Anda di halaman 1dari 3

RINCIAN ANGGARAN BIAYA PEKERJAAN TAMBAH KURANG

SATKER : DINAS PENDIDIKAN DAERAH PROVINSI SULAWESI UTARA


PEKERJAAN : REHABILITASI RUANG KELAS BESERTA PERABOTNYA - SMK COKROAMINOTO KOTAMOBAGU
LOKASI : SMK COKROAMINOTO KOTAMOBAGU
TAHUN ANGGARAN : 2021

MENURUT KONTRAK AWAL PEMERIKSAAN BERSAMA


MENURUT MHUTUAL CHEK AWAL PEKERJAAN TAMBAH KURANG
NO URAIAN PEKERJAAN PEKERJAAN TAMBAH PEKERJAAN KURANG KET.
SAT. VOL. HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
SAT. VOL. JUMLAH HARGA (Rp) VOLUME VOLUME
HARGA TAMBAH (Rp) HARGA KURANG (Rp)
TAMBAH KURANG
a b c d e f = (d x e) g h i = (h x e) j = (h - d) k = (j x e) l = (d - h) m = (l x e) n
I PEKERJAAN PERSIAPAN
1 Papan nama proyek Ls 1.00 500,000.00 500,000.00 Ls 1.00 500,000.00 - TETAP
2 Biaya air dan listrik Ls 1.00 1,500,000.00 1,500,000.00 Ls 1.00 1,500,000.00 TETAP
3 Biaya K3 Ls 1.00 10,790,000.00 10,790,000.00 Ls 1.00 10,790,000.00 TETAP
KELAS A
II PEKERJAAN ATAP
1 Pas. Rangka Baja Ringan C.75.75 M2 317.55 200,644.00 63,714,502.20 M2 317.55 63,714,502.20 TETAP
2 Pas. Penutup atap Spandek, t=0,3 mm M2 325.60 108,987.00 35,486,167.20 M2 325.60 35,486,167.20 TETAP
3 Pas. Nok Atap M 29.36 69,564.00 2,042,399.04 M 29.36 2,042,399.04 TETAP
4 Pas. Lisplank GRC 8X200 MM M 80.10 74,307.00 5,951,990.70 M 80.10 5,951,990.70 TETAP
III PEKERJAAN PLAFON
1 Rangka plafon hollow 4X2,t=0,7 mm, modul 60X60 M2 282.08 150,164.00 42,358,261.12 M2 282.08 42,358,261.12 TETAP
2 Pas. Plafon GRC t=4 mm M2 282.08 69,671.00 19,652,795.68 M2 282.08 19,652,795.68 TETAP
3 Pas. List plafon profil M 262.68 31,351.95 8,235,530.23 M 262.68 8,235,530.23 TETAP
IV PEKERJAAN LANTAI
1 Cor lantai 135 M3 0.08 779,702.00 62,376.16 M3 0.08 62,376.16 TETAP
2 Keramik biasa 30 X 30 (dalam ruangan) M2 0.81 172,183.00 139,468.23 M2 0.81 139,468.23 TETAP
V PEKERJAAN DINDING
1 Rangka dinding hollow 4X2,t=0,7 mm, modul 60X120 M2 6.62 150,164.00 994,085.68 M2 13.24 1,988,171.36 6.62 994,085.68 BERTAMBAH
2 Dinding sopi-sopi GRC M2 6.62 69,671.00 461,222.02 M2 13.24 922,444.04 6.62 461,222.02 BERTAMBAH
VI PEKERJAAN ELEKTRIKAL
1 Pasang Instalasi lampu indoor dan outdoor Titik 27.00 209,000.00 5,643,000.00 Titik 27.00 5,643,000.00 TETAP
2 Pasang stop kontak Bh 24.00 219,450.00 5,266,800.00 Bh 24.00 5,266,800.00 TETAP
3 Pasang Saklar Tunggal Bh 3.00 80,000.00 240,000.00 Bh 3.00 240,000.00 TETAP
4 Pasang Saklar Ganda Bh 12.00 90,000.00 1,080,000.00 Bh 12.00 1,080,000.00 TETAP
