DAFTAR KUANTITAS DAN HARGA

RENCANA ANGGARAN BIAYA (RAB)


KEGIATAN #REF!
PEKERJAAN : PEMBUATAN JEMBATAN ( 3 BUAH), JALAN, DAN TIMBUNAN KANTOR DISTRIK ARSO
LOKASI : DISTRIK ARSO KABUPATEN KEEROM
TAHUN ANGGARAN : 2007

HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (Rp)
01 02 03 04 05 06

I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi M2 6.000 7,350.00 44,100.00
2 Pengukuran & Pemasangan Bouplank M' 16.000 44,567.50 713,080.00
3 Pembuatan Direksi/Gudang M2 20.000 #REF! #REF!
4 Mobilisasi dan Demobilisasi Ls 1.000 21,650,000.00 21,650,000.00
#REF!
II. PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi M3 91.050 49,625.00 4,518,356.25
2 Urugan Kembali Sisi Pondasi M3 36.000 12,406.25 446,625.00
3 Urugan Pasir Bawah Pondasi M3 2.400 636,000.00 1,526,400.00
4 Urugan Karang /Sirtu M3 336.000 #REF! #REF!
5 Penyiapan Badan Jalan M2 840.000 #REF! #REF!
6 Urugan Karang/Sirtu Keliling Rumah M3 15.750 329,400.00 5,188,050.00
#REF!
III. PEKERJAAN PASANGAN
1 Pasang Pondasi Bt kali jembatan & Sayap 1 : 3 M3 57.660 1,417,883.00 81,755,133.78
2 Pas. Aanstamping Batu Kali M3 7.200 634,125.00 4,565,700.00
3 Plesteran Batu Kali (Mata Sapi) M2 56.040 71,554.50 4,009,914.18
90,330,747.96
IV. PEKERJAAN LANTAI DAN BETON
1 Cor Lantai Tebal 20 CM Camp. 1 : 2 : 3 M3 4.350 5,108,924.00 22,223,819.40
2 Cor sandaran/relling Jembatan 1 : 3 : 5 M3 0.293 5,108,924.00 1,494,360.27
3 Cor Beton 1 : 2 : 3 Plat Injak M3 3.600 5,108,924.00 18,392,126.40
42,110,306.07
V. PEKERJAAN AKHIR
1 Pembersihan Akhir Ls 1.000 500,000.00 500,000.00
500,000.00

1 Galian Tanah Pondasi M3 30.350 3 91.05


2 Urugan Kembali Sisi Pondasi M3 12.000 3 36.00
1 Pasang Pondasi Bt kali jembatan & Sayap 1 : 3 M3 19.220 3 57.66
2 Pas. Aanstamping Batu Kali M3 2.400 3 7.20
3 Plesteran Batu Kali (Mata Sapi) M2 18.680 3 56.04
1 Cor Lantai Tebal 20 CM Camp. 1 : 2 : 3 M3 1.450 3 4.35
2 Cor sandaran/relling Jembatan 1 : 3 : 5 M3 0.098 3 0.29
3 Cor Beton 1 : 2 : 3 Plat Injak M3 1.200 3 3.60
REKAPITULASI
KEGIATAN #REF!
PEKERJAAN : PEMBUATAN JEMBATAN ( 3 BUAH), JALAN, DAN TIMBUNAN KANTOR DISTRIK ARSO
LOKASI : DISTRIK ARSO KABUPATEN KEEROM
TAHUN ANGGARAN : 2007

NO URAIAN PEKERJAAN JUMLAH HARGA


1 2 3

I. PEKERJAAN PERSIAPAN Rp #REF!

II. PEKERJAAN TANAH DAN PONDASI Rp #REF!

III. PEKERJAAN PASANGAN Rp 90,330,747.96

IV. PEKERJAAN LANTAI DAN BETON Rp 42,110,306.07

V. PEKERJAAN AKHIR Rp 500,000.00

REAL COST Rp #REF!


DAFTAR ANALISA HARGA SATUAN
KEGIATAN #REF!
R DISTRIK ARSO PEKERJAAN : PEMBUATAN JEMBATAN ( 3 BUAH), JALAN, DAN TIMBUNAN KANTOR DISTRIK ARSO
LOKASI : DISTRIK ARSO KABUPATEN KEEROM
TAHUN ANGGARAN : 2007

HARGA
NO URAIAN PEKERJAAN
SATUAN (Rp)
01 02 03

1 1 M2 PEMBERSIHAN LOKASI
0.1000 O/h Pekerja 62,500.00
0.0100 O/h Mandor 110,000.00

2 1 M' PASANG BOUPLANK


0.0050 M3 Papan Kayu Matoa 1,700,000.00
0.0035 M3 Patok kayu 1,700,000.00
0.0500 Kg Paku Campur 20,000.00
0.0330 O/h Pekerja 62,500.00
0.2700 O/h Tukang Kayu 85,000.00
0.0270 O/h Kepala Tukang 95,000.00
0.0140 O/h Mandor 110,000.00

3 1 M2 DIREKSI / GUDANG
0.1000 M3 Kayu Matoa 1,700,000.00
0.1000 Kg Paku Campur 20,000.00
1.0000 Lbr Seng Glbg BJLS 20 #REF!
0.0490 O/h Kepala tukang 95,000.00
0.4900 O/h Tukang kayu 85,000.00
0.2500 O/h Pekerja 62,500.00
0.1250 O/h Mandor 110,000.00

4 1 M3 GALIAN TANAH
0.7500 O/h Pekerja 62,500.00
0.0250 O/h Mandor 110,000.00

5 1 M3 URUGAN TANAH KEMBALI


0.2500 x Galian Tanah Pondasi
6 1 M3 URUGAN PASIR BAWAH PONDASI
1.2000 M3 Pasir Urug 445,000.00
1.5000 O/h Pekerja 62,500.00
0.0750 O/h Mandor 110,000.00

7 1 M3 PASANG BATU KOSONG


1.2000 M3 Batu Kali / Batu gunung 445,000.00
1.5000 O/h Pekerja 62,500.00
0.0750 O/h Tukang batu 85,000.00

01 02 03
8 1 M3 PASANG PONDASI BATU KALI 1 : 3
1.1000 M3 Batu kali / batu gunung 445,000.00
0.5220 M3 Pasir pasang 445,000.00
4.0710 Zak Semen 83,000.00
3.6000 O/h Pekerja 62,500.00
1.2000 O/h Tukang batu 85,000.00
0.1200 O/h Kepala Tukang 95,000.00
0.1800 O/h Mandor 110,000.00
`
9 1 M3 URUGAN KARANG /SIRTU (mekanik)
1.2000 M3 Karang/Sirtu 189,500.00
0.0884 Jam Dump Truck 159,794.80
0.0117 Jam Motor Grader 333,503.45
0.0214 Jam Vibro Roller #REF!
0.0070 Jam Water Tangker 159,794.80
1.5000 O/h Pekerja 62,500.00
0.0750 O/h Mandor 110,000.00

10 1 M2 PENYIAPAN BADAN JALAN


0.0025 Jam Motor Grader 333,503.45
0.0040 Jam Vibro Roller #REF!
0.0105 Jam Water Tangker 159,794.80
1.5000 O/h Pekerja 62,500.00
0.0750 O/h Mandor 110,000.00

11 1 M3 URUGAN KARANG ( manual)


1.2000 M3 Karang/Sirtu 189,500.00
1.5000 O/h Pekerja 62,500.00
0.0750 O/h Mandor 110,000.00

12 1 M2 PLESTERAN MATA SAPI CAMP. 1 : 2


0.0171 M3 Pasir 445,000.00
0.2150 Sak Semen 83,000.00
0.4000 O/h Pekerja 62,500.00
0.2000 O/h Tukang batu 85,000.00
0.0200 O/h Kepala Tukang 95,000.00
0.0200 O/h Mandor 110,000.00

13 1 M3 BETON BERTULANG CAMP. 1 : 2 : 3


UNTUK LANTAI,PLAT INJAK & SANDARAN
A. PEK. CAMPURAN
0.9400 M3 Kerikil pecah 445,600.00
0.6800 M3 Pasir 445,000.00
7.0000 Zak Semen 83,000.00
6.0000 O/h Pekerja 62,500.00
1.0000 O/h Tukang batu 85,000.00
0.1000 O/h Kepala Tukang 95,000.00
0.3000 O/h Mandor 110,000.00

B. PEMBESIAN
110.0000 Kg Besi Beton 15,500.00
2.0000 Kg Kawat Ikat 33,000.00
4.8600 O/h Pekerja 62,500.00
4.8600 O/h Tukang besi 85,000.00
1.6200 O/h Kepala Tukang besi 95,000.00

C. BEKISTING (CETAKAN)
0.3000 M3 Papan Bekisting 1,700,000.00
2.0000 Kg Paku 20,000.00
0.2200 O/h Pekerja 62,500.00
0.5000 O/h Tukang kayu 85,000.00
0.0500 O/h Kepala Tukang kayu 95,000.00
0.0110 O/h Mandor 110,000.00
2.0000 O/h Tukang Bongkar Cetakan 25,000.00

JADI UNTUK 1 M3 BETON BEETULANG =


(A+B+C+D)

R DISTRIK ARSO
TUAN

AN TIMBUNAN KANTOR DISTRIK ARSO

HARGA SATUAN
(Rp)
04

6,250.00
1,100.00

7,350.00

8,500.00
5,950.00
1,000.00
2,062.50
22,950.00
2,565.00
1,540.00
44,567.50

170,000.00
2,000.00
#REF!
4,655.00
41,650.00
15,625.00
13,750.00
#REF!

46,875.00
2,750.00
49,625.00

12,406.25

534,000.00
93,750.00
8,250.00
636,000.00

534,000.00
93,750.00
6,375.00
634,125.00

04

489,500.00
232,290.00
337,893.00
225,000.00
102,000.00
11,400.00
19,800.00
1,417,883.00
227,400.00
14,125.86
3,901.99
#REF!
1,118.56
93,750.00
8,250.00
#REF!

