Ducting, BJLS 50, tanpa isolasi : - -
□ 100 mm x 100 mm m 7.00 0.00 7.00 0.00 - 7.00 0.00 7.00
□ 125 mm x 125 mm m 1.50 0.00 1.50 0.00 - 1.50 0.00 1.50

72/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

□ 150 mm x 150 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00


□ 175 mm x 175 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
□ 250 mm x 250 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
d. Exhaust air grille : - -
□ 100 mm x 100 mm pcs 6.00 0.00 6.00 0.00 - - -
e. Outdoor air grille : - -
□ 250 mm x 250 mm pcs 1.00 0.00 1.00 0.00 - - -
2. Pekerjaan Instalasi Exhaust Fan - 02. - -
a. Exhaust Fan Unit unit 1.00 0.02 1.00 0.02 - - -
Ruang : R. Toilet Dosen - -
Type : Minitube Axial Fan - -
Kap. : 150 m3/jam - -
St. Press. : 52 Pa - -
Power : 30 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 102. - -
lengkap dengan peralatan pendukung (anciliries) - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
c. Ducting, BJLS 50, tanpa isolasi : - -
□ 100 mm x 100 mm m 4.00 0.00 4.00 0.00 - 4.00 0.00 4.00
□ 150 mm x 150 mm m 2.00 0.00 2.00 0.00 - 2.00 0.00 2.00
d. Exhaust air grille : - -
□ 100 mm x 100 mm pcs 2.00 0.00 2.00 0.00 - - -
e. Outdoor air grille : - -
□ 150 mm x 150 mm pcs 1.00 0.00 1.00 0.00 - - -
3 Pekerjaan Instalasi Exhaust Fan - 03 - -
a. Exhaust Fan Unit unit 1.00 0.01 1.00 0.01 - - -
Ruang : R. Panel - -
Type : Propeller Wall Mounted - -
Kap. : 150 m3/jam - -
St. Press. : 21 Pa - -
Power : 32 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 103 - -
lengkap dengan peralatan pendukung (anciliries) & auto shutter grille - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
4 Pekerjaan Instalasi Exhaust Fan - 04 - -
a. Exhaust Fan Unit unit 1.00 0.01 1.00 0.01 - - -
Ruang : R. Pantry - -
Type : Propeller Wall Mounted - -
Kap. : 100 m3/jam - -
St. Press. : 21 Pa - -
Power : 32 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 104 - -
lengkap dengan peralatan pendukung (anciliries) & auto shutter grille - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
5 Test & commissioning pekerjaan instalasi ventilasi mekanik/exhaust fan dan ducting lot 1.00 0.00 1.00 0.00 - - -

SUB JUMLAH - 4.A. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI 1 : 0.06 0.06 - 0.00

4.B. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI 2


1 Pekerjaan Instalasi Exhaust Fan - 01
a. Exhaust Fan Unit unit 1.00 0.02 1.00 0.02 - - -
Ruang : R. Toilet Pria & Wanita - -
Type : Minitube Axial Fan - -
Kap. : 400 m3/jam - -
St. Press. : 41 Pa - -
Power : 58 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 201 - -
lengkap dengan peralatan pendukung (anciliries) - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
c. Ducting, BJLS 50, tanpa isolasi : - -
□ 100 mm x 100 mm m 7.00 0.00 7.00 0.00 - 7.00 0.00 7.00

73/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

□ 125 mm x 125 mm m 1.50 0.00 1.50 0.00 - 1.50 0.00 1.50


□ 150 mm x 150 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
□ 175 mm x 175 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
□ 250 mm x 250 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
d. Exhaust air grille : - -
□ 100 mm x 100 mm pcs 6.00 0.00 6.00 0.00 - - -
e. Outdoor air grille : - -
□ 250 mm x 250 mm pcs 1.00 0.00 1.00 0.00 - - -
2. Pekerjaan Instalasi Exhaust Fan - 02. - -
a. Exhaust Fan Unit unit 1.00 0.02 1.00 0.02 - - -
Ruang : R. Toilet Dosen & Difable - -
Type : Minitube Axial Fan - -
Kap. : 230 m3/jam - -
St. Press. : 54 Pa - -
Power : 58 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 202. - -
lengkap dengan peralatan pendukung (anciliries) - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
c. Ducting, BJLS 50, tanpa isolasi : - -
□ 100 mm x 100 mm m 4.50 0.00 4.50 0.00 - 4.50 0.00 4.50
□ 150 mm x 150 mm m 1.50 0.00 1.50 0.00 - 1.50 0.00 1.50
d. Exhaust air grille : - -
□ 100 mm x 100 mm pcs 2.00 0.00 2.00 0.00 - - -
e. Outdoor air grille : - -
□ 150 mm x 150 mm pcs 1.00 0.00 1.00 0.00 - - -
3 Pekerjaan Instalasi Exhaust Fan - 03 - -
a. Exhaust Fan Unit unit 1.00 0.01 1.00 0.01 - - -
Ruang : R. Panel - -
Type : Propeller Wall Mounted - -
Kap. : 150 m3/jam - -
St. Press. : 21 Pa - -
Power : 32 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 203 - -
lengkap dengan peralatan pendukung (anciliries) & auto shutter grille - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
4 Test & commissioning pekerjaan instalasi ventilasi mekanik/exhaust fan dan ducting lot 1.00 0.00 1.00 0.00 - - -

SUB JUMLAH - 4.B. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI 2 : 0.05 0.05 - 0.00

4.C. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI 3


1 Pekerjaan Instalasi Exhaust Fan - 01
a. Exhaust Fan Unit unit 1.00 0.02 1.00 0.02 - - -
Ruang : R. Toilet Pria & Wanita - -
Type : Minitube Axial Fan - -
Kap. : 400 m3/jam - -
St. Press. : 41 Pa - -
Power : 58 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 301 - -
lengkap dengan peralatan pendukung (anciliries) - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
c. Ducting, BJLS 50, tanpa isolasi : - -
□ 100 mm x 100 mm m 7.00 0.00 7.00 0.00 - 7.00 0.00 7.00
□ 125 mm x 125 mm m 1.50 0.00 1.50 0.00 - 1.50 0.00 1.50
□ 150 mm x 150 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
□ 175 mm x 175 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
□ 250 mm x 250 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
d. Exhaust air grille : - -
□ 100 mm x 100 mm pcs 6.00 0.00 6.00 0.00 - - -
e. Outdoor air grille : - -
□ 250 mm x 250 mm pcs 1.00 0.00 1.00 0.00 - - -
2. Pekerjaan Instalasi Exhaust Fan - 02. - -

74/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

a. Exhaust Fan Unit unit 1.00 0.02 1.00 0.02 - - -


Ruang : R. Toilet Dosen - -
Type : Minitube Axial Fan - -
Kap. : 150 m3/jam - -
St. Press. : 52 Pa - -
Power : 30 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 302. - -
lengkap dengan peralatan pendukung (anciliries) - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
c. Ducting, BJLS 50, tanpa isolasi : - -
□ 100 mm x 100 mm m 4.00 0.00 4.00 0.00 - 4.00 0.00 4.00
□ 150 mm x 150 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
d. Exhaust air grille : - -
□ 100 mm x 100 mm pcs 2.00 0.00 2.00 0.00 - - -
e. Outdoor air grille : - -
□ 150 mm x 150 mm pcs 1.00 0.00 1.00 0.00 - - -
3 Pekerjaan Instalasi Exhaust Fan - 03 - -
a. Exhaust Fan Unit unit 1.00 0.01 1.00 0.01 - - -
Ruang : R. Panel - -
Type : Propeller Wall Mounted - -
Kap. : 150 m3/jam - -
St. Press. : 21 Pa - -
Power : 32 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 303 - -
lengkap dengan peralatan pendukung (anciliries) & auto shutter grille - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
4 Pekerjaan Instalasi Exhaust Fan - 04 - -
a. Exhaust Fan Unit unit 1.00 0.01 1.00 0.01 - - -
Ruang : R. Pantry - -
Type : Propeller Wall Mounted - -
Kap. : 100 m3/jam - -
St. Press. : 21 Pa - -
Power : 32 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 304 - -
lengkap dengan peralatan pendukung (anciliries) & auto shutter grille - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
5 Test & commissioning pekerjaan instalasi ventilasi mekanik/exhaust fan dan ducting lot 1.00 0.00 1.00 0.00 - - -

SUB JUMLAH - 4.C. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI 3 : 0.06 0.06 - 0.00

4.D. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI 4


1 Pekerjaan Instalasi Exhaust Fan - 01
a. Exhaust Fan Unit unit 1.00 0.02 1.00 0.02 - - -
Ruang : R. Toilet Pria & Wanita - -
Type : Minitube Axial Fan - -
Kap. : 400 m3/jam - -
St. Press. : 41 Pa - -
Power : 58 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 401 - -
lengkap dengan peralatan pendukung (anciliries) - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
c. Ducting, BJLS 50, tanpa isolasi : - -
□ 100 mm x 100 mm m 7.00 0.00 7.00 0.00 - 7.00 0.00
□ 125 mm x 125 mm m 1.50 0.00 1.50 0.00 - 1.50 0.00
□ 150 mm x 150 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00
□ 175 mm x 175 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00
□ 250 mm x 250 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00
d. Exhaust air grille : - -
□ 100 mm x 100 mm pcs 6.00 0.00 6.00 0.00 - - -
e. Outdoor air grille : - -
□ 250 mm x 250 mm pcs 1.00 0.00 1.00 0.00 - - -

75/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

2. Pekerjaan Instalasi Exhaust Fan - 02. - -


a. Exhaust Fan Unit unit 1.00 0.02 1.00 0.02 - - -
Ruang : R. Toilet Dosen & Tempat Wudlu - -
Type : Minitube Axial Fan - -
Kap. : 150 m3/jam - -
St. Press. : 52 Pa - -
Power : 30 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 402. - -
lengkap dengan peralatan pendukung (anciliries) - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
c. Ducting, BJLS 50, tanpa isolasi : - -
□ 100 mm x 100 mm m 4.00 0.00 4.00 0.00 - 4.00 0.00 4.00
□ 150 mm x 150 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
d. Exhaust air grille : - -
□ 100 mm x 100 mm pcs 2.00 0.00 2.00 0.00 - - -
e. Outdoor air grille : - -
□ 150 mm x 150 mm pcs 1.00 0.00 1.00 0.00 - - -
3 Pekerjaan Instalasi Exhaust Fan - 03 - -
a. Exhaust Fan Unit unit 1.00 0.01 1.00 0.01 - - -
Ruang : R. Panel - -
Type : Propeller Wall Mounted - -
Kap. : 150 m3/jam - -
St. Press. : 21 Pa - -
Power : 32 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 403 - -
lengkap dengan peralatan pendukung (anciliries) & auto shutter grille - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
4 Pekerjaan Instalasi Exhaust Fan - 04 - -
a. Exhaust Fan Unit unit 1.00 0.01 1.00 0.01 - - -
Ruang : R. Pantry - -
Type : Propeller Wall Mounted - -
Kap. : 100 m3/jam - -
St. Press. : 21 Pa - -
Power : 32 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 404 - -
lengkap dengan peralatan pendukung (anciliries) & auto shutter grille - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
5 Test & commissioning pekerjaan instalasi ventilasi mekanik/exhaust fan dan ducting lot 1.00 0.00 1.00 0.00 - - -

SUB JUMLAH - 4.D. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI 4 : 0.06 0.06 - 0.00

4.E. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI 5


1 Pekerjaan Instalasi Exhaust Fan - 01
a. Exhaust Fan Unit unit 1.00 0.02 1.00 0.02 - - -
Ruang : R. Toilet Pria & Wanita - -
Type : Minitube Axial Fan - -
Kap. : 400 m3/jam - -
St. Press. : 41 Pa - -
Power : 58 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 501 - -
lengkap dengan peralatan pendukung (anciliries) - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
c. Ducting, BJLS 50, tanpa isolasi : - -
□ 100 mm x 100 mm m 7.00 0.00 7.00 0.00 - 7.00 0.00 7.00
□ 125 mm x 125 mm m 1.50 0.00 1.50 0.00 - 1.50 0.00 1.50
□ 150 mm x 150 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
□ 175 mm x 175 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
□ 250 mm x 250 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
d. Exhaust air grille : - -
□ 100 mm x 100 mm pcs 6.00 0.00 6.00 0.00 - - -
e. Outdoor air grille : - -

76/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

□ 250 mm x 250 mm pcs 1.00 0.00 1.00 0.00 - - -


2. Pekerjaan Instalasi Exhaust Fan - 02. - -
a. Exhaust Fan Unit unit 1.00 0.02 1.00 0.02 - - -
Ruang : R. Toilet Dosen - -
Type : Minitube Axial Fan - -
Kap. : 150 m3/jam - -
St. Press. : 52 Pa - -
Power : 30 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 502. - -
lengkap dengan peralatan pendukung (anciliries) - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
c. Ducting, BJLS 50, tanpa isolasi : - -
□ 100 mm x 100 mm m 4.00 0.00 4.00 0.00 - 4.00 0.00 4.00
□ 150 mm x 150 mm m 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
d. Exhaust air grille : - -
□ 100 mm x 100 mm pcs 2.00 0.00 2.00 0.00 - - -
e. Outdoor air grille : - -
□ 150 mm x 150 mm pcs 1.00 0.00 1.00 0.00 - - -
3 Pekerjaan Instalasi Exhaust Fan - 03 - -
a. Exhaust Fan Unit unit 1.00 0.01 1.00 0.01 - - -
Ruang : R. Panel - -
Type : Propeller Wall Mounted - -
Kap. : 150 m3/jam - -
St. Press. : 21 Pa - -
Power : 32 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 503 - -
lengkap dengan peralatan pendukung (anciliries) & auto shutter grille - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
4 Pekerjaan Instalasi Exhaust Fan - 04 - -
a. Exhaust Fan Unit unit 1.00 0.01 1.00 0.01 - - -
Ruang : R. Pantry - -
Type : Propeller Wall Mounted - -
Kap. : 100 m3/jam - -
St. Press. : 21 Pa - -
Power : 32 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 504 - -
lengkap dengan peralatan pendukung (anciliries) & auto shutter grille - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
5 Test & commissioning pekerjaan instalasi ventilasi mekanik/exhaust fan dan ducting lot 1.00 0.00 1.00 0.00 - - -
- -
SUB JUMLAH - 4.E. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI 5 : 0.06 0.06 - 0.00

4.F. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI 6


1 Pekerjaan Instalasi Exhaust Fan - 01
a. Exhaust Fan Unit unit 1.00 0.02 1.00 0.02 - - -
Ruang : R. Toilet Pria & Wanita - -
Type : Minitube Axial Fan - -
Kap. : 400 m3/jam - -
St. Press. : 41 Pa - -
Power : 58 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 601 - -
lengkap dengan peralatan pendukung (anciliries) - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
c. Ducting, BJLS 50, tanpa isolasi : - -
□ 100 mm x 100 mm m 7.00 0.00 7.00 0.00 - 5.95 0.00 5.95
□ 125 mm x 125 mm m 1.50 0.00 1.50 0.00 - 1.28 0.00 1.28
□ 150 mm x 150 mm m 1.00 0.00 1.00 0.00 - 0.85 0.00 0.85
□ 175 mm x 175 mm m 1.00 0.00 1.00 0.00 - 0.85 0.00 0.85
□ 250 mm x 250 mm m 1.00 0.00 1.00 0.00 - 0.85 0.00 0.85
d. Exhaust air grille : - - -
□ 100 mm x 100 mm pcs 6.00 0.00 6.00 0.00 - - -

77/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

e. Outdoor air grille : - -


□ 250 mm x 250 mm pcs 1.00 0.00 1.00 0.00 - - -
2. Pekerjaan Instalasi Exhaust Fan - 02. - -
a. Exhaust Fan Unit unit 1.00 0.02 1.00 0.02 - - -
Ruang : R. Toilet Dosen & Wudhu - -
Type : Minitube Axial Fan - -
Kap. : 150 m3/jam - -
St. Press. : 52 Pa - -
Power : 30 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 602. - -
lengkap dengan peralatan pendukung (anciliries) - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
c. Ducting, BJLS 50, tanpa isolasi : - -
□ 100 mm x 100 mm m 4.00 0.00 4.00 0.00 - 3.40 0.00 3.40
□ 150 mm x 150 mm m 1.00 0.00 1.00 0.00 - 0.85 0.00 0.85
d. Exhaust air grille : - -
□ 100 mm x 100 mm pcs 2.00 0.00 2.00 0.00 - - -
e. Outdoor air grille : - -
□ 150 mm x 150 mm pcs 1.00 0.00 1.00 0.00 - - -
3 Pekerjaan Instalasi Exhaust Fan - 03 - -
a. Exhaust Fan Unit unit 1.00 0.01 1.00 0.01 - - -
Ruang : R. Panel - -
Type : Propeller Wall Mounted - -
Kap. : 150 m3/jam - -
St. Press. : 21 Pa - -
Power : 32 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 603 - -
lengkap dengan peralatan pendukung (anciliries) & auto shutter grille - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
4 Pekerjaan Instalasi Exhaust Fan - 04 - -
a. Exhaust Fan Unit unit 1.00 0.01 1.00 0.01 - - -
Ruang : R. Pantry - -
Type : Propeller Wall Mounted - -
Kap. : 100 m3/jam - -
St. Press. : 21 Pa - -
Power : 32 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 604 - -
lengkap dengan peralatan pendukung (anciliries) & auto shutter grille - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
5 Test & commissioning pekerjaan instalasi ventilasi mekanik/exhaust fan dan ducting lot 1.00 0.00 1.00 0.00 - - -

SUB JUMLAH - 4.F. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI 6 : 0.06 0.06 - 0.00

