KEBUTUHAN MATERIAL
NOMOR NAMA DESA
NO NAMA MATERIAL SATUAN KETERANGAN ITEM
MATERIAL DEDAP
JUMLAH
MDU JTM
1 CONDUCTOR; AAAC; 70 mm2 0003050081 Meter -
2 CONDUCTOR; AAAC; 150 mm2 0003050075 Meter -
3 CONDUCTOR; AAAC; 240 mm2 0003050049 Meter -
4 CONDUCTOR; AAAC-S; 150 mm2 0003050084 Meter 61,193
5 ISOLATOR PINPOST; 24 kV; 12.5kN 0003070151 Bh 1,162
6 ISOLATOR; SUSP; 24 kV 0003070155 Bh 228
7 POOL STEEL; 20 kV; CIRCL; 9m; 200daN 0003030041 Batang -
8 POOL STEEL; 20 kV; CIRCL; 11m; 200daN 0003030030 Batang -
9 POOL STEEL; 20 kV; CIRCL; 12m; 200daN 0003030101 Batang -
10 POOL STEEL; 20 kV; CIRCL; 12m; 350daN 0003030113 Batang -
11 POOL STEEL; 20 kV; CIRCL; 14m; 350daN 0003030103 Batang -
MDU JTR
1 CABLE POWER; NFA2X-T; 3X70+1X50;0.6/1 kV;OH 0003110041 Meter 13,821
2 POOL STEEL; 20 kV; CIRCL; 9m; 200daN 0003030041 Batang Err:509
MDU GARDU DISTRIBUSI
1 CABLE POWER; NYY 1X70mm2;0.6/1 kV;OH 0003110514 Meter 800
2 CABLE POWER; NYY 1X150mm2;0.6/1 kV;OH 0003110060 Meter 400
3 LA; 20 kV; K; 10 kA; POLYMER; 17 kV 0002090046 Bh 30
4 FUSE; 20/24 kV; 100A; TUBE; mini10 kA 0002240226 Bh 30
5 LVSB; DIST; 3P; 380V; 250A; 2LINE; OD 0003260027 Unit 10
6 LVSB; DIST; 3P; 380V; 400A; 4LINE; OD 0003260036 Unit -
7 TRF DIS; D3; 20 kV/400V;3P; 50 kVA; YZN5; OD 0001030069 Unit 5
8 TRF DIS; D3; 20 kV/400V;3P;100 kVA; YZN5; OD 0001030074 Unit 5
9 TRF DIS; D3; 20 kV/400V;3P;160 kVA; YZN5; OD 0001030063 Unit -
10 TRF DIS; D3; 20 kV/400V;3P;200 kVA; YZN5; OD 0001030011 Unit -
11 POOL STEEL; 20 kV; CIRCL; 12m; 350daN 0003030113 Batang 20

Keterangan :

XX/XX/2019
MENYETUJUI,
MANAJER SPV. KONSTRUKSI

YANUAR ARIF RAHMAN


PT. PLN (Persero) TUG-5
UNIT INDUK WILAYAH RIAU DAN KEPULAUAN RIAU FORM REQUEST MATERIAL
UNIT PELAKSANA PROYEK KETENAGALISTRIKAN RIAU NOMOR 0000.TUG-5/LOG.00.02/UPPK-RIAU/2019
TANGGAL XX/XX/2019

DAFTAR PERMINTAAN MATERIAL


KEPADA : LOGISTIK PT PLN (PERSERO) UP3 RENGAT
ALAMAT/LOKASI : DESA PASIR LIMAU KAPAS 2 PT. PLN (Persero) UP3 DUMAI
PEKERJAAN : PEMASANGAN JTM 20kV AAAC-S 150mm2, SEPANJANG 19,9 KMS

NO. KONTRAK/PK/PJ/SPBJ : .SPBJ/DAN.02.03/UPPK-RIAU/2019 / JUNI 2019


SUMBER ANGGARAN : PRK.2019.WRKR.5.002
PELAKSANA/VENDOR : Mengetahui
KEBUTUHAN MATERIAL MDU PEMBANGUNAN JARINGAN LISTRIK DESA
NOMOR PERMINTAAN MATERIAL
NO NAMA MATERIAL KETERANGAN ITEM
MATERIAL JUMLAH SATUAN
MDU JTM
1 CONDUCTOR; AAAC; 70 mm2 0003050081 - Meter
2 CONDUCTOR; AAAC; 150 mm2 0003050075 - Meter
3 CONDUCTOR; AAAC; 240 mm2 0003050049 - Meter
4 CONDUCTOR; AAAC-S; 150 mm2 0003050084 61,193 Meter
5 ISOLATOR PINPOST; POLYMER; 24 kV; 12.5kN 0003070150 - Bh
6 ISOLATOR PINPOST; PORC; 24 kV; 12.5kN 0003070151 1,162 Bh
7 ISOLATOR LINEPOST; POLYMER;24 kV;12.5kN 0003070152 - Bh
8 ISOLATOR; SUSP; POLYMER; 24 kV; 12.5kN 0003070154 228 Bh
9 ISOLATOR; SUSP; PORC; 24 kV; 70kN 0003070155 - Bh
10 POOL STEEL; 20 kV; CIRCL; 9m; 200daN 0003030041 - Batang
11 POOL STEEL; 20 kV; CIRCL; 11m; 200daN 0003030030 - Batang
12 POOL STEEL; 20 kV; CIRCL; 12m; 200daN 0003030101 - Batang
13 POOL STEEL; 20 kV; CIRCL; 12m; 350daN 0003030113 - Batang
14 POOL STEEL; 20 kV; CIRCL; 14m; 350daN 0003030103 - Batang
Diterima Tanggal : . . . . . . . . . Disetujui Tanggal : . . . . . . . . . UNIT PELAKSANA PROYEK KETENAGALISTRIKAN (UPPK) RIAU
PENERIMA MENYETUJUI MENGETAHUI/MEMERIKSA, PERMINTAAN OLEH