833.76
#REF!
1,677.85
93,750.00
8,250.00
#REF!

227,400.00
93,750.00
8,250.00
329,400.00

7,609.50
17,845.00
25,000.00
17,000.00
1,900.00
2,200.00
71,554.50

418,864.00
302,600.00
581,000.00
375,000.00
85,000.00
9,500.00
33,000.00
1,804,964.00

1,705,000.00
66,000.00
303,750.00
413,100.00
153,900.00
2,641,750.00

510,000.00
40,000.00
13,750.00
42,500.00
4,750.00
1,210.00
50,000.00
662,210.00

5,108,924.00
RENCANA ANGGARAN BIAYA
( R.A.B )
SATUAN KERJA : DINAS PEKERJAAN UMUM KABUPATEN KEEROM
PEKERJAAN : PEMBANGUNAN PAGAR KELILING & POS JAGA KANTOR BUPATI (TAHAP I)
LOKASI : DISTRIK ARSO KABUPATEN KEEROM
TAHUN ANGGARAN : 2011

HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (Rp)
01 02 03 04 05 06
A. PAGAR, GAPURA Type A + PINTU PAGAR
I. PAGAR Type A

1. PEKERJAAN PERSIAPAN
a. Dokumentasi & Pelaporan Ls 1.000 750,000.00 750,000.00
b. Pengukuran & Pemasangan Bouplank M' 82.300 44,567.50 3,667,905.25
4,417,905.25
2. PEKERJAAN TANAH
a. Galian tanah pondasi M3 144.671 49,625.00 7,179,273.56
b. Urugan kembali sisi pondasi M3 36.168 41,781.25 1,511,128.58
c. Urugan pasir bawah pondasi M3 9.892 636,000.00 6,291,312.00
14,981,714.14
3. PEKERJAAN PASANGAN & BETON
a. Kolom Beton 10x30 cm M3 0.720 5,108,924.00 3,678,425.28
b. Sloof beton bertulang 20/25 cam. 1 : 2 : 3 M3 3.880 5,108,924.00 19,822,625.12
c. Pasang pondasi batu kali 1 : 3 M3 66.771 1,417,883.00 94,673,465.79
d. Pasang dinding batu tela 1 : 4 M3 65.459 1,183,690.00 77,482,571.87
e. Plesteran dinding batu tela 1 : 4 M2 634.230 66,190.50 41,980,000.82
f. Pas Anstamping/Batu kosong M3 0.160 634,125.00 101,460.00
237,738,548.87
4. PEKERJAAN PENGECATAN
a. Cat Dinding Pagar M2 634.230 59,550.00 37,768,396.50
b. Cat Relife M2 36.288 Tahap II
37,768,396.50
5. PEKERJAAN LAIN-LAIN
a. Relife Ukiran Beton M2 36.288 150,000.00 5,443,200.00
b. Pagar Besi Hollow 4 cm Unit 76.000 750,000.00 57,000,000.00
c. Pintu Besi Pagar Dorong Unit 2.000 Tahap II
62,443,200.00

Jumlah 357,349,764.77
II. GAPURA Type A

1. PEKERJAAN PERSIAPAN
a. Pengukuran & Pemasangan Bouplank M' 12.000 Tahap II
-
2. PEKERJAAN TANAH
a. Galian tanah pondasi M3 5.824 Tahap II
b. Urugan kembali sisi pondasi M3 1.456 Tahap II
c. Urugan pasir bawah pondasi M3 0.143 Tahap II
-
3. PEKERJAAN PASANGAN & BETON
a. Pondasi Telapak M3 0.648 Tahap II
b. Kolom Beton Bertulang Tiang Gapura camp. 1 : 2 : 3 M3 17.182 Tahap II
c. Kolom Pondasi Telapak 30 x 60 cm M3 0.360 Tahap II
d. Plat Papan Nama Beton t: 10 cm M3 1.585 Tahap II
e. Cor Beton 1 : 3 : 5 M3 0.546 Tahap II
-
4. PEKERJAAN PENGECATAN
a. Cat Dinding M2 68.288 Tahap II
b. Cat Relife M2 30.475 Tahap II
c. Cat Kayu M2 1.750 Tahap II
-
5. PEKERJAAN LAIN-LAIN
a. Relife Ukiran Beton M2 36.288 Tahap II
b. Relife Patung Kayu Unit 2.000 Tahap II
-

@ Biaya Gapura Type A Unit 1.00 Tahap II


Jumlah Gapura 2 Unit Unit 2.00 Tahap II
-

Jumlah -
III. PAPAN NAMA Pagar Type A

1. PEKERJAAN PERSIAPAN
a. Pengukuran & Pemasangan Bouplank M' 17.900 44,567.50 797,758.25
797,758.25
2. PEKERJAAN TANAH
a. Galian tanah pondasi M3 3.510 49,625.00 174,183.75
b. Urugan kembali sisi pondasi M3 0.878 41,781.25 36,663.05
c. Urugan pasir bawah pondasi M3 0.270 636,000.00 171,720.00
382,566.80
3. PEKERJAAN PASANGAN & BETON
a. Kolom Bt Tela 1:4 dimensi 60 x 60 cm M3 1.296 1,183,690.00 1,534,062.24
b. Sloof beton bertulang 20/25 cam. 1 : 2 : 3 M3 0.323 5,108,924.00 1,647,627.99
c. Ring Balk 10x10 cm cam 1 : 2 : 3 0.086 5,108,924.00 436,813.00
d. Pasang pondasi batu kali 1 : 3 M3 3.645 1,417,883.00 5,168,183.54
e. Pasang dinding batu tela 1 : 4 M3 1.695 1,183,690.00 2,006,354.55
f. Plesteran dinding batu tela 1 : 4 M2 22.600 66,190.50 1,495,905.30
g. Pas Anstampink/Batu kosong M3 1.032 634,125.00 654,417.00
12,943,363.62
4. PEKERJAAN PENGECATAN
a. Cat Dinding Papan nama M2 32.240 Tahap II
b. Cat Relife M2 2.697 Tahap II
-
5. PEKERJAAN LAIN-LAIN
a. Relife Ukiran Beton M2 2.697 465,000.00 1,254,105.00
1,254,105.00

Jumlah 15,377,793.66

Jumlah I + II + III Rp 372,727,558.43

HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (Rp)
01 02 03 04 05 06
B. PAGAR Type B
I. PEKERJAAN PERSIAPAN
1 Pengukuran & Pemasangan Bouplank M' 25.000 Tahap II
-
II. PEKERJAAN TANAH
1 Galian tanah pondasi M3 44.928 Tahap II
2 Urugan kembali sisi pondasi M3 11.232 Tahap II
3 Urugan pasir bawah pondasi M3 3.072 Tahap II
-
III. PEKERJAAN PASANGAN
1 Pasang pondasi batu kali 1 : 3 M3 20.736 Tahap II
2 Pasang dinding batu tela 1 : 4 M3 20.007 Tahap II
3 Plesteran dinding batu tela 1 : 4 M2 226.760 Tahap II
4 Pasang Kawat Duri M' 230.400 Tahap II
5 Pas Anstampink M3 12.288 Tahap II
-
IV. PEKERJAAN BETON DAN PAGAR BRC
1 Sloof beton bertulang 20/25 cam. 1 : 2 : 3 M3 3.840 Tahap II
2 Ring Balk beton bertulang 20/20 cam. 1 : 2 : 3 M3 3.072 Tahap II
3 Kolom praktis 30/30 camp. 1 : 2 : 3 M3 4.446 Tahap II
-

V. PEKERJAAN PENGECATAN
1 Cat Dinding Pagar M2 226.760 Tahap II
-

Jumlah -
HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (Rp)
01 02 03 04 05 06
C. PAGAR Type C
I. PEKERJAAN PERSIAPAN
1 Pengukuran & Pemasangan Bouplank M' 94.500 Tahap II
-
II. PEKERJAAN TANAH
1 Galian tanah pondasi M3 1.140 Tahap II
-
III. PEKERJAAN PASANGAN & BETON
1 Pasang Pondasi Cor Beton camp 1 : 3 : 5 M3 1.520 Tahap II
2 Pasang Balok Kayu Besi 10/10 M3 1.710 Tahap II
3 Pasang Kawat Duri M' 2,550.16 Tahap II
-