4.G. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI 7


1 Pekerjaan Instalasi Exhaust Fan - 01
a. Exhaust Fan Unit unit 1.00 0.02 1.00 0.02 - - -
Ruang : R. Toilet Pria & Wanita - -
Type : Minitube Axial Fan - -
Kap. : 400 m3/jam - -
St. Press. : 41 Pa - -
Power : 58 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 701 - -
lengkap dengan peralatan pendukung (anciliries) - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
c. Ducting, BJLS 50, tanpa isolasi : - -
□ 100 mm x 100 mm m 7.00 0.00 7.00 0.00 - - -
□ 125 mm x 125 mm m 1.50 0.00 1.50 0.00 - - -
□ 150 mm x 150 mm m 1.00 0.00 1.00 0.00 - - -
□ 175 mm x 175 mm m 1.00 0.00 1.00 0.00 - - -
□ 250 mm x 250 mm m 1.00 0.00 1.00 0.00 - - -
d. Exhaust air grille : - -

78/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

□ 100 mm x 100 mm pcs 6.00 0.00 6.00 0.00 - - -


e. Outdoor air grille : - -
□ 250 mm x 250 mm pcs 1.00 0.00 1.00 0.00 - - -
2. Pekerjaan Instalasi Exhaust Fan - 02. - -
a. Exhaust Fan Unit unit 1.00 0.02 1.00 0.02 - - -
Ruang : R. Toilet Dosen - -
Type : Minitube Axial Fan - -
Kap. : 150 m3/jam - -
St. Press. : 52 Pa - -
Power : 30 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 702. - -
lengkap dengan peralatan pendukung (anciliries) - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
c. Ducting, BJLS 50, tanpa isolasi : - -
□ 100 mm x 100 mm m 4.00 0.00 4.00 0.00 - - -
□ 150 mm x 150 mm m 1.00 0.00 1.00 0.00 - - -
d. Exhaust air grille : - -
□ 100 mm x 100 mm pcs 2.00 0.00 2.00 0.00 - - -
e. Outdoor air grille : - -
□ 150 mm x 150 mm pcs 1.00 0.00 1.00 0.00 - - -
3 Pekerjaan Instalasi Exhaust Fan - 03 - -
a. Exhaust Fan Unit unit 1.00 0.01 1.00 0.01 - - -
Ruang : R. Panel - -
Type : Propeller Wall Mounted - -
Kap. : 150 m3/jam - -
St. Press. : 21 Pa - -
Power : 32 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 703 - -
lengkap dengan peralatan pendukung (anciliries) & auto shutter grille - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
4 Pekerjaan Instalasi Exhaust Fan - 04 - -
a. Exhaust Fan Unit unit 1.00 0.01 1.00 0.01 - - -
Ruang : R. Pantry - -
Type : Propeller Wall Mounted - -
Kap. : 100 m3/jam - -
St. Press. : 21 Pa - -
Power : 32 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 704 - -
lengkap dengan peralatan pendukung (anciliries) & auto shutter grille - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
5 Test & commissioning pekerjaan instalasi ventilasi mekanik/exhaust fan dan ducting lot 1.00 0.00 1.00 0.00 - - -

SUB JUMLAH - 4.G. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI 7 : 0.06 0.06 - -

4.H. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI 8


1 Pekerjaan Instalasi Exhaust Fan - 01
a. Exhaust Fan Unit unit 1.00 0.02 1.00 0.02 - - -
Ruang : R. Toilet Pria & Wanita - -
Type : Minitube Axial Fan - -
Kap. : 400 m3/jam - -
St. Press. : 41 Pa - -
Power : 58 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 801 - -
lengkap dengan peralatan pendukung (anciliries) - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
c. Ducting, BJLS 50, tanpa isolasi : - -
□ 100 mm x 100 mm m 7.00 0.00 7.00 0.00 - - -
□ 125 mm x 125 mm m 1.50 0.00 1.50 0.00 - - -
□ 150 mm x 150 mm m 1.00 0.00 1.00 0.00 - - -
□ 175 mm x 175 mm m 1.00 0.00 1.00 0.00 - - -
□ 250 mm x 250 mm m 1.00 0.00 1.00 0.00 - - -

79/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

d. Exhaust air grille : - -


□ 100 mm x 100 mm pcs 6.00 0.00 6.00 0.00 - - -
e. Outdoor air grille : - -
□ 250 mm x 250 mm pcs 1.00 0.00 1.00 0.00 - - -
2. Pekerjaan Instalasi Exhaust Fan - 02. - -
a. Exhaust Fan Unit unit 1.00 0.02 1.00 0.02 - - -
Ruang : R. Toilet Dosen - -
Type : Minitube Axial Fan - -
Kap. : 150 m3/jam - -
St. Press. : 52 Pa - -
Power : 30 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 802. - -
lengkap dengan peralatan pendukung (anciliries) - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
c. Ducting, BJLS 50, tanpa isolasi : - -
□ 100 mm x 100 mm m 4.00 0.00 4.00 0.00 - - -
□ 150 mm x 150 mm m 1.00 0.00 1.00 0.00 - - -
d. Exhaust air grille : - -
□ 100 mm x 100 mm pcs 2.00 0.00 2.00 0.00 - - -
e. Outdoor air grille : - -
□ 150 mm x 150 mm pcs 1.00 0.00 1.00 0.00 - - -
3 Pekerjaan Instalasi Exhaust Fan - 03 - -
a. Exhaust Fan Unit unit 1.00 0.01 1.00 0.01 - - -
Ruang : R. Panel - -
Type : Propeller Wall Mounted - -
Kap. : 150 m3/jam - -
St. Press. : 21 Pa - -
Power : 32 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 803 - -
lengkap dengan peralatan pendukung (anciliries) & auto shutter grille - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
4 Pekerjaan Instalasi Exhaust Fan - 04 - -
a. Exhaust Fan Unit unit 1.00 0.01 1.00 0.01 - - -
Ruang : R. Pantry - -
Type : Propeller Wall Mounted - -
Kap. : 100 m3/jam - -
St. Press. : 21 Pa - -
Power : 32 W / 220 V / 1 ph / 50 Hz - -
Kode : EF - 804 - -
lengkap dengan peralatan pendukung (anciliries) & auto shutter grille - -
b. Instalasi kabel NYM 3 x 2,5 mm2 m 5.00 0.00 5.00 0.00 - - -
5 Test & commissioning pekerjaan instalasi ventilasi mekanik/exhaust fan dan ducting lot 1.00 0.00 1.00 0.00 - - -

SUB JUMLAH - 4.H. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI 8 : 0.06 0.06 - -

4.I. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI ATAP


1 Instalasi Pressurized Fan - 01
a. Pressurized Fan - 01 unit 1.00 0.10 1.00 0.10 - - -
Type : Centrifugal Fan - -
Kapasitas : 24.500 m3/jam - -
Static pressure : 415 Pa - -
Konsumsi daya : 7.500 Watt / 380 V / 3 Ph / 50 Hz - -
Servis : Tangga Darurat - -
Kode unit - -
Lengkap dengan instalasi kabel , dudukan, Outdoor Grille dan kelengkapan - -
pendukung lainnya - -
b. Ducting,tanpa isolasi : - -
□ 375 mm x 300 mm m 7.50 0.01 7.50 0.01 - 6.38 0.00 6.38
□ 650 mm x 300 mm m 4.50 0.00 4.50 0.00 - 3.83 0.00 3.83
□ 900 mm x 300 mm m 4.50 0.01 4.50 0.01 - 3.83 0.00 3.83
□ 950 mm x 350 mm m 4.50 0.01 4.50 0.01 - 3.83 0.01 3.83

80/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

□ 1.150 mm x 350 mm m 4.50 0.01 4.50 0.01 - 3.83 0.01 3.83


□ 1.350 mm x 350 mm m 4.50 0.01 4.50 0.01 - 3.83 0.01 3.83
□ 1.350 mm x 400 mm m 7.00 0.02 7.00 0.02 - 5.95 0.01 5.95
c. Grille - -
- SAG □ 375 mm x 300 mm pcs 7.00 0.00 7.00 0.00 - - -
d. Instalasi kabel NYM 4 x 2,5 mm2 m 56.00 0.01 56.00 0.01 - - -
2, Test & commissioning pekerjaan instalasi ventilasi mekanik/exhaust fan dan ducting lot 1.00 0.00 1.00 0.00 - - -

SUB JUMLAH - 4.I. PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN - LANTAI ATAP : 0.17 0.17 - 0.05
JUMLAH - 4, PEKERJAAN INSTALASI VENTILASI MEKANIK/EXHAUST FAN : 0.63 0.63 - 0.07

5, PEKERJAAN INSTALASI AIR CONDITIONING (AC)


Pengadaan dan pemasangan air conditioning (AC) lengkap dengan
pipa kabel daya, refrigerant berisolasi, pipa kondensat
dan perlengkapannya beserta pengetesan sistem dan instalasi.

5.A. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI 1


1 Instalasi Air Conditioning - 01
a. Unit AC : set 1.00 0.01 1.00 0.01 - 0.50 0.01 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Kajur - -
Tipe : Split, Wall Mounted - -
Kapasitas : 9.700 BTU/h - -
Electricity : 580 W / 220V / 1 ph / 50 Hz - -
Kode : FCU 101 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 101 - -
Lokasi : Outdoor lantai - 1 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.00 1.00 0.00 - 0.50 0.00 0.50
Instalasi kabel & kontrol, dan accessories - -
2 Instalasi Air Conditioning - 02 - -
a. Unit AC : set 1.00 0.01 1.00 0.01 - 0.50 0.01 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Rapat - -
Tipe : Split, Wall Mounted - -
Kapasitas : 7.700 BTU/h - -
Electricity : 580 W / 220V / 1 ph / 50 Hz - -
Kode : FCU 102 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 102 - -
Lokasi : Outdoor lantai - 1 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.00 1.00 0.00 - 0.50 0.00 0.50
Instalasi kabel & kontrol, dan accessories - -
3 Instalasi Air Conditioning - 03 - -
a. Unit AC : set 1.00 0.01 1.00 0.01 - 0.50 0.01 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Sekjur - -
Tipe : Split, Wall Mounted - -
Kapasitas : 7.700 BTU/h - -
Electricity : 580 W / 220V / 1 ph / 50 Hz - -
Kode : FCU 103 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 103 - -
Lokasi : Outdoor lantai - 1 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.00 1.00 0.00 - 0.50 0.00 0.50
Instalasi kabel & kontrol, dan accessories - -
4 Instalasi Air Conditioning - 04 - -
a. Unit AC : set 1.00 0.01 1.00 0.01 - 0.50 0.01 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Tunggu - -
Tipe : Split, Wall Mounted - -

81/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

Kapasitas : 9.700 BTU/h - -


Electricity : 750 W / 220V / 1 ph / 50 Hz - -
Kode : FCU 104 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 104 - -
Lokasi : Outdoor lantai - 1 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.00 1.00 0.00 - 0.50 0.00 0.50
Instalasi kabel & kontrol, dan accessories - -
5A&B Instalasi Air Conditioning - 05A&B - -
a. Unit AC : set 2.00 0.03 2.00 0.03 - 1.00 0.01 1.00
~ Fan coil unit (indoor unit) : - -
Ruang : R. Adm. Jurusan Matematika - -
Tipe : Split, Wall Mounted - -
Kapasitas : 9.700 BTU/h - -
Electricity : 750 W / 220V / 1 ph / 50 Hz - -
Kode : FCU 105A&B - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 105A&B - -
Lokasi : Outdoor lantai - 1 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.00 1.00 0.00 - 0.50 0.00 0.50
Instalasi kabel & kontrol, dan accessories - -
6 Instalasi Air Conditioning - 06 - -
a. Unit AC : set 1.00 0.08 1.00 0.08 - 0.50 0.04 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Rapat Besar - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 25.000 BTU/h - -
Electricity : 1.870 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 106 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 106 - -
Lokasi : Outdoor lantai - 1 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - 0.50 0.00 0.50
Instalasi kabel & kontrol, dan accessories - -
7 Instalasi Air Conditioning - 07 - -
a. Unit AC : set 1.00 0.01 1.00 0.01 - 0.50 0.01 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Prodi - 1 - -
Tipe : Split, Wall Mounted - -
Kapasitas : 7.700 BTU/h - -
Electricity : 580 W / 220V / 1 ph / 50 Hz - -
Kode : FCU 107 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 107 - -
Lokasi : Outdoor lantai - 1 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.00 1.00 0.00 - 0.50 0.00 0.50
Instalasi kabel & kontrol, dan accessories - -
8 Instalasi Air Conditioning - 08 - -
a. Unit AC : set 1.00 0.01 1.00 0.01 - 0.50 0.01 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Prodi - 2 - -
Tipe : Split, Wall Mounted - -
Kapasitas : 7.700 BTU/h - -
Electricity : 580 W / 220V / 1 ph / 50 Hz - -
Kode : FCU 108 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 108 - -
Lokasi : Outdoor lantai - 1 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.00 1.00 0.00 - 0.50 0.00 0.50
Instalasi kabel & kontrol, dan accessories - -
9 Instalasi Air Conditioning - 09 - -
a. Unit AC : set 3.00 0.11 3.00 0.11 - 1.50 0.06 1.50

82/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

~ Fan coil unit (indoor unit) : - -


Ruang : R. Lobby Lift - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 12.500 BTU/h - -
Electricity : 1.120 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 109 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 109 - -
Lokasi : Outdoor lantai - 1 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - 0.50 0.01 0.50
Instalasi kabel & kontrol, dan accessories - -
10 Instalasi Air Conditioning - 010 - -
a. Unit AC : set 1.00 0.09 1.00 0.09 - 0.50 0.04 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Lobby Lift - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 30.000 BTU/h - -
Electricity : 2.240 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 1010 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 1010 - -
Lokasi : Outdoor lantai - 1 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - 0.50 0.00 0.50
Instalasi kabel & kontrol, dan accessories - -
11 Test & commissioning pekerjaan instalasi air conditioning (AC) lot 1.00 0.02 1.00 0.02 - - -

SUB JUMLAH - 5.A. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI 1 : 0.45 0.45 - 0.22

5.B. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI 2


1 Instalasi Air Conditioning - 01
a. Unit AC : set 1.00 0.10 1.00 0.10 - 0.95 0.10 0.95
~ Fan coil unit (indoor unit) : - -
Ruang : R. Kelas - 1 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 40.000 BTU/h - -
Electricity : 2.980 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 201 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 201 - -
Lokasi : Outdoor lantai - 2 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - 1.00 0.01 1.00
Instalasi kabel & kontrol, dan accessories - -
2 Instalasi Air Conditioning - 02 - -
a. Unit AC : set 1.00 0.10 1.00 0.10 - 0.75 0.08 0.75
~ Fan coil unit (indoor unit) : - -
Ruang : R. Kelas - 2 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 40.000 BTU/h - -
Electricity : 2.980 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 202 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 202 - -
Lokasi : Outdoor lantai - 2 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - 1.00 0.01 1.00
Instalasi kabel & kontrol, dan accessories - -
3 Instalasi Air Conditioning - 03 - -
a. Unit AC : set 1.00 0.09 1.00 0.09 - 0.75 0.07 0.75
~ Fan coil unit (indoor unit) : - -
Ruang : R. Kelas - 3 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 30.000 BTU/h - -
Electricity : 2.240 W / 380V / 3 ph / 50 Hz - -

83/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

Kode : FCU 203 - -


~ Condensing unit (outdoor unit) : - -
Kode : CU 203 - -
Lokasi : Outdoor lantai - 2 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - 1.00 0.01 1.00
Instalasi kabel & kontrol, dan accessories - -
4 Instalasi Air Conditioning - 04 - -
a. Unit AC : set 1.00 0.09 1.00 0.09 - 0.50 0.04 0.50
~ Fan coil unit (indoor unit) :
Ruang : R. Kelas - 4
Tipe : Split, Ceiling Cassete
Kapasitas : 30.000 BTU/h
Electricity : 2.240 W / 380V / 3 ph / 50 Hz
Kode : FCU 204
~ Condensing unit (outdoor unit) :
Kode : CU 204
Lokasi : Outdoor lantai - 2
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - 1.00 0.01 1.00
Instalasi kabel & kontrol, dan accessories - -
5 Instalasi Air Conditioning - 05 - -
a. Unit AC : set 1.00 0.13 1.00 0.13 - 0.50 0.07 0.50
~ Fan coil unit (indoor unit) :
Ruang : R. Lobby Lift
Tipe : Split, Ceiling Cassete
Kapasitas : 30.000 BTU/h
Electricity : 2.240 W / 380V / 3 ph / 50 Hz
Kode : FCU 205
~ Condensing unit (outdoor unit) :
Kode : CU 205
Lokasi : Outdoor lantai - 2
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - 1.00 0.01 1.00
Instalasi kabel & kontrol, dan accessories - -
6 Test & commissioning pekerjaan instalasi air conditioning (AC) lot 1.00 0.02 1.00 0.02 - - -

SUB JUMLAH - 5.B. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI 2 : 0.58 0.58 - 0.40

5.C. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI 3


1 Instalasi Air Conditioning - 01
a. Unit AC : set 1.00 0.10 1.00 0.10 - 0.50 0.05 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Kelas - 1 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 40.000 BTU/h - -
Electricity : 2.980 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 301 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 301 - -
Lokasi : Outdoor lantai - 3 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - 1.00 0.01 1.00
Instalasi kabel & kontrol, dan accessories - -
2 Instalasi Air Conditioning - 02 - -
a. Unit AC : set 1.00 0.10 1.00 0.10 - 0.50 0.05 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Kelas - 2 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 40.000 BTU/h - -
Electricity : 2.980 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 302 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 302 - -
Lokasi : Outdoor lantai - 3 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - 1.00 0.01 1.00

84/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

Instalasi kabel & kontrol, dan accessories - -


3 Instalasi Air Conditioning - 03 - -
a. Unit AC : set 1.00 0.09 1.00 0.09 - 0.50 0.04 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Kelas - 3 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 30.000 BTU/h - -
Electricity : 2.240 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 303 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 303 - -
Lokasi : Outdoor lantai - 3 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - 1.00 0.01 1.00
Instalasi kabel & kontrol, dan accessories - -
4 Instalasi Air Conditioning - 04 - -
a. Unit AC : set 1.00 0.09 1.00 0.09 - 0.50 0.04 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Kelas - 4 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 30.000 BTU/h - -
Electricity : 2.240 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 304 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 304 - -
Lokasi : Outdoor lantai - 3 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - 1.00 0.01 1.00
Instalasi kabel & kontrol, dan accessories - -
5 Instalasi Air Conditioning - 05 - -
a. Unit AC : set 1.00 0.09 1.00 0.09 - 0.50 0.04 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Lobby Lift - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 30.000 BTU/h - -
Electricity : 2.240 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 305 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 305 - -
Lokasi : Outdoor lantai - 3 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - 1.00 0.01 1.00
Instalasi kabel & kontrol, dan accessories - -
6 Test & commissioning pekerjaan instalasi air conditioning (AC) lot 1.00 0.01 1.00 0.01 - - -

SUB JUMLAH - 5.C. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI 3 : 0.52 0.52 - 0.28

5.D. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI 4.