............................. ............................. YANUAR ARIF RAHMAN


PELAKSANA / PT. . . . . . . . . . . . . . . LOGISTIK/GUDANG PLN AREA . . . . . . . . MANAJER SPV. KONSTRUKSI
PT. PLN (Persero) JTM
UNIT INDUK WILAYAH RIAU DAN KEPULAUAN RIAU TM1
UNIT PELAKSANA PROYEK KETENAGALISTRIKAN RIAU TM2
TM3
TM4
TM5
LAMPIRAN SURAT PESANAN BARANG DAN JASA (SPBJ) TM7
TM8
PAKET : PAKET 4 (KHSJ JTM A3C-S) TM10
NO./TGL. SPBJ : .SPBJ/DAN.02.03/UPPK-RIAU/2019 / JUNI 2019 TM11
PEKERJAAN : PEMASANGAN JTM 20kV AAAC-S 150mm2, SEPANJANG 19,9 KMS TM16
TM16A
LOKASI : DESA PASIR LIMAU KAPAS 2 PT. PLN (Persero) UP3 DUMAI
SUMBER ANGGARAN : PRK.2019.WRKR.5.002

HARGA SATUAN JUMLAH HARGA


TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOL MATERIAL JASA MATERIAL JASA
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
A PEMB./PEMASANGAN JTM 20 KV AAAC-S 150mm
1 Konstr. Penarikan JTM 3 Phasa A3C-S 150 mm2 Kms 19.90 170,500 11,320,500 3,392,950 225,277,950 228,670,900
2 Konstruksi Tiang Penyangga pd T. Besi (TM-1) Unit 326 862,622 117,790 281,214,633 38,399,540 319,614,173
3 Konst. T.Penyangga Ganda pd T. Besi (TM-2) Unit 24 1,528,426 157,050 36,682,228 3,769,200 40,451,428
4 Konstruksi Tiang Awal/Akhir Besi (TM-3) Unit 9 1,131,152 94,230 10,180,368 848,070 11,028,438
5 Pemas.Konstruksi Tiang Tarik Akhir pd T.Besi (TM-4) Unit 10 1,234,023 94,230 12,340,233 942,300 13,282,533
6 Konstruksi Tiang Tarik Ganda T. Besi (TM-5) Unit 26 1,420,702 235,590 36,938,261 6,125,340 43,063,601
7 Konst. Percab. pd. T. Existing T. Besi (TM-7) Unit 1 1,288,519 94,230 1,288,519 94,230 1,382,749
8 Konstruksi Percabangan T. Besi (TM-8) Unit - 2,094,068 94,230 - - -
9 Konst.Tiang Belokan / Sudut T. Besi (TM-10) Unit 2 2,628,623 315,620 5,257,247 631,240 5,888,487
10 Konstruksi Tiang Opstijg Cable pd T. Besi (TM-11) Unit - 9,354,043 935,390 - - -
11 Konst. Portal/Single-Arm 2 T. Besi (TM-16) Unit - 1,724,936 315,620 - - -
12 Konst. Portal/Double-Arm 2 T. Besi (TM-16A) Unit - 3,083,553 387,670 - - -
13 Down Guy/Trekschoor komplit T. Besi (E-1) Unit 21 560,760 78,540 11,775,960 1,649,340 13,425,300
14 Down Guy/Trekschoor Douuble komplit T.Besi (E-1D) Set - 919,320 78,540 - - -
15 Span Guy / Kontramast komplit T. Besi (E-2) Btg 6 776,850 117,790 4,661,100 706,740 5,367,840
16 Span Guy / Kontramast Double komplit T.Besi (E-2D) Btg - 1,553,890 157,050 - - -
17 Strut Pole / Drugschoor komplit T. Beton (E-3) Btg - 547,595 123,050 - - -
18 Pemasangan Penghalang Panjat & Plat Tanda Bahaya Set 398 186,318 6,136 74,154,564 2,442,128 76,596,692
JUMLAH A 477,886,064 280,886,078 758,772,142
B MATERIAL DISTRIBUSI UTAMA (MDU) JTM 20 kV
1 Kawat AAAC - 150 mm2 Mtr - PM - - - -
2 Kawat AAACS - 150 mm2 Mtr 61,193 PM - - - -
3 ISOLATOR PINPOST; PORC; 24 kV; 12.5kN Bh 1,162 PM - - - -
4 ISOLATOR; SUSP; PORC; 24 kV; 70kN Set 228 PM - - - -
JUMLAH B - - -
C ONGKOS ANGKUT DAN BONGKAR MUAT
1 Transportasi Darat + Laut (Zona C) Km 215.00 - 12,307 - 56,644,246 56,644,246
2 Tonase Ton 21.41 - - - - -
3 - - - -
4 - - - -
JUMLAH C - 56,644,246 56,644,246
Terbilang : JUMLAH (A+B+C) 815,416,388
Delapan Ratus Sembilan Puluh Enam Juta Sembilan Ratus Lima Puluh Tujuh Ribu PEMBULATAN 815,416,000
Enam Ratus Rupiah PPN 10% 81,541,600
TOTAL 896,957,600

Keterangan :
- RAB Berdasarkan Kontrak KHSJ 2018 PLN WRKR dan Amandemennya

Mengetahui Pekanbaru, 20 Juni 2019


MANAJER, SPV PERENCANAAN,

YANUAR AHMAD ZAKI ARFAN


JTM PI SI
TM1 326 978 0
TM2 24 144 0
TM3 9 9 27
TM4 10 0 30
TM5 26 26 156
TM7 1 1 3
TM8 0 0 0
TM10 2 4 12
TM11 0 0 0
TM16 0 0 0
TM16A 0

19900
PT. PLN (Persero)
UNIT INDUK WILAYAH RIAU DAN KEPULAUAN RIAU
UNIT PELAKSANA PELAYANAN PELANGGAN PEKANBARU

ANALISA BIAYA
TRANSPORTASI DAN BONGKAR MUAT MATERIAL DISTRIBUSI UTAMA (MDU)

PAKET :
NO./TGL. SPB-J :
PEKERJAAN :
LOKASI : PENYALAI, PT. PLN (PERSERO) UP3 PEKANBARU
GUDANG PLN UP3 :
SUMBER ANGGARAN :