Jumlah -

HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (Rp)
01 02 03 04 05 06
D. PAGAR Type D + PINTU PAGAR
I. PEKERJAAN PERSIAPAN
1 Pengukuran & Pemasangan Bouplank M' 21.000 Tahap II
-
II. PEKERJAAN TANAH
1 Galian tanah pondasi M3 46.069 Tahap II
2 Urugan kembali sisi pondasi M3 11.517 Tahap II
3 Urugan pasir bawah pondasi M3 3.150 Tahap II
-
III. PEKERJAAN PASANGAN
1 Pasang pondasi batu kali 1 : 3 M3 21.263 Tahap II
2 Pasang dinding batu tela 1 : 4 M3 19.950 Tahap II
3 Plesteran dinding batu tela 1 : 4 M2 266.000 Tahap II
5 Pas Anstamping/Batu kosong M3 2.576 Tahap II
-
IV. PEKERJAAN BETON DAN PAGAR BRC
1 Sloof beton bertulang 20/25 cam. 1 : 2 : 3 M3 4.440 Tahap II
2 Ring Balk beton bertulang 20/20 cam. 1 : 2 : 3 M3 3.153 Tahap II
3 Kolom praktis 20/30 camp. 1 : 2 : 3 M3 2.394 Tahap II
-
V. PEKERJAAN PENGECATAN
1 Cat Dinding Pagar M2 266.000 Tahap II
2 Pintu Besi Pagar Dorong Unit 2.000 Tahap II
-
Jumlah -
HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (Rp)
01 02 03 04 05 06
E. POS JAGA
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi LS 1.000 Tahap II
2 Pengukuran & Pemasangan Bouplank M' 24.400 Tahap II
-
II. PEKERJAAN TANAH DAN PONDASI
1 Galian tanah pondasi M3 7.560 Tahap II
2 Urugan kembali sisi pondasi M3 1.890 Tahap II
3 Urugan pasir bawah pondasi M3 0.480 Tahap II
-
III. PEKERJAAN PASANGAN
1 Pasang pondasi batu kali 1 : 3 M3 3.515 Tahap II
2 Pas. Aanstamping batu kali M3 1.920 Tahap II
3 Pasang dinding batu tela 1 : 4 M3 3.420 Tahap II
4 Plesteran dinding batu tela 1 : 4 M2 6.840 Tahap II
-
IV. PEKERJAAN LANTAI DAN BETON
1 Sloof Beton Bertulang 12/25 cam. 1 : 2 : 3 M3 0.360 Tahap II
2 Ring Balok Beton Bertulang 12/25 Camp. 1 : 2 : 3 M3 0.216 Tahap II
3 Kolom 15/15 Camp. 1 : 2 : 3 M3 0.473 Tahap II
4 Cor Dasar Keramik 7 CM Camp. 1 : 3 : 5 M3 0.420 Tahap II
5 Pasang Lantai Keramik 30/30 M2 15.555 Tahap II
6 Saluran air Hujan M' 18.000 Tahap II
-
V. PEK. RANGKA ATAP DAN PLAFOND
1 Kuda-Kuda Kayu Besi 5x10 cm M3 0.200 Tahap II
2 Balok Gording Kayu Matoa 5x10 cm M3 0.416 Tahap II
3 Kusen Pintu Jendela M3 0.082 Tahap II
4 Papan Listplank 2,5/20 cm Kayu Besi M' 14.640 Tahap II
5 Atap seng Gelombang BJLS 0,30 M2 14.975 Tahap II
6 Nok/Bubungan Seng Plat BJLS 0,20 M' 11.250 Tahap II
7 Pintu Panil Kayu Besi BH 1.000 Tahap II
8 Jendela Panil Kaca Ryben 5 mm BH 1.000 Tahap II
9 Plafond Tripleks 3 mm + rangka M2 15.555 Tahap II
-
VI. PEK. ALAT GANTUNG
1 Engsel Pintu BH 3.000 Tahap II
2 Engsel Jendela BH 2.000 Tahap II
3 Grendel Pintu BH 2.000 Tahap II
4 Grendel Jendela BH 1.000 Tahap II
5 Kunci Pintu 2 Slaag BH 1.000 Tahap II
6 Kait Angin BH 2.000 Tahap II
-
VII. PEK. INSTALASI LISTRIK
1 Pek. Pemasangan Lampu SL 15 Watt ttk 4.000 Tahap II
2 Pek. Pemasangan Stop Kontak ttk 2.000 Tahap II
3 Pek. Pemasangan Saklar Tunggal ttk 1.000 Tahap II
4 Pek. Pemasangan Saklar Ganda ttk 1.000 Tahap II
5 Penyambungan listrik ls 1.000 Tahap II
-
VIII. PEK. PENGECATAN -
1 Cat Dinding M2 6.840 Tahap II
2 Cat plafond M2 15.555 Tahap II
3 Cat Kayu / Cat besi M2 1.630 Tahap II
4 Residu rangka atap M2 4.000 Tahap II
-
IX. PEKERJAAN AKHIR
1 Pembersihan Akhir Ls 1.000 Tahap II
-

Jumlah
Jumlah Cost X 2 Unit -
BILL OF QUANTITY (B.O.Q)
REKAPITULASI
SATUAN KERJA : DINAS PEKERJAAN UMUM KABUPATEN KEEROM
PEKERJAAN : PEMBANGUNAN PAGAR KELILING & POS JAGA KANTOR BUPATI (TAHAP I)
LOKASI : DISTRIK ARSO KABUPATEN KEEROM
TAHUN ANGGARAN : 2011

NO URAIAN PEKERJAAN JUMLAH HARGA


1 2 3

I. PAGAR Type A Rp 372,727,558.43

II. PAPAN NAMA Pagar Type A Rp Tahap II

REAL COST Rp 372,727,558.43


PPN 10 % Rp 37,272,755.84
TOTAL COST Rp 410,000,314.27
DIBULATKAN Rp 410,000,000.00

Terbilang :

Arso, ............................... 2011


Dibuat Oleh :
CV/PT. ...............................................

........................................
Direktur/Pimpinan
DAFTAR ANALISA HARGA SATUAN
SATUAN KERJA : DINAS PEKERJAAN UMUM KABUPATEN KEEROM
PEKERJAAN : PEMBANGUNAN PAGAR KELILING & POS JAGA KANTOR BUPATI (TAHAP I)
LOKASI : DISTRIK ARSO KABUPATEN KEEROM
TAHUN ANGGARAN : 2011

HARGA HARGA SATUAN


NO URAIAN PEKERJAAN
SATUAN (Rp) (Rp)
01 02 03 04

1 1 M2 PEMBERSIHAN LOKASI
0.1000 O/h Pekerja 62,500.00 6,250.00
0.0100 O/h Mandor 110,000.00 1,100.00
7,350.00
2 1 M' PASANG BOUPLANK
0.0050 M3 Papan Kayu Matoa 1,700,000.00 8,500.00
0.0035 M3 Patok kayu 1,700,000.00 5,950.00
0.0500 Kg Paku Campur 20,000.00 1,000.00
0.0330 O/h Pekerja 62,500.00 2,062.50
0.2700 O/h Tukang Kayu 85,000.00 22,950.00
0.0270 O/h Kepala Tukang 95,000.00 2,565.00
0.0140 O/h Mandor 110,000.00 1,540.00
44,567.50
3 1 M2 DIREKSI / GUDANG
0.1000 M3 Kayu Matoa 1,700,000.00 170,000.00
0.1000 Kg Paku Campur 20,000.00 2,000.00
1.0000 Lbr Seng Glbg BJLS 20 108,000.00 108,000.00
0.0490 O/h Kepala tukang 95,000.00 4,655.00
0.4900 O/h Tukang kayu 85,000.00 41,650.00
0.2500 O/h Pekerja 62,500.00 15,625.00
0.1250 O/h Mandor 110,000.00 13,750.00
355,680.00
4 1 M3 GALIAN TANAH
0.7500 O/h Pekerja 62,500.00 46,875.00
0.0250 O/h Mandor 110,000.00 2,750.00
49,625.00
5 1 M3 URUGAN TANAH KEMBALI
0.2500 x Galian Tanah Pondasi 49,625.00 12,406.25
0.2500 O/h Pekerja 62,500.00 15,625.00
0.1250 O/h Mandor 110,000.00 13,750.00
41,781.25
6 1 M3 URUGAN KARANG
1.2000 M3 Karang 189,600.00 227,520.00
0.2500 O/h Pekerja 62,500.00 15,625.00
0.0250 O/h Mandor 110,000.00 2,750.00
245,895.00
7 1 M3 URUGAN PASIR BAWAH PONDASI
1.2000 M3 Pasir Urug 445,000.00 534,000.00
1.5000 O/h Pekerja 62,500.00 93,750.00
0.0750 O/h Mandor 110,000.00 8,250.00
636,000.00
8 1 M3 URUGAN PASIR BAWAH LANTAI
1.2000 M3 Pasir Urug 445,000.00 534,000.00
1.5000 O/h Pekerja 62,500.00 93,750.00
0.0750 O/h Mandor 110,000.00 8,250.00
636,000.00
9 1 M3 PASANG BATU KOSONG
1.2000 M3 Batu Kali / Batu gunung 445,000.00 534,000.00
1.5000 O/h Pekerja 62,500.00 93,750.00
0.0750 O/h Tukang batu 85,000.00 6,375.00
634,125.00
10 1 M3 PASANG PONDASI BATU KALI 1 : 4
1.1000 M3 Batu kali / batu gunung 445,000.00 489,500.00
0.5220 M3 Pasir pasang 445,000.00 232,290.00
4.0710 Zak Semen 83,000.00 337,893.00
3.6000 O/h Pekerja 62,500.00 225,000.00
1.2000 O/h Tukang batu 85,000.00 102,000.00
0.1200 O/h Kepala Tukang 95,000.00 11,400.00
0.1800 O/h Mandor 110,000.00 19,800.00
1,417,883.00
11 1 M3 PASANGAN DINDING BATU TELA 1 : 2
167.0000 Bh Batu Tela 3,500.00 584,500.00
0.3300 M3 Pasir pasang 445,000.00 146,850.00
2.8600 Sak Semen 83,000.00 237,380.00
3.0000 O/h Pekerja 62,500.00 187,500.00
1.5000 O/h Tukang batu 85,000.00 127,500.00
0.1500 O/h Kepala Tukang 95,000.00 14,250.00
0.0400 O/h Mandor 110,000.00 4,400.00
1,302,380.00
01 02 03 04

