5101
07:30:00
Relfitriansyah Putra
PT INDONESIA POWER
OPERATION AND MAINTENANCE SERVICE UNIT
LEMBAR PENGESAHAN
LAPORAN HARIAN OPERASI PLTU BERAU OMU
------oooOooo-----
10:30:00
11:00:00
11:30:00
12:00:00
12:30:00
13:00:00
13:30:00
14:00:00
14:30:00
15:00:00
15:30:00
16:00:00
16:30:00
19:00:00
19:30:00
20:00:00
20:30:00
21:00:00
21:30:00
22:00:00
22:30:00
23:00:00
23:30:00
00:00:00
00:30:00
01:00:00
01:30:00
02:00:00
02:30:00
03:00:00
03:30:00
04:00:00
06:30:00
07:00:00
07:30:00
08:00:00
08:30:00
09:00:00
09:30:00
10:00:00
17:00:00
17:30:00
18:00:00
18:30:00
04:30:00
05:00:00
05:30:00
06:00:00
18:30:00 3500 4772 3681 1397 0 1091 0.97 50.63 21 Load following Dispatcher
19:00:00 3500 5278 4156 1427 0 1122 0.97 50.93 17 Load following Dispatcher
19:30:00 3500 5113 3972 1258 0 1141 0.97 50.93 43 Load following Dispatcher ROH Beban Gross (KW) Beban Aktif (KW) Beban Reaktif (KVAR) UAT IMPORT UAT EXPORT
20:00:00 3500 5204 4080 1412 0 1124 0.96 50.75 44 Load following Dispatcher
20:30:00 3500 5176 4118 1448 0 1058 0.96 50.75 50 Load following Dispatcher
21:00:00 3500 5301 4234 1315 0 1067 0.96 51.07 50 Load following Dispatcher
21:30:00 3500 5229 4165 1233 0 1064 0.97 51.07 38 Load following Dispatcher
22:00:00 3500 5152 4049 1535 0 1103 0.96 50.95 24 Load following Dispatcher
22:30:00 3500 5414 4316 1468 0 1098 0.97 50.76 24 Load following Dispatcher
23:00:00 3500 5559 4421 1253 0 1138 0.98 50.98 24 Load following Dispatcher
23:30:00 3500 5565 4438 1243 0 1127 0.97 50.72 41 Load following Dispatcher
00:00:00 3500 5140 4015 1006 0 1125 0.98 51.09 44 Load following Dispatcher
00:30:00 3500 4833 3765 875 0 1068 0.99 50.98 40 Load following Dispatcher
01:00:00 3500 4811 3683 1008 0 1128 0.98 50.82 31 Load following Dispatcher
01:30:00 3500 4834 3694 1049 0 1140 0.98 50.90 24 Load following Dispatcher
02:00:00 3500 5028 3885 1064 0 1143 0.97 50.90 34 Load following Dispatcher
02:30:00 3500 4644 3501 1171 0 1143 0.97 50.87 35 Load following Dispatcher
03:00:00 3500 4635 3516 1182 0 1119 0.97 50.82 16 Load following Dispatcher
03:30:00 3500 4845 3714 1074 0 1131 0.97 50.90 18 Load following Dispatcher
04:00:00 3500 4840 3702 1146 0 1138 0.97 50.89 38 Load following Dispatcher
04:30:00 3500 4776 3674 1130 0 1102 0.97 51.01 47 Load following Dispatcher
05:00:00 3500 5059 4057 1110 0 1002 0.98 50.76 41 Load following Dispatcher
05:30:00 3500 5687 4568 1074 0 1119 0.98 51.10 32 Load following Dispatcher
06:00:00 3500 5845 4712 1115 0 1133 0.98 50.79 26 Load following Dispatcher
06:30:00 3500 5543 4427 916 0 1116 0.98 51.02 31 Load following Dispatcher
07:00:00 3500 5037 4001 1064 0 1036 0.98 50.90 25 Load following Dispatcher