BERAT KEBUTUHAN MDU TON KM HARGA ONGKOS ANGKUT HARGA BONGKAR MUAT
TOTAL HARGA
NO. URAIAN PEKERJAAN SATUAN MDU SATUAN TONASE JARAK SATUAN JUMLAH SATUAN JUMLAH
VOLUME KALI
(Kg/Unit.) (Unit) (Ton.) (Km.) (Rp./TonKM) (Rp.) (Rp./Ton) (Rp.) (Rp.)
a b c d e f = (c x d) / 1000 g h i=fxgxh j k l=fxjxk m=i+l
A TRANSPORTASI DARAT
1 Kawat AAAC - 150 mm2 0.434 - Mtr - - 2,497 - 0 64,984.00 - -
2 Kawat AAACS - 150 mm2 0.594 - Mtr - - 2,497 - 0 64,984.00 - -
3 Kawat AAACS - 240 mm2 0.700 788 Mtr 0.55 - 2,497 - 0 64,984.00 - -
4 Isolator Pinpost; Porceline; 24 kV; 12.5kN 9.00 - Bh - - 2,497 - 0 64,984.00 - -
5 Isolator; Suspention; Porceline; 24 kV; 70kN 4.60 - Set - - 2,497 - 0 64,984.00 - -
6 Isolator Pinpost; Polymer;24 kV;12.5kN 3.30 - Bh - - 2,497 - 0 64,984.00 - -
7 Isolator; Suspention; Polymer; 24 kV; 12.5kN 3.40 - Set - - 2,497 - 0 64,984.00 - -
8 Tiang besi 9 M - 200 daN 233.00 15 Btg 3.50 - 2,497 - 0 64,984.00 - -
9 Tiang besi 11 M - 200 daN 306.00 - Btg - - 2,497 - 0 64,984.00 - -
10 Tiang besi 12 M - 200 daN 347.00 33 Btg 11.45 - 2,497 - 0 64,984.00 - -
11 Tiang besi 12 M - 350 daN 505.00 2 Btg 1.01 - 2,497 - 0 64,984.00 - -
12 Tiang besi 13 M - 350 daN 585.00 - Btg - - 2,497 - 0 64,984.00 - -
13 Tiang besi 14 M - 350 daN 642.00 - Btg - - 2,497 - 0 64,984.00 - -
14 Load Breaker Switch - - Set - - 2,497 - 0 64,984.00 - -
15 kabel tanah 28.00 70 Mtr 1.96 - 2,497 - 0 64,984.00 - -
16 Kubikel 980.00 3 Unit 2.94 - 2,497 - 0 64,984.00 - -
JUMLAH A - - 21.407 - - -
B TRANSPORTASI LAUT, SUNGAI DAN PERAIRAN
1 Kawat AAAC - 150 mm2 0.43 - Mtr - - 3,319 - 0 190,540.00 - -
2 Kawat AAACS - 150 mm2 0.59 - Mtr - - 3,319 - 0 190,540.00 - -
3 Isolator Pinpost; Porceline; 24 kV; 12.5kN 9.00 - Bh - - 3,319 - 0 190,540.00 - -
4 Isolator; Suspention; Porceline; 24 kV; 70kN 4.60 - Set - - 3,319 - 0 190,540.00 - -
5 Isolator Pinpost; Polymer;24 kV;12.5kN 3.30 - Bh - - 3,319 - 0 190,540.00 - -
6 Isolator; Suspention; Polymer; 24 kV; 12.5kN 3.40 - Set - - 3,319 - 0 190,540.00 - -
7 Tiang besi 9 M - 200 daN 233.00 - Btg - - 3,319 - 0 190,540.00 - -
8 Tiang besi 11 M - 200 daN 306.00 - Btg - - 3,319 - 0 190,540.00 - -
9 Tiang besi 12 M - 200 daN 347.00 - Btg - - 3,319 - 0 190,540.00 - -
10 Tiang besi 12 M - 350 daN 505.00 - Btg - - 3,319 - 0 190,540.00 - -
11 Tiang besi 13 M - 350 daN 585.00 - Btg - - 3,319 - 0 190,540.00 - -
12 Tiang besi 14 M - 350 daN 642.00 - Btg - - 3,319 - 0 190,540.00 - -
13 Load Breaker Switch - - Set - - 3,319 - 0 190,540.00 - -
JUMLAH B - - - - - -
Terbilang :
nol Rupiah JUMLAH -

Keterangan :
- Perhitungan Biaya/Harga Ongkos Angkut (Transportasi) dan Bongkar Muat Material Distribusi Utama (MDU) Untuk Lokasi Darat, Laut dan Sungai Berdasarkan Addendum/Amandemen I Kontrak Kesepakatan Harga Satuan (KHS)
Jasa Tanggal 24 Juli 2018, pada pasal 3 ayat 9.
23.62 TON Pekanbaru, 05 November 2018
MANAJER 12,543 TRANSPORT SPV. PELAKSANA PENGADAAN
266 KM
78,804,280 HARGA TRANSPORT
YANUAR AHMAD FAISAL
PT. PLN (Persero)
UNIT INDUK WILAYAH RIAU DAN KEPULAUAN RIAU
UNIT PELAKSANA PROYEK KETENAGALISTRIKAN RIAU

RUTE PENGANGKUTAN DAN BONGKAR MUAT MATERIAL DISTRIBUSI UTAMA (MDU)

PAKET : PAKET 3 (KHSJ JTM A3C)


PEKERJAAN : PEMASANGAN JTM 20kV AAAC-S 150mm2, SEPANJANG 19,9 KMS
LOKASI : DESA PASIR LIMAU KAPAS 2 PT. PLN (Persero) UP3 DUMAI