12 1 M3 PASANGAN DINDING BATU TELA 1 : 4


167.0000 Bh Batu Tela 3,500.00 584,500.00
0.3300 M3 Pasir pasang 445,000.00 146,850.00
1.4300 Sak Semen 83,000.00 118,690.00
3.0000 O/h Pekerja 62,500.00 187,500.00
1.5000 O/h Tukang batu 85,000.00 127,500.00
0.1500 O/h Kepala Tukang 95,000.00 14,250.00
0.0400 O/h Mandor 110,000.00 4,400.00
1,183,690.00
13 1 M2 PLESTERAN DINDING T = 1,5 CAMP. 1 : 4
0.0209 M3 Pasir pasang 445,000.00 9,300.50
0.1300 Sak Semen 83,000.00 10,790.00
0.4000 O/h Pekerja 62,500.00 25,000.00
0.2000 O/h Tukang batu 85,000.00 17,000.00
0.0200 O/h Kepala Tukang 95,000.00 1,900.00
0.0200 O/h Mandor 110,000.00 2,200.00
66,190.50
14 1 M2 PLESTERAN DINDING T = 1,5 CAMP. 1 : 2
0.0171 M3 Pasir 445,000.00 7,609.50
0.2150 Sak Semen 83,000.00 17,845.00
0.4000 O/h Pekerja 62,500.00 25,000.00
0.2000 O/h Tukang batu 85,000.00 17,000.00
0.0200 O/h Kepala Tukang 95,000.00 1,900.00
0.0200 O/h Mandor 110,000.00 2,200.00
71,554.50
15 1 M3 BETON BERTULANG CAMP. 1 : 2 : 3
UNTUK KOLOM, RING BALK & SLOOF
A. PEK. CAMPURAN
0.9400 M3 Kerikil pecah 445,600.00 418,864.00
0.6800 M3 Pasir beton 445,000.00 302,600.00
7.0000 Zak Semen 83,000.00 581,000.00
6.0000 O/h Pekerja 62,500.00 375,000.00
1.0000 O/h Tukang batu 85,000.00 85,000.00
0.1000 O/h Kepala Tukang 95,000.00 9,500.00
0.3000 O/h Mandor 110,000.00 33,000.00
1,804,964.00
B. PEMBESIAN
110.0000 Kg Besi Beton 15,500.00 1,705,000.00
2.0000 Kg Kawat Ikat 33,000.00 66,000.00
4.8600 O/h Pekerja 62,500.00 303,750.00
4.8600 O/h Tukang besi 85,000.00 413,100.00
1.6200 O/h Kepala Tukang besi 95,000.00 153,900.00
2,641,750.00
C. BEKISTING (CETAKAN)
0.3000 M3 Papan Bekisting 1,700,000.00 510,000.00
2.0000 Kg Paku 20,000.00 40,000.00
0.2200 O/h Pekerja 62,500.00 13,750.00
0.5000 O/h Tukang kayu 85,000.00 42,500.00
0.0500 O/h Kepala Tukang kayu 95,000.00 4,750.00
0.0110 O/h Mandor 110,000.00 1,210.00
2.0000 O/h Tukang Bongkar Cetakan 25,000.00 50,000.00
662,210.00
JADI UNTUK 1 M3 BETON BEETULANG =
(A+B+C+D) 5,108,924.00
16 1 M3 COR BETON CAMP. 1 : 3 : 5, t = 5 CM, DI ACI
0.9100 M3 Karang cor 189,500.00 172,445.00
0.4286 M3 Pasir 445,000.00 190,727.00
5.0000 Zak Semen 83,000.00 415,000.00
6.0000 O/h Pekerja 62,500.00 375,000.00
1.0000 O/h Tukang batu 85,000.00 85,000.00
0.1000 O/h Kepala Tukang 95,000.00 9,500.00
0.3000 O/h Mandor 110,000.00 33,000.00
1,280,672.00
17 1 M3 COR LANTAI 1 : 3 : 5
0.9100 M3 Kerikil Cor 445,600.00 405,496.00
4.2857 Zak Semen 83,000.00 355,713.10
0.4286 M3 Pasir 445,000.00 190,727.00
6.0000 O/h Pekerja 62,500.00 375,000.00
1.0000 O/h Tukang batu 85,000.00 85,000.00
0.1000 O/h Kepala Tukang batu 95,000.00 9,500.00
0.3000 O/h Mandor 110,000.00 33,000.00
1,454,436.10
01 02 03 04

18 1 M2 PASANG LANTAI KM/WC KERAMIK 20/20 CM


25.0000 Bh Keramik 20 / 20 3,920.00 98,000.00
0.0400 M3 Pasir pasang 445,000.00 17,800.00
0.0400 Zak Semen 83,000.00 3,320.00
0.2500 Kg Semen putih 17,000.00 4,250.00
1.0000 O/h Pekerja 62,500.00 62,500.00
0.3100 O/h Tukang batu 85,000.00 26,350.00
0.0310 O/h Kepala Tukang 95,000.00 2,945.00
0.0700 O/h Mandor 110,000.00 7,700.00
222,865.00
19 1 M2 PASANG LANTAI KERAMIK 30 / 30 CM
11.2000 Bh Keramik 30/30 CM 10,270.00 115,024.00
0.0400 M3 Pasir pasang 445,000.00 17,800.00
0.4100 Zak Semen 83,000.00 34,030.00
1.8500 Kg Semen Putih 17,000.00 31,450.00
1.0000 O/h Pekerja 62,500.00 62,500.00
0.5000 O/h Tukang batu 85,000.00 42,500.00
0.0500 O/h Kepala Tukang batu 95,000.00 4,750.00
0.0500 O/h Mandor 110,000.00 5,500.00
313,554.00
20 1 M3 PAS. KUDA-KUDA KAYU BESI 5/10
1.1000 M3 Kayu Besi 2,750,000.00 3,025,000.00
2.0000 Kg Paku Campur 20,000.00 40,000.00
8.0000 O/h Pekerja 62,500.00 500,000.00
24.0000 O/h Tukang kayu 85,000.00 2,040,000.00
2.4000 O/h Kepala Tukang kayu 95,000.00 228,000.00
0.4000 O/h Mandor 110,000.00 44,000.00
5,877,000.00
21 1 M3 PAS.GORDING KAYU MATOA 5/10
1.1000 M3 Kayu Matoa 1,700,000.00 1,870,000.00
0.1250 Kg Paku Campur 20,000.00 2,500.00
8.0000 O/h Pekerja 62,500.00 500,000.00
24.0000 O/h Tukang kayu 85,000.00 2,040,000.00
0.0400 O/h Kepala Tukang kayu 95,000.00 3,800.00
0.0100 O/h Mandor 110,000.00 1,100.00
4,417,400.00
24 10 M' PAS. JURAI BJLS 20
11.0000 M' Seng Plat BJLS 20 108,000.00 1,188,000.00
0.2500 Kg Paku seng 29,000.00 7,250.00
0.2500 O/h Tukang 29,000.00 7,250.00
0.0250 O/h Kepala Tukang 95,000.00 2,375.00
0.5000 O/h Mandor 110,000.00 55,000.00
1,259,875.00
1 M' PAS. BUBUNGAN SENG PLAT BJLS 20 = 125,987.50
25 1 M2 PAS. ATAP SENG GELOMBANG BJLS 30
1.0000 Lbr Seng Gelombang BJLS 30 108,000.00 108,000.00
0.0200 Kg Paku Seng 29,000.00 580.00
0.1200 O/h Pekerja 62,500.00 7,500.00
0.0600 O/h Tukang 85,000.00 5,100.00
0.0060 O/h Kepala Tukang 95,000.00 570.00
0.0060 O/h Mandor 110,000.00 660.00
122,410.00
26 1 M' PAS. BUBUNGAN
1.0000 M' seng plat 66,000.00 66,000.00
0.0400 Kg Paku seng 29,000.00 1,160.00
0.1500 O/h Pekerja 62,500.00 9,375.00
0.0700 O/h Tukang 85,000.00 5,950.00
0.0080 O/h Kepala Tukang 95,000.00 760.00
0.0060 O/h Mandor 110,000.00 660.00
83,905.00
01 02 03 04

27 1 M2 PAPAN TRITIS ( LISPLANK, DINDING DLL


DISEKAP HALUS TEBAL 2 CM )
0.0275 M3 Papan Kayu Besi 2,750,000.00 75,625.00
0.2000 Kg Paku campur 20,000.00 4,000.00
0.6000 O/h Pekerja 62,500.00 37,500.00
1.8000 O/h Tukang kayu 85,000.00 153,000.00
0.1800 O/h Kepala Tukang kayu 95,000.00 17,100.00
0.0300 O/h Mandor 110,000.00 3,300.00
290,525.00
28 1 M2 PAS. PLAFOND TRIPLEKS + RANGKA
0.0150 M3 Kayu Matoa 1,700,000.00 25,500.00
0.4000 Lbr Tripleks 3 mm 53,000.00 21,200.00
0.3000 Kg Paku campur 20,000.00 6,000.00
0.0500 Kg Paku Tripleks 33,000.00 1,650.00
0.5000 O/h Pekerja 62,500.00 31,250.00
0.8000 O/h Tukang 85,000.00 68,000.00
0.0800 O/h Kepala Tukang 95,000.00 7,600.00
0.0500 O/h Mandor 110,000.00 5,500.00
166,700.00
29 1 M3 PAS. KUSEN PINTU, JEND. & VENTILASI
1.1000 M3 Kayu Besi 2,750,000.00 3,025,000.00
2.0000 Kg Paku campur 20,000.00 40,000.00
12.0000 O/h Pekerja 62,500.00 750,000.00
36.0000 O/h Tukang kayu 85,000.00 3,060,000.00
3.6000 O/h Kepala Tukang kayu 95,000.00 342,000.00
0.6000 O/h Mandor 110,000.00 66,000.00
7,283,000.00
30 1 M2 PAS. PINTU DOUBLE TRIPLEKS LAPIS SENG BAG. DALAM
0.8000 Lbr Tripleks pintu 53,000.00 42,400.00
0.0440 M3 Papan Kayu Besi 2,750,000.00 121,000.00
0.0500 Kg Paku tripleks 33,000.00 1,650.00
0.6000 M' Seng Plat 66,000.00 39,600.00
0.2500 O/h Pekerja 62,500.00 15,625.00
1.0000 O/h Tukang kayu 85,000.00 85,000.00
0.1000 O/h Kepala Tukang kayu 95,000.00 9,500.00
0.0125 O/h Mandor 110,000.00 1,375.00
316,150.00
31 1 M2 PAS. PINTU TRIPLEKS
0.8000 Lbr Tripleks pintu 3 mm 53,000.00 42,400.00
0.0440 M3 Papan Kayu Besi 2,750,000.00 121,000.00
0.0500 Kg Paku tripleks 33,000.00 1,650.00
0.2500 O/h Pekerja 62,500.00 15,625.00
1.0000 O/h Tukang kayu 85,000.00 85,000.00
0.1000 O/h Kepala Tukang kayu 95,000.00 9,500.00
0.0125 O/h Mandor 110,000.00 1,375.00
276,550.00
32 1 M2 PAS. JENDELA PANEL KACA RIBEN, t = 5 mm
0.7500 M2 Kaca Riben 285,000.00 213,750.00
0.0800 M3 Papan Kayu Besi 2,750,000.00 220,000.00
1.0000 Btg Lat kayu 15,000.00 15,000.00
2.0000 O/h Pekerja 62,500.00 125,000.00
4.0000 O/h Tukang kayu 85,000.00 340,000.00
0.4000 O/h Kepala Tukang kayu 95,000.00 38,000.00
0.1000 O/h Mandor 110,000.00 11,000.00
962,750.00
33 1 M2 PAS. JALUSI / VENTILASI / LAMBER SERING
0.0700 M3 Papan Kayu Besi 2,750,000.00 192,500.00
0.0100 Kg Paku cmpur 20,000.00 200.00
0.3000 O/h Pekerja 62,500.00 18,750.00
9.0000 O/h Tukang kayu 85,000.00 765,000.00
0.9000 O/h Kepala Tukang 95,000.00 85,500.00
0.1500 O/h Mandor 110,000.00 16,500.00
1,078,450.00
34 1 M2 PASANG HAS NYAMUK NYLON
1.1000 M2 Has nyamuk nylon 17,000.00 18,700.00
0.1000 Kg Paku tripleks 33,000.00 3,300.00
0.2500 O/h Tukang kayu 85,000.00 21,250.00
43,250.00
35 1 BH PAS. KUNCI TANAM 2 SLAAG
1.0000 Bh Kunci Tanam 2 Slaag 142,000.00 142,000.00
0.5000 O/h Tukang 85,000.00 42,500.00
184,500.00
36 1 BH PAS. KUNCI TANAM 1 SLAAG
1.0000 Bh Kunci Tanam 1 Slaag 135,000.00 135,000.00
0.5000 O/h Tukang 85,000.00 42,500.00
177,500.00
01 02 03 04