07:30:00 3500 5392 4365 1141 0 1027 0.98 50.94 16 Load following Dispatcher
08:00:00 3500 5430 4350 1176 0 1080 0.98 50.98 42 Load following Dispatcher
08:30:00 3500 4648 3610 1954 0 1038 0.92 50.52 24 Load following Dispatcher
09:00:00 3500 6057 5036 1775 0 1021 0.96 50.84 16 Load following Dispatcher
09:30:00 3500 5604 4588 1867 0 1016 0.95 51.13 12 Load following Dispatcher
10:00:00 3500 5270 4138 1750 0 1132 0.95 51.15 14 Load following Dispatcher
Nett max Nett min Nett average
5261 2206 3734
Total produksi 124688 98522
Total UAT (IMPORT)
0
Total UAT (EXPORT) 26166
GRAFIK PEMBEBANAN
No. Dokumen BEU.05.02.54 Rabu , 23 Februari 2022
11 Januari 2019
MONITORING REALISASI BEBAN
Revisi 00
Halaman 4 dari 10
Hari/Tanggal : Rabu , 23 Februari 2022
Beban Gross Beban Aktif Beban Reaktif
Jam ROH UAT IMPORT UAT EXPORT Cos ϕ Frekuensi (Hz) Level Bunker KETERANGAN 10000
(KW) (KW) (KVAR)
10:30:00 3500 5235 4528 1606 0 707 0.95 50.62 35 Load following Dispatcher 9500
11:00:00 3500 5287 4557 1453 0 730 0.96 51.03 52 Load following Dispatcher 9000
11:30:00 3500 4940 4213 1315 0 727 0.96 51.12 54 Load following Dispatcher 8500
12:00:00 3500 4797 4073 1212 0 724 0.96 51.17 54 Load following Dispatcher 8000
7500
12:30:00 3500 5085 4353 1197 0 732 0.97 51.17 43 Load following Dispatcher
7000
13:00:00 3500 4683 3960 1294 0 723 0.96 50.96 43 Load following Dispatcher
6500
13:30:00 3500 4247 3562 1484 0 685 0.94 50.53 33 Load following Dispatcher
6000
14:00:00 3500 4261 3564 1509 0 697 0.94 50.75 26 Load following Dispatcher
5500
14:30:00 3500 5317 4610 1228 0 707 0.97 51.10 24 Load following Dispatcher
5000
15:00:00 3500 5100 4390 1345 0 710 0.96 50.94 0 Load following Dispatcher
4500
15:30:00 3500 4413 3684 1263 0 729 0.96 50.94 27 Load following Dispatcher 4000
16:00:00 3500 5356 4625 1274 0 731 0.96 51.03 39 Load following Dispatcher 3500
16:30:00 3500 4525 3796 1294 0 729 0.96 50.75 50 Load following Dispatcher 3000
17:00:00 3500 4489 3791 1156 0 698 0.96 51.12 48 Load following Dispatcher 2500
17:30:00 3500 4695 3960 1110 0 735 0.96 50.79 42 Load following Dispatcher 2000
18:00:00 3500 5634 4912 1258 0 722 0.97 50.60 40 Load following Dispatcher 1500
18:30:00 3500 5485 4774 1258 0 711 0.97 50.63 21 Load following Dispatcher 1000
19:00:00 3500 5360 4654 1171 0 706 0.97 50.93 45 Load following Dispatcher 500
19:30:00 3500 4731 3999 1171 0 732 0.97 50.93 53 Load following Dispatcher 0
20:00:00 3500 5141 4419 890 0 722 0.96 50.75 47 Load following Dispatcher
20:30:00 3500 5074 4345 910 0 729 0.98 51.08 41 Load following Dispatcher
ROH Beban Gross (KW) Beban Aktif (KW) Beban Reaktif (KVAR) UAT IMPORT UAT EXPORT
21:00:00 3500 5315 4617 910 0 698 0.98 50.89 34 Load following Dispatcher
