B PERALATAN
C Jumlah (A+B+C)
D Overhead & profit (5%)
E Harga Satuan Pekerjaan
B BAHAN
Tanah Urug m3 1.200
Angkutan Truk m3 1
C PERALATAN
D Jumlah (A+B+C)
E Overhead & profit (5%)
F Harga Satuan Pekerjaan
B BAHAN
Kayu kelas III (Kayu Rimba Campuran) M3 0.030
Balok kayu kelas II (kayu Rimba Campuran) M3 0.020
Kayu Dolken (kayu Galam 8-10cm - 400cm btg 3.000
Plywood tebal 9 mm (122x244 cm) M2 0.350
Minyak bekisting liter 0.200
Paku 5-12 cm Kg 0.400
Formite/spacer/penjaga jarak bekisting bh 4.000
D Jumlah (A+B+C)
E Overhead & profit (5%)
F Harga Satuan Pekerjaan
Pekerjaan 1 kg Pembesian
No Uraian Sat Koef
A TENAGA
Pekerja OH 0.0700
Tukang OH 0.0700
Kepala Tukang OH 0.0070
Mandor OH 0.0040
B BAHAN
Besi beton Kg 1.050
Kawat beton Kg 0.150
D Jumlah (A+B+C)
E Overhead & profit (5%)
F Harga Satuan Pekerjaan
B BAHAN
Kayu Meranti Palembang papan M3 0.007
Kayu Meranti Palembang kaso M3 0.010
Paku biasa 2"-5" Kg 0.020
D Jumlah (A+B+C)
E Overhead & profit (5%)
F Harga Satuan Pekerjaan
B BAHAN
Semen PC zak 2.500
Pasir beton M3 0.005
Batu pecah/split 2/3 M3 0.009
Seng gelombang 3x6 ft BJLS 20 (0,2 mm) lbr 1.200
Kayu dolken Ø 8-10/400 cm btg 1.250
Kayu Meranti Palembang kaso M3 0.014
Paku biasa 2"-5" Kg 0.060
D Jumlah (A+B+C)
E Overhead & profit (5%)
F Harga Satuan Pekerjaan
A TENAGA
Pekerja OH 0.2000
Tukang OH 2.0000
Kepala Tukang OH 1.0000
Mandor OH 0.0500
B BAHAN
Semen PC zak 10.500
Pasir beton M3 0.030
Batu pecah/split 2/3 M3 0.050
Seng gelombang 3x6 ft BJLS 20 (0,2 mm) lbr 1.200
Kayu dolken Ø 8-10/400 cm btg 1.700
Kayu Meranti Palembang kaso M3 0.021
Paku biasa 2"-5" Kg 0.300
D Jumlah (A+B+C)
E Overhead & profit (5%)
F Harga Satuan Pekerjaan
B BAHAN
Cat Tembok ICI Dulux Acrilyc Emulsion Kg 0.3600
Plamur tembok kg 0.100
Kuas Roll Bh 0.015
C PERALATAN
D Jumlah (A+B+C)
E Overhead & profit (5%)
F Harga Satuan Pekerjaan
D Jumlah (A+B+C)
E Overhead & profit (5%)
F Harga Satuan Pekerjaan
Handraill
No Uraian Sat Koef
A TENAGA
- Railling besi bahan pipa besi hitam dia. 2" (hand rail) m' 3.5000
- Railling besi bahan pipa besi hitam dia. 1,5" (tiang) m' 4.4000
- Railling besi bahan pipa besi hitam dia. 1" (pembagi) m' 14.0000
- Base plate + baut angkur bh 4.0000
- Finishing pengecatan lot 1
- Upah pasang lot 1
D Jumlah (A+B+C)
E Overhead & profit (5%)
F Harga Satuan Pekerjaan
B BAHAN
Semen PC kg 1.000
Batu bata uk. 5 x 11 x 22 cm Bh 55.000
Pasir pasang M3 0.050