1 Instalasi Air Conditioning - 01
a. Unit AC : set 1.00 0.13 1.00 0.13 - 0.50 0.07 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Kelas - 1 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 40.000 BTU/h - -
Electricity : 2.980 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 401 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 401 - -
Lokasi : Outdoor lantai - 4 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - 1.00 0.01 1.00
Instalasi kabel & kontrol, dan accessories - -
2 Instalasi Air Conditioning - 02 - -
a. Unit AC : set 1.00 0.13 1.00 0.13 - 0.50 0.07 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Kelas - 2 - -

85/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

Tipe : Split, Ceiling Cassete - -


Kapasitas : 40.000 BTU/h - -
Electricity : 2.980 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 402 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 402 - -
Lokasi : Outdoor lantai - 4 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - 1.00 0.01 1.00
Instalasi kabel & kontrol, dan accessories - -
3 Instalasi Air Conditioning - 03 - -
a. Unit AC : set 1.00 0.01 1.00 0.01 - 0.50 0.00 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Penguji-1 - -
Tipe : Split, Wall Mounted - -
Kapasitas : 5.500 BTU/h - -
Electricity : 380 W / 220V / 1 ph / 50 Hz - -
Kode : FCU 403 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 403 - -
Lokasi : Outdoor lantai - 4 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
Instalasi kabel & kontrol, dan accessories - -
4 Instalasi Air Conditioning - 04 - -
a. Unit AC : set 1.00 0.01 1.00 0.01 - 0.50 0.01 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Micro Teaching -1 - -
Tipe : Split, Wall Mounted - -
Kapasitas : 12.700 BTU/h - -
Electricity : 1.120 W / 220V / 1 ph / 50 Hz - -
Kode : FCU 404 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 404 - -
Lokasi : Outdoor lantai - 4 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
Instalasi kabel & kontrol, dan accessories - -
5 Instalasi Air Conditioning - 05 - -
a. Unit AC : set 1.00 0.01 1.00 0.01 - 0.50 0.00 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Penguji-2 - -
Tipe : Split, Wall Mounted - -
Kapasitas : 5.500 BTU/h - -
Electricity : 380 W / 220V / 1 ph / 50 Hz - -
Kode : FCU 405 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 405 - -
Lokasi : Outdoor lantai - 4 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
Instalasi kabel & kontrol, dan accessories - -
6 Instalasi Air Conditioning - 06 - -
a. Unit AC : set 1.00 0.01 1.00 0.01 - 0.50 0.01 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Micro Teaching -2 - -
Tipe : Split, Wall Mounted - -
Kapasitas : 12.700 BTU/h - -
Electricity : 1.120 W / 220V / 1 ph / 50 Hz - -
Kode : FCU 406 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 406 - -
Lokasi : Outdoor lantai - 4 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
Instalasi kabel & kontrol, dan accessories - -
7 Instalasi Air Conditioning - 07 - -

86/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

a. Unit AC : set 1.00 0.01 1.00 0.01 - 0.50 0.00 0.50


~ Fan coil unit (indoor unit) : - -
Ruang : R. Penguji-3 - -
Tipe : Split, Wall Mounted - -
Kapasitas : 5.500 BTU/h - -
Electricity : 380 W / 220V / 1 ph / 50 Hz - -
Kode : FCU 407 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 407 - -
Lokasi : Outdoor lantai - 4 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
Instalasi kabel & kontrol, dan accessories - -
8 Instalasi Air Conditioning - 08 - -
a. Unit AC : set 1.00 0.01 1.00 0.01 - 0.50 0.01 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Micro Teaching -3 - -
Tipe : Split, Wall Mounted - -
Kapasitas : 12.700 BTU/h - -
Electricity : 1.120 W / 220V / 1 ph / 50 Hz - -
Kode : FCU 408 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 408 - -
Lokasi : Outdoor lantai - 4 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.00 1.00 0.00 - 1.00 0.00 1.00
Instalasi kabel & kontrol, dan accessories - -
9 Instalasi Air Conditioning - 09 - -
a. Unit AC : set 1.00 0.13 1.00 0.13 - 0.50 0.07 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Lobby Lift - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 30.000 BTU/h - -
Electricity : 2.240 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 409 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 409 - -
Lokasi : Outdoor lantai - 4 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - 1.00 0.01 1.00
Instalasi kabel & kontrol, dan accessories - -
10 Test & commissioning pekerjaan instalasi air conditioning (AC) lot 1.00 0.02 1.00 0.02 - - -

SUB JUMLAH - 5.D. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI 4. : 0.53 0.53 - 0.28

5.E. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI 5.


1 Instalasi Air Conditioning - 01
a. Unit AC : set 1.00 0.10 1.00 0.10 - 0.50 0.05 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Kelas - 1 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 40.000 BTU/h - -
Electricity : 2.980 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 501 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 501 - -
Lokasi : Outdoor lantai - 5 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - - -
Instalasi kabel & kontrol, dan accessories - -
2 Instalasi Air Conditioning - 02 - -
a. Unit AC : set 1.00 0.10 1.00 0.10 - 0.50 0.05 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Kelas - 2 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 40.000 BTU/h - -

87/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

Electricity : 2.980 W / 380V / 3 ph / 50 Hz - -


Kode : FCU 502 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 502 - -
Lokasi : Outdoor lantai - 5 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - - -
Instalasi kabel & kontrol, dan accessories - -
3 Instalasi Air Conditioning - 03 - -
a. Unit AC : set 1.00 0.09 1.00 0.09 - 0.50 0.04 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Kelas - 3 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 30.000 BTU/h - -
Electricity : 2.240 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 503 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 503 - -
Lokasi : Outdoor lantai - 5 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - - -
Instalasi kabel & kontrol, dan accessories - -
4 Instalasi Air Conditioning - 04 - -
a. Unit AC : set 1.00 0.09 1.00 0.09 - 0.50 0.04 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Kelas - 4 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 30.000 BTU/h - -
Electricity : 2.240 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 504 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 504 - -
Lokasi : Outdoor lantai - 5 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - - -
Instalasi kabel & kontrol, dan accessories - -
5 Instalasi Air Conditioning - 05 - -
a. Unit AC : set 1.00 0.13 1.00 0.13 - 0.50 0.07 0.50
~ Fan coil unit (indoor unit) : - - -
Ruang : R. Lobby Lift - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 30.000 BTU/h - -
Electricity : 2.240 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 505 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 505 - -
Lokasi : Outdoor lantai - 5 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - - -
Instalasi kabel & kontrol, dan accessories - -
6 Test & commissioning pekerjaan instalasi air conditioning (AC) lot 1.00 0.01 1.00 0.01 - - -

SUB JUMLAH - 5.E. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI 5. : 0.57 0.57 - 0.25

5.F. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI 6.


1 Instalasi Air Conditioning - 01
a. Unit AC : set 1.00 0.10 1.00 0.10 - 0.50 0.05 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Dosen - 1 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 40.000 BTU/h - -
Electricity : 2.980 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 601 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 601 - -
Lokasi : Outdoor lantai - 6 - -

88/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - - -
Instalasi kabel & kontrol, dan accessories - -
2 Instalasi Air Conditioning - 02 - -
a. Unit AC : set 1.00 0.10 1.00 0.10 - 0.50 0.05 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Dosen - 2 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 40.000 BTU/h - -
Electricity : 2.980 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 602 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 602 - -
Lokasi : Outdoor lantai - 6 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - - -
Instalasi kabel & kontrol, dan accessories - -
3 Instalasi Air Conditioning - 03 - -
a. Unit AC : set 1.00 0.09 1.00 0.09 - 0.50 0.04 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Dosen - 3 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 30.000 BTU/h - -
Electricity : 2.240 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 603 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 603 - -
Lokasi : Outdoor lantai - 6 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - - -
Instalasi kabel & kontrol, dan accessories - -
4 Instalasi Air Conditioning - 04 - -
a. Unit AC : set 1.00 0.09 1.00 0.09 - 0.50 0.04 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Dosen - 4 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 30.000 BTU/h - -
Electricity : 2.240 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 604 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 604 - -
Lokasi : Outdoor lantai - 6 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - - -
Instalasi kabel & kontrol, dan accessories - -
5 Instalasi Air Conditioning - 05 - -
a. Unit AC : set 1.00 0.09 1.00 0.09 - 0.50 0.04 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Lobby Lift - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 30.000 BTU/h - -
Electricity : 2.240 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 605 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 605 - -
Lokasi : Outdoor lantai - 6 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - - -
Instalasi kabel & kontrol, dan accessories - -
6 Test & commissioning pekerjaan instalasi air conditioning (AC) lot 1.00 0.01 1.00 0.01 - - -

SUB JUMLAH - 5.F. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI 6. : 0.52 0.52 - 0.23

5.G. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI 7.


1 Instalasi Air Conditioning - 01
a. Unit AC : set 1.00 0.10 1.00 0.10 - 0.50 0.05 0.50
~ Fan coil unit (indoor unit) : - -

89/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

Ruang : R. Dosen - 1 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 40.000 BTU/h - -
Electricity : 2.980 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 701 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 701 - -
Lokasi : Outdoor lantai - 7 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - - -
Instalasi kabel & kontrol, dan accessories - -
2 Instalasi Air Conditioning - 02 - -
a. Unit AC : set 1.00 0.10 1.00 0.10 - 0.50 0.05 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Dosen - 2 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 40.000 BTU/h - -
Electricity : 2.980 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 702 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 702 - -
Lokasi : Outdoor lantai - 7 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - - -
Instalasi kabel & kontrol, dan accessories - -
3 Instalasi Air Conditioning - 03 - -
a. Unit AC : set 1.00 0.09 1.00 0.09 - 0.50 0.04 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Dosen - 3 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 30.000 BTU/h - -
Electricity : 2.240 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 703 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 703 - -
Lokasi : Outdoor lantai - 7 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - - -
Instalasi kabel & kontrol, dan accessories - -
4 Instalasi Air Conditioning - 04 - -
a. Unit AC : set 1.00 0.09 1.00 0.09 - 0.50 0.04 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Dosen - 4 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 30.000 BTU/h - -
Electricity : 2.240 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 704 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 704 - -
Lokasi : Outdoor lantai - 7 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - - -
Instalasi kabel & kontrol, dan accessories - -
5 Instalasi Air Conditioning - 05 - -
a. Unit AC : set 1.00 0.13 1.00 0.13 - 0.50 0.07 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Lobby Lift - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 30.000 BTU/h - -
Electricity : 2.240 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 705 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 705 - -
Lokasi : Outdoor lantai - 7 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - - -
Instalasi kabel & kontrol, dan accessories - -

90/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

6 Test & commissioning pekerjaan instalasi air conditioning (AC) lot 1.00 0.07 1.00 0.07 - - -

SUB JUMLAH - 5.G. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI 7. : 0.63 0.63 - 0.25

5.H. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI 8.


1 Instalasi Air Conditioning - 01
a. Unit AC : set 1.00 0.10 1.00 0.10 - 0.50 0.05 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Serbaguna - 1 - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 40.000 BTU/h - -
Electricity : 2.980 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 801 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 801 - -
Lokasi : Outdoor lantai - 8 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.01 1.00 0.01 - - -
Instalasi kabel & kontrol, dan accessories - -
2A~D Instalasi Air Conditioning - 02A~D - -
a. Unit AC : set 4.00 0.25 4.00 0.25 - 2.00 0.13 2.00
~ Fan coil unit (indoor unit) : - -
Ruang : R. Serbaguna - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 21.000 BTU/h - -
Electricity : 1.490 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 802A~D - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 802A~D - -
Lokasi : Outdoor lantai - 8 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.03 1.00 0.03 - - -
Instalasi kabel & kontrol, dan accessories - -
3A&B Instalasi Air Conditioning - 03A&B - -
a. Unit AC : set 2.00 0.18 2.00 0.18 - 1.00 0.09 1.00
~ Fan coil unit (indoor unit) : - -
Ruang : R. Pre Function - -
Tipe : Split, Ceiling Cassete - -
Kapasitas : 30.000 BTU/h - -
Electricity : 2.240 W / 380V / 3 ph / 50 Hz - -
Kode : FCU 803A&B - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 803A&B - -
Lokasi : Outdoor lantai - 8 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.02 1.00 0.02 - - -
Instalasi kabel & kontrol, dan accessories - -
4 Instalasi Air Conditioning - 04 - -
a. Unit AC : set 1.00 0.02 1.00 0.02 - 0.50 0.01 0.50
~ Fan coil unit (indoor unit) : - -
Ruang : R. Himpunan Mahasiswa - -
Tipe : Split, Wall Mounted - -
Kapasitas : 12.700 BTU/h - -
Electricity : 1.120 W / 220V / 1 ph / 50 Hz - -
Kode : FCU 804 - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 804 - -
Lokasi : Outdoor lantai - 8 - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.00 1.00 0.00 - - -
Instalasi kabel & kontrol, dan accessories - -
8 Test & commissioning pekerjaan instalasi air conditioning (AC) lot 1.00 0.02 1.00 0.02 - - -

SUB JUMLAH - 5.H. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI 8. : 0.62 0.62 - 0.27

5.E. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI ATAP.

91/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

1A&B Instalasi Air Conditioning - 01A&B


a. Unit AC : set 1.00 0.01 -
~ Fan coil unit (indoor unit) : - -
Ruang : R. Mesin Lift - -
Tipe : Split, Wall Mounted - -
Kapasitas : 9.700 BTU/h - -
Electricity : 1.000 W / 220V / 1 ph / 50 Hz - -
Kode : FCU 901A&B - -
~ Condensing unit (outdoor unit) : - -
Kode : CU 901A&B - -
Lokasi : Outdoor lantai - Atap - -
b. Instalasi pipa refrigerant & isolasi, pipa uPVC AW Class & isolasi, ls 1.00 0.00 -
Instalasi kabel & kontrol, dan accessories - -
2 Test & commissioning pekerjaan instalasi air conditioning (AC) lot 1.00 0.00 -

SUB JUMLAH - 5.E. PEKERJAAN INSTALASI AIR CONDITIONING (AC) - LANTAI ATAP. : 0.02 - - -
JUMLAH - 5, PEKERJAAN INSTALASI AIR CONDITIONING (AC) : 4.44 4.42 - 2.18

6, PEKERJAAN TRANSPORTASI DALAM GEDUNG


Pengadaan dan pemasangan Elevator, beserta peralatan pendukungnya
beserta pengetesan performance unit.

