PENGANGGARAN PERKEBUNAN
Oleh :
TONI WIJAYA
(201911062)
PROGRAM STUDI
BUDIDAYA PERKEBUNAN KELAPA SAWIT
POLITEKNIK KELAPA SAWIT
CITRA WIDYA EDUKASI
BEKASI
2021
@ HARGA Rp. JUMLAH UNIT KEBUN
TYPE Unit RMM Keterangan
(x,000)
6,670,000
200 M2 -
72 M2 138,000 -
72 M2 138,000 -
600 M2 -
36 M2 -
-
240 M2 350,000 1 350,000
-
-
24 M2 -
-
-
12 M2 -
-
- 497,000 CF bangunan Work shop (Rp 252 Jt) & Gudang Induk (Rp 245 jt) 2011
847,000