Anda di halaman 1dari 1

KETERANGAN

Keramik / Granite
Keramik / Granite Keramik / Granite Unpolished 30x30
Unpolished 30x30 Unpolished 30x30
Spesi CATATAN
Spesi
Grill Besi Beton K-225
Beton K-225

Tempat Wudhu Wanita Toilet Wanita


Toilet Wanita -0.02 -0.02 PEKERJAAN
-0.02 -0.02

REVITALISASI
MASJID RAYA WATAMPONE
KELURAHAN BUKAKA
M10-150
M10-150 M10-150 MENYETUJUI
Lantai Kerja
Lantai Kerja YAYASAN MASJID RAYA WATAMPONE
Sloof 15/15 Beton K-125
Pas. Bt. Kosong Sloof 15/15 Pas. Bt. Kosong

Pasir Urug Pasir Urug

H. A. SURYA DARMA, SE. MSI


Ketua

M10-150 Detail 3 MENGETAHUI

Detail 1 Lantai Kerja t = 5 cm KONSULTAN PERENCANA - REVIEW DESIGN

Keramik / Granite
Unpolished 30x30

Spesi
PT. BARUGA ASRI NUSA
Beton K-225 DEVELOPMENT
Jl. Raya Baruga No. 1
Rollag Bata
Lantai Dasar BARUGA ASRI NUSA DEVELOPMENT
±0.00

Muka Bt. Koral


-0.18

IR. H. FURQON AFFANDI


Direktur Utama

DIAJUKAN OLEH :
Keramik / Granite
Unpolished 30x30
Keramik / Granite
Unpolished 30x30 Detail Rollag Bata
Spesi Grill Besi
Beton K-225
Jln. Perintis Kemerdekaan Km.15 Makassar Telp. 0411-512347 / 0411-512347
Tempat Wudhu Pria Tempat Wudhu Wanita Email : binusantarapt@gmail.com

Toilet Wanita -0.02 -0.02


-0.02 -0.02

M10-150
NUR SALIM DIMAS VINCENT, ST
M10-150 M10-150 Lantai Kerja Direktur Arsitektur

DIPERIKSA DIGAMBAR
Lantai Kerja
Sloof 15/15
Beton K-125, Pas. Bt. Kosong
Pas. Bt. Kosong t = 5 cm Pasir Urug
MUHAMMAD IDRIS, ST RAHAYU ZAENAL, ST
Pasir Urug S1 GAMBAR SKALA
S1
· DETAIL PONDASI 1 : 20

Detail 2 Detail 4 NO. LBR JML. LBR TAHUN KD. GBR

54 85 2021 ARS

Anda mungkin juga menyukai