21:30:00 3500 4901 4165 931 0 736 0.97 51.07 23 Load following Dispatcher
22:00:00 3500 5256 4536 1043 0 720 0.98 50.96 29 Load following Dispatcher s
22:30:00 3500 4691 3967 1524 0 724 0.95 50.76 32 Load following Dispatcher
23:00:00 3500 4813 4083 1499 0 730 0.95 50.98 47 Load following Dispatcher
23:30:00 3500 4808 4104 1315 0 704 0.96 51.04 46 Load following Dispatcher
00:00:00 3500 4878 4146 1151 0 732 0.97 51.09 45 Load following Dispatcher
00:30:00 3500 5233 4507 1207 0 726 0.97 50.98 38 Load following Dispatcher
01:00:00 3500 5017 4286 1151 0 731 0.97 50.82 33 Load following Dispatcher
01:30:00 3500 5443 4736 1151 0 707 0.98 50.90 36 Load following Dispatcher
02:00:00 3500 5221 4501 1089 0 720 0.97 50.90 54 Load following Dispatcher
02:30:00 3500 4870 4165 1176 0 705 0.97 50.87 59 Load following Dispatcher
03:00:00 3500 4478 3752 1146 0 726 0.97 50.82 64 Load following Dispatcher
03:30:00 3500 4426 3697 1074 0 729 0.97 50.90 61 Load following Dispatcher
04:00:00 3500 4447 3741 1156 0 706 0.97 50.89 55 Load following Dispatcher
04:30:00 3500 4172 3444 1182 0 728 0.96 51.04 50 Load following Dispatcher
05:00:00 3500 4279 3576 1228 0 703 0.96 50.73 46 Load following Dispatcher
05:30:00 3500 3907 3176 1202 0 731 0.96 51.04 46 Load following Dispatcher
06:00:00 3500 4471 3769 1217 0 702 0.96 50.82 45 Load following Dispatcher
06:30:00 3500 3918 3195 1171 0 723 0.95 51.02 52 Load following Dispatcher
07:00:00 3500 3960 3235 1202 0 725 0.95 50.90 47 Load following Dispatcher
07:30:00 3500 3911 3202 1166 0 709 0.96 50.94 43 Load following Dispatcher
08:00:00 3500 3908 3108 1171 0 800 0.96 50.98 36 Load following Dispatcher
08:30:00 3500 4197 3496 1627 0 701 0.93 50.52 41 Load following Dispatcher
09:00:00 3500 4602 3899 1498 0 703 0.95 50.84 35 Load following Dispatcher
09:30:00 3500 4775 4048 1632 0 727 0.94 51.13 34 Load following Dispatcher
10:00:00 3500 4694 3973 1448 0 721 0.95 51.15 32 Load following Dispatcher
Nett max Nett min Nett average
4912 3108 4010
UNIT 2
Jam mulai Jam akhir Stand Awal Stand Akhir
HARIAN Tonnage
loading Loading Belt Weigher Belt Weigher
10:01 10:58 63460.55 63490.79 30.240
Kalibrasi belt weigher 63523.49 63530.98 7.490
15:35 16:17 63544.65 63566.98 22.330
18:27 19:00 63583.91 63604.37 20.460
21:40 21:57 63628.54 63637.03 8.490
22:18 23:08 63637.03 63660.6 23.570
01:14 02:40 63679.58 63718.83 39.250
JAM 10-10 06:02 06:25 63744.36 63755.89 11.530
08:13 08:41 63766.39 63770.84 4.450
09:16 09:23 63770.84 63773.91 3.070
0.000
0.000
0.000
0.000
0.000
Total pemakaian 170.880
No. Dokumen BEU.05.02.54
Tanggal Terbit 11 Januari 2019
MONITORING PEMAKAIAN HSD HARIAN Revisi 00
Halaman 6 dari 10