37 1 BH PASANG ENGSEL / GRENDEL PINTU / JENDELA


1.0000 Bh Engsel Pintu / Jendela 13,600.00 13,600.00
0.2500 O/h Tukang 85,000.00 21,250.00
34,850.00
1 BH PASANG GRENDEL = 1/2 x ENGSEL PINTU 17,425.00
38 1 BH PASANG HAK / KAIT ANGIN
1.0000 Psg Hak angin 14,500.00 14,500.00
0.2500 O/h Tukang kayu 85,000.00 21,250.00
35,750.00
39 1 BH. WASBAK ALUMINIUM 1 LUBANG
1.0000 Bh Wasbak lengkap 400,000.00 400,000.00
2.0000 M' Pipa PVC dia 2" 75,000.00 150,000.00
1.4500 O/h Tukang pasang wasbak 85,000.00 123,250.00
673,250.00
40 1 BUAH PASANG CLOSET DUDUK
1.0000 Set Kloset duduk keramik (KIA) 485,000.00 485,000.00
0.0500 Zak Semen 83,000.00 4,150.00
0.0300 M3 Pasir Pasang 445,000.00 13,350.00
0.5000 O/h Pekerja 62,500.00 31,250.00
1.0000 O/h Tukang 85,000.00 85,000.00
0.1000 O/h Kepala Tukang 95,000.00 9,500.00
0.0400 O/h Mandor 110,000.00 4,400.00
632,650.00
41 1 TITIK KRAN AIR
1.0000 Bh Stop Kran Air 50,000.00 50,000.00
1.0000 Btg Pipa Dia 1/2'' 17,500.00 17,500.00
0.2500 O/h Pekerja 62,500.00 15,625.00
0.5000 O/h Tukang pipa 85,000.00 42,500.00
0.1000 O/h Mandor 110,000.00 11,000.00
Alat-alat sambungan dan lain - lain 5,250.00 5,250.00
91,875.00
42 1 M' PIPA INSTALASI AIR BERSIH DIA 1/2'' GIP
1.0000 M' Pipa Gip dia 1/ 2" 17,500.00 17,500.00
0.1500 O/h Pekerja 62,500.00 9,375.00
0.2000 O/h Tukang 85,000.00 17,000.00
0.0200 O/h Kepala Tukang 95,000.00 1,900.00
0.0500 O/h Mandor 110,000.00 5,500.00
Alat-alat sambungan dan lain - lain 5,250.00 5,250.00
56,525.00
43 1 M' PIPA PEMBUANG AIR KOTOR DIA 4 '' PVC
1.0000 M' Pipa PVC Dia 4 '' 250,000.00 250,000.00
0.2500 O/h Pekerja 62,500.00 15,625.00
0.3500 O/h Tukang 85,000.00 29,750.00
0.0350 O/h Kepala Tukang 95,000.00 3,325.00
0.0100 O/h Mandor 110,000.00 1,100.00
Alat-alat sambungan dan lain - lain 5,250.00 5,250.00
305,050.00
44 1 M' PIPA PEMBUANG AIR KOTOR 2'' PVC
1.0000 M' Pipa PVC Dia 2 '' 75,000.00 75,000.00
0.2500 O/h Pekerja 62,500.00 62,500.00
0.3500 O/h Tukang 85,000.00 85,000.00
0.0350 O/h Kepala Tukang 95,000.00 95,000.00
0.0100 O/h Mandor 110,000.00 110,000.00
Alat-alat sambungan dan lain - lain 5,250.00 5,250.00
432,750.00
45 1 UNIT SEPTICKTANK / REMBESAN LENGKAP
220.0000 Bh Batu Tela 3,500.00 770,000.00
1.0000 M3 Batu Kali 445,000.00 445,000.00
12.0000 Zak Semen 83,000.00 996,000.00
2.2500 M3 Pasir pasang 445,000.00 1,001,250.00
2.2500 M3 Kerikil 445,600.00 1,002,600.00
15.2500 Kg Besi Beton 15,500.00 236,375.00
7.4000 Kg Kawat Ikat 33,000.00 244,200.00
1.0000 M Pipa 250,000.00 250,000.00
6.0000 O/h Pekerja 62,500.00 375,000.00
4.0000 O/h Tukang batu 85,000.00 340,000.00
0.4000 O/h Kepala Tukang 95,000.00 38,000.00
0.2500 O/h Mandor 110,000.00 27,500.00
5,725,925.00
46 1 TITIK LAMPU PIJAR / SAKLAR 20 Watt
1.0000 Bh Lampu Pijar 20 Watt 7,000.00 7,000.00
8.0000 M' Kabel ( 2,5 / 1,5 MM ) 80,000.00 640,000.00
1.0000 Bh Isolator + Tali 5,034.00 5,034.00
0.5000 O/h Pekerja 62,500.00 31,250.00
0.5000 O/h Kepala Tukang 95,000.00 47,500.00
0.0500 O/h Tukang listrik 85,000.00 4,250.00
0.0500 O/h Mandor 110,000.00 5,500.00
740,534.00
SAKLAR = 1/2 x SL 18 WATT 468,767.00
01 02 03 04

47 1 TITIK LAMPU SL 15 Watt


1.0000 Set Lampu SL 15 Watt 44,000.00 44,000.00
1.0000 Bh Isolator + Tali 5,034.00 5,034.00
10.0000 M Kabel ( 2,5 / 1,5 MM ) 80,000.00 800,000.00
0.5000 O/h Pekerja 62,500.00 31,250.00
0.5000 O/h Tukang 95,000.00 47,500.00
0.0500 O/h Kepala Tukang 85,000.00 4,250.00
0.0500 O/h Mandor 110,000.00 5,500.00
937,534.00
48 1 TITIK LAMPU TL 1 X 20 WATT
1.0000 Set Lampu TL 20 Watt 92,500.00 92,500.00
8.0000 M Kabel ( 2,5 / 1,5 ) 440,000.00 3,520,000.00
1.0000 Bh Isolator lengkap 5,034.00 5,034.00
0.5000 O/h Pekerja 80,000.00 40,000.00
0.5000 O/h Tukang listrik 62,500.00 31,250.00
0.0500 O/h Kepala Tukang 95,000.00 4,750.00
0.0500 O/h Mandor 85,000.00 4,250.00
3,697,784.00
STOP KONTAK = 1/2 X TITIK LAMPU SL 15 W 468,767.00
49 10 M2 CAT KILAP (3 X Menggosok/Mendempul )
1.7000 Kg Cat Kilat 60,000.00 102,000.00
0.5700 Ltr Minyak Cat 60,000.00 34,200.00
0.8000 Kg Dempul 36,000.00 28,800.00
5.0000 Lbr Amplas 5,000.00 25,000.00
0.0500 O/h Pekerja 62,500.00 3,125.00
3.4000 O/h Tukang cat 85,000.00 289,000.00
0.3400 O/h Kepala Tukang 95,000.00 32,300.00
0.1000 O/h Mandor 110,000.00 11,000.00
525,425.00
1 M2 CAT KILAP ( 3 X Menggosok / Mendempul ) = 52,542.50
50 100 M2 CAT DINDING TEMBOK BARU /KAPUR ( 3 x CAT )
55.0000 Kg Cat Tembok 15,600.00 858,000.00
55.0000 Kg Plamur 75,000.00 4,125,000.00
6.0000 Lbr Amplas 5,000.00 30,000.00
6.0000 O/h Pekerja 62,500.00 375,000.00
6.0000 O/h Tukang cat 85,000.00 510,000.00
0.6000 O/h Kepala Tukang 95,000.00 57,000.00
5,955,000.00
1 M2 CAT DINDING TEMBOK 59,550.00
51 100 M2 MENGECAT LANGIT-LANGIT DGN CAT TEMBOK
( PLAFOND BARU ) 3 X CAT
55.0000 Kg Cat Tembok 15,600.00 858,000.00
6.0000 O/h Pekerja 62,500.00 375,000.00
6.0000 O/h Tukang cat 85,000.00 510,000.00
0.6000 O/h Kepala Tukang 95,000.00 57,000.00
1,800,000.00
1 M2 MENGECAT LANGIT-LANGIT 18,000.00
52 1 M2 MENETER / RESIDU KAYU 2 x
0.3500 Ltr Cat (Ter/Residu) 50,000.00 17,500.00
0.1000 O/h Pekerja 62,500.00 6,250.00
0.0050 O/h Mandor 110,000.00 550.00
24,300.00
53 1 M2 PASANG PINTU PANEL KAYU BESI
0.0900 M3 Papan Kayu Besi 2,750,000.00 247,500.00
0.1000 Kg Paku campur 20,000.00 2,000.00
1.0000 O/h Pekerja 62,500.00 62,500.00
7.0000 O/h Tukang kayu 85,000.00 595,000.00
0.7000 O/h Kepala Tukang kayu 95,000.00 66,500.00
0.1000 O/h Mandor 110,000.00 11,000.00
984,500.00
54 1 M' PASANG TIANG CANAPY 2'' GIV
1.0000 M' Pipa GIV Dia 2 '' 45,800.00 45,800.00
0.2500 O/h Pekerja 62,500.00 15,625.00
0.3500 O/h Tukang Las 85,000.00 29,750.00
0.0350 O/h Kepala Tukang Las 95,000.00 3,325.00
0.0100 O/h Mandor 110,000.00 1,100.00
95,600.00