D Jumlah (A+B+C)
E Overhead & profit (5%)
F Harga Satuan Pekerjaan
UAN
100,000 70,000
125,000 37,500
175,000 26,250
225,000 6,750
100,000 25,000
125,000 3,125
175,000 4,375
225,000 2,250
100,000 3,300
125,000 41,250
175,000 10,500
225,000 7,425
100,000 7,000
125,000 8,750
175,000 1,225
225,000 900
7,850 8,243
25,000 3,750 Kawat bet 414.36792262 kg
100,000 1,000
125,000 12,500
175,000 17,500
225,000 1,125
3,500,000 23,100 Kayu Meran 0.33 M3
2,500,000 24,063 Kayu Meran 0.48125 M3
20,000 400 Paku biasa 1 Kg
100,000 2,000
125,000 25,000 84
175,000 70,000
225,000 4,500
100,000 20,000
125,000 250,000
175,000 175,000
225,000 11,250
1,500 15,750 Semen PC 4.2 zak
110,000 3,300 Pasir beton 0.48 M3
130,000 6,500 Batu pecah/ 0.8 M3
47,250 56,700 Seng gelom 19.2 lbr
36,750 62,475 Kayu dolke 27.2 btg
2,500,000 52,500 Kayu Meran 0.336 M3
20,000 6,000 Paku biasa 4.8 Kg
Jumlah (A+B+C) 659,475
Overhead & profit (5%) 32,974
Harga Satuan Pekerjaan 692,449
125,000 750
150,000 9,000
200,000 6,000
250,000 750
-
-
50,000 18,000 Cat Tembok 106.7904 Kg
7,500 750 Plamur te 29.664 kg
20,000 300 Kuas Roll 4.450 Bh
125,000 37,500
150,000 15,000
200,000 2,000
250,000 3,750
1,500 1,500
1,250 68,750
120,000 6,000
150,000 525,000
120,000 528,000
100,000 1,400,000
25,000 100,000
200,000 200,000
1,376,500 1,376,500
125,000 37,500
150,000 15,000
200,000 2,000
250,000 3,750
1,500 1,500
1,250 68,750
120,000 6,000
B BAHAN
Kayu kelas III (kayu papan Terentang) M3 0.2000
Paku 5-12 cm Kg 1.5000
Minyak bekisting liter 0.4000
Besi beton polos Kg 157.5000
Kawat beton Kg 2.2500
Semen PC kg 336.0000
Pasir beton m3 0.5400
Kerikil / split (2-3 cm) m3 0.8100
C Jumlah (A+B+C)
D Overhead & profit (5%)
E Harga Satuan Pekerjaan
B BAHAN
Semen PC Kg 175.0000
Batu kali M3 1.5000
Pasir pasang M3 0.4850
C Jumlah (A+B+C)
D Overhead & profit (5%)
E Harga Satuan Pekerjaan
B BAHAN
Kayu kelas III (kayu papan Terentang) M3 0.2000
Paku 5-12 cm Kg 2.0000
Minyak bekisting liter 1.0000
Besi beton polos Kg 105.0000
Kawat beton Kg 2.2500
Semen PC kg 168.0000
Pasir beton m3 0.2700
Kerikil / split (2-3 cm) m3 0.4050
Kayu kelas II (kayu Meranti basah Balok) M3 0.075
Plywood/multiplex 9mm lmbr 1.7500
Dolken kayu Galam, dia. 8-10cm, panjang 4m btg 10.00
C Jumlah (A+B+C)
D Overhead & profit (5%)
E Harga Satuan Pekerjaan
B BAHAN
Kayu kelas III (kayu papan Terentang) M3 0.1600
Paku 5-12 cm Kg 1.6000
Minyak bekisting liter 0.8000