1 Instalasi Elevator/Lift - 01
Type : Passenger - Gearless set 1.00 1.00
Kapasitas : 1.350 kg
Speed : 90 mpm
Door Type : 2 Panel Center Opening
Floor of serve : 8 stop/ 8 opening
CWT Location : Rear
Machine Type : AC - Gearless
Machine Location : In Machine Room
Power : 18,5 KW / 380 V / 3 ph / 50 Hz
Kode : LIFT - 01
Lengkap dengan fasilitas standart feature
2 Test & Commisioning ls 1.00 1.00

JUMLAH - 6,PEKERJAAN TRANSPORTASI DALAM GEDUNG :

92/107
PEMILIK PROYEK Konsultan Pengawas, LAPORAN PROGRESS KONTRAKTOR PELAKSANA

UNIVERSITAS NEGERI MEDAN PT. Wahanacipta Bangunwisma PEKERJAAN KONSTRUKSI PT. GUNAKARYA NUSANTARA
PEMBANGUNAN GEDUNG TOWER FMIPA JURUSAN FISIKA
LOKASI JL. WILLEM ISKANDAR PASAR V, MEDAN
No. Kontrak :1465/UN33-PPK/PNBP/SP/2018
MINGGU KE : XXIX (KEDUA PULUH SEMBILAN)
PERIODE : 12 NOVEMBER S/D 18 NOVEMBER 2018
LINGKUP PEKERJAAN : ELEKTRIKAL
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

D. PEKERJAAN ELEKTRIKAL
II. BANGUNAN UTAMA JURUSAN FISIKA

II.1. PEKERJAAN LANTAI -1 (SATU)


1 Panel Hubung Bagi
Panel PSD /NE unit 1.00 0.62 1.00 0.62 - 1.00 0.62 1.00
Panel P-1 unit 1.00 0.05 1.00 0.05 - 1.00 0.05 1.00
Panel PAC-1 unit 1.00 0.05 1.00 0.05 - 1.00 0.05 1.00
2 Kabel Feeder
Dari PUTR ke PSD/NE, NYFGbY 4x240 mm2 m 135.00 MASUK THP II 135.00 MASUK THP II
Dari PSD ke P-1, NYY 4x4 mm2 m 10.00 0.00 10.00 0.00 - - -
Dari PSD ke PAC-1, NYY 4x10 mm2 m 10.00 0.00 10.00 0.00 - - -
Dari PAC-1 ke FCU.101/CU.101, NYA 3x2.5 mm2 m 12.00 0.00 12.00 0.00 - - -
Dari PAC-1 ke FCU.102/CU.102, NYA 3x2.5 mm2 m 17.00 0.00 17.00 0.00 - - -
Dari PAC-1 ke FCU.103/CU.103, NYA 3x2.5 mm2 m 14.00 0.00 14.00 0.00 - - -
Dari PAC-1 ke FCU.104/CU.104, NYA 3x2.5 mm2 m 12.00 0.00 12.00 0.00 - - -
Dari PAC-1 ke FCU.105.A/CU.105.A, NYA 3x2.5 mm2 m 14.00 0.00 14.00 0.00 - - -
Dari PAC-1 ke FCU.105.B/CU.105.B, NYA 3x2.5 mm2 m 16.00 0.00 16.00 0.00 - - -
Dari PAC-1 ke FCU.106/CU.1061, NYA 3x2.5 mm2 m 12.00 0.00 12.00 0.00 - - -
Dari PAC-1 ke FCU.107/CU.107, NYA 3x2.5 mm2 m 17.00 0.00 17.00 0.00 - - -
Dari PAC-1 ke FCU.108/CU.108, NYA 3x2.5 mm2 m 14.00 0.00 14.00 0.00 - - -
Dari PAC-1 ke FCU.109/CU.109, NYA 3x2.5 mm2 m 12.00 0.00 12.00 0.00 - - -
Dari PAC-1 ke FCU.110/CU.110, NYA 3x2.5 mm2 m 14.00 0.00 14.00 0.00 - - -
Dari PAC-1 ke EFT-101, NYA 3x2.5 mm2 m 16.00 0.00 16.00 0.00 - - -
Pekerjaan tanah jalur kabel feeder kedalaman 80 cm (galian, pasir urug, - -
bata pengaman, urugan kembali, pemadatan dan patok tanda kabel) m 125.00 0.05 125.00 0.05 - - -
Alat bantu lot 1.00 0.00 1.00 0.00 - - -
3 Pembumian Pengaman - -
Kabel - -
a NYA 1x4 mm2 m' 10.00 0.00 10.00 0.00 - - -
b NYA 1x10 mm2 m' 10.00 0.00 10.00 0.00 - - -
Titik Pentanahan titik 1.00 0.01 1.00 0.01 - - -
Bak Kontrol 60x60x60 cm unit 1.00 0.00 1.00 0.00 - - -
Alat bantu lot 1.00 0.00 1.00 0.00 - - -
4 Pencahayaan - -
Lampu RM 300 ML TL-D 2x36 W Mirror Louvre bh 18.00 0.08 18.00 0.08 12.00 0.05 3.30 0.01 3.30
Lampu TK TG 1x36 TL-D 1x36 W bh 2.00 0.00 10.00 0.02 8.50 0.01 - -
Lampu BL MA5 TL-D 1x36 W bh 6.00 0.01 10.00 0.01 8.50 0.01 - -
Down Light RD 150 E27 Essential 1x18 W bh 14.00 0.01 14.00 0.01 10.00 0.01 1.90 0.00 1.90
Lampu downlight RD 125 E27 Geniel 1x14 W bh 10.00 0.01 10.00 0.01 8.50 0.01 - -
Lampu downlight SMD 150 E27 Essential 1x18 W bh 4.00 0.01 4.00 0.01 3.40 0.00 - -
Lampu Keluar TL-D 1x8 W berikut battery Ni.Cad dan charger bh 1.00 0.01 1.00 0.01 0.85 0.01 - -
Saklar tunggal, 10 A, 250 VAC bh 12.00 0.00 12.00 0.00 10.20 0.00 - -
Saklar ganda, 10 A, 250 VAC bh 7.00 0.00 7.00 0.00 5.95 0.00 - -
Saklar tukar tunggal, 10 A, 250 VAC bh 2.00 0.00 6.00 0.00 5.10 0.00 -
Instalasi pencahayaan, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 55.00 0.08 63.00 0.09 63.00 0.09 -
5 Kotak Kontak - -
Kotak kontak biasa, 1fasa 15 A, 250 VAC bh 24.00 0.01 28.00 0.01 23.80 0.01 -
Kotak kontak Water Proof, 1fasa 15 A, 250 VAC bh 1.00 0.00 1.00 0.00 0.85 0.00 -
Kotak kontak lantai, 1fasa 15 A, 250 VAC bh 3.00 0.00 3.00 0.00 2.55 0.00 -
Instalasi kotak kontak, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 28.00 0.04 28.00 0.04 28.00 0.04 -
6 Telepon - -
Kotak kontak telepon bh 9.00 0.00 9.00 0.00 - 7.65 0.00 7.65
Instalasi telepon, kabel dalam pipa konduit uPVC HI Ø 20 mm titik 9.00 0.01 9.00 0.01 7.65 0.01 -
Pesawat Telepon Standar unit 9.00 0.01 9.00 0.01 - 7.65 0.01 7.65
Kotak Terminal Telepon 20 Pairs, TBT-1 unit 1.00 0.00 1.00 0.00 - 0.85 0.00 0.85
Kabel dari MDF ke TBT-1, ITC 20x2x0,6 mm m' 128.00 0.02 128.00 0.02 - 108.80 0.02 108.80
Pekerjaan tanah jalur kabel feeder kedalaman 80 cm (galian, pasir urug, - - -
bata pengaman, urugan kembali, pemadatan dan patok tanda kabel) m 116.36 0.05 116.36 0.05 80.00 0.03 18.91 0.01 18.91
Alat bantu (pipa pelindung dan fittings) lot 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
PABX 4/34 ext, lengkap dengan battery, line arrrester, dan - - -
93/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

peralatan lainnya sesuai spesifikasi teknik dan gambar unit 1.00 0.46 1.00 0.46 0.50 0.23 0.35 0.16 0.35
MDF 2x40 Pair unit 1.00 0.04 1.00 0.04 0.50 0.02 0.35 0.01 0.35
7 Deteksi dan Alarm Kebakaran - - -
PKFA Semi Addressable 1 Loop 250 Address, lengkap dengan unit 1.00 0.37 1.00 0.37 0.50 0.18 0.35 0.13 0.35
battery, battery charger, Master intercom dan pentanahan - - -
Announciator unit 1.00 0.10 1.00 0.10 0.50 0.05 0.35 0.04 0.35
TBFA - 1 bh 1.00 0.01 1.00 0.01 0.50 0.00 0.35 0.00 0.35
Detektor Asap bh 4.00 0.01 4.00 0.01 3.00 0.01 0.40 0.00 0.40
Detektor Panas ROR bh 8.00 0.01 8.00 0.01 4.00 0.00 2.80 0.00 2.80
Titik panggil manual dengan Jack telepon bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
Bell alarm bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
Lampu indikator bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
End of line Resistor (EOL) bh 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
Instalasi jack telepon, kabel ITC 2x2x0.6 mm2 dalam konduit uPVC, HI, Ø 20 mm ttk 1.00 0.00 1.00 0.00 1.00 0.00 - - -
Kabel Loop Data, Power dan Intercom dari Panel Kontrol (PKFA-A) ke TBFA-1 : - - -
a. Nontwisted Pair Nonshielded Cable AWG #16 1 Pair dlm konduit uPVC20 mm m' 12.00 0.00 12.00 0.00 10.00 0.00 0.20 0.00 0.20
b. NYA 1,5 mm2x3 dalam Konduit uPVC HI Ø 20 mm m' 12.00 0.00 12.00 0.00 10.00 0.00 0.20 0.00 0.20
c. ITC 2x2x0,6 mm dalam Konduit uPVC Ø 20 mm m' 12.00 0.00 12.00 0.00 10.00 0.00 0.20 0.00 0.20
Kabel Data dan Power dari Panel Kontrol (PKFA-A) ke Annunciator - - -
a. Shielded Twisted Pair AWG #16 1Pair dalam konduit uPVC Ø 20 mm m' 22.00 0.00 22.00 0.00 16.00 0.00 2.70 0.00 2.70
b. NYA 1,5mm2 x 2 dalam konduit uPVC Ø 20 mm m' 22.00 0.00 22.00 0.00 16.00 0.00 2.70 0.00 2.70
Instalasi titik deteksi, kabel NYA 1,5mm2x2 dalam konduit uPVC, HI, Ø 20 mm ttk 12.00 0.02 12.00 0.02 10.00 0.01 0.20 0.00 0.20
Pengesahan dari Depnaker lot 1.00 0.01 1.00 0.01 0.50 0.00 0.35 0.00 0.35
8 Tata Suara - - -
Sistim Public Adress - - -
- Speaker Plafon 6/3 W bh 4.00 0.00 4.00 0.00 2.00 0.00 1.40 0.00 1.40
- Kontrol Volume dengan Saklar 30 W bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Instalasi Speaker Plafon dan volume kontrol, kabel dalam konduit uPVC Ø 20mm titk 6.00 0.00 6.00 0.00 4.00 0.00 2.00 0.00 2.00
- Kotak Terminal Tata Suara, TBS-1 unit 1.00 0.02 1.00 0.02 0.50 0.01 0.35 0.01 0.35
- Kabel dari MDF Tata Suara ke TBS-1, - - -
kabel NYMHY 3x1,5 mm2 dalam Konduit uPVC Ø 20 mm m' 10.00 0.00 10.00 0.00 0.50 0.00 8.00 0.00 8.00
- Peralatan Utama Tata Suara, lengkap dengan : set 1.00 0.24 1.00 0.24 0.50 0.12 0.35 0.08 0.35
a 1 buah CD Player dengan FM Tuner - -
b 1 unit Remote Mic - -
c 1 unit Paging Mic - -
d 1 unit Power Amplifier 120 W - -
e 1 unit Mixer Pre Amplifier - -
f Zone Slector Switch 12 Zone - -
g 1 Lot Cabinet Rack & accessories - -
h 1 unit MDF Tata Suara - -
Sistim Car Calling - -
- Speaker Clear Horn 10 W lengkap dengan tiang dan pondasi bh 4.00 0.06 4.00 0.06 2.00 0.03 1.40 0.02 1.40
- Kabel instalasi Horn Speaker, NYYHY 2x1,5 mm2 m' 210.00 0.07 210.00 0.07 150.00 0.05 28.50 0.01 28.50
- Pekerjaan Tanah Jalur Kabel kedalaman 60 cm (galian,urugan pasir, beton - -
pelindung kabel, urugan kembali bekas galian, pemadatan, buang sisa galian - -
dan pemasangan patok tanda jalur kabel) m' 96.00 0.03 96.00 0.03 50.00 0.02 31.60 0.01 31.60
- Alat Bantu (Pipa Pelindung) lot 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Kotak Terminal Tata Suara, TBS-Car Call unit 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Peralatan Utama Car Call, lengkap : set 1.00 0.04 1.00 0.04 0.50 0.02 0.35 0.02 0.35
- 1 unit Paging Mic - -
- 1 unit Mixer Amplifier 60 W - -
9 CCTV - -
- Kamera dome berwarna type PTZ unit 2.00 0.06 2.00 0.06 1.00 0.03 0.70 0.02 0.70
- Instalasi CCTV, kabel Coaxial 5C-2V dalam konduit uPVC Ø 20 mm ttk 2.00 0.01 2.00 0.01 1.00 0.00 1.00 0.00 1.00
- Instalasi daya Kamera, Kabel NYA 3x2,5 mm2 dalam uPVC Ø 20 mm ttk 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
- Instalasi Kabel Kontrol, Kabel STP AWG #18 dalam konduit uPVC Ø 20 mm ttk 2.00 0.01 2.00 0.01 1.00 0.00 1.00 0.00 1.00
- Peralatan Utama Sistem CCTV : set 1.00 0.98 1.00 0.98 - - - -
a 1 unit DVR 16 Channel - -
b Matrix Switcher - -
c Controller - -
d Multi Screen LED Monitor 32" - -
e UPS - -
10 Rak Kabel - -
Rak Kabel Elektrikal - -
a. Tray Type TRC 300x100 mm - -
- Straight Tray m' 10.00 0.02 10.00 0.02 8.00 0.01 2.00 0.00 2.00
- Flat Wise Elbow bh 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
- Flat Wise Tee bh 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
- Riser bh 3.00 0.00 3.00 0.00 3.00 0.00 - -
- Reducer 300 - 200 mm bh 1.00 0.00 1.00 0.00 1.00 0.00 - -
- Ladder 600x100 mm dalam shaft m' 4.00 0.01 4.00 0.01 3.00 0.01 1.00 0.00 1.00
94/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 1.00 0.00 - -
b Tray Type TRC 200x100 mm - -
- Straight Tray m' 13.00 0.02 13.00 0.02 10.00 0.01 3.00 0.00 3.00
- Jointing Set set 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 1.00 0.00 - -
Rak Kabel Elektronik (Tray 200x100mm Tipe TRC) - -
a Tray Type TRC 200x100 mm - -
- Straight Tray m' 27.00 0.04 27.00 0.04 20.00 0.03 7.00 0.01 7.00
- Flat Wise Elbow bh 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Flat Wise Tee bh 1.00 0.00 1.00 0.00 1.00 0.00 - -
- Flat Wise Cross bh 1.00 0.00 1.00 0.00 1.00 0.00 - -
- Riser bh 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Reducer 200 - 100 mm bh 1.00 0.00 1.00 0.00 1.00 0.00 - -
- Ladder 600x100 mm dalam shaft m' 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
- Jointing Set set 20.00 0.01 20.00 0.01 18.00 0.01 2.00 0.00 2.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.01 1.00 0.01 1.00 0.01 - -
b Tray Type TRC 150x100 mm - -
- Straight Tray m' 13.00 0.02 13.00 0.02 10.00 0.01 3.00 0.00 3.00
- Jointing Set set 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 1.00 0.00 - -
11 Pengujian seluruh Pekerjaan Elektrikal lantai 1 lot 1.00 0.02 1.00 0.02 1.00 0.02 - -
SUB JUMLAH ELEKTRIKAL - LANTAI 1 3.89 3.92 1.25 1.33

II.2 PEKERJAAN LANTAI - 2 (DUA)


1 Panel Hubung Bagi
- Panel P-2 unit 1.00 0.07 1.00 0.07 0.50 0.04 0.50 0.04 0.50
- Panel PAC-2 unit 1.00 0.04 1.00 0.04 0.50 0.02 0.50 0.02 0.50
2 Kabel Feeder - -
- Dari PSD ke P-2, NYY 4x4 mm2 m 14.00 0.00 14.00 0.00 - - -
- Dari PSD ke PAC-2, NYY 4x10 mm2 m 14.00 0.00 14.00 0.00 - - -
- Dari PAC-2 ke FCU.201/CU.201, NYA 3x2.5 mm2 m 17.00 0.00 17.00 0.00 - - -
- Dari PAC-2 ke FCU.202/CU.202, NYA 3x2.5 mm2 m 15.00 0.00 15.00 0.00 - - -
- Dari PAC-2 ke FCU.203/CU.203, NYA 3x2.5 mm2 m 18.00 0.00 18.00 0.00 - - -
- Dari PAC-2 ke FCU.204 A/CU.204 A, NYA 3x2.5 mm2 m 12.00 0.00 12.00 0.00 - - -
- Dari PAC-2 ke FCU.204 B/CU.204 B, NYA 3x2.5 mm2 m 13.00 0.00 13.00 0.00 - - -
- Dari PAC-2 ke FCU.205/CU.205, NYA 3x2.5 mm2 m 17.00 0.00 17.00 0.00 - - -
- Dari PAC-2 ke EFT-201, NYA 3x2.5 mm2 m 11.00 0.00 11.00 0.00 - - -
- Alat bantu lot 1.00 0.00 1.00 0.00 - - -
3 Pembumian Pengaman
- Kabel
a NYA 1x4 mm2 m' 14.00 0.00 14.00 0.00 - - -
b NYA 1x10 mm2 m' 14.00 0.00 14.00 0.00 - - -
- Alat bantu lot 1.00 0.00 1.00 0.00 - - -
4 Pencahayaan - -
- Lampu RMO TL-D 2x36 W bh 12.00 0.03 12.00 0.03 10.00 0.03 2.00 0.01 2.00
- Lampu TK TG 1x36 TL-D 1x36 W bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Lampu BL MA5 TL-D 1x36 W bh 6.00 0.01 6.00 0.01 4.00 0.00 1.10 0.00 1.10
- Lampu GMS TP 1x36 W TL-D 1x36 W, Acrylic Cover bh 4.00 0.01 4.00 0.01 2.00 0.01 1.40 0.00 1.40
- Down Light RD 150 E27 Essential 1x18 W bh 8.00 0.01 8.00 0.01 4.00 0.00 2.80 0.00 2.80
- Lampu downlight RD 125 E27 Geniel 1x14 W bh 10.00 0.01 10.00 0.01 6.00 0.00 2.50 0.00 2.50
- Lampu Keluar TL-D 1x8 W berikut battery Ni.Cad dan charger bh 2.00 0.01 2.00 0.01 1.00 0.01 0.70 0.00 0.70
- Saklar tunggal, 10 A, 250 VAC bh 14.00 0.00 14.00 0.00 10.00 0.00 1.90 0.00 1.90
- Saklar ganda, 10 A, 250 VAC bh 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
- Saklar tripel, 10 A, 250 VAC bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Saklar tukar tunggal, 10 A, 250 VAC bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Instalasi pencahayaan, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 43.00 0.06 43.00 0.06 30.00 0.04 6.55 0.01 6.55
5 Kotak Kontak - - -
- Kotak kontak biasa, 1fasa 15 A, 250 VAC bh 13.00 0.00 13.00 0.00 9.00 0.00 2.05 0.00 2.05
- Kotak kontak lantai, 1fasa 15 A, 250 VAC bh 6.00 0.01 6.00 0.01 4.00 0.01 1.10 0.00 1.10
- Instalasi kotak kontak, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 13.00 0.02 13.00 0.02 10.00 0.01 3.00 0.00 3.00
6 Telepon - - -
- Kotak kontak telepon bh 3.00 0.00 3.00 0.00 1.50 0.00 1.05 0.00 1.05
- Instalasi telepon, kabel dalam pipa konduit uPVC HI Ø 20 mm titik 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Pesawat Telepon Standar unit 3.00 0.01 3.00 0.01 2.00 0.00 0.55 0.00 0.55
- Kotak Terminal Telepon 20 Pairs, TBT-2 unit 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Kabel dari MDF ke TBT-2, ITC 20x2x0,6 mm m' 18.00 0.00 18.00 0.00 12.00 0.00 3.30 0.00 3.30
7 Deteksi dan Alarm Kebakaran - - -
- TBFA - 2 bh 1.00 0.01 1.00 0.01 1.00 0.01 - - -
- Detektor Asap bh 4.00 0.01 4.00 0.01 3.00 0.01 1.00 0.00 1.00
- Detektor Panas ROR bh 8.00 0.01 8.00 0.01 6.00 0.01 2.00 0.00 2.00
- Titik panggil manual dengan Jack telepon bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35