START POINT RUTE PERJALANAN


NO. URAIAN SAT VOL KETERANGAN
GUDANG PLN TUJUAN
(Asal MDU) (Lokasi Transit l) (Lokasi Desa/Transit ll) (Lokasi Desa)
A TRANSPORTASI/PENGANGKUTAN
1 Transportasi (Darat) Km 137 AREA PEKANBARU PLBHN BUTON
Jarak (Km) X Tonase (Ton) X Rp. 5.700,-
2 Transportasi (Laut dan Sungai) Km 130.86 PLBHN BUTON DESA SOKOI
Jarak (Km) X Tonase (Ton) X Rp. 11.582,-
B Bongkar Muat 2 X Bongkar Muat
1 Kawat AAAC - 150 mm2 Mtr - (1 X Darat, 1 X Perairan)
2 Kawat AAACS - 150 mm2 Mtr 61,193
3 ISOLATOR PINPOST; PORC; 24 kV; 12.5kN Bh 1,162
4 ISOLATOR; SUSP; PORC; 24 kV; 70kN Set 228
5 ISOLATOR LINEPOST; POLYMER;24 kV;12.5kN Bh
6 ISOLATOR; SUSP; POLYMER; 24 kV; 12.5kN Set
7 Tiang besi 9 M - 200 daN Btg Err:509
8 Tiang besi 11 M - 200 daN Btg Err:509
9 Tiang besi 12 M - 200 daN Btg Err:509
10 Tiang besi 12 M - 350 daN Btg Err:509
11 Tiang besi 13 M - 350 daN Btg
12 Tiang besi 14 M - 350 daN Btg
13 Load Breaker Switch Set

Mengetahui, Pekanbaru, 29 Oktober 2018


MANAJER SPV. PELAKSANA PENGADAAN

YANUAR AHMAD FAISAL


PT. PLN (Persero) TUG-5
UNIT INDUK WILAYAH RIAU DAN KEPULAUAN RIAU FORM REQUEST MATERIAL
UNIT PELAKSANA PROYEK KETENAGALISTRIKAN RIAU NOMOR 0000.TUG-5/LOG.00.02/UPPK-RIAU/2019
TANGGAL XX/XX/2019

DAFTAR PERMINTAAN MATERIAL


KEPADA : LOGISTIK PT PLN (PERSERO) UP3 RENGAT
ALAMAT/LOKASI : DESA PASIR LIMAU KAPAS 2 PT. PLN (Persero) UP3 DUMAI
PEKERJAAN : PEMASANGAN JTR LVTC 3x70mm+1x50mm, SEPANJANG 13,55 KMS

NO. KONTRAK/PK/PJ/SPBJ : .SPBJ/DAN.02.03/UPPK-RIAU/2019 / JUNI 2019


SUMBER ANGGARAN : PRK.2019.WRKR.5.003
PELAKSANA/VENDOR : Mengetahui
KEBUTUHAN MATERIAL MDU PEMBANGUNAN JARINGAN LISTRIK DESA
NOMOR PERMINTAAN MATERIAL
NO NAMA MATERIAL KETERANGAN ITEM
MATERIAL JUMLAH SATUAN
MDU JTR
1 CABLE POWER; NFA2X-T; 3X70+1X50;0.6/1 kV;OH 0003110041 13,821 Meter
2 POOL STEEL; 20 kV; CIRCL; 9m; 200daN 0003030041 Err:509 Batang
3 POOL STEEL; 20 kV; CIRCL; 12m; 350daN 0003030101 - Batang
Diterima Tanggal : . . . . . . . . . Disetujui Tanggal : . . . . . . . . . UNIT PELAKSANA PROYEK KETENAGALISTRIKAN (UPPK) RIAU
PENERIMA MENYETUJUI MENGETAHUI/MEMERIKSA, PERMINTAAN OLEH

............................. ............................. YANUAR ARIF RAHMAN


PELAKSANA / PT. . . . . . . . . . . . . . . LOGISTIK/GUDANG PLN AREA . . . . . . . . MANAJER SPV. KONSTRUKSI
PT. PLN (Persero)
UNIT INDUK WILAYAH RIAU DAN KEPULAUAN RIAU
UNIT PELAKSANA PROYEK KETENAGALISTRIKAN RIAU

LAMPIRAN SURAT PESANAN BARANG DAN JASA (SPBJ)

PAKET : PAKET 2 (KHSJ JTR)


NO./TGL. SPBJ : .SPBJ/DAN.02.03/UPPK-RIAU/2019 / JUNI 2019
PEKERJAAN : PEMASANGAN JTR LVTC 3x70mm+1x50mm, SEPANJANG 13,55 KMS

LOKASI : DESA PASIR LIMAU KAPAS 2 PT. PLN (Persero) UP3 DUMAI
SUMBER ANGGARAN : PRK.2019.WRKR.5.003

HARGA SATUAN JUMLAH HARGA


TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOL MATERIAL JASA MATERIAL JASA
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
A PEMB./PEMASANGAN JARINGAN TEGANGAN RENDA
1 Penarikan LVTC 3x70+1x50 mm2 ( JTR Murni ) Kms - 152,475 5,063,680 - - -
2 Penarikan LVTC 3x70+1x50 mm2 ( JTR Numpang ) Kms 13.55 152,475 5,063,680 2,066,036 68,612,864 70,678,900
3 Konstruksi (SKUTR) Tiang Penyangga (TR-1) Unit 219 87,150 47,180 19,085,850 10,332,420 29,418,270
4 Konstruksi (SKUTR) Tiang Belokan (TR-2) Unit 9 110,253 78,630 992,277 707,670 1,699,947
5 Konstruksi (SKUTR) Tiang Awal/Akhir (TR-3) Unit 18 221,428 47,180 3,985,704 849,240 4,834,944
6 Konst.(SKUTR) T.Penyangga pd Persimp. (TR-4) Unit - 347,538 47,180 - - -
7 Konstruksi (SKUTR) Tiang Penegang (TR-5) Unit 7 234,713 67,390 1,642,991 471,730 2,114,721
8 Konstruksi (SKUTR) Tiang Pencabangan (TR-6) Unit - 276,381 94,360 - - -
9 Konstruksi (SKUTR) Tiang Pencabangan (TR-6A) Unit - 212,866 94,360 - - -
10 Konst.Penyambungan/SKUTR dg Existing (TR-7) Unit - 207,077 58,960 - - -
11 Konst.SKUTR Tiang. Awal/Akhir dg Adjustable (TR-8) Unit - 477,059 58,960 - - -
12 Konst.Penyamb./SKUTR pd Trafo Tiang (TR-9): Unit 10 309,690 117,950 3,096,900 1,179,500 4,276,400
13 Konst.Penyamb./SKUTR pd Trf Tiang (TR-10) Unit - 346,443 117,950 - - -
14 Grounding / Pentanahan SKUTR ( GTR ) Unit 18 1,375,457 78,630 24,758,226 1,415,340 26,173,566
15 Down Guy/Trekschoor komplit T.Besi (E-1) Unit 18 511,170 78,630 9,201,060 1,415,340 10,616,400
16 Span Guy / Kontramast komplit T. Besi (E-2) Unit - 637,844 117,950 - - -
17 Strut Pole / Drugschoor komplit T.Besi (E-3) Unit - 525,304 94,360 - - -
JUMLAH A 64,829,044 84,984,104 149,813,148
B MATERIAL DISTRIBUSI UTAMA (MDU) JTR -
1 LVTC 3x70+1x50 mm2 Mtr 13,821 PM - - - -
JUMLAH B - - -
C ONGKOS ANGKUT DAN BONGKAR MUAT
1 Transportasi Darat + Laut (Zona C) Km 215.00 - 12,307 - 38,947,513 38,947,513
2 Tonase Ton 14.72 - - - - -
3 - - - -
4 - - - -
JUMLAH C - 38,947,513 38,947,513
JUMLAH (A + B + C) 64,829,044 123,931,617 188,760,662
Terbilang : JUMLAH 188,760,662
Dua Ratus Tujuh Juta Enam Ratus Tiga Puluh Enam Ribu Rupiah PEMBULATAN 188,760,000
PPN 10% 18,876,000
TOTAL 207,636,000