55 1 M2 PAS. ATAP FORMIKA POLOS


0.7400 Lbr Formika Polos 215,000.00 159,100.00
0.0200 Kg Baut 20,000.00 400.00
0.1200 O/h Pekerja 62,500.00 7,500.00
0.0600 O/h Tukang 85,000.00 5,100.00
0.0060 O/h Mandor 110,000.00 660.00
172,760.00
01 02 03 04
56 1 M' PAS. KUDA-KUDA PIPA GIV 3/4 "
1.0000 M' Pipa Civ 3/4" 22,500.00 22,500.00
2.0000 O/h Pekerja 62,500.00 125,000.00
1.0000 O/h Tukang pipa 85,000.00 85,000.00
0.4000 O/h Mandor 110,000.00 44,000.00
276,500.00
58 1 M' PAS. TALANG AIR
1.0000 M' Seng Talang 30,000.00 30,000.00
0.0400 Kg Paku 20,000.00 800.00
0.1500 O/h Pekerja 62,500.00 9,375.00
0.0700 O/h Tukang 85,000.00 5,950.00
0.0080 O/h Kepala Tukang 95,000.00 760.00
0.0060 O/h Mandor 110,000.00 660.00
47,545.00

50 1 M' PASANG SALURAN / GOT


10.0000 Bh Batu Tela 3,500.00 35,000.00
1.0000 M2 Plesteran 71,554.50 71,554.50
0.4800 O/h Tukang batu 85,000.00 40,800.00
0.0480 O/h Kepala Tukang 95,000.00 4,560.00
0.0700 O/h Mandor 110,000.00 7,700.00
159,614.50
51 1 M² PASANG JENDELA KACA MATI TEBAL 5 MM ( RYBEN )
4.0000 M¹ Lat kayu 15,000.00 60,000.00
1.0000 M³ Kaca Ryben tebal 5 mm 285,000.00 285,000.00
1.3000 O/h Tukang kayu 85,000.00 110,500.00
0.0500 kg Paku campur 20,000.00 1,000.00
456,500.00
52 1 M² PASANG JENDELA KACA MATI TEBAL 5mm ( POLOS )
4.0000 M¹ Lat kayu 15,000.00 60,000.00
1.0000 M³ Kaca polos tebal 5 mm 270,000.00 270,000.00
1.3000 O/h Tukang kayu 85,000.00 110,500.00
0.0500 kg Paku campur 20,000.00 1,000.00
441,500.00
54 1 M¹ PASANG TEGEL PLINT 10 / 30 CM
2.0000 Bh Keramik 30/30 CM 10,270.00 20,540.00
0.0200 M3 Pasir pasang 445,000.00 8,900.00
0.0250 Zak Semen 83,000.00 2,075.00
0.0500 O/h semen warna 17,000.00 850.00
0.1000 O/h Tukang 85,000.00 8,500.00
0.0100 O/h Kepala Tukang 95,000.00 950.00
0.2000 O/h Pekerja 62,500.00 12,500.00
0.0100 O/h Mandor 110,000.00 1,100.00
55,415.00
55 1 BH KLOSET DUDUK
1.0000 Bh Kloset duduk keramik 485,000.00 485,000.00
0.0500 Zak semen 83,000.00 4,150.00
0.0300 M3 Pasir pasang 445,000.00 13,350.00
0.5000 O/h Pekerja 62,500.00 31,250.00
1.0000 O/h Tukang batu 85,000.00 85,000.00
0.1000 O/h Kepala tukang batu 95,000.00 9,500.00
0.4000 O/h Mandor 110,000.00 44,000.00
672,250.00
56 1 M2 PAS. JENDELA PANEL KACA RYBEN , t = 5 mm
0.8000 M2 Kaca ryben 285,000.00 228,000.00
0.0800 M3 Papan Kayu Besi 2,750,000.00 220,000.00
1.0000 O/h Pekerja 62,500.00 62,500.00
4.0000 O/h Tukang 85,000.00 340,000.00
0.6000 O/h Kepala Tukang 95,000.00 57,000.00
1.0000 O/h Mandor 110,000.00 110,000.00
1,017,500.00
57 1 M2 PAS. DAUN PINTU PANEL KAYU
0.0480 M3 Kayu Besi 2,750,000.00 132,000.00
0.0900 M3 Papan Kayu Besi 2,750,000.00 247,500.00
0.1000 Kg Paku campur 20,000.00 2,000.00
1.0000 O/h Pekerja 62,500.00 62,500.00
6.0000 O/h Tukang 85,000.00 510,000.00
0.7000 O/h Kepala Tukang 95,000.00 66,500.00
0.1000 O/h mandor 110,000.00 11,000.00
1,031,500.00
DAFTAR HARGA BAHAN & UPAH KERJA

SATUAN KERJA : DINAS PEKERJAAN UMUM KABUPATEN KEEROM


PEKERJAAN : PEMBANGUNAN PAGAR KELILING & POS JAGA KANTOR BUPATI (TAHAP I)
LOKASI : DISTRIK ARSO KABUPATEN KEEROM
TAHUN ANGGARAN : 2011

BERAT/ HARGA
No. URAIAN JENIS BAHAN
SATUAN (Rp)

01 02 03 04

A DAFTAR UPAH
1 Pekerja O/h 62,500.00
2 Tukang O/h 85,000.00
3 Kepala Tukang O/h 95,000.00
4 Mandor O/h 110,000.00
5 Dump Truck Jam 159,794.80
6 Motor Grader Jam 333,503.45
8 Water Tannker Jam 159,794.80

BERAT/ HARGA
No. URAIAN JENIS BAHAN
SATUAN (Rp)
01 02 03 04

B BAHAN-BAHAN
1 Papan Bekisting / steger M3 1,700,000.00
2 Papan kayu Matoa M3 1,700,000.00
3 Balok Kayu Matoa M3 1,700,000.00
4 Papan Kayu Besi M3 2,750,000.00
5 Balok Kayu Besi M3 2,750,000.00
6 Paku Campuran Kg 20,000.00
7 Pasir Urug M3 445,000.00
8 Pasir Pasang M3 445,000.00
9 Timbunan Karang M3 189,600.00
10 Batu Kali M3 445,000.00
11 Karang cor/karang timbun/Sirtu M3 189,500.00
12 Semen (50 Kg) Sak 83,000.00
13 Batu Tela Bh 3,500.00
14 Kerikil Cor M3 445,600.00
15 Tripleks 3 mm Lbr 53,000.00
16 Teak Wood Pintu 4 mm Lbr 151,000.00
17 Paku Tripleks Kg 33,000.00
18 Atap Seng Gelombang BJLS 30 Lbr 108,000.00
19 Seng Plat BJLS 30 M' 66,000.00
22 Kunci Tanam 2 Slaag Bh 142,000.00
23 Kunci tanam 1 slaag Bh 135,000.00
24 Lampu TL 20 Watt Set 92,500.00
26 Lampu SL 15 Watt Set 44,000.00
27 Lampu pijar 20 Watt Bh 7,000.00
28 Stop Kontak Bh 20,000.00
29 Kabel NYA 2x 2.5 mm M' 80,000.00
30 Fitting Plafond Bh 17,000.00
31 Cat Tembok Kg 15,600.00
32 Cat Genteng Atap Klg 25,000.00
33 Cat kilat Kayu Kg 60,000.00
34 Teak Oil Liter 55,000.00
35 Residu Liter 50,000.00
36 Paku Ardeks Kg 26,500.00
37 Lat tripleks Btg 7,000.00
38 Lat Kayu Btg 15,000.00
39 Kaca Polos 5 mm Bening M2 270,000.00
40 Kaca Ryben M2 285,000.00
41 As Nyamuk nylon M' 17,000.00
42 Paku Seng Kg 29,000.00
43 Kabel NYM 3 x 2,5 mm M' 440,000.00
44 Isolator Lengkap Tali Bh 5,034.00
45 Pipa GIP 1/2" 6 m M' 17,500.00
46 Pipa GIP 3/4" 6 m M' 22,500.00
47 Amplas Lbr 5,000.00
48 Dempul Kg 36,000.00
1 2 3 4