5 Pasang Lampu LED 4 Watt + Feteng Bh 3.00 100,000.00 300,000.00 Bh 3.00 300,000.00 TETAP
6 Pasang Lampu LED 12 Watt + Feteng Bh 24.00 130,000.00 3,120,000.00 Bh 24.00 3,120,000.00 TETAP
7 Memasang Box MCB Unit 1.00 346,500.00 346,500.00 Unit 1.00 346,500.00 TETAP
8 Arde / Pentanahan Unit 1.00 400,000.00 400,000.00 Unit 1.00 400,000.00 TETAP
VII PEKERJAAN PENGECATAN
1 Pengecatan Dinding lama M2 555.64 30,981.00 17,214,282.84 M2 555.64 17,214,282.84 TETAP
2 Pengecatan pintu dan jendela lama M2 114.97 69,202.00 7,956,153.94 M2 114.97 7,956,153.94 TETAP
3 Pengecatan plafon M2 282.08 30,981.00 8,739,120.48 M2 295.32 9,149,308.92 13.24 410,188.44 BERTAMBAH
VIII PEKERJAAN UTILITAS
1 Pas. Wastafel luar ruangan Bh 1.00 1,277,652.00 1,277,652.00 Bh 1.00 1,277,652.00 TETAP
2 Pipa PVC 2" (Buangan) M 6.00 94,942.00 569,652.00 M 6.00 569,652.00 TETAP
3 Instalasi air bersih M 18.00 37,066.00 667,188.00 M 18.00 667,188.00 TETAP
4 Mata kran Bh 1.00 138,675.00 138,675.00 Bh 1.00 138,675.00 TETAP
IX PEKERJAAN BONGKARAN
1 Bongkaran atap M2 317.55 46,365.00 14,723,205.75 M2 317.55 14,723,205.75 TETAP
2 Bongkaran plafon M2 282.08 30,910.00 8,719,092.80 M2 282.08 8,719,092.80 TETAP
KELAS B
X PEKERJAAN ATAP
1 Pas. Rangka Baja Ringan C.75.75 M2 361.42 200,644.00 72,516,754.48 M2 361.42 72,516,754.48 TETAP
2 Pas. Penutup atap Spandek, t=0,3 mm M2 361.42 108,987.00 39,390,081.54 M2 361.42 39,390,081.54 TETAP
3 Pas. Nok Atap M 14.17 69,564.00 985,721.88 M 14.17 985,721.88 TETAP
4 Pas. Lisplank GRC 8X200 mm M 82.64 74,307.00 6,140,730.48 M 82.64 6,140,730.48 TETAP
XI PEKERJAAN PLAFON
1 Rangka plafon hollow 4X2,t=0,7 mm, modul 60X60 M2 162.58 150,164.00 24,413,663.12 M2 162.58 24,413,663.12 TETAP
2 Pas. Plafon GRC t=4 mm M2 162.58 69,671.00 11,327,111.18 M2 162.58 11,327,111.18 TETAP
3 Pas. List plafon profil M 261.34 31,351.95 8,193,518.61 M 261.34 8,193,518.61 TETAP
XII PEKERJAAN DINDING
1 Rangka dinding hollow 4X2,t=0,7 mm, modul 60X120 M2 9.71 150,164.00 1,458,092.44 M2 19.42 2,916,184.88 9.71 1,458,092.44 BERTAMBAH
2 Dinding sopi-sopi GRC M2 9.71 69,671.00 676,505.41 M2 19.42 1,353,010.82 9.71 676,505.41 BERTAMBAH
XIII PEKERJAAN ELEKTRIKAL
1 Pasang Instalasi lampu indoor dan outdoor Titik 27.00 209,000.00 5,643,000.00 Titik 27.00 5,643,000.00 TETAP
2 Pasang stop kontak Bh 24.00 219,450.00 5,266,800.00 Bh 24.00 5,266,800.00 TETAP
3 Pasang Saklar Tunggal Bh 3.00 80,000.00 240,000.00 Bh 3.00 240,000.00 TETAP
4 Pasang Saklar Ganda Bh 12.00 90,000.00 1,080,000.00 Bh 12.00 1,080,000.00 TETAP