Keterangan :
- RAB Berdasarkan Kontrak KHSJ 2018 PLN WRKR dan Amandemennya

Mengetahui Pekanbaru, 20 Juni 2019


MANAJER, SPV PERENCANAAN,

YANUAR AHMAD ZAKI ARFAN


Menyetujui
MANAJER,

YANUAR
271 129
13550 6450
PT. PLN (Persero)
UNIT INDUK WILAYAH RIAU DAN KEPULAUAN RIAU
UNIT PELAKSANA PROYEK KETENAGALISTRIKAN RIAU

ANALISA BIAYA
TRANSPORTASI DAN BONGKAR MUAT MATERIAL DISTRIBUSI UTAMA (MDU)

PAKET : PAKET 2 (KHSJ JTR)


NO./TGL. SPB-J : .SPBJ/DAN.02.03/UPPK-RIAU/2019 / JUNI 2019
PEKERJAAN : PEMASANGAN JTR LVTC 3x70mm+1x50mm, SEPANJANG 13,55 KMS
LOKASI : DESA PASIR LIMAU KAPAS 2 PT. PLN (Persero) UP3 DUMAI
GUDANG PLN UP3 : RENGAT
SUMBER ANGGARAN : PRK.2019.WRKR.5.003

BERAT KEBUTUHAN MDU TON KM HARGA ONGKOS ANGKUT HARGA BONGKAR MUAT
TOTAL HARGA
NO. URAIAN PEKERJAAN SATUAN MDU SATUAN TONASE JARAK SATUAN JUMLAH SATUAN JUMLAH
VOLUME ZONASI
(Kg/Unit.) (Unit) (Ton.) (Km.) (Rp./TonKM) (Rp.) (Rp./Ton) (Rp.) (Rp.)
a b c d e f = (c x d) / 1000 g h i=fxgxh j k l=fxjxk m=i+l
A TRANSPORTASI DARAT
1 LVTC 3x70+1x50 mm2 1.07 13,821 Mtr 14.72 - 2,497 - 0 64,984.00 - -
2 Tiang besi 9 M - 200 daN 233.00 - Mtr - - 2,497 - 0 64,984.00 - -
3 Tiang besi 11 M - 200 daN 306.00 - Bh - - 2,497 - 0 64,984.00 - -
4 Tiang besi 12 M - 200 daN 347.00 - Set - - 2,497 - 0 64,984.00 - -
5 Tiang besi 12 M - 350 daN 505.00 - Bh - - 2,497 - 0 64,984.00 - -
JUMLAH A - - 14.72 - - -
B TRANSPORTASI LAUT, SUNGAI DAN PERAIRAN
1 LVTC 3x70+1x50 mm2 1.07 - Mtr - - 3,319 - 0 190,540.00 - -
2 Tiang besi 9 M - 200 daN 233.00 - Mtr - - 3,319 - 0 190,540.00 - -
3 Tiang besi 11 M - 200 daN 306.00 - Bh - - 3,319 - 0 190,540.00 - -
4 Tiang besi 12 M - 200 daN 347.00 - Set - - 3,319 - 0 190,540.00 - -
5 Tiang besi 12 M - 350 daN 505.00 - Bh - - 3,319 - 0 190,540.00 - -
JUMLAH B - - - - - -
Terbilang :
nol Rupiah JUMLAH -

Keterangan :
- Perhitungan Biaya/Harga Ongkos Angkut (Transportasi) dan Bongkar Muat Material Distribusi Utama (MDU) Untuk Lokasi Darat, Laut dan Sungai Berdasarkan Addendum/Amandemen I Kontrak Kesepakatan Harga Satuan (KHS)
Jasa Tanggal 24 Juli 2018, pada pasal 3 ayat 9.
Pekanbaru, 05 November 2018
MANAJER SPV. PELAKSANA PENGADAAN

YANUAR AHMAD FAISAL


PT. PLN (Persero)
UNIT INDUK WILAYAH RIAU DAN KEPULAUAN RIAU
UNIT PELAKSANA PROYEK KETENAGALISTRIKAN RIAU

RUTE PENGANGKUTAN DAN BONGKAR MUAT MATERIAL DISTRIBUSI UTAMA (MDU)

PAKET : PAKET 2 (KHSJ JTR)


PEKERJAAN : PEMASANGAN JTR LVTC 3x70mm+1x50mm, SEPANJANG 13,55 KMS
LOKASI : DESA PASIR LIMAU KAPAS 2 PT. PLN (Persero) UP3 DUMAI