49 Minyak Cat Liter 60,000.00


50 Keramik 30 x 30 Bh 10,270.00
51 Keramik 20 x 20 Bh 3,920.00
52 Kloset Jongkok KIA Bh 375,000.00
53 Kloset Duduk Keramik Bh 485,000.00
54 Semen Putih Kg 17,000.00
55 Baut Mur 12 - 25 cm Kg 20,000.00
56 Baut Mur 12 - 20 cm Kg 20,000.00
57 Baut Mur 12 - 30 cm Kg 20,000.00
58 Besi Plat tbl 0.3 - 5cm Kg 25,000.00
59 Engsel nylon Bh 13,600.00
60 Grendel Bh 15,000.00
61 Hak Angin Biasa Bh 14,500.00
62 Hak Angin Istimewa Bh 20,000.00
63 Besi L 40.40.4 Kg 160,000.00
64 Sekring Kas 1 Group Bh 36,000.00
65 Pipa PVC 2'' Btg 75,000.00
66 Pipa PCV dia 4" Btg 250,000.00
67 Besi Beton Kg 15,500.00
68 Kawat Ikat Kg 33,000.00
69 Meny Kayu Kg 75,000.00
70 Floor Drain Bh 4,500.00
71 Kran Air Bh 50,000.00
72 Plamur Kg 75,000.00
73 Anker kosen Bh 5,000.00
75 Teakwood Lbr 151,000.00
76 Bak cuci piring aluminium 1 lubang Bh 400,000.00
77 Cat besi Kg 85,000.00
78 Kaca lovers 7 klip dg tralis Set 156,000.00
79 Kaca lovers 6 klip dg tralis Set 134,000.00
80 Kaca lovers 5 klip dg tralis Set 112,000.00
81 Kaca lovers 8 klip dg tralis Set 178,000.00
82 Pipa PVC dia 3 " M' 37,000.00
84 Multiroof Polos Lbr 82,000.00
85 Bubungan Multiroof Bh 32,000.00
86 Pagar BRC Unit 550,000.00
87 Paku Seng + Ring Karet. Kg 29,000.00
88 Tripleks Pintu Lbr 53,000.00
89 Kawat Duri M' 5,500.00
90 Paku Seng Kg 29,000.00
91 Kabel NYM 3 x 2,5 mm M' 440,000.00
92 Isolator Lengkap Tali Bh 5,034.00
93 Pipa GIP 1/2" 6 m M' 17,500.00
94 Pipa GIP 3/4" 6 m M' 22,500.00
95 Amplas Lbr 5,000.00
96 Dempul Kg 36,000.00
100 Pintu Harmonika Set 9,000,000.00
101 Pipa GIP 2" 6 m M' 45,800.00
102 Formika Polos. Lbr 215,000.00
103 Baut Kg 20,000.00
104 Besi Beton Ǿ 12 Panjang 11 Kg 15,500.00
105 Besi Plat Tebal 1.2 Lbr 430,000.00
106 Seng Talang M' 30,000.00
PERHITUNGAN VOLUME PEKERJAAN

I. PEKERJAAN PERSIAPAN
Pembersihan Lokasi
Panjang = 247.3
Lebar = 1
Luas = 247.3 m2

© Pek.Pasang Bouwplank
Panjang = 82.3
Vol = 82.3 m'

II. PEKERJAAN TANAH DAN PONDASI


© Pek. Galian Tanah Biasa
Panjang = 247.3
Tinggi = 0.65
Vol = 144.6705
Vol Total = 144.67 m3
© Pek. Urugan Tanah Kembali
Vol = 36.17

© Pek. Urugan Pasir di Bawah Pondasi


Panjang = 0.8
Tinggi = 0.05
Vol = 9.892

© Pek. Urugan Pasir Di Bawah Lantai


Luas = 4,263
Vol = 213
Vol Total = 213.15

III. PEKERJAAN PASANGAN


© Pek. Pondasi Batu Kali
Panjang Atas = 0.3
Panjang Bawah = 0.6
Tinggi Pondasi Bt Kali = 0.6
Panjang Pondasi = 247.3
Vol = 66.771
Vol Total = 66.771

© Pek. Pondasi Batu Kosong


Panjang = 0.8
Tinggi = 0.2
Vol = 0.16

© Pek. Dinding Batu Tela 1 : 4


Panjang = 247.3
Tinggi = 0.6
Luas total = 148.38
Luas Kusen =
Luas Terpakai = 148.38
© Pek. Dinding Batu Tela 1 : 2
Panjang =
Tinggi =
Luas total =

© Pek. Plesteran 1 : 4
Panjang = 247.3
Tinggi = 0.6
Luas total = 296.76

© Pek. Plesteran 1 : 2
Panjang =
Tinggi =
Luas total =

IV. PEKERJAAN LANTAI DAN BETON


© Sloof beton bertulang 20/25 cam. 1 : 2 : 3
Panjang Sloof = 247.3
Tinggi = 0.25
Lebar = 0.2
Luas = 0.05
Vol = 12.365

© Sloof beton bertulang 20/30 cam. 1 : 2 : 3


Panjang = 70
Luas = 0.06
Vol = 4.2

© Ring Balk beton bertulang 15/20 cam. 1 : 2 : 3


Panjang = 38
Luas = 0.03
Vol = 1.14

© Ring Balk beton bertulang 10/10 cam. 1 : 2 : 3


Panjang = 148
Luas = 0.01
Vol = 1.48

© Balok Level beton bertulang 10/10 cam. 1 : 2 : 3


Panjang = 6.5
Luas = 3
Vol = 19.5
Luas total = 22.016
© Kolom Utama 30/30 cam. 1 : 2 : 3
Panjang = 38
Tinggi = 3.8
Luas = 0.09
Vol = 12.996

© Kolom praktis10/10 cam. 1 : 2 : 3


Jumlah = 39
Tinggi = 3.8
Luas = 0.01
Vol = 1.482

© Kolom praktis10/10 kayu besi


Panjang =
Tinggi = 4
Vol =
Luas sloof Keseluruhan

Tamb. Entrance
Luas Kusen
3.2625 7
4.1625 4

4.6125 2
14.075 1
7.3125 3
0.4125 3
3.922 4

1.9125 1
1.6 3
2.385 15

32
180

2.516 Level Total


3.16
luas lantai 267.5
-3.16

264.34
tebal 0.05
cor lt 13.217

panjang kayu kuda kuda 39.61


Luas Kusen Volume kusen
22.8375 7.8 54.6 16.38
16.65 18.65 74.6 15.05

9.225 20.15 40.3 8.815


14.075 36.95 36.95 10.01
21.9375 27.9 83.7 21.9375
1.2375 3 9 1.125
15.688 8.66 34.64 15.688

1.9125 9.15 9.15 1.9125


4.8 6 18
35.775 7.06 105.9 11.475
144.138 466.84 2.3342 102.393
PERHITUNGAN VOLUME PEKERJAAN

I. PEKERJAAN PERSIAPAN
Pembersihan Lokasi
Panjang = 247.3
Lebar = 1
Luas = 247.3 m2

© Pek.Pasang Bouwplank
Panjang = 82.3
Vol = 82.3 m'

II. PEKERJAAN TANAH DAN PONDASI


© Pek. Galian Tanah Biasa
Panjang = 247.3
Tinggi = 0.65
Vol = 144.6705
Vol Total = 144.67 m3
© Pek. Urugan Tanah Kembali
Vol = 36.17

© Pek. Urugan Pasir di Bawah Pondasi


Panjang = 0.8
Tinggi = 0.05
Vol = 9.892

© Pek. Urugan Pasir Di Bawah Lantai


Luas = 4,263
Vol = 213
Vol Total = 213.15

III. PEKERJAAN PASANGAN


© Pek. Pondasi Batu Kali
Panjang Atas = 0.3
Panjang Bawah = 0.6
Tinggi Pondasi Bt Kali = 0.6
Panjang Pondasi = 247.3
Vol = 66.771
Vol Total = 66.771

© Pek. Pondasi Batu Kosong


Panjang = 0.8
Tinggi = 0.2
Vol = 0.16

© Pek. Dinding Batu Tela 1 : 4


a. Panjang = 247.3
Tinggi = 0.6
Luas = 148.38
Volume 14.838 m3
Luas dinding = 296.76 m2

b. Jumlah Kolom = 80
Tinggi = 1.75
Lebar = 0.6
Vol 1 tiang = 0.63 m3
Vol total = 50.62 m3
Luas Dinding = 337.47 m2
Volume 50.62

Vol Terpakai = 65.46 m3


Luas Terpakai = 634.23 m2

© Pek. Dinding Batu Tela 1 : 2


Panjang =
Tinggi =
Luas total =

© Pek. Plesteran 1 : 4
a. Panjang = 247.3
Tinggi = 0.6
Luas = 296.76

b. Panjang = 2.4
Tinggi = 1.8
Luas = 4.32 m2
Jumlah Kolom = 80
Luas total Kolom = 347.112 m2
Luas Keseluruhan = 643.872 m2

© Pek. Plesteran 1 : 2
Panjang =
Tinggi =
Luas total =

IV. PEKERJAAN LANTAI DAN BETON


© Sloof beton bertulang 20/25 cam. 1 : 2 : 3
Panjang Sloof = 247.3
Tinggi = 0.25
Lebar = 0.2
Luas = 0.05
Vol = 12.365

© Kolom Utama 30/30 cam. 1 : 2 : 3


Panjang = 38
Tinggi = 3.8
Luas = 0.09
Vol = 12.996
bawah atas
3.14 1.131429
2.1357142855
3.3531 6.706143 m3

silinder
1.884856

ttl vol 8.591 17.182

60.9469 60.9469
30.47345 18.28407
Luas sloof Keseluruhan 30.47345 42.66283

Tamb. Entrance
247.3 6.25 241.05

Luas Kusen
3.2625 7
4.1625 4

4.6125 2
14.075 1

7.3125 3
0.4125 3
3.922 4
1.9125 1
1.6 3
2.385 15
Luas Kusen Volume kusen
22.8375 7.8 54.6 16.38
16.65 18.65 74.6 15.05

9.225 20.15 40.3 8.815


14.075 36.95 36.95 10.01

21.9375 27.9 83.7 21.9375


1.2375 3 9 1.125
15.688 8.66 34.64 15.688
1.9125 9.15 9.15 1.9125
4.8 6 18
35.775 7.06 105.9 11.475
144.138 466.84 2.3342 102.393
PERHITUNGAN VOLUME PEKERJAAN

I. PEKERJAAN PERSIAPAN
Pembersihan Lokasi
Panjang = 247.3
Lebar = 1
Luas = 247.3 m2

© Pek.Pasang Bouwplank
Panjang = 82.3
Vol = 82.3 m'

II. PEKERJAAN TANAH DAN PONDASI


© Pek. Galian Tanah Biasa
Panjang = 247.3
Tinggi = 0.65
Vol = 144.6705
Vol Total = 144.67 m3
© Pek. Urugan Tanah Kembali
Vol = 36.17