Besi beton polos Kg 105.0000
Kawat beton Kg 1.5000
Semen PC kg 168.0000
Pasir beton m3 0.2700
Kerikil / split (2-3 cm) m3 0.4050
Kayu kelas II (kayu Meranti basah Balok) M3 0.07
Plywood/multiplex 9mm lmbr 1.4000
Dolken kayu Galam, dia. 8-10cm, panjang 4m btg 8.00
C Jumlah (A+B+C)
D Overhead & profit (5%)
E Harga Satuan Pekerjaan
B BAHAN
Atap Metal SPANDEX ZINCALUM, tebal 0,5 mm M2 1.1000
Skrup + ring BH 4.0000
C Jumlah (A+B+C)
D Overhead & profit (5%)
E Harga Satuan Pekerjaan
B BAHAN
Cat Tembok ICI Dulux, Wathershield Kg 0.7000
Alkali Resistants Dulux ICI Bh 0.1100
Amplas besi Bh 0.5000
Kuas Roll Bh 1.0000
C Jumlah (A+B+C)
D Overhead & profit (5%)
E Harga Satuan Pekerjaan
B BAHAN
Cat Minyak Kg 0.4000
Tinner Up Kg 0.2000
Amplas besi Bh 1.0000
Alat semprot Lot 1.0000
C Jumlah (A+B+C)
D Overhead & profit (5%)
E Harga Satuan Pekerjaan
B BAHAN
Semen PC kg 1.000
Paving Blok K125 Bh 60.000
Pasir pasang M3 0.050
D Jumlah (A+B+C)
E Overhead & profit (5%)
F Harga Satuan Pekerjaan
Harsat (Rp) Jumlah (Rp)
100,000 530,000
125,000 34,375
125,000 162,500
125,000 131,250
175,000 45,850
225,000 59,625
2,500,000 500,000
20,000 30,000
35,000 14,000
13,125 2,067,188
25,000 56,250
1,500 504,000
200,000 108,000
300,000 243,000
100,000 530,000
125,000 34,375
175,000 45,850
225,000 59,625
1,500 262,500
500,000 750,000
250,000 121,250
-
-
-
-
-
Jumlah (A+B+C) 1,803,600
Overhead & profit (5%) 90,180
Harga Satuan Pekerjaan 1,893,780
100,000 500,000
125,000 34,375
125,000 125,000
125,000 137,500
175,000 70,525
225,000 79,425
2,500,000 500,000
20,000 40,000
35,000 35,000
13,125 1,378,125
25,000 56,250
1,500 252,000
200,000 54,000
300,000 121,500
2,700,000 202,500
150,000 262,500
72,000 720,000
100,000 29,700
125,000 4,125
125,000 4,125
125,000 4,125
175,000 1,750
225,000 3,375
2,500,000 400,000
20,000 32,000
35,000 28,000
13,125 1,378,125
25,000 37,500
1,500 252,000
200,000 54,000
300,000 121,500
2,700,000 189,000
150,000 210,000
72,000 576,000
100,000 10,000
125,000 25,000
175,000 17,500
225,000 20,250
305,400 335,940
500 2,000
100,000 8,000
125,000 6,250
175,000 5,250
225,000 2,025
95,000 66,500
50,000 5,500
10,000 5,000
30,000 30,000
100,000 8,000
125,000 6,250
175,000 5,250
225,000 2,025
105,000 42,000
50,000 10,000
10,000 10,000
75,000 75,000
125,000 37,500
150,000 15,000
200,000 2,000
250,000 3,750
1,500 1,500
5,000 300,000
120,000 6,000
GAMBAR
DESCIPTION