START POINT RUTE PERJALANAN


NO. URAIAN SAT VOL KETERANGAN
GUDANG PLN TUJUAN
(Asal MDU) (Lokasi Transit l) (Lokasi Desa/Transit ll) (Lokasi Desa)
A TRANSPORTASI/PENGANGKUTAN
1 Transportasi (Darat) Km - AREA PEKANBARU PLBHN BUTON
Jarak (Km) X Tonase (Ton) X Rp. 5.700,-
2 Transportasi (Laut dan Sungai) Km - PLBHN BUTON DESA SOKOI
Jarak (Km) X Tonase (Ton) X Rp. 11.582,-
B Bongkar Muat 2 X Bongkar Muat
1 LVTC 3x70+1x50 mm2 Mtr 13,821 (1 X Darat, 1 X Perairan)
2 Tiang besi 9 M - 200 daN Btg Err:509
3 Tiang besi 11 M - 200 daN Btg Err:509
4 Tiang besi 12 M - 200 daN Btg Err:509
5 Tiang besi 12 M - 350 daN Btg -

Mengetahui, Pekanbaru, 29 Oktober 2018


MANAJER SPV. PELAKSANA PENGADAAN

YANUAR AHMAD FAISAL


PT. PLN (Persero) TUG-5
UNIT INDUK WILAYAH RIAU DAN KEPULAUAN RIAU FORM REQUEST MATERIAL
UNIT PELAKSANA PROYEK KETENAGALISTRIKAN RIAU NOMOR 0000.TUG-5/LOG.00.02/UPPK-RIAU/2019
TANGGAL XX/XX/2019

DAFTAR PERMINTAAN MATERIAL


KEPADA : LOGISTIK PT PLN (PERSERO) UP3 RENGAT
ALAMAT/LOKASI : DESA PASIR LIMAU KAPAS 2 PT. PLN (Persero) UP3 DUMAI
PEKERJAAN : PEMASANGAN GARDU DISTRIBUSI

NO. KONTRAK/PK/PJ/SPBJ : 0000.SPBJ/DAN.02.03/UPPK-RIAU/2019 / 00 JUNI 2019


SUMBER ANGGARAN : PRK.2019.WRKR.5.004
PELAKSANA/VENDOR : Mengetahui
KEBUTUHAN MATERIAL MDU PEMBANGUNAN JARINGAN LISTRIK DESA
NOMOR PERMINTAAN MATERIAL
NO NAMA MATERIAL KETERANGAN ITEM
MATERIAL JUMLAH SATUAN
MDU GARDU DISTRIBUSI
1 CABLE POWER; NYY 1X70mm2;0.6/1 kV;OH 0003110514 800 Meter
2 CABLE POWER; NYY 1X150mm2;0.6/1 kV;OH 0003110060 400 Meter
3 LA; 21 kV; K; 10 kA; POLYMER; 17 kV 0002090033 - Bh
4 LA; 24 kV; K; 10 kA; POLYMER; 17 kV 0002090046 30 Bh
5 FUSE; 20/24 kV; 100A; TUBE; mini10 kA 0002240226 30 Bh
6 LVSB; DIST; 3P; 380V; 250A; 2LINE; OD (Cantol) - Unit
7 LVSB; DIST; 3P; 380V; 250A; 2LINE; OD 0003260027 10 Unit
8 LVSB; DIST; 3P; 380V; 400A; 4LINE; OD 0003260036 - Unit
9 TRF DIS; D3; 20 kV/400V;3P; 25 kVA; YZN5; OD - Unit
10 TRF DIS; D3; 20 kV/400V;3P; 50 kVA; YZN5; OD 0001030069 5 Unit
11 TRF DIS; D3; 20 kV/400V;3P;100 kVA; YZN5; OD 0001030074 5 Unit
12 TRF DIS; D3; 20 kV/400V;3P;160 kVA; YZN5; OD 0001030063 - Unit
13 TRF DIS; D3; 20 kV/400V;3P;200 kVA; YZN5; OD 0001030011 - Unit
14 POOL STEEL; 20 kV; CIRCL; 12m; 350daN 0003030113 20 Batang
Diterima Tanggal : . . . . . . . . . Disetujui Tanggal : . . . . . . . . . UNIT PELAKSANA PROYEK KETENAGALISTRIKAN (UPPK) RIAU
PENERIMA MENYETUJUI MENGETAHUI/MEMERIKSA, PERMINTAAN OLEH

............................. ............................. YANUAR ARIF RAHMAN


PELAKSANA / PT. . . . . . . . . . . . . . . LOGISTIK/GUDANG PLN AREA . . . . . . . . MANAJER SPV. KONSTRUKSI
PT. PLN (Persero)
UNIT INDUK WILAYAH RIAU DAN KEPULAUAN RIAU
UNIT PELAKSANA PROYEK KETENAGALISTRIKAN RIAU

LAMPIRAN SURAT PESANAN BARANG DAN JASA (SPBJ)

PAKET : PAKET 5 (KHSJ PERALATAN JTM, GARDU)


