BQ
BQ
BENGKULU KAUR
HARGA : Rp 85,000,000
1,800
2. Lain-lain
Asuransi 3% + PPN 10% 3.3 % = 0.033 x 85,000,000 = Rp 1,558.33
1,800
1 2 3 4 5 6
I. TENAGA AHLI
1 Ahli Ilmu Perundang - undangan (3 Bln) 1.00 OB 6,000,000.00 18,000,000.00
2 Ahli Teknik Pengairan (3 Bln) 1.00 OB 5,000,000.00 15,000,000.00
3 Ahli Hukum Administrasi (3 Bln) 1.00 OB 5,000,000.00 15,000,000.00
4 Tenaga Lapangan (2 Bln) 2.00 OB 2,000,000.00 8,000,000.00
56,000,000.00
II. SURVEY LAPANGAN
1 Pengurusan Izin 2.00 Org/Pkt 300,000.00 600,000.00
2 Survey Lapangan (Observasi dan FGD) 5.00 OH 350,000.00 36,750,000.00
3 Transport Lokal responden (2 Hari) 25.00 OH 100,000.00 5,000,000.00
4 Hotel (4 hari) 3.00 Kmr/hr 264,000.00 3,168,000.00
5 Konsumsi FGD (2 Kegiatan) 30.00 Ktk 25,000.00 1,500,000.00
6 Makan dan Konsumsi TIM Lapangan (6 Hari) 5.00 Org/Hr 100,000.00 3,000,000.00
7 Rental Mobil (15 Hari) 1.00 Mbl/Hari 460,000.00 6,900,000.00
56,918,000.00
HARGA SATUAN JUMLAH
No. URAIAN PEKERJAAN VOLUME ANALISA
(Rp) (Rp)
1 2 3 4 5 6
III. PENYUSUNAN LAPORAN
1 Konsumsi (5 Hari) 5.00 Org/Hr 100,000.00 2,500,000.00
2 Penyusunan Norma kedalam Ranperda (10 Hari) 5.00 Org/Hr 100,000.00 5,000,000.00
III.a Uji Publik
1 Transport Peserta 50.00 Org/Hr 100,000.00 5,000,000.00
2 Sewa Tempat 1.00 Hari 2,000,000.00 2,000,000.00
3 Konsumsi Lokakarya 100.00 Org/Hr 25,000.00 2,500,000.00
17,000,000.00
BILLING OF QUANTITY
(BOQ)
Kegiatan : Program Pengembangan dan Pengelolaan Jaringan Irigasi, Rawa dan Jaringan Pengairan Lainnya
Sub. Kegiatan : Penyusunan Naskah Akademik dan Draft Perda Irigasi Kabupaten Kaur
Pekerjaan : Penyusunan Naskah Akademik dan Draft Perda Irigasi Kabupaten Kaur
Lokasi : Kabupaten Kaur
Sumber Dana : APBD-P
Tahun Anggaran : 2021
JUMLAH HARGA
No. URAIAN PEKERJAAN
( Rp )
I. TENAGA AHLI -
II. SURVEY LAPANGAN -
J U M L A H ( I + II + III + IV) -
PPN 10% -
Jumlah Total -
Dibulatkan -
Terbilang : -
#REF!
ANALISA