TURAP
Dinding
Safety Guard
Paving blok
Kanopi
Pemasangan lampu
Tangga
TOT
DI PERIKSA OLEH :
LEMBAR PE
PEKERJAAN PED
ITEM PEM
GAMBAR
DESCIPTION
Tangga
Safety Guard
Kanopi
Pemasangan lampu
TOT
DI PERIKSA OLEH :
LEMBAR PE
PEKERJAAN PEDESTRI
ITEM PEM
GAMBAR
DESCIPTION
Safety Guard
Kanopi
Pekerjaan Lantai
talang
Pemasangan lampu
TOT
DI PERIKSA OLEH :
LEMBAR PE
PEKERJAAN PENGGE
ITEM PEM
GAMBAR
DESCIPTION
support pipa
siku
Seng Galvalum
Wiremesh
polycarbonat
pengecatan
TOT
DI PERIKSA OLEH :
LEMBAR PE
PEKERJAAN PEDESTRIAN A
ITEM PEM
GAMBAR
DESCIPTION
TURAP
Dinding
Safety Guard
Paving blok
Kanopi
Pemasangan lampu
Tangga
sdh naik turun
TOT
DI PERIKSA OLEH :
LEMBAR PE
PEKERJAAN PEDESTRIAN AREA
ITEM PEM
GAMBAR
DESCIPTION
Safety Guard
Kanopi
Pekerjaan Lantai
Pemasangan lampu
TOT
DI PERIKSA OLEH :
LEMBAR PE
PEKERJAAN CANOPY SAMPING
ITEM PEM
GAMBAR
DESCIPTION
Kanopi
Pemasangan lampu
TOT
DI PERIKSA OLEH :
LEMBAR PERHITUNGAN
PEKERJAAN PEDESTRIAN 46 M
ITEM PEMBAYARAN
DIMENTION/CANCULATION
A B C QUANTITY
KODE UNIT
(m) (m) (m) Sat
titik
TOTAL
: DI BUAT OLEH
LEMBAR PERHITUNGAN
PEKERJAAN PEDESTRIAN 33,3 M
ITEM PEMBAYARAN
DIMENTION/CANCULATION
A B C QUANTITY
KODE UNIT
(m) (m) (m) Sat
titik
TOTAL
: DI BUAT OLEH
LEMBAR PERHITUNGAN
PEKERJAAN PEDESTRIAN AREA LIMBAH 15m
ITEM PEMBAYARAN
DIMENTION/CANCULATION
A B C QUANTITY
KODE UNIT
(m) (m) (m) Sat
Pipa 2 inchi 9.08 btng
Elbow 10.00 bh
tiang utama 1.30 3 4.29 btng
pembagi 3.00 2 6.60 btng
Elbow 2.00 2.00 bh
cat dasar 1.91 9.08 1 21.71 m2
cat hitam 10.86 m2
cat kuning 10.86 m2
15.00 m
titik
TOTAL
: DI BUAT OLEH
LEMBAR PERHITUNGAN
PEKERJAAN PENGGESERAN AREA LIMBAH
ITEM PEMBAYARAN
DIMENTION/CANCULATION
A B C QUANTITY
KODE UNIT
(m) (m) (m) Sat
TOTAL
: DI BUAT OLEH
LEMBAR PERHITUNGAN
PEKERJAAN PEDESTRIAN AREA SAMPING 600 ML 37 m
ITEM PEMBAYARAN
DIMENTION/CANCULATION
A B C QUANTITY
KODE UNIT
(m) (m) (m) Sat
titik
TOTAL
: DI BUAT OLEH
EKKY SETIA FANI
LEMBAR PERHITUNGAN
PEKERJAAN PEDESTRIAN AREA SAMPING UTILITY 600ML 15m
ITEM PEMBAYARAN
DIMENTION/CANCULATION
A B C QUANTITY
KODE UNIT
(m) (m) (m) Sat
titik
TOTAL
: DI BUAT OLEH
EKKY SETIA FANI
LEMBAR PERHITUNGAN
PEKERJAAN CANOPY SAMPING GUDANG RESIN 600 ML (48m)
ITEM PEMBAYARAN
DIMENTION/CANCULATION
A B C QUANTITY
KODE UNIT
(m) (m) (m) Sat
titik
TOTAL
: DI BUAT OLEH
1.1
101.8325
1.914144 3.689583
5.06
16.192
182.16
121.44
29.04
32
0.715
69.48343
34.74171
34.74171
65.78
65.78
14.05556