NO./TGL. SPBJ : 0000.SPBJ/DAN.02.03/UPPK-RIAU/2019 / 00 JUNI 2019
PEKERJAAN : PEMASANGAN GARDU DISTRIBUSI

LOKASI : DESA PASIR LIMAU KAPAS 2 PT. PLN (Persero) UP3 DUMAI
SUMBER ANGGARAN : PRK.2019.WRKR.5.004

HARGA SATUAN JUMLAH HARGA


TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOL MATERIAL JASA MATERIAL JASA
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
A PEMB./PEMASANGAN KONSTRUKSI GARDU DISTRIBUSI
1 Pas. Trafo 3 Phasa 25 KVA/20 KV/B2 Unit - - 629,500 - - -
2 Pas. Trafo 3 Phasa 50 KVA/20 KV/B2 Unit 5 - 916,900 - 4,584,500 4,584,500
3 Pas. Trafo 3 Phasa 100 KVA/20 KV/B2 Unit 5 - 1,204,290 - 6,021,450 6,021,450
4 Pas. Trafo 3 Phasa 160 KVA/20 KV/B2 Unit - - 1,347,990 - - -
5 Pas. Trafo 3 Phasa 200 KVA/20 KV/B2 Unit - - 1,507,610 - - -
6 Kons. Tiang Besi 12 Meter - 350 daN : Btg - - 225,240 - - -
7 Pengecatan Tiang besi 12 M - 350 daN Btg - 31,653 81,540 - - -
8 Pas. Konstruksi Platfrom Tansfomator Gardu Cantol Set 2,926,984 469,880 - - -
9 Pas. Konstruksi Platfrom Tansfomator Gardu Portal Set 10 4,337,552 773,200 43,375,521 7,732,000 51,107,521
10 Pas. LS Board 2 Jurusan Gardu Cantol Unit 829,441 234,940 - - -
11 Pas. LS Board 2 Jurusan Gardu Portal Unit 10 1,221,333 469,880 12,213,332 4,698,800 16,912,132
12 Pas. LS Board 4 Jurusan Gardu Portal Unit - 1,221,333 613,580 - - -
13 Pas. Cut Out + Fuse Link + jamper U/Gardu Set 10 1,578,453 156,630 15,784,528 1,566,300 17,350,828
14 Pas. Lightning Arrester + Jamper U/Gardu Set 10 - 156,630 - 1,566,300 1,566,300
15 Pemasangan Kabel Induk Gardu (NYY 150 mm2) Set 10 2,135,276 629,500 21,352,755 6,295,000 27,647,755
16 Pemasangan Kabel Jurusan (NYY 70 mm2) Set 20 1,901,093 300,330 38,021,855 6,006,600 44,028,455
17 Grounding / Pentanahan Gardu ( GTR ) Set 10 1,496,696 78,310 14,966,957 783,100 15,750,057
18 Pondasi trafo Tiang Portal (Cor Beton 1:2:3 ) Uk. 280x50x30 cm unit 10 229,690 178,410 2,296,902 1,784,100 4,081,002
JUMLAH A 148,011,849 41,038,150 189,049,999
B MATERIAL DISTRIBUSI UTAMA (MDU) Gardu Distribusi
1 Trafo 3 Phasa 25 KVA/20 KV/B2 Unit - PM
2 Trafo 3 Phasa 50 KVA/20 KV/B2 Unit 5 PM - - - -
3 Trafo 3 Phasa 100 KVA/20 KV/B2 Unit 5 PM - - - -
4 Trafo 3 Phasa 160 KVA/20 KV/B2 Unit - PM - - - -
5 Trafo 3 Phasa 200 KVA/20 KV/B2 Unit - PM - - - -
6 Tiang Besi 12 Meter - 350 daN : Btg 20 PM - - - -
7 LS Board 2 Jurusan Gardu Cantol Unit - PM - - - -
8 LS Board 2 Jurusan Gardu Portal Unit 10 PM - - - -
9 LS Board 4 Jurusan Gardu Portal Unit - PM - - - -
10 Pas. Cut Out + Fuse Link + jamper U/Gardu Bh 30 PM - - - -
11 Pas. Lightning Arrester + Jamper U/Gardu Bh 30 PM - - - -
12 Pemasangan Kabel Induk Gardu (NYY 150 mm2) Meter 400 PM - - - -
13 Pemasangan Kabel Jurusan (NYY 70 mm2) Meter 800 PM - - - -
JUMLAH B - - -
C ONGKOS ANGKUT DAN BONGKAR MUAT
1 Transportasi Darat + Laut (Zona C) Km 215.00 - 12,307 - 5,852,500 5,852,500
2 Tonase Ton 2.21 - - - - -
3 - - - -
4 - - - -
JUMLAH C - 5,852,500 5,852,500
JUMLAH (A + B + C) 148,011,849 46,890,650 194,902,499
Terbilang : JUMLAH 194,902,499
Dua Ratus Empat Belas Juta Tiga Ratus Sembilan Puluh Dua Ribu Dua Ratus Rupiah PEMBULATAN 194,902,000
PPN 10% 19,490,200
TOTAL 214,392,200

Keterangan :
- RAB Berdasarkan Kontrak KHSJ 2018 PLN WRKR dan Amandemennya

Mengetahui Pekanbaru, 20 Juni 2019


MANAJER, SPV PERENCANAAN,

YANUAR AHMAD ZAKI ARFAN


PT. PLN (Persero)
UNIT INDUK WILAYAH RIAU DAN KEPULAUAN RIAU
UNIT PELAKSANA PROYEK KETENAGALISTRIKAN RIAU

ANALISA BIAYA
TRANSPORTASI DAN BONGKAR MUAT MATERIAL DISTRIBUSI UTAMA (MDU)

PAKET : PAKET 5 (KHSJ PERALATAN JTM, GARDU)


NO./TGL. SPB-J : 0000.SPBJ/DAN.02.03/UPPK-RIAU/2019 / 00 JUNI 2019
PEKERJAAN : PEMASANGAN GARDU DISTRIBUSI
LOKASI : DESA PASIR LIMAU KAPAS 2 PT. PLN (Persero) UP3 DUMAI
GUDANG PLN UP3 : RENGAT
SUMBER ANGGARAN : PRK.2019.WRKR.5.004