95/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

- Bell alarm bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Lampu indikator bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- End of line Resistor (EOL) bh 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
- Instalasi jack telepon, kabel ITC 2x2x0.6 mm2 dalam konduit uPVC, HI, Ø 20 mm ttk 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Kabel Loop Data, Power dan Intercom dari Panel Kontrol (PKFA-A) ke TBFA-2 : - - -
a. Nontwisted Pair Nonshielded Cable AWG #16 1 Pair dlm konduit uPVC20 mm m' 16.00 0.00 16.00 0.00 11.00 0.00 2.60 0.00 2.60
b. NYA 1,5 mm2x3 dalam Konduit uPVC HI Ø 20 mm m' 16.00 0.00 16.00 0.00 11.00 0.00 2.60 0.00 2.60
c. ITC 2x2x0,6 mm dalam Konduit uPVC Ø 20 mm m' 16.00 0.00 16.00 0.00 11.00 0.00 2.60 0.00 2.60
- Instalasi titik deteksi, kabel NYA 1,5mm2x2 dalam konduit uPVC, HI, Ø 20 mm ttk 15.00 0.02 15.00 0.02 12.00 0.02 3.00 0.00 3.00
8 Tata Suara - - -
Sistim Public Adress - - -
- Speaker Plafon 6/3 W bh 4.00 0.00 4.00 0.00 2.00 0.00 2.00 0.00 2.00
- Kontrol Volume dengan Saklar 30 W bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Instalasi Speaker Plafon dan volume kontrol, kabel dalam konduit uPVC Ø 20mm titk 5.00 0.00 5.00 0.00 4.00 0.00 1.00 0.00 1.00
- Speaker Kotak 6/3 W bh 2.00 0.01 2.00 0.01 1.00 0.01 0.70 0.00 0.70
- Instalasi Speaker kotak, kabel dalam konduit uPVC Ø 20mm titk 2.00 0.02 2.00 0.02 1.00 0.01 1.00 0.01 1.00
- Kotak Terminal Tata Suara, TBS-2 unit 1.00 0.02 1.00 0.02 0.50 0.01 0.35 0.01 0.35
- Kabel dari MDF Tata Suara ke TBS-2, - - -
kabel NYMHY 3x1,5 mm2 dalam Konduit uPVC Ø 20 mm m' 14.00 0.00 14.00 0.00 9.00 0.00 2.90 0.00 2.90
- Rak sistem multimedia set 3.00 0.07 3.00 0.07 2.00 0.05 0.55 0.01 0.55
- Motorized screen unit 3.00 0.14 3.00 0.14 2.00 0.09 0.55 0.03 0.55
- LCD proyector ls 6.00 0.10 6.00 0.10 3.00 0.05 2.10 0.04 2.10
9 CCTV - - -
- Kamera dome berwarna type PTZ unit 8.00 0.23 8.00 0.23 6.00 0.17 2.00 0.06 2.00
- Instalasi CCTV, kabel Coaxial 5C-2V dalam konduit uPVC Ø 20 mm ttk 8.00 0.02 8.00 0.02 6.00 0.02 2.00 0.01 2.00
- Instalasi daya Kamera, Kabel NYA 3x2,5 mm2 dalam uPVC Ø 20 mm ttk 8.00 0.02 8.00 0.02 6.00 0.01 2.00 0.00 2.00
- Instalasi Kabel Kontrol, Kabel STP AWG #18 dalam konduit uPVC Ø 20 mm ttk 8.00 0.03 8.00 0.03 6.00 0.02 2.00 0.01 2.00
- Rak CCTV unit 3.00 0.06 3.00 0.06 1.50 0.03 1.05 0.02 1.05
- DVR unit 3.00 0.11 3.00 0.11 1.50 0.06 1.05 0.04 1.05
10 Rak Kabel - -
Rak Kabel Elektrikal - -
a. Tray Type TRC 300x100 mm - -
- Straight Tray m' 10.00 0.02 10.00 0.02 8.00 0.01 2.00 0.00 2.00
- Flat Wise Elbow bh 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
- Flat Wise Tee bh 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
- Riser bh 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Reducer 300 - 200 mm bh 1.00 0.00 1.00 0.00 1.00 0.00 - - -
- Ladder 600x100 mm dalam shaft m' 4.00 0.01 4.00 0.01 2.00 0.00 2.00 0.00 2.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 1.00 0.00 - - -
b Tray Type TRC 200x100 mm - - -
- Straight Tray m' 13.00 0.02 13.00 0.02 11.00 0.02 2.00 0.00 2.00
- Jointing Set set 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 1.00 0.00 - - -
Rak Kabel Elektronik (Tray 200x100mm Tipe TRC) - - -
a Tray Type TRC 200x100 mm - - -
- Straight Tray m' 18.00 0.03 18.00 0.03 16.00 0.02 2.00 0.00 2.00
- Flat Wise Elbow bh 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Flat Wise Tee bh 1.00 0.00 1.00 0.00 1.00 0.00 - - -
- Flat Wise Cross bh 1.00 0.00 1.00 0.00 1.00 0.00 - - -
- Riser bh 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Reducer 200 - 100 mm bh 1.00 0.00 1.00 0.00 1.00 0.00 - - -
- Ladder 600x100 mm dalam shaft m' 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
- Jointing Set set 17.00 0.01 17.00 0.01 15.00 0.00 2.00 0.00 2.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 1.00 0.00 - - -
b Tray Type TRC 150x100 mm - - -
- Straight Tray m' 13.00 0.02 13.00 0.02 12.00 0.02 1.00 0.00 1.00
- Jointing Set set 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 1.00 0.00 - - -
11 Pengujian seluruh Pekerjaan Elektrikal lantai 2 lot 1.00 0.02 1.00 0.02 1.00 0.02 - -
SUB JUMLAH ELEKTRIKAL - LANTAI 2 1.38 1.38 0.89 0.36

II.3. PEKERJAAN LANTAI - 3 (TIGA)


1 Panel Hubung Bagi
- Panel P-3 unit 1.00 0.07 1.00 0.07 0.50 0.04 0.50 0.04 0.50
- Panel PAC-3 unit 1.00 0.04 1.00 0.04 0.50 0.02 0.50 0.02 0.50
2 Kabel Feeder - -
- Dari PSD ke P-3, NYY 4x4 mm2 m 14.00 0.00 14.00 0.00 - - -
- Dari PSD ke PAC-3, NYY 4x10 mm2 m 14.00 0.00 14.00 0.00 - - -
- Dari PAC-3 ke FCU.301/CU.301, NYA 4x3.5 mm2 m 18.00 0.00 18.00 0.00 - - -
- Dari PAC-3 ke FCU.302/CU.302, NYA 4x3.5 mm2 m 15.00 0.00 15.00 0.00 - - -
- Dari PAC-3 ke FCU.303/CU.303, NYA 4x3.5 mm2 m 12.00 0.00 12.00 0.00 - - -
96/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

- Dari PAC-3 ke FCU.304 A/CU.304 A, NYA 3x3.5 mm2 m 16.00 0.00 16.00 0.00 - - -
- Dari PAC-3 ke FCU.304 B/CU.304 B, NYA 3x3.5 mm2 m 14.00 0.00 14.00 0.00 - - -
- Dari PAC-3 ke FCU.305/CU.305, NYA 3x3.5 mm2 m 13.00 0.00 13.00 0.00 - - -
- Dari PAC-3 ke EFT-301, NYA 3x3.5 mm2 m 11.00 0.00 11.00 0.00 - - -
- Alat bantu lot 1.00 0.00 1.00 0.00 - - -
3 Pembumian Pengaman - -
- Kabel - -
a NYA 1x4 mm2 m' 14.00 0.00 14.00 0.00 - - -
b NYA 1x10 mm2 m' 14.00 0.00 14.00 0.00 - - -
- Alat bantu lot 1.00 0.00 1.00 0.00 - - -
4 Pencahayaan - -
- Lampu RMO TL-D 2x36 W bh 24.00 0.07 24.00 0.07 20.00 0.06 4.00 0.01 4.00
- Lampu TK TG 1x36 TL-D 1x36 W bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Lampu BL MA5 TL-D 1x36 W bh 6.00 0.01 6.00 0.01 4.00 0.00 1.10 0.00 1.10
- Lampu GMS TP 1x36 W TL-D 1x36 W, Acrylic Cover bh 4.00 0.01 4.00 0.01 3.00 0.01 0.40 0.00 0.40
- Down Light RD 150 E27 Essential 1x18 W bh 6.00 0.01 6.00 0.01 4.00 0.00 1.10 0.00 1.10
- Lampu downlight RD 125 E27 Geniel 1x14 W bh 10.00 0.01 10.00 0.01 6.00 0.00 2.50 0.00 2.50
- Lampu Keluar TL-D 1x8 W berikut battery Ni.Cad dan charger bh 2.00 0.01 2.00 0.01 1.00 0.01 0.70 0.00 0.70
- Saklar tunggal, 10 A, 250 VAC bh 10.00 0.00 10.00 0.00 6.00 0.00 2.50 0.00 2.50
- Saklar tripel, 10 A, 250 VAC bh 4.00 0.00 4.00 0.00 3.00 0.00 0.40 0.00 0.40
- Saklar tukar tunggal, 10 A, 250 VAC bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Instalasi pencahayaan, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 54.00 0.08 54.00 0.08 48.00 0.07 6.00 0.01 6.00
5 Kotak Kontak - - -
- Kotak kontak biasa, 1fasa 15 A, 250 VAC bh 13.00 0.00 13.00 0.00 9.00 0.00 2.05 0.00 2.05
- Kotak kontak Water Proof, 1fasa 15 A, 250 VAC bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Instalasi kotak kontak, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 14.00 0.02 14.00 0.02 10.00 0.01 4.00 0.01 4.00
6 Deteksi dan Alarm Kebakaran - - -
- TBFA - 3 bh 1.00 0.01 1.00 0.01 1.00 0.01 - - -
- Detektor Asap bh 4.00 0.01 4.00 0.01 3.00 0.01 1.00 0.00 1.00
- Detektor Panas ROR bh 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
- Detektor Panas Suhu Tetap bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Titik panggil manual dengan Jack telepon bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Bell alarm bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Lampu indikator bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- End of line Resistor (EOL) bh 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
- Instalasi jack telepon, kabel ITC 2x2x0.6 mm2 dalam konduit uPVC, HI, Ø 20 mm ttk 1.00 0.00 1.00 0.00 1.00 0.00 - - -
- Kabel Loop Data, Power dan Intercom dari Panel Kontrol (PKFA-A) ke TBFA-3 : - - -
a. Nontwisted Pair Nonshielded Cable AWG #16 1 Pair dlm konduit uPVC20 mm m' 20.00 0.00 20.00 0.00 14.00 0.00 3.00 0.00 3.00
b. NYA 1,5 mm2x3 dalam Konduit uPVC HI Ø 20 mm m' 20.00 0.00 20.00 0.00 14.00 0.00 3.00 0.00 3.00
c. ITC 2x2x0,6 mm dalam Konduit uPVC Ø 20 mm m' 20.00 0.00 20.00 0.00 14.00 0.00 3.00 0.00 3.00
- Instalasi titik deteksi, kabel NYA 1,5mm2x2 dalam konduit uPVC, HI, Ø 20 mm ttk 12.00 0.02 12.00 0.02 9.00 0.01 3.00 0.00 3.00
7 Tata Suara - - -
Sistim Public Adress - - -
- Speaker Plafon 6/3 W bh 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
- Kontrol Volume dengan Saklar 30 W bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Instalasi Speaker Plafon dan volume kontrol, kabel dalam konduit uPVC Ø 20mm titk 5.00 0.00 5.00 0.00 3.00 0.00 2.00 0.00 2.00
- Speaker Kotak 6/3 W bh 2.00 0.01 2.00 0.01 1.00 0.01 0.70 0.00 0.70
- Instalasi Speaker kotak, kabel dalam konduit uPVC Ø 20mm titk 2.00 0.02 2.00 0.02 1.00 0.01 1.00 0.01 1.00
- Kotak Terminal Tata Suara, TBS-3 unit 1.00 0.02 1.00 0.02 0.50 0.01 0.35 0.01 0.35
- Kabel dari MDF Tata Suara ke TBS-3, - - -
kabel NYMHY 3x1,5 mm2 dalam Konduit uPVC Ø 20 mm m' 18.00 0.00 18.00 0.00 13.00 0.00 2.30 0.00 2.30
8 CCTV - - -
- Kamera dome berwarna type PTZ unit 2.00 0.06 2.00 0.06 - - - -
- Instalasi CCTV, kabel Coaxial 5C-2V dalam konduit uPVC Ø 20 mm ttk 2.00 0.01 2.00 0.01 1.00 0.00 1.00 0.00 1.00
- Instalasi daya Kamera, Kabel NYA 3x2,5 mm2 dalam uPVC Ø 20 mm ttk 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
- Instalasi Kabel Kontrol, Kabel STP AWG #18 dalam konduit uPVC Ø 20 mm ttk 2.00 0.01 2.00 0.01 1.00 0.00 1.00 0.00 1.00
9 Rak Kabel - - -
Rak Kabel Elektrikal - - -
a. Tray Type TRC 300x100 mm - - -
- Straight Tray m' 9.00 0.02 9.00 0.02 6.00 0.01 3.00 0.01 3.00
- Flat Wise Elbow bh 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
- Flat Wise Tee bh 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
- Riser bh 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Reducer 300 - 200 mm bh 1.00 0.00 1.00 0.00 1.00 0.00 - - -
- Ladder 600x100 mm dalam shaft m' 4.00 0.01 4.00 0.01 3.00 0.01 1.00 0.00 1.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 1.00 0.00 - - -
b Tray Type TRC 200x100 mm - - -
- Straight Tray m' 13.00 0.02 13.00 0.02 10.00 0.01 3.00 0.00 3.00
- Jointing Set set 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 1.00 0.00 - - -
Rak Kabel Elektronik (Tray 200x100mm Tipe TRC) - - -
97/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