© Pek. Urugan Pasir di Bawah Pondasi


Panjang = 0.8
Tinggi = 0.05
Vol = 9.892

© Pek. Urugan Pasir Di Bawah Lantai


Luas = 4,263
Vol = 213
Vol Total = 213.15

III. PEKERJAAN PASANGAN


© Pek. Pondasi Batu Kali
Panjang Atas = 0.3
Panjang Bawah = 0.6
Tinggi Pondasi Bt Kali = 0.6
Panjang Pondasi = 247.3
Vol = 66.771
Vol Total = 66.771

© Pek. Pondasi Batu Kosong


Panjang = 0.8
Tinggi = 0.2
Vol = 0.16

© Pek. Dinding Batu Tela 1 : 4


Panjang = 247.3
Tinggi = 0.6
Luas total = 148.38
Luas Kusen =
Luas Terpakai = 148.38
© Pek. Dinding Batu Tela 1 : 2
Panjang =
Tinggi =
Luas total =

© Pek. Plesteran 1 : 4
Panjang = 247.3
Tinggi = 0.6
Luas total = 296.76

© Pek. Plesteran 1 : 2
Panjang =
Tinggi =
Luas total =

IV. PEKERJAAN LANTAI DAN BETON


© Sloof beton bertulang 20/25 cam. 1 : 2 : 3
Panjang Sloof = 247.3
Tinggi = 0.25
Lebar = 0.2
Luas = 0.05
Vol = 12.365

© Ring Balk beton bertulang 15/20 cam. 1 : 2 : 3


Panjang = 38
Tinggi = 0.25
Lebar = 0.2
Luas = 0.05
Vol = 1.9

© Kolom Utama 30/30 cam. 1 : 2 : 3


Panjang = 38
Tinggi = 3.8
Luas = 0.09
Vol = 12.996

© Kolom praktis10/10 cam. 1 : 2 : 3


Jumlah = 39
Tinggi = 3.8
Luas = 0.01
Vol = 1.482

© Kolom praktis10/10 kayu besi


Panjang =
Tinggi = 4
Vol =
Luas sloof Keseluruhan

Tamb. Entrance
Luas Kusen
3.2625 7
4.1625 4

4.6125 2
14.075 1

7.3125 3
0.4125 3

3.922 4
1.9125 1
1.6 3
2.385 15

luas lantai

tebal
cor lt #VALUE!
267.5
#VALUE!

#VALUE!
0.05
panjang kayu kuda kuda 39.61 #VALUE!
Luas Kusen Volume kusen
22.8375 7.8 54.6 16.38
16.65 18.65 74.6 15.05

9.225 20.15 40.3 8.815


14.075 36.95 36.95 10.01

21.9375 27.9 83.7 21.9375


1.2375 3 9 1.125

15.688 8.66 34.64 15.688


1.9125 9.15 9.15 1.9125
4.8 6 18
35.775 7.06 105.9 11.475
144.138 466.84 2.3342 102.393
PERHITUNGAN VOLUME PEKERJAAN

I. PEKERJAAN PERSIAPAN
Pembersihan Lokasi
Panjang = 247.3
Lebar = 1
Luas = 247.3 m2

© Pek.Pasang Bouwplank
Panjang = 82.3
Vol = 82.3 m'

II. PEKERJAAN TANAH DAN PONDASI


© Pek. Galian Tanah Biasa
Panjang = 247.3
Tinggi = 0.65
Vol = 144.6705
Vol Total = 144.67 m3
© Pek. Urugan Tanah Kembali
Vol = 36.17

© Pek. Urugan Pasir di Bawah Pondasi


Panjang = 0.8
Tinggi = 0.05
Vol = 9.892

© Pek. Urugan Pasir Di Bawah Lantai


Luas = 4,263
Vol = 213
Vol Total = 213.15

III. PEKERJAAN PASANGAN


© Pek. Pondasi Batu Kali
Panjang Atas = 0.3
Panjang Bawah = 0.6
Tinggi Pondasi Bt Kali = 0.6
Panjang Pondasi = 247.3
Vol = 66.771
Vol Total = 66.771

© Pek. Pondasi Batu Kosong


Panjang = 0.8
Tinggi = 0.2
Vol = 0.16

© Pek. Dinding Batu Tela 1 : 4


Panjang = 247.3
Tinggi = 0.6
Luas total = 148.38
Luas Kusen =
Luas Terpakai = 148.38
© Pek. Dinding Batu Tela 1 : 2
Panjang =
Tinggi =
Luas total =

© Pek. Plesteran 1 : 4
Panjang = 247.3
Tinggi = 0.6
Luas total = 296.76

© Pek. Plesteran 1 : 2
Panjang =
Tinggi =
Luas total =

IV. PEKERJAAN LANTAI DAN BETON


© Sloof beton bertulang 20/25 cam. 1 : 2 : 3
Panjang Sloof = 247.3
Tinggi = 0.25
Lebar = 0.2
Luas = 0.05
Vol = 12.365

© Ring Balk beton bertulang 15/20 cam. 1 : 2 : 3


Panjang = 38
Tinggi = 0.25
Lebar = 0.2
Luas = 0.05
Vol = 1.9

© Kolom Utama 30/30 cam. 1 : 2 : 3


Panjang = 38
Tinggi = 3.8
Luas = 0.09
Vol = 12.996

© Kolom praktis10/10 cam. 1 : 2 : 3


Jumlah = 39
Tinggi = 3.8
Luas = 0.01
Vol = 1.482

© Kolom praktis10/10 kayu besi


Panjang =
Tinggi = 4
Vol =
Luas sloof Keseluruhan

Tamb. Entrance
Luas Kusen
3.2625 7
4.1625 4

4.6125 2
14.075 1

7.3125 3
0.4125 3

3.922 4
1.9125 1
1.6 3
2.385 15

luas lantai

tebal
cor lt #VALUE!
267.5
#VALUE!

#VALUE!
0.05
panjang kayu kuda kuda 39.61 #VALUE!
Luas Kusen Volume kusen
22.8375 7.8 54.6 16.38
16.65 18.65 74.6 15.05

9.225 20.15 40.3 8.815


14.075 36.95 36.95 10.01

21.9375 27.9 83.7 21.9375


1.2375 3 9 1.125

15.688 8.66 34.64 15.688


1.9125 9.15 9.15 1.9125
4.8 6 18
35.775 7.06 105.9 11.475
144.138 466.84 2.3342 102.393
93,000,000
84,545,455
8,454,545
3,381,818
11,836,364

81,163,636

2,434,909
4,058,182
12,174,545
4,058,182
22,725,818

58,437,818

29,218,909
PERHITUNGAN VOLUME PEKERJAAN

I. PEKERJAAN PERSIAPAN
Pembersihan Lokasi
Panjang = 247.3
Lebar = 1
Luas = 247.3 m2

© Pek.Pasang Bouwplank
Panjang = 82.3
Vol = 82.3 m'

II. PEKERJAAN TANAH DAN PONDASI


© Pek. Galian Tanah Biasa
Panjang = 247.3
Tinggi = 0.65
Vol = 144.6705
Vol Total = 144.67 m3
© Pek. Urugan Tanah Kembali
Vol = 36.17

© Pek. Urugan Pasir di Bawah Pondasi


Panjang = 0.8
Tinggi = 0.05
Vol = 9.892

© Pek. Urugan Pasir Di Bawah Lantai


Luas = 4,263
Vol = 213
Vol Total = 213.15

III. PEKERJAAN PASANGAN


© Pek. Pondasi Batu Kali
Panjang Atas = 0.3
Panjang Bawah = 0.6
Tinggi Pondasi Bt Kali = 0.6
Panjang Pondasi = 247.3
Vol = 66.771
Vol Total = 66.771

© Pek. Pondasi Batu Kosong


Panjang = 0.8
Tinggi = 0.2
Vol = 0.16

© Pek. Dinding Batu Tela 1 : 4


Panjang = 247.3
Tinggi = 0.6
Luas total = 148.38
Luas Kusen =
Luas Terpakai = 148.38
© Pek. Dinding Batu Tela 1 : 2
Panjang =
Tinggi =
Luas total =

© Pek. Plesteran 1 : 4
Panjang = 247.3
Tinggi = 0.6
Luas total = 296.76

© Pek. Plesteran 1 : 2
Panjang =
Tinggi =
Luas total =

IV. PEKERJAAN LANTAI DAN BETON


© Sloof beton bertulang 20/25 cam. 1 : 2 : 3
Panjang Sloof = 247.3
Tinggi = 0.25
Lebar = 0.2
Luas = 0.05
Vol = 12.365

© Ring Balk beton bertulang 15/20 cam. 1 : 2 : 3


Panjang = 38
Tinggi = 0.25
Lebar = 0.2
Luas = 0.05
Vol = 1.9

© Kolom Utama 30/30 cam. 1 : 2 : 3


Panjang = 38
Tinggi = 3.8
Luas = 0.09
Vol = 12.996

© Kolom praktis10/10 cam. 1 : 2 : 3


Jumlah = 39
Tinggi = 3.8
Luas = 0.01
Vol = 1.482

© Kolom praktis10/10 kayu besi


Panjang =
Tinggi = 4
Vol =
Luas sloof Keseluruhan

Tamb. Entrance
Luas Kusen
3.2625 7
4.1625 4

4.6125 2
14.075 1

7.3125 3
0.4125 3

3.922 4
1.9125 1
1.6 3
2.385 15

luas lantai

tebal
cor lt #VALUE!
267.5
#VALUE!

#VALUE!
0.05
panjang kayu kuda kuda 39.61 #VALUE!
Luas Kusen Volume kusen
22.8375 7.8 54.6 16.38
16.65 18.65 74.6 15.05

9.225 20.15 40.3 8.815


14.075 36.95 36.95 10.01

21.9375 27.9 83.7 21.9375


1.2375 3 9 1.125

15.688 8.66 34.64 15.688


1.9125 9.15 9.15 1.9125
4.8 6 18
35.775 7.06 105.9 11.475
144.138 466.84 2.3342 102.393