12.65
33.73333
116.325
144.6109
144.6109
7
7
5
6
10
8
5.5
95.75
DI BUAT OLEH
KETERANGAN
1.1
4.50
0.00
0.00
1.914144 0.00
0.00
0.00
0.00
0.00
20.46
24.00
48.95
24.48
24.48
0.00
0.00
0.00
10.18
9.17
14.67
86.63
81.39
81.39
DI BUAT OLEH
KETERANGAN
1.1 9.075
10
1.914144
21.71357
10.85679
10.85679
27.5
22
11
37.125
144.7571
144.7571
1.98
750
4.010417
13.125
13.125
15
DI BUAT OLEH
1.1
DI BUAT OLEH
KETERANGAN
1.1
35.10375
1.271875
3.56125
1.914144 13.024
61.05
65
3.09375
111
2.475
101.75
23.595
26
56.45528
18.81843
18.81843
52.91
52.91
11.30556
10.175
27.13333
91.575
116.3175
116.3175
4
4
3
4
6
2
2
50.65
75
75
DI BUAT OLEH
EKKY SETIA FANI
KETERANGAN
#VALUE! 27.5
#VALUE! 22
0.00 11
#VALUE! 37.125
#VALUE! 144.7571
#VALUE! 144.7571
#VALUE! 1.98
750.00 750
#VALUE! 4.010417
#VALUE! 28.125
DI BUAT OLEH
EKKY SETIA FANI
KETERANGAN
1.1
1.914144
DI BUAT OLEH
1 2
I PEKERJAAN PERSIAPAN
- ###
Survey Lokasi
- ###
Akomodasi Manpower
- ###
Mobilisasi Alat Dan Bahan
- Pembersihan Area Lahan
- Pembuatan Pagar Pembatas
- Pembuatan Gudang Peralatan & Material Sementara
- Pembuatan bowplank
- ###
Pekerjaan K3
- ###
Peralatan
- ###
Issue Sosial
JUMLAH TOTAL
Profit 10%
Total Biaya Pekerjaan
Pembulatan
KONTRAK AWAL
HARGA HARGA
SATUAN
KUANTITAS SATUAN PEKERJAAN
(Rp.) (Rp.)
3 4 5 6=(4x5)
Is 1 1,000,000 1,000,000.00
Is 1 2,000,000 2,000,000.00
Is 1 7,500,000 7,500,000.00
Is 1 7,500,000 7,500,000.00
m 150 258,098 38,714,681.25
m2 16 692,449 11,079,180.00
m 95 83,672 7,948,828.13
Is 1 2,500,000 2,500,000.00
Is 1 4,000,000 4,000,000.00
Is 1 5,000,000 5,000,000.00
JUMLAH I 82,242,689.38
JUMLAH II 173,660,878.92
m3 101.83 1,893,780 192,848,351.85
m3 16.19 4,710,339 76,269,815.16
m3 3.69 4,797,135 17,699,429.34
m3 5.06 3,491,591 17,667,451.73
btng 69.75 1,062,500 74,104,652.78
bh 42.00 150,000 6,300,000.00
btng 39.23 1,115,000 43,745,166.67
lbr 5.00 4,387,500 21,937,500.00
m2 212.08 431,225 91,451,935.84
m2 65.78 384,038 25,261,986.75
btng 7.00 5,000,000 35,000,000.00
btng 7.00 636,250 4,453,750.00
Is 1.00 2,500,000 2,500,000.00
m2 369.38 134,951 49,848,292.73
m2 428.19 166,451 71,272,543.64
JUMLAH IV 180,786,836.37
btng 4.40 1,062,500 4,675,000.00
btng 2.00 636,250 1,272,500.00
m2 24.75 431,225 10,672,806.38
lbr 7.28 1,200,000 8,730,158.73
lbr 3.33 3,000,000 9,987,893.46
m2 85.00 166,451 14,148,356.25
JUMLAH V 49,486,714.82
600 ml 37 m
JUMLAH VI 552,508,445.65
LITY 600ml 15 m