a Tray Type TRC 200x100 mm - - -


- Straight Tray m' 18.00 0.03 18.00 0.03 15.00 0.02 3.00 0.00 3.00
- Flat Wise Elbow bh 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Flat Wise Tee bh 1.00 0.00 1.00 0.00 1.00 0.00 - - -
- Flat Wise Cross bh 1.00 0.00 1.00 0.00 1.00 0.00 - - -
- Riser bh 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Reducer 200 - 100 mm bh 1.00 0.00 1.00 0.00 1.00 0.00 - - -
- Ladder 600x100 mm dalam shaft m' 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
- Jointing Set set 17.00 0.01 17.00 0.01 15.00 0.00 2.00 0.00 2.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 1.00 0.00 - - -
b Tray Type TRC 150x100 mm - - -
- Straight Tray m' 13.00 0.02 13.00 0.02 10.00 0.01 3.00 0.00 3.00
- Jointing Set set 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 1.00 0.00 - - -
10 Pengujian seluruh Pekerjaan Elektrikal lantai 3 lot 1.00 0.02 1.00 0.02 1.00 0.02 - - -
SUB JUMLAH ELEKTRIKAL - LANTAI 3 0.69 0.69 0.44 0.16 -
-
II.4. PEKERJAAN LANTAI - 4 (EMPAT) -
1 Panel Hubung Bagi -
- Panel P-4 unit 1.00 0.07 1.00 0.07 0.50 0.04 0.50 0.04 0.50
- Panel PAC-4 unit 1.00 0.04 1.00 0.04 0.50 0.02 0.50 0.02 0.50
2 Kabel Feeder - - -
- Dari PSD ke P-4, NYY 4x4 mm2 m 18.00 0.00 18.00 0.00 - - - -
- Dari PSD ke PAC-4, NYY 4x10 mm2 m 18.00 0.01 18.00 0.01 - - - -
- Dari PAC-4 ke FCU.401/CU.401, NYA 4x2.5 mm2 m 17.00 0.00 17.00 0.00 - - - -
- Dari PAC-4 ke FCU.402/CU.402, NYA 4x2.5 mm2 m 15.00 0.00 15.00 0.00 - - - -
- Dari PAC-4 ke FCU.403/CU.403, NYA 3x2.5 mm2 m 17.00 0.00 17.00 0.00 - - - -
- Dari PAC-4 ke FCU.404/CU.404, NYA 3x2.5 mm2 m 14.00 0.00 14.00 0.00 - - - -
- Dari PAC-4 ke FCU.405/CU.405, NYA 3x2.5 mm2 m 13.00 0.00 13.00 0.00 - - - -
- Dari PAC-4 ke FCU.406/CU.406, NYA 3x2.5 mm2 m 12.00 0.00 12.00 0.00 - - - -
- Dari PAC-4 ke FCU.407/CU.407, NYA 3x2.5 mm2 m 18.00 0.00 18.00 0.00 - - - -
- Dari PAC-4 ke FCU.408/CU.408, NYA 3x2.5 mm2 m 17.00 0.00 17.00 0.00 - - - -
- Dari PAC-4 ke FCU.409/CU.409, NYA 3x2.5 mm2 m 15.00 0.00 15.00 0.00 - - - -
- Dari PAC-4 ke EFT-401, NYA 3x2.5 mm2 m 12.00 0.00 12.00 0.00 - - - -
- Alat bantu lot 1.00 0.00 1.00 0.00 - - - -
3 Pembumian Pengaman - - -
- Kabel - - -
a NYA 1x4 mm2 m' 18.00 0.00 18.00 0.00 - - - -
b NYA 1x10 mm2 m' 18.00 0.00 18.00 0.00 - - - -
- Alat bantu lot 1.00 0.00 1.00 0.00 - - - -
4 Pencahayaan - - -
- Lampu RMO TL-D 2x36 W bh 24.00 0.07 24.00 0.07 18.00 0.05 2.40 0.01 2.40
- Lampu TK TG 1x36 TL-D 1x36 W bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Lampu BL MA5 TL-D 1x36 W bh 6.00 0.01 6.00 0.01 4.00 0.00 1.10 0.00 1.10
- Lampu GMS TP 1x36 W TL-D 1x36 W, Acrylic Cover bh 4.00 0.01 4.00 0.01 2.00 0.01 1.40 0.00 1.40
- Down Light RD 150 E27 Essential 1x18 W bh 7.00 0.01 7.00 0.01 4.00 0.00 1.95 0.00 1.95
- Lampu downlight RD 125 E27 Geniel 1x14 W bh 10.00 0.01 10.00 0.01 6.00 0.00 2.50 0.00 2.50
- Lampu Keluar TL-D 1x8 W berikut battery Ni.Cad dan charger bh 2.00 0.01 2.00 0.01 1.00 0.01 0.70 0.00 0.70
- Saklar tunggal, 10 A, 250 VAC bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Saklar tripel, 10 A, 250 VAC bh 4.00 0.00 4.00 0.00 2.00 0.00 1.40 0.00 1.40
- Saklar tukar tunggal, 10 A, 250 VAC bh 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
- Instalasi pencahayaan, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 55.00 0.08 55.00 0.08 50.00 0.07 5.00 0.01 5.00
5 Kotak Kontak - - -
- Kotak kontak biasa, 1fasa 15 A, 250 VAC bh 12.00 0.00 12.00 0.00 8.00 0.00 2.20 0.00 2.20
- Kotak kontak Water Proof, 1fasa 15 A, 250 VAC bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Instalasi kotak kontak, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 13.00 0.02 13.00 0.02 10.00 0.01 3.00 0.00 3.00
6 Deteksi dan Alarm Kebakaran - - -
- TBFA - 4 bh 1.00 0.01 1.00 0.01 0.50 0.00 0.35 0.00 0.35
- Detektor Asap bh 4.00 0.01 4.00 0.01 2.00 0.01 1.40 0.00 1.40
- Detektor Panas ROR bh 8.00 0.01 8.00 0.01 4.00 0.00 2.80 0.00 2.80
- Titik panggil manual dengan Jack telepon bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Bell alarm bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Lampu indikator bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- End of line Resistor (EOL) bh 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
- Instalasi jack telepon, kabel ITC 2x2x0.6 mm2 dalam konduit uPVC, HI, Ø 20 mm ttk 1.00 0.00 1.00 0.00 0.85 0.00 - - -
- Kabel Loop Data, Power dan Intercom dari Panel Kontrol (PKFA-A) ke TBFA-4 : - - -
a. Nontwisted Pair Nonshielded Cable AWG #16 1 Pair dlm konduit uPVC20 mm m' 24.00 0.00 24.00 0.00 17.00 0.00 3.40 0.00 3.40
b. NYA 1,5 mm2x3 dalam Konduit uPVC HI Ø 20 mm m' 24.00 0.00 24.00 0.00 17.00 0.00 3.40 0.00 3.40
c. ITC 2x2x0,6 mm dalam Konduit uPVC Ø 20 mm m' 24.00 0.00 24.00 0.00 17.00 0.00 3.40 0.00 3.40
- Instalasi titik deteksi, kabel NYA 1,5mm2x2 dalam konduit uPVC, HI, Ø 20 mm ttk 15.00 0.02 15.00 0.02 12.00 0.02 3.00 0.00 3.00
7 Tata Suara - - -
98/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

Sistim Public Adress - - -


- Speaker Plafon 6/3 W bh 4.00 0.00 4.00 0.00 2.00 0.00 1.40 0.00 1.40
- Speaker Plafon 15 W bh 6.00 0.01 6.00 0.01 3.00 0.00 2.10 0.00 2.10
- Kontrol Volume dengan Saklar 30 W bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Instalasi Speaker Plafon dan volume kontrol, kabel dalam konduit uPVC Ø 20mm titk 12.00 0.01 12.00 0.01 10.00 0.01 2.00 0.00 2.00
- Speaker Kotak 6/3 W bh 2.00 0.01 2.00 0.01 1.00 0.01 0.70 0.00 0.70
- Instalasi Speaker kotak, kabel dalam konduit uPVC Ø 20mm titk 2.00 0.02 2.00 0.02 1.00 0.01 1.00 0.01 1.00
- Kotak Terminal Tata Suara, TBS-4 unit 1.00 0.02 1.00 0.02 0.50 0.01 0.35 0.01 0.35
- Kabel dari MDF Tata Suara ke TBS-4, - - -
kabel NYMHY 3x1,5 mm2 dalam Konduit uPVC Ø 20 mm m' 22.00 0.00 22.00 0.00 - - - -
8 CCTV - - -
- Kamera dome berwarna type PTZ unit 2.00 0.06 2.00 0.06 1.00 0.03 0.70 0.02 0.70
- Instalasi CCTV, kabel Coaxial 5C-2V dalam konduit uPVC Ø 20 mm ttk 2.00 0.01 2.00 0.01 1.00 0.00 1.00 0.00 1.00
- Instalasi daya Kamera, Kabel NYA 3x2,5 mm2 dalam uPVC Ø 20 mm ttk 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
- Instalasi Kabel Kontrol, Kabel STP AWG #18 dalam konduit uPVC Ø 20 mm ttk 2.00 0.01 2.00 0.01 1.00 0.00 1.00 0.00 1.00
9 Rak Kabel - - -
Rak Kabel Elektrikal - - -
a. Tray Type TRC 300x100 mm - - -
- Straight Tray m' 9.00 0.02 9.00 0.02 7.00 0.01 2.00 0.00 2.00
- Flat Wise Elbow bh 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
- Flat Wise Tee bh 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
- Riser bh 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Reducer 300 - 200 mm bh 1.00 0.00 1.00 0.00 1.00 0.00 - - -
- Ladder 600x100 mm dalam shaft m' 4.00 0.01 4.00 0.01 3.00 0.01 1.00 0.00 1.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 1.00 0.00 - - -
b Tray Type TRC 200x100 mm - - -
- Straight Tray m' 13.00 0.02 13.00 0.02 10.00 0.01 3.00 0.00 3.00
- Jointing Set set 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 1.00 0.00 - - -
Rak Kabel Elektronik (Tray 200x100mm Tipe TRC) - - -
a Tray Type TRC 200x100 mm - - -
- Straight Tray m' 18.00 0.03 18.00 0.03 15.00 0.02 3.00 0.00 3.00
- Flat Wise Elbow bh 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Flat Wise Tee bh 1.00 0.00 1.00 0.00 1.00 0.00 - - -
- Flat Wise Cross bh 1.00 0.00 1.00 0.00 1.00 0.00 - - -
- Riser bh 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Reducer 200 - 100 mm bh 1.00 0.00 1.00 0.00 1.00 0.00 - - -
- Ladder 600x100 mm dalam shaft m' 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
- Jointing Set set 17.00 0.01 17.00 0.01 15.00 0.00 2.00 0.00 2.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 1.00 0.00 - - -
b Tray Type TRC 150x100 mm - - -
- Straight Tray m' 13.00 0.02 13.00 0.02 12.00 0.02 1.00 0.00 1.00
- Jointing Set set 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 1.00 0.00 - - -
10 Pengujian seluruh Pekerjaan Elektrikal lantai 4 lot 1.00 0.02 1.00 0.02 - 1.00 0.02 1.00
SUB JUMLAH ELEKTRIKAL - LANTAI 4 0.72 0.72 0.45 0.21

II.5. PEKERJAAN LANTAI - 5 (LIMA)


1 Panel Hubung Bagi
- Panel P-5 unit 1.00 0.07 1.00 0.07 0.50 0.04 0.35 0.03 0.35
- Panel PAC-5 unit 1.00 0.04 1.00 0.04 0.50 0.02 0.35 0.01 0.35
2 Kabel Feeder - - -
- Dari PSD ke P-5, NYY 4x4 mm2 m 22.00 0.00 22.00 0.00 - - -
- Dari PSD ke PAC-5, NYY 4x10 mm2 m 22.00 0.01 22.00 0.01 - - -
- Dari PAC-5 ke FCU.501 A/CU.501 A, NYA 4x2.5 mm2 m 17.00 0.00 17.00 0.00 - - -
- Dari PAC-5 ke FCU.501 B/CU.501 B, NYA 4x2.5 mm2 m 15.00 0.00 15.00 0.00 - - -
- Dari PAC-5 ke FCU.502 A/CU.502 A, NYA 4x2.5 mm2 m 17.00 0.00 17.00 0.00 - - -
- Dari PAC-5 ke FCU.502 B/CU.502 B, NYA 4x2.5 mm2 m 14.00 0.00 14.00 0.00 - - -
- Dari PAC-5 ke FCU.503/CU.503, NYA 4x2.5 mm2 m 13.00 0.00 13.00 0.00 - - -
- Dari PAC-5 ke EFT-501, NYA 3x2.5 mm2 m 12.00 0.00 12.00 0.00 - - -
- Alat bantu lot 1.00 0.00 1.00 0.00 - - -
3 Pembumian Pengaman - -
- Kabel - -
a NYA 1x4 mm2 m' 12.00 0.00 12.00 0.00 - - -
b NYA 1x10 mm2 m' 12.00 0.00 12.00 0.00 - - -
- Alat bantu lot 1.00 0.00 1.00 0.00 - - -
4 Pencahayaan - -
- Lampu TK TG 1x36 TL-D 1x36 W bh 4.00 0.01 4.00 0.01 - - -
- Lampu BL MA5 TL-D 1x36 W bh 6.00 0.01 6.00 0.01 - - -
- Lampu GMS TP 1x36 W TL-D 1x36 W, Acrylic Cover bh 4.00 0.01 4.00 0.01 - - -
- Down Light RD 150 E27 Essential 1x18 W bh 43.00 0.04 43.00 0.04 - - -

99/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

- Lampu downlight RD 125 E27 Geniel 1x14 W bh 9.00 0.01 9.00 0.01 - - -
- Lampu Keluar TL-D 1x8 W berikut battery Ni.Cad dan charger bh 2.00 0.01 2.00 0.01 - - -
- Saklar tunggal, 10 A, 250 VAC bh 41.00 0.01 41.00 0.01 - - -
- Saklar ganda, 10 A, 250 VAC bh 1.00 0.00 1.00 0.00 - - -
- Saklar tukar tunggal, 10 A, 250 VAC bh 3.00 0.00 3.00 0.00 - - -
- Instalasi pencahayaan, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 109.00 0.16 109.00 0.16 90.00 0.13 19.00 0.03 19.00
5 Kotak Kontak - -
- Kotak kontak biasa, 1fasa 15 A, 250 VAC bh 36.00 0.01 36.00 0.01 - - -
- Kotak kontak Water Proof, 1fasa 15 A, 250 VAC bh 1.00 0.00 1.00 0.00 - - -
- Instalasi kotak kontak, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 37.00 0.05 37.00 0.05 30.00 0.04 7.00 0.01 7.00
6 Telepon - -
- MDF 40 Pair unit 1.00 0.04 1.00 0.04 - - -
- Kotak Terminal Telepon 10 Pairs, TBT-5 unit 1.00 0.00 1.00 0.00 - - -
- PABX 4/34 ext, lengkap dengan battery, line arrrester, dan - -
peralatan lainnya sesuai spesifikasi teknik dan gambar unit 1.00 0.46 1.00 0.46 - - -
- Kabel dari MDF ke TBT-1, ITC 20x2x0,6 mm m' 45.00 0.01 45.00 0.01 - - -
- Kabel dari MDF ke TBT-2, ITC 20x2x0,6 mm m' 35.00 0.01 35.00 0.01 - - -
- Kabel dari MDF ke TBT-5, ITC 20x2x0,6 mm m' 10.00 0.00 10.00 0.00 - - -
- Kabel dari MDF ke TBT-6, ITC 20x2x0,6 mm m' 128.00 0.02 128.00 0.02 - - -
- Kabel dari MDF ke TBT-7, ITC 20x2x0,6 mm m' 128.00 0.02 128.00 0.02 - - -
- Alat bantu (pipa pelindung dan fittings) lot 1.00 0.00 1.00 0.00 - - -
- Kotak kontak telepon bh 3.00 0.00 3.00 0.00 - - -
- Instalasi telepon, kabel dalam pipa konduit uPVC HI Ø 20 mm titik 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Pesawat Telepon Standar unit 3.00 0.01 3.00 0.01 - - -
7 Deteksi dan Alarm Kebakaran - -
- TBFA - 5 bh 1.00 0.01 1.00 0.01 - - -
- Detektor Asap bh 5.00 0.02 5.00 0.02 - - -
- Detektor Panas ROR bh 4.00 0.00 4.00 0.00 - - -
- Detektor Panas Suhu Tetap bh 1.00 0.00 1.00 0.00 - - -
- End of line Resistor (EOL) bh 1.00 0.00 1.00 0.00 - - -
- Titik panggil manual dengan Jack telepon bh 1.00 0.00 1.00 0.00 - - -
- Bell alarm bh 1.00 0.00 1.00 0.00 - - -
- Lampu indikator bh 1.00 0.00 1.00 0.00 - - -
- End of line Resistor (EOL) bh 3.00 0.00 3.00 0.00 - - -
- Instalasi jack telepon, kabel ITC 2x2x0.6 mm2 dalam konduit uPVC, HI, Ø 20 mm ttk 1.00 0.00 1.00 0.00 0.50 0.00 0.50 0.00 0.50
- Kabel Loop Data, Power dan Intercom dari Panel Kontrol (PKFA-A) ke TBFA-5 : - -
a. Nontwisted Pair Nonshielded Cable AWG #16 1 Pair dlm konduit uPVC20 mm m' 28.00 0.00 28.00 0.00 - - -
b. NYA 1,5 mm2x3 dalam Konduit uPVC HI Ø 20 mm m' 28.00 0.00 28.00 0.00 - - -
c. ITC 2x2x0,6 mm dalam Konduit uPVC Ø 20 mm m' 28.00 0.00 28.00 0.00 - - -
- Instalasi titik deteksi, kabel NYA 1,5mm2x2 dalam konduit uPVC, HI, Ø 20 mm ttk 14.00 0.02 14.00 0.02 12.00 0.02 2.00 0.00 2.00
8 Tata Suara - -
Sistim Public Adress - -
- Speaker Plafon 6/3 W bh 9.00 0.01 9.00 0.01 - - -
- Kontrol Volume dengan Saklar 30 W bh 3.00 0.01 3.00 0.01 - - -
- Instalasi Speaker Plafon dan volume kontrol, kabel dalam konduit uPVC Ø 20mm titk 12.00 0.01 12.00 0.01 - - -
- Speaker Kotak 6/3 W bh 2.00 0.01 2.00 0.01 - - -
- Instalasi Speaker kotak, kabel dalam konduit uPVC Ø 20mm titk 2.00 0.02 2.00 0.02 1.00 0.01 1.00 0.01 1.00
- Kotak Terminal Tata Suara, TBS-5 unit 1.00 0.02 1.00 0.02 - - -
- Kabel dari MDF Tata Suara ke TBS-5, - -
kabel NYMHY 3x1,5 mm2 dalam Konduit uPVC Ø 20 mm m' 26.00 0.00 26.00 0.00 - - -
9 CCTV - -
- DVR unit 1.00 0.04 1.00 0.04 - - -
- Kamera dome berwarna type PTZ unit 2.00 0.06 2.00 0.06 - - -
- Instalasi CCTV, kabel Coaxial 5C-2V dalam konduit uPVC Ø 20 mm ttk 2.00 0.01 2.00 0.01 1.00 0.00 1.00 0.00 1.00
- Instalasi daya Kamera, Kabel NYA 3x2,5 mm2 dalam uPVC Ø 20 mm ttk 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
- Instalasi Kabel Kontrol, Kabel STP AWG #18 dalam konduit uPVC Ø 20 mm ttk 2.00 0.01 2.00 0.01 1.00 0.00 1.00 0.00 1.00
10 Rak Kabel - -
Rak Kabel Elektrikal - -
a. Tray Type TRC 300x100 mm - -
- Straight Tray m' 9.00 0.02 9.00 0.02 7.00 0.01 2.00 0.00 2.00
- Flat Wise Elbow bh 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
- Flat Wise Tee bh 2.00 0.00 2.00 0.00 1.00 0.00 1.00 0.00 1.00
- Riser bh 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Reducer 300 - 200 mm bh 1.00 0.00 1.00 0.00 1.00 0.00 - - -
- Ladder 600x100 mm dalam shaft m' 4.00 0.01 4.00 0.01 3.00 0.01 1.00 0.00 1.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 1.00 0.00 - - -
b Tray Type TRC 200x100 mm - - -
- Straight Tray m' 13.00 0.02 13.00 0.02 11.00 0.02 2.00 0.00 2.00
- Jointing Set set 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 1.00 0.00 - - -
Rak Kabel Elektronik (Tray 200x100mm Tipe TRC) - - -
100/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

a Tray Type TRC 200x100 mm - - -


- Straight Tray m' 18.00 0.03 18.00 0.03 15.00 0.02 3.00 0.00 3.00
- Flat Wise Elbow bh 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Flat Wise Tee bh 1.00 0.00 1.00 0.00 1.00 0.00 - - -
- Flat Wise Cross bh 1.00 0.00 1.00 0.00 1.00 0.00 - - -
- Riser bh 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Reducer 200 - 100 mm bh 1.00 0.00 1.00 0.00 1.00 0.00 - - -
- Ladder 600x100 mm dalam shaft m' 4.00 0.00 4.00 0.00 3.00 0.00 1.00 0.00 1.00
- Jointing Set set 17.00 0.01 17.00 0.01 15.00 0.00 2.00 0.00 2.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 - - - -
b Tray Type TRC 150x100 mm - - -
- Straight Tray m' 13.00 0.02 13.00 0.02 11.00 0.01 2.00 0.00 2.00
- Jointing Set set 3.00 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.00
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 - - - -
11 Pengujian seluruh Pekerjaan Elektrikal lantai 5 lot 1.00 0.02 1.00 0.02 - - -
SUB JUMLAH ELEKTRIKAL - LANTAI 5 1.41 1.41 0.36 0.12