5 Pasang Lampu LED 4 Watt + Feteng Bh 3.00 100,000.00 300,000.00 Bh 3.00 300,000.00 TETAP
6 Pasang Lampu LED 12 Watt + Feteng Bh 24.00 130,000.00 3,120,000.00 Bh 24.00 3,120,000.00 TETAP
7 Memasang Box MCB Unit 1.00 346,500.00 346,500.00 Unit 1.00 346,500.00 TETAP
8 Arde / Pentanahan Unit 1.00 400,000.00 400,000.00 Unit 1.00 400,000.00 TETAP
XIV PEKERJAAN PENGECATAN
1 Pengecatan Dinding lama M2 495.64 30,981.00 15,355,422.84 M2 495.64 15,355,422.84 TETAP
2 Pengecatan pintu dan jendela lama M2 40.14 69,202.00 2,777,768.28 M2 40.14 2,777,768.28 TETAP
3 Pengecatan plafon M2 162.58 30,981.00 5,036,890.98 M2 182.00 5,638,542.00 19.42 601,651.02 BERTAMBAH
XV PEKERJAAN UTILITAS
1 Pas. Wastafel luar ruangan Bh 1.00 1,277,652.00 1,277,652.00 Bh 1.00 1,277,652.00 TETAP
2 Pipa PVC 2" (Buangan) M 10.00 94,942.00 949,420.00 M 10.00 949,420.00 TETAP
3 Instalasi Air bersih pipa 3/4" M 10.00 37,066.00 370,660.00 M 10.00 370,660.00 TETAP
4 Mata kran Bh 1.00 138,675.00 138,675.00 Bh 1.00 138,675.00 TETAP
XVI PEKERJAAN BONGKARAN
1 Bongkaran atap M2 361.42 46,365.00 16,757,238.30 M2 361.42 16,757,238.30 TETAP
2 Bongkaran plafon M2 162.58 30,910.00 5,025,347.80 M2 162.58 5,025,347.80 TETAP
KELAS C
XVII PEKERJAAN ATAP
1 Pas. Rangka Baja Ringan C.75.75 M2 360.35 200,644.00 72,302,065.40 M2 360.35 72,302,065.40 TETAP
2 Pas. Penutup atap Spandek, t=0,3 mm M2 368.72 108,987.00 40,185,686.64 M2 368.72 40,185,686.64 TETAP
3 Pas. Nok Atap M 29.44 69,564.00 2,047,964.16 M 29.44 2,047,964.16 TETAP
4 Pas. Lisplank GRC 8X200 mm M 82.96 74,307.00 6,164,508.72 M 82.96 6,164,508.72 TETAP
XVIII PEKERJAAN PLAFON
1 Rangka plafon hollow 4X2,t=0,7 mm, modul 60X60 M2 255.70 150,164.00 38,396,934.80 M2 255.70 38,396,934.80 TETAP
2 Pas. Plafon GRC t=4 mm M2 255.70 69,671.00 17,814,874.70 M2 255.70 17,814,874.70 TETAP
3 Pas. List plafon profil M 204.42 31,351.95 6,408,965.62 M 204.42 6,408,965.62 TETAP
XIX PEKERJAAN ELEKTRIKAL
1 Pasang Instalasi lampu indoor dan outdoor Titik 27.00 209,000.00 5,643,000.00 Titik 27.00 5,643,000.00 TETAP
2 Pasang stop kontak Bh 24.00 219,450.00 5,266,800.00 Bh 24.00 5,266,800.00 TETAP
3 Pasang Saklar Tunggal Bh 3.00 80,000.00 240,000.00 Bh 3.00 240,000.00 TETAP
4 Pasang Saklar Ganda Bh 12.00 90,000.00 1,080,000.00 Bh 12.00 1,080,000.00 TETAP
5 Pasang Lampu LED 4 Watt + Feteng Bh 3.00 100,000.00 300,000.00 Bh 3.00 300,000.00 TETAP
6 Pasang Lampu LED 12 Watt + Feteng Bh 24.00 130,000.00 3,120,000.00 Bh 24.00 3,120,000.00 TETAP