BERAT KEBUTUHAN MDU TON KM HARGA ONGKOS ANGKUT HARGA BONGKAR MUAT
TOTAL HARGA
NO. URAIAN PEKERJAAN SATUAN MDU SATUAN TONASE JARAK SATUAN JUMLAH JUMLAH SATUAN JUMLAH
VOLUME
(Kg/Unit.) (Unit) (Ton.) (Km.) (Rp./TonKM) (Rp.) BONGKAR MUAT (Rp./Ton) (Rp.) (Rp.)
a b c d e f = (c x d) / 1000 g h i=fxgxh j k l=fxjxk m=i+l
A TRANSPORTASI DARAT
1 Trafo 3 Phasa 50 KVA/20 KV/B2 510.00 - Mtr - - 2,497 - 0 64,984.00 - -
2 Trafo 3 Phasa 100 KVA/20 KV/B2 810.00 2 Mtr 1.62 - 2,497 - 0 64,984.00 - -
3 Trafo 3 Phasa 160 KVA/20 KV/B2 850.00 - Bh - - 2,497 - 0 64,984.00 - -
4 Trafo 3 Phasa 200 KVA/20 KV/B2 1,050.00 - Set - - 2,497 - 0 64,984.00 - -
5 Tiang Besi 12 Meter - 350 daN : 505.00 - Bh - - 2,497 - 0 64,984.00 - -
6 LS Board 2 Jurusan Gardu Portal 160.00 3 Set 0.48 - 2,497 - 0 64,984.00 - -
7 Pas. LS Board 4 Jurusan Gardu Portal 160.00 - Unit - - 2,497 - 0 64,984.00 - -
8 Pas. Cut Out + Fuse Link + jamper U/Gardu 4.20 - Bh - - 2,497 - 0 64,984.00 - -
9 Pas. Lightning Arrester + Jamper U/Gardu 4.13 - Bh - - 2,497 - 0 64,984.00 - -
10 Pemasangan Kabel Induk Gardu (NYY 150 mm2) 1.07 - Mtr - - 2,497 - 0 64,984.00 - -
11 Pemasangan Kabel Jurusan (NYY 70 mm2) 1.07 105 Mtr 0.11 - 2,497 - 0 64,984.00 - -
12 Load Breaker Switch 642.00 - Unit - - 2,497 - 0 64,984.00 - -
JUMLAH A - - - 2.2 - - -
B TRANSPORTASI LAUT, SUNGAI DAN PERAIRAN
1 Trafo 3 Phasa 50 KVA/20 KV/B2 510.00 - Mtr - - 3,319 - 0 190,540.00 - -
2 Trafo 3 Phasa 100 KVA/20 KV/B2 810.00 - Mtr - - 3,319 - 0 190,540.00 - -
3 Trafo 3 Phasa 160 KVA/20 KV/B2 850.00 - Bh - - 3,319 - 0 190,540.00 - -
4 Trafo 3 Phasa 200 KVA/20 KV/B2 1,050.00 - Set - - 3,319 - 0 190,540.00 - -
5 Tiang Besi 12 Meter - 350 daN : 505.00 - Bh - - 3,319 - 0 190,540.00 - -
6 LS Board 2 Jurusan Gardu Portal 160.00 - Set - - 3,319 - 0 190,540.00 - -
7 Pas. LS Board 4 Jurusan Gardu Portal 160.00 - Btg - - 3,319 - 0 190,540.00 - -
8 Pas. Cut Out + Fuse Link + jamper U/Gardu 4.20 - Btg - - 3,319 - 0 190,540.00 - -
9 Pas. Lightning Arrester + Jamper U/Gardu 4.13 - Btg - - 3,319 - 0 190,540.00 - -
10 Pemasangan Kabel Induk Gardu (NYY 150 mm2) 1.07 - Btg - - 3,319 - 0 190,540.00 - -
11 Pemasangan Kabel Jurusan (NYY 70 mm2) 1.07 - Btg - - 3,319 - 0 190,540.00 - -
12 Load Breaker Switch 642.00 - Btg - - 3,319 - 0 190,540.00 - -
JUMLAH B - - - 0.0 - - -
Terbilang :
nol Rupiah JUMLAH -

Keterangan :
- Perhitungan Biaya/Harga Ongkos Angkut (Transportasi) dan Bongkar Muat Material Distribusi Utama (MDU) Untuk Lokasi Darat, Laut dan Sungai Berdasarkan Addendum/Amandemen I Kontrak Kesepakatan Harga Satuan (KHS) Jasa Tanggal
24 Juli 2018, pada pasal 3 ayat 9.
Pekanbaru, 05 November 2018
MANAJER SPV. PELAKSANA PENGADAAN

YANUAR AHMAD FAISAL


PT. PLN (Persero)
UNIT INDUK WILAYAH RIAU DAN KEPULAUAN RIAU
UNIT PELAKSANA PROYEK KETENAGALISTRIKAN RIAU

RUTE PENGANGKUTAN DAN BONGKAR MUAT MATERIAL DISTRIBUSI UTAMA (MDU)

PAKET : PAKET 5 (KHSJ PERALATAN JTM, GARDU)


PEKERJAAN : PEMASANGAN GARDU DISTRIBUSI
LOKASI : DESA PASIR LIMAU KAPAS 2 PT. PLN (Persero) UP3 DUMAI

START POINT RUTE PERJALANAN


NO. URAIAN SAT VOL KETERANGAN
GUDANG PLN TUJUAN
(Asal MDU) (Lokasi Transit l) (Lokasi Desa/Transit ll) (Lokasi Desa)
A TRANSPORTASI/PENGANGKUTAN
1 Transportasi (Darat) Km 137 AREA PEKANBARU PLBHN BUTON
Jarak (Km) X Tonase (Ton) X Rp. 5.700,-
2 Transportasi (Laut dan Sungai) Km 130.86 PLBHN BUTON DESA SOKOI
Jarak (Km) X Tonase (Ton) X Rp. 11.582,-
B Bongkar Muat 2 X Bongkar Muat
1 Trafo 3 Phasa 50 KVA/20 KV/B2 Unit 5 (1 X Darat, 1 X Perairan)
2 Trafo 3 Phasa 100 KVA/20 KV/B2 Unit 5
3 Trafo 3 Phasa 160 KVA/20 KV/B2 Unit -
4 Trafo 3 Phasa 200 KVA/20 KV/B2 Unit -
5 Tiang Besi 12 Meter - 350 daN : Btg 20
6 LS Board 2 Jurusan Gardu Portal Set 10
7 LS Board 4 Jurusan Gardu Portal Set -
8 Pas. Cut Out + Fuse Link + jamper U/Gardu Bh 30
9 Pas. Lightning Arrester + Jamper U/Gardu Bh 30
10 Pemasangan Kabel Induk Gardu (NYY 150 mm2) Meter 400
11 Pemasangan Kabel Jurusan (NYY 70 mm2) Meter 800
12 Load Breaker Switch Unit -

Mengetahui, Pekanbaru, 29 Oktober 2018


MANAJER SPV. PELAKSANA PENGADAAN

YANUAR AHMAD FAISAL

Anda mungkin juga menyukai