II.6. PEKERJAAN LANTAI - 6 (ENAM)


1 Panel Hubung Bagi
- Panel P-6 unit 1.00 0.07 1.00 0.07 0.50 0.04 0.35 0.03 0.35
- Panel PAC-6 unit 1.00 0.04 1.00 0.04 0.50 0.02 0.35 0.01 0.35
2 Kabel Feeder - -
- Dari PSD ke P-6, NYY 4x4 mm2 m 22.00 0.00 22.00 0.00 - - -
- Dari PSD ke PAC-6, NYY 4x10 mm2 m 22.00 0.01 22.00 0.01 - - -
- Dari PAC-6 ke FCU.601 A/CU.601 A, NYA 4x2.5 mm2 m 17.00 0.00 17.00 0.00 - - -
- Dari PAC-6 ke FCU.601 B/CU.601 B, NYA 4x2.5 mm2 m 15.00 0.00 15.00 0.00 - - -
- Dari PAC-6 ke FCU.602 A/CU.602 A, NYA 4x2.5 mm2 m 17.00 0.00 17.00 0.00 - - -
- Dari PAC-6 ke FCU.602 B/CU.602 B, NYA 4x2.5 mm2 m 14.00 0.00 14.00 0.00 - - -
- Dari PAC-6 ke FCU.603/CU.603, NYA 4x2.5 mm2 m 13.00 0.00 13.00 0.00 - - -
- Dari PAC-6 ke EFT-601, NYA 3x2.5 mm2 m 12.00 0.00 12.00 0.00 - - -
- Alat bantu lot 1.00 0.00 1.00 0.00 - - -
3 Pembumian Pengaman - -
- Kabel - -
a NYA 1x4 mm2 m' 12.00 0.00 12.00 0.00 - - -
b NYA 1x10 mm2 m' 12.00 0.00 12.00 0.00 - - -
- Alat bantu lot 1.00 0.00 1.00 0.00 - - -
4 Pencahayaan - -
- Lampu TK TG 1x36 TL-D 1x36 W bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Lampu BL MA5 TL-D 1x36 W bh 6.00 0.01 6.00 0.01 4.00 0.00 1.10 0.00 1.10
- Lampu GMS TP 1x36 W TL-D 1x36 W, Acrylic Cover bh 4.00 0.01 4.00 0.01 2.00 0.01 1.40 0.00 1.40
- Down Light RD 150 E27 Essential 1x18 W bh 41.00 0.04 41.00 0.04 30.00 0.03 4.85 0.00 4.85
- Lampu downlight RD 125 E27 Geniel 1x14 W bh 10.00 0.01 10.00 0.01 8.00 0.01 0.50 0.00 0.50
- Lampu Keluar TL-D 1x8 W berikut battery Ni.Cad dan charger bh 2.00 0.01 2.00 0.01 1.00 0.01 0.70 0.00 0.70
- Saklar tunggal, 10 A, 250 VAC bh 43.00 0.01 43.00 0.01 30.00 0.01 6.55 0.00 6.55
- Saklar tukar tunggal, 10 A, 250 VAC bh 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
- Instalasi pencahayaan, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 65.00 0.09 65.00 0.09 - - - -
5 Kotak Kontak - - -
- Kotak kontak biasa, 1fasa 15 A, 250 VAC bh 33.00 0.01 33.00 0.01 25.00 0.01 3.05 0.00 3.05
- Kotak kontak Water Proof, 1fasa 15 A, 250 VAC bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Instalasi kotak kontak, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 34.00 0.05 34.00 0.05 - - - -
6 Telepon - - -
- Kotak kontak telepon bh 5.00 0.00 5.00 0.00 3.00 0.00 1.25 0.00 1.25
- Instalasi telepon, kabel dalam pipa konduit uPVC HI Ø 20 mm titik 5.00 0.00 5.00 0.00 - - - -
- Pesawat Telepon Standar unit 5.00 0.01 5.00 0.01 3.00 0.01 1.25 0.00 1.25
- Kotak Terminal Telepon 10 Pairs, TBT-5 unit 1.00 0.00 1.00 0.00 - - - -
- Kabel dari MDF ke TBT-5, ITC 10x2x0,6 mm m' 30.00 0.00 30.00 0.00 - - - -

101/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

7 Deteksi dan Alarm Kebakaran - - -


- TBFA - 6 bh 1.00 0.01 1.00 0.01 0.50 0.00 0.35 0.00 0.35
- Detektor Asap bh 4.00 0.01 4.00 0.01 3.00 0.01 0.40 0.00 0.40
- Detektor Panas ROR bh 5.00 0.01 5.00 0.01 3.00 0.00 1.25 0.00 1.25
- Detektor Panas Suhu Tetap bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Titik panggil manual dengan Jack telepon bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Bell alarm bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Lampu indikator bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- End of line Resistor (EOL) bh 3.00 0.00 3.00 0.00 1.00 0.00 1.55 0.00 1.55
- Instalasi jack telepon, kabel ITC 2x2x0.6 mm2 dalam konduit uPVC, HI, Ø 20 mm ttk 1.00 0.00 1.00 0.00 - - - -
- Kabel Loop Data, Power dan Intercom dari Panel Kontrol (PKFA-A) ke TBFA-6 : - - -
a. Nontwisted Pair Nonshielded Cable AWG #16 1 Pair dlm konduit uPVC20 mm m' 32.00 0.00 32.00 0.00 20.00 0.00 7.20 0.00 7.20
b. NYA 1,5 mm2x3 dalam Konduit uPVC HI Ø 20 mm m' 32.00 0.00 32.00 0.00 20.00 0.00 7.20 0.00 7.20
c. ITC 2x2x0,6 mm dalam Konduit uPVC Ø 20 mm m' 32.00 0.00 32.00 0.00 20.00 0.00 7.20 0.00 7.20
- Instalasi titik deteksi, kabel NYA 1,5mm2x2 dalam konduit uPVC, HI, Ø 20 mm ttk 13.00 0.02 13.00 0.02 - - - -
8 Tata Suara - - -
Sistim Public Adress - - -
- Speaker Plafon 6/3 W bh 9.00 0.01 9.00 0.01 6.00 0.01 1.65 0.00 1.65
- Kontrol Volume dengan Saklar 30 W bh 3.00 0.01 3.00 0.01 1.00 0.00 1.55 0.00 1.55
- Instalasi Speaker Plafon dan volume kontrol, kabel dalam konduit uPVC Ø 20mm titk 12.00 0.01 12.00 0.01 - - - -
- Speaker Kotak 6/3 W bh 2.00 0.01 2.00 0.01 1.00 0.01 0.70 0.00 0.70
- Instalasi Speaker kotak, kabel dalam konduit uPVC Ø 20mm titk 2.00 0.02 2.00 0.02 - - - -
- Kotak Terminal Tata Suara, TBS-6 unit 1.00 0.02 1.00 0.02 0.50 0.01 0.35 0.01 0.35
- Kabel dari MDF Tata Suara ke TBS-6, - - -
kabel NYMHY 3x1,5 mm2 dalam Konduit uPVC Ø 20 mm m' 30.00 0.00 30.00 0.00 - - - -
9 CCTV - - -
- Kamera dome berwarna type PTZ unit 2.00 0.06 2.00 0.06 - 1.70 0.05 1.70
- Instalasi CCTV, kabel Coaxial 5C-2V dalam konduit uPVC Ø 20 mm ttk 2.00 0.01 2.00 0.01 - - - -
- Instalasi daya Kamera, Kabel NYA 3x2,5 mm2 dalam uPVC Ø 20 mm ttk 2.00 0.00 2.00 0.00 - - - -
- Instalasi Kabel Kontrol, Kabel STP AWG #18 dalam konduit uPVC Ø 20 mm ttk 2.00 0.01 2.00 0.01 - - - -
10 Rak Kabel - - -
Rak Kabel Elektrikal - - -
a. Tray Type TRC 300x100 mm - - -
- Straight Tray m' 9.00 0.02 9.00 0.02 4.00 0.01 3.65 0.01 3.65
- Flat Wise Elbow bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Flat Wise Tee bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Riser bh 3.00 0.00 3.00 0.00 1.00 0.00 1.55 0.00 1.55
- Reducer 300 - 200 mm bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Ladder 600x100 mm dalam shaft m' 4.00 0.01 4.00 0.01 2.00 0.00 1.40 0.00 1.40
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 - - - -
b Tray Type TRC 200x100 mm - - -
- Straight Tray m' 13.00 0.02 13.00 0.02 9.00 0.01 2.05 0.00 2.05
- Jointing Set set 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 - - - -
Rak Kabel Elektronik (Tray 200x100mm Tipe TRC) - - -
a Tray Type TRC 200x100 mm - - -
- Straight Tray m' 18.00 0.03 18.00 0.03 13.00 0.02 2.30 0.00 2.30
- Flat Wise Elbow bh 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
- Flat Wise Tee bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Flat Wise Cross bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Riser bh 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
- Reducer 200 - 100 mm bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Ladder 600x100 mm dalam shaft m' 4.00 0.00 4.00 0.00 2.00 0.00 1.40 0.00 1.40
- Jointing Set set 17.00 0.01 17.00 0.01 12.00 0.00 2.45 0.00 2.45
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 - - - -
b Tray Type TRC 150x100 mm - - -
- Straight Tray m' 13.00 0.02 13.00 0.02 9.00 0.01 2.05 0.00 2.05
- Jointing Set set 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 - - - -
11 Pengujian seluruh Pekerjaan Elektrikal lantai 6 lot 1.00 0.02 1.00 0.02 - - - -
SUB JUMLAH ELEKTRIKAL - LANTAI 6 0.75 0.75 0.25 0.16

II.7. PEKERJAAN LANTAI - 7 (TUJUH)


1 Panel Hubung Bagi
- Panel P-7 unit 1.00 0.07 1.00 0.07 0.50 0.04 0.35 0.03 0.35
- Panel PAC-7 unit 1.00 0.04 1.00 0.04 0.50 0.02 0.35 0.01 0.35
2 Kabel Feeder - -
- Dari PSD ke P-7, NYY 4x4 mm2 m 26.00 0.00 26.00 0.00 - - -
- Dari PSD ke PAC-7, NYY 4x10 mm2 m 26.00 0.01 26.00 0.01 - - -
- Dari PAC-7 ke FCU.701 A/CU.701A, NYA 4x2.5 mm2 m 17.00 0.00 17.00 0.00 - - -
- Dari PAC-7 ke FCU.701 B/CU.701 B, NYA 4x2.5 mm2 m 15.00 0.00 15.00 0.00 - - -
102/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

- Dari PAC-7 ke FCU.702 A/CU.702 A, NYA 4x2.5 mm2 m 17.00 0.00 17.00 0.00 - - -
- Dari PAC-7 ke FCU.702 B/CU.702 B, NYA 4x2.5 mm2 m 14.00 0.00 14.00 0.00 - - -
- Dari PAC-7 ke FCU.703/CU.703, NYA 4x2.5 mm2 m 13.00 0.00 13.00 0.00 - - -
- Dari PAC-7 ke EFT-701, NYA 3x2.5 mm2 m 12.00 0.00 12.00 0.00 - - -
- Alat bantu lot 1.00 0.00 1.00 0.00 - - -
3 Pembumian Pengaman - -
- Kabel - -
a NYA 1x4 mm2 m' 18.00 0.00 18.00 0.00 - - -
b NYA 1x10 mm2 m' 18.00 0.00 18.00 0.00 - - -
- Alat bantu lot 1.00 0.00 1.00 0.00 - - -
4 Pencahayaan - -
- Lampu TK TG 1x36 TL-D 1x36 W bh 4.00 0.01 -
- Lampu BL MA5 TL-D 1x36 W bh 6.00 0.01 -
- Lampu GMS TP 1x36 W TL-D 1x36 W, Acrylic Cover bh 4.00 0.01 -
- Down Light RD 150 E27 Essential 1x18 W bh 6.00 0.01 -
- Lampu downlight RD 125 E27 Geniel 1x14 W bh 9.00 0.01 -
- Lampu Keluar TL-D 1x8 W berikut battery Ni.Cad dan charger bh 2.00 0.01 -
- Saklar tunggal, 10 A, 250 VAC bh 9.00 0.00 9.00 0.00 6.00 0.00 1.65 0.00 1.65
- Saklar tripel, 10 A, 250 VAC bh 4.00 0.00 4.00 0.00 2.00 0.00 1.40 0.00 1.40
- Saklar tukar tunggal, 10 A, 250 VAC bh 4.00 0.00 4.00 0.00 2.00 0.00 1.40 0.00 1.40
- Instalasi pencahayaan, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 29.00 0.04 29.00 0.04 - - - -
5 Kotak Kontak - - -
- Kotak kontak biasa, 1fasa 15 A, 250 VAC bh 20.00 0.00 20.00 0.00 15.00 0.00 2.00 0.00 2.00
- Kotak kontak Water Proof, 1fasa 15 A, 250 VAC bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Instalasi kotak kontak, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 21.00 0.03 21.00 0.03 - - - -
6 Telepon - - -
- Kotak kontak telepon bh 4.00 0.00 4.00 0.00 2.00 0.00 1.40 0.00 1.40
- Instalasi telepon, kabel dalam pipa konduit uPVC HI Ø 20 mm titik 4.00 0.00 4.00 0.00 - - - -
- Pesawat Telepon Standar unit 4.00 0.01 4.00 0.01 2.00 0.00 1.40 0.00 1.40
- Kotak Terminal Telepon 10 Pairs, TBT-7 unit 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Kabel dari MDF ke TBT-7, ITC 10x2x0,6 mm m' 34.00 0.00 34.00 0.00 - - - -
7 Deteksi dan Alarm Kebakaran - - -
- TBFA - 7 bh 1.00 0.01 1.00 0.01 0.50 0.00 0.35 0.00 0.35
- Detektor Asap bh 5.00 0.02 5.00 0.02 3.00 0.01 1.25 0.00 1.25
- Detektor Panas ROR bh 4.00 0.00 4.00 0.00 2.00 0.00 1.40 0.00 1.40
- Detektor Panas Suhu Tetap bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Titik panggil manual dengan Jack telepon bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Bell alarm bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Lampu indikator bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- End of line Resistor (EOL) bh 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
- Instalasi jack telepon, kabel ITC 2x2x0.6 mm2 dalam konduit uPVC, HI, Ø 20 mm ttk 1.00 0.00 1.00 0.00 - - - -
- Kabel Loop Data, Power dan Intercom dari Panel Kontrol (PKFA-A) ke TBFA-7 : - - -
a. Nontwisted Pair Nonshielded Cable AWG #16 1 Pair dlm konduit uPVC20 mm m' 36.00 0.00 36.00 0.00 - - - -
b. NYA 1,5 mm2x3 dalam Konduit uPVC HI Ø 20 mm m' 36.00 0.00 36.00 0.00 - - - -
c. ITC 2x2x0,6 mm dalam Konduit uPVC Ø 20 mm m' 36.00 0.00 36.00 0.00 - - - -
- Instalasi titik deteksi, kabel NYA 1,5mm2x2 dalam konduit uPVC, HI, Ø 20 mm ttk 13.00 0.02 13.00 0.02 - - - -
8 Tata Suara - - -
Sistim Public Adress - - -
- Speaker Plafon 6/3 W bh 8.00 0.01 8.00 0.01 4.00 0.00 2.80 0.00 2.80
- Kontrol Volume dengan Saklar 30 W bh 4.00 0.01 4.00 0.01 2.00 0.00 1.40 0.00 1.40
- Instalasi Speaker Plafon dan volume kontrol, kabel dalam konduit uPVC Ø 20mm titk 12.00 0.01 12.00 0.01 - - - -
- Speaker Kotak 6/3 W bh 2.00 0.01 2.00 0.01 1.00 0.01 0.70 0.00 0.70
- Instalasi Speaker kotak, kabel dalam konduit uPVC Ø 20mm titk 2.00 0.02 2.00 0.02 - - - -
- Kotak Terminal Tata Suara, TBS-7 unit 1.00 0.02 1.00 0.02 0.50 0.01 0.35 0.01 0.35
- Kabel dari MDF Tata Suara ke TBS-7, - - -
kabel NYMHY 3x1,5 mm2 dalam Konduit uPVC Ø 20 mm m' 32.00 0.00 32.00 0.00 - - - -
9 CCTV - - -
- Kamera dome berwarna type PTZ unit 2.00 0.06 2.00 0.06 1.00 0.03 0.70 0.02 0.70
- Instalasi CCTV, kabel Coaxial 5C-2V dalam konduit uPVC Ø 20 mm ttk 2.00 0.01 2.00 0.01 - - - -
- Instalasi daya Kamera, Kabel NYA 3x2,5 mm2 dalam uPVC Ø 20 mm ttk 2.00 0.00 2.00 0.00 - - - -
- Instalasi Kabel Kontrol, Kabel STP AWG #18 dalam konduit uPVC Ø 20 mm ttk 2.00 0.01 2.00 0.01 - - - -
10 Rak Kabel - - -
Rak Kabel Elektrikal - - -
a. Tray Type TRC 300x100 mm - - -
- Straight Tray m' 9.00 0.02 9.00 0.02 6.00 0.01 1.65 0.00 1.65
- Flat Wise Elbow bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Flat Wise Tee bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Riser bh 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
- Reducer 300 - 200 mm bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Ladder 600x100 mm dalam shaft m' 4.00 0.01 4.00 0.01 2.00 0.00 1.40 0.00 1.40
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 - - - -
103/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