Hari/Tanggal Rabu , 23 Februari 2022
ALBES KEPERLUAN UNIT
SHIFT DT-01 DT-02 DT-03 DT-04 DT-05 DT-06 DT-07 FORKLIFT DOZER-01 LOADER-01 BSDG EXCA-02 DAMKAR CAR WATER EDG FIRING #1 FIRING #2
Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter
100
75
Pagi
07:00 - 15:00 WITA
Siang
15:00 - 22:00 WITA
Malam
22:00 - 07:00 WITA
Tanggal
TANGGAL LAPORAN KUALITAS AIR - UAP INTERNAL TREATMENT
Revisi
HARI Halaman
JAM (WITA)
Sampling Point Parameter Satuan Standard
08:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 00:00 02:00 04:00 06:00
47
CC µS/cm ≤ 0,3 0,000 0,012 0,032 0,03 42,00 41,00 39,00 32,00 0,045 41,000 38,000
6.95
SC µS/cm ≤ 10 9,51 9,6 9,5 9,34 7.39 7.28 9.47 9.14 7.57 7.15 7.09
9.47
pH 9,2 - 9,6 9,25 9,24 9,21 9,20 9.28 9.22 9.4 9.42 9,48 9.5 9.55
9.52
pH 9,2 - 9,6 9,44 9,49 9,46 9,39 9.33 9.36 9.43 9.4 9.44 9.45 9.47
Condensate Water
SiO2 µg/L ≤ 80
(Deaerator Inlet)
Na+ µg/L ≤ 10
Iron µg/L ≤ 80
Dissolved 19.5
µg/L ≤ 30 16,00 21,40 24,30 23,20 24.4 25.1 22.1 20.9 21,80 22.12 20.6
Oxygen
Dissolved
µg/L ≤ 30
Oxygen
Hardness mg/L ~0
SC µS/cm ≤ 0,2
Hardness mg/L ~0
Make Up Water
33.52
CC µS/cm ≤ 0,3 37,9 37,7 37,6 37,1 37.96 35.45 38.45 37.52 38,6 38.12 35.56
SiO2 µg/L ≤ 10
Dissolved 285.3
Deaerator Outlet µg/L ≤ 10 317,70 384,20 311,60 301,50 359 332.9 315.2 332.8 328,50 312.9 299.5
Oxygen
8.95
SC µS/cm ≤ 10 9,97 10,0 10,0 9,9 8.91 8.85 10.7 9.86 8.83 8.56 9.12
9.18
pH 9,2 - 9,6 9,21 9,21 9,19 9,18 9.18 9.2 9.24 9.22 9,19 9.2 9.22
9.52
pH 9,2 - 9,6 9,46 9,52 9,47 9,43 9.39 9.4 9.42 9.44 9.49 9.5 9.55
49.8
Hydrazine µg/L 10 - 50 65,4 70,2 55,6 52,1 50.7 48.2 55.4 50.7 49,6 50.6 54.2
Feed Water
(Economizer Inlet) Hydrazine µg/L 10 - 50
SiO2 µg/L ≤ 60
Iron µg/L ≤ 10
Dissolved
µg/L ≤5
Oxygen
Hardness mg/L ~0
6.77
SC µS/cm ≤ 50 9,09 9,21 9,48 9,65 5.75 9.65 7.65 6.95 6.61 6.55 6.75
9.33
pH 9,2 - 9,6 9,45 9,40 9,42 9,44 9.31 9.33 9.3 9.33 9.36 9.25 9.31
Boiler Water
46
SiO2 µg/L ≤ 200 64 68 67 66 51 55 33 55 43 51 55
Cl - mg/L ≤ 0,5
SC µS/cm ≤ 10
pH 9,2 - 9,6
Superheated Steam
SiO2 µg/L ≤ 20
SiO2 µg/L ≤ 20
CBD Opening % 2 2 2 2 2 2 2
Boiler Pressure Mpa 4,1 4,1 4,0 3.8 3.7 3.8 3.9
UNIT 2 No. Dokumen BEU.05.02.54
Tanggal 11-Jan-19
HARI & TANGGAL #REF! LAPORAN KUALITAS AIR - UAP INTERNAL TREATMENT Revisi 0
Halaman 9 dari 10
JAM (WITA)
Sampling Point Parameter Satuan Standard
08:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 00:00 02:00 04:00 06:00
CC µS/cm ≤ 0,3 0,664 0,715 0,658 0,62 705,00 711,00 680,00 677,00 0,792 668,000 771,000 722
SC µS/cm ≤ 10 9,3 9,4 9,0 8,87 7.69 7.54 8.52 8.09 6.34 8.15 8.05 7.91
pH 9,2 - 9,6 8,86 8,82 8,79 8,75 8.83 9.1 8.86 8.74 8,88 9.95 9.12 9.2
pH 9,2 - 9,6 9,50 9,55 9,51 9,48 9.42 9.44 9.28 9.3 9.33 9.45 9.42 9.39