7 Memasang Box MCB Unit 1.00 346,500.00 346,500.00 Unit 1.00 346,500.00 TETAP
8 Arde / Pentanahan Unit 1.00 400,000.00 400,000.00 Unit 1.00 400,000.00 TETAP
XX PEKERJAAN PENGECATAN
1 Pengecatan Dinding lama M2 570.30 30,981.00 17,668,464.30 M2 570.30 17,668,464.30 TETAP
2 Pengecatan pintu dan jendela lama M2 126.21 69,202.00 8,733,984.42 M2 126.21 8,733,984.42 TETAP
3 Pengecatan plafon M2 295.30 30,981.00 9,148,689.30 M2 295.30 9,148,689.30 TETAP
4 Pengecatan pintu dan jalusi baru M2 91,686.00 - M2 37.89 3,473,565.67 37.89 3,473,565.67 ITEM PEK. BARU
XXI PEKERJAAN UTILITAS
1 Pas. Wastafel luar ruangan Bh 1.00 1,277,652.00 1,277,652.00 Bh 1.00 1,277,652.00 TETAP
2 Pipa PVC 2" (Buangan) M 9.00 94,942.00 854,478.00 M 9.00 854,478.00 TETAP
3 Instalasi Air bersih pipa 3/4" M 13.00 37,066.00 481,858.00 M 13.00 481,858.00 TETAP
4 Mata kran Bh 1.00 138,675.00 138,675.00 Bh 1.00 138,675.00 TETAP
XXII PEKERJAAN BONGKARAN
1 Bongkaran atap M2 359.85 46,365.00 16,684,445.25 M2 359.85 16,684,445.25 TETAP
2 Bongkaran plafon M2 255.70 30,910.00 7,903,687.00 M2 255.70 7,903,687.00 TETAP
XXIII PENGADAAN MEUBELER
1 Papan Tulis Bh 10.00 800,000.00 8,000,000.00 Bh 10.00 8,000,000.00 TETAP
2 Meja Guru Bh 10.00 900,000.00 9,000,000.00 Bh 10.00 9,000,000.00 TETAP
3 Kursi Guru Bh 10.00 500,000.00 5,000,000.00 Bh 10.00 5,000,000.00 TETAP
4 Meja Siswa Bh 270.00 400,000.00 108,000,000.00 Bh 233.00 93,200,000.00 37.00 14,800,000.00 BERKURANG
5 Kursi Siswa Bh 270.00 250,000.00 67,500,000.00 Bh 233.00 58,250,000.00 37.00 9,250,000.00 BERKURANG
XXIV PEKERJAAN PINTU DAN JALUSI KAYU
1 Pas. Kusen pintu Kayu Kelas II M3 9,560,567.00 - M3 0.06 580,900.05 0.06 580,900.05 ITEM PEK. BARU
2 Pas. Pintu Panel Kayu Kelas II M2 1,012,734.00 - M2 2.93 2,962,449.50 2.93 2,962,449.50 ITEM PEK. BARU
3 Pas. Jalusi pintu dan jendela kayu kelas I atau II M2 1,101,330.00 - M2 10.72 11,802,182.68 10.72 11,802,182.68 ITEM PEK. BARU
4 Engsel Pintu Bh 86,392.00 - Bh 6.00 518,352.00 6.00 518,352.00 ITEM PEK. BARU
5 Grendel Pintu Bh 72,268.00 - Bh 1.00 72,268.00 1.00 72,268.00 ITEM PEK. BARU
6 Kunci Tanam 2 slag Bh 38,537.09 - Bh 1.00 38,537.09 1.00 38,537.09 ITEM PEK. BARU
XXV PEKERJAAN LAIN-LAIN
1 Pembersihan akhir/buangan bongkaran Ls 1.00 1,000,000.00 1,000,000.00 Ls 1.00 1,000,000.00 TETAP
A SUB TOTAL 958,586,908.72 958,586,908.72 24,050,000.00 24,050,000.00
B PPN 10% 95,858,690.87 95,858,690.87
C A+B 1,054,445,599.59 1,054,445,599.59
D DIBULATKAN 1,054,445,000.00 1,054,445,000.00