b Tray Type TRC 200x100 mm - - -


- Straight Tray m' 13.00 0.02 13.00 0.02 9.00 0.01 2.05 0.00 2.05
- Jointing Set set 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 - - - -
Rak Kabel Elektronik (Tray 200x100mm Tipe TRC) - - -
a Tray Type TRC 200x100 mm - - -
- Straight Tray m' 18.00 0.03 18.00 0.03 13.00 0.02 2.30 0.00 2.30
- Flat Wise Elbow bh 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
- Flat Wise Tee bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Flat Wise Cross bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Riser bh 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
- Reducer 200 - 100 mm bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Ladder 600x100 mm dalam shaft m' 4.00 0.00 4.00 0.00 2.00 0.00 1.40 0.00 1.40
- Jointing Set set 17.00 0.01 17.00 0.01 10.00 0.00 4.45 0.00 4.45
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 - - - -
b Tray Type TRC 150x100 mm - - -
- Straight Tray m' 13.00 0.02 13.00 0.02 9.00 0.01 2.05 0.00 2.05
- Jointing Set set 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 - - - -
11 Pengujian seluruh Pekerjaan Elektrikal lantai 7 lot 1.00 0.02 1.00 0.02 - - - -
SUB JUMLAH ELEKTRIKAL - LANTAI 7 0.65 0.60 0.21 0.11 -
-
II.8. PEKERJAAN LANTAI - 8 (DELAPAN) -
1 Panel Hubung Bagi -
- Panel P-8 unit 1.00 0.07 1.00 0.07 0.50 0.04 0.35 0.03 0.35
- Panel PAC-8 unit 1.00 0.04 1.00 0.04 0.50 0.02 0.35 0.01 0.35
2 Kabel Feeder - - -
- Dari PSD ke P-8, NYY 4x4 mm2 m 25.00 0.00 25.00 0.00 - - - -
- Dari PSD ke PAC-8, NYY 4x10 mm2 m 25.00 0.01 25.00 0.01 - - - -
- Dari PAC-8 ke FCU.801/CU.801, NYA 4x2.5 mm2 m 15.00 0.00 15.00 0.00 - - - -
- Dari PAC-8 ke FCU.802 A/CU.802 A, NYA 4x2.5 mm2 m 12.00 0.00 12.00 0.00 - - - -
- Dari PAC-8 ke FCU.802 B/CU.802 B, NYA 4x2.5 mm2 m 16.00 0.00 16.00 0.00 - - - -
- Dari PAC-8 ke FCU.803 A/CU.803 A, NYA 3x2.5 mm2 m 13.00 0.00 13.00 0.00 - - - -
- Dari PAC-8 ke FCU.803 B/CU.803 B, NYA 3x2.5 mm2 m 17.00 0.00 17.00 0.00 - - - -
- Dari PAC-8 ke FCU.804 A/CU.804 A, NYA 4x2.5 mm2 m 10.00 0.00 10.00 0.00 - - - -
- Dari PAC-8 ke FCU.804 B/CU.804 B, NYA 4x2.5 mm2 m 16.00 0.00 16.00 0.00 - - - -
- Dari PAC-8 ke FCU.805/CU.805, NYA 4x2.5 mm2 m 14.00 0.00 14.00 0.00 - - - -
- Alat bantu lot 1.00 0.00 1.00 0.00 - - - -
3 Pembumian Pengaman - - -
- Kabel - - -
a NYA 1x4 mm2 m' 25.00 0.00 25.00 0.00 - - - -
b NYA 1x10 mm2 m' 25.00 0.00 25.00 0.00 - - - -
- Alat bantu lot 1.00 0.00 1.00 0.00 - - - -
4 Pencahayaan - - -
- Lampu RM 300 ML TL-D 2x36 W Mirror Louvre bh 9.00 0.04 9.00 0.04 4.00 0.02 3.65 0.02 3.65
- Lampu RMO TL-D 2x36 W bh 9.00 0.03 9.00 0.03 4.00 0.01 3.65 0.01 3.65
- Lampu TK TG 1x36 TL-D 1x36 W bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Lampu BL MA5 TL-D 1x36 W bh 6.00 0.01 6.00 0.01 4.00 0.00 1.10 0.00 1.10
- Lampu GMS TP 1x36 W TL-D 1x36 W, Acrylic Cover bh 4.00 0.01 4.00 0.01 2.00 0.01 1.40 0.00 1.40
- Down Light RD 150 E27 Essential 1x18 W bh 5.00 0.00 5.00 0.00 3.00 0.00 1.25 0.00 1.25
- Lampu downlight RD 125 E27 Geniel 1x14 W bh 10.00 0.01 10.00 0.01 6.00 0.00 2.50 0.00 2.50
- Lampu Keluar TL-D 1x8 W berikut battery Ni.Cad dan charger bh 2.00 0.01 2.00 0.01 1.00 0.01 0.70 0.00 0.70
- Saklar tunggal, 10 A, 250 VAC bh 15.00 0.00 15.00 0.00 10.00 0.00 2.75 0.00 2.75
- Saklar tripel, 10 A, 250 VAC bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Saklar tukar tunggal, 10 A, 250 VAC bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Instalasi pencahayaan, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 38.00 0.06 38.00 0.06 - - - -
5 Kotak Kontak - - -
- Kotak kontak biasa, 1fasa 15 A, 250 VAC bh 19.00 0.00 19.00 0.00 14.00 0.00 2.15 0.00 2.15
- Kotak kontak Water Proof, 1fasa 15 A, 250 VAC bh 1.00 0.00 1.00 0.00 - - - -
- Instalasi kotak kontak, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 20.00 0.03 20.00 0.03 - - - -
6 Deteksi dan Alarm Kebakaran - - -
- TBFA - 8 bh 1.00 0.01 1.00 0.01 0.50 0.00 0.35 0.00 0.35
- Detektor Panas Suhu Tetap bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Detektor Asap bh 4.00 0.01 4.00 0.01 2.00 0.01 1.40 0.00 1.40
- Detektor Panas ROR bh 8.00 0.01 8.00 0.01 4.00 0.00 2.80 0.00 2.80
- Titik panggil manual dengan Jack telepon bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Bell alarm bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Lampu indikator bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- End of line Resistor (EOL) bh 3.00 0.00 3.00 0.00 2.00 0.00 0.55 0.00 0.55
- Instalasi jack telepon, kabel ITC 2x2x0.6 mm2 dalam konduit uPVC, HI, Ø 20 mm ttk 1.00 0.00 1.00 0.00 - - - -
- Kabel Loop Data, Power dan Intercom dari Panel Kontrol (PKFA-A) ke TBFA-8 : - - -

104/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

a. Nontwisted Pair Nonshielded Cable AWG #16 1 Pair dlm konduit uPVC20 mm m' 36.00 0.00 36.00 0.00 - - - -
b. NYA 1,5 mm2x3 dalam Konduit uPVC HI Ø 20 mm m' 36.00 0.00 36.00 0.00 - - - -
c. ITC 2x2x0,6 mm dalam Konduit uPVC Ø 20 mm m' 36.00 0.00 36.00 0.00 - - - -
- Instalasi titik deteksi, kabel NYA 1,5mm2x2 dalam konduit uPVC, HI, Ø 20 mm ttk 15.00 0.02 15.00 0.02 - - - -
7 Tata Suara - - -
Sistim Public Adress - - -
- Speaker Plafon 6/3 W bh 7.00 0.01 7.00 0.01 4.00 0.00 1.95 0.00 1.95
- Kontrol Volume dengan Saklar 30 W bh 4.00 0.01 4.00 0.01 2.00 0.00 1.40 0.00 1.40
- Instalasi Speaker Plafon dan volume kontrol, kabel dalam konduit uPVC Ø 20mm titk 11.00 0.01 11.00 0.01 7.00 0.01 2.35 0.00 2.35
- Speaker Kotak 6/3 W bh 2.00 0.01 2.00 0.01 1.00 0.01 0.70 0.00 0.70
- Instalasi Speaker kotak, kabel dalam konduit uPVC Ø 20mm titk 2.00 0.02 2.00 0.02 - - - -
- Kotak Terminal Tata Suara, TBS- unit 1.00 0.02 1.00 0.02 - - - -
- Kabel dari MDF Tata Suara ke TBS-8, - - -
kabel NYMHY 3x1,5 mm2 dalam Konduit uPVC Ø 20 mm m' 36.00 0.01 36.00 0.01 - - - -

105/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

8 CCTV - - -
- Kamera dome berwarna type PTZ unit 2.00 0.06 2.00 0.06 1.00 0.03 0.70 0.02 0.70
- Instalasi CCTV, kabel Coaxial 5C-2V dalam konduit uPVC Ø 20 mm ttk 2.00 0.01 2.00 0.01 - - - -
- Instalasi daya Kamera, Kabel NYA 3x2,5 mm2 dalam uPVC Ø 20 mm ttk 2.00 0.00 2.00 0.00 - - - -
- Instalasi Kabel Kontrol, Kabel STP AWG #18 dalam konduit uPVC Ø 20 mm ttk 2.00 0.01 2.00 0.01 - - - -
9 Rak Kabel - - -
Rak Kabel Elektrikal - - -
a. Tray Type TRC 300x100 mm - - -
- Straight Tray m' 9.00 0.02 9.00 0.02 6.00 0.01 1.65 0.00 1.65
- Flat Wise Elbow bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Flat Wise Tee bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Riser bh 3.00 0.00 3.00 0.00 1.00 0.00 1.55 0.00 1.55
- Reducer 300 - 200 mm bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Ladder 600x100 mm dalam shaft m' 4.00 0.01 4.00 0.01 2.00 0.00 1.40 0.00 1.40
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 - - - -
b Tray Type TRC 200x100 mm - - -
- Straight Tray m' 13.00 0.02 13.00 0.02 9.00 0.01 2.05 0.00 2.05
- Jointing Set set 3.00 0.00 3.00 0.00 1.00 0.00 1.55 0.00 1.55
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 - - - -
Rak Kabel Elektronik (Tray 200x100mm Tipe TRC) - - -
a Tray Type TRC 200x100 mm - - -
- Straight Tray m' 18.00 0.03 18.00 0.03 12.00 0.02 3.30 0.00 3.30
- Flat Wise Elbow bh 3.00 0.00 3.00 0.00 1.00 0.00 1.55 0.00 1.55
- Flat Wise Tee bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Flat Wise Cross bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Riser bh 3.00 0.00 3.00 0.00 1.00 0.00 1.55 0.00 1.55
- Reducer 200 - 100 mm bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Ladder 600x100 mm dalam shaft m' 4.00 0.00 4.00 0.00 2.00 0.00 1.40 0.00 1.40
- Jointing Set set 17.00 0.01 17.00 0.01 12.00 0.00 2.45 0.00 2.45
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 - - - -
b Tray Type TRC 150x100 mm - - -
- Straight Tray m' 13.00 0.02 13.00 0.02 10.00 0.01 1.05 0.00 1.05
- Jointing Set set 3.00 0.00 3.00 0.00 1.00 0.00 1.55 0.00 1.55
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 - - - -
10 Pengujian seluruh Pekerjaan Elektrikal lantai 8 lot 1.00 0.02 1.00 0.02 - - -
SUB JUMLAH ELEKTRIKAL - LANTAI 8 0.72 0.72 0.25 0.15

II.9. PEKERJAAN LANTAI - 9 (SEMBILAN)


1 Panel Hubung Bagi 0.35
- Panel P-Lift unit 1.00 0.06 1.00 0.06 0.50 0.03 0.35 0.02 0.35
- Panel P-Booster Pump unit 1.00 0.04 1.00 0.04 0.50 0.02 0.35 0.01
2 Kabel Feeder - -
- Dari PSD ke P-Lift, FRC 4x25mm2 m 42.00 0.08 42.00 0.08 - - -
- Dari PSD ke P-Booster Pump, NYY 4x4 mm2 m 40.00 0.01 40.00 0.01 - - -
- Alat bantu lot 1.00 0.00 1.00 0.00 - - -
3 Pembumian Pengaman - -
- Kabel - -
a NYA 1x4 mm2 m' 42.00 0.00 42.00 0.00 - - -
b NYA 1x10 mm2 m' 40.00 0.00 40.00 0.00 - - -
- Alat bantu lot 1.00 0.00 1.00 0.00 - - -
4 Pencahayaan - -
- Lampu TK TG 1x36 TL-D 1x36 W bh 2.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Lampu GMS TP 1x36 W TL-D 1x36 W, Acrylic Cover bh 2.00 0.01 - - -
- Saklar tunggal, 10 A, 250 VAC bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Instalasi pencahayaan, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 4.00 0.01 3.00 0.00 - - - -

106/107
NO ITEM PEKERJAAN KONTRAK AWAL CCO PROGRESS Laporan Harian
SAT. VOL. BOBOT VOL. BOBOT MINGGU LALU MINGGU INI Hari Ke
(%) (%) VOLUME BOBOT (%) VOLUME BOBOT (%) 12 13 14 15 16 17 18

5 Kotak Kontak - - -
- Kotak kontak biasa, 1fasa 15 A, 250 VAC bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Kotak kontak Water Proof, 1fasa 15 A, 250 VAC bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Instalasi kotak kontak, kabel NYM 3x2,5 mm2 dalam konduit uPVC Ø 20 mm titik 2.00 0.00 2.00 0.00 - - - -
6 Deteksi dan Alarm Kebakaran - - -
- Detektor Asap bh 2.00 0.01 2.00 0.01 1.00 0.00 0.70 0.00 0.70
- Instalasi titik deteksi, kabel NYA 1,5mm2x2 dalam konduit uPVC, HI, Ø 20 mm ttk 2.00 0.00 2.00 0.00 - - - -
7 Tata Suara - - -
Sistim Public Adress - - -
- Speaker Kotak 6/3 W bh 1.00 0.01 1.00 0.01 0.50 0.00 0.35 0.00 0.35
- Instalasi Speaker kotak, kabel dalam konduit uPVC Ø 20mm titk 1.00 0.01 1.00 0.01 - - - -
8 Rak Kabel - - -
Rak Kabel Elektronik (Tray 200x100mm Tipe TRC) - - -
- Straight Tray m' 3.00 0.00 3.00 0.00 1.00 0.00 1.55 0.00 1.55
- Flat Wise Elbow bh 2.00 0.00 2.00 0.00 1.00 0.00 0.70 0.00 0.70
- Flat Wise Tee bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Riser 200x100 mm bh 3.00 0.00 3.00 0.00 1.50 0.00 1.05 0.00 1.05
- Ladder 200x100 mm dalam shaft m' 4.00 0.01 4.00 0.01 2.00 0.00 1.40 0.00 1.40
- Jointing Set set 13.00 0.00 13.00 0.00 9.00 0.00 2.05 0.00 2.05
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 - - - -
Rak Kabel Elektronik (Tray 200x100mm Tipe TRC) - - -
- Straight Tray m' 15.00 0.02 15.00 0.02 9.00 0.01 3.75 0.01 3.75
- Flat Wise Elbow bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Riser 200x100 mm bh 1.00 0.00 1.00 0.00 0.50 0.00 0.35 0.00 0.35
- Ladder 200x100 mm dalam shaft m' 4.00 0.01 4.00 0.01 2.00 0.00 1.40 0.00 1.40
- Jointing Set set 8.00 0.00 8.00 0.00 4.00 0.00 2.80 0.00 2.80
- Accessories (hanger/support beam & rod, Hold Down Clamp, dyna bolt) lot 1.00 0.00 1.00 0.00 - - - -
Proteksi Petir - - -
- Terminal udara tembaga spliz Ø 3/4 mm, franklin farady unit 23.00 0.05 23.00 0.05 - - - -
- Kotak pengujian aluminium, dengan penghitung sambaran unit 4.00 0.07 4.00 0.07 - - - -
- Kabel BCC 1 x 50 mm ke terminal udara, lengkap klem dan alat bantu lainya m' 298.00 0.04 298.00 0.04 - - - -
- Titik Pentanahan titik 4.00 0.02 4.00 0.02 - - - -
- tembaga pejal 20 mm @ 2 m bh 4.00 0.00 4.00 0.00 - - - -
- Bak kontrol 6000 x 6000 x 600 mm bh 4.00 0.01 4.00 0.01 - - - -
- Pekerjaan Tanah Jalur Kabel BC (galian,urugan pasir, beton pelindung kabel, - - -
urugan kembali bekas galian, pemadatan, buang sisa galian dan pemasangan m' 6.00 0.00 6.00 0.00 - - - -
patok tanda jalur kabel) - - -
9 Pengujian seluruh Pekerjaan Elektrikal lantai 9 lot 1.00 0.02 1.00 0.02 - - - -
SUB JUMLAH ELEKTRIKAL - LANTAI 9 0.52 0.51 0.08 0.06

107/107