SURAT PERMINTAAN PENGADAAN/PENYERAHAN (SPP/P) NO : 023/SPP/XI/2021

PROYEK : GEDUNG PARKIR R4 RS SAIFUL ANWAR MALANG KODE ITEM :

CATATAN : PUTIH : LOGISTIK, PENGADAAN


1. SATU LEMBAR SPP/P DIGUNAKAN HANYA UNTUK SATU LEMBAR BUDGET 2. PENGAJUAN SPP/P KE COST CONTROL HO PALING LAMBAT SEMINGGU SCHEDULE BARANG TIBA MERAH : PELAKSANA
3. KHUSUS UNTUK PENGADAAN ALAT AGAR MENCANTUMKAN RENCANA PERIODE WAKTU PEMAKAIAN ALAT DI KOLOM KETERANGAN KUNING : COST CONTROL PROYEK
HIJAU : COST CONTROL HO
JUMLAH KEBUTUHAN DI ISI BAG. LOG. & PERALATAN
KODE POS
NAMA BARANG UKURAN SATUAN SCHEDULE BARANG KETERANGAN
ANGKA HURUF PEKERJAAN PEMASOK/SUPPLIER NO. OP / SPK SEWA ALAT
TIBA (TANGGAL)

BETON STRUKTUR (SLUMP 12+-2) F'c 35 (K-425) 500 LIMARATUS m3 19 November 2021 SLUMP 12+-2 PT.MERAK JAYA BETON

BETON STRUKTUR (SLUMP 12+-2) F'c 35 (K-425) 200 DUARATUS m3 19 November 2021 SLUMP 12+-2 PT.KONSTRUKSI MANDIRI BETON

DIAJUKAN DIPERIKSA DIPERIKSA DISETUJUI DISETUJUI DISETUJUI DISETUJUI


ENGINEERING SITE MANAGER PROJECT MANAGER COST CONTROL HO MGR. COST CONTROL DIR. TEKNIK DIR. OPERASIONAL

Yaysyirul U. F. Yonathan Robedho Bonar Adiatmoko,ST


18 November 2021 18 November 2021 18 November 2021