Condensate Water SiO2 µg/L ≤ 80
(Deaerator Inlet) Na+ µg/L ≤ 10
Iron µg/L ≤ 80
Dissolved Oxygen µg/L ≤ 30 0,00 0,00 0,00 0,00 0 0 0 0 0,00 0 0 0
Dissolved Oxygen µg/L ≤ 30
Hardness mg/L ~0
SC µS/cm ≤ 0,2
Hardness mg/L ~0
Make Up Water
CC µS/cm ≤ 0,3 0,5 0,5 0,3 0,3 394,0 354.2 500,0 512,0 0,5 455,0 428,0 419
SiO2 µg/L ≤ 10
Deaerator Outlet Dissolved Oxygen µg/L ≤ 10 0,00 0,00 0,00 0,00 - - - - - - - -
SC µS/cm ≤ 10 10,4 10,6 9,2 9,1 8.94 8.74 8.17 8.55 7.92 7.86 6.99 7.02
pH 9,2 - 9,6 10,08 10,00 9,99 9,99 9.97 9.91 9.91 9.98 9,93 9.78 9.88 9.92
pH 9,2 - 9,6 9,52 9,57 9,52 9,49 9.45 9.47 9.33 9.34 9.42 9.44 9.51 9.47
Hydrazine µg/L 10 - 50 4,0 4,0 7,0 7,5 4.9 5.3 3.8 4.4 2,4 5.8 5.5 4.1
Feed Water
(Economizer Inlet) Hydrazine µg/L 10 - 50
SiO2 µg/L ≤ 60
Iron µg/L ≤ 10
Dissolved Oxygen µg/L ≤5
Hardness mg/L ~0
SC µS/cm ≤ 50 9,46 9,67 8,12 6,73 8.6 8.66 6.3 6.54 8.53 7.56 8.08 8.14
pH 9,2 - 9,6 9,32 9,39 9,37 9,33 9.39 9.4 9.26 9.31 9.48 9.5 9.54 9.49
Phosphate mg/L 0,2 - 1,0
SiO2 µg/L ≤ 200 0,0 0,0 0,0 0,0 0 0 0 0 0,0 0 0 0
Boiler Water
SiO2 µg/L ≤ 200 26 29 35 42 44 39 33 42 36 48 55 0.62
Iron µg/L ≤ 100
Cl- mg/L ≤ 0,5
SO42- mg/L ≤ 1,5
Saturated Steam SiO2 µg/L ≤ 20
SC µS/cm ≤ 10
pH 9,2 - 9,6
Superheated Steam
SiO2 µg/L ≤ 20
SiO2 µg/L ≤ 20
Load MW 3,6 4,8 4,1 5.2 5.7 4.9 5.1
CBD Opening % 5 5 5 5 5 5 5
Boiler Pressure Mpa 4,4 4,5 4,6 4.1 4.1 4.3 4.1
UNIT Common No. Dokumen BEU.05.02.54
Tanggal 11-Jan-19
HARI & TANGGAL Rabu , 23 Februari 2022 LAPORAN KUALITAS AIR-UAP EKSTERNAL TREATMENT Revisi 0
Halaman 10 dari 10
ITEM PARAMETER SATUAN STANDARD
JAM (WITA)
08:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 00:00 02:00 04:00 06:00
Inta ke Pump A Pressure Bar 2 2 2 2 2 2 2 2 2 2
P Inta ke Pump B Pressure Bar 2 2 2 2 2 2 2 2 2 2
R Pra s edi men Pump A Pressure Bar
Inlet Pressure Mpa 1,4 1.2 1.2 1.2 1.2 1.2 1.2 1.2
Flow m³/hr ~2 2,6 2.4 2.4 2.4 2.4 2.4 2.4 2.4
D
Counductivity uS/cm 0.3 0,084 0.083. 0,081. 0.082. 0.081. 0.082. 0.084. 0.086.
E Mi x Bed A
Hardness ppm 0
M
I pH 6,58 6.77 6.66 6.96 6.62 6.54 6.46 6.6
N SiO2 ppb ≤5 90 98 89 99 86 72 68 62
TSS ~50
pH 6 -9 6,65 7,01 7,25 7,09 6.98 7.18 7.12 7.24 7.62 7.52 6.81 6.92
W Minyak dan Lemak mg/l ~1
W Cl mg/l 0.03
ACF da n MMF Krom Total mg/l
T
Cu mg/l ~0,02
P Fe mg/l ~0,3
Zn mg/l ~0,05
PO4 mg/l ~0,2
No. Dokumen BEU.05.02.54
Tanggal Terbit 11 Januari 2019
DOKUMENTASI KEGIATAN HARIAN OPERASI Revisi 00
Halaman
Welding support Wjp 2A Melanjutkan perbaikan bel conveyor 1A Penggantian selang hose oil gear box SAC B
Pengcekan flow meter intake pump Penataan ash valey Cleaning strainer oil cooler unit 1
Cleaning filter udara loader Drain fly ash silo Kalibrasi belt weigher line B